ATTACHMENT 5
TERCERO PHASE 3 EXPANSION
Summary of the Tiered Initial Study and
Mitigated Negative Declaration
The following Initial Study has been prepared in compliance with CEQA.
Prepared By:
ENVIRONMENTAL STEWARDSHIP AND SUSTAINABILITY
University of California
One Shields Avenue
436 Mrak Hall
Davis, California 95616

December 2011
State Clearinghouse No. 2011112018
Contact: A. Sidney England, Assistant Vice Chancellor for Environmental
Stewardship and Sustainability
530-752-2432
TABLE OF CONTENTS
1
PROJECT INFORMATION
1
2
INTRODUCTION
2
2.1
Initial Study
2
2.2
Tiering Process
2
2.3
Public and Agency Review
3
3
PROJECT DESCRIPTION
4
3.1
Regional Location
4
3.2
Project Overview
4
3.3
Project Site
13
3.4
Project Objectives
13
3.5
Project Elements
13
3.6
Construction Schedule and Staging
13
Appendix A. Mitigated Negative Declaration
Appendix B. Mitigation Monitoring and Reporting Plan
LIST OF FIGURES
Figure 1. Regional Location
7
Figure 2. Project Location
8
Figure 3. Project Boundary and Area of Demolition
10
Figure 4. Redevelopment Plan
12
Tercero Phase 3
i
UNIVERSITY OF CALIFORNIA
Davis Campus
1
December 2011
PROJECT INFORMATION
Project title:
Tercero Phase 3 Expansion
Project location:
University of California, Davis
Yolo County
Lead agency’s name and address:
The Regents of the University of California
1111 Franklin Street
Oakland, CA 94607
Contact person:
A. Sidney England, Assistant Vice Chancellor for Environmental
Stewardship and Sustainability, 530-752-2432
Project sponsor’s name and address:
Environmental Stewardship and Sustainability
University of California
One Shields Avenue
436 Mrak Hall
Davis, CA 95616-8678
Location of administrative record:
See lead agency.
Identification of previous documents relied upon for tiering purposes:
This environmental analysis is tiered from the Environmental Impact Report (EIR) for the UC Davis 2003
Long Range Development Plan (2003 LRDP) (State Clearinghouse No. 2002102092). The 2003 LRDP is a
comprehensive land use plan that guides physical development on campus to accommodate projected
enrollment increases and expanded and new program initiatives through the 2015-16 academic year.
Section 2.2 provides additional information about the tiering process. The 2003 LRDP and its EIR are
available for review at the following locations:

UC Davis Environmental Stewardship and Sustainability in 436 Mrak Hall on the UC Davis campus

Reserves at Shields Library on the UC Davis campus

Yolo County Public Library at 315 East 14 th Street in Davis

Online at http://sustainability.ucdavis.edu/progress/commitment/environmental_review/index.html
Tercero Phase 3
1
2
INTRODUCTION
2.1
INITIAL STUDY
Pursuant to Section 15063 of the California Environmental Quality Act (CEQA) Guidelines (Title 14,
California Code of Regulations, Sections 15000 et seq.), an Initial Study is a preliminary environmental
analysis that is used by the lead agency as a basis for determining whether an EIR, a Mitigated Negative
Declaration, or a Negative Declaration is required for a project. The CEQA Guidelines require that an
Initial Study contain a project description, description of environmental setting, identification of
environmental effects by checklist or other similar form, explanation of environmental effects, discussion
of mitigation for significant environmental effects, evaluation of the project’s consistency with existing,
applicable land use controls, and the name of persons who prepared the study.
2.2
TIERING PROCESS
The CEQA concept of "tiering" refers to the evaluation of general environmental matters in a broad
program-level EIR, with subsequent focused environmental documents for individual projects that
implement the program. This environmental document incorporates by reference the discussions in the
2003 LRDP EIR (the Program EIR) and concentrates on project-specific issues. CEQA and the CEQA
Guidelines encourage the use of tiered environmental documents to reduce delays and excessive
paperwork in the environmental review process. This is accomplished in tiered documents by eliminating
repetitive analyses of issues that were adequately addressed in the Program EIR and by incorporating
those analyses by reference.
Section 15168(d) of the State CEQA Guidelines provides for simplifying the preparation of
environmental documents on individual parts of the program by incorporating by reference analyses and
discussions that apply to the program as a whole. Where an EIR has been prepared or certified for a
program or plan, the environmental review for a later activity consistent with the program or plan should
be limited to effects that were not analyzed as significant in the prior EIR or that are susceptible to
substantial reduction or avoidance (CEQA Guidelines Section 15152[d]).
This Initial Study is tiered from the UC Davis 2003 LRDP EIR in accordance with Sections 15152 and
15168 of the CEQA Guidelines and Public Resources Code Section 21094. The 2003 LRDP EIR is a
Program EIR that was prepared pursuant to Section 15168 of the CEQA Guidelines. The 2003 LRDP is a
comprehensive land use plan that guides physical development on campus to accommodate projected
enrollment increases and expanded and new program initiatives through the 2015-16 academic year. The
2003 LRDP EIR analyzes full implementation of uses and physical development proposed under the 2003
LRDP, and it identifies measures to mitigate the significant adverse program-level and cumulative
impacts associated with that growth. The proposed project is an element of the growth that was
anticipated in the 2003 LRDP and evaluated in the 2003 LRDP EIR.
By tiering from the 2003 LRDP EIR, this Tiered Initial Study will rely on the 2003 LRDP EIR for the
following:
2

