Annual Progress Report 2013/14 Herefordshire Local Transport Plan Herefordshire in Statistics (figures in brackets for Hereford only) Population in 2013 186,100 (55,800) Buses: Number of bus stops Number of city bus services: Number of country bus services: 1,935 (362) 22 106 Rail: Number of railway stations: Number of ticket sales in 2013: 4 Hereford- 1,085,918 Ledbury- 185,558 Leominster- 264,436 Colwall- 63,374 Highways: A class roads (km): B class roads (km): C class roads (km): Unclassified roads (km): 378 316 1,075 1,549 Parking (spaces): Multi-storey public parking Other off-street public parking (399) 4,627 (2,277) Walking & Cycling: Number of pelican/puffin/toucan crossings: Public rights of way (km): 48 3,474 Cycling: Segregated and shared cycle routes (km): On-road cycle lanes (km) Quiet roads (km) 39.73 (29.52) 1.11 (0.52) 67.96 (25.5) Car Ownership (Census): One car per household: Two or more cars per household: Households without a car: 2001 44.8% 37.0% 18.2% 2011 42% (47%) 41% (28%) 16% (25%) Means of Travel to Work (Census) Car driver/passenger Rail Bus Motor cycle: Pedal cycle: On foot: Working at home: Other: 2001 63.5% (58.3%) 0.5% (0.5%) 2.9% (5.4%) 1.0% (1.3%) 4.2% (8.9%) 11.7% (16.7%) 15.2% (7.6%) 0.9% (1.2%) 2011 63.0% (59.4%) 0.7% (0.6%) 1.6% (2.4%) 1.7% (0.8%) 3.5% (7.5%) 12.2% (20.1%) 17.3% (7.8%) 1.0% (1.3%) HEREFORDSHIRE COUNCIL Annual Progress Report 2013/14 Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Signed 1 2 3 4 Draft for comments Draft for comments Draft for comments Final for circulation 09.12.14 17.12.14 14.01.14 02.02.14 SG SG JC JC 0.1 0.2 0.3 1.0 Review date: July 2015 Contents 1.0 Executive Summary ....................................................................................................... 2 2.0 Introduction ...................................................................................................................... 4 3.0 Delivery.............................................................................................................................. 7 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Transport Asset Management................................................................................... 7 Network Development .............................................................................................. 8 Transport Safety ....................................................................................................... 9 Public Transport ..................................................................................................... 10 Active Transport (including ‘Destination Hereford’) ................................................. 13 Air Quality ............................................................................................................... 16 Carbon management .............................................................................................. 16 4.0 Measuring Progress .................................................................................................... 18 5.0 Spending Programme ................................................................................................. 21 LTP Annual Progress Report 2013/14 1.0 Executive Summary We are proud of our achievements delivering improvements for transport supported by our Third Local Transport Plan (LTP3). This is despite the many challenges we have faced, including funding reductions and a severe flooding event. The following provides a summary for the 2013/14 financial year of our performance. Summary of achievements in 2013/14 Delivery of the Greenway, linking Rotherwas Industrial Estate and Hereford City Centre Distribution of 5,659 tonnes of salt on the county’s roads to ensure the network was as safe as possible during the winter. Repair of 40,907 potholes and 102 miles of surfacing to reduce the formation of further potholes. An extra £20m of funding allocated to highway maintenance to improve the condition of the network CO2 emissions derived from transport declined from 483,400 tonnes in 2005 to 393,500 tonnes in 2011 Delivery of 11 safety improvement schemes The number of people killed or seriously injured (KSIs) in road traffic collisions declined by 31% from the previous year. Reduction in traffic flows (vehicles) of 3% in Hereford and 4% in the rest of Herefordshire since 2009/10 Decrease in pollutant concentrations of NO2 at Hereford's Air Quality Management Area (AQMA) from 51.7ug/m3 in 2010/11 to 49.2 ug/m3 this year against a legal limit of 40ug/m3. Gained £3.5 million of extra funding from central government’s Severe Weather Fund to repair our local roads after flooding. Continued success with the Destination Hereford project to encourage sustainable transport, including: o o o 21% of people now aware of the ‘Choose How You Move’ brand, and 42% of people interviewed claiming to have changed their travel behaviour to more sustainable forms of transport. An increase in the number of people who park and share and park and cycle Expansion of the Travel for Work network and School Travel Network with 40 businesses and 21 city schools receiving travel information. 