Restoring a Culture of Agriculture for the Benefit of the Poor in the Makana Area Project Plan Makana SUS Delegation Gardening Project Author: Creation Date: Marlene Mitchener 21/05/2011 Last Revised: 25/05/2011 Version: 2.0 MAKANA GARDENING PROJECT TABLE OF CONTENTS A. INTRODUCTION ............................................................................................................................... 3 PURPOSE OF PLAN........................................................................................................................................... 3 BACKGROUND INFORMATION ............................................................................................................................ 3 PROJECT TEAM ................................................................................................................................................. 1. Mrs Marlene Mitchener, Director Umthathi Training Project .............................................. 4 B. 2. Ms Nthabiseng Moche, Masters Student Rhodes University, Environmental Learning Centre ................................................................................................................. 4 3. Ms Zimasa Nduna, Manager Agricultural & Smme’s, Makana Municipality ......................... 4 4. Mr Kwanele Mbangi, Superintendent Parks & Recreation, Makana Municipality................. 4 5. Mr Ntobeko Nyengane, Environmental Facilitator, Makana Youth Community ................... 4 PROJECT RATIONALE, GOALS AND OBJECTIVES................................................................................. 5 MAKANA RESPONSE ........................................................................................................................................ 5 PROJECT RATIONALE........................................................................................................................................ 5 PROJECT GOAL & MISSION ............................................................................................................................... 5 PROJECT PURPOSE & OBJECTIVES ...................................................................................................................... 5 PROJECT APPROACH ........................................................................................................................................ 6 PROJECT PHASES ............................................................................................................................................. 7 PHASE 1: PREPARATION ................................................................................................................................... 7 PHASE 2: IMPLEMENTATION ............................................................................................................................. 7 PHASE 3: MONITORING & EVALUATION ............................................................................................................. 8 PHASE 4: FUTURE PLANS AND PROJECTS ............................................................................................................. 8 C. SCOPE OF THE PROJECT ................................................................................................................... 8 SCOPE DEFINITION .......................................................................................................................................... 8 RISK ASSESSMENT ........................................................................................................................................... 8 INITIAL PROJECT RISK ASSESSMENT .................................................................................................................... 9 PROJECTED BUDGET ...................................................................................................................................... 10 MILESTONES ................................................................................................................................................ 10 ASSUMPTIONS............................................................................................................................... 11 PROJECT ASSUMPTIONS .................................................................................................................. 11 CONSTRAINTS................................................................................................................................ 11 PROJECT CONSTRAINTS .................................................................................................................................. 11 RELATED PROJECTS ....................................................................................................................................... 11 CRITICAL PROJECT BARRIERS ........................................................................................................................... 11 CHANGE MANAGEMENT ................................................................................................................................ 11 D. PROJECT MANAGEMENT APPROACH.............................................................................................. 12 PROJECT TIMELINE ........................................................................................................................................ 12 PROJECT ROLES AND RESPONSIBILITIES ............................................................................................................. 12 COMMUNICATIONS PLAN ............................................................................................................................... 13 E. ATTACHMENTS/APPENDICES ......................................................................................................... 15 STAKEHOLDERS ............................................................................................................................................. 15 1 MAKANA GARDENING PROJECT PHASE 1: PREPARATION ................................................................................................................................. 16 PHASE 2: IMPLEMENTATION ........................................................................................................................... 17 PHASE 3: MONITORING AND EVALUATION ........................................................................................................ 18 PHASE 4: FUTURE PLANS AND PROJECTS ........................................................................................................... 