EPOS TCS Implementation Plan Working Group: WG10 “Infrastructures for Georesources” Date: 14.03.2014 Version: 1 Authors: Beata Orlecka-Sikora, Stanisław Lasocki, Mariusz Sterzel, Grzegorz Lizurek and WG10 Team 1. Technical Plan 1. WG Pillar Structure WG10 Thematic Core Service (WG10 TCS) will be composed of four pillars: Pillar I “Acquisition of Induced Seismicity Episodes”. An induced seismicity (IS) episode are all data describing comprehensively a separate anthropogenic seismicity case. The IS episode comprises time-correlated seismic and relevant production data supplemented with other geo-data: geological, geomechanical, geodetic, etc. Pillar II “InSilico Experiments Including Technology-oriented Seismic Hazard”. These are common software tools for data handling and visualization, standard and advanced software for research, including software based on newly proposed algorithms for tests and development. The pillar will make possible using the integrated software as a software library in own researchers’ programs. In case of need IS TCS will provide HPC facility. Pillar III “Document Repository” will integrate documents: scientific publications, peer reviewed and unreviewed reports, recommendations, expert opinions, manuals, instrument specifications etc. Pillar IV “Outreach, Education, Users’ Feedback”. This pillar plays an outstanding role in connection with the fact that IS research community is located in the field of conflict between industry and public. WG10 TCS as a platform grouping experts in the field around the integrated infrastructure aims to serve the public sector by expert knowledge and background information. The outreach service will be dedicated to the public sector and local administration bodies. WG10 TCS of EPOS will provide rational, well-documented information on the phenomenon of anthropogenic seismicity and associated hazards directed to general public. Tools for education and training are also foreseen. They will facilitate more inter- and multidisciplinary approach to education, and provide opportunity for students to obtain competences in the IS field as well as foster cooperative approach in education. Fig. 1 WG10 TCS pillar structure Technical description of the implementation of WG10 TCS prototype The prototype will become operational within 2014. It will have a full functionality of the final WG10 TCS and it will be developed to this final form during the construction phase of EPOS. In order to reach the goal of prototype’s full functionality implementation plan (ISEPOS project) includes also other two layers of IS RI integration. The whole set built in the framework of IS-EPOS project consists of: layer of acquisition of IS and related data of individual IS episodes, IS episodes acquisition and adaptation within Data Centers (DC) layer, and integration of DC resources and software solutions in WG10 TCS. WG10 TCS prototype will deal with one DC and seven IS episodes from different inducing technologies from 3 countries. The main technical aims of WG10 TCS are: (1) to register DC and facilitate bi-directional communication with DC. WG10 TCS stores metadata on the data located in DC; (2) to verify the quality of the research infrastructure reported by DC both in terms of subject matter and formal point of view as well as registers these resources in its metadata database; (3) to manage registration and offer services i.e. software tools to users. A part of the software resources will be released for download by WG10 TCS users. The software resources envisaged for the prototype of WG10 TCS are mainly selected to enable an examination of a scientific problem "Clustering of induced seismicity events - identification and reasons". This is a broad, important and current scientific issue. Both theoretical and observational works indicate strong relationships between seismic events resulting from their reciprocal influence. WG10 TCS computing resources to manage, store and analyze induced seismicity data will be provided by PL-Grid infrastructure of which Academic Computer Centre CYFRONET is a coordinator. Data Center will collect the mentioned seven IS episodes and upload them, on user’s request, to WG10 TCS. The main tasks of the Data Center are: (1) to register infrastructure providers. As part of this project, upon DC establishment, three infrastructure providers are to be registered: Institute of Geophysics, Polish Academy of Sciences, Central Mining Institute and Coal Company S.A. – Bobrek – Centrum coal mine. DC will be however open for registration and servicing of further providers of research infrastructure; (2) to receive data from data providers by data download interfaces. Some IS episodes will include seismic data recorded continuously by DC data download interfaces, other processed: triggered signals and seismic catalogs; (3) to convert provided analog data into a relevant digital form; (4) to convert digital data formats to formats acceptable by TCS; (5) to prepare metadata for the received data; (6) to communicate with TCS. DC created in the framework of IS-EPOS project will be located in the premises of Institute of Geophysics, Polish Academy of Sciences. The array of the future users of WG10 TCS prototype will be the same as in case of the final TCS in EPOS. The WG10 TCS prototype will be the first example of organized integration of IS RI in the global scale. WG10 TCS will implement educational functions for universities and other educational centers. An important group of users will be industrial users such as infrastructure providers and recipients of scientific research results implemented in their custom activities. TCS is to assist in the development of these methods and rules as to manage the exploitation of natural assets in a better way. Thanks to the science and industry synergy, science gains access to induced seismicity data collected in industrial centers whereas industry – access to new and fully tested solutions. In this way the competitiveness of both science and industrial centers increases. Central and local public administration bodies, crisis management centers, insurers, investors and interested representatives of the broad society will be important users as well. The WG10 TCS goal, among others, is to increase the social understanding and proper assessment of hazards and risk related to the anthropogenic seismicity by providing basic information and specialized know-how on SI. 2. WG progress on shared strategy for TCS governance The governance