DRAWING / DOCUMENT NO. NOMENCLATURE REQUESTOR DEPT / COMPANY ECR NO. MONOGRAM SYSTEMS CARSON, CA 90746 DATE SUBMITTED (210) MSC/MSE ENG (310) MSC. MANUF. (325) PROVO MANUF. CAGE CODE: 29780 (315) MSC. PUR (410) MSC SALES (240) MST ENG. DISPOSITION OF PARTS WORK IN FINISHED MATERIAL TOOLING PROCESS PRODUCT USE UNTIL DEPLETED REWORK SCRAP ENGINEERING CHANGE REQUEST NOT AFFECTED REQUESTED RELEASE DATE NEW REV OTHER TC HOLDER OR DESIGN AUTH APP. YES CLASS CHANGE I II ITAR or ECCN EFFECTIVITY IMMEDIATELY NEXT PRODUCTION SERIAL NO.: DATE: ITAR / MILITARY R ECCN / COMMERCIAL NO IMPACTS ACCEPTANCE TEST YES NO REASON FOR CHANGE IMPACTS MATERIAL AND PROCESS YES NO CHANGE CATEGORY ADMINISTRATIVE UPDATE DRAWING ERROR COST REDUCTION DESIGN IMPROVEMENT CUSTOMER CHANGE REQ MANUFACTURABILITY PART OBSOLESCENCE BASIC DESCRIPTION PRIORITY NORMAL URGENT EXTREMELY URGENT APPROVALS STRESS DD-MM-YY PART NUMBER(S) OF AFFECTED LINE REPLACEBLE UNIT OR KIT LISTED ON PMA LIST (6300) ELECTRICAL MATERIAL & PROCESS THIS AREA TO BE FILLED BY PROJECT ENGINEER PROJECT ENGINEER CHARGE NO. DATE COMPLETED MANUFACTURING ENGINEERING ENGINEERING ACCEPTANCE YES QUALITY IF NOT ACCEPTED, WHY? PURCHASING NO DISPOSITION / ACTION INCORPORATE RECOMMENDED CHANGES EXPORT COMPLIANCE (ITAR ONLY) CONFIGURATION CONTROL F-7301, ECR, REV. A FILLED BY REQUESTOR FILLED BY DOCUMENT CONTROL APPROVALS FILLED BY PROJECT ENGINEER FILLED BY MANUFACTURING ENGINEERING FILLED BY PURCHASING Note to Document Control: This page is for definition only and does not need to be a part of the ECR record. CHANGE CATEGORY DEFINITION (Check only 1 category that is most relevant to the change requested): Administrative Update: Any change that is resultant from a standard specification, drawing format, or drawing standard update and has no change to the design. Drawing Error: Wrong/missing/conflicting material call out, dimension, view, typo error, duplicate information added, missing information, etc. Cost Reduction: This category covers any change that is proposed primarily to reduce recurring supply cost. Design Improvement: Increase part reliability, enhance structural and electrical integrity, improve performance, and enhance fit at the next assembly level. Customer Change Req: Customer request for change (Boeing, Airbus, Embraer, etc.). Reference to the Customer Change Request should be noted in the “Reason for Change” field. Manufacturability: Relax tolerance where allowed, incorporate geometric tolerancing, simplify assembly of parts and improve inspectibility of the part. Part Obsolescence: Part or assembly no longer available or procurable. F-7301, ECR, REV. A FILLED BY REQUESTOR FILLED BY DOCUMENT CONTROL APPROVALS FILLED BY PROJECT ENGINEER FILLED BY MANUFACTURING ENGINEERING FILLED BY PURCHASING