2 LTP Annual Progress Report 2013/14 Increase in rail patronage at Hereford station to over 1.6 million passengers per year from 1.5 million in 2010/11. Increase in urban bus patronage of 6% since 2012/13 Increase in cycling on off-road routes by 10% since 2011/12 Performance Indicators The work we undertake is aimed at meeting our performance targets. Table 1 illustrates our progress over the past year. We are currently meeting just less than half of our targets. Table 1- Progress made in achieving our performance indicator targets Indicator Road Safety Number of People Killed or Seriously Injured in Road Traffic Incidents (rolling 3 year average – calendar year) Local Congestion – Average Peak Journey Time (*On specific routes within Hereford (min:sec) Peak hour car flows in Hereford (Indexed) Average weekday car flows accessing Hereford during peak times (0700-0900 and 1600-1800) Annual Average Daily Traffic (AADT) Flows AADT flows recorded at HC managed monitoring sites within Hereford and Herefordshire (Indexed) Highway Condition- Principal ‘A’ Roads The % of the principal ‘A’ Road network requiring further investigation Highway Condition- Non-principal ‘B’ and ‘C’ roads The % of the non-principal ‘B’ roads requiring further investigation Highway Condition- Unclassified roads The % of the unclassified road network requiring further investigation Local Bus Punctuality Percentage of buses running on time Urban Bus Patronage Total number of passengers recorded using urban bus services within Herefordshire (Thousand Passenger Journeys) Rural Bus Patronage Total number of passengers recorded using rural bus services within Herefordshire (Thousand Passenger Journeys) Cycle Flows Number of cyclists using cycle paths recorded at HC managed monitoring sites within Hereford (Indexed) Air Quality- Hereford (ug/m3) The level of particulate matter in Hereford’s AQMA Air Quality- Leominster (ug/m3) The level of particulate matter in Leominster’s AQMA 3 Performance 2013/14 61 Target 2013/14 89 20:45 19:00 94 97.5 96 (Herefordshire) 98 (Hereford) 7% 98 5% 10% 5% 27% 5% 87% 88% 1,170 1,172 1,976 2,054 110 103 49.2 47.5 58.1 51.9 98 LTP Annual Progress Report 2013/14 2.0 Introduction This is Herefordshire’s 13th Annual Progress Report. It sets out our progress delivering our Key Performance Indicators (targets) and transport improvements over the past financial year (April 2013 to April 2014). It also summarises transport conditions and trends in Herefordshire over the past year. Our LTP policies, targets and programme are set out in our LTP Strategy and Policy documents which are available on our website here. The documents were adopted in March 2013 and cover the period 2013/14-2015/16. The LTP3 has two main foci. These are: Reducing congestion in Hereford and increasing the use of less polluting and healthier forms of transport than the private car, particularly for short distance journeys. Maintaining access for rural residents and people without access to a car. The work we undertake and schemes we deliver are aimed at achieving these objectives. This report provides a record of that work and our progress towards our targets for the past year. The data indicates where we are succeeding and where we need to make changes. Some aspects need a longer time period than a year to demonstrate significant change such as congestion, air quality and CO2 emissions. There can also be many variables within a year that are outside our control. These are elements such as the weather which can have a significant impact on transport use such as the numbers choosing to cycle and the condition of our roads. 2.1 Performance Indicators and Targets The work we undertake is aimed at meeting our performance targets. Table 2 sets out the rationale for monitoring the performance indicators we do. 4 LTP Annual Progress Report 2013/14 Table 2- Rationale for monitoring our LTP performance indicators Indicator Target Target source Number of people killed or seriously injured (KSI) in Road Traffic Incidents (3 year rolling average) Average peak journey times on specific routes within Hereford Average weekday car flows in Hereford during peak times (0700-0900 and 1600-1800) To reduce KSI’s by 50% by 2020 (from 119 in 2005-09 to 59 by 2020) Reduce average journey times to 19 mins by 2014/15 Reduce peak hour car flows by 3% by 2014/15 (from 29,071 in 2009/10 to 28,198) DfT- Targets based on central government guidelines using a 2005-09 average as a baseline Annual average daily traffic flows recorded at HC and Highways Agency managed sites within Hereford and Herefordshire The % of the principle ‘A’ road network requiring further investigation Reduce vehicle flows in Hereford and Herefordshire by 3% by 2014/15 Reduce the % of the A road network requiring further investigation to 5% by 2014/15 Highway Condition The % of