bharat sanchar nigam limited - Data Networks Circle Website

advertisement
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of Three STM-1 International Internet Bandwidth of “IPLC nature to
USA (Trans-Atlantic) (including IP termination in USA in designated Tier-1 ISP
router over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Mumbai
1
Name &
Address of
Contractor
2
Name of
Purchaser
M/s Reliance Communications Infrastructure Limited
5th Floor Vijaya Building,
17 Barakhamba Road
Cannaught Place
New Delhi -1
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
Scope of the
Purchase order
4
(Hereafter referred to as Purchaser)
1. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
2. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell,
BSNL CO
1) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of Three STM-1 International Internet Bandwidth of “IPLC
nature to USA through Trans-Atlantic route (including IP termination in
USA in designated Tier-1 ISP router” for a period of six months for
Bharat Sanchar Nigam Limited’s Internet Operations at BSNL Mumbai.
The supplier shall provide the IP port termination in at least two different
designated Tier-1 ISP in USA to provide diversity to BSNL network.
Supplier shall provide all three STM-1 IPLC at its premises in Mumbai
and BSNL shall carry these STM-1 bandwidth links over its transmission
network to terminate on BSNL Mumbai.
Page 1 of 25
BSNL reserves the right to change the place of termination as per its
requirement.
5
Item with
Quantity and
Price
6
Delivery
Schedule
Three STM–1 International Internet Bandwidth (1:1) [IPLC nature
to USA(Trans-Atlantic) including IP termination in USA in designated
Tier-1 ISP route] for BSNL’s Internet operations at Rs 71, 92, 000/(Rupees Seventy one Lakhs ninety two thousands only) per six
month per STM-1 (inclusive of all levies, charges and taxes but
excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over Optical
Fibre at BSNL Mumbai within eight weeks from the date of issue of this
letter.
Supplier shall explore the possibility of providing maximum number
of STM-1 links on gigabit Ethernet interface(s) for bandwidth
termination at BSNL Mumbai.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
Late deliveries
9
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM WTR, Mumbai for bandwidths
getting terminated at BSNL Mumbai.
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charge for a delay of every
week or part thereof for the first three weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within eight
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit three separate Performance Bank Guarantee of
Rs 3,59,600/- (Rupees Three Lakhs Fifty Nine Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Chief Account Officer, Data Networks, New Delhi. This PBG should
Page 2 of 25
11
Payment terms
remain valid up to nine months.
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
made on a monthly basis and after the expiry of the month by CGM,
WTR, Mumbai bandwidths getting terminated at BSNL Mumbai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be enchased from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
1. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
2. Fully restorable
3. packet drop less than 1%
4. Web based monitoring tools and reports would be provided.
5. Latency to:
USA(Trans Atlantic) : 270ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in USA, where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Commitment
Period
Installation and
Commissioning
Supplier will demonstrate the following at the time of acceptance testing:
i. Functioning of tools for measurement of SLA on STM-1 link
ii. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
iii. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
The commitment period for above mentioned bandwidths will be six
month.
Supplier shall commission all STM-1 links within eight weeks from the
date of issue of this letter.
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s Reliance without any extra cost. BSNL shall on
its own arrange, for the extension of fiber connectivity between the
Page 3 of 25
17
Coordinator
18
Other
Conditions of
Contract
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
1. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
2. M/s Reliance will be responsible for all obligations of the IP gateway
as required by the ISP license conditions.
3. If at any stage, it is felt necessary that M/s Reliance should supply
the copy of the IP Gateway license/clearance, then it will be
mandatory for M/s Reliance to supply the same in the timeframe
prescribed by BSNL.
4. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s Reliance
NOTE:
1. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
2. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
3. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
4. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
5. Three PBG’s each of Rs 3,59,600/- valid up to 14-11-2008 shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma Mishra
DGM(BM)
Copy to:1. CGM, Data Networks Circle, New Delhi
2. CGM, WTR, Mumbai
3. DDG(Broadband), BSNL CO, New Delhi
4. GM(T/P), Data Networks, New Delhi
5. DGM(NIB & Mtce), Mumbai
6. DGM(MPLS),DNW, Bangalore
7. CAO, Data Networks, New Delhi
8. NIB Node in charges Mumbai
Page 4 of 25
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of Seven STM-1 International Internet Bandwidth of “IPLC nature to
USA (Trans-Atlantic) (including IP termination in USA in designated Tier-1 ISP
router over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Mumbai.
