Assignment: MRP-I / MRP-II 1. Explain the purpose of Master Production Schedule (MPS) 2. Explain the term Projected Available Balance (PAB) 3. Explain the term Available to Promise (ATP) 4. Elaborate the Benefits of MRP 5. Explain how demand is chased using level production strategy 6. Explain various inputs required for ‘aggregate production plan’ 7. What is the difference between Aggregate Production Plan and Master Production Schedule? 8. Explain various types in which Master Production Schedule can be expressed 9. Explain the terms make-to-order, assemble-to-order and make-to-stock 10. Explain V-A-T model with examples when to use which type 11. What do you understood by ‘MPS: Planning Horizons’, explain its significance 12. Explain the term Bill of Material (BoM) with examples 13. Explain the term ‘Rough Cut Capacity Planning’ (RCCP) with its importance in MRP 14. Explain various inputs required for Master Production Schedule 15. Explain the reasons why ‘Safety Stock’ is needed 16. Explain why the safety stock should be minimized and ultimately eliminated 17. Explain Final Assembly Schedule (FAS) with its significance 18. Differentiate between Independent Demand and Dependent Demand 19. Explain how ‘the demand for one item is related to the demand for another item’ 20. Explain how for a given a quantity for the end item dependent demands are derived? 21. Differentiate between ‘planned-order receipts’ and ‘planned-order releases’ 22. Explain the term ‘schedule receipts’ 23. Explain the term ‘projected on hand’ 24. Explain Gross-Net-Lot-Shift logic of MRP 25. Explain the MRP report consist of ‘changes’ 26. Explain how the product design impacts Bill of Material 27. Explain various types of BoM 28. Explain the Hierarchy of Production Decisions 29. Differentiate between Rough Cut Capacity Planning (RCCP) and Capacity Requirement Planning (CRP) 30. Explain various Strategies applied to maintain production level 31. What do you understood by term ‘Routing’? 32. What are Pure Strategies used for level capacity 33. Differentiate between ‘queue’ and ‘stack’ 34. Explain how MPS can be serving as a basis of communication? 35. Explain Capacity planning using overall planning factors (CPOPF) 36. Explain with Example the significance of Rough-Cut Capacity Planning (RCCP) 37. Explain the details of Scheduling and how Shop-Floor Decisions are taken 38. Explain Production Planning Hierarchy 39. Differentiate between ‘pull-system’ and ‘push-system’ 40. Explain the term ‘Pond-Draining Systems’ 41. Explain ‘Focusing on Bottlenecks’ strategy; when to use it 42. Differentiate between Forward and Backward Scheduling 43. Explain Commonly Used Priority Rules 44. Explain how to Measure Scheduling Performance? 45. Differentiate between Finite and Infinite Loading 46. Differentiate between Material Requirement Planning & Manufacturing Resources Planning 47. Explain Closed-Loop MRP 48. Identify the need of Enterprise Resources Planning (ERP) 49. Compare between MRP and JIT 50. Compare Synchronous Manufacturing with MRP