non-principle (B and C) roads requiring further investigation Reduce the % of the B road network requiring further investigation to 5% by 2014/15 Highway Condition The % of the unclassified road network requiring further investigation Bus Percentage of buses Reduce the % of the unclassified road network requiring further investigation to 5% by 2014/15 Increase the % of Road Safety Congestion Peak hour car flows Annual Average Daily Traffic Flows Highway Condition Description HC- A local target established using historical data and a baseline year of 2007/09 HC- A local target established using historical data and a baseline year of 2009/10 LTP Objective/ Theme - Safety Why we monitor it To ensure we are reducing deaths and injuries on Herefordshire’s roads - Congestion - - Short distance journeys by car in Hereford Health Congestion HC- A local target established using historical data and a baseline year of 2009/10 - Economy Environment Congestion To assess economic growth as well as monitor congestion in Hereford. It also helps us monitor environmental effects from transport. HC- A local target established using historical data and a baseline year of 2009/10. From 2015, this target will be established by BBLP. HC- A local target established using historical data and a baseline year of 2009/10. From 2015, this target will be established by BBLP. HC- A local target established using historical data and a baseline year of 2009/10. From 2015, this target will be established by BBLP. HC- A local target established - Economy Safety To ensure the safe movement of people and goods across the county and aid economic growth - Economy Safety To ensure the safe movement of people and goods across the county and aid economic growth - Economy Safety To ensure the safe movement of people and goods across the county and aid economic growth - Congestion To ensure bus users have a reliable 5 To help us assess where we need to target our schemes and initiatives to address congestion To help us assess where we need to target our schemes and initiatives to reduce short distance journeys by car in Hereford and improve health LTP Annual Progress Report 2013/14 Punctuality running on time in Herefordshire Urban Bus Patronage The total number of passengers recorded using city bus services in Hereford Rural Bus Patronage The total number of passengers recorded using bus services travelling to rural areas of Herefordshire Cycle flows Number of cyclists using off-road cycle baths at HC managed monitoring sites in Hereford (indexed) Air Quality The level of particulate matter recorded at Hereford and Leominster’s AQMA buses running on time in Herefordshire to 89% by 2014/15 Increase urban patronage by 3% between 2009/10 and 2014/15 (from 1,152,000 journeys to 1,186,000 journeys) Increase rural patronage by 3% between 2010/11 and 2014/15 (from 2,018,000 journeys to 2,066,000 journeys) Increase off-road cycle levels by 10% by 2014/15 Reduce the level of particulate matter to 40ug/m3 by 2032 using historical data and a baseline year of 2011/12 - Accessibility service to access key services, and to monitor congestion in Hereford HC- A local target established using historical data and a baseline year of 2009/10 - Accessibility Congestion To monitor where we need to target behaviour change campaigns to increase bus use and reduce congestion in Hereford HC- A local target established using historical data and a baseline year of 2009/10 - Accessibility To monitor where we need to target bus service improvements to improve access to services for rural residents HC- A local target established using historical data and a baseline year of 2010/11 - Health Congestion Cycle usage as well as vehicle flow and congestion monitoring helps us assess the effectiveness of the schemes and initiatives we deliver to reduce short distance journeys by car and improve health Defra- A recommended threshold used as a target by local authorities to facilitate the removal of an Air Quality Management Area in their area. - Environmental Health To target schemes and initiatives to reduce the environmental and health impacts of transport emissions in AQMAs. 6 LTP Annual Progress Report 2013/14 3.0 Delivery This chapter sets out the schemes and initiatives the Council has delivered during 2013/14 and how they contribute to our objectives and targets. The transport themes covered in this chapter comprise public transport, active transport, road safety, transport asset management, network development and air quality. 