CONTROLLER’S DIVISION PROCUREMENT OFFICE The Procurement Office is responsible for the purchase of supplies, materials, equipment and services for the various schools, colleges and other units within the University. The total dollar amount for formal orders increased this fiscal year from $131,194,281 in Fiscal Year 2006 to $165,907,048 in Fiscal Year 2007 while the total number of formal orders issued decreased from 29,863 to 27,702 between years. The number of electronically generated purchase requests exceeded the number of hard copy purchase requests by a wide margin (85% electronic, 15% hard copy). This breakdown between electronic and hard copy requests remained consistent with the experience of the previous fiscal year. Summary of Major Accomplishments The Procurement Office staff provided information regarding the campus entry system and purchasing policies and procedures to University personnel through training sessions for those who are responsible for ordering materials, equipment and services. The staff participated in the Athens Chamber of Commerce Expo, the Alliance South Vendor Fair and a Business Matchmaking Event sponsored by the Small Business Administration to foster an understanding of how to do business with the University. The purchasing card program experienced growth during the year. The fiscal year began with 1,555 cards in the program and ended with 1,666 cards. During the fiscal year, cardholders initiated 134,425 transactions totaling $35,263,747. This equates to a 14.6% increase in transactions and a 13.1% increase in dollar value over the previous fiscal year. The office continues to offer training on the Web-based reconciliation system for purchasing card transactions. The State Purchasing Department’s Official Memorandum No. 93-009 provided that each agency of state government must meet a target of 95% for annual aggregate of recycled paper purchased for printing, writing and computer usage. The University of Georgia exceeded this goal in FY 2007, with all paper purchases containing recycled fiber. Procurement’s delegated purchase authority remained at $100,000, and the state’s competitive bid threshold remained at $5,000. The $100,000 purchase authority restrictions effective February 2003 remained as State Purchasing rescinded many of the special purchase authorities delegated to state agencies. The moratorium implemented by the Governor’s office on the purchase of motor vehicles remained in place. Purchasing activity for the past 10 years is shown in the following chart. Formal orders are those issued on field purchase orders through the University's Procurement Office and F-111 those issued on state purchase orders by State Purchasing against requisitions from the Procurement Office (excluding verbal and petty cash orders issued by University departments). FORMAL PURCHASING DOLLARS Millions of Dollars $200 $150 $165 $122 $111 $129 $123 $135 $112 $117 $117 $131 $100 $50 $0 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Fiscal Year The number of formal orders decreased 7.2% between FY 2006 and FY 2007 from 29,863 to 27,702. The following chart indicates the number of formal purchases made over a 10-year period: NUMBER OF FORMAL PURCHASES 70 Thousands 60 54.9 57.3 59.1 56.2 50.6 50 41.1 40 30 38.6 33.5 29.8 27.7 20 10 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Fiscal Year F-112 The dollar amount of purchases made under supply contracts increased 13.7% from $37,456,704 in FY 2006 to $42,572,927 in FY 2007, and the number of individual contract purchases decreased from 12,708 to 11,483 for the same time period. The following chart shows the dollar value of supply contract orders over the prior 10 years (additional information may be seen in Exhibit 1): SUPPLY CONTRACT DOLLARS Millions of Dollars 50 40 38.9 38.4 43.4 43.7 35.8 36.8 39.5 37.4 42.5 30.8 30 20 10 0 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Fiscal Year The Procurement Office has the responsibility for screening payment requests to ensure that all are within the limits delegated to University departments. In FY 