PROJECT FACT SHEET COLLEGE OF BUSINESS FACILITY UNIVERSITY OF SOUTH FLORIDA ST. PETERSBURG CONSTRUCTION MANAGER SELECTION PROJECT DESCRIPTION: The proposed project is a multi-functional elevated facility which will include parking underneath on the ground level, classrooms, teaching labs, study areas, offices, auditorium/exhibition spaces, instructional media space, student academic support space and support services space. Technology enhanced classrooms and lecture auditoria will facilitate the instructional needs for the entire College of Business (COB) curriculum and will be constructed using flexible space configurations to meet diverse programmatic requirements. This facility will accommodate our COB currently located in four buildings on the USFSP Campus. This facility is anticipated to be a structure of about 70,000 G.S.F. with a minimum LEED Certification of Silver. The construction costs are expected to be about $20,000,000. The contract for Construction Management services shall consist of a preconstruction phase and a construction phase. The preconstruction services phase, for which the Construction Manager will be paid a fixed fee, will include value engineering, construction analyses, development of cost models, estimating, and the development of a Guaranteed Maximum Price (GMP) at 75% Construction Document phase. Failure to negotiate an acceptable fixed fee for the contract or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the Construction Managers contract. SELECTION CRITERIA: The Selection Committee for this project will evaluate the applications according to the law and the Policies and Procedures of the University of South Florida. Selection of finalists for interviews will be made on the basis of Construction Manager qualifications including applicant’s experience (particularly with College of Business facilities), applicant’s personnel, applicant’s ability to provide service, record-keeping/administrative ability, recording of as-built conditions, critical path scheduling expertise, conceptual cost estimating and cost control ability, quality control capability, etc., and the applicant’s license, bondability and insurability. As part of USFSP’s strategic plan, USFSP made a commitment to foster a diverse community distinguished by a shared purpose, collaboration, open and timely communication, mutual respect, trust, and inclusiveness. USFSP is an equal opportunity institution, and, as such, strongly encourages the lawful use of certified Minority and Women-owned Business Enterprises (“MBEs”) in the provision of design and construction-related services by providing a fair and equal opportunity to compete for, or for participation in, design and/or construction-related services. Finalists will be provided with a draft copy of the building program and any documentation pertaining to the project that has been prepared by the Architect, a list of final interview evaluation criteria, and a copy of the standard USFSP Construction Management Agreement. Finalists shall be requested to provide the Selection Committee with copies of a written summary of their presentation at the conclusion of the interview. SELECTION COMMITTEE: John Dickson Director, Facilities Services University of South Florida St. Petersburg John Trecastelli Assoc. Director, Facilities Planning and Construction Services University of South Florida St. Petersburg Page 1 of 4 Project Fact Sheet Brian Long Project Manager, Facilities Planning and Construction Services University of South Florida St. Petersburg Ron Quincel Maintenance Supervisor, Facilities Services University of South Florida St. Petersburg Michael Luckett Faculty, College of Business University of South Florida St. Petersburg Joneen Maczis Faculty Services Administrator, College of Business University of South Florida St. Petersburg Lena Wray Student Representative University of South Florida St. Petersburg INSTRUCTIONS: Applicants desiring to provide Construction Management services for the project shall submit eight (8) original paper copies of a letter of interest, a completed “USFSP Construction Management Qualification Supplement” (CMQS), dated March, 2011 and all required information within the proposal limits as required in the “Submittal Requirements” of the Project Fact Sheet. Application on any other format or form may not be considered. Proposals must not exceed sixty (60) pages. Pages should be numbered consecutively. Each original CMQS submittal requested must be signed in blue ink by the principal or officer of the firm and notarized with seal. Submittals that do not comply with these requirements or do not include the