1
2
Name &
Address of
Contractor
Name of
Purchaser
M/s Tata Communications Limited
( former M/s Videsh Sanchar Nigam Limited)
Videsh Sanchar Bhawan
Bangla Sahib Marg
New Delhi -1
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
Scope of the
Purchase order
4
(Hereafter referred to as Purchaser)
3. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
4. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell,
BSNL CO
2) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of Seven STM-1 International Internet Bandwidth of “IPLC
nature to USA through Trans-Atlantic route (including IP termination in
USA in designated Tier-1 ISP router” for a period of six months for
Bharat Sanchar Nigam Limited’s Internet Operations at BSNL Mumbai.
The supplier shall provide the IP port termination in at least two different
designated Tier-1 ISP in USA to provide diversity to BSNL network.
Supplier shall provide all Seven STM-1 IPLC at its premises in Mumbai
and BSNL shall carry these STM-1 bandwidth links over its transmission
Page 5 of 25
5
Item with
Quantity and
Price
6
Delivery
Schedule
network to terminate on BSNL Mumbai.
BSNL reserves the right to change the place of termination as per its
requirement.
Seven STM–1 International Internet Bandwidth (1:1) [IPLC nature
to USA(Trans-Atlantic) including IP termination in USA in designated
Tier-1 ISP route] for BSNL’s Internet operations at Rs 71, 92, 000/(Rupees Seventy one Lakhs ninety two thousands only) per six
month per STM-1 (inclusive of all levies, charges and taxes but
excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over Optical
Fibre at BSNL Mumbai within eight weeks from the date of issue of this
letter.
Supplier shall explore the possibility of providing maximum number
of STM-1 links on gigabit Ethernet interface(s) for bandwidth
termination at BSNL Mumbai.
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM, WTR, Mumbai for bandwidths
getting terminated at BSNL, Mumbai for bandwidths getting terminated
at BSNL Mumbai.
9
Late deliveries
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charge for a delay of every
week or part thereof for the first Seven weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within two
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit Seven separate Performance Bank Guarantee
of Rs 3,59,600/- (Rupees Three Lakhs Fifty Nine Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Page 6 of 25
11
Payment terms
Chief Account Officer, Data Networks, New Delhi. This PBG should
remain valid up to nine months.
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
made on a monthly basis and after the expiry of the month by CGM,
WTR, Mumbai bandwidths getting terminated at BSNL Mumbai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be enchased from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
6. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
7. Fully restorable
8. packet drop less than 1%
9. Web based monitoring tools and reports would be provided.
10. Latency to:
USA(Trans Atlantic) : 270ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in USA, where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Commitment
Period
Installation and
Commissioning
Supplier will demonstrate the following at the time of acceptance testing:
iv. Functioning of tools for measurement of SLA on STM-1 link
v. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
vi. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
The commitment period for above mentioned bandwidths will be six
month.
Supplier shall commission all STM-1 links before within eight weeks
from the date of issue of this letter.
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s TCL without any extra cost. BSNL shall on its
Page 7 of 25
17
Coordinator
18
Other
Conditions of
Contract
own arrange, for the extension of fiber connectivity between the
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
5. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
6. M/s TCL will be responsible for all obligations of the IP gateway as
required by the ISP license conditions.
7. If at any stage, it is felt necessary that M/s TCL should supply the
copy of the IP Gateway license/clearance, then it will be mandatory
for M/s TCL to supply the same in the timeframe prescribed by
BSNL.
8. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s TCL
NOTE:
6. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
7. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
8. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
9. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
10. Seven PBG’s each of Rs 3,59,600/- valid up to nine months shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma Mishra
DGM(BM)
Copy to:1.
2.
3.
4.
5.
6.
7.
8.
CGM, Data Networks Circle, New Delhi
CGM, WTR, Mumbai
DDG(Broadband), BSNL CO, New Delhi
GM(T/P), Data Networks, New Delhi
DGM(NIB & Mtce), Mumbai
DGM(MPLS),DNW, Bangalore
CAO, Data Networks, New Delhi
NIB Node in charge Mumbai
Page 8 of 25
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of Four STM-1 International Internet Bandwidth of “IPLC nature to
USA (Trans-Pacific) (including IP termination in USA in designated Tier-1 ISP
router over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Chennai.