18 SURVEYS / QUESTIONNAIRES ................................................................................................................ 19 1. 2. SURVEY QUESTIONNAIRE FOR INDIVIDUALS GROWING VEGETABLES ............................................................... 19 SURVEY QUESTIONS FOR INDIVIDUALS NOT GROWING VEGETABLES ................................................................ 19 OVERALL VIEW ..................................................................................................................................... 20 F. APPROVALS ................................................................................................................................... 21 G. SIGN-OFF SHEET ....................................................................................................................................... 21 2 A. INTRODUCTION Purpose of Plan The Makana SUS Delegation Gardening Project Plan will provide a definition of the project, including the project’s goals and objectives. The Project Plan defines the following: Project background Project rationale Project goal, mission, purpose and objectives Project approach Scope and expectations Roles and responsibilities Assumptions and constraints Ground rules for the project Project budget and timeline Background Information More than half of the world’s population is already living in towns and cities and urbanisation is accelerating, especially in Africa and Asia. At the same time, human activities have crossed or are about to cross the critical ecological boundaries of the planet. Cities are therefore facing major challenges in maintaining and restoring the ecosystem services on which they depend for their functioning, while also securing equal access to natural and man-made resources among the growing number of urban citizens. The Supporting Urban Sustainability (SUS) Programme is a ground-breaking initiative developed by the Swedish International Centre for Education for Sustainable Development (SWEDESD). The programme is focused on ecosystem services approaches to poverty alleviation (ESPA) in urban settings. ESPA seeks to tie together experiences of social and environmental programmes in order to tackle poverty alleviation in a more holistic manner, recognising the interdependence between humans and nature. Through dialogical processes in Asia, Africa and Sweden, partner cities were identified and key stakeholder networks mapped in order to identify a diverse mix of five stakeholders active within each city-wide process, and with an interest in joining the programme to explore ESPA approaches. A partnership agreement and MOU was signed between SWEDESD and the Makana Municipality. The Environmental Manager, Mr N Nongwe was selected as project leader for the programme. The programme is focused on ecosystem services approaches to poverty alleviation (ESPA) in urban settings. ESPA seeks to tie together experiences of social and environmental programmes in order to tackle poverty alleviation in a more holistic manner, recognising the interdependence between humans and nature. The SUS programme brings together teams of stakeholders from six cities; Makana & Mangaung (South Africa), Dhaka (Bangladesh), Ahmadabad (India), Malmo (Sweden) and Arusha (Tanzania) to support collaboration and learning for strong urban sustainability. In May the Makana team joined delegates from the Municipalities of Mangaung and Arusha for a regional workshop in Arusha, Tanzania. During the workshop team were tasked to explore possibilities where they could identify, initiate or further develop ESPA-schemes in their respective cities. 3 Project Team A team of five delegates representing a diverse mix of organisations from Makana will bring together their expertise to develop a pro-poor green economy scheme that will attempt to address this challenge. 1. Mrs Marlene Mitchener, Director Umthathi Training Project Umthathi Training Project is an education and developmental training NGO established in 1993 and based in Grahamstown, Eastern Cape, South Africa. Their aim is to raise the productivity and quality of life of people within their focus areas. Umthathi works towards this through nutrition and health-related garden activities and by utilising the maximum resources of the homestead for growing vegetables, medicinal and indigenous plants, and increasing the nutritional status and income of people through research, development, training and the extension of school, home and community garden technologies. Umthathi will bring their expertise in training and education in the development of community and home gardens. In return they will benefit from the best practice methods identified in this project. 2. Ms Nthabiseng Mohanoe, Masters Student Rhodes University, Environmental Learning Centre Rhodes University will bring their expertise in research and development to the project. They will benefit because the project focuses on Environmental Education and enhancing professional capacity on sustainability development research programmes. 3. Ms Zimasa Nduna, Manager Agricultural & SMME’s, Makana Municipality This project identifies with their strategic approach of creating an enabling environment. Through this, jobs will be created and this will increase the Regional Gross Domestic Product. 4. Mr Kwanele Mbangi, Superintendent Parks & Recreation, Makana Municipality The Parks Department will support this project as part of the green city programme that they are already working towards. The Department already has commonages that are not efficiently utilized, and this project would be able to utilize them in a sustainable manner. 5. Mr Ntobeko Nyengane, Environmental Facilitator, Makana Youth Community The youth will benefit in the programme by learning on how to sustain programmes and what needs to be done in order to start a programme. When jobs are created, it will reduce unemployment rate of the youth. 