1. Company Rough Map ……………………………………………………………………………… 1
2. Overview of PT Fata Sarana Makmur ………………………………………………………. 2
‐ Company Information ………………………………………………………………………….. 2
‐ Vision , Mission and Motto …………………………………………………………………… 3
‐ Organization Structure …………………………………………………………………………. 4
Organization Structure
4
3. Key Milestone …………………………………………………………………………………………. 5
‐ Manufacturing …………..…………………………………………………………………………. 5
‐ 5 S ………………………………………………………………………………………………………… 6
‐ Training ………………………………………………………………………………………………… 10
‐ Certification ………………………………………………………………………………………… 12
4. Operational System Standard ………………………………………………………………….. 14
‐ Lay Out Company ………………………………………………………………………………….. 14
L O C
14
‐ Process Lay Out…………………………………………………………………………………… .. 15
‐ Key Company Product …………………………………………………………………………. 16
‐ Machine & Equipment ………………………………………………………………………….. 22
Machine & Equipment
22
‐ Production & Sales Result ……………………………………………………………………… 24
5. Key Project ……………………………………………………………………………………………… 26
6. Key Forward Project Plan ………………………………………………………………………. 34
7. Appendix ………………………………………………………………………………………………… 35
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
1. Company Rough Map
PT Fata PT Fata Sarana
Sarana Makmur
Jl Inti 1 Blok C1 No. 20 BIIE Lippo Cikarang Bekasi 17550 Indonesia
17550 Indonesia
Telp : (021) 89907565/70
Fax : (021) 89907569
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
2. Overview of PT Fata Sarana
2. Overview of PT Fata Sarana Makmur
 Company Information
Company Name
PT Fata Sarana Makmur
Business
Manufacture Air Conditioning & Spare Prt
Address
Jl Inti 1 Blok C1 No. 20 BIIE Lippo
pp Cikarangg Bekasi
17550 Indonesia
Telp : (021) 89907565/70, Fax : (021) 89907569
Established
April 2003, Initial Production : April 2003
Akta notaris
AHU‐AH.01.10‐20270 SK Menhum & HAM
AHU‐30609.AH01.02.Tahun 2008
IUI No.
IUI No.
503.15/127/BPPT/IUI‐01/XI/2010
503.15/127/BPPT/IUI
01/XI/2010
SIUP No.
503.09/2‐610/BPPT/PM‐00/IX/2012
TDP No.
10071460517
PKP No.
N
PEM 00065/WPJ 22/KP 0203/2007
PEM‐00065/WPJ.22/KP.0203/2007
NPWP No.
02.245.436.7‐431.000
Contact Person
Albertus Rusenobanu
Employee
124 Person ( In August 2013 )
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
2. Overview of PT Fata Sarana
2. Overview of PT Fata Sarana Makmur
 Vision , Mission and Motto of the Company
Vision of the company
World Leader Heat Exchanger & HVAC with the best PRESENT
Mission of the company
1. Customer satisfaction
2 Provide a diverse variety of products
2.
P id di
i
f
d
3. Innovative in product development
4. Maintain a safe working environment.
5 Improve the effectiveness of the Quality and Environmental 5.
Improve the effectiveness of the Quality and Environmental
Management system.
6. Complying with government regulations
7. Do not pollute the environment
7. Do not pollute the environment
Motto of the company
Committed to customer satisfaction
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
2. Overview of PT Fata Sarana
2. Overview of PT Fata Sarana Makmur
 Organization Structure
Director
( A.Rusenobanu)
Advisor
( Yohanes)
General Mngr
g
( Akeng Lie)
S & D
(Rinda P.)
PE
(Deffy S.A.)
Acc ‐ Finance
( Griesce I)
I T
(Edi Setiawan)
HRD‐GA
(An An S.)
Manufacturing
(Hendrik)
PPIC
(Dicky . NP)
Purchasing
( Yuniharti)
QA
(Agus Suroso)
Warehouse
(Abdul R.)
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 Manufacturing & Management 1. Incorporated in Indonesia in March 2003 2. Started HE business beside PT. Fata Metal
3 Move to current facility in July 2004
3.