3.1 Transport Asset Management The County’s highway network is the most valuable asset the Council manages. It provides access to vital services for its users, enabling many other services and activities that are essential to the economy of the county. Users of the network rely on it being well-maintained and well-managed. The council is required each year to submit information to Government on the Gross Replacement Costs of its highway assets. In 2013/14 this was estimated at £2.8billion. This estimate includes all carriageways, footways, cycleways, highway structures, street lighting, traffic management, and street furniture assets. The council continues to make made excellent progress in developing the Transport Asset Management Plan (TAMP) and we anticipate finalising the plan during 2014. The TAMP will provide ‘a strategic approach that identifies the optimal allocation of resources for the management, operation, preservation and enhancement of the highway infrastructure to meet the needs of current and future customers’. Information on the amount of surface maintenance to the roads that has been undertaken since 2006 is displayed in Table 3 below. Table 3- Highway maintenance improvements 2006/07-2013/14 (km) 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 Microasphalt Resurfacing Surface Dressing Footway Work Bellwin Fund Total 0.3 0.6 7.3 7.0 5.9 5.5 21.2 N/A 47.9 16.1 21.6 16.8 27.0 32.2 45 22.1 18.8 198.9 91 82.1 46.2 50 61.4 41 40.2 25.3 437.2 12.5 13.3 13.1 21.7 24.2 5.3 39.3 1.7 131.1 13.3 13.3 The council has managed to maintain the condition of the principal and unclassified highway network over the past few years despite a number of severe winters and reducing budgets. Over 21,000 pothole repairs were undertaken in 2013/14 and over the next two years the Council will be investing an extra £20m to specifically target roads that are in the greatest need of repair and have the greatest value to our local communities. 7 LTP Annual Progress Report 2013/14 During the winter of 2013/14, 5,659 tonnes of salt were used on the county’s roads to ensure the network was as safe as possible. Table 4 provides information on the length of road surface treated through our winter maintenance programme between 2011 and 2014. Table 4 –Length (km) of road treated through our winter maintenance programme between 2011/12 and 2013/14 Road Type 2011/12 2012/13 2013/14 Principle ‘A’, Non-principle ‘B’ and ‘C’ roads 63,030 87,768 61,120 Unclassified roads 2,052 4,297 0 Spot or Partial Treatments 5 808 0 Total 65,085 92,873 61,120 Public Rights of Way Herefordshire Council manage over 3,380 km of public rights of way (PROW). The following PROW improvements were undertaken across the RoW network during 2013/14: 3.2 145 stiles replaced with kissing gates 22 field gates replaced by ‘2 in 1’ gates 17 wider ditched crossings 29 extra-way posts, 67 new steps and 10 higher cross steps installed. Network Development Hereford City Centre Transport Package (HCCTP) The Hereford City Centre Transport Package (HCCTP) will assist in delivering retail, leisure, tourism, employment and housing development. There are three key elements to the package: A new city link road from the A49 Edgar Street to Aylestone Hill which will provide access to the new 800 home Urban Village and enable wider development of the Edgar Street Grid (ESG) area Public realm improvements to Newmarket Street, Blueschool Street and Commercial Road reducing traffic volumes and speeds, resulting in environmental improvements for pedestrians and cyclists and reduced severance. A new integrated transport hub at Hereford Railway Station improving interchange between bus and rail services. A Strategic Outline Business Case (SOBC) was submitted to the Marches Local Enterprise Partnership (LEP) in early 2014 for approximately £33m. The package achieved outline approval. A full business case is now in development to enable the release of funds for project delivery. South Wye Transport Package During 2013, work continued on the development of a package of measures to address transport problems in the South Wye area. The aim of the study is to find a package of measures across the area to: Enable growth at the Hereford Enterprise Zone; 8 LTP Annual Progress Report 2013/14 reduce congestion and delay in the area; reduce growth in emissions and traffic noise; reduce accidents, and encourage physical activity A range of options has been considered including a new road link and sustainable transport measures. Consultation on the options was in July and August 2014. A preferred route to the Southern Link has recently been adopted by the Council. It is anticipated that a planning application will be submitted in early 2015. 3.3 Transport Safety Casualty Reduction Between 2012/13 and 2013/14 the number of people killed or seriously injured (KSI) on Herefordshire’s roads reduced by 31% (80 to 61). There has also been a significant overall reduction in KSIs in the county since 2005. This is illustrated in Figure 4. This good news demonstrates that our road safety work is positively contributing to this decrease in road accidents as well as a recorded reduction in vehicle flows. Figure 4- No of KSIs in Herefordshire 2005-2013 No of people killed or seriously injured in Herefordshire 2005-2013 160 140 No of KSIs 120 100 80 60 40 20 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 Year Speed Limits Ensuring the most appropriate speed limit is assigned to a section of highway is fundamental to our approach to managing the use of our highway network and reducing the potential for road traffic incidents. During 2013/14, 12 changes to speed limits were implemented across the county. Speed Indicating Devices (SIDs) SIDs are an educational tool used to inform drivers of their speed. We have a total of ten SIDs operating throughout the county and during 2013/14 five new sockets were installed in Burghill, and 33 deployments were made at various locations around the county at the request of parish councils. 