Schedule Change Control System Development Checklist and Worksheet Overview & Purpose A schedule change control system defines the procedures by which the project schedule may be changed. It includes the paperwork, tracking systems, and approval levels necessary for authorizing changes. Schedule change control should be integrated with the integrated change control system. The schedule change control system helps manage the process by which schedule changes occur, and provides a basis for schedule updates and corrective actions. Document Information: Category: Pages (excluding cover): Version: Updated: Other: Template 1 1.0 July 2004 Schedule Change Control System Development Checklist and Worksheet Project Name Project Ref. No. Prepared By Date Prepared Customer Business Unit / Dept. Contact Project Type (STD / ADV) STD Determine those responsible for approving or rejecting proposed schedule changes: Be sure to provide for appropriate review of all changes. Define categories of schedule changes qualifying for automatic approval without review: Describe how schedule change control will be integrated with the integrated change control system: Define steps by which schedule documents may be changed, including: Paperwork Tracking Systems Dispute Resolution Procedures Approval Levels Required