1
Name &
Address of
Contractor
2
Name of
Purchaser
M/s Bharti Airtel Limited
234, Okhla Industrial Estate
Phase III
New Delhi -1
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
4
Scope of the
Purchase order
(Hereafter referred to as Purchaser)
5. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
6. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell, BSNL CO
3) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of Four STM-1 International Internet Bandwidth of “IPLC
nature to USA through Trans-Pacific route (including IP termination in
USA in designated Tier-1 ISP router” for a period of six months for
Bharat Sanchar Nigam Limited’s Internet Operations at BSNL Chennai.
The supplier shall provide the IP port termination in at least two different
designated Tier-1 ISP in USA to provide diversity to BSNL network.
Supplier shall provide all Four STM-1 IPLC at its premises in Chennai
and BSNL shall carry these STM-1 bandwidth links over its transmission
network to terminate on BSNL Chennai.
BSNL reserves the right to change the place of termination as per its
requirement.
Page 9 of 25
5
Item with
Quantity and
Price
6
Delivery
Schedule
Four STM–1 International Internet Bandwidth (1:1) [IPLC nature to
USA(Trans-Pacific) including IP termination in USA in designated Tier-1 ISP
route] for BSNL’s Internet operations at 71, 92, 000/- (Rupees Seventy
one Lakhs ninety two thousands only) per six month per STM-1
(inclusive of all levies, charges and taxes but excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over
Optical Fibre at BSNL Chennai within eight weeks from the date of
issue of this letter.
Supplier shall explore the possibility of providing maximum number
of STM-1 links on gigabit Ethernet interface(s) for bandwidth
termination at BSNL Chennai.
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM, Chennai Telephones for
bandwidths getting terminated at BSNL, Chennai for bandwidths getting
terminated at BSNL Chennai.
9
Late deliveries
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charges for a delay of every
week or part thereof for the first three weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within eight
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
11
Payment terms
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit Four separate Performance Bank Guarantee of
Rs 3,59,600/- (Rupees Three Lakhs Fifty Nine Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Chief Account Officer, Data Networks, New Delhi. This PBG should
remain valid up to nine months.
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
Page 10 of 25
made on a monthly basis and after the expiry of the month by CGM,
Chennai Telephones, Chennai bandwidths getting terminated at BSNL
Chennai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be asked from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
11. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
12. Fully restorable
13. packet drop less than 1%
14. Web based monitoring tools and reports would be provided.
15. Latency to:
USA(Trans Pacific) : 320ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in USA, where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Supplier will demonstrate the following at the time of acceptance testing:
vii. Functioning of tools for measurement of SLA on STM-1 link
viii. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
ix. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
Commitment
The commitment period for above mentioned bandwidths will be six
Period
month.
Installation and
Supplier shall commission all STM-1 links before within eight weeks
Commissioning from the date of issue of this letter.
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s Bharti without any extra cost. BSNL shall on its
own arrange, for the extension of fiber connectivity between the
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
Page 11 of 25
17
Coordinator
18
Other
Conditions of
Contract
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
9. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
10. M/s Bharti will be responsible for all obligations of the IP gateway
as required by the ISP license conditions.
11. If at any stage, it is felt necessary that M/s Bharti should supply the
copy of the IP Gateway license/clearance, then it will be mandatory
for M/s Bharti to supply the same in the timeframe prescribed by
BSNL.
12. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s Bharti
NOTE:
11. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
12. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
13. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
14. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
15. Four PBG’s each of Rs Rs 3,59,600/- valid up to nine months shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma Mishra
DGM(BM)
Copy to:1.
2.
3.
4.
5.
6.
7.
8.
CGM, Data Networks Circle, New Delhi
CGM, Chennai Telephones, Chennai
DDG(Broadband), BSNL CO, New Delhi
GM(T/P), Data Networks, New Delhi
DGM(NIB), Chennai
DGM(MPLS), DNW, Bangalore
CAO, Data Networks, New Delhi
NIB Node in charge Chennai
Page 12 of 25
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of Two STM-1 International Internet Bandwidth of “IPLC nature to
USA (Trans-Pacific) (including IP termination in USA in designated Tier-1 ISP
router over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Chennai.