a discussion of general background and setting information for environmental topic areas;

overall growth-related issues;

issues that were evaluated in sufficient detail in the 2003 LRDP EIR for which there is no
significant new information or change in circumstances that would require further analysis; and

assessment of cumulative impacts.
Tercero Phase 3
This Initial Study will evaluate the potential environmental impacts of the proposed project with respect
to the 2003 LRDP EIR to determine what level of additional environmental review, if any, is appropriate.
As shown in the Determination in Section 6 of this document, and based on the analysis contained in this
Initial Study, it has been determined that the proposed project would not result in any potentially
significant impacts that cannot be mitigated to less-than-significant levels or that were not adequately
addressed by the 2003 LRDP EIR.
The project would result in new potentially significant impacts that were not previously identified in the
2003 LRDP EIR but implementation of the identified project-specific mitigation measures would reduce
these impacts to less-than-significant levels. Therefore, preparation of a Mitigated Negative Declaration
is appropriate (the Proposed Mitigated Negative Declaration is presented in Appendix A).
This Initial Study concludes that many potentially significant project impacts are addressed by the
measures that have been adopted as part of the approval of the 2003 LRDP. Therefore, those 2003 LRDP
EIR mitigation measures that are related to, and may reduce the impacts of, this project will be identified
in this Initial Study. Since these mitigation measures are already being carried out as part of
implementation of the 2003 LRDP, they will not be readopted, but rather are incorporated as part of the
project. The benefits of these mitigation measures will be achieved independently of considering them as
specific mitigation measures of this project. Nothing in this Initial Study in any way alters the obligations
of the campus to implement the LRDP mitigation measures.
2.3
PUBLIC AND AGENCY REVIEW
The Initial Study was circulated for public and agency review from November 4, 2011 to December 5,
2011. Copies of the Initial Study, the 2003 LRDP, and the 2003 LRDP EIR were available for review at
the following locations:

UC Davis Environmental Stewardship and Sustainability in 436 Mrak Hall on the UC Davis
campus