2007, there were 218 unauthorized purchases, a decrease of 7.6% when compared to 236 in FY 2006. All of the 218 transactions were violations of the University’s rules and regulations. A report on unauthorized purchases is included in Exhibit 2. The number of emergency order transactions increased slightly from 2,964 to 3,059. The percentage of emergency orders to formal orders increased slightly from 9.9% to 11.0% between years. A comparison of the volume of emergency transactions for the past 10 years is shown in the following chart: F-113 NUMBER OF EMERGENCY ORDERS 6000 5000 4000 3000 2000 1000 0 4559 5062 5544 4149 3427 1998 1999 2000 2001 2519 2275 2002 2003 2004 3003 2964 3059 2005 2006 2007 Fiscal Year The dollar volume of emergency orders increased and the percentage of the dollar volume of emergency orders to the total dollar volume of formal orders increased slightly from 3.3 % to 4.1% between FY 2006 and FY 2007. This comparison for the past 10 years follows: Millions of Dollars EMERGENCY ORDER DOLLARS 8 7 6 5 4 3 2 1 0 6.8 5.1 6.8 5.6 4.5 4.2 4.6 3.6 3.6 4.3 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Fiscal Year The University Procurement Office bids and awards construction contracts and issues field purchase orders on certain construction contracts awarded by the Board of Regents and funded through the University. In FY 2007 the University’s authority for local administration of construction contracts remained at $1,000,000. A comparison of construction awards for the past five years follows. Minor construction orders ($5,000 or below) are not included. F-114 Fiscal Year Number of Construction Contracts Awarded Dollar Amount of Construction Contracts Awarded 2002 234 $42,179,834 2003 122 $20,647,200 2004 109 $20,956,380 2005 188 $20,295,717 2006 175 $18,082,357 2007 341 $55,388,883 A listing of construction contracts of $25,000 or more for the fiscal year is shown in Exhibit 3. During FY 2007, the Procurement Office developed four agency contracts: PC Asset Tracking Software; High Performance Cluster Computer Systems; Chematix – Environmental and Health Safety Modules, and Deionized Water. The development of these contracts achieved cost savings through better contract pricing and reduced administrative effort. Additionally, other University System of Georgia institutions can utilize three of the four contracts and share in the cost-saving benefits. Summary of FY 2008 Goals As always, a major goal of the Procurement Office is to pursue cost savings for the campus. By analyzing expenditures to ascertain trends, savings can be realized through strategic sourcing initiatives and the development of agency contracts for like or similar type items. The Procurement Office will continue to provide data to DOAS State Purchasing to pursue strategic sourcing on statewide contracts. In an effort to strengthen and increase business with small and minority vendors, the Procurement Office will organize a campus-wide Small and Minority Vendor Expo in the spring of 2008. The expo will foster relationships between the campus and our vendor community and assist vendors in identifying campus units that utilize their products and services. The Procurement Office will continue improving the P-card program by offering new training opportunities for card holders and reviewers. This training includes an online refresher training program. More specific P-card training for department heads and department managers will be developed to provide greater awareness of P-card process requirements to those University leaders whose organizations depend heavily on the efficiency and effectiveness of the P-card program. F-115 The Procurement Office will continue to research electronic “procure-to-pay” systems which have the potential for increased automation of purchasing functions, increased identification of vendors as strategic partners and enhanced tracking of commodity spending. Finally, in conjunction with Accounts Payable, the Procurement Office will explore the development of a combined vendor database for central use and improved efficiency. Exhibits