1
2
Name &
Address of
Contractor
Name of
Purchaser
M/s Tata Communications Limited
( former M/s Videsh Sanchar Nigam Limited)
Videsh Sanchar Bhawan
Bangla Sahib Marg
New Delhi -1
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
4
Scope of the
Purchase order
(Hereafter referred to as Purchaser)
7. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
8. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell, BSNL CO
4) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of Two STM-1 International Internet Bandwidth of “IPLC
nature to USA through Trans-Pacific route (including IP termination in
USA in designated Tier-1 ISP router” for a period of six months for
Bharat Sanchar Nigam Limited’s Internet Operations at BSNL Chennai.
The supplier shall provide the IP port termination in at least two different
designated Tier-1 ISP in USA to provide diversity to BSNL network.
Supplier shall provide all Two STM-1 IPLC at its premises in Chennai
and BSNL shall carry these STM-1 bandwidth links over its transmission
network to terminate on BSNL Chennai.
Page 13 of 25
5
Item with
Quantity and
Price
6
Delivery
Schedule
BSNL reserves the right to change the place of termination as per its
requirement.
Two STM–1 International Internet Bandwidth (1:1) [IPLC nature to
USA(Trans-Pacific) including IP termination in USA in designated Tier-1 ISP
route] for BSNL’s Internet operations at 71, 92, 000/- (Rupees Seventy
one Lakhs ninety two thousands only) per six month per STM-1
(inclusive of all levies, charges and taxes but excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over Optical
Fibre at BSNL Chennai within eight weeks from the date of issue of this
letter.
Supplier shall explore the possibility of providing maximum number of
STM-1 links on gigabit Ethernet interface(s) for bandwidth termination at
BSNL Chennai.
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM, Chennai Telephones for
bandwidths getting terminated at BSNL, Chennai for bandwidths getting
terminated at BSNL Chennai.
9
Late deliveries
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charge for a delay of every
week or part thereof for the first three weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within two
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit Two separate Performance Bank Guarantee of
Rs 3,59,600/- (Rupees Three Lakhs Fifty Nine Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Chief Account Officer, Data Networks, New Delhi. This PBG should
Page 14 of 25
11
Payment terms
remain valid up to nine months.
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
made on a monthly basis and after the expiry of the month by CGM,
Chennai Telephones, Chennai bandwidths getting terminated at BSNL
Chennai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be enchased from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
16. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
17. Fully restorable
18. packet drop less than 1%
19. Web based monitoring tools and reports would be provided.
20. Latency to:
USA(Trans Pacific) : 320 ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in USA, where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Supplier will demonstrate the following at the time of acceptance testing:
x. Functioning of tools for measurement of SLA on STM-1 link
xi. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
xii. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
Commitment
The commitment period for above mentioned bandwidths will be six
Period
month.
Installation and
Supplier shall commission all STM-1 links within eight weeks from the
Commissioning date of issue of this letter..
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s TCL without any extra cost. BSNL shall on its
Page 15 of 25
17
Coordinator
18
Other
Conditions of
Contract
own arrange, for the extension of fiber connectivity between the
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
13. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
14. M/s TCL will be responsible for all obligations of the IP gateway as
required by the ISP license conditions.
15. If at any stage, it is felt necessary that M/s TCL should supply the
copy of the IP Gateway license/clearance, then it will be mandatory
for M/s TCL to supply the same in the timeframe prescribed by
BSNL.
16. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s TCL
NOTE:
16. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
17. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
18. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
19. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
20. Two PBG’s each of Rs Rs 3,59,600/- valid up to nine months shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma
Mishra
DGM(BM)
Copy to:1.
2.
3.
4.
5.
6.
CGM, Data Networks Circle, New Delhi
CGM, Chennai Telephones, Chennai
DDG(Broadband), BSNL CO, New Delhi
GM(T/P), Data Networks, New Delhi
DGM(NIB), Chennai
DGM(MPLS), DNW, Bangalore
Page 16 of 25
7. CAO, Data Networks, New Delhi
8. NIB Node in charge Chennai
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of Three STM-1 International Internet Bandwidth of “IPLC port to
Europe (UK) (including IP termination in Europe (UK) in designated Tier-1 ISP
router) over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Chennai.
1
Name &
Address of
Contractor
M/s Bharti Airtel Limited
234, Okhla Industrial Estate
Phase III
New Delhi -1
2
Name of
Purchaser
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
Scope of the
Purchase order
4
(Hereafter referred to as Purchaser)
9. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
10. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell,
BSNL CO
5) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of Three STM-1 International Internet Bandwidth of “IPLC
port to Europe (UK) (including IP termination in Europe (UK) in
designated Tier-1 ISP router) over OFC” for a period of six months for
Bharat Sanchar Nigam Limited’s Internet Operations at BSNL Chennai.
