Safety, Health & Environment System Doc. nr. Page Revision Procedure Risk assessment & control HSE 3.1 1 van 3 0.1 Risk assessment & control. REVISION 0 DATE DESCRIPTION PREPARED CHECKED 19-2011 Initial document procedure IvD ECO Page All Revision 0.2 Revision appendices: notification form, investigation report. APPROVED Safety, Health & Environment System Doc. nr. Page Revision Procedure Risk assessment & control 1.0 HSE 3.1 2 van 3 0.1 PURPOSE The purpose of this procedure is to ensure VSH has suitable means for the assessment and control of risks. 2.0 SCOPE This procedure is applicable for all departments of CM&I. 3.0 DEFINITIONS HAZID HAZard IDentification LMRA Last Minute Risk Assessment RI&E Risk Identification & Evaluation SJA Safe Job Analysis TRA Task Risk Assessment 4.0 PROCEDURE See flowchart The assessment of risks takes place in several levels in the organisation: Scope of work / level Risk assessment Assessment method Responsible Timing Company RI&E Fine & Kinney Director Organisational changes Project/procedure HAZID Risk Matrix Project manager During engineering phase Task TRA / JSA Risk Matrix Project superintendent Before the execution of the job/procedure Execution LMRA Risk Matrix Employee Before the start of each task 5.0 RESPONSIBILITIES See flowchart 6.0 REFERENCES SHE 5.1 Monitoring and Measuring SHE 5.3.2 Corrective and Preventive measures 7.0 APPENDICES SHE 4.3.1-F1 Risk matrix Safety, Health & Environment System Doc. nr. Page Revision Procedure Risk assessment & control INPUT PROCESS OUTPUT HSE 3.1 3 van 3 0.1 RESPONSIBLE Start 1. Manager Define scope of work – client expectations. Define the level of risk assessment 1. Define scope of Work · Procedure · Method statement · Work instruction Risk Matrix 2. Manager Inventorises the requirements from; Year plan assessment, Project requirements, processes / activities. 2. Identification of Risks 3. Assessment of Risks 4. Mitigation Actions? Database YES 5.3.2 Preventive / Corrective actions 3. Manager Sets up an assessment team incl. SHE advisor, supervisor, and involved personnel to assess the Risks. 4. SHE Advisor Advise and communicate Mitigated actions to relevant parties. NO 5. Implement mitigation actions and controls in relevant processes PRIMARY PROCESSES 5.1 Monitoring and Measurment END 5. Manager Execute actions and set up controls.