PARADIP PORT TRUST BUILDING CONSTRUCTION DIVISION No.CE/TECH/TB- 18/08/122 Date: 26/04/2012 NOTICE INVITING TENDER (NIT) Paradip Port Trust invites offers from the empanelled Architect under IDCO, Govt. of Odisha/ Govt. of India for providing architectural service for “construction of Modern Auditorium of 1000 capacity at Paradip Port” on lump sum basis, in a sealed cover. The participating architect shall have to deposit 5% (five percent) of the accepted offer value as ISD in shape of Demand Draft/ Bankers’ cheque on any scheduled bank drawn in favour of FA & CAO, PPT or irrecoverable bank guarantee equivalent to above amount in favour of Chief Engineer, PPT from any Nationalized Bank. The validity of the Bank Guarantee shall be for a period not less than 2(two) Years. The price bid will be received on 16.05.2012 upto 1.00 P.M. in the tender box placed in the office of the Executive Engineer, BC Division / Chief Engineer’s office/ Gate No.IV, Paradip Port Trust. The offers will be opened on 16.05.2012 at 3.30 P.M. in the office of the Chief Engineer, PPT. The intending bidders or their authorized representatives may present during opening of the offers, if he/they so desires. The details of the NIT will be available in the website of Paradip Port Trust : www.paradipport.gov.in for downloading from 27.04.2012. For any further clarification the Chief Engineer, Paradip Port Trust or the undersigned may be contacted. The firms shall have to enclose past experience certificate in the similar field & copy of the empanelled list from the appropriate authority along with their price offer. The authority reserves the right to reject any or all the offers without assigning any reason thereof. Executive Engineer Building Construction Division Paradip Port Trust. Copy to:01) 02) 03) 04) 05) 06) 07) 08) The CE/ FA & CAO/CE & ME PPT for favour of information. Dy.CE / SE(R&B), PPT for information. Vigilance Wing, PPT for information. All Heads of Deptt/All Heads of Office’s PPT/ Commandant, CISF, PPT for information and wide circulation. The Dy.Director, EDP Cell, PPT. It is requested to arrange publication of this Tender Call notice in the Port website www.paradipport.gov.in and the tender portal http://tender.gov.in. The Mech. Supdt/SE(Mech)/Dy.Traffic Manager, PPT for circulation. PRO, PPT for information. It is to arrange publication in the Port Gazette and Two leading Dailies (English & Odia). Notice Board for information of all concerned. SCOPE OF WORK: The Architect is required to provide service in respect of the followings:- ARCHITECTURE:i) ii) iii) iv) v) vi) Structural design and construction drawings. Sanitary, plumbing, drainage, water supply and sewerage design. Electrical, electronics, communication system design. Heating, ventilation and Air Condition design (HVAC) and other mechanical system. Fire detection, Fire Protection and Security System, etc. Periodic inspection and evaluation of construction works. ALLIED FIELDS: I) II) III) IV) V) Landscape Architecture. Interior Architecture. Architectural Conservation. Retrofitting of Buildings. Graphic Design and Signage. SCHEDULE OF SERVICE The Architect shall, after taking instruction from the authority render the following service:- CONCEPT DESIGN a) Prepare report on site evaluation, state of existing building, if any and analysis and impact of existing and/or proposed development on its immediate environments. b) Furnish report on measures required to be taken to mitigate the adverse impact, if any, of the existing and/or proposed development on its immediate environs. WORKING DRAWING AND DESIGN Preparation of the detail structural drawing and design for construction and supervision of the works. Preparation of detail drawing, design for electrical, electronics, communication system, Air conditioning, Fire protection and security system, etc to ensure a complete functional auditorium. CONSTRUCTION STAGE: i) The Architect will prepare and issue working drawings and details for proper execution of the work. ii) Approve samples of various elements and components for construction. iii) Visit the site of work, at intervals mutually agreed upon, to inspect and evaluate the Construction works and where necessary clarify any decision, offer interpretation of the drawings/specifications, attend conferences and meeting to ensure that the project proceeds in accordance with the conditions of contract and keep the authority informed and render advice on actions, if required. iv) To ensure that the work at site proceeds in accordance with the contract documents/drawings and to exercise time and quality controls, the day to day supervision will be carried out by a Construction Manager. v) Issue certificate for completion of works. COMPLETION: i) Prepare and submit completion reports and drawings for the project as required and assist the Authority in obtaining “Completion/Occupancy Certificate” from statutory authorities, wherever required. ii) Issue two sets of ‘as built’ drawings including services and structures. FORMAT FOR SUBMISSION OF PRICE BIDS Name of the work Completion period Price Offer In Figure In Words Providing Architectural Assistance for Construction of Modern auditorium 1000 capacity at Paradip Port. 2(Two) Years NB: The above offer is inclusive of all taxes, etc. SCHEDULE OF PAYMENTS The Architect shall be paid the above amount done progress. Acceptance of offer/ signing of the agreement Submission of detail cross sectional drawing, design and detail estimate of Electrical, electronics, communication system and Air Conditioning design, Fire detection, Fire protection, landscaping, etc. On Completion of 20% of work over plinth level On completion of 40% of work On completion of 60% of work On completion of 80% of work On virtual completion of the work Submission of completion report and drawing for issuance of completion / occupancy certificate by authority, wherever required and on issue of ‘as built’ drawing. in the following stages consistent with the work 10% of the quoted amount. 25% of the quoted amount. 10% of the quoted amount 10% of the quoted amount 10% of the quoted amount 10% of the quoted amount 10% of the quoted amount 15% of the quoted amount. Executive Engineer Building Construction Division Paradip Port Trust.