9 LTP Annual Progress Report 2013/14 Education through Raising Awareness and Promoting Safer Travel Young Road Users The council has established strong relationships with schools and further education establishments to ensure the progressive road safety awareness programme is communicated to its full potential. We continue to provide road safety education to primary and secondary school pupils. The annual ‘Dying to Drive’ event took place between 18th-24th September 2013 and was attended by 771 pupils. In 2013, the age group for this event was changed from Year 10 to Year 11 to focus more on the pre-driver age group. Pupils in year 11 are also likely to be more independent, or passengers in a car. The event is very popular and contains many important messages for pre-drivers and raises their awareness of the consequences of careless driving and speeding. The event is carried out in partnership with the emergency services, the Herefordshire Youth offending team and the councils own road safety team. A staged crash scheme is followed by workshops and talks by individuals who have been personally affected by road traffic accidents. As well as the ‘Dying to Drive’ event we also undertook the annual Year 6 ‘Crucial Crew’ event over a two week period the 17th-28th June 2013 which was attended by 1,481 pupils. Adult Road Users Due to low take up and an evaluation of the scheme showing that the training made little difference to the likelihood of having an accident, the Council stopped subsidising Pass Plus in August 2013. However, we continue to provide and subsidise the Older Driver Refresher training and during 2013/14, 34 people undertook this training. School Crossing Patrols The council continues to provide and manage school crossing patrols in line with nationally agreed criteria as they play a key role in preventing accidents to children on the journey to and from school. We currently have a total of 15 patrols around the county. 3.4 Public Transport Bus Two bus shelters including cycle racks, were installed in Pixley and Tarrington which will serve bus services on the A438 between Ledbury and Hereford . These form part of the LTP policy ‘PT3 Bus Infrastructure Improvements’ which supports the development of rural transport hubs. Our programme includes delivery of cycle shelters at key bus stops so people can travel to bus stops by bike and safely leave their bike when using the bus. Seven raised bus kerbs were installed to assist wheelchair users and people with mobility issues. Bus patronage over the past 13 years is shown in Figure 1. Since 2001, urban bus use has declined and rural bus use has increased. Data for the past year however shows an increase of 6% in urban bus patronage levels. This may be a result of our campaigns as part of the Destination Hereford ‘Choose Bus’ promotion. This aims to encourage bus use by providing free bus tickets and information such as bus service maps and timetables. 10 LTP Annual Progress Report 2013/14 Figure 1 – Bus patronage for urban and rural services in Herefordshire 2001/02 -2013/14 Bus patronage in Herefordshire 2001-2014 180 160 143 140 145 Index 120 149 151 65 61 170 169 169 166 169 167 149 103 100 80 60 40 20 100 95 86 66 61 Rural patronage 61 45 47 46 40 46 Urban patronage 0 Year Rail In 2012 Network Rail confirmed that Herefordshire would be one of a number of authorities in the West Midlands that would benefit from a number of signalling improvements enabling more services to Worcester, Birmingham and London. Work is currently underway at Hereford station to install lifts, upgrade footbridges, and refurbish canopies and customer facilities. Once completed Hereford station will be fully accessible for wheelchair users and those with other mobility problems. The number of people using Hereford rail station, based on ticket sales, has increased by 48% since 2004, as shown in Figure 2. This follows the national picture, where rail passenger journeys have increased annually since 1995 reaching 1.6 billion journeys in 2014 (Office of Rail Regulation). 