TOWN PLANNING URBAN DESIGN AND HERITAGE BYFORD TOWN CENTRE STAGE 1 DEVELOPMENT APPLICATION September 2014 712-403A perth sydney SJS TRIM - IN14/19829 Document Control Document ID: PG 2012/712-403A Byford Town Centre DA/7 Final Documents/1 Lodged/712-403A DA Abernethy Rd, Byford 02.09.14.indd Issue Date Status Prepared by Name 1 02.09.14 Final Approved by Initials Michael Kevill Name Initials Murray Casselton This report has been prepared for the exclusive use of the Client, in accordance with the agreement between the Client and TPG (‘Agreement’). TPG accepts no liability or responsibility whatsoever in respect of any use of or reliance upon this report by any person who is not a party to the Agreement or an intended recipient. In particular, it should be noted that this report is a qualitative assessment only, based on the scope and timing of services defined by the Client and is based on information supplied by the Client and its agents. TPG cannot be held accountable for information supplied by others and relied upon by TPG. Copyright and any other Intellectual Property arising from the report and the provision of the services in accordance with the Agreement belongs exclusively to TPG unless otherwise agreed and may not be reproduced or disclosed to any person other than the Client without the express written authority of TPG. Our reports are printed on: ii SJS TRIM - IN14/19829 Contents INTRODUCTION1 Joint Development Assessment Panel (JDAP) Determination 1 THE SUBJECT LAND 3 Existing Development 3 Property Description 3 Active Subdivision Applications 3 Previously Approved Development Application 3 Context Analysis 3 Proposed Development 7 Site Layout 7 Overall Development Composition 7 Traffic and Pedestrian Access 8 Public Transport and relationship to development 8 Car Parking 8 Landscaping and Amenity 8 Built Form and Architecture 8 PLANNING FRAMEWORK 10 Metropolitan Region Scheme 10 Shire of Serpentine-Jarrahdale Town Planning Scheme No. 2 10 Byford District Structure Plan 10 Byford Town Centre Local Structure Plan 13 Byford Town Centre Design Guidelines 13 DETAILED PLANNING ASSESSMENT 16 Orderly and Proper Planning 19 CONCLUSION20 APPENDIX A 21 Certificates of Title 21 APPENDIX B 23 Proposed Site Development Plans and Coloured Perspectives 23 APPENDIX C 25 Schedule of Materials/Finishes 25 APPENDIX D 27 Traffic and Parking Assessment 27 BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 iii This page has been left blank intentionally. iv SJS TRIM - IN14/19829 INTRODUCTION TPG Town Planning, Urban Design and Heritage (TPG) has prepared this report on behalf of Coles Group Property Development Limited (Coles) to support a new development application for the development of the first stage of the Byford Town Centre located on a portion of Lot 2 Abernethy Road, Byford (the subject site). The subject land is zoned ‘Urban Development’ under the Shire of Serpentine-Jarrahdale Town Planning Scheme No.2 (TPS2), and is subject to the Byford District Structure Plan. Byford is classified as a District Centre under State Planning Policy No. 4.2 – Activity Centres for Perth and Peel (SPP4.2) and therefore the retail floorspace within the Town Centre is limited to 15,000m2 (NLA). Based on the retail sustainability assessment contained within the endorsed Byford Town Centre Local Structure Plan (LSP), the town centre can support up to 15,538m2 of retail NLA to 2031. This development application follows an existing approved development application for a town centre in an alternate location within the site. The current proposal is intended to accord more closely with the endorsed structure plan, and provide the centre with a greater level of exposure to Abernethy Road to the south while emphasising strong linkages to future retail and residential opportunities flagged for the district. Similarly to the previously approved development application for the centre, the proposed development will incorporate a new town square, covered plaza areas and a number of different retail tenancies, the exact details of which will depend on finalised leasing arrangements. Whilst these tenancyleasing arrangements are yet to be finalised, the proposed development includes a Coles Supermarket, a range of specialty retail and other commercial tenancies and café/ restaurants, which along with the new town square collectively form the main street and heart of the Byford Town Centre. In summary, the application proposes the following: •• An improved town centre location, with increased accessibility, better design and greater external visibility that will become a catalyst to the formation of the new Byford Town Centre. •• A high amenity contemporary built form, incorporating tenancies with active frontages that will establish a covered all weather ‘main-street’ adjacent to the supermarket in accordance with the Byford Town Centre Structure Plan. •• The development of a feature Town Square, which will act as a vibrant pedestrian destination and meeting point, with a surrounding built form vernacular that is reflective of selected elements of Byford’s agricultural history. •• The construction of an at grade main car park in the southern section of the subject land with an integrated vehicle and pedestrian access network that will be required to safely and legibly service the proposed development. •• The construction of an appropriately positioned service area to suit the operational requirements of the centre as it evolves. This report includes a new Overall Master Plan detailing the future development of the site in detail, and covers those aspects of the statutory and strategic planning framework relevant to the proposal as well as providing an assessment of the proposed development against the provisions of the Shire’s TPS2, the Byford Town Centre Local Structure Plan (LSP), relevant aspects of the City’s local planning framework and applicable State level planning policies. Joint Development Assessment Panel (JDAP) Determination Due to the development cost exceeding $7 million, the development application will be required to be determined by the Metro-East Joint Development Assessment Panel (JDAP). The JDAP process has been set up in order to streamline approval processes for large-scale development proposals, and act in the place of the relevant local government in making decisions on whether or not to grant development approval. Development approval documentation is lodged in the same way with the local government authority with the inclusion of a JDAP development application form and application fee. The local authority will then assess the development proposal and submit a report and all of the documentation to the relevant JDAP for determination. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 1 STREET SOUTH GEORGE WESTERN Lot 2 HIGHWAY WAY EVANS ABERNETHY ROAD Source: Nearmaps Subject Site Development Site Figure 1 – Aerial Photo Figure 2 Aerial This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. 2 Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Drawing No. Designer: CH Drawn: TC 712-403A Whole Lot 2 PS.ai sustained by any person acting on any visual impression gained from this drawing. © The Planning Group WA Pty Ltd Level 7, 182 St Georges Terrace Perth Western Australia 6000 PO Box 7375 Cloisters Square Perth Western Australia 6850 SJS TRIM - IN14/19829 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 www.tpgwa.com.au The Planning Group WA Pty Ltd ABN 36 097 273 222 THE SUBJECT LAND Existing Development Active Subdivision Applications The subject site is largely vacant, with the exception of a single house that is located in the south-eastern corner of the site on an adjacent lot. Beenyup Brook traverses east west through the site and provides a major drainage function within the site. Various Multiple Use Corridors (MUC) have been earmarked in the Byford Town Centre Local Structure Plan (LSP) traversing through the southern and northern portions of the site. However it is only the MUC along the southern boundary of the stage 1 area that affects this development application. In addition to the approved development application, the subject site has been the subject of two subdivision applications, the intent of which are to separate the landholdings of the two owners, create the road and MUC networks and to lock in the structure plan elements. As of the time of publication of this report one of the applications has been conditionally approved, however neither of the subdivision applications have been finalised and as such the subject site details remain as one contiguous landholding. Refer to Figure 1 – Aerial Photo In this regard the applicant and proponent of this application have been in close liaison with the Shire and the WAPC in regard to the conditions and timing of the various applications affecting the subject land, and it is intended that this liaison will continue through the approval process to result in a coordinated set of approval conditions that will facilitate the rapid development of the centre. Property Description The subject land is approximately 40 kilometres south-east of the Perth CBD, adjacent to the South-Western Highway Highway. Abernethy Road forms the southern boundary of the subject site, with Evans Way to the north, George Street to the east and a vacant landholding to the west. The frontage to Abernethy Road is in the order of 145 metres and the subject land has a total area of 19.2691ha (Refer to Figure 2). Refer to Figure 2 – Site Plan Coles Group Property Developments Ltd currently has an 11/20 share of the site, with LWP Byford Syndicate Pty Ltd having the remaining 9/20 share, as tenants in common. The following table details the particulars of the Certificates of Title. Lot Plan 2 Vol/ Folio Land Area 65664 1671/912 19.2691ha Registered Proprietor Coles Group Property Developments Ltd LWP Byford Syndicate Pty Ltd Refer to Appendix A – Certificate of Title Previously Approved Development Application A development application for the Byford Town Centre was previously submitted and approved by the JDAP for this site, and this development application represents a new and improved design and layout that will take the elements that were previously approved and re-structure the layout and function of the centre to bring an improved outcome for the precinct. The main difference between this application and the approved application is the movement of the proposed Stage 1 retail from the northern portion of the site to the south eastern portion of the site. The new layout offers a number of advantages both for the retail centre and the development of the Byford Town Centre which are explored in more detail below. Context Analysis The subject site is located approximately 40 kilometres south-east of Perth adjacent to the South-Western Highway. The site currently fronts Abernethy Road to the south and backs on to Evans Way in the north. A number of new access roads are earmarked as part of the Byford LSP and these are to be constructed in the future. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 3 WAY 322.33 HIGHW AY EVANS TURN Reserve 50666 1001 12 STREET PADRA ALEXANDER RD 9001 11 9002 27 705.09 460.83 19.2691ha WESTERN 2 2 LOT 1 130.26 GEORGE 153.55 5 4 15 SOUTH SOLDIE R ROAD S 282 ROAD GORDIN WAY ABERNETHY 145.73 Source: Landgate Subject Site Development Site Figure 2 – Site Plan Figure 3 Site Plan This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. 4 Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be sustained by any person acting on any visual impression gained from this drawing. © The Planning Group WA Pty Ltd Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Drawing No. Level 7, 182 St Georges Terrace Perth Western Australia 6000 Designer: CH Drawn: TC 712-403A Whole Lot 2 PS.ai PO Box 7375 Cloisters Square Perth Western Australia 6850 SJS TRIM - IN14/19829 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 www.tpgwa.com.au The Planning Group WA Pty Ltd ABN 36 097 273 222 The subject site is located in the centre of the wider Byford area, with the newly established Byford estate located on the eastern side of South-Western Highway. Byford has a population of 7,034 (ABS, 2011), with the majority residing adjacent to the subject site. The Byford Trotting Complex is located approximately 1.5km to the west, with the Darling Range Regional Park approximately 1.5km to the east. The Armadale Strategic Metropolitan Centre is located approximately 10km north of the Byford Town Centre, which is home to a number of primary and high schools, as well as a TAFE and the Armadale Train Station. Refer to Figure 3 – Location Plan The Byford LSP identifies two large parcels of land to the south and the south-west of the Town Centre that have been identified as a future primary school and high school with the potential to cater for all ages, from kindergarten to year 12. This is reflective of the Byford District Structure Plan, which also identifies a new school site in a similar location. The school is planned to be a prominent landmark and will act as a key activity node that will help support the development of the Town Centre over time. The proposed Byford rail station is noted within the LSP as being adjacent to the proposed Town Centre location. Given the uncertainty around timing for a new rail station in Byford, the LSP (and the proposed design of the centre) allow for an interim bus interchange to connect to Armadale station, increasing connectivity to the Town Centre in the short term should the Public Transport Authority (PTA) develop this facility at a future stage. The subject site forms a large portion of the Byford Town Centre, however the Byford LSP also identifies further areas of commercial, mixed use and medium density residential development, all of which will assist in creating and enhancing the growth of the Byford district. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 5 ARMADALE Subject Site Darling Range Regional Park Subject Site BYFORD Source: Landgate Subject Site Development Site Figure 3 – Location Plan Figure 1 This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. 6 Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be sustained by any person acting on any visual impression gained from this drawing. © The Planning Group WA Pty Ltd Location Plan Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Drawing No. Designer: CH Drawn: TC 712-403A Whole Lot 2 PS.ai Level 7, 182 St Georges Terrace Perth Western Australia 6000 PO Box 7375 Cloisters Square Perth Western Australia 6850 SJS TRIM - IN14/19829 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 www.tpgwa.com.au The Planning Group WA Pty Ltd ABN 36 097 273 222 PROPOSED DEVELOPMENT •• Site Layout The proposed development of the Byford Town Centre has been designed as a premium retail development with a high level of amenity and legibility. Care has been taken throughout the design process to incorporate best practice design initiatives, especially in terms of building accessibility and interaction, in line with the LSP that have a focus on creating strong connections to the remainder of the future Town Centre for when this is developed. The proposed development will include the construction of a supermarket sleeved with specialty retail stores along the southern side of the supermarket, as well as further specialty stores to create an internal pedestrianised main street, in accordance with the LSP. The detailed design has been created in order to foster a sense of place and unique identity. In summary, the application proposes the following: •• An improved town centre location, with increased accessibility, better design and greater external visibility that will become a catalyst to the formation of the new Byford Town Centre. •• A high amenity contemporary built form, incorporating tenancies with active frontages that will establish a covered all weather ‘main-street’ adjacent to the supermarket in accordance with the Byford Town Centre Structure Plan. •• In this regard it is worth noting that the design of the centre is a bespoke design specifically created for Byford, and differs significantly from the regular Coles retail offering in order to assist in establishing a centre with a unique Byford feel. •• The development of a feature Town Square, which will act as a vibrant pedestrian destination and meeting point, with a built form vernacular that ties into the adjacent retail and is reflective of Byford’s agricultural and industrial history. •• The construction of an at grade main car park in the southern section of the subject land with an integrated vehicle and pedestrian access network that will be required to safely and legibly service the proposed development. The construction of an appropriately positioned service area to suit the operational requirements of the centre as it evolves. Refer to Appendix B – Proposed Site Development Plans and Coloured Perspectives Overall Development Composition The works proposed in this application form the first stage of the development of the Byford Town Centre. The town centre is divided into three sectors, separated by the north-south and east-west main streets, which meet at a T-intersection in the middle of the town centre. The Overall Masterplan indicates another potential supermarket, discount department store (DDS) and smaller commercial tenancies and a residential development in the northern sector. A town square is located on the northern and south eastern side of the T-junction connecting the three sectors. The strength of the proposed stage 1 and masterplan layout relies on the relationship between the major ‘anchor’ retailers, the proposed supermarket and the future discount department store. These are positioned either side of the north south main street on the southern side of the site. The main reasons for this arrangement are: •• Locating the major supermarket adjacent to the future railway station or high frequency bus interchange allows excellent legibility and accessibility to the main retail areas of the site. •• Having the major stores face each other across the main street helps activate the street with the ‘crosspollination’ of complementary shopping opportunities. The proposed stage 1 development will incorporate a number of different commercial tenancies, the exact details of which will depend on finalised leasing arrangements. Whilst these leasing arrangements have yet to be finalised, the expected floorspace distribution for the proposed development is described in the following table. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 7 Type Total Area (m2 GLA) Total Area (m2 NLA) Coles Supermarket 4,024 (including 1,275 of BOH) 2,749 Specialty Retail 1,027 1,027 Restaurant/Cafés 380 380 Gym 350 350 Liquor Store 200 Car Parking The level of car parking provision associated with the development is provided in the following table: Type Spaces Standard 291 200 Disabled 8 20 323 Medical Centre 301 301 Street bays Total 6,282 5,007 Total Traffic and Pedestrian Access Given that the subject development application only comprises the first stage of the Town Centre development, vehicle access to the supermarket and specialty shops will be accommodated via a constructed road from Abernethy Road. The main access road and intersection with Abernethy Road will be constructed to Main Roads standard and its location and alignment will be in accordance with the conditionally approved subdivision of the site. The design accords with the endorsed structure plan and will allow appropriate access from Abernethy Road to the Stage 1 development. A network of footpaths will facilitate pedestrian access into and around the site and the configuration of the specialty stores will create a pedestrian mall located in front of the supermarket. Once planning for future stages of the Town Centre is finalised and the subdivision is completed all of the internal roads will be ceded as public roads and constructed to Main Roads standard. Public Transport and relationship to development The Perth to Bunbury regional rail service runs parallel to South-Western Highway, between George and Alexander Streets. The existing Byford rail station is disjointed from the Town Centre at present. The LSP includes the potential to relocate the station to better align with the Town Centre and maximise its catchment, providing greater connectivity to surrounding areas. Given the uncertainty around timing for a new rail station in Byford, the LSP also allows for an interim bus interchange to connect to Armadale station, increasing connectivity to the Town Centre in the short term. A design consideration with the proposed development application was to ensure that the service areas proposed to the east side of the development would be able to be reconfigured to accommodate future public transport initiatives if required in the future. Disabled parking bays will be provided within parking aisles as close as possible to building entrances in accordance with Building Codes of Australia (BCA) and relevant Australian Standards, and will be constructed, sealed and marked to the satisfaction of the Shire. Landscaping and Amenity As indicated in the LSP, a number of multiple use corridors (MUC) have been identified to perform an urban water management, recreation, public open space, amenity and conservation role. These MUC’s are to be appropriately landscaped to contribute to the amenity of the Town Centre, whilst performing a drainage function reflective of the natural topography. The LSP states that the MUC’s are to be designed and maintained in accordance with Element 5 of Liveable Neighbourhoods. Whilst some landscaping has been identified on the plans provided as part of this application, it is anticipated that a detailed landscaping plan shall accompany the future Building Permit application, and that this will be reflected as a condition of planning approval. Built Form and Architecture The retail plan for the stage 1 development takes its form from the overall masterplan for the Byford Town Centre and the layout of ‘main streets’. The major stores form the anchors of the retail development: the supermarket in Stage 1 and the proposed discount department store (DDS) and additional supermarket in future stages. The DDS and the retail proposed within this application will in time create a dual sided main street which will create strong desire lines and consistent activation between the major stores and specialities assisting with the vitality and viability of the town square and the main street proper. The town square will be further enhanced by locating a cafes or restaurants on the western side with the opportunity for alfresco dining to spill out into the public plaza areas. 