Move to current facility in July 2004
4. Started customize HVAC business in January 2005
5. Started OEM HVAC business in 2006
6. Enlarge OEM HVAC in 2007
7. Re‐Lay Out Line Production & Office in 2010
8. Continue renovation building process
‐ Re‐lay out office room
‐ Created wiring room g
‐ Created canteen room
‐ Replace & renovation pray room 9 I t ll
9. Install security system by CCTV in 2012
it
t
b CCTV i 2012
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 5 S
1. Improve and Re‐lay Out Warehouse
Before Improvement
“Stock Card” for identification material not maximal yet After Improvement
Racking and stock card system
follow with type of material
Placement of plate
as create a space in
Key and inventory stock
y
Pl
Placement of plate in direct production area t f l t i di t
d ti
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 5 S
2. Re‐lay out split duct (indoor) line
Before Improvement
After Improvement
All base panel first title on the pallet so many area A d
And semi finish‐goods when the component of
i fi i h
d
h th
t f
need not completed
The process of assembly using a conveyor and
stock material in a stacked panel the pallet before th
the assembly process
bl
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 5 S
3. Re‐Lay out control panel / wiring process
Before Improvement
Produce control panel / wiring process in open areas (Join the assembly area) so risky
areas (Join the assembly area) so risky damage on electrical components
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
After Improvement
Produce control panel / wiring process in room area ( make the wiring room )
area ( make the wiring room )
3. Key Milestone
 5 S
4. Re‐lay out office
Before Improvement
messy office and
the document
laying on the floor
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
After Improvement
Partition for every Dept.
and arranged for filling
Document system 3. Key Milestone
 Training
No
Type of Training
Trainer
Time
1
Awareness Quality Management System internal audit and problem solving
audit and problem solving
Proxis
Consultant
2008
2
Basic Industrial Safety
Dyperma
2009
3
Technical & trouble shooting Danfoss
2008,2009
4
Awareness & Environmental Management System
include internal audit
Proxis
Consultant
2010
5
Johnson Control Manufacturing System
JCI
2010
6
Emergency drill / fire fighting
Proxis
Consultant
2010
7
5 S / 5P Review
In house FSM
2011
8
Emergency drill / fire fighting
Pamas protex
2012
9
APQP , JIT & FMEA Training
Mata Pro
2012
10
QCC T i i
QCC Training
M t P
Mata Pro
2012
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 Training
No
Type of Training
Trainer
Time
11
Cardiopulmonary resuscitation (CPR)
RS Hosana
Medica
2012
12
Compressor R‐410 characteristic &handling
Emerson
2013
13
Electronic automation industry
Cevest
2013
14
Awareness ISO 9001 & 14001 and refreshing and
Internal audit
Prisma
2013
15
Practical recruitment system
RSM
2013
16
Compressor R‐32 characteristic
Danfoss
2013
17
Compressor R‐32 characteristic &handling
( two time )
( two time )
Emerson
2013
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 Certification
Quality Management System
Quality
Management System
Certification 2008
Quality Management System
Certification 2010
Environmental Management System
Environmental Management System
Certification 2010
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
3. Key Milestone
 Certification
Drafting and signing of the Memorandum of Agreement (MOA) between the company and the Ministry of Environment
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Lay Out of Company
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Process Lay Out  Coil & Header Process Start
Preparation
Pipe & end plate
1
Fin Press
2
3
Insert pipe
& End plate
Flaring & Expander
4
Bending coil
( Outdoor Unit)
 Metal, Sub Assy
Metal, Sub ,
Assyy & Assembly process
yp
Start
Metal Process
