Prezentacja programu PowerPoint - IS-EPOS

advertisement
WG10 Infrastructure for Georesources
o
o
o
o
o
o
o
Short-term implementation plan of the Induced Seismicity Node
Amendments of WG10 Science Plan
Fundraising strategy
Plan of WG10 promotion at national and international levels
Short and long term policy of relations with industrial stakeholders
Intellectual property rights policy from WG10 standpoint
IS Node financial plan
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
C
WG10 Infrastructure for Georesources
Induced
Seismicity
Episode
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
WG10 Infrastructure for Georesources
MIS
MIS
MIS
MIS - Mining Induced Seismicity
IIS - Injection Induced
Seismicity
EIS - Extraction Induced
Seismicity
RIS - Reservoir Induced Seismicity
RIS
IIS
MIS
RIS
EIS
IIS
RIS
RIS
EIS
A Roadmap for Earth Science in Europe: The next generation of Geophysical Research Infrastructures, Erice 2013
WG10 Infrastructure for Georesources
Science Gateway: processing and presentation
Data
Management
Services
Scientific
Analysis
And
Visualisation
Tools
Open
Access
Data Accuisition and Integration
User
Registr
ation
&
Access
Manag
ement
On-line data
loading
New sources
integration
Data preparation and QoS
Authentication and Authorization Services
Basic technology has been chosen
to create Node Gateway
(InSilicoLab Technology). Currently
basic system allowing registration,
authorization and authentication is
in testing phase.
Off-line data
loading
Publishing services
Scientific and Technical
Coordination
Data and Metadata Repositories
Data Repository
Metadata
Repository
Data Backups
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
A first set of services to
be integrated with the
system have been
identified.
Preparation of semiautomatic to
automatically recreate
metadata set for a
given data.
WG10 Infrastructure for Georesources
 2014
Phase 1: Implementation
Milestone ISN1-1: Coordination
structure and essential staff
in place
Milestone ISN1-2: Data
repositories are operational
Milestone ISN1-3: Process for
integration of off-line sources
in place, integration activity
established
Milestone ISN1-4: Process for
integration of on-line sources
in place
Milestone ISN1-5: Science
gateway in place with data
management module and at
least 2 scientific pipelines
integrated
Milestone ISN1-6: All IS Node
services are operational, user
registration open, pilot sources
integrated
 2015
Phase 2:
Integration
 2016
Milestone ISN2-1: Second
phase of integration of online sources in place
Phase 3:
Maintainance and
evolution
Milestone ISN2-2: Second
phase of integration of offline sources in place
Milestone ISN3-1: Sustainability
and development plan
Milestone ISN2-3: Third
phase of integration of online sources in place
Milestone ISN3-2: New RI in
place
Milestone ISN3-3: IS Node
services expansion phase 2
complete
Milestone ISN3-4:
Implementation of EPOS
integratated services complete
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
WG10 Infrastructure for Georesources
o At least 3 classes of users: science, industrial partners, other;
o ‚Science’ will have an access to all IS Node resources;
o ‚Industrial partners’ are industrial providers of research infrastructure.
‚Industrial partners’ will have more rights to use IS node resources than
users class ‘other’;
o Uploaded infrastructure (data, software, reports) will be basically open.
On request of data provider, its small part can be temporarily closed or
restricted for specified users. Decisions for such cases will be taken by
node management;
o Software openness will be determined by software providers under
acceptance of node management.
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
WG10 Infrastructure for Georesources
IS RI running costs and
development
IS RI integration in IS NODE
IS NODE implementation within
EPOS construction phase
National funds within WG10
countries: more than 60 mln €
in last 5 years
Partial support of national
funding agencies including
EU structural funds
EU support
EPOS WG Coordination Workshop, 25-27.02.2014 Prague
Download