8 SJS TRIM - IN14/19829 Design Intent Servicing Areas The Byford area has many local attributes that can be integrated into the design and materials palette for the Town Centre. The natural, cultural and historical features of the area have been referenced in developing a design concept for the new Byford Town Centre project. A servicing area has been provided for the supermarket and the retail and commercial premises. A major dock is provided at the rear of the supermarket, out of view of the main street and provided in a configuration that will allow modification post construction to incorporate future public transport initiatives should they eventuate. The forms of the buildings refer to the areas rural identity and are to be read as a ‘collection of sheds’ in recognition of the agricultural history of the locality. This analogy works well to demonstrate both historical and contemporary reflections of the local character. Rather than utilising the typical parapet and awning designs common in suburban town centre architecture (and indeed the general Coles retail centre offering), the ‘shed analogy’ has allowed the creation of an exciting roof line that creates scale along the main street and a strong identity for the centre. Trading Hours Trading hours for the tenancies within the centre will be in accordance with current State policy and local government regulations. Byford township was initially formed to provide housing for workers at the Armadale Brickworks. A contemporary structure referencing a brickworks chimney is centered in the Town Square referring to this history and acting as a marker to the town square. An overall palette of robust materials has been chosen to help create a design that identifies the site character and one that works within the site context. Profiled metal deck cladding, recycled timber, brick and textured pre-cast concrete panels all reference the unique rural and bushland setting and help to establish an appropriate and natural colour palette for the development (refer to Appendix C) Lighting And Security The stage 1 development is a covered open-air pedestrian and main street environment. Care has been taken not to create any blind alleys so that passive surveillance is possible in all pedestrian areas with activation provided by restaurant / café uses outside of traditional retailing hours. Street, building, under-awning and carpark lighting will be provided to assist in creating a safe environment after dark. Signage Signage proposals indicated in this application are preliminary at this stage and a full signage strategy will be prepared and presented in due course. The supermarket and all specialty and commercial tenancies will have wall and under-awning signage. Signage forms, sizes and locations will be regulated by the signage strategy and design guidelines will be prepared to control the quality and appearance of tenant signs. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 9 PLANNING FRAMEWORK Metropolitan Region Scheme The Metropolitan Region Scheme (MRS) is the statutory planning Scheme for the Perth Metropolitan Region. Under the MRS, subject site is zoned ‘Urban’. A ‘Railways Reserve’ adjoins the site to the east and the South Western Highway, which is also located to the east is reserved as a ‘Primary Regional Road’. Refer to Figure 4 – MRS Extract Shire of Serpentine-Jarrahdale Town Planning Scheme No. 2 The subject land is currently zoned ‘Urban Development’ under the provisions of the Shire of Serpentine-Jarrahdale Town Planning Scheme No. 2 (TPS2). Refer to Figure 5 – TPS2 Zoning The purpose of the Urban Development zone is to provide for the orderly planning of large areas of land in a locally integrated manner and within a regional context, whilst retaining flexibility to review planning with changing circumstances. The zone will allow for: a) “Development of functional communities consistent with orderly and proper planning and the establishment and maintenance of an appropriate level of amenity; b) Variety in the range of lot sizes and dwelling types within communities, consistent with a cohesive and attractively built environment; c) Provision of retail, commercial, industrial and mixed use facilities to service the needs of residents within the communities, and integration of these facilities with social and recreational services, so as to maximise convenience; d) Provision of retail, commercial, business park and industrial facilities to provide local employment opportunities; e) Provision of open space and recreation networks, appropriate community services, school sites and other recreational facilities; f) Establishment of multiple use corridors for drainage, nutrient control and recreational purposes, in association with the development of communities based on the principles of water sensitive urban design; g) Optimisation of convenience in respect of rail, road, cycleway and other transportation means, to and within the communities.” TPS2 outlines that the above components are to be achieved through the establishment of structure plans to ensure development is coordinated and integrated with the surrounding areas. The Byford District Structure Plan was adopted by the Western Australian Planning Commission (WAPC) in March 2005 and was supplemented with the preparation and adoption of the Byford Town Centre Local Structure Plan. An assessment of the proposed development in relation to the provisions of TPS1A is included within the ‘Detailed Planning Assessment’ section of this report. Byford District Structure Plan The original Byford District Structure Plan (DSP) was prepared in response to continued pressure from landowners within the DSP study area to develop their land for urban purposes and was adopted by the WAPC in March 2005. Since 2005, the Town Centre has been identified as the area primarily west of the railway, equally distributed north and south of Abernethy Road. The DSP has recently been amended, relocating the focus of the Town Centre further north of Abernethy Road. The Structure Plan report provides broad assessment of planning, environmental and engineering issues affecting the study area and the formulation of the Structure Plan. It also includes an Implementation Strategy to ensure that the vision is realised at the development stage. The DSP provides a framework to guide the design of further detailed Local Structure Plans, Detailed Area Plans and subdivision designs over land holdings within the area. The DSP identifies an area for Town Centre development along Abernethy Road to the west of the railway line. 10 SJS TRIM - IN14/19829 LOT 2 ABERNETHY ROAD LEGEND METROPOLITAN REGION SCHEME RESERVES ZONES OTHER Source: WAPC Subject Site Figure 4 – MRS Extract Development Site Figure 4 Shire of Serpentine-Jarrahdale Town Planning Scheme No. 2 This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be sustained by any person acting on any visual impression gained from this drawing. The Planning Group WA Pty Ltd Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Designer: CH BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION Drawing No. 11 Drawn: TC 712-403A Whole Lot 2 PS.ai SJS TRIM - IN14/19829 Level 7, 182 St Georges Terrace Perth Western Australia 6000 PO Box 7375 Cloisters Square Perth Western Australia 6850 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 The Planning Group WA Pty Ltd ABN 36 097 273 222 LOT 2 ABERNETHY LEGEND RESERVED LANDS ZONES URBAN URBAN DEFERRED Source: WAPC Subject Site Development Site Figure 5 – TPS2 Zoning Figure 5 Metropolitan Regional Scheme This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be sustained by any person acting on any visual impression gained from this drawing. 12 © The Planning Group WA Pty Ltd Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Drawing No. Designer: CH Drawn: TC 712-403A Whole Lot 2 PS.ai Level 7, 182 St Georges Terrace Perth Western Australia 6000 PO Box 7375 Cloisters Square Perth Western Australia 6850 SJS TRIM - IN14/19829 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 www.tpgwa.com.au The Planning Group WA Pty Ltd ABN 36 097 273 222 The DSP sets out a number of provisions specific to the Town Centre, as follows: •• The High School site will be a prominent landmark. •• The existing waterway in the Town Centre will be subject to water sensitive urban design principles. •• Thomas Road, Abernethy Road and Orton Road to be widened to accommodate stormwater. •• The future construction of Abernethy Road should include dense landscaping, appropriate fencing or bunding. •• The final alignment of the Town Centre district distributor road through Lot 1 Abernethy Road will be determined during detailed structure planning. •• Detailed Area Plans are required for land abutting major distributor roads, public open space, reserves, multipleuse corridors and arterial roads to ensure the built form reflects the rural character of the area. Byford Town Centre Local Structure Plan The Byford Town Centre Local Structure Plan (LSP) has been prepared to guide the development of the Byford Town Centre and its growth into a “vibrant and sustainable Town Centre, comprising a mix of land uses centred on a ‘main street’ retail and commercial development on South Western Highway, and a significant area of mostly vacant land to the west of the railway line, identified for Town Centre expansion”. •• Facilitate and coordinate the progressive subdivision, development and redevelopment of land within the LSP area. •• Provide a framework to achieve certain land use and development outcomes within defined precincts. •• Provide a framework to coordinate the adequate and timely provision of common infrastructure for the LSP and provide for the reasonable and equitable sharing of costs of common infrastructure between landowners. •• Provide a framework for the establishment of a mechanism for