1
2
Powder Coating Prepation
Assy Process
(S
(Supplier)
li )
3
Comp. Assy
( Sub Assy)
( Sub Assy)
Finish
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5
4
Assembly unit
6
Brazing U‐Bend
Piping &
Brazing
8
7
FG Coil
Coil Leaking test
(Indoor)
7
Leaking test
((Outdoor))
6
Wiring process
9
8
7
FG Unit
Pallet / Packing
Running test
4. Operational System Standard  Key Company Product
Coil
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Key Company Product
Single Split Duct
SB 40 ~ SB1000 (Capacity 40kBtuh ~ 1000kBtuh)
Features :
Features :
 DX or Chilled Water System
 ESP up to 2”WG
 Double Skin Panel with PU Foam Injection
Double Skin Panel with PU Foam Injection
 Aluminum frame with Nylon corner
 Optional with Internal Isolator
(Vibration Damping)
 Slim or Sequential controller
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Key Company Product
Single Split Duct
MAC 75 ~ MAC600 & YVC 75 ~ YVC 150
(Capacity 75kBtuh ~ 600kBtuh)
Features :
Features :
 DX System
 ESP up to 2”WG
 Single Skin Panel with Powder Coating
Single Skin Panel with Powder Coating
 Scroll Compressor
 Aluminum frame with Nylon corner
Slim or Sequential controller
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Key Company Product
Single Split Condensing Unit
Si
l S li C d i
i
CU 30 ~ 150
(Cap. 30 kBtuh ~ 150 kBtuh)
Features:
 Horizontal Throw for CU 30 ~ CU 60
 Convertible Horizontal or Vertical throw
for CU 75 ~ 150
 Scroll Compressor
Scroll Compressor
 Aluminum frame with Nylon corner
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Key Company Product
Draw Through FCU
D
Th
h FCU
CC 10 ~ CC 40 B ( Cap. 10 kbtuh ~ 40 kBtuh)
ESP
ESP up to 50 Pa
t 50 P
CC 10 ~ CC 60 C
( Cap. 10 kbtuh ~ 60 kBtuh)
ESP
ESP up to 200 Pa
200 P
Double Drain pan
Blow Through FCU
CW/CX 200 ~ 1200
Chilled Water or R‐22 system
Capacity 7 kBtuh ~ 40 kBtuh
Airflow 200 ~ 1200 CFM
ESP 0, 30, 60 and 80 Pa
Option return plenum and filter
Available up to 3000 CFM
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Key Company Product
Air Handling Unit
 Modular Concept Design
Size: 24 Horizontal & 16 Vertical Unit Arrangement
 Air Volume: 1200 to 69500 CMH (700 to 40800 CFM)
 Total Static Pressure Up To 1500 Pa (6” W.G.)
 Coil Face Area: 0.28 to 7.66 m²
(3.0 to 82.5 ft²)
 High Strength Extruded Aluminum Framework
 Double Skin PU Injected Insulation Panel
j
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Machine and Equipment
 Key Production Facilities
1. Coil Lines: two line 3/8”, one line 1/2 “ ,one line 5/8”.
2. Sheet Metal working Line : two shear , One corner notching, two CNC turret punch, two benders, One roller press orifice, three power press (hydraulic pneumatic and electronic) three welder
power press (hydraulic, pneumatic and electronic), three welder.
3. PU Lines : Two high pressure PU injection machine, One multi level foaming press.
4. Assembly lines : Split Duct line ( Indoor & Outdoor ), AHU Line, Customize line
5. Powder Coating line : Complete powder coating facilites available from PT Davy Prima Teknik Indonesia, PT Terra Megantara, PT Letrus
Oversees PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Machine and Equipment
 Supporting the production machine
No
Name of Machine
Qty
1
Milling Machine
2 pcs
2
Lathe Machine
2 Pcs
3
Air Compressor
Air Compressor
7 Pcs
7 Pcs
4
Vacuum 1 Pcs
5
Expander Machine
3 Pcs
6
Pipe Bender Machine
1 Pcs
7 Coil Bender Machine
1 Pcs
8
Bench Drillingg
2 Pcs
9
Straightened Machine
3 Pcs
10
Penta post blade saw Machine
3 Pcs
11
Roller Press Penta post
1 Pcs
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4. Operational System Standard  Production & Sales Result
HVAC PRODUCTION RESULT PERFORMANCE
Q’ty / Unit
5000
4221
4504
4180
3615
4000
3613
2644
3000
2515
2000
1000
0
2008
NO
1
2
3
4
5
6
MODEL TYPE
SPLIT DUCT / MAC
OUTDOOR / YVC
OUTDOOR / YVC
OUTDOOR / CU
INDOOR / SB
AHU
OTHERS
TOTAL QTY PROD.
