REQUEST FOR PROPOSALS (RFP) TEMPLATE (NON-WORKS) DELETE THIS PAGE BEFORE PUBLICATION) [Instructions and guidence] [Content to be inserted by the Procurement Officer] [Responses to be inserted by the Respondent] In this template the Ministry of Education/School Board of Trustees is to be referred to as “the Buyer” and potential suppliers that have submitted a response are referred to as “Respondents”. Identify the name of the school/college in the Procurement title followed by (the School) or (the College). The specified school/college may then be referred to as “the School” or “the College” throughout the RFP. Content in the RFP must be consistent with the relevant approved Procurement Plan. This template is to be used for: single stage open tenders for (excluding construction works) the second stage of a two stage open tender for goods and or services (closed RFP to Respondents shortlisted from an open Registration of Interest). Prior to publication: 1. delete all unused optional content 2. Ensure all [green] and [yellow] highlighting has been removed 3. update the Contents table: a. right click on contents table b. select “Update table” c. select “Update entire table” d. click “OK” 4. delete the Instructions page 5. make a separate Word document copies of Section 7 Response Form Part A and Section 7 Response Form Part A. Copy and paste Section 7 Response Form Part A and Part B into seperate new Word documents and save as Word documents with the file names: “Response Form Part A [Procurement Title] RFP” and “Response Form Part A [Procurement Title] RFP”. 6. save the whole RFP document (including Section 7: Response Form Parts A and B) as a PDF document with the file name: “[Procurement Title] RFP” 7. save the Proposed Contract as a PDF document with the file name “Proposed Contract for [Procurement Title]” EIS01Jul15 [Insert School Logo or delete] [The Ministry of Education[Or]The Board of Trustees for [Name of School] (the Buyer) Request for Proposals (RFP) [Nature of Services/Goods] for [Nature of the Project] at [Name of School] (the School) [Procurement Title e.g. Design and Engineering services for the Construction of a Four Classroom Block at Bugtown School] [Reference number (if available)] RFP released: [Date] Deadline for Questions: [Time date] Deadline for Proposals: [Time date] Contents This Opportunity .................................................................................................... 4 SECTION 1: Key information ................................................................................... 5 SECTION 2: Our Requirements ............................................................................... 9 SECTION 3: Our Evaluation Approach ................................................................... 12 SECTION 4: Pricing information ............................................................................ 14 SECTION 5: Our Proposed Contract ...................................................................... 15 SECTION 6: RFP Process, Terms and Conditions .................................................... 16 SECTION 7: Response Form Part A: Non-Price Criteria .......................................... 17 SECTION 7: Response Form Part B: Price, Due Diligence and Declaration ............. 20 EIS01Jul15 This Opportunity What we need [The Ministry of Education (the Ministry)] [Or] [The Board of Trustees for [name of school]] (the Buyer) is seeking [description of services (e.g. project management/design/quantity surveying)] for [description of the project] at [name of school] (the School). [Brief summary of the procurement including the background, a description of project, the outcome sought and the form of contract to be used.] Pre-conditions [Optional section: If used, copy from Our Requirements (Section 2)] To be considered for this opportunity you must satisfy all of the following pre-conditions: [pre-condition] [pre-condition]. Respondents that are not able to satisfy all pre-conditions should conclude that they are unable to meet our Requirements and will not benefit from submitting a Proposal. What we don’t want [Brief summary of what is out of scope of this procurement.] What’s important to us [Brief summary of how Proposals will be evaluated including: attributes of a fit for purpose solution Respondent capability (qualifications, experience and track record) Respondent capacity (resources and availability) how Price will be evaluated and best value-for-money over whole-of-life determined.] Why should you bid? [Optional section] [Summary of why potential suppliers should bid for this opportunity.] General Background Information about [name of School] can be found at:[Hyperlink to School website] The Ministry of Education's Education Infrastructure Service (EIS) is responsible for New Zealand's state school property portfolio comprising around 2,300 schools. The New Zealand School Property Strategy (2011-2021) can be found at: EIS01Jul15 SECTION 1: Key information 1.1 Context a. This Request for Proposal (RFP) is an invitation to suitably qualified potential suppliers to submit a Proposal for the supply of [master planning/project management/design/quantity surveying] services. b. Words and phrases that have a special meaning are shown by the use of capitals. Definitions are at the end of Section 6 (RFP Process Terms and Conditions). 