model of the EPOS WG10 TCS foreseen for after reaching the full operational phase is (Fig. 2): a. ISN Council (ISNC) composed of WG10 National Contact Persons; Tasks: recommends WG10 TCS Managing Officers; nominates Scientific & Technical Board (S&TB); provides general recommendations for TCS Management; provides general recommendations for S&TB; approves reports of activity and operational plans. b. Scientific & Technical Board (S&TB); Tasks: reviews research activity in the field of hazards evoked by exploitation of georesources and suggests and prioritizes its objectives; monitors and evaluates TCS usefulness, modifies strategy of TCS; recommends changes of TCS functions and construction for upgrading its usefulness; recommends technical modifications. c. Quality Control Section (QCS); Tasks: Controls quality of the substantive content of infrastructure being integrated and of services provided. QCS comprises: • Data Section • Software Section • Reports Section • Service Section d. ICT Section; Tasks: maintenance and development of e-platform. e. Promotion & Collaboration Section; Tasks: Promoting TCS in various environments: governmental, academia, industry, public; actions to increase and develop the integrated infrastructure; stakeholders engagement, contact and collaboration with industrial partners. Fig. 2 Proposed administration/governance model for WG10 TCS Initial Assessment of Human Resource Requirements For the operational phase of WG10 TCS human resources would be required: TCS Council: 13 persons - 1.0 FTEs TCS Management: 5 persons - 4.0 FTEs S&TB: 15 persons – 2.5 FTEs QCS: 5 persons - 4.5 FTEs ICTS: 5 persons – 5.0 FTEs PCS: 2 persons – 2.0 FTEs Coordination at Data Center: 1 person – 0.5 FTEs a Center During the implementation and construction phase additional resources would be required, e.g. the 0.5 – 1 FTE to integrate WG10 TCS with the EPOS Portal through the Compatibility Layer. 3. Plan to provide access to data products of higher level in data taxonomy According to adopted by EPOS data taxonomy, the integrated IS research infrastructure is divided into five group: Level 0: Raw-data related to IS episodes: continuous and event waveforms, relevant technological data (maps of technological environment, injection pressure, front advance, lake level etc.), measurements of various physical parameters (stress, geomechanical parameters, etc.); Level 1: Data-products coming from nearly automated procedures (e.g. earthquake locations, magnitudes, focal mechanisms, source parameters, extracted volumes, injection rates, etc.); Level 2: Data-products resulting from research (e.g., strain maps, earthquake source models, compiled catalogues, velocity models, 3D stress field changes due to production, rock sample tests results, geological data, etc.); Level 3: Data products integrating seismic, technological data and other geodata (e.g. technology (time) dependent hazards maps, surface impacts studies, seismo-technological rockmass models, cause-effect studies, hazard management and hazard conditioned optimization of production process, recommendations, know how, training materials, tutorials, etc.); Level 4: Computer software: acquired, contributed and generated software. We plan to have an open access to all WG10 TCS resources form the level 0-2 for registered users. On request of data provider, a small part of research infrastructure can be temporarily located in a restricted area. Decisions for such cases will be taken by TCS management. An open access to some TCS resources can be problematic. For instance TCS will have hazard assessment services but hazard estimates can be easily converted into „risk information”. Hazard estimates should be assessed and conveyed in a competent way. Because of that hazard assessment services cannot be fully public. In this connection RI from levels 3-4 will be basically open but we envision that some information and services can be located in restricted area. Software openness will be determined by software providers under acceptance of TCS management. 4. Plan to link TCS to ICS (contribution to metadata catalogue and compatibility layer, interoperability among services,....) In order to achieve compatibility with EPOS central hub and ICS, the WG10 TCS is built with all recommendations provided by WG7. For smooth cooperation between WG10 and WG7 one of the WG7 members is also a member of WG10. A few technical details concerning TCS/ICS compatibility are given in the following sections. Metadata catalogue To achieve compatibility at this level WG10 provides detailed information concerning IS metadata for WG7. As a result we expect a core set of metadata common among all WGs enriched with WGs’ specific sets. That way any user can easily reach information he/she needs. To assure EPOS-CERIF compatibility either WG10 CERIF setup will be provided or a 100% CERIF-compatible system. CERIF applicability for WG10 purposes is currently in test phase. WG10 TCS services To speed up the ICS/TCS integration, and at the same time lower the amount of work needed for it the WG10 TCS services are built as web services. TCS architecture is based on InSilicoLab technology. This technology implements open, widely accepted standards, with known API. These key factors make it easy to integrate with ICS web services. Data compatibility Data of EPOS community, including WG10 are stored in several data formats. WG10 works closely with WG7 on this topic in order to achieve data compatibility. As a result we expect EPOS to provide common tools allowing users transparent access to the community data. WGs Support, work duplication In order to achieve compatibility layer between various WGs of EPOS WG10 is actively involved in works of the Recommendation Board. We expect that the Board will provide best practice examples, recommendations concerning standards used in EPOS (above-mentioned metadata structure, protocols for data transfer, data sharing strategies and many more). The involvement in Board works together with WG7 will lower the work duplication that may take place among many WGs. Employing standards, common tools, software, etc. several common issues can be solved. We expect that a number of new TCS/ICS issues will show up during the integration process. However, we believe that they will be solved through close WG10/WG7 cooperation. 