depicting Procurement activities during the fiscal year are presented as follows: Exhibit 1 - Report of Supply Contracts for FY 2007 Exhibit 2 - Report of Unauthorized Purchases During FY 2007 Exhibit 3 - Report of Construction and Public Works Contracts of $25,000 or more for FY 2007 Exhibit 4 - FY 2007 Purchasing Volume in Dollars Exhibit 5 - FY 2007 Purchasing Volume by Orders F-116 Exhibit 1 REPORTS OF SUPPLY CONTRACTS For the Fiscal Years 2006–2007 FY 2006 I. Comparative Volume: Number of Contract Releases: (Contract releases are orders released against a statewide or agency contract.) Procurement Campus Scientific Stores Central Office Supply Central Research Stores Physical Plant Printing Department Total Number of Releases Number of Releases as a Percentage of Total Formal Orders Percentage FY 2007 Change 10,103 0 0 2,183 422 0 12,708 9,112 0 0 2,173 198 0 11,483 43% 41% 33,583,29 6 0 0 2,377,086 1,496,322 0 37,456,70 4 39,387,53 0 0 0 2,180,368 1,005,029 0 42,572,92 7 30% 26% 550 550 -10% 0% 0% 0% -53% 0% -10% Dollar Amount of Contract Releases: Procurement Campus Scientific Stores Central Office Supply Central Research Stores Physical Plant Printing Department Total Dollar Amount of Releases Dollar Amount as a Percent Of Total Formal Orders Dollars II. Number of Contracts in Effect At End of Period Report of Unauthorized Purchases For the Fiscal Years 2006 – 2007 No. of Unauthorized Purchases No. of Unauthorized Purchases as a Percentage of Total Purchases Dollar Amount of Unauthorized Purchases Dollar Amount of Unauthorized Purchases as a Percentage of Total Dollar Purchases Average Dollar Amount of Unauthorized Purchases F-117 17% 0% 0% -8% -33% 0% 14% 0% Exhibit 2 FY 2006 236 .11% $749,013 FY 2007 218 .09% $936,854 .33% $ 3,174 .36% $4,298 Exhibit 3 PROCUREMENT OFFICE Report of Construction and Public Works Contracts Over $25,000 in Fiscal Year 2007 Contractor’s Name Contract Amount Project Description Abatech Services Inc. $26,000.00 Asbestos Tile Removal – Brumby and Creswell Halls A&D Painting, Inc. $68,400.00 Interior Painting and Shower Coating, Mell and Lipscomb Halls Advantage Fire Sprinkler Co., Inc. Advantage Fire Sprinkler Co., Inc. $1,192,775.00 Fire Sprinklers, Main Library and Pharmacy $347,100.00 Installation of Fire Sprinkler System, Mell and Lipscomb Residence Halls ALC Controls, Inc. $38,805.00 Furnish and Install Automated Control System – Melton Building, Griffin Campus Allgood Landscaping & Development $43,273.00 Furnish and Install Various Landscaping – UGA Athens, Georgia Anderson Development $459,500.00 Furnish and Install Elevator – Environmental Health Sciences Bldg Anderson Development $776,500.00 Vet School – Furnish and Install Bldg for Tissue Digester Anderson Development $224,100.00 Furnish and Install Greenhouse – Plant Biology Greenhouse Arnold’s Abbey Carpets Bell South Communication System, LLC Berry Coating, Inc. Not to exceed Furnish and Install Removing Carpet, Pad, $40,000 Tile, Base and Cove Base – Various Locations $460,125.00 UGA – Griffin Campus Underground Utilities, Phase I $30,750.00 Furnish and Install Labor and Materials for Flooring and Anatomy Lab F-118 Contractor’s Name Bilmar Environmental Bone Dry Roofing, Co. Brasfield & Gorrie Brasfield & Gorrie Contract Amount Project Description Not to exceed Asbestos Abatement, Various Locations, $40,000.00 UNIT COST CONTRACT $90,000.00 Ramsey Skylight Repair $988,030.00 PVAC Phase II, Lamar Dodd School of Art $31,403,891.00 PVAC Phase II, School of Art Citadel Security Systems, Inc. $47,580.00 Installation of Corridor Smoke Detection, Myers Hall Continental Flooring Co. $88,870.00 Furnish and Install Porcelain Tile Flooring, Ramsey Student Center for Physical Activities Custom Lagoon Services $25,500.00 Clean Out Lagoon #1 and #2 Dalton Carpet One $40,000.00 Furnish and Install or Remove Carpet Pad, Floor Tile and Cove Base, as Required, Various Locations, UNIT COST CONTRACT Davis Painting, Inc. $122,800.00 Exterior Cleaning, Caulking, Painting – East Campus Parking Deck Delmonico Restoration & Development $145,000.00 Furnish