11 LTP Annual Progress Report 2013/14 Figure 2 – Hereford Station usage 2004/05 -2013/14 Hereford Rail Station Usage 2004-2012 160 139 140 133 130 133 Index 123 117 120 110 148 148 150 109 100 100 90 80 Year The numbers of people using the other stations in Herefordshire has also increased as illustrated in Figure 3. Leominster station remains the most popular station. Since 2004/05 usage has increased by 85% (from 143,300 to 264,436). Figure 3 –Station usage at Colwall, Ledbury and Leominster 2004/05 -2013/14 Rail Station Usage at Colwall, Leominster and Ledbury stations 20042012 200 184 180 168 151 Index 160 133 140 120 100 127 110 100 164 151 152 139 185 176 139 163 142 155 141 138 156 145 149 125 113 104 Leominster Colwall Ledbury 80 Year Community Transport There are currently seven Community Transport (CT) providers across Herefordshire. Some of the vehicles used are specifically adapted to provide transport for those with mobility problems. Table 2 shows total passengers between 2009/10 and 2013/14 for each service. Demand for the Dore, Ross and Ledbury CT services has increased during 2013/14. This could be because these operators promoted their services more widely than others, using 12 LTP Annual Progress Report 2013/14 promotional leaflets we provided. More recently some of the other services have experienced a decline in passengers. A new mini-bus brokerage facility is now operational for communities to book mini-buses to anywhere in the county. Bromyard CT operators have also developed the ‘wiggly bus’ route which runs from Bromyard to its surrounding villages on Fridays. Following a consultation revealing strong support for the service to run on Fridays, this has proved popular with local residents. Bromyard and Ledbury CT operators have also purchased new vehicles (one bus and one Multi Passenger Vehicle) for their services. Hay (DAR) has implemented a new computer system to improve their back office facilities. The Council has revised and issued a new Service Level Agreement for 2013/14 and the new funding formula has been agreed by all CT operators. This has resulted in an increase in service hours to the benefit of customers, as well as moving towards the introduction of an email booking system allowing for greater flexibility in booking the service. It is hoped this service will be operational in 2014/15. Table 2- Total CT passengers 2009/10-2013/14 CT operator 2009/10 2010/11 Bromyard Community Wheels (central and north Herefordshire) Dore Hay Hereford (DAR) Hereford Car Scheme Ledbury Ross Total 3.5 2011/12 2012/13 2013/14 6,847 6,258 5,980 6,054 5,018 10,614 12,153 11,184 15,955 14,489 5,039 736 11,441 4,386 639 9,625 5,440 565 7,712 3,738 3,208 2,669 6,749 3,426 48,590 5,903 2,814 44,986 5,236 4,637 43,423 5,356 5,417 193 630 5,843 5,774 Now taken over by Community Wheels 4,216 5,180 4,391 4,524 42,008 41,032 Active Transport (including ‘Destination Hereford’) During 2013/14 we continued work on the Destination Hereford project. This is funded by central government via the Local Sustainable Transport Fund (LSTF). More information on Destination Hereford can be found on our website www.herefordshire.gov.uk. The project is now in its 3rd year and during 2013/14 the following were the main achievements. Travel Awareness and Information: Awareness of the Choose How You Move (CHYM) initiative increased from 13% to 35% and more people recognised the CHYM logo, up from 17% to 40%. 16% claimed to have walked more or tried walking, 6% claimed to have cycled more and a further 6% claimed to have used a bus. 13 LTP Annual Progress Report 2013/14 Workplace Connectivity and Travel Choice Support: The Connect 2 Greenway opened in December 2013 providing a traffic-free route including a new river crossing from Hereford city centre to Hereford Enterprise Zone for pedestrians and cyclists. Analysis of cycle flows from our permanent cycle counter on the bridge reveals that approximately 330 cyclists use the route on an average day. 11 travel advice days were held at Hereford businesses and attended by 460 employees. 65 employees received free MOT's for their bikes. Cycling promotions, Walking Challenge and Car-share promotions were delivered to employees at all network businesses and distributed to additional businesses across Herefordshire. 12 business grants were awarded providing cycle parking for 220 bikes, 2 pool bikes, and remote working equipment. Child scooter skills training Child cycle training (Bikeability) School Travel Choice Support: Approximately 5,000 pupils took part in Walk to School Week in May 2013 1,052 pupils undertook Level 1 and 2 Bikeability cycle training and 46 pupils undertook Level 3. Four weekend cycle maintenance and cycle skills sessions were undertaken and attended by 22 children. 32 adults completed individual programmes of adult cycle training. 12 parent and children completed individual programmes of parent and child cycle training. 