5. Scientific vision and the stakeholder interaction strategy for your own community Scientific vision Our mission is to create new research opportunities in the field responding to global challenges connected with exploitation of georesources. We envision that WG10 TCS will be involved in developing services/centers of studies of hazards linked to exploitation of georesources. Accurate assessment of human-induced seismic hazards and risks is a challenging research problem, which needs a specific and adequate methodological approach and data collection. Studies focused on the common physics of the fracturing processes associating different technologies of georesources exploitation, however being in touch with technological conditioning of these processes, will make it possible to accelerate recognition of these processes and related hazards. WG10 TCS will serve also to strengthen cooperation between science and the interested in research results: industry, administrative bodies, insurance sector, NGO-s etc., ensuring a bi-directional mobility and transfer of knowledge between these sectors. WG10 scientific plan includes: Similarities and particularities of seismic processes induced by different technological activities. Discrimination between the induced and natural seismicity From time-dependent seismic hazard assessment to hazard management. Optimizing production for hazard control IS as a characterization tool for production enhancement Optimization of IS monitoring strategies IS response to technological activity in a long and short time-scale Testing procedures and benchmark tests Assessment and management of hazards induced by exploitation of georesources Increasing awareness and understanding of the hazards induced by exploitation of georesources The stakeholder interaction strategy Worldwide scientific community of IS is aware of the need of integration. This has been expressed within activities of several world initiatives such as TAIS Triggered and Induced Seismicity Working Group (TAIS WG) of the International Association of Seismology and Physics of the Earth’s Interior (IASPEI) and the Teamwork for Hazard Assessment for Induced Seismicity (THAIS). Thematic sessions on IS organized by TAIS WG during different seismological and geophysical conferences (EGU, ESC and IUGG/IASPEI General Assemblies, etc.) facilitate information exchange and bring together scientists. Community integration initiatives, including EPOS and its WG10 are presented during these events. WG 10 TCS is envisioned and presented to research community as primarily IT research platform facilitating in-silco experimentation. EPOS is on the ESFRI Roadmap and in some countries it is also on national RI roadmaps. This results in better understanding of EPOS and WG-s aims and plans by national research funding agencies. The interaction is based mainly upon the official communication channels. On its community meetings WG10 urged its members to recognize possibilities of raising funds at the national levels. Going along this strategy Polish members of WG10 applied and obtained national financing of WG10 TCS prototype construction at the level of some 3.5MEuro. The membership of an industrial partners in the consortium of the aforementioned project is a good example of the WG10 strategy of cooperation with industry. WG10 members participate also in thematic georesources workshops, where they have opportunities to present aims and goals of WG10 and gain new industrial partners (e.g. XXIIIrd School of Undergrond Mining, D&P Forum Society of Exploration Geophysicists, 2nd ILP-Liebenberg Workshop: From Microseismicity to Large Earthquakes, engagement of BESTEC GmbH Geothermal Exploration & Exploitation). WG10 also extends invitations to industry to participate in periodical EPOS WG10 meetings. Hazards associating georesources exploitation is carefully monitored by the society. WG10 taking into account ethical issues of industry-public interaction determines its position as a third party and has been developing a wide strategy to convey competent fair information in this respect to both, public and industry. This goal will be realized mostly within the fourth pillar of WG10TCS: “Outreach, Education, Users’ Feedback”. 2. Financial Plan 1. Financial plan to support TCS and long-term financial sustainability A preliminary 5-year financial plan for WG10 TCS implementation and the first part operational phase is formulated according to inputs from WG10 members by using a number of estimates and assumptions concerning particular countries future involvement in the process of the IS research infrastructure integration and creation of WG10 TCS services. Our assumptions are: WG10 countries involvement in the TCS implementation process We assume that the following countries are engaged in the TCS implementation: Poland, Italy, Sweden, Czech Republic, Finland, Germany, France, Spain. However, we foresee that in the 5-year perspective another countries will join this process, e.g. UK, Iceland, Portugal and Switzerland. Number of the integrated IS episodes We assume that in the first phase of EPOS construction we will integrate not more than twenty IS episodes. However, we envision the increase of industrial partners involvement in connection with the introduced stakeholders engagement strategy (Paragraph 1.5). This will influence the bulk of integrated research infrastructure and will have an impact on the demand for services and the type of infrastructure incorporated in the financial plan. Number of services In the implementation phase of WG10 TCS, during first phase of EPOS construction, we assume to integrate only some existing (software) and create only some new services. However, part of these services in and after testing phase will be developed and new services will be created. Some of services could be built together with other communities (WGs), e.g. services to integrate multidisciplinary data could be shared with WG2, WG5b and WG8. Part of services envisaged in InSilico Pillar of WG10 TCS can be adopted from WG1 TCS Computational Seismology Pillar. This will reduce costs. WG10 TCS hosting We plan to locate WG10 TCS in the Academic Computer Centre CYFRONET AGH in Poland. WG10 TCS will be located on PL-Grid IT infrastructure (with HPC facility). ACC CYFRONET AGH and other IT institutions building PL-Grid have vast knowledge concerning provision of high quality and reliability infrastructure and serve other research communities out of geosciences. The potential of hosting IT infrastructure consists of approx. 