The supplier shall provide the IP port termination in at least two different
designated Tier-1 ISP in UK to provide diversity to BSNL network.
Supplier shall provide all three STM-1 IPLC at its premises in Chennai
and BSNL shall carry these STM-1 bandwidth links over its transmission
Page 17 of 25
5
Item with
Quantity and
Price
6
Delivery
Schedule
network to terminate on BSNL Chennai.
BSNL reserves the right to change the place of termination as per its
requirement.
Three STM–1 International Internet Bandwidth (1:1) [IPLC port to
Europe (UK) (including IP termination in Europe (UK)] for BSNL’s
Internet operations at Rs 67, 12, 000/- (Rupees Sixty Seven Lakhs
twelve thousands only) per six month per STM-1 (inclusive of all
levies, charges and taxes but excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over Optical
Fibre at BSNL Chennai within eight weeks from the date of issue of
this letter.
Supplier shall explore the possibility of providing maximum number
of STM-1 links on gigabit Ethernet interface(s) for bandwidth
termination at BSNL Chennai.
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM, Chennai Telephones for
bandwidths getting terminated at BSNL, Chennai for bandwidths getting
terminated at BSNL Chennai.
9
Late deliveries
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charge for a delay of every
week or part thereof for the first three weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within eight
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit three separate Performance Bank Guarantee of
Rs 3,35,600/- (Rupees Three Lakhs thirty Five Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Chief Account Officer, Data Networks, New Delhi. This PBG should
Page 18 of 25
11
Payment terms
remain valid up to nine months
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
made on a monthly basis and after the expiry of the month by CGM,
Chennai Telephones, Chennai bandwidths getting terminated at BSNL
Chennai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be enchased from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
21. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
22. Fully restorable
23. packet drop less than 1%
24. Web based monitoring tools and reports would be provided.
25. Latency to:
UK
: 200ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in UK where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Supplier will demonstrate the following at the time of acceptance testing:
xiii. Functioning of tools for measurement of SLA on STM-1 link
xiv. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
xv. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
Commitment
The commitment period for above mentioned bandwidths will be six
Period
month.
Installation and
Supplier shall commission all STM-1 links before within eight weeks
Commissioning from the date of issue of this letter.
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s Bharti without any extra cost. BSNL shall on its
Page 19 of 25
17
Coordinator
18
Other
Conditions of
Contract
own arrange, for the extension of fiber connectivity between the
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
17. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
18. M/s Bharti will be responsible for all obligations of the IP gateway
as required by the ISP license conditions.
19. If at any stage, it is felt necessary that M/s Bharti should supply the
copy of the IP Gateway license/clearance, then it will be mandatory
for M/s Bharti to supply the same in the timeframe prescribed by
BSNL.
20. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s Bharti
NOTE:
21. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
22. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
23. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
24. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
25. Three PBG’s each of Rs 3,35,600/- valid up to nine month shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma
Mishra
DGM (BM)
Copy to:1.
2.
3.
4.
5.
6.
CGM, Data Networks Circle, New Delhi
CGM, Chennai Telephones, Chennai
DDG(Broadband), BSNL CO, New Delhi
GM(T/P), Data Networks, New Delhi
DGM(NIB), Chennai
DGM(MPLS), DNW, Bangalore
Page 20 of 25
7. CAO, Data Networks, New Delhi
8. NIB Node in charge Chennai
BHARAT SANCHAR NIGAM LIMITED
(A Government of India Enterprise)
Data Networks Circle
nd
2 Floor, BSNL Telephone Exchange
Sector-62, Noida - 201301
PO No. BSNL/DNW/International Bandwidth/2007/XI/
June
, 2008
Procurement of One STM-1 International Internet Bandwidth of “IPLC port to
Europe (UK) (including IP termination in Europe (UK) in designated Tier-1 ISP
router) over OFC” for a period of six months for Bharat Sanchar Nigam Limited’s
Internet Operations at BSNL Mumbai.