Reserves at Shields Library on the UC Davis campus

Yolo County Public Library at 315 East 14th Street in Davis

Online at:
http://sustainability.ucdavis.edu/progress/commitment/environmental_review/index.html
Comments on this Initial Study were due by 5:00 PM on December 5, 2011 and could have been e-mailed
to medulcich@ucdavis.edu or sent to:
A. Sidney England
Assistant Vice Chancellor – Environmental Stewardship and Sustainability
University of California
One Shields Avenue
436 Mrak Hall
Davis, CA 95616
Tercero Phase 3
3
3
PROJECT DESCRIPTION
3.1
REGIONAL LOCATION
The approximately 5,300 acre UC Davis campus is located in Yolo and Solano Counties approximately
72 miles northeast of San Francisco, 15 miles west of the City of Sacramento, and adjacent to the City of
Davis (see Figure 1). The campus is comprised of four campus units: the central campus, the south
campus, the west campus, and Russell Ranch. Most academic and extracurricular activities occur within
the central campus. The central campus is bounded generally by Russell Boulevard to the north, State
Route 113 (SR 113) to the west, Interstate 80 (I-80) and the Union Pacific Railroad tracks to the south,
and A Street to the east. The south campus is located south of I-80 and north of the South Fork of Putah
Creek. The west campus is bounded by SR 113 to the east, Putah Creek to the south, Russell Boulevard to
the north, and extends approximately one-half mile west of County Road 98. The south and west campus
units are contiguous with the central campus, and are used primarily for field teaching and research. The
approximately 1,600 acre Russell Ranch portion of the campus lies to the west, separated from the west
campus by approximately one and one-half miles of privately owned agricultural land. Russell Ranch
was purchased in 1990 for campus uses including large-scale agricultural and environmental research,
study of sustainable agricultural practices, and habitat mitigation. Russell Ranch is bordered roughly by
County Road 96 on the east, Putah Creek on the south, Covell Boulevard on the north, and Russell
Boulevard and privately owned agricultural land on the west and northwest.
3.2
PROJECT OVERVIEW
UC Davis proposes to demolish and redevelop a 12-acre portion of the existing Tercero student housing
area in the core campus at UC Davis. The existing 12 buildings provide dormitory housing for 800
students and were constructed in 1967. The buildings were recently evaluated for seismic safety and are
in need of replacement. The project will redevelop the Tercero site with modern buildings providing
increased seismic safety, improved energy efficiency, and an upgraded design for improved livability and
student enjoyment. The proposed project will redevelop the site at a higher density, with 7 buildings
totaling 280,000 square feet and increasing the capacity of the housing area by 400 students to provide
dormitory housing for 1,200 students.
The proposed demolition effort will occur in the following three phases:
 Removal of usable furnishings and building equipment for re-use in campus buildings and/or
materials recycling,
 Abatement of certain asbestos and lead paint conditions, and
 Structural demolition and removal of the buildings.
 Removal of underground utilities and removal of approximately 95 trees and shrubs to
accommodate the site plan for the new buildings.
The proposed redevelopment project will include construction of seven four-story buildings to provide
housing for approximately 1,200 students. In addition, the redevelopment will include installation of new
bike parking areas to serve the new buildings, new sidewalks and bike paths within the Tercero area to
improve circulation for students, and new landscaping around the perimeter and the interior portions of
the project site.
While the project will increase the housing capacity from the existing 800 students to the eventual 1,200
students, the overall development is expected to reduce the amount of per student energy and water
consumption at the site because the new buildings will include improved energy efficiency measures and
low-flow water fixtures. The project is adjacent to the Central Heating and Cooling Plant (CHCP) and the
4
Tercero Phase 3
initial utility planning for the project has identified potential for the new Tercero Phase 3 Expansion
buildings to utilize waste heat from the CHCP. The waste heat is currently produced by the CHCP
operations and allowed to dissipate. A looping hot water system that is part of the proposed project
would capture waste heat from the CHCP and utilize it to provide all building heating for the proposed
project. The landscaping at the site will be designed to use less water through the installation of an
improved irrigation system and plants requiring less water than the existing plants. In addition, the site
will be designed to have less impervious surfaces so that stormwater discharge is reduced and aquifer
