cv_24 - al-atfain arabian co. ltd.

advertisement
GHAZALI ISRAR
House No. 45 Zohra Nager
Safoora Goth
Gulshan-e-Iqbal
Karachi Pakistan.
Education




Last Name:
Date of Birth:
Marital Status:
Nationality:
Religion:
Languages:
Israr
10-july-1974
Married
Pakistan
Islam
English/Urdu/
Punjabi/Sindhi.
NIC:
42501-0763220-3
Passport:
AW1822201
Cell # Pak:
+923213499008
E-mail:ghazali.israr74@gmail.com
Skype ID: ghazali.israr
Metric Metropolitan Secondary School Karachi 1989.
F.A (Private), Karachi 1992.
B Com (Private), Karachi 1996. Huawei Technologies Co, Ltd
Diploma of Associate Engineer in Electrical (1st Division) 1997.
Work Experience as BTS Engineer (03 Years)
03Year Experience Ericsson Pakistan (pvt) Ltd. Installation, Local testing, Maintenance
Troubleshooting of Ericsson RBS 2206, 2207 and 2106,2107,2116,2117 and 2111, 2308
Micro Rbs and New Install RBS 6000 Series O&M to Warid Telecom.
(3 month) Working Huawei Technologies Co, Ltd. As a Bsc Engineer in south region
Siemens Pakistan Engineering Co. Ltd. (16 years).
Communication Carrier services Department (1998 – 2009).
Siemens (M T L) Maintenance, tool & Laboratories Department. (1997–1998).
Railway Signaling Department (1994 – 1996).
Working as an Installation supervisor, (ICN) Information and Communication and Network
Services at Siemens Pakistan Engineering Co. Ltd. Providing services to customers, e.g.
Pakistan Mobile Communication Ltd., (www.mobilinkgsm.com) Pakistan. Telecommunication
Corporation Ltd. (www.ptcl.com.pk), National Telecommunication Corporation,
(www.ntcpk.com) Telenor, World call Ldi Surpass.
Core Power Experience









3/1
Installed KS600 power supply with Batteries for Mobilink at different cities of Pakistan.
Installed UPS & Batteries in Intelligent Network (IN) 2, 3 & 4 for Mobilink Lahore.
Installed KS600 power supply with Batteries for world call at Karachi & Lahore.
Installed PSR610 power supply and batteries in world call co locations of media gateways in
different cities of Pakistan.
Installed KS600 power supply with Batteries for PTCL NGN Trial at Gujranwala Pakistan.
Installed PS900 power supply with batteries for Telenor Pakistan.
Installed Power Supply (Power One) with batteries at Lahore, Faisalabad & Karachi.
Installed Power Supply (Emerson) with batteries at Kabul, Kandahar and Herat (Roshan)
Afghanistan.
Installed SPSC2000 power supply with batteries for Telenor Pakistan at different cities of
Pakistan.
International Experience in Hayat Communication (Qatar).








Employer: Hayat Communication (Qtel).
Dates: 27 May 2009 to 27 July 2009.
Role: Core Network Engineer.
Summary of tasks: Qatar (Qtel).
Installation of MSS Release 4 (M 14) in phase 0 and phase 1. (Nokia Siemens Networks).
Installation of MGW Release 4 (U 4) in phase 0 and phase 1. (Nokia Siemens Networks).
Installation of CDS Release 4 (M 14). (Nokia Siemens Networks).
SND
Upgrade in MSC 1, 2 and 5. (Nokia Siemens Networks).
SND
Expansion in MSC 3, 4 and 6 (Nokia Siemens Networks).
BSC3i Installation and supervision in Qtel project in (Qatar) Nokia Siemens Networks.
TCSM3i Migration and new installation in Qtel project (Qatar) Nokia Siemens Networks
RNC
Installation in Qtel project (Qatar) Nokia Siemens Networks
Work Responsibilities at Communication Services (1998 – 2009).

As Installation Supervisor, presently I am working at Information & Communication Networks
Department Karachi. I coordinate with the customers: PTCL, NTC MOBILINK, TELE NOR,
WORLD CALL LDI SURPASS and Internet Service Providers, for the provision of technical
services and power audit AC&DC including( ATS, AVR& D.GSets, cooling system fire fighting
system and grounding), are running as per standards in the Southern Region of Pakistan.

Installation and Technical support as a vendor for Siemens, D900/1800 (GSM mobile Switch) and
EWSD V12 (Fixed Switch).

Installation and Working experience of Centralized O&M concept, for OMC (Operation and
Maintenance Centers) at PTCL and NTC networks connectivity via NETMANAGER X.25 & CSC
Links.
Installation, Commissioning and Maintenance of Internet Services from EWSD V12 exchanges
for ISDN Primary Rate and Basic Rate Interface, which includes installation of Line Trunk Group
(LTG), HDSL (ULAF) and cabling from Switch Room DDF up to customer premises.

Work Projects at ICN Services

Worked Independently and as a Siemens Experts Team for,

Installation of Mobile Switching Canter, MSC-04 at Karachi, for Pakistan Mobile Communication
Pvt. Ltd. Mobilink GSM.
Installation support for System Upgrade of Switching Network from SNA to SNB at Karachi
Transit B Digital Exchange.
Installation support for System Upgrade of Switching Network SN DE52 to SN DE54 at Karachi
Transit B Digital Exchange.
Installation support for System Upgrade, Expansion of Call Processors for CP113D at Karachi
Cantt-IV Exchange, Karachi Central IV, Karachi PakCapital Transit B, Defence II Exchange.
Installation and complete Maintenance support of ISDN Primary and Basic Interface Rates for
different Internet Service Providers and Banks at Karachi, working from Siemens Digital
Exchanges.
Installation and complete Maintenance support of Telenor LDI Switching (SUR PASS).
Installation and complete Maintenance support of World Call Switching (SUR PASS).
Installation and complete Maintenance support of NET MANAGER Platform of P T C L.
Installation and complete Maintenance support of R4 (Nokia Switch) Phase I Platform neither of











3/2
TELE NOR in Karachi.
Installation and complete Maintenance support of R4 (Nokia Switch) Phase I Platform of
MOBILINK in Karachi.
Installation and complete Maintenance support of R4 (Nokia Switch) Phase II Platform of
MOBILINK in Karachi.
All MSC actual power audit + needed arrangement for AC&DC power expansion

Work Experience and Responsibilities in MTL Department (1997–1998).







Worked as a Technical Executive in Maintenance, Tool & Laboratories Department.
Operation & Maintenance of the Equipment in Different Fields.
Electrical.
Air Conditioning/Refrigeration.
Telephone.
Plumber.
Welding.
D G Sets (Generators).
Steam Compressor.
Experience and Responsibilities in Railway Signaling Project (1994 – 1996).









Rectification of faults.
Supervision of cables lying.
Commissioning of cables.
Installation of Distribution box (DB).
Installation of Junction box (JB).
Installation of power box (PB).
Commissioning, Testing & Installation of System panel.
Worked as a technical supervisor in Railway Signalling Dept. on 94 stations project.
Worked as a technical supervisor in Railway Signalling Dept. on Auto Blacksignalproject.
Technical Training
 One month training program of Installation of the Bay network, Sun server & new Bridge
equipment for Internet set-up.
 Trained on SDH media and work experience of Pak net PRIs installation (Fibre) and Cyber net
PRI on Fibre.
 One week training Program for installation of voice messaging system (VMS) equipment.
 One week training Program for installation of LDI SURPASS Switch.
 One month training program for installation and fault rectification of NET MANAGER
Platform at Karachi, P T C L.
References
Available upon request.
3/3
Download