4 B. PROJECT RATIONALE, GOALS AND OBJECTIVES Makana Response Our city is facing major challenges in maintaining and restoring the ecosystem services on which we depend for our functioning, while also securing equal access to natural and man-made resources among the growing number of urban citizens. In addition taking into consideration the existing poverty, high levels of unemployment, lack of easy access to affordable, fresh food and the future food demand in the Makana area there is an urgent need for investment in sustainably managed agriculture that would demonstrate that ecosystem health is essential to long-term food security and to promote sustainable livelihoods where agricultural production and resource conservation positively reinforce each other. Project Rationale Ecological, economic and political changes, coupled with consumer demand and rising fuel prices have resulted in the current food crisis. Triggered by these crises and the high levels of poverty and unemployment in the Makana area, the reinvestment in agriculture is essential to reducing the high levels of poverty in our area. However, in a context of ecological, food and energy crises, the most pressing issue regarding reinvestment is not how much, but how. Cultivating school, community, and home or farm food gardens is the most direct way for many poor families to improve their access to a variety of micronutrient-rich food and to generate a much needed income thereby improving their quality of life and livelihoods. Poverty: The depth of poverty in the Eastern Cape is revealed in one of the worst Human Development Indices (0.49) in the country; Unemployment: Over 50% of people are unemployed and living in poverty, in some areas, this is over 70%; Food price increases: With food prices massively escalating the poor are more vulnerable than ever; Poor access to nutritious foods and inadequate food security; Lack of access to land and other resources; Changing land use practices as more land is used for game farming; Climate change is having a negative impact on food production. Project Goal & Mission Our vision is for a growing number of people having the necessary passion and skills to ensure their food, health and livelihood security. Our goal is to restoring a culture of agriculture for the benefit of the poor in Makana. Our mission is to increase the quality of life of the poor in Makana by establishing income generating, sustainable agricultural nodes that support the surrounding community by providing affordable, fresh vegetables and other useful plants for medicinal, cultural and environmental purposes. Project Purpose & Objectives The purpose of the pilot phase taking place during 2011 will be to establish sound protocols by which other similar projects can be established. 5 Our objective for the initial stage is: To establish three income generating, sustainable agricultural nodes within Makana that supports the surrounding community by providing affordable, fresh vegetables and other useful plants. The agricultural nodes must encompass the following principles: Each agricultural node will consist of one community garden surrounded by ten home gardens; To green our city particularly by introducing valuable indigenous plants to the gardens and surrounding landscape; To protect indigenous medicinal & traditional plants that are becoming endangered; To use agricultural methods that can cope with the negative effects of climate change; To introduce environmentally and practically sustainable cultivation principles and practices that result in an integrated, diverse and productive land-use system; To encourage the use of natural resources; To establish gardens that are not labour or cost intensive and are appropriate to members of the community who are elderly, frail or disabled and do not have a great deal of money; To encourage job creation and for community members to engage in secured diverse livelihood strategies. To encourage the protection of and develop an understanding of the importance of ecosystem services. Project Approach The project approach needs to explore how we can, and must achieve a reorientation of our agricultural systems towards modes of production that are highly productive, highly sustainable and that contribute to the progressive realisation of the human right to adequate food. The approach should contribute to the broader economic development of vulnerable people and needs to explore how ecosystem services approaches can help alleviate poverty and contribute to strong sustainability in rural and urban settings. The cultivation practices and philosophy that should be adopted and applied must be in accordance with agro-ecological and organic farming methods and principles and promote green economy within the Makana Municipal area. Expensive and cost bearing methods must be avoided to enable suppliers to build up their financial and capital assets. The use of organic methods gains credence in light of global warming, climate change and changing weather patterns. There is an urgent need to design diverse gardens that include organic inputs and methods, water harvesting and conservation, prevent soil erosion, remove invasive plants and restore useful indigenous plant species including medicinal plants and adding plants that can cope with the adverse effects of Climate Change. One of the key components of our work must be to support and encourage indigenous forms of knowledge and ways of working. All aspects of our projects decision-making must emerge out of consultative processes with a broad range of stakeholders, including non-literate and highly marginalised sectors of society. The style of consultation should draw on Xhosa traditions of grassroots democratic practice. Community profiling and community interaction through stakeholder & focus group discussions will ensure that we are working towards the needs and requirements of the people and this will help build our project and ensure community confidence, empowerment and ownership. 6 Project Phases The project will be developed in four phases: Phase I: Preparation Phase III: Implementation Phase IV: Monitoring and Evaluation Phase V: Future Plans and Projects Project plan with budget and timeline.xlsx Phase 1: Preparation 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. Establish a project plan; Establish project purpose, vision, goals and objectives; Design a presentation to potential stakeholders and funders; Identify and approach project support stakeholders; Identify potential community garden sites; Identify potential home garden sites ; Identify potential garden stakeholders; Design a participant survey / questionnaire Perform survey within identified areas and households; Analyse and evaluate findings; Devise a community survey / questionnaire; Perform survey within identified communities; Carry out survey; Analyse and evaluate findings; Select community and home garden participants; Chose the most appropriate community and home garden sites; Host project support stakeholders workshop; Host community stakeholders workshop; Identifying entrepreneurial development programmes; Identifying potential markets; Identify who can assist with establishing co-operatives; Identify resources required for the implementation of the project; Identify and source funders or donors for the project; Identify and train facilitators (trainers) for the project participants; Develop best model garden design; Develop performance indicators for monitoring & evaluation programme. Phase 2: Implementation 1. 