recharge is improved. The project also includes removal an underground fuel oil storage tank at the
northwest corner of the project site. The storage tank serves the adjacent CHCP with backup fuel in the
event of a disruption in natural gas service to the campus. A second tank was recently installed and the
first tank is now unnecessary. The tank is not leaking and poses no known risk of contaminated soil.
Removal of the tank will proceed as part of the demolition process at the project site.
Tercero Phase 3
5
W. Q
Bowley Plant Science
Teaching Facility
Hutchison Dr.
Dairy
Road
Field
TB 161-172,
175, 191-194,
204-205
Tercero Hall Circle
Health Sciences Dr.
Pritchard
VMTH
Veterinary
Medicine 2
VMTH
Feed
Center for
Companion
Animal Health
Garrod Dr.
Dairy Rd.
od D
r.
G ar r
W. Health Sciences Dr.
c:/data/arcmap_projects/tercero_phase_3_prj_location.mxp 10-24-11
Valley
Hall
Unitrans
Fleet
Services
Advanced
Materials
Research
Laboratory
Putah Creek
Lodge
Arboretum
Teaching
Nursery
Mathematical
Sciences
Wright
Hall
Wyatt
Deck
600
FeetArt
Annex
Chemistry
Annex
Watershed
Science
Facilities
Services
King Hall
Earth and
Physical
Sciences
La Rue Rd.
Arboretum
Headquarters
Cole
Facility
Art
Environm
Horticu
r.
Vet Med Equine
Athletic
Performance Lab
Vet
Med 3A
Medical
Sciences
IB
Hall
Crocker Nuclear Physics
Laboratory
Academic
Surge
Bargain
Barn
300
Everson
Shields
Library
H all D
Gourley Clinical
Teaching Center
Schalm
Hall
Ghausi
Hall
´
Olson
Hall
Physical Sciences and
Roessler Engineering Library
Mrak Hall
Hall
Bainer
Hall
Meyer Hall
Admin
Trailer
West
OutdoorAdv.
&
0
Bike
Chemistry
Barn
Cross
Cultural
Center
Mondavi
Admin
Robert Mondavi
Institute for Wine
and Food Science
Mondavi
Center
Buehler
Alumni &
Visitors
Center
Vanderhoef
Quad
South Entry
L an e
Thurman
Laboratory
Tupper
Hall
Medical
Sciences I C
Annual
Fund
Trailer
Tercero
Dining
Commons
Walker
Hall
Area
Hilgard
Maddy
Lab
Aggie
Stadium
ve.
ld s A
J. Sh ie Project
Heitman Staff
Learning Center
Kemper
Hall
Tercero
Residence
Halls
Schaal
Aquatic
Center
Silo
South
The
Barn
Giedt
Hall
Peter
South
Hall
E.
Quad
W.
Quad
Mrak
Genome &
Western Human Biomedical
Nutrition Research Sciences
Center
Silo
Surge
Surge 3 2
Wellman
Hall
Hart
Robbins
Hall
Legend
Hall
Haring
Hall
W ay
Í
A
Plant
Reproductive
Biology Facility
Sciences
Lab
Life
Sciences Sciences Lab
Lecture Hall
i
Biole tt
Student Farm
Field House
Facilities HR
Briggs
Hall
Robbins
Hall Annex
Hutchison
Hall
S. California Ave.
Extension Center Dr.
West Entry
Storer
Kleiber
Hall
Hall
Hall Dr.
RecPool
Hutchison
Field
Kleiber
UCD Extension
International Center
La Rue Rd.
Rec
Hutchison Child
Pool
Development
Lodge
Center
Transportation
and
Parking Fire & Police
Services
Building
ve.
u ad A
The Colleges at La Rue
D
Old
sR
a vi
d.
Teaching Vineyard
teaching and Research Winery and
Brewing and Food Science Laboratory
$
c
"
!
Figure 2
Site Location
Legend
Project Area
Buildings to be demolished
c:/data/arcmap_projects/tercero_phase_3_demo_plan.mxp 10-24-11
0
´
50
100
Feet
Figure 3
Demolition Plan
Legend
New Building Location
c:/data/arcmap_projects/tercero_phase_3_redev_plan.mxp 10-24-11
0
´
50
100
Feet
Figure 4
Redevelopment Plan
APPENDIX A
MITIGATED NEGATIVE DECLARATION
MITIGATED NEGATIVE DECLARATION
Lead Agency:
University of California
Project Proponent:
University of California, Davis
Project Location:
The Tercero Phase 3 Expansion would be located between Bioletti and
Dairy Road in the core campus at UC Davis.
Project Description:
UC Davis proposes to demolish and redevelop a 12-acre portion of the
existing Tercero student housing area in the core campus at UC Davis.
The existing 12 buildings provide dormitory housing for 800 students
and were constructed in 1967. The buildings were recently evaluated for
seismic safety and are in need of replacement. The project will
redevelop the Tercero site with modern buildings providing increased
seismic safety, improved energy efficiency, and an upgraded design for
improved livability and student enjoyment. The proposed project will
redevelop the site at a higher density, with 7 buildings totaling 280,000
square feet and increasing the capacity of the housing area by 400
students to provide dormitory housing for 1,200 students.
Mitigation Measures:
The following project-specific mitigation measures are included in
addition to relevant mitigation measures from the 2003 Long Range
Development Plan Environmental Impact Report.
Mitigation Measure GHG-1: Under the Strategic Energy Partnership Program,16 the Campus will fund
energy-efficiency improvements in existing buildings on the campus that will achieve a minimum GHG
emissions reduction of 214.53 MTCO2e per year, within two years of the occupancy of the Tercero Phase
3 Expansion Project. The SEPP is forecasted to achieve a reduction of approximately 18,900 MTCO2e
by the year 2014 (UC Davis 2010, page 27)
Mitigation Measure NOI-1: Implementation of the following project elements would mitigate the