requested data will not be considered. Submittals are part of the public record and no submittal material will be returned. The Selection Committee may not consider submittals that do not comply with these requirements or do not include the requested data. All applicants must be licensed to practice as Certified General Contractors in the State of Florida at the time of the application. Corporations must be registered to operate in the State of Florida by the Department of State, Division of Corporations, at the time of the application. As required by Section 287.133, Florida Statutes, a Construction Management firm may not submit a proposal for this project if it has been on the Convicted Vendor List for a public entity crime within the past 36 months. The selected Construction Management firm must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $25,000.00 in connection with this project for a period of 36 months from the date of placement on the Convicted Vendor List. The University of South Florida St. Petersburg “Construction Management Qualifications Supplement, dated March 2011” and the Project Fact Sheet may be obtained electronically by contacting: Sandy McFarlin smcfarlin@usfsp.edu Facilities Planning and Construction Services University of South Florida St. Petersburg Page 2 of 4 Project Fact Sheet 140 Seventh Avenue South, TER 100 St. Petersburg, Florida 33701 Telephone: 727-873-4822 Fax: 727-873-4194 It shall be noted that no communication regarding the project shall take place between the applicants and the Selection Committee Members and/or employees of the University of South Florida St. Petersburg, except as provided at the Pre-Submittal Meeting, the request for the CMQS and Fact Sheet, and requests for clarifications. Any project information and/or requests for clarifications prior to the selection of finalists for interviews must be requested either at the Pre-Submittal meeting listed below, or by e-mail in writing to Sandy McFarlin smcfarlin@usfsp.edu. The Selection Committee may reject all proposals and stop the selection process at any time. The Construction Manager shall have no ownership, entrepreneurial or financial affiliation with the selected Architect involved in the project. GENERAL INFORMATION: 1. A Pre-Submittal Meeting will be held at 9:00 a.m. EDT, on Friday, May 25th, 2012, at the University of South Florida St. Petersburg, Davis Hall (DAV), Room 103. Attendance at this Pre-Submittal Meeting is mandatory. The University of South Florida St. Petersburg is located at 140 Seventh Avenue South, St. Petersburg, FL 33701. The Davis Hall (DAV) is located on the USFSP campus at 140 Seventh Avenue South, St. Petersburg, FL 33701. 2. All applicants will be notified of the results of the short listing in writing. Finalists will be informed of the interview date and time. Short listed applicants will be provided with additional project information, if available. 3. The Selection Committee will make a recommendation to the Regional Vice Chancellor of Administrative and Financial Services and the Regional Chancellor of the University of South Florida St. Petersburg. If approved, the recommendation is sent to the Vice President for Business & Finance, University of South Florida for final approval. Upon approval by the Vice President for Business & Finance, University of South Florida, negotiations will be conducted in accordance with Section 287.055, Florida Statutes. 4. All applicants shall submit eight (8) original paper copies of the submittal including the letter of interest, the “USF Construction Manager Qualifications Supplement, dated March 2011” and all required information within the proposal limits as outlined in the “Submittal Requirements” of the Project Fact Sheet, to: John Dickson, Director of Facilities Services University of South Florida St. Petersburg 140 Seventh Avenue South, TER 100 St. Petersburg, FL 33701 5. Submittals must be received by 2:00 p.m. EDT, on Friday, June 8, 2012. Facsimile (FAX) or email submittals are not acceptable and will not be considered. SUBMITTAL REQUIREMENTS: Please type. The entire proposal must be limited to sixty (60) single-sided 8 ½ x 11 pages (or 30 pages front and back), including the CMQS form, the letter of interest, submittal requirements as listed below in the following sections and any additional information, but excluding cover sheets, divider pages (as long as such pages do not include any promotional material, such as proposal language, pictures of past projects, etc.) and Joint Venture Agreements. Number each page consecutively. Provide the number of copies of the submittal specified in the