10 family and social led cycle rides were organised and led by our in-house team of cycle trainers. Approximately 50 adults and children joined the rides. Recruitment of a Sustrans School Project Officer who started in March 2014. Five schools were awarded TravelFund grants in 2013/14 up to a value of £10,000 to use on the installation of active travel infrastructure at their schools such as parent waiting shelters, improved pedestrian access and bicycle equipment for the bike club. Spring and autumn promotions were undertaken including ‘Be Bright Be Seen’- a competition in schools to promote safe walking and cycling 14 LTP Annual Progress Report 2013/14 Our new child and parent cycling training Connect 2 Greenway Personalised Travel Planning (PTP) Travel advisors undertook door-to-door visits at 4,496 households in 2013/14 Hereford Active Travel Schemes (HATS): During 2013/14 new cycle infrastructure provided better facilities for cyclists in Hereford including: o New crossing facilities on Tillington Road/Roman Road junction o Shared use path on Whitecross Road from Plough Lane to the Great Western Way o Safety improvements to King Street/Bridge Street junction o An improved riverside path by Asda o Cycle bypass on Melrose Place onto Whitecross Road o Hoarwithy road roundabout improvements o A new cycle access between Station Road and Grimmer road o A shared use path along Holmer Road to Widemarsh Common including a new toucan crossing over Newtown Road. o Extended and/or upgraded cycle parking across the city including Broad Street and the Old Market development Since the launch of our Destination Hereford project in 2011, off-road cycle use in Hereford has increased by 10%. Rural Access There are now 34 Park and Share sites around the county which provide 350 car parking spaces for car share users. The Park and Choose scheme registered 27 new members during 2013/14 bringing total membership to 67. Ten secure cycle lockers were installed at Hereford Railway Station and six were installed at Aylestone Park. 70 new members looking to car share with others, signed up to our Twoshare website (part of Lifeshare) with 25 of those registering during September as a result of our autumn promotions 15 LTP Annual Progress Report 2013/14 Shirley’s Wheels- Led cycle rides for women The improved Riverside shared use path 3.6 Air Quality Herefordshire’s air quality is generally very good although the county has two Air Quality Management Areas (AQMAs) which are areas where levels of pollutants exceed the EU standard of 40ug/m3. 3.7 Information collected from within our AQMA in Hereford shows that NO2 concentrations have increased from 47.6ug/m3 in 2012/13 to 49.2ug/m3 in 2013/14. We will continue to monitor these sites closely through the Hereford Air Quality Action Plan to understand why levels have increased during 2013/14 and develop mitigation measures. Our AQMA in Leominster shows that NO2 concentrates have decreased from 55.9ug/m3 in 2012/13 to 48.8ug/m3 in 2013/14 indicating that the previous trend is reversing and air quality is improving at this location. We are now in the final stages of developing our Leominster Air Quality Action Plan. Carbon management Herefordshire Council is committed to a six year 30% carbon reduction target against its 2008/09 baseline. This target has been adopted in-line with the Council’s corporate objective of creating and maintaining a successful economy that embraces new ways of responding to changing resource pressures. Carbon emissions derived from transport in Herefordshire have been recorded since 2005 by the Department of Energy and Climate Change (DECC). CO2 emissions declined from 483,400 tonnes in 2005 to 393,500 tonnes in 2011 (see Figure 5). 16 LTP Annual Progress Report 2013/14 Figure 5- Estimated, actual and predicted carbon dioxide emissions derived from transport in Herefordshire 1990-2050 Herefordshire Carbon Dioxide emissions derived from transport 1990-2050 500,000 Carbon Dioxide tonnes 450,000 400,000 350,000 300,000 250,000 200,000 150,000 100,000 50,000 ESTIMATED Herefordshire CO2 Emissions (Backcast using Herefordshire % of UK emissions ACTUAL Herefordshire CO2 Emission data (DECC) PREDICTED Herefordshire CO2 Emission data (Based on "IN YEAR" targets) 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042 2044 2046 2048 2050 0 Year Overall, total carbon emissions in the county have declined from 1,573,100 tonnes in 2005 to 1,369,000 tonnes in 2011. This is on course to achieve the Climate Change Act targets in 2020 and 2050 based on forecasted emissions. These represent industrial, domestic and transport related emissions. A number of reasons could explain this reduction, such as the economic downturn, improvements in energy efficiency both domestic and industrial, our Destination Hereford project encouraging more sustainable travel, as well as low emission vehicles. 17 LTP Annual Progress Report 2013/14 4.0 Measuring Progress Table 8 below documents our progress against our 15 performance indicators over the past six years. This is to demonstrate a clearer pattern of recent change and performance. The bullet points below summarise our progress. Road safety continues to improve and during 2013 numbers of KSI casualties reduced to match our lowest ever recorded level of 61 casualties, representing a reduction of 49 per cent compared to our 2005-09 baseline. Average peak hour car flows have reduced by 6% between 2009/10 and 2013/14 87% of bus journeys were on time in 2013/14; an increase of 2% compared to 2012/13. Urban bus patronage has increased by 2% from 2012/13 whilst rural patronage has declined by 2% during the same period. Annual Average Daily Traffic (AADT) flows in Hereford declined by 3% and on rural routes by 4% between 2008/09 and 2013/14 Cycling in Hereford has increased by 10% since the launch of our Destination Hereford project in 2011. 