2. 3. 4. 5. 6. 7. Conduct Participant Training Community Group Organisation Preparation of Sites Development of Sites – resources etc. Cultivating site – resources etc. Harvesting Income generation – introducing markets, co-ops 7 Phase 3: Monitoring & Evaluation Monitoring and evaluating will form an integral part of the project life, as it will shape the bases for the future development of the project. We need time to enable reflection, learning and planning and have structured that into our project plan. Monitoring and evaluation will take place at regular intervals where a range of performance indicators will be in place to assess the quality and extent of the project. The results of the monitoring process will also be used to evaluate the impact our training on the individual, group and community. Phase 4: Future Plans and Projects The success rate and challenges met of the first three agriculture nodes will inform us as to the development of future projects. C. SCOPE OF THE PROJECT Scope Definition Short-term gains will be offset by long-term losses if it leads to further degradation of ecosystems, thereby threatening future ability to maintain current levels of production. It is possible however, to significantly improve agricultural productivity where it has been lagging behind, and thus raise production amongst vulnerable people while at the same time improving the livelihoods of small-scale producers and preserving ecosystems. The project would contribute to sustainable development and preserve the ability for the succeeding generation to meet its own needs. It would also contribute to the growth of other sectors of the economy by stimulating demand for non-agricultural products that would result from higher incomes. During the pilot phase (2011) the project will support the establishment of three agricultural nodes in three diverse areas in the Makana Township that will benefit the poor. Each node will include a community garden, ten home gardens and a market place. It is envisaged that the home gardeners will form the core of the community group who will run the community garden and will transfer and share their newly learnt skills and knowledge with new members. The establishment of the three community gardens will be in a school, a clinic and a commonage area and the participants will be selected from different age groups. A selection criterion for participants will be based on, inter alia: Commitment, passion, need, access to land, and access to resources. Because one of our objectives is job creation the project team has decided that the unemployed Makana youth member of our group will undergo capacity building and developmental training to develop his skills in facilitating and training community members in the establishment of income generating, food producing gardens. This will enable him to provide training for all our programmes and will also provide him with the ability to secure other similar positions in the future. Risk Assessment The initial Risk Assessment will attempt to identify, characterise, prioritise and document a mitigation approach relative to those risks which can be identified prior to the start of the project. 8 The Risk Assessment will be continuously monitored and updated throughout the life of the project, with monthly assessments and it will allocate time into each Steering Committee meeting, dedicated to identifying new risks and discussing mitigation strategies. Initial Project Risk Assessment Risk Makana Project Team remaining as a group Project Team Availability Lack of buy-in from community members towards the project Lack of buy-in from project supporters Access to land Access to resources Access to funding Community taking ownership of project Lack of skills and knowledge and how to establish gardens Cost Estimtes Unrealistic Timeline Estimates Unrealistic Mitigation Strategy Comprehensive communications plan, frequent meetings, tight project management oversight. Involve other interested stakeholders in all processes, so that someone can step in should the need arise. Frequently seek feedback to ensure continued support. A Steering Committee to be elected. Continuous review of project momentum at all levels and identify any impacts caused by unavailability. If necessary, increase project team. Consultative processes drawing on Xhosa traditions of grassroots practice with a broad range of stakeholders, including highly marginalised sectors of society. Create an ongoing comprehensive list of potential project support stakeholders. Design a solid project plan and project presentation. Frequently seek feedback to ensure continued support. Create networks and links with municipal and government departments that can assist with land acquisition. Involve schools, clinics and other community facilities in the project. Identify access to different resource needs eg. Water,dry grass, manure, paper, compost bins, garden equipment, ploughs, seeds, seedlings, plants, treees. Compile a comprehensive list of potential funders who support this type of project and send out funding proposals. Frequent community interaction through stakeholder & focus group discussions to ensure that the project is working towards the needs and requirements of the people. Building the programme to ensure community confidence, empowerment and ownership. Comprehensive evaluation and pre-selection process Solid training programmes using the Asset Based Approach. Recapping sessions to identify knowledge gaps and provide additional training, if necessary Budget is subject to amendment as new details regarding project scope are revealed Timeline reviewed to prevent undetected timeline departures 9 Projected Budget Define the project budget Milestones The following represent key project milestones, with estimated completion dates: Milestone Estimated Completion Date Phase I: Preparation Identify project supporter stakeholders 00/00/2011 Adhoc meetings with potential project supporter stakeholders 00/00/2011 Project supporter stakeholders workshop 00/00/2011 Select Steering Committee Members 00/00/2011 Initial Steering Committee Meeting 00/00/2011 Prepare project