2009
2010
2011
2008
1420
2009
1782
FISCAL YEAR
2010
779
1526
1302
1295
759
1062
524
516
34
46
4221
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
4180
2644
2012
2011
862
1680
439
403
63
168
Jan‐Jul 2013
2012
1403
2196
362
328
76
139
3615
AVERAGE
Jan‐Jul 2013
845
1087
209
263
20
91
4504
2515
AVERAGE
1249
1600
401
615
70
181
3613
4. Operational System Standard  Production & Sales Result
Sales Result ( IDR )
60,000,000,000
50,000,000,000
40,000,000,000
30,000,000,000
20,000,000,000
10,000,000,000
0
2008
2009
Other Sales / Sparepart
2010
2011
2012
Sales Product HVAC / Unit
Jan - Jul
2013
Average
Sales Product HE / Coil
FISCAL YEAR
NO
MODEL TYPE
2008
2009
2010
2011
2012
J J l 2013
Jan-Jul
AVERAGE
1
Sales Product HE / Coil
6,529,223,633
6,537,665,757
8,411,335,653
5,902,549,523
6,249,172,954
3,033,060,886
6,110,501,401
2
Sales Product HVAC / Unit 39,907,540,521
43,771,565,821
36,593,367,815
42,231,597,439
51,236,251,431
29,289,969,938
40,505,048,827
3
Other Sales / Sparepart
1 207 414 476
1,207,414,476
2 128 063 769
2,128,063,769
1 825 470 281
1,825,470,281
918 050 628
918,050,628
1 117 246 300
1,117,246,300
1 654 122 455
1,654,122,455
1 475 061 318
1,475,061,318
Total Sales
47,644,178,630
52,437,295,347
46,830,173,749
49,052,197,590
58,602,670,685
33,977,153,279
48,090,611,547
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 HVAC Project References C
Commercial & Office Building
i l & Offi B ildi
No
Project Name
Type of unit
1
Panakukang Mall, Sulawesi
Ducted Split
2
Jamsostek Building, Jakarta
Ducted Split
3
Bakmi Japos Karawaci, Jakarta
Ducted Split
4
Gedung Arsip Nasional, Jakarta
Ducted Split
5
Ambarukmo Mall, Yogjakarta
FCU
6
Artha Gading Mall, Jakarta
FCU
7
Padang Mall, West Sumatra
FCU
8
Pangrango Plaza, Jakarta
FCU
9
Balikpapan Mall, East Kalimantan
FCU
10
Department Perdagangan, Jakarta
p
g g ,
FCU
11
Manado Mall, Sulawesi
FCU
12
Kooperasi Wahana Kalpika, Jakarta Barat
FCU
13
Palembang Indah Mall, Palembang
Palembang Indah Mall, Palembang
FCU
14
Sawangan Town Square, Depok
FCU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 HVAC Project References No
Project Name
Type of unit
15
Bale Pakuan, Bandung
FCU
16
Mall Mollies, Bandung
Mall Mollies, Bandung
FCU
17
XXI Bintaro, Jakarta
Ducted Split
18
XXI Kalibata, Jakarta
Ducted Split
19
XXI Kuningan Jakarta
XXI Kuningan, Jakarta
Ducted Split
Ducted Split
20
XXI Rumah Tinggal, Jakarta
Ducted Split
21
XXI Solo Paragon, Solo
Ducted Split
22
XXI Bali, Bali
D t d S lit
Ducted Split
23
XXI Casablanca, Jakarta
Ducted Split
24
XXI Gading Imax, Jakarta
Ducted Split
25
XXI Bandung Indah Plaza, Bandung
Ducted Split
26
XXI Bali Galeria, Ducted Split
27
XXI Molis Bandung, Bandung
g
g
Ducted Split
28
XXI Cirebon, Cirebon
Ducted Split
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 HVAC Project References No
Project Name
Type of unit
29
XXI Bali Galeria, Ducted Split
30
XXI Molis Bandung, Bandung
Ducted Split
31
XXI Cirebon, Cirebon
Ducted Split
32
XXI Jayapura, Papua
Ducted Split
33
XXI Green Bay Jakarta
XXI Green Bay, Jakarta
Ducted Split
p
34
XXI Sumarecon, Bekasi
Ducted Split
35
XXI Makasar, Sulawesi
Ducted Split
36
XXI P l i M d M d
XXI Polonia Medan, Medan
Ducted Split
Ducted Split
37
XXI Kelapa Gading, Jakarta
Ducted Split
38
Universitas Indonesia (UI)
AHU
39
Departement Agama, Jakarta
AHU
40
MTC Manado, Sulawesi
AHU
41
Lotte Mart, Jakarta
AHU
42
Lotte Mart, Cibitung
AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 HVAC Project References  Apartment and Hotels
A
dH l
No
Project Name
Type of unit
1
Apartment Bellagio Residency, Jakarta
Multi split Condenser
2
Apartment Bellagio Mansion, Jakarta
Multi split Condenser
3
Apartment Shangri La, Jakarta