and Install Sanitary Sewer Line Replacement – Park Hall Driver Construction Co., Inc. $25,031.00 Furnish and Install ADA Restroom Holmes-Hunter Rm. 113A, TASK ORDER CONTRACT Driver Construction Co., Inc. $52,726.00 Furnish and Install Electrical Upgrade – Law Library Annex, TASK ORDER CONTRACT F-119 Contractor’s Name Contract Amount Project Description Driver Construction Co., Inc. $59,004.00 Furnish and Install Reading Room Cosmetic Upgrade – Law Library, TASK ORDER CONTRACT Driver Construction Co., Inc. $33,487.00 Furnish and Install ADA Restroom – Ag Engineering, TASK ORDER CONTRACT Driver Construction Co., Inc. $44,000.00 Furnish and Install Carpenter Labor for Family Housing, TASK ORDER CONTRACT Driver Construction Co., Inc. $54,670.00 Furnish and Install Metal Soffits, Fascia and Gutters at Family Housing, TASK ORDER CONTRACT Driver Construction Co., Inc. $109,715.00 Furnish and Install Pavilion, Family Housing K, TASK ORDER CONTRACT Driver Construction Co., Inc. $114,950.00 Furnish and Install Pressure Wash, Prepare Surfaces and Paint Exterior, TASK ORDER CONTRACT Driver Construction Co., Inc. $44,000.00 Furnish and Install Carpenter Labor, TASK ORDER CONTRACT Driver Construction Co., Inc. $43,670.00 Furnish and Install Metal Soffit, Gutter and Downspouts, TASK ORDER CONTRACT Driver Construction Co., Inc. $523,244.00 Auditorium Renovations, 404E BioSciences DSI Construction Group $122,000.00 Furnish and Install All Bathroom Renovation, Georgia Center for Continuing Education DSI Construction Group $99,500.00 Furnish and Install Hallway Ceiling Lights, Aderhold Hall DSI Construction Group $84,800.00 Renovate Labs 200, 201, 202 – Pharmacy Bldg. F-120 Contractor’s Name Contract Amount Project Description DSI Construction Group $82,500.00 Tucker Hall Rear Entrance Canopy and Stairs E.R. Snell Contractor, Inc. $27,300.00 Pave Parking Lot at Fish and Wildlife Building E.R. Snell Contractor, Inc. $130,800.50 East Campus Exit Gameday Ramp Fire Protection Associates $26,926.90 Fire Alarm System Upgrade, Family Housing Building L Fire Protection Associates $64,000.00 Annual Maintenance Agreement Gay Construction Co. $5,524,890.00 Rock Eagle 4-H Eatonton, Georgia – Dining Hall Gay Construction Co. $72,979.00 Rock Eagle 4-H, Eatonton, Georgia – Water Distribution System Improvements Georgia Atlanta Contractors, Inc. $28,240.00 Furnish and Install Renovations at PVAC, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $82,104.00 Furnish and Install – Remove and Replace Carpet, Bolton Dining Hall, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $34,546.00 Furnish and Install in 34 Apartments and Laundry at Family Housing, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $49,033.00 Furnish and Install New Window, Family Housing, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $45,183.00 Furnish and Install Sprinkler System Family Housing K, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $100,688.00 Furnish and Install – Provide Electrician Labor, Family Housing K, TASK ORDER CONTRACT F-121 Contractor’s Name Georgia Atlantic Contractors, Inc. Georgia Atlantic Contractors, Inc. Contract Amount Project Description $41,543.00 Reroof Family Housing K, TASK ORDER CONTRACT $112,156.00 Furnish and Install – Provide Electrical Labor, TASK ORDER CONTRACT Georgia Atlantic Contractors, inc. $29,470.00 Furnish and Install – Smoke Walls in Attic, Building L, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $42,814.00 Furnish and Install New Windows in 30 Apartments, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $46,773.00 Furnish and Install – Provide Fire Sprinkler System, TASK ORDER CONTRACT $25,010.00 Furnish and Install – Provide New Roof, Family Housing L, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. Georgia Atlantic Contractors, Inc. $161,742.00 Furnish and Install – Renovation, 5th Floor Area, Boyd Graduate Studies Bldg., TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. $40,443.00 Lab Renovations at Life Sciences, TASK ORDER CONTRACT Georgia Atlantic Contractors, Inc. Griffeth, A.B. and Sons Harrison