the Shire to recover contributions for the provision of common infrastructure from landowners within the LSP area. •• Create a residential and mixed use, well defined Town Centre offering facilities of local and district value. •• Provide a range of dwelling types and densities accommodating a diverse residential community. •• Provide a “Main Street” that creates the environment for mixed-use, day and night activity. •• Provide for a transition of land use over time, including robust and durable building design and site planning to accommodate change in future use, density and form. •• Provide for the sensitive incorporation of cultural heritage and rural character elements.” The objectives of the LSP are: The LSP was finalised in 2014 by the Shire and the WAPC, and the objectives of the LSP as well as the location of the Town Centre to the north of Abernethy Road within Lot 2 are encapsulated within the endorsed LSP design. •• “Facilitate an appropriate mix of retail, commercial, residential and mixed-use development within the Byford Town Centre. Refer to Figure 6 – Byford LSP Extract •• Provide for increased densities of residential development within proximity of the Byford Town Centre and proposed Byford metropolitan railway station/transit node. •• Provide land for public purposes. •• Provide for an appropriate distribution of active and passive public open space. The Byford Town Centre Design Guidelines have been prepared as a Local Planning Policy by the Shire, in order to control the future built form within the Town Centre. The Guidelines outline with following vision for the Town Centre, in accordance with the LSP: •• Provide for a permeable, efficient and effective movement network throughout the LSP area. A Vibrant and Integrated District Centre •• Facilitate the development of street blocks to provide for appropriate lot orientation and accessibility, whilst facilitating the intended use and form. •• Provide for efficient and effective urban water management addressing water quality and quantity. Byford Town Centre Design Guidelines •• A vibrant town centre containing a mix of retail, commercial, civic, recreation, residential uses consistent with its role as a District Centre. •• The existing and expansion areas of the town centre are seamlessly integrated and connected, and demonstrate historical and contemporary reflections of the local rural character. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 13 Source: WAPC Development Site Subject Site Figure 6 – Byford LSP Extract Figure 6 Byford Town Centre This concept has been prepared for the purpose of meeting client specifications. The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. Although care has been taken in the compilation of this drawing by The Planning Group WA Pty Ltd, all parties associated with the proposed property development disclaim all responsibility for any errors or omissions. The right is reserved to change the plan at any time. 14 Liability is expressly disclaimed by The Planning Group WA Pty Ltd for any loss or damage which may be sustained by any person acting on any visual impression gained from this drawing. © The Planning Group WA Pty Ltd Lot 2 Abernethy Road, Byford Date: 25 Sept 2014 Scale: NTS @ A4 Drawing No. Designer: CH Drawn: TC 712-403A Whole Lot 2 PS.ai Level 7, 182 St Georges Terrace Perth Western Australia 6000 PO Box 7375 Cloisters Square Perth Western Australia 6850 SJS TRIM - IN14/19829 Telephone +61 08 9289 8300 Facsimile +61 08 9321 4786 www.tpgwa.com.au The Planning Group WA Pty Ltd ABN 36 097 273 222 •• The location of major store anchors, high quality shopfront environments and car parking areas contribute to an active main street environment. Identifiable Character and Distinct Sense of Place •• Natural, cultural and heritage features, landmarks and public art within the public realm, contribute to sense of place. •• A network of public space and open space corridors contribute to the rural and bushland feel of the area. A Safe Pedestrian and Transit Oriented Place •• There are many streets and pedestrian routes leading to a transit hub. •• Open space areas are provided with passive surveillance. •• The street network and urban environment provides high levels of connectivity and legibility. A Place that Capitalises on its Environmental Assets •• Existing natural assets such as mature and remnant vegetation and streams are central to public realm themeing. •• The main street environment is sheltered from strong easterly winds. •• Existing views and vistas to and from the centre are maintained. A Water Integrated Place •• Living streams and swales are a feature of the town centre and contribute to sense of place as well as perform a drainage, bio-retention and recreation BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 15 DETAILED PLANNING ASSESSMENT The following statutory planning assessment examines in detail the local planning framework applicable to the development of the subject land. Capacity for Council to Consider and Support the Proposed Development Application Clause 5.18.7 of TPS2 relates to development of land before a structure plan has been adopted. Whilst development is generally required to follow the adoption of a structure plan, Clause 5.18.7.3 states: • “Council may approve the development or use for other than a single house within the Urban Development zone subject to Council being satisfied that the nature or scale of such development or use will not have an adverse effect on: Land Use Permissibility The proposed development incorporates predominantly retail uses that generally fall within the definition of ‘Retail Shops’ for the purpose of determining their land use classification. Other proposed uses include a restaurant and commercial tenancies. Clause 6.3.1 of the LSP outlines the land uses that are encouraged within the Retail Core of the Town Centre. These include: •• Retail shops. •• Restaurants and Cafes. •• Leisure and Entertainment. •• Commercial Offices. •• Civic and Community uses, including a Town Square. a) the preparation of a Structure Plan for, or •• Child Care facilities. b) the orderly and proper planning of, or •• Consulting Rooms and Medical Suites. c) the health, amenity, safety or convenience of the future occupants of, •• Residential Development. • the area intended for the preparation of a Structure Plan, and subject to the proposed development or use being advertised for public inspection in accordance with Clause 6.3.” •• Open Space. Therefore based on the above. The land uses proposed as part of Stage 1 are considered to fit well within the requirements of the LSP and can therefore be approved. As the LSP has been finalised by the Shire and WAPC, the location and nature of the Town Centre area is encapsulated by the prevailing planning framework. In conjunction with the Overall Masterplan provided, the proposal is considered to be completely compliant with the adopted LSP, and is reflective of the principles of orderly and proper planning. Therefore the proposed development should be supported by the Council as it enhances and enacts the vision created by the LSP for the area. 16 SJS TRIM - IN14/19829 Clause 7.5 – Notice of Proposed Development Stage 1 development and specific measures to address some of the recommendations outlined in the study shall be detailed at Building Permit stage. It is anticipated that the proposed development application will be advertised in accordance with Clause 6.3 of TPS2. Clause 6.3 requires that owners of land that is considered likely to be affected by the proposal be consulted, as well as a notice being published in the local newspaper and a sign erected on site. Clause 6.3.2 also states that any submissions are to be made to the Council within 21 days from the date of the notice. In addition to the work conducted by GHD on the LSP, Riley Consulting was commissioned by the proponent to consider the traffic issues associated with a proposed new supermarket and associated specialty shops within the Byford Town Centre stage 1. The report concluded that: •• The proposed Coles shopping centre can be expected to generate up to 7,601 vehicle movements per day once fully operational. Analysis of the increase in traffic as a result of the new store is shown to have no material impact to the operation of the local road network based on WAPC guidelines. However, an impact to Abernethy Road is indicated. •• The impact to Abernethy Road is indicated to be acceptable and is not expected to result in poor Levels of Service. The proposed access to Abernethy Road will require the provision of a right turn lane and it is recommended that the design include for a pedestrian median to the west of the access. It is also recommended that at least one footpath be provided to the proposed access road. •• Analysis of local intersections shows that acceptable Levels of Service will be maintained with the forecast traffic increases. No upgrading to local intersections is required as a result of the proposed development. Zone Development Requirements The following table contains an assessment of the proposed development in accordance with the Byford Town Centre Design Guidelines. Landscaping The large multiple use corridor (MUC) along the southern boundary of the site will provide significant landscaping for the site and also act as a buffer between the Town Centre and the adjoining Abernethy Road to the south. The proposal also incorporates landscaping within the carpark areas of the site and within the Town Square providing a green backdrop for the Town Centre. The provision of landscaping on the development site exceeds the required 5-10% identified in the Design Guidelines. A comprehensive landscaping plan shall be provided as part of the Building Permit application and any landscaping provided will be reflective of the surrounding Byford area. Vehicle Access and Parking Traffic analysis of the town centre site has been previously considered during structure planning processes based on a total development of 21,000m2 of town centre activity floor space. The conclusions of the analysis indicated that the full development of the town centre could have impacts on the South Western Highway based on the location of future population cells in the locality. Initial stages of development were also considered and indicate that development of up to 6,200m2 of floorspace would have minimal impact on the local road network. However, the analysis did indicate that some attention to the town centre access road at Abernethy Road may be required. As part of the LSP, GHD prepared a Traffic and Transport report in order to identify the traffic impacts and appropriate traffic management measures to support the implementation of the Byford LSP. This study has informed the basic design of the In addition to the traffic analysis, an analysis of the car parking requirements of the site as they relate to the LSP was conducted by the proponent project team. The requirements detailed within the structure plan note that a provision of car parking at 1 bay per 20m2 of GLA applies to the Byford Town Centre. The proposed development therefore generates a requirement for 314 bays in order to comply with the LSP. A total of 319 bays have been provided within the proposed development, meeting the requirements of the LSP. The report also notes that the centre will have a surplus of parking during peak periods. For further detail on the above please refer to Appendix 4 – Traffic and Parking Assessment. Signage As indicated previously, notional signage locations for individual tenancies are indicated as part of the development proposal. Whilst detailed signage arrangements have yet to be confirmed, the commercial design of the proposed development has taken into consideration the likely placement of future signage associated with the minor tenancies and the major supermarket tenant. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 17 Servicing Considerations discharging to drainage detention facilities with associated water quality treatment. Sewage JDA Consulting Hydrologists are in the process of amending a stormwater management plan for the site, which will outline in detail the design measures to manage stormwater runoff. These measures will potentially include: Provision of a gravity sewer connection to the Water Corporations Byford sewerage scheme can be achieved in accordance with the Water Corporation’s requirements by the construction of DN225 and DN300 gravity sewers from the North West corner of Lot 2 along Coragem Turn, Thatcher Road to the intersection of Larson Road discharging into the existing Water Corporation DN225 sewer main. Separately to this direct connection of the site, the Water Corporation have also advised that an additional offsite link between Larson Way and Thomas Road as part of the Byford West project would be required to boost capacity to provide for ultimate sewer flow rates from the Lot 2. •• The top water level in the basin to cater for a 100yr ARI rainfall event. •• Building pad levels required. •• The required constructed road levels adjacent to the basin/drains and the development site. •• Preliminary level modelling has been taken into account in the proposed development design, and it is envisaged that a comprehensive management plan will be provided as a condition of approval prior to building permit. Water Supply Provision of potable water supply to the site would be achieved by connection to the Water Corporation’s existing water distribution network located to the north of Lot 2. Connection into the Stage 1 site would be achieved by the construction of DN250 and DN200 PVC water mains connecting to the north along road reserves. Electricity Provision of an electricity connection to the site would be achieved by connection to Horizon Power’s existing High Voltage power line located along Abernethy Road. Power distribution within the site would be achieved by high voltage interconnection between the High voltage power line, switchgear and transformers before being located reticulated at low voltage about the site. Earthworks Earthworks for the site would be designed to accommodate the various site-specific parameters including: •• Appropriate Clearance to Groundwater •• Appropriate local and scheme wide drainage flood routing •• Minimum grades to accommodate shopping centre car park configurations. •• Sand pad installation to suit site building requirements •• Existing ground surface fall across the site from South East to North West. Reticulated gas connection to the site would be provided by connection to existing Alinta gas mains located in Abernethy Road and Soldiers Road at the south east corner of the site. It is noted from site geotechnical investigations that the site subsurface can generally be described as 0.25m layer of topsoil overlaying natural clayey sand and sandy clay of the Guilford formation. In some locations local pockets of a 300mm layer of grey silty sand were present over the underlying clay materials. Telecommunications Pavements High-speed broadband communications to the site would be achieved by connection to Telstra infrastructure in Abernethy Road that interconnects to Telstra’s broadband enabled Byford Telephone Exchange. Noting the geotechnical parameters of the site pavements for the development would be a combination of flexible pavements (asphalt, roadbase and limestone subbase) and rigid pavements (Reinforced concrete) to suit the particular vehicle usage in each location of the development and the geotechnical pavement design parameters. Further aesthetic improvements may be prescribed by the project architect. Gas Reticulation Stormwater Drainage Noting the clayey ground conditions and associated minimal site infiltration site stormwater drainage would be collected by a network of consisting of roof top gutters and downpipes, ground level gullies and an interconqnected pipe network 18 SJS TRIM - IN14/19829 Demand for Proposed Development Orderly and Proper Planning As part of the preparation of the LSP, Pracsys were engaged to conduct a retail demand analysis for the Town Centre. The purpose of the analysis was to calculate the viable retail floorspace to 2031. The analysis took into account demand from a range of users including residents, workers, visitors and passing trade, upon which available expenditure pools and ultimate floorspace estimates were calculated. The proposed development is demonstrated to be orderly and proper, with reference to TPS2, the Byford Local Structure Plan and the associated Byford Town Centre Design Guidelines. Traffic impact investigations undertaken in support of the Byford LSP and the proposed development also demonstrate the suitability of the proposed access arrangements. Based on the findings of Pracsys’ report, the below table outlines the range of floorspace demand until 2031. The key aspects of the proposal to be taken into consideration are that: Year Floorspace Demand (m2 nla) Increase 2011 1,746 – 3,052 N/A - existing 2021 3,614 – 6,144 1,746 – 3,052 2031 8,962 – 15,538 7,037 – 11,962 From the above, it can be seen that there is already ample demand for retail space within Byford and this is set to increase significantly by 2031. The proposed Stage 1 development incorporates 5,353m2 nla of retail floorspace (excluding the commercial tenancies), which is considered appropriate to meet demand in the short term. Given the expected sharp increase in demand between 2021 and 2031, detailed planning for Stage 2 of the Town Centre shall quickly follow Stage 1. Pracsys identified the following conclusions from their analysis, in relation to the development of new retail, stating that new retail should: •• Focus on the development of a core of commercial activity within the Town Centre. •• Ensure the provision of new convenience retail is concentrated within this core given the high frequency of transactions that such uses generate. •• Maintain the intensity of the Town Centre, with expansion to adjacent locations occurring incrementally. Congestion of activity within a confined location is far more desirable in activating the Activity Centre than the development of disparate, poorly connected nodes. •• Have strong relationships to public transport infrastructure. •• The development will predominantly accommodate retail uses that will be assessed which are promoted in the LSP. •• The proposed development accords with the requirements of the LSP and the Shire’s Byford Town Centre Design Guidelines. •• The proposed development proposes a high amenity built form incorporating appropriate high quality design features and landscaping, in addition to an appropriate network of pedestrian paths and vehicle circulation routes. •• The proposed development will improve the amenity of and general aesthetic of the locality. •• The proposal will create employment opportunities and provide a community focal point in a sustainable location, which is readily accessible by the local community. The proposed development is considered to align with Pracsys’ conclusions and in light of the above, there is considered to be sufficient demand for the proposed retail facilities. BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 19 CONCLUSION This report has been prepared by TPG Town Planning, Urban Design and Heritage (TPG) on behalf of Coles Group Property Developments Ltd to support a development application for the development of the first stage of the Byford Town Centre on Lot 2 Abernethy Road, Byford. Based on a detailed planning assessment of the proposal, it has been determined that the proposed development is demonstrated to be orderly and appropriate with respect to the development requirements under TPS2, the Byford Town Centre Structure Plan and Byford Town Centre Design Guidelines. The application proposes a high amenity built form sympathetic to the local character of Byford, a pedestrianised main street, appropriate car parking facilities, an integrated vehicle and pedestrian access network and an appropriately positioned service area. Development of the Town Centre will also provide muchneeded retail and commercial facilities for the 6,000+ adjoining residents, who are currently having to travel to other centres for their daily shopping needs. The development of the Byford Town Centre will help ensure the long term economic viability and sustainability of Byford. Accordingly, it is respectfully requested that the Shire of Serpentine-Jarrahdale, the WAPC and JDAP gives timely consideration and approval to the proposed development. 20 SJS TRIM - IN14/19829 APPENDIX A Certificates of Title BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 21 This page has been left blank intentionally. 22 SJS TRIM - IN14/19829 LANDGATE COPY OF ORIGINAL NOT TO SCALE Thu Oct 2 10:53:28 2014 SJS TRIM - IN14/19829 JOB 45785731 www.landgate.wa.gov.au APPENDIX B Proposed Site Development Plans and Coloured Perspectives BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 23 This page has been left blank intentionally. 