US-41 Roundabout Marquette Construction and Motorist Information For More Information May - August 2010 Call the Ishpeming Transportation Service Center at: 888-920-6368 Visit MDOT's Web site at: MDOT: Providing the highest quality integrated transportation services for economic benefit and improved quality of life. Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\US-41 Roundabout (2/10 rld) 1000 copies printed @ $0.08 each for a total cost of $80 Ishpeming Transportation Service Center 100 S. Westwood Drive Ishpeming, MI 49849 www.michigan.gov/mdot What Is Being Done? GTON When Will This Be Done? A AVEN SPRIN UE This project will require partial closure of the intersection, and traffic shifts using temporary widening. Alternate routes to reach downtown Marquette from US-41 will be available, and motorists are encouraged to use Grove Street and Washington Street to access the downtown area during construction. US-41 through-traffic will be maintained. EET 41 28 ET E V RO E TR Marquette FISHE R STR EET REE T How Will Traffic Be Affected? G STR NT S T BARAG ET FRO Construction is scheduled to begin in May and be completed by August. STRE TREE T WASH IN 4TH S This project is funded by the American Recovery and Reinvestment Act (ARRA). 5TH ST RE E T The Michigan Department of Transportation (MDOT) will be constructing a modern roundabout at the intersection of US-41 and Front Street in the city of Marquette. S G Long-term Benefits This project will improve safety at this intersection, reduce motorist delay, improve ride quality, and extend the pavement service life by 25 years. MDOT's 2010 road and bridge program supports the creation of jobs, growth of the economy, preservation of the environment and the safety and security of the transportation system. How Will We Keep Motorists Informed? For up-to-date information on this project, go to the list of statewide lane closures at: www.michigan.gov/drive. More information on this project and the use of roundabouts can be found at: www.michigan.gov/mdotprojects. Marquette Lower Harbor Location of New Roundabout Alternate Route to Downtown Closed to through-traffic 41 28