plan 00/00/2011 Prepare action plan 00/00/2011 Prepare project budget 00/00/2011 Prepare funding proposal 00/00/2011 Identify home garden areas & participants 00/00/2011 Identify community garden areas & participants 00/00/2011 Prepare home gardener survey 00/00/2011 Perform home garden survey 00/00/2011 Analyse & evaluate home gardener survey 00/00/2011 Select home garden participants 00/00/2011 Community Stakeholder Meeting 00/00/2011 Prepare community gardener survey 00/00/2011 Perform community gardener survey 00/00/2011 Analyse & evaluate community gardener survey 00/00/2011 Select community garden participants 00/00/2011 Select Steering Committee Members 00/00/2011 Initial Steering Committee Meeting 00/00/2011 Identify entrepreneurial development programmes 00/00/2011 Identify potential markets 00/00/2011 Identify who can assist with establishing co-ops 00/00/2011 Identify & source funding or donors 00/00/2011 Identify & train facilitators 00/00/2011 Develop training material 00/00/2011 Develop M&E performance indicators 00/00/2011 10 ASSUMPTIONS Project Assumptions The following assumptions were made in preparing the Project Plan: All involved organisations will ensure that project team members are available as needed to complete project tasks and objectives. All involved organisations will foster support and “buy-in” of project goals and objectives. Newly elected council will buy in and support the project fully as it unfolds until completion. The Steering Committee will participate in the timely execution of the Project Plan (i.e., timely approval cycles and meeting when required). Community members are willing to accept and take ownership of the project. The acquisition of land and natural resources is provided by the municipality and will support the project. All project participants will abide by the guidelines identified within this plan. The Project Plan may change as new information and issues are revealed. CONSTRAINTS Project Constraints The following represent known project constraints: Project funding sources are limited, with no contingency. Due to the nature of the environment, resource availability is inconsistent. Non- collaborative learning and/or non reflexive governance. Related Projects Umthathi Training Project The East Cape Agricultural Research Project (ECARP) Critical Project Barriers Unlike risks, critical project barriers are insurmountable issues that can be destructive to the project’s initiative. In this project, the following are possible critical barriers: Removal of project funding and support; Project quality; Natural disasters or civil unrest. Should any of these events occur, the Project Plan would become invalid. Change Management The information contained within the Project Plan will likely change as the project progresses. While change is both certain and required, it is important to note that any changes to the Project Plan will impact at least one of three critical success factors: Available personnel or time, Available resources (financial or in-kind), or Project Quality (garden ownership or outputs). The decision by which to make modifications to the Project Plan (including project scope and resources) should be coordinated using the following process: 11 Step 1: As soon as a change which impacts project scope, schedule or spending is identified, the issue will be documented. The Team will review the change and determine the associated impact to the project and will forward the issue, along with a recommendation, to the Steering Committee for review and decision. Upon receipt, the Steering Committee should reach a consensus opinion on whether to approve, reject or modify the request based upon the information contained within the recommendation and their own judgment. Step 2: Step 3: D. PROJECT MANAGEMENT APPROACH Project Timeline Initial Phase May to December 2011 Project Roles and Responsibilities Role SWEDESD Project Facilitators Steering Committee Project Manager Project Team Responsibilities Provide SUS Programme project facilitation oversight and guidance Review project elements for comment Participant(s) Martin Westin Shepherd Urenje Alexander Hellquist Commits resources Approves major funding and resource allocation strategies, and significant changes to funding/resource allocation Resolves conflicts and issues Provides direction to the Project Team Reviews project deliverables To be decided Ideal: Muni: Riana Meiring, Kevin Bates, Clr Wells, RU: Rob o’ Donogue, Lawrence Sisitka and Di Hornby Community Leaders Manages project in accordance to the project plan Serves as liaison to the Steering Committee Receives guidance from Steering Committee Provide overall project direction Direct/lead team members toward project objectives Handles problem resolution Manages the project budget Communicates project goals, status and progress throughout the project to their stakeholders Monitors and Evaluates project deliverables Coordinates participation of work groups, individuals and stakeholders Provides knowledge and Ndumiso Nongwe Marlene Mitchener Nthabi Mohanoe Zimasa Nduna Kwanele Mbangi Ntobeko Nyengane 12 Role Responsibilities recommendations Helps identify and remove project barriers Assures that the project will meet the project goals and objectives Identifies risks and issues and helps in resolutions Supervises facilitators Supervises participants Lend expertise and guidance as needed Subject Matter Experts Participant(s) As per list of stakeholders Communications Plan Disseminating knowledge about the project is essential to the project’s success. Project participants desire knowledge of what the status of the project is and how they are affected. Furthermore, they are anxious to participate. The more that people are informed about the progress of the project and how it will help them in the future, the more likely they are to participate and benefit. This plan provides a framework for informing, involving, and obtaining buy-in from all participants throughout the duration of the project. Audience - This communication plan is for the following audiences: Project Facilitators Steering Committee Project Leader Project Team Project Support Stakeholders Community Stakeholders Garden Participants Subject Matter Experts Communications Methodology The communications methodology utilizes three directions for effective communication: Top-Down It is absolutely crucial that all participants in this project sense the Project Team support and guidance for this effort. The Project Team needs to speak with a unified, enthusiastic