24 SJS TRIM - IN14/19829 RL. 48.5 m PROPOSED SUBDIVISION BOUNDARIES 47 BAYS FUTURE RESIDENTIAL TRAIN LINE 20 BAYS 21 BAYS 61 BAYS TOWN SQUARE 2 POSSIBLE SUPERMARKET 02 40 BAYS 20 BAYS FUTURE RETAIL SLEEVE LVD NB EO SIIM FUTURE STATION N SA TOWN SQUARE NEW COLES 19 BAYS CURRENT BOUNDARY POSSIBLE DDS ABERNETHY RD Overall Master Plan COLES BYFORD DEVELOPMENT Status: DEVELOPMENT APPLICATION Path: \\ARSENAL\z_projects\pdrive\42567 Coles Byford Shopping Centre\03 Design Scale: 0 © Hames Sharley: SJS TRIM - IN14/19829 1:1000 @ A1 80 North: Project Number: Drawing Number: Revision: Date: 42567 DA100 A 09/18/14 MEDICAL FUTURE RETAIL (STAGE 2) 301 m² TOWN SQUARE AMENITIES RETAINING WALL 106 m² SPECIALTIES CL 223 m² KEY PLAN 1 : 5000 COLES BOH 1:10 1275 m² 27000 AIRLOCK AREA SCHEDULE - NLA COLES SELLING FLOOR 380 m² 2749 m² 350 m² 200 m² 301 m² 1027 m² 5007 m² 2749 m² CL CAFE COLES SELLING FLOOR GYM LIQUOR MEDICAL SPECIALTIES CAFE 190 m² LIQUOR 200 m² LOADING DOCK AREA SCHEDULE - OTHER AMENITIES BIN STORE COLES BOH 138 m² 147 m² 1275 m² 1560 m² CAFE 190 m² SPECIALTIES 8 4 20 291 323 17500 TAXI 10000 12000 SPECIALTIES 386 m² BIN STORE 147 m² SPECIALTIES GYM 162 m² 350 m² RETAINING WALL 1:10 PROPOSED SUBDIVISION BOUNDARY ACROD Bays Coles Online Truck Parking On-Street Bays Parking Bays 256 m² WC RETAINING WALL Parking Bays Schedule Site Plan COLES BYFORD DEVELOPMENT Status: PRELIMINARY - INFORMATION ONLY Path: \\ARSENAL\z_projects\pdrive\42567 Coles Byford Shopping Centre\03 Design Scale: 0 © Hames Sharley: SJS TRIM - IN14/19829 1:500 @ A1 40 North: Project Number: Drawing Number: Revision: Date: 42567 DA200 C 09/18/14 PANELISED LIGHTWEIGHT CLADDING PERFORATED METAL SCREEN ON STEEL FRAME FEATURE METAL BATTEN AWNING ON STEEL FRAME COLES FEATURE CANOPY ROOF METALDECK ROOF IN COLORBOND FINISH METALDECK ROOF IN COLORBOND FINISH EXPOSED STEEL TRUSS FEATURE STEEL FRAME CANOPY OVER PEDESTRIAN MALL RL 65.920 m RL 65.320 m PRECAST CONCRETE PANELS RL 64.388 m RL 64.250 m RL 63.371 m LANDMARK TOWER IN STEEL & METAL CLADDING EXPOSED STEEL TRUSS RL 61.068 m RL 61.975 m RL 60.265 m LOADING DOCK BEYOND RAMP DOWN TO LOADING DOCK SE Tenancy RL 54500 SW Tenancies RETAIL TENANCIES PEDESTRIAN MALL RETAIL TENANCIES GYM RL 53700 SUPERMARKET SOUTH ELEVATION 1 : 200 PANELISED LIGHTWEIGHT CLADDING COLES FEATURE CANOPY ROOF IN COLORBOND FINISH COLES FEATURE SIGNAGE BANNER PRECAST CONCRETE PANELS COLES RED ALUCOBOND PORTAL METALDECK ROOF IN COLORBOND FINISH PERFORATED METAL SCREEN ON STEEL FRAME RL 65.320 m RL 64.388 m RL 64.250 m RL 63.371 m RL 61.975 m RL 60.583 m LANDMARK TOWER IN STEEL & METAL CLADDING STEEL FRAME CANOPY OVER PEDESTRIAN WALKWAY coles FEATURE METAL BATTEN AWNING ON STEEL FRAME SW Tenancies RL 53700 Ground Floor (Coles) RL 53320 TOWN SQUARE WITH RETAIL TENANCIES AND SUPERMARKET BEYOND CAFES RETAIL TENANCIES WEST ELEVATION 1 : 200 PANELISED LIGHTWEIGHT CLADDING COLES FEATURE CANOPY ROOF METALDECK CLADDING IN COLORBOND FINISH LANDMARK TOWER IN STEEL & METAL CLADDING EXPOSED STEEL TRUSS RL 65.320 m RL 64.388 m RL 64.240 m RL 60.583 m PRECAST CONCRETE PANELS ACCESS TO LOADING DOCK SE Tenancy RL 54500 Ground Floor (Coles) RL 53320 SUPERMARKET MEDICAL TENANCY TOWN SQUARE NORTH ELEVATION 1 : 200 FEATURE BRICK WALL METALDECK ROOF IN COLORBOND FINISH PANELISED LIGHTWEIGHT CLADDING EXPOSED STEEL TRUSS FEATURE PRECAST CONCRETE PANELS EXPOSED STEEL TRUSS FEATURE PANELISED LIGHTWEIGHT CLADDING FEATURE METAL BATTEN AWNING ON STEEL FRAME RL 65.920 m RL 65.912 m RL 65.320 m RL 63.371 m RL 60.583 m SE Tenancy RL 54500 Loading Dock RL 52000 GYM BIN STORE SUPERMARKET LOADING DOCK SUPERMARKET AMENITIES & MEDICAL TENANCIES BEYOND EAST ELEVATION 1 : 200 Elevations COLES BYFORD DEVELOPMENT Status: DEVELOPMENT APPLICATION Path: \\ARSENAL\z_projects\pdrive\42567 Coles Byford Shopping Centre\03 Design Scale: 0 © Hames Sharley: SJS TRIM - IN14/19829 1:200 @ A1 16 North: Project Number: Drawing Number: Revision: Date: 42567 DA400 A 09/18/14 NORTH WEST PERSPECTIVE SOUTH PERSPECTIVE Perspectives Sheet 01 COLES BYFORD DEVELOPMENT Scale: NTS Status: DEVELOPMENT APPLICATION Path: \\ARSENAL\z_projects\pdrive\42567 Coles Byford Shopping Centre\03 Design © Hames Sharley: SJS TRIM - IN14/19829 North: Project Number: Drawing Number: Revision: Date: 42567 DA001 A 09/18/14 OUTER SOUTH-WEST PERSPECTIVE OUTER NORTH-WEST PERSPECTIVE Perspectives Sheet 02 COLES BYFORD DEVELOPMENT Scale: NTS Status: DEVELOPMENT APPLICATION Path: \\ARSENAL\z_projects\pdrive\42567 Coles Byford Shopping Centre\03 Design © Hames Sharley: SJS TRIM - IN14/19829 North: Project Number: Drawing Number: Revision: Date: 42567 DA002 A 09/19/14 APPENDIX C Schedule of Materials/Finishes BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 25 This page has been left blank intentionally. 26 SJS TRIM - IN14/19829 SJS TRIM - IN14/19829 SJS TRIM - IN14/19829 APPENDIX D Traffic and Parking Assessment BYFORD TOWN CENTRE – STAGE 1 DEVELOPMENT APPLICATION SJS TRIM - IN14/19829 27 This page has been left blank intentionally. 28 SJS TRIM - IN14/19829 COLES PTY LTD BYFORD SHOPPING CENTRE TRAFFIC AND PARKING ASSESSMENT October 2014 PO Box Z5578 Perth WA 6831 0413 607 779 Mobile Issued on 02 October 2014 Amendment Date Version V2 V1 Area amended 2/10/14 Reference 646 SJS TRIM - IN14/19829 Coles - Byford ^ -~ CONTENTS 1.0 EXECUTIVE SUMMARY 2.0 THE SITE AND SURROUNDING ROAD NETWORK 3.0 TRAFFIC GENERATION AND DISTRIBUTION 4.0 TRAFFIC IMPACT 5.0 ACCESS 6.0 PARKING 7.0 PEDESTRIANS, CYCLISTS AND PUBLIC TRANSPORT Page 2 of 25 SJS TRIM - IN14/19829 1.0 EXECUTIVE SUMMARY Riley Consulting has been commissioned by Coles Pty Ltd to consider the traffic issues associated with a proposed new supermarket and associated specialty shops at Byford. The development of the supermarket is the first stage of the development of the future Byford town centre. The analysis undertaken in this report indicates the following: • The proposed development forms stage 1 of the Byford town centre, which has been previously assessed by GHD (August 2011) for the Shire of Serpentine-Jarrahdale. • The proposed Coles shopping centre can be expected to generate up to 7,601 vehicle movements per day once fully operational. Analysis of the increase in traffic as a result of the new store is shown to have no material impact to the operation of the local road network based on WAPC guidelines. However, an impact to Abernethy Road is indicated. • The impact to Abernethy Road is indicated to be acceptable and is not expected to result in poor Levels of Service. The proposed access to Abernethy Road will require the provision of a right turn lane and it is recommended that the design include for a pedestrian median to the west of the access. It is also recommended that at least one footpath be provided to the proposed access road. • Analysis of local intersections shows that acceptable Levels of Service will be maintained with the forecast traffic increases. No upgrading to local intersections is required as a result of the proposed development. • Car parking in accordance with the Local Structure Plan is provided. Page 3 of 25 SJS TRIM - IN14/19829 I ICY ( Vw^snltirux. Coles - Byford 2.0 THE SITE AND SURROUNDING ROAD NETWORK The site is located to the west side of the Perth-Bunbury railway line, closely located to the South Western Highway, Byford. The locality of the site is shown in Figure 1. Figure 1 Site Location Roads of significance to the development site are considered below. South Western Highway The South Western Highway is a primary regional road under the control of Main Roads WA (MRWA). It provides a regional link between Armadale (where it joins Albany Highway), Perth and Walpole (where it joins the South Coast Highway to Albany). The South Western Highway is a primary freight route and caters for large trucks throughout the year. However, the development of the Tonkin Highway should remove the use of this route by large trucks over time. The South Western Highway is generally constructed as a single carriageway two-lane road, except through Byford, where a four-lane divided carriageway has been provided. Traffic speeds are limited to 90kph approaching the town and 50-60kph through the town. Traffic data has been provided by MRWA for 2010 and is shown in Table 1. Page 4 of 25 SJS TRIM - IN14/19829 Table 1 South Western Highway Traffic Volumes Location Daily Flow Northbound Southbound South of Jessie Street (2010)* 12,140 5,891 6,249 South of Nettleton Road 9,948 5,030 4,819 *2014 SCATS data indicates 12,196vpd to the north of Abernethy Road. Vehicle classification indicates 9% truck movements on the South Western Highway, although truck traffic varies according to the season and is known to increase significantly during the grain season. As stated, it is expected that the extension of the Tonkin Highway beyond Thomas Road will provide an alternative route for regional traffic and trucks. Significant traffic decreases can be expected when the Tonkin Highway is extended. The intersection of South Western Highway / Abernethy Road is controlled by traffic signals that were installed in January 2009. Scats data has been provided for the traffic signals from MRWA and shows that the traffic data shown in Table 1 is still valid. Analysis of the intersection operation undertaken in this report is based on the current Scats data. Abernethy Road To the south of the subject land lies Abernethy Road, which is classified in the MRWA Functional Road Hierarchy as a district distributor type A road between the South Western Highway and Soldiers Road. West of Soldiers Road it is classified as a local distributor road. It is constructed as a rural road with a standard 7.2m (approximate) road pavement between Soldiers Road and Hopkinson Road. East of Soldiers Road a slightly wider carriageway has been constructed to provide additional capacity at its intersection with the South Western Highway. East of Soldiers Road there is a level crossing. Traffic data supplied by the Shire of Serpentine-Jarrahdale indicates a daily flow of 7,095vpd (2014) to the east of Soldiers Road. Beenyup Road Beenyup Road is classified as a local distributor road in the MRWA Functional Road Hierarchy. The hierarchy suggests that local distributors should provide access within the cell, but discourage through traffic and have a maximum desirable traffic flow of 6,000vpd. Beenyup Road is constructed as a single carriageway road with residential property to the northern side taking direct access. Page 5 of 25 SJS TRIM - IN14/19829 Coles - Byford Current traffic data provide by the Shire of Serpentine - Jarrahdale indicates a traffic flow of 1,694vpd (2012). Scats data from the traffic signals at South Western Highway indicates a peak hour flow of about 160 vehicles in the evening peak hour. The existing layout of the South Western Highway / Abernethy Road / Soldiers Road intersection is shown in Figure 2. Figure 2 Existing Road Layout The development site plan is shown as Figure 3 and is provided for reference only. Page 6 of 25 SJS TRIM - IN14/19829 Coles - Byford Era (TJX ni !) 10 Figure 3 Development Plan (refer to Architect for detail) Page 7 of 25 SJS TRIM - IN14/19829 Coles - Byford 3.0 TRAFFIC GENERATION AND DISTRIBUTION The existing site area is occupied by a single residential dwelling and would be expected to generate about 8 to 10 vehicle movements per day. The traffic generation of the existing land uses is insignificant and is not considered further in this report. As indicated, the development of the Coles supermarket and speciality stores is shown within the local structure plan and form the first stage of an expected 3 stage development of the future Byford town centre. The Proposed Development The development plan prepared by Hames Sharley and shown in Figure 3 provides the following development opportunity (gross floor areas). 