1
2
Name &
Address of
Contractor
Name of
Purchaser
M/s Tata Communications Limited
( former M/s Videsh Sanchar Nigam Limited)
Videsh Sanchar Bhawan
Bangla Sahib Marg
New Delhi -1
(Hereafter referred to as Supplier)
Bharat Sanchar Nigam Ltd. (BSNL)
through
CGM (DNW), BSNL
CTS Compound
Netaji Nagar, New Delhi-110 023
3-a
Purchaser’s
reference
3-b
Supplier
Reference
4
Scope of the
Purchase order
(Hereafter referred to as Purchaser)
11. EOI No: BSNL/DNW/ International Bandwidth/EOI/2007 dated
29.05.2007 (hereafter referred to as EOI) and subsequent
clarifications and addendum
12. Letter no. 3-3/2007-ILD (part) dated 19-06-2008 from ILD Cell, BSNL CO
6) Bid Document and subsequent submission by supplier in response
to above-referenced EOI under Purchaser’s reference
Procurement of One STM-1 International Internet Bandwidth of “IPLC
port to Europe (UK) (including IP termination in Europe (UK) in designated Tier-1
ISP router) over OFC” for a period of six months for Bharat Sanchar
Nigam Limited’s Internet Operations at BSNL Mumbai.
Supplier shall provide one STM-1 IPLC at its premises in Mumbai and
Page 21 of 25
5
Item with
Quantity and
Price
6
Delivery
Schedule
BSNL shall carry these STM-1 bandwidth links over its transmission
network to terminate on BSNL Mumbai.
BSNL reserves the right to change the place of termination as per its
requirement.
One STM–1 International Internet Bandwidth (1:1) [IPLC port to Europe
(UK) (including IP termination in Europe (UK)] for BSNL’s Internet
operations at Rs 67, 12, 000/- (Rupees Sixty Seven Lakhs twelve
thousands only) per six month per STM-1 (inclusive of all levies, charges
and taxes but excluding Service tax)
The supplier shall commission all these STM-1 Bandwidths over Optical
Fibre at BSNL Mumbai within eight weeks from the date of issue of
this letter.
Supplier shall explore the possibility of providing maximum number
of STM-1 links on gigabit Ethernet interface(s) for bandwidth
termination at BSNL Mumbai.
7.
Acceptance
testing
8.
Technical
observation and
the monitoring
of the links
Late deliveries
9
All required tests shall be carried out to the satisfaction of BSNL before
declaring the connectivity as commissioned. Circuit will be declared
commissioned in accordance with the provisions as defined in clause 6.4
of EOI.
Acceptance testing prior to the commissioning of the link will be carried
out by the designated officer of the Data Networks Circle, New Delhi. A
commissioning report would be sent by Data Networks circle to the
paying authority for payment purposes etc.
All technical observations and the monitoring of the links will be done by
the Teams or person nominated by CGM, WTR, Mumbai for bandwidths
getting terminated at BSNL, Mumbai.
Any delay in commissioning of the capacity shall attract liquidated
damages (LD) @0.5% of the six monthly charge for a delay of every
week or part thereof for the first three weeks and @ 0.7% per week
thereafter, subject to a maximum LD of 12%. Quantum of liquidated
damages assessed and levied by the Purchaser shall be final and not
challengeable by the supplier
BSNL reserves the right to cancel the Purchase Order if STM-1
Bandwidth links with Internet connectivity is not extended within eight
week from the date of issue of PO unless the commissioning period is
extended in writing by BSNL in which case also, LD shall be applicable
and Bank Guarantee may be encashed.
10
Performance
Bank Guarantee
The extension of delivery/commissioning period may be granted subject
to the condition that BSNL shall have the absolute right to revise the
prices and also levy penalty/liquidated damages for delayed supplies.
The supplier has to submit One separate Performance Bank Guarantee of
Rs 3,35,600/- (Rupees Three Lakhs thirty Five Thousand Six
Hundred Only) within 15 days of the date of this Purchase Order to
Chief Account Officer, Data Networks, New Delhi. This PBG should
Page 22 of 25
11
Payment terms
remain valid up to nine months.
The Price (service charges) for each STM-1 Bandwidth will be paid in
accordance with clause 18 of EOI. Payment (In Indian Rupees) will be
made on a monthly basis and after the expiry of the month by CGM,
WTR, Mumbai bandwidths getting terminated at BSNL Mumbai.
The payment of the first month shall be made only after successful
testing / commissioning of the service.
Payment will be made after submission of bill and deduction of IncomeTax, Penalties etc, if any.
12
Specification
Any amount due to BSNL for any reason whatsoever (In reference to
above tender) can be enchased from the PBG, The PBG shall be returned
after successful completion of contract period.