voice about the project and what it holds for everyone involved. If the project is to be successful a 'hands-on' approach is required. Not only will the team need to speak directly to all stakeholders, they will also need to listen directly to all stakeholders, as well. The transition from the project management practices of today to the practices envisioned for tomorrow will be driven by a sure and convinced leadership focused on a vision and guided by clearly defined, strategic, measurable goals. Bottom-Up To ensure the buy-in and confidence of all involved in bringing the proposed project to reality, it will be important to communicate the way in which the project goals and objectives were created. If the perception is that only the Project Team created the proposed 13 project, resistance is likely to occur. However, if it is understood that all stakeholders were consulted, acceptance seems more promising. Middle-Out Full support at all levels, where any changes will have to be implemented, is important to sustainable development. At this level (as with all levels), there must be an effort to find and communicate the specific benefits of the changes. People need a personal stake in the success of the project management practices. Communications Outreach The following is a list of communication events that are established for this project: 1. Monthly Status Reports The Project Team shall provide monthly written status reports to the Steering Committee. The reports shall include the following information tracked against the Project Plan: Summary of tasks completed in previous month; Summary of tasks scheduled for completion in the next month; Summary of issue status and resolutions 2. Monthly Steering Committee Meeting These status meetings are held at least once per month and are coordinated by the Project Manager. Every member of the Steering Committee attends and participates in the meeting. The Project Manager sends the status report to each member of the team prior to the meeting time so everyone can review it in advance. 3. Bi-Weekly Project Team Status Meeting These status meetings are held every other week. Every member of the Project Team will be invited to participate in the meeting. Project Manager sends the status report to each member of the team prior to the meeting so everyone can review it in advance. 4. Website Use Monthly updates and information will be posted to the SUS Programmes website. 14 ATTACHMENTS/APPENDICES Stakeholders Name Position and Organisation Contact details Independent Schools Bruce Haynes Caleb Mandikonza RU – Common Ground SADC - WESSA Di Hornby Heila Lotz-Sisitka Jai Clifford-Holmes RU – Centre for Social Development Rhodes University RU – Galela Amanzi Kevin Bates Parks Department Lali Naidoo Lawrence Sisitka ECARP Rhodes University Likhaya Ngandi (SPU) Mike Powell Mr Nodada Mr. D Magxwalisa Rhodes University ECDC Cacadu District Municipality Mrs Khatshaza/ Ms Keva (ASD) Ndomiso Nongwe Riana Meiring Department Of Agriculture Rob O'Donoghue S.Ngilana (PE office) Tandi Hopa RU - Professor: Environmental Dept of water affairs Tandi Matebese Makana Communication Director : LED Makana Municipality NDA 082 662 9335 082 736 4092 caleb@wessa.co.za d.hornby@ru.ac.za h.lotz-sisitka@ru.ac.za 082 769 1622 jai.clifford.holmes@gmail.com 046 603 6072 kgb@makana.gov.za 046 622 5429 083 621 3422 heilaw@imaginet.co.za 046 603 6244 likhaya@makana.gov.za 043 704 5708 041 508 7141 DMagxwalisa@cacadu.co.za 046 603 5402/5400 Nongwe@makana.gov.za 083 448 1055 riana@makana.gov.za r.odonoghue@ru.ac.za 082 881 3551 043 721 1226 072 309 6901 083 771 7697 matebeset@makana.gov.za 15 Phase 1: Preparation 1. Establish a project plan; 2. Establish project purpose, vision, goals and objectives; 3. Design a presentation to potential stakeholders and funders; 4. Identify and approach project support stakeholders; 5. Identify potential community garden sites; 6. Identify potential home garden sites ; 7. Identify potential garden stakeholders; 8. Design a participant survey / questionnaire that will determine their: i) Need and desire to own a garden ii) Current status – already gardening or not iii) Kind of vegetables currently eaten iv) Kind of vegetables would like to eat v) Type of garden they would desire vi) Who the garden would serve-youth, seniors, special populations See attached survey 9. Perform survey within identified areas and households; 10. Analyse and evaluate findings; 11. Devise a community survey / questionnaire; 12. Perform survey within identified communities; 13. Carry out survey; 14. Analyse and evaluate findings; 15. Select community and home garden participants; 16. Chose the most appropriate community and home garden sites; i) Identify the owner of the land; ii) Make sure the site gets at least 6 full hours of sunlight daily; iii) Do a soil test in the fall for nutrients & heavy metals; iv) Consider the availability of water; v) Consider past uses of the land - Is there any contamination? 17. Host project support stakeholders workshop; 18. Host community stakeholders workshop; 19. Identifying entrepreneurial development programmes; 20. Identifying potential markets; 21. Identify who can assist with establishing co-operatives; 22. Identify resources required for the implementation of the project; 16 23. Identify and source funders or donors for the project; 24. Identify and train facilitators (trainers) for the project participants; 25. Develop best model garden design; 26. Develop performance indicators for monitoring & evaluation programme Phase 2: Implementation 1. Training Programme One of the key components of the project must be to support and encourage indigenous forms of knowledge and ways of working. All aspects of the decisionmaking should emerge out of consultative processes. The training should follow the assets based approach and there is little traditional training; the approach is facilitated learning – providing opportunities for participants to discover for themselves, learn from each other, and make explicit and validate what they already know. In keeping with this principle, people decide themselves how to engage with the material and approaches. Their responses depend on their prior knowledge, willingness to be open to learning, and preparedness to reflect on their own behaviour and attitudes. 