360 Teraflops of computing power and more than 2.5 petabytes of storage. ACC CYFRONET AGH coordinates PL-Grid infrastructure, whose total resources consist of around 1000 Teraflops of computing power together with c.a. 10 petabytes of storage. Computing power at CYFRONET includes traditional computer clusters, graphics processing units (GPGPU), the dedicated FPGA platform and systems with shared memory such vSMP and SMP. With the high-speed network of 100 Gb/s, these resources allow both sending/receiving large amounts of data (big-data) and perform their analysis. In addition, the integral part of the computing infrastructure consists general type services like grids and cloud computing as well as data visualisation services. Financial support at the national level It is assumed that the current level of grant/project funding at the national level will continue. Grants are a significant source of funding for running costs and maintenance as well as acquisition of IS and related data of individual IS episodes. Being such, any fluctuation of current levels is likely to have a substantial effect on the research infrastructure adaptation within Data Centers (DC) layer and their integration with software solutions in WG10 TCS, identified in the financial plan. The TCS prototype construction costs are being covered by Polish national structural funds at the level of 90% during this and the next year. The costs of integration of IS episodes (pillar 1 of TCS) are assumed to be supported at national levels by some 60%, the rest is needed to be funded from EU projects. Such a level of national support is assumed based on information about the IS support in the WG10 countries in the last five years. Pillars 2-4 should be mainly supported at the EU level (the national support for these pillars is assumed in the financial plan to be some 10%). Flexible funding model of EPOS-ERIC will hopefully support the implementation of these pillars and also travel costs, meetings, costs concerning preparation of proposals for calls in Horizon 2020. As presented before, Pillar 4: “Outreach, Education, Users’ Feedback” has an outstanding role in the whole EPOS and its implementation should be strongly encouraged and supported from EPOS Flexible funding model. The preliminary financial scenario PILLARS UNDER IMPLEMENTATION 2014 Pillar W annual cost in cash (exluding personnel) in € local annual average salary for 1 FTE in € total number of FTEs TOTAL cash + personnel 2 331 700 46 000 23.6 3 417 300 2015 599 500 46 000 21.6 1 593 100 2016 761 700 46 000 20 1 681 700 2017 483 800 46 000 18.1 1 316 400 2018 520 800 46 000 18.1 1 353 400 installation, installation, installation, installation, installation, equipment, equipment, equipment, equipment, equipment, Aquisition of Induced coordination, coordination, coordination, coordination, description of activities (list all that apply)* coordination, Seismicity Episodes development, development, development, development, development, maintenance, maintenance, maintenance, maintenance, maintenance, other other other other other potential EU or National project funding 2 800 000 1 100 000 1 100 000 900 000 900 000 We have stable support at the national level of about 2 400 000 EUR for the next 2 years, COMMENTS the rest of sum in raw 9 is envisioned. 2014 Pillar X annual cost in cash (exluding personnel) in € local annual average salary for 1 FTE in € total number of FTEs TOTAL cash + personnel 797 500 46 000 8.1 1 170 100 2015 82 300 46 000 8.1 454 900 2016 180 500 46 000 7.3 516 300 2017 59 600 46 000 6.3 349 400 2018 55 600 46 000 6.4 350 000 InSilico experiments equipment, equipment, equipment, equipment, equipment, including technologycoordination, coordination, coordination, coordination, coordination, oriented seismic description of activities (list all that apply)* development, development, development, development, development, hazards maintenance, maintenance, maintenance, maintenance, maintenance, other other other other other potential EU or National project funding 800 000 200 000 200 000 100 000 100 000 Stable support at the national level of about 1200000 for the next 2 years COMMENTS 2014 Pillar Y 2015 2016 2017 2018 annual cost in cash (exluding personnel) in € 270 000 80 000 180 000 50 000 60 000 local annual average salary for 1 FTE in € total number of FTEs TOTAL cash + personnel 46 000 6 546 000 46 000 6 356 000 46 000 5.4 428 400 46 000 4.5 257 000 46 000 4.5 267 000 Document Repository description of activities (list all that apply)* potential EU or National project funding COMMENTS coordination, development, maintenance, other coordination, development, maintenance, other coordination, development, maintenance, other coordination, development, maintenance, other 400 000 200 000 200 000 60 000 Stable support at the national level of about 400000 for the next 2 years coordination, development, maintenance, other 60 000 InSilico experiments equipment, equipment, equipment, equipment, equipment, including technologycoordination, coordination, coordination, coordination, coordination, oriented seismic description of activities (list all that apply)* development, development, development, development, development, hazards maintenance, maintenance, maintenance, maintenance, maintenance, other other other other other potential EU or National project funding 800 000 200 000 200 000 100 000 100 000 Stable support at the national level of about 1200000 for the next 2 years COMMENTS 2014 Pillar Y 2015 2016 2017 2018 annual cost in cash (exluding personnel) in € 270 000 80 000 180 000 50 000 60 000 local annual average salary for 1 FTE in € total number of FTEs TOTAL cash + personnel 46 000 6 546 000 46 000 6 356 000 46 000 5.4 428 400 46 000 4.5 257 000 46 000 4.5 267 000 Document Repository description of activities (list all that apply)* potential EU or National project funding COMMENTS coordination, development, maintenance, other coordination, development, maintenance, other coordination, development, maintenance, other coordination, development, maintenance, other 400 000 200 000 200 000 60 000 Stable support at the national level of about 400000 for the next 2 years 2014 Pillar Z coordination, development, maintenance, other 2015 2016 2017 60 000 2018 annual cost in cash (exluding personnel) in € OUTREACH, EDUCATION, USERS FEEDBACK 300 000 70 000 200 000 60 000 90 000 local annual average salary for 1 FTE in € 46 000 46 000 46 000 46 000 46 000 total number of FTEs 5.3 5.5 4.9 4 4 TOTAL cash + personnel 543 800 323 000 425 400 244 000 274 000 