2 Supermarket and liquor 4,224m Speciality shops 1,027m Other related uses 1,031m Amenities (non traffic producing uses) (285m ) Total Floor Area 6,282m (6,567m) GFA 2 2 2 2 2 The Road Traffic Authority of New South Wales in their publication Guide to Traffic Generating Developments has undertaken the most recent research on the traffic generation of shopping centres. The RTA undertook surveys in the 1980s and found that the traffic generation was more accurately assessed by considering the different types of retail premises. To determine the peak generation of a local centre, a formula was derived to consider: major department stores; discount stores; supermarkets; speciality stores and other associated uses, such as a medical centre and fast food outlets. The Guide to Traffic Generating Developments can be seen to appropriately assess the expected mix of uses within the centre proposed for Byford. Applying the RTA Guide to Traffic Generating Developments formulae to Byford produces the estimation of the Thursday PM peak hour traffic demands shown in Table 1. Page 8 of 25 SJS TRIM - IN14/19829 Coles - Byford Table 1 Peak Trafi ic Generation Land Use Area Thursday Peak trips Saturday Peak Trips Supermarket 4224 655 621 Speciality 1,027 47 110 Other related 1031 23 23 725 754 Reference to local traffic data indicates Abernethy Road passes 663 two-way vehicle movements on a Thursday evening between 5pm and 6pm. The peak flow on Saturday between 11am and 12pm is 579 vehicle movements. It can be seen therefore that the peak period of impact will be on a Thursday evening. The Byford Coles development is expected to generate 725 peak hour trips. 2 2 The RTA guide suggests a daily trip rate of 121 trips per 100m for centres <10,000m , suggesting the proposed Byford centre will generate (6,282 / 100 x 121) 7,601 movements per day. The Coles development at Byford could generate up to 7,601 trips per day. Pass-by Traffic Attraction Whilst the expected attraction to the shopping centre is shown as 7,601 vehicle movements per day, much of this traffic attraction will already be passing the site and/or passing through the local area. There is an existing IGA store adjacent to the South Western Highway which can be expected to continue to trade, although it can be expected that some customers will transfer to the new centre. Studies undertaken in the USA by the Institute of Transportation Engineers (ITE) indicates 2 that the pass-by attraction to a shopping centre of less than 10,000m is in the order of 35%. When considering the introduction of a new supermarket store in Byford, it is obvious that a pass-by attraction will occur. At the present time, district centres are based in Armadale, Baldivis and Cockburn requiring residents south of Byford to drive past the shopping centre site. Further, the quality of supermarkets currently available in the locality would require extensive travel to reach larger supermarkets, thus the Byford shopping centre can be expected to have a catchment extending from Armadale, to potentially Pinjarra in the south and west to Wellard. " " : Page 9 of 25 SJS TRIM - IN14/19829 Coles - Byford On the basis that 35% of traffic is already on the network, the proposed shopping centre can be expected to increase local traffic by (7,601 x 65%) 4,940 movements per day. During the peak periods the increase will be (725 x 65%) 471 new trips to the local road network. The proposed Coles development will increase local traffic by 4,940 vehicle movements per day. Distribution The distribution of traffic attracted to the shopping centre will be biased towards new development in the region. The shopping centre is located to the west of an existing IGA store that can be expected to remain. Whilst it can be expected that residents may continue to use the existing IGA store, new residents are more likely to be attracted to the new facilities. The attraction to the shopping centre is based on population data contained in the Shire of Serpentine - Jarrahdale document Population and Household Forecasts prepared by id Consulting in August 2009. As a published Shire document, this should be the most supportable projections. As indicated, the development of the shopping centre is reliant on population increases for its customer base and in that respect, the traffic forecasts developed for the Byford structure plan and the Shire's plan (Maunsell modelling) will be used to determine future traffic volumes in the vicinity of the proposed shopping centre. The indicative distribution of traffic is shown below: South Western Highway south South Western Highway north Abernethy Road Beenyup Road Soldiers Road 30% 22% 35% 8% 5% Figure 4 shows the derived daily traffic demands associated with the proposed development and the expected actual daily traffic increases based on a 35% pass-by attraction. Page 10 of 25 SJS TRIM - IN14/19829 c v Owlisulliryi Coles - Byford Thursday - Dally Volumes h Western Highway Actual Increase (35% pass-by) I Shopping Centre 7,601 1,672 1,087 Abernethy Road Beenyup Road 608 1,729 2,964 380 247 Figure 4 South Western Highway / 395 2,280 1,482 Daily Traffic Forecasts Page 11 of 25 SJS TRIM - IN14/19829 Coles - Byford 4.0 TRAFFIC IMPACT Figure 4 shows the expected increases to local traffic volumes with the development of Stage 1 of the proposed Byford shopping centre. Reference to the WAPC Transport Assessment Guidelines for Developments states that: As a general rule an increase in traffic of less than 10% of capacity would not normally be likely to have a material impact on any particular section of road, but increases over 10% may. All sections of road with an increase greater than 10% of capacity should therefore be included in the analysis. Table 2 considers the anticipated traffic generation of the site in comparison to the affected road capacity. Appendix A provides the capacity levels for each road type and the Level of Service thresholds. Table 2 E x p e c t e d I n c r e a s e s to L o c a R o a d Network Road Capacity Increase % Volume LoS South Western Highway north 50,000 1,087 2% 13,227 A South Western Highway south 50,000 1,482 3% 11,430 A Abernethy Road west 15,000 1,729 12% 8,824 D Abernethy Road east 15,000 2,964 20% 10,059 D Beenyup Road 9,000 395 4% 2,089 A Soldiers Road 9,000 247 3% 2,371 A Table 2 indicates the expected traffic increases to the surrounding road network and compares the forecast traffic increases in regard to the WAPC requirements. It can be seen from table 2 that only Abernethy Road would be considered as materially affected and further assessment is required. All roads except Abernethy Road are deemed "not materially affected" under WAPC guidelines. Abernethy Road Abernethy Road is shown to experience traffic increases up to 20% of its capacity with the proposed supermarket. However, as Byford is an expanding suburb, much of these "new" trips will actually be as a result of new residential development in the area. It is not Page 12 of 25 SJS TRIM - IN14/19829 anticipated that the shopping centre will operate at 100% capacity from day 1 and it will be reliant on new residents in Byford to continue to build the store's catchment. From an operational perspective, the forecast Level of Service can be expected to drop, but Abernethy Road will continue to operate with acceptable Levels of Service. In the longer term a new road crossing of the rail line will access the town centre, reducing the demands to Abernethy Road. However, the development of this new link is not part of the current development application. Analysis of the peak hour operation is provided in the following section. Page 13 of 25 SJS TRIM - IN14/19829 5.0 ACCESS The proposed shopping centre will be provided with a single point of access to Abernethy Road. Some traffic will then pass Soldiers Road and access the South Western Highway at the traffic lights. Thursday evening peak hour analysis has been undertaken to determine the expected operation of the three affected intersections. Appendix B shows the peak hour traffic demands with the proposed development. Site Access / Abernethy Road Access to Abernethy Road is new and Figure 5 shows the expected treatment including a right turn lane to heighten the prominence of the intersection and provide a safer environment for turning traffic. Figure 5 shows an indicative standard right turn pocket on Abernethy Road. The lane comprises a standard 40 metre turn lane with a 30 metre taper. X! o cc , Provide footpath to at least one side V) a Provide pedestrian median < 0) O U Abernethy Road to O S Figure 5 Access to Abernethy Road (subject to detail design) As the proposed connection road will form the initial and only access to the shopping centre, 12 metre minimum radii kerbs are recommended to ensure services vehicles can easily access the site. Sidra analysis of the expected operation of the site access / Abernethy Road intersection is attached as Appendix C and Table 3 provides a summary of the peak hour operation. Page 14 of 25 SJS TRIM - IN14/19829 Coles - Byford Table 3 Thursday PM Peak - Site Access / Abernethy Rd Sat Delay LoS Abernethy Road east 0.263 5.3 A Shopping Centre Access 0.578 18.8 B Abernethy Road west 0.219 2.6 A Road Design life assessment indicates that the access to Abernethy Road can be expected to fail within about 10 years. However, it is expected that the development of future stages of the shopping centre will require some form of control at the Abernethy Road access point (roundabout expected), but this will be dependent upon other access opportunities and should be reviewed in following stage applications. Soldiers Rd / Abernethy Road Sidra analysis of the expected operation of Soldiers Road / Abernethy Road intersection is attached as Appendix D and Table 4 provides a summary of the peak hour operation. Table 4 Thursday PM Peak - Soldiers Rd / Abernethy Rd Road Sat Delay LoS Abernethy Road east 0.292 1.5 A Soldiers Road 0.598 42.7 E Abernethy Road west 0.326 5.5 A An upgrade to the Soldiers Road intersection is not be warranted by the proposed development, although there is an opportunity to provide a right turn lane to Soldiers Road to improve safety at this intersection. However, this suggestion does not form part of the development application and the cost of these works is to be met by the Shire of Serpentine-Jarrahdale. South Western Highway / Abernethy Road Sidra analysis of the expected operation of South western Highway / Abernethy Road intersection is attached as Appendix E and Table 5 provides a summary of the peak hour operation. It is noted that Sidra may select signal cycle times