Contracting Co., Inc. $952,400.00 Furnish and Install Windows, Interior Renovations, Barrow Hall Not to Exceed Furnish All Labor and Equipment to Clean, $40,000.00 Seal and Paint, as Required at Various Locations, UNIT COST CONTRACT $88,400.00 Zolatone Treatment of Cabinets – Mell and Lipscomb Halls Harry Hancock Construction, Co. $365,535.00 Carlton Street Utilities Upgrade Holder Construction Co. $905,169.00 Labor and Materials for Law School Classroom Upgrades F-122 Contractor’s Name Contract Amount Project Description The House Doctor $58,555.00 Pavilion Renovation, Bamboo Farm and Coastal Gardens, Savannah, Georgia The House Doctor $30,806.00 Roofing, Carpentry Repair, Stucco Repair, Exterior Painting, Gutter System – Bamboo Farm Conference Center Jack Buckland Paving $32,525.00 Furnish and Install Complete 2” Type F Asphalt Paving and Thermoplastic Striping, Rock Eagle Pavilion Parking Lot Jack’s Remodeling $39,000.00 PDRC Manager’s House Renovation, Add 2 Bathrooms Jack’s Remodeling JHC Corporation J.M. Clayton Co. Klein Contracting Co., Inc. Land Design Not to exceed Furnish All Labor and Equipment to Clean, $40,000.00 Seal and Paint, as Required, at Various Locations, UNIT COST CONTRACT $717,000.00 Carlton Street Reconstruction $98,600.00 Owner-Furnished Chiller and Cooling Tower for Griffin Campus $383,950.00 Life Sciences Reroof $26,000.00 Campus Tree Planting – UGA, Athens, Georgia LMI Electrical Contractors, Inc. $431,625.67 Installation of Data/Voice/CATV Cabling, Brumby Residence Hall Martin Mechanical Contractors, Inc. $444,150.00 Camp Wahsega 4-H Center Sewer System Improvement Martin Mechanical Contractors, Inc. $151,920.00 Correct Pressure Problems, Dance Bldg. Martin Mechanical Contractors, Inc. $128,655.00 Caldwell Fire Main Melton Painting Co. $55,717.00 Interior Painting – Family and Grad Housing, Athens, Georgia F-123 Contractor’s Name Contract Amount Project Description Melton Painting Co. $44,480.00 Exterior Cleaning, Caulking and Painting 1260 & 1280 S. Lumpkin and S. Hull Melton Painting Co. $37,450.00 2007 Painting Svcs, East Campus Village, UNIT COST CONTRACT Mercer Construction $179,565.00 Jekyll Island 4-H Center Ballroom Improvements, Jekyll Island, Georgia Midwest Maintenance, Inc. $597,558.00 Envelope Repairs, Dean Rusk Bldg Nash Construction $49,400.00 Shower Door Replacement – Oglethorpe House Nash Construction $76,967.00 Renovation for Entomology – Poultry Research Isolation Building Oconee Well Drillers, Inc. $26,850.00 Install 8” Well, UGA Teaching Dairy Omega Electric $38,000.00 Remove Old Light Fixtures in Laboratories and Offices in the UGA Aquarium Building (7012) on Skidaway Island Operational Security Systems, Inc. $60,243.42 Furnish and Install Building Security and Access Control System, Aderhold Hall Operational Security Systems, Inc. $81,912.72 Furnish and Install Building Security and Access Control System, ESC Complex Operational Security Systems, Inc. $128,825.98 Furnish and Install Building Security and Access Control System, Riverbend Research South Operational Security Systems, Inc. $47,207.22 Furnish and Install Building Security and Access Control System, Rivers Crossing Operational Security Systems, Inc. $86,820.38 Furnish and Install Building Security and Access Control System, Business Services Building Operational Security Systems, Inc. $207,136.42 Furnish and Install Security and Access Control Systems, Vet Med 1 F-124 Contractor’s Name Operational Security Systems, Inc. Contract Amount Project Description $37,057.00 Furnish and Install Building Security and Access Control Systems, Applied Genetic Technologies Building Operational Security Systems, Inc. $207,549.03 Furnish and Install Security and Access Control System, Main Library Operational Security Systems, Inc. $228,731.82 Furnish and Install Security and Access Control Systems, Vet Med 1 Ostrom Boiler Service, Inc. $73,000.00 Furnish and Install Repairs to Boiler Tubes and Breeching – Central Steam Plant Ostrom Boiler Service, Inc. $97,900.00 Furnish and Install Replacement Feedwater Piping system – Central Steam Plant