coordination, coordination, coordination, coordination, coordination, development, development, development, development, development, description of activities (list all that apply)* maintenance, maintenance, maintenance, maintenance, maintenance, other other other other other potential EU or National project funding COMMENTS 400 000 200 000 200 000 60 000 Stable support at the national level of about 500000 for the next 2 years 60 000 Details of the preliminary financial scenario a. The envisioned costs of IT solutions for technical implementation of TCS Personnel Data and service infrastructure costs Other costs TOTAL IS Node: Data integration and access for user Year 1 - 2013 Year 2 - 2014 Year 3 - 2015 Year 4 - 2016 Year 5 - 2017 TOTAL 5years FTEs sum/year FTEs sum/year FTEs sum/year FTEs sum/year FTEs sum/year Node scientific and technical coordination 1.50 63 000 € 1.50 63 000 € 1.50 63 000 € 1.50 63 000 € 1.50 63 000 € 315 000 € Integration services, support, data preparation and QoS 2.00 84 000 € 2.00 84 000 € 1.00 42 000 € 1.00 42 000 € 1.00 42 000 € 294 000 € Data accuisition infrastructure development and maintance 1.50 63 000 € 1.00 42 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 136 500 € Data repositories technical coordination and maintance 1.00 42 000 € 0.50 21 000 € 0.50 21 000 € 0.50 21 000 € 0.50 21 000 € 126 000 € Metadata development and engineering 0.50 21 000 € 1.00 42 000 € 1.00 42 000 € 105 000 € AA Service development and maintance, information security related works 1.00 42 000 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 94 500 € Science Gateway Framework including social deployment and maintaince 2.00 84 000 € 1.00 42 000 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 168 000 € User management service operation 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 42 000 € Data management services development 1.00 42 000 € 0.50 21 000 € 63 000 € Integration of scientific workflows and visualization tools 0.50 21 000 € 1.00 42 000 € 1.00 42 000 € 105 000 € Open access, publication repository, social network tools 0.50 21 000 € 1.00 42 000 € 1.00 42 000 € 105 000 € IS Node helpdesk and support, social network coordination 0.50 21 000 € 1.00 42 000 € 1.00 42 000 € 1.00 42 000 € 147 000 € Documentation and training 1.00 42 000 € 1.00 42 000 € 0.50 21 000 € 0.50 21 000 € 126 000 € Data center equipment 600 000 € 400 000 € 1 000 000 € Operational costs 50 000 € 50 000 € 50 000 € 50 000 € 50 000 € 250 000 € Administration overhead (30%) 339 900 € 163 050 € 167 700 € 84 300 € 84 300 € 839 250 € TOTAL 11.50 1 472 900 € 11.75 706 550.00 € 9.25 1 006 200 € 5.50 365 300 € 5.50 365 300 € 3 916 250 € From which about of 90% during first two years, 80% in 2016 and 50% in 2017 and 2018 years are supported by the structural funds. Personnel Data and service infrastructure costs Other costs TOTAL IS Node: Data integration and access for user Year 1 - 2014 Year 2 - 2015 Year 3 - 2016 Year 4 - 2017 Year 5 - 2018 TOTAL 5years FTEs sum/year FTEs sum/year FTEs sum/year FTEs sum/year FTEs sum/year Node scientific and technical coordination 1.50 63 000 € 1.50 63 000 € 0.50 21 000 € 0.50 21 000 € 0.50 21 000 € 189 000 € Integration services, support, data preparation and QoS 1.50 63 000 € 1.50 63 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 157 500 € Data accuisition infrastructure development and maintance 1.00 42 000 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 94 500 € Data repositories technical coordination and maintance 0.50 21 000 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 73 500 € Metadata development and engineering 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 42 000 € AA Service development and maintance, information security related works 1.00 42 000 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 94 500 € Science Gateway Framework including social deployment and maintaince 2.00 84 000 € 0.75 31 500 € 0.50 21 000 € 0.25 10 500 € 0.25 10 500 € 157 500 € User management service operation 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 42 000 € Data management services development 1.00 42 000 € 0.50 21 000 € 63 000 € Integration of scientific workflows and visualization tools 0.50 21 000 € 1.00 42 000 € 0.50 21 000 € 84 000 € Open access, publication repository, social network tools 0.50 21 000 € 0.75 31 500 € 0.25 10 500 € 63 000 € IS Node helpdesk and support, social network coordination 0.50 21 000 € 0.50 21 000 € 0.50 21 000 € 0.50 21 000 € 84 000 € Documentation and training 1.00 42 000 € 0.25 10 500 € 0.25 10 500 € 0.25 10 500 € 73 500 € Data center equipment 600 000 € 350 000 € 950 000 € Operational costs 50 000 € 50 000 € 40 000 € 27 500 € 27 500 € 195 000 € Administration overhead (30%) 321 000 € 134 700 € 133 920 € 21 450 € 21 450 € 632 520 € TOTAL 10.00 1 391 000 € 9.50 583 700.00 € 4.00 691 920 € 2.75 164 450 € 2.75 164 450 € 2 995 520 € b. Costs of personnel in particular pillars: IS episodes staff, Data acquisition infrastructure development and maintenance, Metadata development and engineering, Services, support, data preparation and Quality Control Personnel, Data Management, IT specialists, Programmers, Support personnel, Field support (interaction between industry and RI), Geophysicists, Summer school organization: PILLAR I: AQUISITION OF INDUCED SEISMICITY EPIZODES YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Personel Personel YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR 6.75 1.5 1 € 202 500.0 € 78 000.0 € 14 000.0 4.75 1.5 1 € 142 500.0 € 78 000.0 € 14 000.0 3.8 1.5 1 € 114 000.0 € 78 000.0 € 14 000.0 2.8 1.5 1 € 84 000.0 € 78 000.0 € 14 000.0 2.8 1.5 1 € 84 000.0 € 78 000.0 € 14 000.0 0.7 € 21 000.0 0.7 € 21 000.0 0.7 € 21 000.0 0.7 € 21 000.0 0.7 € 21 000.0 0.9 3.55 3 3.25 € 55 500.0 € 141 500.0 € 190 000.0 € 205 000.0 0.9 3.55 3 3.25 € 55 500.0 € 141 500.0 € 190 000.0 € 205 000.0 0.9 3.55 3 3.25 € 55 500.0 € 141 500.0 € 190 000.0 € 205 000.0 0.9 3.55 3 3.25 € 55 500.0 € 141 500.0 € 190 000.0 € 205 000.0 0.9 3.55 3 3.25 € 55 500.0 € 141 500.0 € 190 000.0 € 205 000.0 100% 60% 60% € 202 500.0 € 46 800.0 € 8 400.0 90% 60% 60% € 128 250.0 € 46 800.0 € 8 400.0 60% 60% 60% € 68 400.0 € 46 800.0 € 8 400.0 60% 60% 60% € 50 400.0 € 46 800.0 € 8 400.0 60% 60% 60% € 50 400.0 € 46 800.0 € 8 400.0 60% 60% 60% 60% 60% Personel € 12 600.0 € 33 300.0 € 84 900.0 € 114 000.0 € 123 000.0 € 12 600.0 60% 60% 60% 60% 60% € 33 300.0 € 84 900.0 € 114 000.0 € 123 000.0 € 625 500.0 € 12 600.0 60% 60% 60% 60% 60% € 33 300.0 € 84 900.0 € 114 000.0 € 123 000.0 € 551 250.0 € 12 600.0 60% 60% 60% 60% 60% € 33 300.0 € 84 900.0 € 114 000.0 € 123 000.0 € 491 400.0 € 12 600.0 60% 60% 60% 60% 60% € 33 300.0 € 84 900.0 € 114 000.0 € 123 000.0 € 473 400.0 € 473 400.0 PILLAR II: INSILICO EXPERIMENTS INCLUDING TECHNOLOGY-ORIENTED SEISMIC HAZARD YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Personel Personel Personel YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR 1.6 0 0.1 € 63 000.0 € 0.0 € 4 000.0 1.55 0 0.1 € 61 500.0 € 0.0 € 4 000.0 1.4 0 0.1 € 57 000.0 € 0.0 € 4 000.0 1.4 0 0.1 € 57 000.0 € 0.0 € 4 000.0 1.4 0 0.1 € 57 000.0 € 0.0 € 4 000.0 0.5 € 9 750.0 0.5 € 9 750.0 0.45 € 9 000.0 0.45 € 9 000.0 0.45 € 9 000.0 0 0 1.5 1.5 € 0.0 € 0.0 € 51 684.6 € 98 000.0 0 0 1.5 1.5 € 0.0 € 0.0 € 51 572.7 € 98 000.0 0 0 1.5 1.5 € 0.0 € 0.0 € 51 572.7 € 98 000.0 0 0 1.5 1.5 € 0.0 € 0.0 € 51 572.7 € 98 000.0 0 0 1.65 1.4 € 0.0 € 0.0 € 52 397.7 € 92 000.0 10% 10% 10% € 6 300.0 € 0.0 € 400.0 10% 10% 10% € 6 150.0 € 0.0 € 400.0 10% 10% 10% € 5 700.0 € 0.0 € 400.0 10% 10% 10% € 5 700.0 € 0.0 € 400.0 10% 10% 10% € 5 700.0 € 0.0 € 400.0 10% € 975.0 10% € 975.0 10% € 900.0 10% € 900.0 10% € 900.0 10% 10% 10% 10% € 0.0 € 0.0 € 5 168.5 € 9 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 5 157.3 € 9 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 5 157.3 € 9 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 5 157.3 € 9 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 5 239.8 € 9 200.0 € 22 643.5 € 22 482.3 € 21 957.3 € 21 957.3 € 21 439.8 PILAR III: DOCUMENT REPOSITORY YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Personel Personel YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR 0.8 0 0.1 € 30 000.0 € 0.0 € 4 000.0 0.8 0 0.1 € 30 000.0 € 0.0 € 4 000.0 0.8 0 0.1 € 30 000.0 € 0.0 € 4 000.0 0.8 0 0.1 € 30 000.0 € 0.0 € 4 000.0 0.8 0 0.1 € 30 000.0 € 0.0 € 4 000.0 0.5 € 10 500.0 0.5 € 10 500.0 0.5 € 10 500.0 0.5 € 10 500.0 0.5 € 10 500.0 0 0 0.9 0.8 € 0.0 € 0.0 € 35 550.0 € 48 000.0 0 0 0.9 0.8 € 0.0 € 0.0 € 35 550.0 € 48 000.0 0 0 0.9 0.8 € 0.0 € 0.0 € 35 550.0 € 48 000.0 0 0 0.9 0.8 € 0.0 € 0.0 € 35 550.0 € 48 000.0 0 0 0.9 0.8 € 0.0 € 0.0 € 35 550.0 € 48 000.0 10% 10% 10% € 3 000.0 € 0.0 € 400.0 10% 10% 10% € 3 000.0 € 0.0 € 400.0 10% 10% 10% € 3 000.0 € 0.0 € 400.0 10% 10% 10% € 3 000.0 € 0.0 € 400.0 10% 10% 10% € 3 000.0 € 0.0 € 400.0 € 1 050.0 10% € 1 050.0 10% € 1 050.0 10% € 1 050.0 10% € 1 050.0 € 0.0 € 0.0 € 3 555.0 € 4 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 3 555.0 € 4 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 3 555.0 € 4 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 3 555.0 € 4 800.0 10% 10% 10% 10% € 0.0 € 0.0 € 3 555.0 € 4 800.0 10% 10% 10% 10% 10% Personel € 12 805.0 € 12 805.0 € 12 805.0 € 12 805.0 € 12 805.0 PILLAR IV: OUTREACH, EDUCATION, USERS FEEDBACK YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Personel Personel YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR 0.5 0.0 0.1 € 15 000.0 € 0.0 € 4 000.0 0.5 0.0 0.1 € 15 000.0 € 0.0 € 4 000.0 0.5 0.0 0.1 € 15 000.0 € 0.0 € 4 000.0 0.5 0.0 0.1 € 15 000.0 € 0.0 € 4 000.0 0.5 0.0 0.1 € 15 000.0 € 0.0 € 4 000.0 0.2 € 4 500.0 0.2 € 4 500.0 0.2 € 4 500.0 0.2 € 4 500.0 0.2 € 4 500.0 0.0 0.1 1.0 0.5 € 0.0 € 5 000.0 € 56 600.0 € 32 000.0 0.0 0.1 1.2 0.5 € 0.0 € 5 000.0 € 67 350.0 € 32 000.0 0.0 0.1 1.2 0.5 € 0.0 € 5 000.0 € 67 350.0 € 32 000.0 0.0 0.1 1.2 0.5 € 0.0 € 5 000.0 € 67 350.0 € 32 000.0 0.0 0.1 1.2 0.5 € 0.0 € 5 000.0 € 65 168.2 € 32 000.0 10% 10% 10% € 1 500.0 € 0.0 € 400.0 10% 10% 10% € 1 500.0 € 0.0 € 400.0 10% 10% 10% € 1 500.0 € 0.0 € 400.0 10% 10% 10% € 1 500.0 € 0.0 € 400.0 10% 10% 10% € 1 500.0 € 0.0 € 400.0 10% € 450.0 10% € 450.0 10% € 450.0 10% € 450.0 10% € 450.0 10% 10% 10% 10% € 0.0 € 500.0 € 5 660.0 € 3 200.0 10% 10% 10% 10% € 0.0 € 500.0 € 6 735.0 € 3 200.0 10% 10% 10% 10% € 0.0 € 500.0 € 6 735.0 € 3 200.0 10% 10% 10% 10% € 0.0 € 500.0 € 6 735.0 € 3 200.0 10% 10% 10% 10% € 0.0 € 500.0 € 6 516.8 € 3 200.0 Personel € 11 710.0 € 12 785.0 € 12 785.0 € 12 785.0 € 12 566.8 c. Equipment: e.g. hardware/software, storages, maintenance of network, software licences and travel costs: PILLAR I: AQUISITION OF INDUCED SEISMICITY EPIZODES YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Equipment and Travel costs 90% 70% 70% Equipment and Travel costs E&T costs 70% 70% 70% 70% 70% ∑ EUR YEAR 2 No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR € 1 279 000.0 € 90 000.0 € 3 000.0 € 120 000.0 € 60 000.0 € 4 000.0 € 67 000.0 € 60 000.0 € 4 000.0 € 47 000.0 € 40 000.0 € 5 000.0 € 42 000.0 € 20 000.0 € 4 000.0 € 38 000.0 € 25 000.0 € 130 000.0 € 95 000.0 € 90 000.0 € 5 000.0 € 25 000.0 €€ 15 000.0 € 10 000.0 € 28 000.0 € 20 000.0 €€ 65 000.0 € 50 000.0 € 5 000.0 € 15 000.0 €€ 15 000.0 € 15 000.0 € 28 000.0 € 15 000.0 €€ 50 000.0 € 25 000.0 € 1 151 100.0 € 63 000.0 € 2 100.0 € 26 600.0 € 17 500.0 € 91 000.0 € 66 500.0 € 63 000.0 € 1 480 800.0 70% 60% 60% € 84 000.0 € 36 000.0 € 2 400.0 60% 60% 60% 60% 60% € 15 000.0 €€ 9 000.0 € 6 000.0 € 3 000.0 € 155 400.0 60% 60% 60% 60% 60% 60% 60% 60% € 40 200.0 € 36 000.0 € 2 400.0 € 16 800.0 € 12 000.0 €€ 39 000.0 € 30 000.0 € 176 400.0 60% 60% 60% 60% 60% 60% 60% 60% € 28 200.0 € 24 000.0 € 3 000.0 € 3 000.0 € 9 000.0 €€ 9 000.0 € 9 000.0 € 85 200.0 60% 60% 60% 60% 60% 60% 60% 60% € 25 200.0 € 12 000.0 € 2 400.0 € 16 800.0 € 9 000.0 €€ 30 000.0 € 15 000.0 € 110 400.0 PILLAR II: INSILICO EXPERIMENTS INCLUDING TECHNOLOGY-ORIENTED SEISMIC HAZARD YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Equipment and Travel costs Equipment and Travel costs YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR € 504 000.0 €€- €€€- €€€- € 4 000.0 €€- €€€- € 7 500.0 €€€ 33 500.0 €- € 7 500.0 €€€ 18 500.0 €- € 5 500.0 €€€ 18 500.0 €- € 5 500.0 €€€ 14 500.0 €- € 5 500.0 €€€ 14 500.0 €- 75% 40% 40% € 378 000.0 €€- 40% 40% 40% €€€- 40% 40% 40% €€€- 40% 40% 40% € 1 600.0 €€- 40% 40% 40% €€€- 40% 40% 40% 40% 40% € 3 000.0 €€€ 13 400.0 €- 40% 40% 40% 40% 40% € 3 000.0 €€€ 7 400.0 €- 40% 40% 40% 40% 40% € 2 200.0 €€€ 7 400.0 €- 40% 40% 40% 40% 40% € 2 200.0 €€€ 5 800.0 €- 40% 40% 40% 40% 40% € 2 200.0 €€€ 5 800.0 €- E&T costs € 394 400.0 € 10 400.0 € 9 600.0 € 9 600.0 € 8 000.0 PILAR III: DOCUMENT REPOSITORY YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Equipment and Travel costs Equipment and Travel costs YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR € 1 500.0 €€- €€€- € 1 500.0 €€- €€€- € 2 000.0 €€- € 3 500.0 €€€ 11 000.0 €- € 3 500.0 €€€ 11 000.0 €- € 2 000.0 €€€ 11 000.0 €- € 4 000.0 €€€ 9 000.0 €- € 4 000.0 €€€ 9 000.0 €- 50% 50% 50% € 750.0 €€- 40% 40% 40% €€€- 40% 40% 40% € 600.0 €€- 40% 40% 40% €€€- 40% 40% 40% € 800.0 €€- 50% € 1 750.0 40% € 1 400.0 40% € 800.0 40% € 1 600.0 40% € 1 600.0 50% 50% 50% 50% €€€ 5 500.0 €- 40% 40% 40% 40% €€€ 4 400.0 €- 40% 40% 40% 40% €€€ 4 400.0 €- 40% 40% 40% 40% €€€ 3 600.0 €- 40% 40% 40% 40% €€€ 3 600.0 €- E&T costs € 8 000.0 € 5 800.0 € 5 800.0 € 5 200.0 € 6 000.0 PILLAR IV: OUTREACH, EDUCATION, USERS FEEDBACK YEAR 1 SUM POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY SWEDEN CZECH REPUBLIC DENMARK FINLAND GERMANY FRANCE SUM Equipment and Travel costs Equipment and Travel costs E&T costs YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No ∑ EUR YEAR 5 No ∑ EUR € 4 000.0 €€- €€€- €€€- € 4 000.0 €€- €€€- € 3 500.0 €€€ 12 000.0 €- € 3 500.0 €€€ 12 000.0 €- € 3 500.0 €€€ 12 000.0 €- € 3 500.0 €€€ 14 000.0 €- € 3 500.0 €€€ 14 000.0 €- 75% 40% 40% € 3 000.0 €€- 40% 40% 40% €€€- 40% 40% 40% €€€- 40% 40% 40% € 1 600.0 €€- 40% 40% 40% €€€- 40% 40% 40% 40% 40% € 1 400.0 €€€ 4 800.0 €- 40% 40% 40% 40% 40% € 1 400.0 €€€ 4 800.0 €- 40% 40% 40% 40% 40% € 1 400.0 €€€ 4 800.0 €- 40% 40% 40% 40% 40% € 1 400.0 €€€ 5 600.0 €- 40% 40% 40% 40% 40% € 1 400.0 €€€ 5 600.0 €- € 9 200.0 € 6 200.0 € 6 200.0 € 8 600.0 € 7 000.0 d. Hosting: hosting costs, software licences for hosting, IT maintenance costs, running costs (overhead) and training budget (including summer schools): PILLAR I: AQUISITION OF INDUCED SEISMICITY EPIZODES YEAR 1 SUM POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE SUM YEAR 2 ∑ EUR No € 135 000.0 € 10 000.0 Hosting 80% 75% Hosting No YEAR 4 ∑ EUR € 108 000.0 € 10 000.0 No YEAR 5 ∑ EUR € 108 000.0 € 16 000.0 No ∑ EUR € 103 000.0 € 16 000.0 € 98 000.0 € 16 000.0 € 3 000.0 € 3 000.0 € 3 000.0 € 3 000.0 € 3 000.0 € 20 700.0 € 111 500.0 € 54 000.0 € 20 700.0 € 111 500.0 € 54 000.0 € 20 700.0 € 111 500.0 € 54 000.0 € 20 700.0 € 111 500.0 € 54 000.0 € 20 700.0 € 111 500.0 € 54 000.0 € 108 000.0 € 7 500.0 80% 75% 75% € 2 250.0 75% 75% 75% 75% € 15 525.0 € 83 625.0 € 40 500.0 75% 75% 75% Hosting YEAR 3 ∑ EUR € 86 400.0 € 7 500.0 75% 75% 75% € 2 250.0 € 15 525.0 € 83 625.0 € 40 500.0 € 257 400.0 € 81 000.0 € 12 000.0 75% 75% 75% € 2 250.0 € 15 525.0 € 83 625.0 € 40 500.0 75% 75% 75% € 235 800.0 € 77 250.0 € 12 000.0 € 2 250.0 € 15 525.0 € 83 625.0 € 40 500.0 75% 75% 75% € 234 900.0 75% 75% € 73 500.0 € 12 000.0 75% € 2 250.0 € 15 525.0 € 83 625.0 € 40 500.0 75% 75% 75% € 231 150.0 € 227 400.0 PILLAR II: INSILICO EXPERIMENTS INCLUDING TECHNOLOGY-ORIENTED SEISMIC HAZARD YEAR 1 SUM POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE SUM YEAR 2 ∑ EUR Hosting No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR € 3 000.0 €- € 2 000.0 €- € 2 000.0 €- € 2 000.0 €- €- €- €- €- €- €€€- €€€- €€€- €€€- €€€- € 500.0 €- 10% 10% € 300.0 €- 10% 10% € 200.0 €- 10% 10% € 200.0 €- 10% 10% € 200.0 €- €- 10% €- 10% €- 10% €- 10% €- €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- 10% 10% 10% 10% Hosting YEAR 3 ∑ EUR € 5 000.0 €Hosting 10% 10% No € 500.0 € 300.0 € 200.0 € 200.0 € 200.0 PILAR III: DOCUMENT REPOSITORY YEAR 1 SUM POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE SUM Hosting 10% 10% Hosting Hosting 10% 10% 10% 10% YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR € 5 000.0 €- € 3 000.0 €- € 2 000.0 €- € 2 000.0 €- € 2 000.0 €- €- €- €- €- €- €€€- €€€- €€€- €€€- €€€- € 500.0 €- 10% 10% € 300.0 €- 10% 10% € 200.0 €- 10% 10% € 200.0 €- 10% 10% € 200.0 €- €- 10% €- 10% €- 10% €- 10% €- €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- 10% 10% 10% €€€- € 500.0 € 300.0 € 200.0 € 200.0 € 200.0 PILLAR IV: OUTREACH, EDUCATION, USERS FEEDBACK YEAR 1 SUM POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE In this: Potential EU or National project funding No POLAND ITALY CZECH REPUBLIC DENMARK GERMANY FRANCE SUM Hosting 10% 10% Hosting Hosting 10% 10% 10% 10% YEAR 2 ∑ EUR No YEAR 3 ∑ EUR No YEAR 4 ∑ EUR No YEAR 5 ∑ EUR No ∑ EUR €€- €€- €€- €€- €€- €- €- €- €- €- €€ 30 000.0 €- €€€- €€ 30 000.0 €- €€€- €€ 30 000.0 €- €€- 10% 10% €€- 10% 10% €€- 10% 10% €€- 10% 10% €€- €- 10% €- 10% €- 10% €- 10% €- €€ 3 000.0 €- 10% 10% 10% €€€- 10% 10% 10% €€ 3 000.0 €- 10% 10% 10% €€€- 10% 10% 10% €€ 3 000.0 €- € 3 000.0 €- € 3 000.0 €- € 3 000.0 The costs of IT solutions for technical implementation of TCS are divided into four pillars of TCS and added to final costs of these pillars than everything is summed in the sheet of The preliminary financial scenario. Financial sustainability With rising demands for georesources: energy and minerals, the anthropogenic seismicity appears in areas previously known as aseismic and in association with quite diverse technological processes. The socio-economic impact of the induced seismicity is very significant. Therefore countries invest a lot of money on research of induced seismicity and other hazards caused by exploitation of georesources. Some of national expenditures in WG10 partner countries on induced seismicity research, monitoring, coordination, demonstration and development initiatives, including governmental and industrial grants during last 5 years were very huge (At least 65 MEuro only for research infrastructure, details in the last Preparatory document for the EPOS Thematic Services). This support tackles the whole breath of all four pillars for WG10 TCS. We expect that the national research program on research on (seismic) hazard due to exploitation of georesources will continue during the next 5 years. We foresee also EU support through the EU Framework Programme for Research and Innovation, Horizon 2020, e.g. "LCE-16 2014: Understanding, preventing and mitigating the potential environmental impacts and risks of shale gas exploration and exploitation" and EPOS-ERIC support. 2. Types of actions within your TCS which could benefit from EPOS Flexible Funding Flexible funding model of EPOS-ERIC will hopefully support the implementation of pillars 24 of WG10 TCS. The national support for these pillars is assumed in the financial plan to be some 10%. EPOS flexible funding can also support travel costs, meetings, costs concerning preparation of proposals for calls in Horizon 2020. Pillar 4: “Outreach, Education and User’s Feedback” has an outstanding role in the whole EPOS and its implementation should be strongly encouraged and supported from EPOS Flexible funding model. 3. Financial plan for existing TCS components WG10 TCS is under implementation, there are no any existing components. 