different to those preferred by MRWA. Page 15 of 25 SJS TRIM - IN14/19829 Coles - Byford Table 5 Thursday PM Peak - South Western Hig hway / Abernethy Rd Road Sat Delay LoS South Western Highway south 0.794 47.7 D Beenyup Road 0.447 45.6 D South Western Highway north 0.799 44.9 D Abernethy Road 0.809 38.5 C Analysis of the expected operation of the South Western Highway intersection indicates that acceptable Levels of Service can be expected with the development of the Coles shopping centre. No intersection upgrading would be required. The development of the shopping centre will not require intersection upgrades. Service Vehicle Access Service vehicles will be required to access the proposed store from Abernethy Road until such time that the east-west road to the north of the sore is connected through to South Western Highway. This connection is a longer-term outcome and will be constructed by others. Figure 6 shows the route for service vehicles to access the loading dock. Trucks will approach from Abernethy Road and turn right to the east-west link and then turn right to the road adjacent to the rail reservation. Trucks can then turn right into the service yard and reverse to the loading dock. Egress from the loading dock will pass through the car park. As loading will typically occur outside of peak trading periods, the service vehicles will have minimal interaction with customer traffic. The access to the road network has been reviewed using MRWA / Austroads turning templates and appropriate width is provide to allow delivery vehicle access and egress without interference with opposing traffic movements. Page 16 of 25 SJS TRIM - IN14/19829 J i ! !'i L — & Figure 6 Service Vehicle Access (Plan is indicative - refer to Architects plan) Page 17 of 25 SJS TRIM - IN14/19829 Coles - Byford 6.0 PARKING Car parking at a shopping centre is an important element to the viability of the centre. However, the cost of providing car parking can be excessive and a balance needs to be made between planning requirements and parking demands. The Shire of SerpentineJarrahdale LPS for Byford town centre has a realistic car parking requirement of 1 bay to be 2 2 provided for every 20m Gross Leasable Area (5 bays per 100m ). 2 A parking requirement of 1 bay per 20m GLA applies to Byford town centre 2 The total floor area of the shopping centre is shown to be 6,282m of commercial leasable 2 use with 285m of amenities (non leasable area). Based on the total leasable floor area of 2 6,282m the LSP parking requirement, would be (6,282/100 x 5) 314 bays. The proposed shopping centre requires 314 bays to accord with the LSP. Reference to the architect's plan attached as Figure 2 indicates that a total of 299 parking bays are provided for the shopping centre (including 8 ACROD bays). Additional parking of 20 bays is provided to the street frontage. In total 319 bays are shown to be provided for the proposed centre, which is greater than required under the Shire's LPS. Parking accords with the LPS requirements. Parking Demands Shopping centres experience peak demands on a Saturday between 11am and 1pm and then Thursday evenings between 5pm to 6pm. During these times the medical centre would most likely be closed and the need to provide 15 bays for the medical centre land use would not exist. The LSP parking requirements for the peak demands of the shopping centre would therefore be (314 - 15) 299 bays. Technically the proposed shopping centre will have a surplus of bays during peak periods of attraction. Based on peak times of attraction, car parking greater than the LSP requirement is provided. Page 18 of 25 SJS TRIM - IN14/19829 Coles - Byford 7.0 PEDESTRIANS, CYCLISTS AND PUBLIC TRANSPORT The proposed shopping centre is located on land designated as future town centre and it is expected that residential development will border the site at some future time. As development in the locality grows, the shopping centre will grow accordingly. A good footpath is currently provided to the south side of Abernethy Road which will provide a good pedestrian and cycle link to the proposed shopping centre. All streets within the town centre will be designed to meet the needs of cyclists and pedestrians. A footpath to at least one side of the access should be provided. A pedestrian median should be provided to Abernethy Road west of the proposed access road (refer to Figure 5). Cycling Cycling to the proposed shopping centre is a realistic opportunity and a footpath currently exists along Abernethy Road. It is shown in structure planning of the locality that a shared path will be provided to Abernethy Road to support continuing residential development in the locality. Public Transport A bus service is provided on Soldiers Road linking through to the South Western Highway at Abernethy Road. Figure 7 shows current bus services in the locality. Buses are provided to Armadale rail station where a regular train service is provided to Perth and the metropolitan area. A rail service is provided from Byford station to Perth and Bunbury. The service operates twice a day in each direction and ticket bookings are required. It is unlikely that the proposed shopping centre will attract a high level of custom from these train services. However, it should be noted that appropriate paths between the station and the shopping centre will exist once the centre is fully developed. In the longer term it is planned to provide a regular train service from a new station in Byford that may operate as an extension to the Armadale train service. Whilst the design of the shopping centre is cognisant of this future public transport facility, no reductions to traffic movements have been assumed. Page 19 of 25 SJS TRIM - IN14/19829 Page 20 of 25 SJS TRIM - IN14/19829 Coles - Byford APPENDIX A Levels of Service by Road Type LOS Single 2-Lane Boulevard Carriageway 2 Dual Carriageway Dual Carriageway 1 (4-Lanes) 3 (4-lane Clearway) A 2,400vpd 2,600vpd 24,000vpd 27,000vpd B 4,800vpd 5,300vpd 28,000vpd 31,500vpd C 7,900vpd 8,700vpd 32,000vpd 36,000vpd D 13,500vpd 15,000vpd 36,000vpd 40,500vpd E 22,900vpd 25,200vpd 40,000vpd 45,000vpd F >22,900vpd >25,200vpd >40,000vpd >45,000vpd 4 4 3 Based on Table 3.9 Austroads - Guide to Traffic Engineering Practice Part 2 Based on single carriageway +10% (supported by Table 3.1 Austroads - Guide to Traffic Engineering Practice Part 3) - Boulevard or division by medians. Based on RRR Table 3.5 - mid-block service flow rates (SF.) for urban arterial roads with interrupted flow. Using 60/40 peak split. Note James Street Guildford passes 28,000vpd. 2 3 4 Road Network Capacity Lane Requirements 2 lanes Arterial 4 lanes 50.000V p d 60.000vpd 6 Lanes 80.000vpd 90.000vpd 8 lanes - 120.000vpd 10 l a n e s Rood Freeway 15.000vpd 150.000vpd Daily Typo Capacity Froovay A Ittno a S0000-60000 37000-49000 *s ionoo 7£O00~9100O 56000-74000 a 1anoo lOiOOO-121000 Exprooawey 4 lanoa 6 Unoo Urban RottCto 46000-56000 34000-45000 7O0OO-S300O SlOOO-fiflOOO A r t o r l o l 4 lonoo ( a ) (undlvidod) 24000-29000 4 l o n o o |»> (divldod) 32OO0-3S00O 24000*32000* C 1nnoa (to) (divided) 48000-56000 36000-48000 Rural 2 HIghwoy 9000 lanoa ftguro (a) aoaunoo <b) aoaunoo 6. 3t Daily Roads no parking no t rat f i c ( v p d) parking. capact ty and n l n l u l v o l MOO t o r f rontaqo Roqionajt lit. Page 21 of 25 SJS TRIM - IN14/19829 Coles - Byford APPENDIX B Forecast Thursday PM Peak Period with Coles South Western Highway Coles 250 ' 372 r 29 Soldiers Road Page 22 of 25 SJS TRIM - IN14/19829 l e y Cfflmsnllirvn Coles - Byford APPENDIX C Sidra Analysis Thursday PM peak Abernethy Road - Site Access MOVEMENT SUMMARY Site: Site - Abernethy Coles PM Abernethy Road / Shopping Centre Access Thursday PM Peak Giveway / Yield (Two-Way) Movement Performance - Vehicles East Abernethy Road east 5 6 T R Approach 245 243 30 30 0.128 0.263 0.0 106 LOS A LOS A 00 1.4 0.0 10.1 0.00 0.51 0.00 0.78 60 0 465 488 30 0 263 5 3 LOS A 1.4 10 1 026 039 52 4 North: Shopping Centre Access 7 L 243 9 R 131 30 30 0.301 0 578 10.9 33 5 LOS A LOSC 1.6 36 11.6 259 0.49 088 0.78 1.11 46 3 31 2 Approach 30 0.578 18.8 LOSC 3.6 25.9 0.63 0.90 39 6 131 282 413 30 30 30 0?^< 0219 0219 8.3 0.0 26 LOS A LOS A LOS A 0.0 00 00 00 0.0 00 0.00 0.00 0.00 090 0.00 0.29 49 0 60 0 56 0 1275 30 0.578 8.4 NA 36 25.9 0.28 0.50 48.8 374 West: Abernethy Road west 10 11 Approach All Vehicles L T Shopping Centre Access 12 15 18 21 Page 23 of 25 SJS TRIM - IN14/19829 c \ C€_vsiil1ii\c Coles - Byford APPENDIX D Sidra Analysis Thursday PM peak Abernethy Road - Soldiers Road MOVEMENT SUMMARY Site: Soldiers - Abernethy Coles PM Abernethy Road - Soldiers Road Thusrday PM Peak with Coles Giveway / Yield (Two-Way) South Soldiers Road 1 3 Approach L R 36 69 ? 0 30 0 082 0 599 11.6 58 7 LOS A LOS E 32 30 1 7 21 5 050 105 . -i4 0 77 1 10 45 6 22 9 30 0 598 427 LOSE 30 21 5 0.79 0 99 27 5 East Abernethy Road east 4 L 5 T 452 30 30 0 292 0 292 83 00 LOS A LOS A 00 00 00 00 0.00 000 0 98 J 30 49 0 600 Approach 1 5 LOS A 00 00 0.00 0 18 57.6 ' 1 51 5 1 369 369 369 076 0.76 0.76 D DO 1 06 0D7 476 470 476 51 369 0.42 020 484 553 30 0 292 West Abernethy Road west 52! 11 T 12 R 39 Approach 564 30 30 30 0 326 0 325 0 326 50 133 55 LOS A LOS A LOS A All Vehicles 30 0 598 69 NA 1222 E Page 24 of 25 SJS TRIM - IN14/19829 lev a Coles - Byford APPENDIX E Sidra Analysis Thursday PM peak South Western Highway - Abernethy Road MOVEMENT SUMMARY Site: SWH - Abernethy PM Coles South Western Highway / Abernethy Road Thursday PM peak hour with Coles Signals - Fixed Time Cycle Time = 90 seconds (Practical Cycle Time) Movement Performance - Vehicles HV % South South Western Highway South 30 1 L 239 2 T 251 9.0 3 R 52 30 Approach 541 5.8 0.794 0 794 0 158 0.794 52 2 438 42 5 47 4 LOS D LOS D LOSC LOS D 12 9 13.0 29 130 92 7 982 206 98 2 1.00 1 00 088 0.99 0 91 0.94 074 0.91 24 6 26.0 27 7 25.6 East Beenyup Road 4 L 6 T 6 R Approach 30 3 u 3.0 30 0 266 0 266 0477 0.477 44 4 36.1 574 45.6 LOS D LOSC LOS E LOS D 46 4.6 31 46 33 1 33.1 222 331 091 0.91 1.00 0.94 0 79 0 1I 0 73 0.73 27 8 28.2 23 3 26.2 North: South Western Highway North 31 7 L 8 T 392 9 R 261 Approach 683 30 9.0 30 64 0 681 0.681 0.799 0.799 48 4 40.2 51 5 44.9 LOS D LOSC LOSD LOS D 109 10.9 137 13.7 81 3 82.0 982 982 099 0.99 1.00 1.00 086 0.85 092 0.88 26 9 272 24 9 26.2 West Ahernethy Road 10 L 11 T 12 R Approach 207 51 242 500 30 30 30 30 0.809 0.810 0392 0.809 52 3 44.1 25 6 385 LOS D LOS D LOS B LOSC 136 13.6 85 136 98.0 98.0 61 2 980 1.00 1.00 0.79 0.90 094 0.94 0 79 0.87 24.8 24.9 35 3 290 1854 5.1 0.809 43.9 LOS D 13.7 982 0.96 087 26.7 All Vehicles 32 53 45 129 PHASING SUMMARY Sri* I W H - A M m t t h y PM C o t o i South AtoWrn H#»w», ' «*Nhv R TK?M* PM (*» xv CMM Sqnax . "» C*« ' * r Tv -i • - T r m '• - >l K -dr r ¥\ [ft Hr ilr South Western Highway Noah South Western Highway South Page 25 of 25 SJS TRIM - IN14/19829