Boiler House No. 1 Parker Young Construction, Inc. $29,951.04 Furnish and Install Necessary Support and Repair Exterior Wall at Thomas Textile Peterman Painting, Inc. $28,690.00 Sandblasting, Cleaning and Painting – East Campus Bridge Peterman Painting, Inc. $48,260.00 Exterior Cleaning, Caulking, Repair, Painting – Poultry Science Feed Mill Pike Electric Pro Clean D/B/A Carpets Unlimited $351,310.00 Replace 15kb Cable for Circuits #1-4 and 6 $33,522.46 Soule Hall – Carpet Replacements Quality Glass Co., Inc. Not to exceed Install Glass/Aluminum Doors, Various $40,000.00 Locations, UNIT COST CONTRACT Quality Glass Co., Inc. Not to exceed Furnish All Labor and Equipment to Install $40,000.00 Glass/Aluminum Doors, Various Locations, UNIT COST CONTRACT Randy Earley Construction Co., Inc. $36,700.00 Furnish and Install Open Shelter – Gin Bldg to Old Sales Bldg and in Front of Old Sales Arena, Tifton Campus F-125 Contractor’s Name Contract Amount Project Description Samsco Heating & Air, Inc. $39,478.00 Correct Zoning Problems – Tanner Bldg Samsco Heating & Air, Inc. $57,146.00 Correct High RH Problems, Environmental Health Sciences Shaw Contract Flooring/Spectra $59,805.00 Vinyl Composition Tile Installation, Mell and Lipscomb Halls Simsco Interiors, Inc. $31,935.00 Acoustical Ceiling and Soffit Installation, Mell and Lipscomb Halls Southeastern Fire Control $37,492.94 Redding Building, Griffin Campus, Fire Alarm Upgrade Southeastern Fire Control $44,287.21 Melton Building, Griffin Campus, Fire Alarm Upgrade Southern Environmental Service, Inc. $57,313.00 Asbestos Abatement – Mell and Lipscomb Halls Southland Power Fence $25,300.00 Furnish and Install Deer Fencing at the State Botanical Garden Southland Technologies, Inc. $86,500.00 Remove Existing Chiller, Furnish and Install Chiller, Tifton Campus Steve’s Refrigeration & Air $31,500.00 Furnish and Install Walk-In Cooler, Vidalia Onion Lab, Tifton Campus Technical Innovation $247,053.00 Furnish and Install Presentation System 3rd Floor Classroom Expansion Trison Group $165,400.00 Sanford Bldg Renovations – Griffin Campus Trison Group $59,973.00 Renovate Turn Science Building UGA – Griffin Campus Venture NetComm, Inc. $86,521.37 Data/Voice/CATV Cabling, Mell and Lipscomb Residence Halls F-126 Contractor’s Name Contract Amount Project Description Waters Mechanical, Inc. $50,750.00 Replace HVAC Units, Marine Ed. Center, Aquarium Dormitory, Savannah WFI Georgia, Inc. $80,613.00 Fire Alarm System Upgrade – Brumby Hall WFI Georgia, Inc. $73,092.00 Fire Alarm System Upgrade – Russell Hall WFI Georgia, Inc. $36,480.00 Fire Alarm System Upgrade – Oglethorpe Hall Whiting-Turner Contracting Co. $767,914.00 Olympic Gymnasium Relocation, Phase III, Build-Out Woodwind Construction Co., Inc. $101,000.00 Furnish and Install Structural Foundation, Myers Hall Woodwind Construction Co., Inc. $157,000.00 Furnish and Install Structural Foundation, Central Steam Plant F-127 FY 2007 PURCHASING VOLUME BY TYPE OF ORDER TOTAL DOLLARS - $ 256,749,168 Supply Contract 42.6 Exhibit 4 Dept Cash 1.7 Other Procurement 69.5 P-Card 35.3 Books & Perishables 7.3 Dept Charge 44.9 Contruction 55.4 MILLIONS OF DOLLARS Exhibit 5 FY 2007 PURCHASING VOLUME BY TYPE OF ORDER TOTAL ORDERS 231,978 Construction .03 Other Procurement 21.3 Dept Change 40.1 Books & Perishables 3.0 P-Card 134.4 Supply Contact 11.5 Dept Cash 21.6 THOUSANDS OF ORDERS F-128 F-129 Assistant Joey Westman Procurement Specialist Jackie Yearwood Assistant Vacant Procurement Specialist Jessica Guest Assistant Rhiannon Shoults Sr. Procurement Specialist Claire Boyd Admin Assoc II Sonya Bishop Assistant Kristen Ball Procurement Specialist Amanda Pruitt Pcard Administrator Jill Haag Assistant Tandi Dubnik Procurement Specialist Cynthia Baker Assistant Charity Knight Procurement Specialist Sarah Williamson Pcard Administrator Lynn Stephens Assistant Procurement Officer Chad Cox Procurement Officer Annette Evans PROCUREMENT DEPARTMENT ORGANIZATION CHART Assistant Donna Dorsey Procurement Specialist Linda Wilkins Assistant Vacant Sr. Procurement Specialist Sara Battey