Multi split Condenser
4
Bali Cottage, Bali
Multi split Condenser
5
Apartment Capital Residence, Jakarta
6
Hotel Quality, Makassar
Ducted Split
7
Hotel Grand Hyatt, Bali
FCU
8
Hotel Kunir, Jakarta
FCU
9
Hotel Novotel, Bandung
10
Hotel Bumi Minang, Padang
g,
g
11
Hotel Nusa Dua Bali, Bali
12
Hotel Haris, Bandung
AHU
13
Hotel Sahid Jaya, Cikarang
Hotel Sahid
Jaya, Cikarang
AHU
14
Menara Era, Jakarta
AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
AHU
AHU & FCU
AHU
Ducted Split
5. Key Project
 HVAC Project References  Industries
I d
i
No
Project Name
Type of unit
1
PT San Miguel, Cibitung
Ducted Split
2
PT Central Agro Mima, Pegaden
Ducted Split
3
Batik Semar, Solo
Ducted Split
4
PT Mayora, Cibitung
5
PT PLTU, Jambi
6
PT Connocco, Jambi
RoofT op Package
7
PT Bayu (Bio Farma
FCU
8
PT Unilever, Cibitung
FCU
9
PT Indofood, Jakarta
FCU
10
PT Sakatama, Surabaya
,
y
FCU
11
PT Asaba, Jakarta
FCU
12
PT Nestle Indonesia, Suraya
FCU
13
PLN, Bojong
PLN, Bojong
FCU
14
Prospek Motor, Sunter
FCU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Condensing Unit
AHU
5. Key Project
 HVAC Project References No
Project Name
Type of unit
15
PT Konimex, Solo
AHU
16
PT Djarum Kudus
PT Djarum, Kudus
AHU
17
PT Nestle Indonesia, Lampung
AHU
18
PT Kalbe Farma, EJIP
AHU
19
PT Indofarma Cibitung
PT Indofarma, Cibitung
AHU
20
PT Ultra Sakti, Bandung
AHU
21
PT Kraft, Bandung
AHU
22
PT K ihi Cibit
PT Keihin Cibitung, Bekasi
B k i
AHU
23
PT Harco Magdu
AHU
24
PT AQUA, Sukabumi
AHU
25
PT AQUA, Cianjur
AHU
26
PT AQUA Pandaan, JATIM
AHU
27
PT Kereta Api Indonesia, Jakarta
AHU
28
PT Berdikari, Jakarta
AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 HVAC Project References  Hospitals
H i l
No
Project Name
Type of unit
1
RS Pluit, Jakarta
FCU
2
RS Surianti Suroso, Sunter
FCU
3
RS Puri Kedoya, Jakarta
FCU
4
RS Dharmais, Jakarta
AHU
5
RS Fatmawati, Jakarta
AHU
6
RS Adam Malik, Jakarta
AHU
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
5. Key Project
 Heat Exchanger
No
Project Name
No
Project Name
1
Hotel Omni Batavia, Jakarta
15
RS Husada, Jakarta
2
Hotel Palembang
16
PLTU Suralaya, Suralaya
3
Mall Gajah Mada, Jakarta
17
Hero Supermarket, Bekasi
4
Mall Pondok Indah, Jakarta
18
Diamond Dept Store, Makassar
5
Mall Ambassador, Jakarta
19
Pabrik Gula, Lampung
6
Mall Kelapa Gading Jakarta
20
TRS Radiator, Jakarta
7
Mall Panakukang Trade Center, 21
PT Mattel, Jababeka
8
Gedung Telkom, Jakarta
22
Hai Lai Ancol, Jakarta
9
Gedung BNI 46, Jakarta
23
PT Karwell, Cakung
10
Gedung BRI, Jakarta
24
PT Charoen Pokphand, Pegaden
11
Gedungg Dirjen
j Pajak, Jakarta
j ,
25
PT Ceres Indonesia, Bandung
12
Gedung Dept Keuangan, Jakarta
26
Bank Indonesia, Bali
13
Gedung Jamsostek, Jakarta
27
DTE, Netherland
14
RS Cipto Mannungal, Jakarta
RS Cipto
Mannungal, Jakarta
28
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
6. Key Forward Project Plan
1 TTechnology transfer process from HCFC (R‐22) to non HCFC 1.
h l
f
f
HCFC (R 22)
HCFC
(R‐32  Program Ministry of Environment & UNDP ) in 2013‐2014 2. Control & monitoring unit by online system in 2014
3. Additional Fin Press m/c for special R‐32 design in 2014
4. Epoxy flooring in 2014
5. Certification by OHSAS 2008 in 2016
PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
7. Photo Gallery
Kick of ISO ISO 14001: 2004 (23 November 2009)
Fire Drill Education training (19 June 2012) Visit of Environmental Ministry (27 February 2013) PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
JCMS ‐JCI Education Training (22‐26 January 2010) Medical Check Up ( 05 July 2012) Work shop training at Ceves Kemenakertrans ( April 2013) PT. FATA SARANA MAKMUR (A Heat Exchanger And HVAC)
Download