The performance of STM-1 Bandwidth should confirm to the SLA
conditions indicated below:
26. The Bandwidth will be 1:1, 155 Mbps Full Duplex (Both Ways)
internet traffic per STM-1 link on 24 X 7 basis.
27. Fully restorable
28. packet drop less than 1%
29. Web based monitoring tools and reports would be provided.
30. Latency to:
UK
: 200ms
The latency /packet loss would be measured from BSNL gateway router
to Tier-1 ISP in UK where BSNL link will be terminated.
13
Degradation in
service
Service Availability:BSNL shall impose penalty as per clause no 6.2.5.1 of referenced EOI
and its subsequent clarifications and addendum.
BSNL shall impose penalty as per clause no 6.6.1.1 of referenced EOI
and its subsequent clarifications and addendum.
14
Final testing and
Inspection
Final testing and commissioning shall be done in accordance with clause
6.4 of EOI along with other terms and condition of EOI and this PO.
15
16
Supplier will demonstrate the following at the time of acceptance testing:
xvi. Functioning of tools for measurement of SLA on STM-1 link
xvii. Demonstrate online, the latency and packet drop statistics in
accordance with terms and condition of EOI and this PO.
xviii. Demonstrate the utilization of web-based tools as specified in the
tender document under reference.
Commitment
The commitment period for above mentioned bandwidths will be six
Period
month.
Installation and
Supplier shall commission all STM-1 links within eight weeks from the
Commissioning date of issue of this letter.
All necessary equipment/infrastructures required for extending the
optical connectivity, to BSNL premises, at the landing Station shall be
made available by M/s TCL without any extra cost. BSNL shall on its
own arrange, for the extension of fiber connectivity between the
Page 23 of 25
17
Coordinator
18
Other
Conditions of
Contract
distribution point of Indian Cable Landing Station to BSNL premises any
where in India as per BSNL’s requirement and convenience.
DGM (BM), Data Networks, BSNL Sec-62, Telephone Exchange
Building, Noida will be the overall coordinator for the project.
21. Supplier shall reduce the price of the bandwidth(s) being
procured on implementation of TRAI directive from the date of
issue of such directive or effective date declared in this regard.
Supplier has to give the acceptance for this effect, failing which
this P.O. shall not be valid. BSNL reserves the right to terminate
the contract if such benefits are not passed on to BSNL as per
TRAI/GOI instructions.
22. M/s TCL will be responsible for all obligations of the IP gateway as
required by the ISP license conditions.
23. If at any stage, it is felt necessary that M/s TCL should supply the
copy of the IP Gateway license/clearance, then it will be mandatory
for M/s TCL to supply the same in the timeframe prescribed by
BSNL.
24. All terms and conditions given under purchase reference in of this
PO shall be applicable and binding on M/s TCL
NOTE:
26. The present rates may be treated as tentative rates and the final rates would be the
present rate or the new finalized rates (effective from 01-07-2008) whichever is
less as on the date of commissioning of respective STM-1 links.
27. All other terms and conditions of reference [1] of serial no 3(a) shall be
applicable. Also, in case of any discrepancy/mistake, the terms and conditions of
EOI-2007 and its subsequent clarifications and addendum will prevail.
28. Acceptance of all terms and conditions of this P.O. have to be submitted to this
office within 15 days from the date of issue of this letter by returning one copy of
P.O. duly signed along with a letter indicating that all terms and conditions are
acceptable.
29. Unless acceptance of P.O. is communicated, this P.O. shall not be valid.
30. One PBG’s each of Rs 3,35,600/- valid up to nine months shall be submitted
within 15 days of the date of this P.O. to Chief Account Officer, Data Networks,
New Delhi along with its copies to this office.
6. Receipt of P.O. may be acknowledged.
Sushma Mishra
DGM(BM)
Copy to:1.
2.
3.
4.
5.
6.
7.
8.
9.
CGM, Data Networks Circle, New Delhi
CGM, WTR, Mumbai
DDG(Broadband), BSNL CO, New Delhi
GM(T/P), Data Networks, New Delhi
GM,DNW, Bangalore
DGM(NIB & Mtce), Mumbai
DGM(MPLS),DNW, Bangalore
CAO, Data Networks, New Delhi
NIB Node in charge Mumbai
Page 24 of 25
Page 25 of 25
Download