potential construction/demolition noise impact to a less-than-significant level.
1. Implement LRDP Mitigation Measure 4.10-1.
2. Construct solid 8 ft. high plywood noise barrier fences around active demolition and construction
sites;
16
Strategic Energy Partnership Program or SEPP is a program that the UC and investor-owned utilities have entered
into whereby the utilities provide a certain amount of matching funds for energy efficiency and energy conservation
initiatives that eligible UC campuses undertake. Actual savings in kWh and therms must be demonstrated to receive
the matching funds. The Davis campus participates in the SEPP and is actively implementing SEPP projects.
3. Utilize ‘quiet’ models of air compressors and other stationary noise sources where technology
exists;
4. Equip all internal combustion engine-driven equipment with mufflers, which are in good
condition and appropriate for the equipment;
5. Prohibit all unnecessary idling of internal combustion engines;
6. Post the schedule of major construction activities and allowable construction hours;
7. A temporary noise control blanket barrier (approximately 15 - 18 feet high) could be erected
along the north facade of Leach Hall (probably along the north side of the row of trees in the
lawn). This mitigation would only be necessary if conflicts occurred which were irresolvable
through implementation of other measures. Noise control blanket barriers can be rented and
quickly erected;
8. Designate a disturbance coordinator, responsible for responding to complaints about construction
noise. The name and telephone number of the disturbance coordinator shall be posted at the
construction site and made available to businesses, residences or noise-sensitive land uses
adjacent to the construction site;
Mitigation Measure TRA-1: The following circulation improvements would mitigate the potentially
significant impacts identified in Impact TRA-1 (a-c).
a) Prior to occupancy, Tercero Hall Circle shall be improved to include a pedestrian sidewalk from
Bioletti Way to Dairy Road.
b) Prior to occupancy, the intersection of Bioletti Way and Hutchison Drive shall be improved to
improve bike and pedestrian safety. Relocation of the Hutchison gate and intersection
improvements such as a roundabout would satisfy this need.
c) Prior to occupancy, the intersection of Bioletti Way and Tercero Hall Circle shall be improved for
bicycle and pedestrian safety and the bike path from Bioletti Way to Bainer Hall (north of
Kemper Hall) shall upgraded to widen the existing bike path and provide continuous pedestrian
connections.
Reference:
This Mitigated Negative Declaration incorporates by reference in their
entirety the text of the Tiered Initial Study prepared for the project, the
2003 LRDP, and the 2003 LRDP EIR and related addenda.
Determination:
In accordance with CEQA, a Draft Tiered Initial Study has been prepared
by UC Davis that evaluates the environmental effects of the proposed
project. On the basis of the project's Draft Tiered Initial Study the
campus found that the proposed project could have a significant effect on
the environment, the project impacts were adequately addressed in an
earlier document or there will not be a significant effect in this case
because revisions in the project have been made that will avoid or reduce
any potential significant effect to a less-than-significant level.
Public Review:
In accordance with Section 15073 of the CEQA Guidelines, the Draft
Tiered Initial Study for the project was circulated for public and agency
review from November 4 to December 5, 2011. Comments received
during the review period and responses to these comments are presented
in Appendix B of the Tiered Initial Study.
APPENDIX B
MITIGATION MONITORING AND REPORTING PROGRAM
Section 15097(a) of the State CEQA Guidelines requires that the Lead Agency establish a program to
report on and monitor measures adopted as part of the environmental review process to mitigate or avoid
significant effects on the environment. This Mitigation Monitoring Program (MMP) is designed to ensure
that the project-specific mitigation measures identified in this Tiered Initial Study are implemented.
Applicable mitigation measures from the 2003 LRDP EIR will be implemented as part of the proposed
project pursuant to the previous MMP adopted by the Regents as part of the 2003 LRDP on November
20, 2003.
The MMP for the proposed project, as outlined in the following table, describes monitoring and reporting
procedures, monitoring responsibilities, and monitoring schedules for the project-specific mitigation
measure identified in the Initial Study. All monitoring actions, once completed, will be reported in
writing to or by the UC Davis Office of Resource Management and Planning, which will maintain
mitigation monitoring records for the proposed project. The MMP will be considered by the campus in
conjunction with project review and will be included as a condition of project approval.
