RATIONALIZING RAP RAP = GREEN What does GREEN mean? – Conserving our resources – Reducing energy cost – Reducing Greenhouse Emission – Being more environmentally friendly – And building a better, longer-lasting pavement UPHILL BATTLE Maximizing RAP Use Barriers to increasing the use of more Recycle – Fear of making a mistake – Meeting skid requirements – Hardness of asphalt with high RAP need to use softer virgin asphalt cement…fatigue cracking – Special mixes like SMA – Limit RAP to 15% when polymers are used Screen separates into 4 sizes Single Cold Feed Bin Sizing moved back to the quarry Expensive oil made RAP attractive. Milling advancements made it easy. Full-Lane Milling Machine A VERY Brief History of RAP Early RAP interest due to high cost of Trinidad Lake Asphalt Oil in PA and TX in the 20’s (oil price plummets) Planets lined up for RAP in the 1970’s Screening Technology, 60’s and 70’s Continuous Plants 1973 Oil Embargo High AC Cost Milling advancements, 1970’s RAP becomes available Continuous plants made RAP POSSIBLE. High AC cost made RAP VALUABLE. RAP availability makes it FEASIBLE. 6% Bitumen 30000 Tonnes of RAP 70 – 25700 liter tanker loads And 28200 Tonnes of clean aggregate RAP is worth the Virgin Material it Replaces 6% AC 30000 tons of RAP 70 – 6000 gallon tanker loads And 28200 tons of clean aggregate RAP is worth the Virgin Material it Replaces Virgin Aggregate (per ton) $25 X 0.94 = $23.50 Liquid Asphalt (per ton) $350 X 0.06 = $21.00 Liquid Asphalt (per ton) Virgin Cost: Milling Cost (per ton) $3.00 Trucking Cost (per ton) Screening Cost (per ton) TOTAL RAP COST (per ton) $2.00 $3.00 $8.00 $44.50 $8.00 Difference $36.50 10% RAP, $3.65/ mix ton savings, 10 tons to save total ∆ per ton 20% RAP, $7.30/ mix ton savings, 5 tons to save total ∆ per ton 50% RAP, $18.25/ mix ton savings, 2 tons to save total ∆ per ton Savings: Virgin Materials vs. RAP (if RAP is purchased) Reclaimed Asphalt Pavement (RAP) 70% ½” minus Milled and brought back to the plant “as is” Lot’s of size variation Potential for segregation in stockpile and when handled RAP Pile With ½” (12.5mm) minus to ¾” (19mm) minus 6 to 8, North America Reclaimed Asphalt Pavement (RAP) Bin Back to the 1920’s Coldfeed Bins Up to 16, Europe Crusher Run 1980-1990’s HMA Facility with Single RAP Bin RAP ½”(12.5mm) - 0 White Rock 3/8”(9.5mm) - #4 White Rock #4-0 White Rock ½”(12.5mm) - 3/8”(9.5mm) SUPERPAVE MIX S WITH ½ (12.5mm) minus RAP ½” (12.5mm) x 0 6% AC ½” (12.5mm) x #4 #4 x 0 3.5% AC 7.5% AC It’s all about surface area! 48,000 ft² ( 4460 m²) 51,000 ft² ( 4738 m²) Fine RAP (high AC) Course RAP (low AC) 3/4” minus (19mm) RAP Bin Course RAP (low AC) Fine RAP (high AC) 1/2” minus (12.5mm) RAP Bin So why is surface area important? Course RAP 10 9 8 7 %AC 6 in 5 RAP 4 3 2 1 0 Fine RAP 7.5% 7.5 3.5% 3.5 -1/2, +1/4 -1/4 Gradation of RAP Because RAP AC content varies with gradation, a variation in RAP gradation due to segregation can affect overall AC content. RAP Segregation can result in variation in overall AC content. DONE Example: RAP Segregation 10 9 We have input a correct AC percentage into the computer -- but this RAP is segregated. What will this difference cause? 