2. Community Group Organisation 1) 2) 3) 4) 3. Organisational Development – forging unified vision, action plans, business plans and land use methods. These plans should include: i) Are there conditions for membership; i) Will the group do certain things cooperatively (such as turning the soil in the spring, planting cover crops, or composting)? ii) When someone leaves, how will the next gardener be chosen; iii) How will vegetables or income be assigned; iv) Will gardeners share tools, hoses, and other such items? v) How will minimum maintenance (especially weeding) be handled both inside plots and in common areas (such as along fences, in flower beds, and in sitting areas)? vi) Will there be a set of written rules which gardeners are expected to uphold? If so, how will they be enforced? vii) Should the group incorporate and consider eventually owning their own garden site? Roles and Responsibility – identifying each person’s roles and responsibility; Organisational structure – organising work team and planning the work routine; Establishing a time table Preparation of sites 1. Clean the site; 2. 3. Land preparation – plowing etc; Gather resources; 17 4. Development of sites 1. 2. 3. 4. 5. 6. 5. Develop the design; Include plans for a storage area for tools and other equipment, Erect shelter for water harvesting as well as to provide a shade and meeting area. Have a rainproof bulletin board for announcing garden events and messages Establish compost and event areas; Gather resources; Lay out garden to place flower or shrub beds around the visible perimeter. This helps to promote good will with non-gardening neighbours, passersby, and municipal authorities. Income Generation Increasing food production to meet future needs, while necessary, is not sufficient. It will not allow significant progress in combating hunger and malnutrition if it is not combined with higher incomes and improved livelihoods for the poorest. Poor access to markets still remains a challenge. There will be a need to explore the following: 1. Establishing Co-ops. Organisational Development – forging unified vision, action plans, business plans and land use methods among male and female and young and older farmers will be an important task for the smooth operation of the coops. 2. Supplying Education Institutions in Makana – The availability of our numerous education institutions is one of competitive advantages. These institutions require a constant supply of fresh, organic vegetables. 3. Creating market spaces within the agricultural nodes. This could have a two-prong effect - the produce produced in the gardens will be available for sale to people locally and will alleviate the need of people travelling into town to purchase their produce thereby reducing their costs and reducing carbon emissions. Phase 3: Monitoring and Evaluation Phase 4: Future Plans and Projects Our project is more relevant in today’s economic crises than ever before. Development work is a slow and continuous process and it could take up to 10 to 15 years before we see a substantial shift in the circumstances of our communities. Development ultimately originates in people themselves when they are empowered with skills and knowledge. 18 Surveys / Questionnaires 1. Survey Questionnaire for Individuals growing vegetables 1. 2. 3. 4. 5. 6. 7. What kinds of vegetables do you grow in your garden? What vegetables grow successfully in your garden? Where do you get your seeds or plants from? Which vegetables are easy to grow here? What are the vegetables that you buy and not grow in your garden? Why? Do you do the garden yourself or do you do it with others? Do you sell the vegetables when ready or do you use them for family? 2. 1. 2. 3. 4. 5. 6. 7. 8. NB Observe whether young or old who tend the gardens? Observe whether male or female who tend the gardens? Observe if there are any people with disabilities tending the gardens? Survey questions for individuals not growing vegetables Do you grow any vegetables in your garden? Why not? If you were to be trained on how to start a garden would you create your own? Where do you buy your vegetables from? Is the place easy to access? Are the vegetables cheap or affordable? How fresh are the vegetables? What kinds of vegetables do you eat? How often do you eat vegetables? If you were to grow your own vegetables what vegetables would you grow? 19 Overall View The goals and objectives for this project will focus on restoring a culture of agriculture for the benefit of the poor in the Makana area through the establishment of gardens that: Are sustainable Improve access to fresh, healthy food for impoverished community members. Creates income opportunities and economic development Preserves Green Space Improves the quality of life for people in the garden Provides a catalyst for neighborhood and community development Stimulates Social Interaction Encourages Self-Reliance Beautifies Neighborhoods Produces Nutritious Food Reduces Family Food Budgets Conserves Resources Creates opportunity for recreation, exercise, therapy, and education Reduces city heat from streets and parking lots Provides opportunities for intergenerational and cross-cultural connections Advance community development, empower local leadership and nurture families, strengthen economic development and improve overall quality of life. 20 E. APPROVALS Sign-off Sheet I have read the above Project Plan and will abide by its terms and conditions and pledge my full commitment and support for the Project Plan. Project Sponsor: Date Project Manager: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date Steering Committee: Date 21 Feedback on survey conducted for individuals growing vegetables in their homes and individuals not growing vegetables in their homes. Goal & Mission The goal and mission of the project is to grow the number of people having necessary skills to ensure their food, health and livelihood security through a culture of agriculture for the benefit of the poor. Data Collection The selection of the garden homes for the purpose of the pilot phase project was carried out in three areas within Makana. Thirty (30) potential home gardens in total were identified for sampling. The three areas covered: Ext 7, Tanki 1, Tanki 2 and Sun City. In each area, ten (10) homes were identified, and these combined both homes growing vegetables and those who were not. The number of households surveyed was limited to only thirty owing to time constrains. There is only a week and a half left before residential workshop in Sweden where a presentation of the Makana strategic enquiry is expected with results. A photographic survey was conducted covering these homes. After determining the location of the sample homes a questionnaire was designed