18 LTP Annual Progress Report 2013/14 Table 8 – LTP Performance Indicators 2012/13 Title Road Safety Number of People Killed or Seriously Injured in Road Traffic Incidents (rolling 3 year average – calendar year) Local Congestion – Average Peak Journey Time *On specific routes within Hereford (mins) Peak hour car flows Average weekday car flows accessing Hereford during peak times (0700-0900 and 1600-1800) Annual Average Daily Vehicle Flows Total number of vehicles recorded at HC managed monitoring sites within Herefordshire (Indexed) Annual Average Daily Vehicle Flows Total number of vehicles recorded at HC managed monitoring sites within Hereford (Indexed) Road Condition- Principal ‘A’ roads The % of the principal ‘A’ road network requiring further investigation Road Condition- Non-principal ‘B’ and ‘C’ roads The % of the non-principal ‘B’ road network requiring further investigation Road Condition- Unclassified roads The % of unclassified roads requiring further investigation Local Congestion - Local Bus Punctuality Percentage of buses running on time Urban Bus Patronage Total number of passengers recorded using urban bus services within Herefordshire (Thousand Passenger Journeys) 2010/11 2011/12 2012/13 2013/14 Target 2013/14 115 110 86 75 80 61 89 19:30 20:14 20:46 20:14 20:44 20:45 19:00 100 98 98 97 94 97.5 100 100 98 97 95 96 98 100 99 100 98 97 98 98 4% 5% 9% 9% 7% 7% 5% 11% 9% 9% 9% 9% 10% 5% 20% 23% 18% 23% 27% 27% 5% 80% 86% 85% 87% 85% 87% 87% 1,568 1,152 1,205 1,170 1,025 1,170 1,179 2008/09 2009/10 19 LTP Annual Progress Report 2013/14 Rural Bus Patronage Total number of passengers recorded using rural bus services within Herefordshire (Thousand Passenger Journeys) Cycle Flows Number of cyclists using cycle paths recorded at HC managed monitoring sites within Hereford (Indexed) Air Quality- Hereford The level of particulate matter recorded within Hereford’s AQMA (ug/m3) Air Quality- Leominster The level of particulate matter recorded within Leominster’s AQMA (ug/m3) 2,021 2,006 2,003 1,974 2,003 1,976 2,054 100 99 101 110 112 53 43.3 51.7 46.5 47.6 49.2 47.5 59 52.3 49 55.1 55.9 58.1 51.9 20 LTP Annual Progress Report 2013/14 5.0 Spending Programme Table 5 below shows our LTP and non-LTP capital spend in 2013/14. Table 6 shows our LTP revenue spend in 2013/14. Table 5- LTP and non-LTP Capital Spend in 2013/14 Spend 2013/14 (£) Hereford Transport Plan Park & Share Cycle Network & Parking Accessible Bus Network Other pedestrian access improvements Hereford 20 mph zones and street de-cluttering Public Rights of way Access Improvements Network Management Sub-total 8,000 58,000 94,000 0 0 3,000 1,278,000 1,441,000 Sub-total 7,427 54,000 0 1,000 0 35,000 97,427 Sub-total 31,000 12,000 214,000 63,000 320,000 Rural Herefordshire and Market Towns Transport Strategy Rural pedestrian and disabled access improvements Rural cycle routes and parking Public transport minor improvements Public Rights of Way Improvements Rural 20mph zones Rural footway improvements Road Safety Safer Routes to School Speed Indicating Devices Minor Safety Improvements Speed Limits Highway Maintenance LTP Funded capital highway maintenance 6,366,000 Bridgeworks Autumn 12 additional Road Maintenance Funding Sub-total 474,000 1,363,000 8,203,000 Sub-total 10,000 1,984,000 470,000 37,000 37,000 1,188,000 60,000 51,000 49,000 3,886,000 Non-LTP Destination Hereford: Scheme Element 1 – Travel Awareness Campaign (Signing) Scheme Element 5 – Connect 2 Scheme Element 5 - Hereford Active Travel Schemes (HATS) Rotherwas Access Road De-trunking grant Link Road Grafton Depot and Hereford Leisure Centre (Defra Grant) S106 Agreements Road Safety Grant 21 LTP Annual Progress Report 2013/14 Other costs Capitalised staff costs Monitoring and Evaluation 593,000 32,000 Sub-total Total 625,000 14,572,427 Table 6- Revenue spend in 2013/14 Spend 2013/14 (£) Revenue Transportation studies Destination Hereford: Scheme Element 1- Travel awareness campaign Scheme Element 2- Workplace connectivity and travel support Scheme Element 3- School Travel Choice Scheme Element 4- Personalised Travel Planning Scheme Element 6- Rural Access Public transport routes and subsidies Community Transport Public transport surveys/publicity Public transport surveys Public transport publicity Concessionary travel Road Safety Accident Investigation and Prevention Road Safety Education, Training and Publicity School Crossing Patrols Bikeability 250,000 70,000 35,000 38,000 41,000 1,661,000 318,000 148,000 19,000 24,000 1,432,000 14,000 132,000 50,000 37,000 Total 4,288,000 22 19,000