3. Legal Plan 1. Impact of EPOS-ERIC and the proposed governance model on the continuation and/or construction of the TCS associated with your WG EPOS-ERIC and the proposed governance model will influence WG10 TCS in the following: - EPOS-ERIC will extend a guardianship over WG10 TCS in accordance with standards laid down in relevant EU and national legislation; - So far WG10 is the only WG in EPOS dealing with georesources in close, indispensable collaboration with industry. Companies which owe and release research infrastructure to EPOS WG10 TCS are called Industrial Partners. Their interest must also be taken into account in EPOS data policy. WG10 wishes to follow in general the EPOS data policy. However, WG10 TCS may be offering some services and conditioning asses to some parts of data in the way differing from the EPOSERIC rules. For instance if EPOS-ERIC decides to charge industry for its use of EPOS resources, such an obligation must not concern our Industrial Partners. Secondly, we have decided that software providers under acceptance of TCS management determine access rules to their products. This might disagree with EPOS-ERIC. Therefore some parts of Pillar II: InSilico experiments including technology oriented seismic hazard of WG10 TCS might be constructed and operated outside the EPOSERIC; - We expect that the WG10 TCS interests will be represented properly in the EPOSERIC governance scheme and we wish to adopt the proposed TCS governance model to the EPOS-ERIC governance; - WG10 expects that financial sustainability of WG10 TCS will be supported by EPOSERIC; - EPOS-ERIC can also help to develop WG10 TCS identity in European Research Area. 2. Integration plan of EPOS data policy and access rules WG10 TCS will promote sharing RIs, knowledge and research activities freely between all relevant actors, while at the same time respecting the intellectual property rights of the providers of the data, who will retain ownership of the released RIs. The main aim of WG10 TCS is to provide a platform for free use of national and local IS RI. Access to and sharing of IS data are essential for advancement of science. The restricted area parts of the integrated RI in all categories of RIs (IS episodes, software and reports) are introduced only in the case of distinct necessity. They are to prevent abuse of the integrated RI as well as to enable careful observation of ethical issues. In general, an open access from in and out of IS research community is assumed. Following, reports of studies using the integrated infrastructure should be open and the use of infrastructure should be acknowledged. Commercial use policies need to be developed. We envisage that commercial use licenses may be determined under separate arrangements. Downloading materials from WG10 TCS will require acceptance of Terms and Conditions. Users will be required to identify themselves (registration) and to specify the purpose of use of data. We consider EPOS ICS and TCS first of all as a research platform facilitating InSilico experimentation. Services are envisioned as open to all registered users but the experimentation is located in a restricted area. One of the WG10 TCS stakeholders group are Industrial Partners that owe and provide data – IS episodes. In return they get free passive access to all services, tested solutions, recommendations. They need also a recognition from EPOS, which should be solved on the whole EPOS level as kind of a “partnership agreement”. 4. Organization and management 1. Most suitable organizational arrangement for your TCS, and the relationship between its TCS central hub and the EPOS-ERIC The following organizational arrangement of WG10 TCS is foreseen: comprehensive IS episodes are collected and maintained in Data Centres of national institutions having rights to and being responsible for these RI. The Data Centres are connected to the WG10 TCS central hub. The TCS central hub receives, stores and updates metadatabase. The Data Centers resources are available to users through the EPOS portal communicating with the Central hub. Prompted by a user the hub accesses, replicates and makes available required resources through communication/transmission protocols. Thematic services are maintained in and provided by the TCS central hub. A user can download data, documents and a part of software released to download from the central hub. Integrated core services and thematic services made available by other TCS-s will be accessible at EPOS ICS level. We plan to locate WG10 TCS central hub in the Academic Computer Centre CYFRONET AGH in Poland. This institution provides PL-Grid infrastructure, which ensures completely the needed ICT environment. WG10 agreed to implement and construct most of TCS within EPOS-ERIC. Details are provided in Section 3.1. 2. Integration plan of EPOS ethics issues within your TCS There are some important issues that influence the organization and management of WG10 TCS. The most important are ethical issues. The most clear example is risk communication. WG10 research community and their TCS is in the field of conflict between industry – a potential damage maker, and public – a potential damage receiver. TCS is planned to have hazard assessment services but hazard estimates can be easily converted into „risk information”. Hazard estimates should be assessed and conveyed in a competent way and because of that the hazard assessment services cannot be fully public. We need to have a restricted area. Simultaneously, our duty is to prepare public and industry for proper understanding of hazard estimates. That is why Pillar 4 of WG10 TCS “Outreach, Education and User’s Feedback” is very important and must be built with great care. Furthermore, in our opinion this task is also of paramount importance for the all EPOS community and therefore Pillar 4 should be under a special care of the whole EPOS. Specificity of WG10 TCS working with close relation with georesurces exploitation carried on by Industrial Partners implies dealing with sensitive data of the Partners. It is extremely vital that EPOS prevents this kind of data and information against an abuse. 3. Application plan for EPOS data policy It is foreseen that data providers, who are public and/or private organization, will retain data ownership rights. However, when uploading data to EPOS platform they will transfer copyrights to EPOS. The data will reside in national and /or local Data Centres and on request will be copied temporarily to EPOS users workspace.