which entailed exactly the same questions for all three areas to be surveyed (pls see attached copy). The survey was conducted over a period of two days. Tantyi 1 and Sun-city were covered by Ntobeko Nyengane, on Saturday 21/05/2011 and completed on Monday 23/05/2011. Tantyi 2 was covered by Kwanele on Saturday 21/05/2011. Section 7 was covered by Nthabiseng Mohanoe on 23/05/2011 and completed Tuesday 24/05/2011. Data Analysis and findings A summary of all the questionnaires was carried out. Each section was reviewed and analysed individually for findings and captured. A review and comparison of all three areas was carried out, in order to draw out the general pattern and trend of all results. Below is an analysis of the survey, based on the received findings from the three areas. EXT 7 The ten individuals identified to participate were all trained by Umthathi in January 2011. Out of the ten homes, seven were already growing their own gardens. They grow different types of vegetables. In one house, inter-cropping system was even used, with cabbage, beetroot and spinach planted. Vegetables growing successfully and easily in all the households identified include spinach, cabbage, potatoes, onions, beetroot and carrots. Tomatoes were also planted in some homes but appeared to suffer because of the cold weather. In one home where the woman was passionate about her garden, she had grown sweet potatoes, sweet peas, green beans, cherry tomatoes and broccoli in addition to what others were planting in their homes. All the individuals said they get their seeds, seedlings and or plants from Umthathi. This is easy access for them and cheap, as the seedlings cost 50c. They also harvest seeds from the vegetables they grow. When the vegetables are out of season, they buy from the local shop although not as fresh as when they have to pick from their own backyards. The price of a cabbage is between R7.00 22 R10.00 depending on the size. They generally concur that they rather buy from the local shops than spend the money on a taxi fare costing the same amount as a cabbage. All the participants worked their own garden themselves. They also grew the vegetables for home use, to feed their families; they are not using it as a source to generate income as yet. Only one woman, who had the most successful and biggest garden, even using her neighbour’s back yard, said she sells the vegetables for income as both she and her husband were unemployed. Observations made were that all individuals were unemployed, with age ranging from 3050yrs old. All were females. None identified had any disabilities. Out of the ten homes, only four were not growing vegetables even though Umthathi had trained them as recently as January 2011. The reason given mostly is that they do not have proper fencing to prevent the neighbour’s chickens, goats, cows and donkeys from invading their gardens. In one house, they had a construction going in their yard, and their garden was destroyed during that time, since then they have not re-started. In two homes, there were issues of ill health, not enabling them to do garden. Because they do not grow any vegetables in their gardens, they have to wait until they have money from their grants to buy from the local market on Thursdays or from the local shop. These individuals eat different types of vegetables, the kinds that are grown mostly by their colleagues-potatoes, pumpkins, cabbage, green pepper, beetroot, tomatoes and carrots. TANTYI (1) In Sun city and Tantyi a random selection of homes with and without gardens were identified for the survey. Six households were identified in Tantyi 1. Four grow vegetables in their gardens successfully. They grow spinach, green peppers, onion, lettuce, carrots, and beetroot. These grow easy in most homes. They indicate that they buy their seeds from Shoprite Checkers, one said she buys from the Dept of Agriculture. All 4 were trained by Umthathi Training Project. When the vegetables they usually eat are out of season they buy from the shop even though expensive. All of the gardens are grown and taken care of by the individuals themselves. Generally these individuals say the grow vegetables in order to feed their families but also sell in order to generate income. At Mavikela backyard, the woman says she sells to Mavick’s caterers in order to generate income. It was observed that in this area just like in Ext 7 the gardens are tended by young and old. The pattern remains consistent with women involved in home gardens. No persons with disabilities were identified who were growing or not growing vegetable gardens. TANTYI (2) Ten households were identified in Tantyi 2. All ten homes grow their own vegetables successfully. All 10 were trained by Umthathi Training Project. The vegetables they grow are the same as those grown in Tantyi 2. They add that these vegetables grow easy in their area. Spinach seems to be the most favourite vegetable to grow and easily so. They buy their seeds and plants from the local shops. All individuals say they do the gardens themselves and enjoy it. All ten homes grow the vegetables in order to feed their families. All ten home gardens are tended by old persons. The individuals doing home gardens in Tantyi i 2 are dominated by males, six males to four females. No persons with disabilities were identified in this area who was involved in the home gardens. 23 SUN CITY All four participants from Sun City grow vegetables in their homes. All 4 were trained by Umthathi Training Project. They also grow the most common vegetables, cabbage, spinach, beetroot, carrots, onion and potatoes. They all say these are easy to grow and successfully so. The individuals said they buy their seeds from Shoprite checkers. One of them said she usually gets from a neighbour and saves money this way. The vegetables they usually buy from the shop which they don’t grow are butternut, green pepper and corn. They all said they do their own gardens themselves. Three said they grow their vegetables in order to feed the family with the exception of one. She donates the vegetables to charities, aids centre and community. One said he grows the vegetables to feed family and sometimes sells. It was observed that a combination of both young and old was involved in the home gardening. Where an old person had a garden a young person would be involved too. The pattern remains dominated by women - In this case three women and one male -. No persons with disabilities were identified who were either growing or not growing their own gardens. 24 25