7.5% 7.5 8 7 6 %AC i n 5 RAP 4 3.5 3.5% 3 2 1 0 20% RAP Mix: 0.2 x 7.5% AC = 1.5% AC -1/2, +1/4 -1/4 Course RAP Fine RAP 0.2 x 3.5% AC = 0.7% AC 1.5% - 0.7% = 0.8% AC swing DONE Example: RAP Segregation 10 9 We have input a correct AC percentage into the computer -- but this RAP is segregated. What will this difference cause? 7.5% 7.5 8 7 6 %AC i n 5 RAP 4 3.5 3.5% 3 2 1 0 40% RAP Mix: 0.4 x 7.5% AC = 3.0% AC -1/2, +1/4 -1/4 Course RAP Fine RAP 0.4 x 3.5% AC = 1.4% AC 3.0% - 1.4% = 1.6% AC swing DONE RUTTING NO ONE WANTS TO PERPETUATE A PROBLEM. Rutting often occurs on older overlay pavements. End of Load Segregation This is the processing that ADDS VALUE. RAP Black Rock ½” (12.5mm) x 0 Black Rock ½” (12.5mm) - 3/8”(9.5mm) Black Rock #4 - 0 Black Rock 3/8” (9.5mm) - #4 PROCESSED RAP SCREENED TO ORIGINAL INGREDIENTS ASPHALT BONDS BREAK MORE EASILY THAN THE ROCK. White Rock #4-0 White Rock 3/8” (9.5mm) - #4 White Rock ½” (12.5mm) - 3/8”(9.5mm) Granite Black Rock #4-0 Black Rock 3/8”(9.5mm) - #4 Limestone Black Rock ½”(12.5mm) – 3/8”(9.5mm) Surface Mix SUPERPAVE MIX WITH PROCESSED RAP - CHOICE #1 White Rock 4-0 White Rock 3/8 - 4 White Rock 1/2 - 3/8 Virgin granite SUPERPAVE MIX Black Rock 4-0 Granite RAP Black Rock 3/8 - 4 Black Rock 1/2 - 3/8 WITH PROCESSED RAP - CHOICE #2 White Rock #4-0 White Rock 3/8”(9.5mm) - #4 White Rock ½”(12.5mm) - 3/8”(9.5mm) Black Rock #4-0 Black Rock 3/8”(9.5mm) - #4 Marshall Granite virgin Black Rock #16- Black Rock #4-#16 Black Rock ½”(12mm) - 3/8”(9.5mm) Granite RAP High 200’s SUPERPAVE MIX WITH PROCESSED RAP - CHOICE #3 Polymers SBS (How much is enough) Aggregate in Mix-Uncrushed Gravel Rut test performed on APA @ 147°F (64°C) % Polymers Rut depth Cycles 0 12.5 mm 2,000 1 9.0 mm 8,000 2 8.0 mm 8,000 3 7.0 mm 8,000 4 6.5 mm 8,000 With RAP @ 50%...4% polymers in virgin liquid results in 2% in final mix plus RAP liquid is harder NCAT PAVEMENT TEST TRACK 1.7 miles 46 test sections 4 trucks, 3 trailers ea 20 hrs/day 2 yr = 15 yr www.pavetrack.com PLANT RAP FRACTIONATION RAP STUDY MATS N5-0%RAP-PG67 W3-20%RAPPG76 E5-45%RAPPG67 E6-45%RAPPG76 W4-20%RAPPG67 E7-45%RAPPG76s W5-45%RAP-RA500 8/27/07 AVERAGE RUT DEPTHS 12 11 10 Average Rut Depth (mm) 9 8 7 6 5 4 3 2 1 0 N5-0%RAP-PG67 W3-20%RAP-PG76 W4-20%RAP-PG67 W5-45%RAP-RA500 E5-45%RAP-PG67 E6-45%RAP-PG76 E7-45%RAP-PG76s Original Roadbed After Overlay After Traffic Overlays Can Experience Cracks and Rerutting Original Roadbed After Milling After Inlay After Traffic Milling and Inlays Prevent Rerutting Sufficient Material for Roll-down Mix Contained Mix Contained No Segregation Mix Contained No Density Change Milling Ensures Consistent Pavement Density Milling Creates a Grooved Surface Shoulder Original Roadbed Shoulder After Milling Shoulder After Inlay No Shoulder or Guardrail Changes with Milling Overlays Change Bridge Clearances Weight Limits Remain Constant with Milling Multiple Overlays Create Drainage Problems Milling Ensures Proper Drainage Milling Leaves Utilities Unchanged SUSTAINABILITY Take Care of Your RAP and it Will Take Care of YOU! WMA And RAP Go hand in hand. Double Barrel Green® Green® Green Pac™ Pac™ Continuous Green Pac™ Pac™ Batch THANK YOU, AGAIN!