Designer's Risk Assessment & Hazard Identification Date: Analysed by: Analysed by (person): Sheet Number: Project: Project No: Drawing Ref: Design Hazard Design Hazard of Task/Element 1. Modifications to fire alarm systems, HIGH 1 False Fire alarms, incorrect installation. Non competent staff for such work. No expansion in system. Existing System out of date. 2. Removal of wall/forming 2.Collapse of structure, Non competent openings HIGH staff for such work 3. Hazardous material HIGH 3. Asbestos within structure Contamination of duct work 4. Demolition material HIGH 4. Material from activity and transport through building. Interaction with users in the building, noise, dust 5. Installation of new ceilings HIGH 5. Non competent staff for such work Use of metal grids. Working at height/falls Cuts, punctures from metal. Collapse of ceiling incorrect installation, 6. New electrical services HIGH 6. Electrical shock/burns, electrocution Non competent staff for such work 7. Decorating HIGH 7. Non competent staff for such work Working at height/falls 8. Installation of floor coverings HIGH 8. Manual handling adhesives, levelling screed 9. Plastering and fixing plasterboard HIGH 9. Manual handling , fixing, cutting drilling . Non competent staff for such work Document Control Document ref: EM32-03 Design Risk Assessment Approved: Simon Chubb, Environment Manager, 09/11/11 Residual Risk Assessment 1.1 Check existing system can be extended. 1.2 Only certified and competent contractor for such works carries out installation. LOW 2.1 Check walls none load bearing. 2.2 Any doubt get Struc Engr report/details. LOW 3. 1 Check asbestos survey for the area. 3.2 Obtain a schedule of materials used in ductwork from client department. Any doubt treat as contaminated. 3.3 Allow for specialist contractor to remove. 3.4 Only certified and competent contractor for such works to carry out work 3.5 Contractors method statement required LOW 4.1 Segregate storage areas,. 4.2 Carry out work out of tuition time. 4.3 Segregate routes out of building Contractors method statement required LOW 5.1 Only certified and competent contractor for such works to carry out works 5.2 Works to be installed to manufactures written instruction for such ceilings specified 5.3 Contractors method statement required for all works including access equipment. 5.4 Use only approved steps, ladders and access towers. LOW 6.1 Only certified and competent contractor for such works to carry out work 6.2 Contractors method statement required for all works including temporary electrical installations LOW 7.1 Contractors method statement required for all works including access equipment 7.1 Use only approved steps, ladders and access towers. LOW 8. 1 Only certified and competent contractor for such works to carry out work 8.2 Contractors method statement required for all works COSHH statement for materials used. LOW 9. 1 Only certified and competent contractor for such works to carry out work. 9.2 Segregated waste disposal required from Page 1 of 3 Design Hazard Design Hazard of Task/Element Residual Risk Assessment general builders rubble. 9.3 Contractors method statement required for all works including disposal of the off cuts. 9.4 Specific PPE required to be worn. Face mask. LOW 10. Movement of staff, students including interaction with contractors. HIGH 11. Disabled access and egress HIGH 10. Moving equipment and waste through corridors. Obstructing fire exits and corridors 10.1 All demolition materials to be bagged up and moved through agreed route. 10.2 All new materials to be moved through agree route ensuring protection of students, staff. Use of a banks man. 10.3 All fire exit routes and exits to be maintained. 10.4 No fire exits to be blocked or routes unless agreed by the University or its agents. Such needs to be recorded and alternatives agreed. LOW 11. Access and Egress of disabled persons. 11.1 All work shall be designed and Lack of compliance with Equality Act and constructed to the Equality Act and DDA Act. DDA Act. 11.2 Use of powered access and egress to doors. In areas agreed with Risk Management. 11.3 Use of localised Fire detection on each side of Fire doors in such areas of access. LOW Risk Rating Assessment To be Actioned by High Risk Medium Risk Low Risk ENVIRONMENTAL RISK ASSESSMENT Environmental Risk Analysis will be carried out by Authorising Building/Project Officer. Environment Team will audit selected projects. Where assistance is required contact Environment Team. Copy of this assessment to be retained in project file Design Hazard Is hazard covered by existing control measures? Dust, fumes, noise & nuisance Work Instruction 01-01: Control of Dust, Noise & Nuisance Work Instruction issue 1 Work Instruction 06-01: Control of Emissions to Air Work Instruction issue 1 Work Instruction 04-01: Storage of Fuels, Oils & Chemicals Work Instruction issue 1 Work Instruction 05-01: Oil and chemical spill procedure Work Instruction 08-01: Storage of Paints & Solvents Work Instruction issue 1 Work Instruction 09-01: Procedure for Using Spill Kits Work Instruction issue 1 Work Instruction 07-01: Wildlife and Archaeology Work Instruction issue 1 Standard Specifications – Materials & Workmanship Design Guide Pollution of land or water Wildlife or archaeology Energy, water or materials consumption Document Control Document ref: EM32-03 Design Risk Assessment Approved: Simon Chubb, Environment Manager, 09/11/11 Please tick to confirm and consult Environment Team regarding residual risks. Yes No Page 2 of 3 ENVIRONMENTAL RISK ASSESSMENT Environmental Risk Analysis will be carried out by Authorising Building/Project Officer. Environment Team will audit selected projects. Where assistance is required contact Environment Team. Copy of this assessment to be retained in project file Design Hazard Is hazard covered by existing control measures? Waste Work Instruction 02-01: Waste Management Work Instruction issue 1 Work Instruction 03-01: Hazardous Waste Management Work Instruction issue 1 Please tick to confirm and consult Environment Team regarding residual risks. Yes No Fire : Is the design in accordance with BS9999 and the Anglia Ruskin Red Book ? Y/N Possible Control Measures : Briefly outline measures required to avoid or minimise residual risk. Delete/add as required. 1. Isolate all services to avoid electrical shock, false fire 7. Trained and competent electrical installer shall be alarms, water damage. employed. All work to be current IEE regulations. 2. Provide temp support to structure, check load bearing walls 8. Manual handling assessment required, before removal of walls 9. Use of adhesives and levelling screed and all other 3. Asbestos register shall be checked by the contractor before materials/substances that are products that could have an works start in the area. effect on people. The contractor shall provide COSHH 4. Agree removal process and segregation of the area/route assessment needed included within the method statement. before works starts. This route to include Maintaining 10. Contractor to use appropriate PPE when cutting. means of Escape and Fire exit routes during the course of 11. Contractor to dispose of cuttings in separate designated the works both in the area and its immediate area/corridors container and in accordance with National regulations for adjacent to the works. Contractor shall allow for any disposal of waste from the project. barriers/tape/.direction signs as required. 5. Installation of ceiling/falls from height use approved steps, ladders and or mobile scaffolding. 6. The contractor shall comply with working at height regulations in respect to all steps, scaffolding, working platforms used during the work/project. GENERAL NOTES/REQUIREMENTS FROM CONTRACTOR. Contractor to submit full method statement for each activity together with Construction risk assessment and necessary COSHH assessment to the Building Officer before work starts on site. Document Control Document ref: EM32-03 Design Risk Assessment Approved: Simon Chubb, Environment Manager, 09/11/11 Page 3 of 3