Project Name Project Location Samet Job # TRADE PACKAGE SCOPE OF WORK 07500 TPO MEMBRANE ROOFING SUBCONTRACT Furnish all labor, materials, tools, taxes, insurances, equipment, hoisting, cranes, supervision and all other incidentals necessary to accomplish all TPO Membrane Roofing Work in accordance with all Contract Documents as defined within Section 01700 Trade Package General Scope Requirements and this Scope of Work. Project Specifications for the TPO Membrane Roofing Scope of Work are listed below. This Subcontractor or Supplier shall carefully examine all specification sections and drawings within the Contract Documents and be responsible for all work described within this Scope of Work and as required on the project, except where excluded or specifically assigned by the Scopes of Work to the other Subcontractors. This Subcontractor or Supplier should carefully examine ALL SCOPE OF WORK PACKAGES for a clear understanding of the delineation of work among Subcontractors and/or Suppliers. PROJECT SPECIFICATIONS 06100 ................................................ (Roof Related Blocking, Nailers and Grounds) Rough Carpentry 07200 ..................................................................... (Rigid Polyiso Roof Insulation) Building Insulation 07545 ................................................................... Thermoplastic Polyolefin (TPO) Membrane Roofing 07620 ............................................ (As Related to this Scope of Work) Sheet Metal Flashing and Trim 07720 .................................................................. (As Related to this Scope of Work) Roof Accessories 07920 ........................................................................ (As Related to this Scope of Work) Joint Sealants The TPO Membrane Roofing Subcontractor shall be responsible for complying with the requirements of each Scope of Work Description / Clarification Section listed below, even if those requirements are not shown within the Specification Sections listed above. 6.0 WOOD AND PLASTIC SCOPE OF WORK DESCRIPTION 6.0.1 7.0 Wood Blocking – This Work shall include providing all required wood blocking, coping nailers, wood parapet blocking at TPO to EIFS / masonry roof conditions, miscellaneous roof nailers, wood blocking, fasteners, shims, etc., where required, in order to properly install all work provided as part of this Scope of Work. THERMAL AND MOISTURE PROTECTION SCOPE OF WORK DESCRIPTION 7.0.1 TPO Membrane Roofing System - This Work shall include providing a complete TPO Membrane Roof System, including but not limited to, fasteners, 60 mil sheet membrane, rigid polyisocyanurate board insulation, cover boards, bitumen, plastic cement, prefabricated roof insulation vents, vent through roof (VTR) flashings, prefinished metal copings, brake metal, etc., compliance with uplift requirements, specified roof warranty, downspouts, gutters, U.L. requirements, sheetmetal flashing, membrane flashing, roof curb flashing including counter flashing of prefabricated roof curbs, roof expansion joints, roof walkway pads, gravel stop, prefabricated cant strips, etc., as designated within the Contract Documents. 7.0.2 Insulation – This Work shall include providing all built-up roofing rigid board insulation and associated adhesives, safing clips, fasteners, caulking compounds, tape, mastic, etc., at Trade Package – 07500 TPO Membrane Roof, Page 1 of 3 This is a Portion of the Complete Trade Package of 3 Pages Project Name Project Location Samet Job # designated locations within the Contract Documents. Unless advise otherwise, the standing seam metal roof assembly shall have an R-value of 20 or three (3”) inch polyisocyanurate rigid board insulation, whichever is greater. 7.0.3 Sheet Metal Flashing, Trim, Manufactured Roof Accessories and Roof Expansion Assemblies - This Work shall include providing all prefinished sheet metal flashing and trim work, manufactured roof accessories work and roof expansion assemblies work designated or required within the TPO membrane roof system, including but not limited to, exposed trim, formed aluminum gutters, formed aluminum downspouts, formed scuppers, downspout straps, formed aluminum gravel stops, reglets, formed pre-finished copings, aluminum roof to wall expansion joint assemblies, aluminum roof to roof expansion joint assemblies, accessories, base flashing, epoxy seam sealers, joint sealants, adhesives, mastic sealants, asphalt mastic, fasteners, etc. as required to complete all sheet metal flashing, trim, manufactured roof accessories and roof expansion assemblies as designated within the Contract Documents. This Work shall also include providing all lead sheet flashing and/or E.P.D.M. premolded flashing of all applicable roof penetrations, including but not limited to, roof drains, vent stacks, miscellaneous HVAC, plumbing, electrical, etc. roof penetrations, etc. specified to receive lead sheet and/or E.P.D.M premolded flashing. 7.0.4 Roof Curb Assemblies - This Work shall include furnishing and installing all mechanical roof curbs, equipment roof curbs and pipe roof curbs scheduled or required within the designated TPO membrane roof system in order to accommodate equipment or work provided by other Trade Subcontractors. The TPO Membrane Roofing Subcontractor shall closely coordinate the proper size requirements with mechanical, plumbing and electrical Trade Subcontractors. This work shall be part of the roof warranty requirements. Reference the roof, mechanical, plumbing and electrical drawings for equipment penetrations requiring a roof curb to be provided as part of this Scope of Work. 7.0.5 Roof Openings - The TPO Membrane Roofing Subcontractor shall make necessary cutouts/blockouts at all TPO membrane roofing conditions requiring a cutout/blockout scheduled to receive work required of this subcontract or by other subcontractors at all project locations within a TPO membrane roof system being installed as part of this Scope of Work. Cutouts/blockouts include openings required for all HVAC, plumbing, fire protection and electrical work located at built-up roof areas. The respective trade subcontractor requiring a specific cutout/blockout will provide the size and location of these areas for the TPO Membrane Roofing Subcontractor’s installation. 7.0.6 Joint Sealants - This Work shall include a complete Joint Sealant System, including but not limited to, all specified pre-construction testing, warranties, elastomeric joint sealants, solvent-release-curing joint sealants, miscellaneous joint sealants, backing, primer, cleaners, bond breaker tape, masking tape, accessory materials, etc. as required to complete this Scope of Work. Include tooling, cleaning and protection of all sealant joints. 7.0.7 Warranty - The TPO Membrane Roofing Subcontractor shall provide the specified roof warranty on the forms required of the Contract Documents. 7.0.8 Manufacturer Representative Inspections - The TPO Membrane Roofing Subcontractor shall include TPO membrane inspection(s) as specified within its Base Bid Proposal Amount. Trade Package – 07500 TPO Membrane Roof, Page 2 of 3 This is a Portion of the Complete Trade Package of 3 Pages Project Name Project Location Samet Job # 17.0 SCOPE OF WORK CLARIFICATIONS AND/OR OTHER REQUIREMENTS 17.0.1 The Architectural Standing Seam Metal Roofing Subcontractor shall be responsible of its own wood blocking, gutters, downspouts, scuppers, copings, etc. as required to complete its own Scope of Work. 17.0.2 The Architectural Standing Seam Metal Roofing Subcontractor and the TPO Membrane Roofing Subcontractor shall coordinate its prefinished sheet metal work to ensure the same color of material as selected by the Designer is delivered and installed on site. - SUMMARY INFORMATION A. The Substantial Completion date for the TPO Membrane Roofing Subcontractor is as reflected within the Construction Schedule. Special attention should be directed to the Construction Schedule for project sequencing requirements which are a requirement of this Scope of Work. END OF SECTION TRADE PACKAGE SCOPE OF WORK: 07500 TPO MEMBRANE ROOFING SUBCONTRACT Trade Package – 07500 TPO Membrane Roof, Page 3 of 3 This is a Portion of the Complete Trade Package of 3 Pages