The components of the MMP include:
a) Project Specific Mitigation Measure: The project-specific mitigation measure provides
mitigation for the proposed project beyond the measures that will be implemented pursuant to the
2003 LRDP EIR.
b) Monitoring and Reporting Procedure: Identifies the action(s) that must be completed for the
mitigation measure to be implemented.
c) Project Phase/ Mitigation Timing: Identifies the Project Phase (Demolition or Redevelopment)
that is applicable for each mitigation measure and identifies the timing for implementation of
each action associated with the mitigation measure in order to effectively accomplish the intended
outcome.
d) Monitoring Responsibilities: Identifies the UC Davis entity responsible for undertaking the
required action and monitoring the mitigation measure.
Mitigation Monitoring Program
Project-Specific
Mitigation Measure
Monitoring and
Reporting
Procedure
Project Phase/
Mitigation
Timing
Mitigation
Responsibility
Mitigation Measure GHG-1:
Under the Strategic Energy Partnership Program,18
the Campus will fund energy-efficiency
improvements in existing buildings on the campus
that will achieve a minimum GHG emissions
reduction of 214.53 MTCO2e per year, within two
years of the occupancy of the Tercero Phase 3
Expansion Project. The SEPP is forecasted to
achieve a reduction of approximately 18,900
MTCO2e by the year 2014 (UC Davis 2010, page
27)
The campus will track
implementation of the
Strategic Energy
Partnership Program on a
yearly basis.
Demolition and
Redevelopment
Phases. The
identified emissions
reduction will take
place within two
years of occupancy
of the Project.
UC Davis,
Environmental
Stewardship and
Sustainability
Compile summary memo
of implementation items
every 6 months during the
24-month project period.
Demolition and
Redevelopment
Phases. Identified
measures will be
implemented during
the demolition and
construction period
of the project.
UC Davis Design
and Construction
Management
Mitigation Measure NOI-1:
Implementation of the following project elements
would mitigate the potential construction/demolition
noise impact to a less-than-significant level.
1.
2.
3.
4.
5.
6.
7.
8.
18
Implement LRDP Mitigation Measure 4.10-1.
Construct solid 8 ft. high plywood noise
barrier fences around active demolition and
construction sites;
Utilize ‘quiet’ models of air compressors and
other stationary noise sources where
technology exists;
Equip all internal combustion engine-driven
equipment with mufflers, which are in good
condition and appropriate for the equipment;
Prohibit all unnecessary idling of internal
combustion engines;
Post the schedule of major construction
activities and allowable construction hours;
A temporary noise control blanket barrier
(approximately 15 - 18 feet high) could be
erected along the north facade of Leach Hall
(probably along the north side of the row of
trees in the lawn). This mitigation would only
be necessary if conflicts occurred which were
irresolvable through implementation of other
measures. Noise control blanket barriers can
be rented and quickly erected;
Designate a disturbance coordinator,
responsible for responding to complaints about
construction noise. The name and telephone
number of the disturbance coordinator shall be
posted at the construction site and made
available to businesses, residences or noisesensitive land uses adjacent to the construction
Strategic Energy Partnership Program or SEPP is a program that the UC and investor-owned utilities have entered
into whereby the utilities provide a certain amount of matching funds for energy efficiency and energy conservation
initiatives that eligible UC campuses undertake. Actual savings in kWh and therms must be demonstrated to receive
the matching funds. The Davis campus participates in the SEPP and is actively implementing SEPP projects.
site.
Mitigation Measure TRA-1:
The following circulation improvements would
mitigate the potentially significant impacts identified
in Impact TRA-1 (a-c).
a)
Prior to occupancy, Tercero Hall Circle shall
be improved to include a pedestrian sidewalk
from Bioletti Way to Dairy Road.
b)
Prior to occupancy, the intersection of Bioletti
Way and Hutchison Drive shall be improved
to improve bike and pedestrian safety.
Relocation of the Hutchison gate and
intersection improvements such as a
roundabout would satisfy this need.
c) Prior to occupancy, the intersection of Bioletti
Way and Tercero Hall Circle shall be
improved for bicycle and pedestrian safety and
the bike path from Bioletti Way to Bainer Hall
(north of Kemper Hall) shall upgraded to
widen the existing bike path and provide
continuous pedestrian connections.
Compile summary memo
of completed
improvements for review
by the campus
Transportation and
Parking Workgroup
Committee.
Redevelopment
Phase. Prior to
occupancy of the
Tercero 3
Expansion
UC Davis Design
and Construction
Management
Download