advertisement. Any proposal exceeding 60 pages may be disqualified. The information in the submittal shall be provided in the following SECTIONS and order, and shall be in adherence with the requirements and instructions of the Fact Sheet and the CMQS: SECTION 1: Letter of Interest Page 3 of 4 Project Fact Sheet SECTION 2: SECTION 3: CMQS dated March 2011 Completed and signed Construction Management Qualifications Supplement dated March 2011. Applicant’s License, Corporate Certificate, Bondability and Insurability a. Attach a copy of the current Florida Contractor’s License for the applicant. b. Attach a copy of the current Florida Corporate Charter Certificate c. Attach a letter from a surety company indicating the applicant’s bondability for this project. The surety letter shall include confirmation that the contractor can provide a performance and payment bond for this project with a potential construction cost of approximately $20,000,000, the contractor’s single project bonding limit, and the contractor’s aggregate bonding limit. The surety shall acknowledge that the firm may be bonded for the project, The surety company must be licensed to do business in the State of Florida, must have a Best Rating of “A”, and a required financial size of “Class IX”. d. Attach a letter from an insurance company indicating the applicant’s insurability for the following. TYPE Commercial General Liability Worker’s Compensation Automobile Liability Builder’s Risk SECTION 4: SECTION 5: SECTION 6: SECTION 7: LIMITS OR AMOUNT $1,000,000 per occurrence $2,000,000 aggregate Statutory Limits per Chapter 440, FS $1,000,000 per occurrence $2,000,000 aggregate Replacement value Applicant’s Organizational Chart and Personnel Résumés a. Provide an organization chart that identifies the role and phases of involvement for key personnel that will provide services for this project including consultants. b. Provide a resume that provides experience, ability and qualifications for key personnel and consultants that will provide services for this project including principal in charge, project manager(s), superintendent(s), project engineer(s), etc. Applicant’s Experience Matrix and Additional Information a. Provide a matrix (rectangular arrangement of rows and columns) showing no more than 10 projects (in response to Item #5 of the CMQS, “Applicant’s Experience”, a through j) in rows on the left side of the matrix and the key personnel (in response to Item #4b, key personnel proposed for this project), of the CMQS in columns on the top of the matrix to create a matrix, using an “X” to indicate which projects the key personnel were involved in at the intersections of the rows and columns in the matrix. b. If desired, provide any additional information on the “Applicant’s Experience” projects (a through j) included in response to Item # 5 of the CMQS. Applicant’s Ability to Provide Service a. Provide a brief summary, in a bullet format, that describes how the applicant is going to provide the: (1) Leadership; (2) Management; and (3) Administration required to be successful in the development of the project. b. Provide a brief summary, in a bullet format, that describes your cost control methods for the (1) Design Phase and (2) Construction Phase of project development for a representative project listed in Item #5, “Applicant’s Experience” of the CMQS. c. Provide a brief summary, in a bullet format, that describes the way you maintain quality control during the (1) Design/Pre-Construction Phase and the (2) Construction Phase of project development. d. Provide a brief summary, in a bullet format, that describes your schedule control methods for the (1) Design Phase and (2) Construction Phase of project development for a representative project listed in Item #5, “Applicant’s Experience” of the CMQS. e. Provide a brief summary, in a bullet format, that describes your team’s approach to resolve potential conflicts with the (1) Trade Contractors and (2) Owner. Supplemental Information (If applicable) a. Other Information, as applicable, which shall count as part of the 60 page limit. b. Joint Venture Agreement Information (if applicable) per instructions in Item #6 on page 6 of 8 of the CMQS. A joint venture agreement shall not count as part of the 60-page limit, however, all other information shall count as part of the 60-page limit. Link to USFSP Logos: http://usfweb2.usf.edu/university-communications-and-marketing/marketing/logos/st-petersburg.asp Link to USFSP Maps: http://www.stpete.usf.edu/directions.htm Link to USFSP Strategic Plan: http://www.stpete.usf.edu/strategicplanning/09-13plan.htm Page 4 of 4 Project Fact Sheet