1.2 Our timeline a. Here is our timeline for this RFP. Steps in RFP process: Date: Deadline for Questions from potential suppliers [Date] Deadline for the Buyer to respond to questions [Date] [Optional]Deadline to register for a briefing session [Date] [Optional]Deadline to register for a site visit [Date] [Optional]Date of briefing session [one: [location]] [Time][Date] [Optional]Date of briefing session [two: [location]] [Time][Date] [Optional]Date of [site visits] (week starting) [Date] Deadline for Proposals [Time][Date] [Optional]Respondent [presentations/interviews] (week starting) [Date] Unsuccessful Respondents notified of outcome (week starting) [Date] Respondent debriefs, week starting [Date] Anticipated Contract start date [Date] b. All dates and times are dates and times in New Zealand. c. The timeline may be subject to change via notification. 1.3 How to contact us a. The Point of Contact for this RFP is: Name: [Procurement Officer name] Role: Procurement Officer b. All enquiries must be directed to the Point of Contact through the GETS question/answer function. All communications in relation to this RFP will be managed by the Point of Contact. c. By subscribing in GETS to the Tender Notice for this RFP, you will automatically be informed by email of all notifications for this RFP. d. [Either(when briefing sessions will be held)]The Buyer will hold [number] briefing session[s] for potential suppliers on [time/date(s)] at [location(s)]. The purpose of [the] briefing session[s] is to clarify the Requirements as detailed within this RFP. [The/Each] briefing session will be limited to [number] persons per potential supplier. Any additional information made available at [the] briefing session[s] will be communicated by GETS notification to those potential suppliers that have subscribed to the tender notice for this RFP. Potential suppliers wishing to attend a briefing session must register with the Point of Contact by the date detailed in Our timeline (Section 1.2) through the GETS question/answer function with the following Page 5 of 27 information: your organisation’s name names(s) of those attending contact phone number briefing session registering for[If multiple briefing sessions to be held] [Or (when no briefing sessions)]Potential supplier briefing sessions will not be held for this RFP. e. [Either (where site visits are allowed)]Potential suppliers will be given the opportunity for a site visit. Site visits will be limited to [number] persons per potential supplier. Potential suppliers wishing to attend a site visit must register with the Point of Contact by the date detailed in Our Timeline (Section 1.2) through the GETS question/answer function with the following information: your organisation’s name names(s) of those attending contact phone number All Respondents shall be deemed to have inspected the site(s) before submitting their Proposal. [Or (when no site visits)]Site visits are not available for this RFP and potential suppliers must not to access the School for any purposes related to this RFP. 1.4 Developing and submitting your Proposal a. This is [an open/a closed] competitive tender process. This RFP sets out the step-bystep process and conditions that apply. b. Take time to read and understand this RFP. In particular: i. develop a strong understanding of our Requirements (Section 2). ii. in structuring your Proposal consider how it will be evaluated. Section 3 describes our Evaluation Approach. c. For helpful hints on tendering and access to a supplier resource centre go to: www.procurement.govt.nz / for suppliers. d. If anything is unclear or you have a question, ask us to explain before the Deadline for Questions. e. In submitting your Proposal you must use the Response Form provided at Section 7. A Microsoft Word document version of the Response Form is included with the Tender Notice. f. You must also complete and sign the declaration at the end of the Response Form. g. [Optional][Additional instructions e.g. limit on number of pages and font size, format for soft copies etc.] h. Proposals must be submitted through the GETS e-tender box function and are limited in size to 100mb. i. Check you have provided all information requested, and in the format and order asked for. j. Having done the work don’t be late – please ensure you get your Proposal to us before the Deadline for Proposals. 1.5 Address for submitting your Proposal a. Proposals must be submitted electronically through the GETS e-tender box function. To submit a Proposal through GETS: Page 6 of 27 1. be registered as a supplier in GETS 2. subscribe to the Tender Notice for this RFP 3. in the Tender Notice, click “Tender a Response” 4. complete the on-line form, attach your Proposal and click “Commit”. (Respondents will receive an automatically generated email acknowledgement of its receipt from GETS.) b. Proposals submitted other than through the GETS e-tender function may be rejected as non-compliant. c. Respondents must submit Part A and Part B of their Proposal as separate files clearly named: Part A [Respondent name] Proposal - [Procurement title] RFP Part B [Resondent name] proposal - [Procurement title] RFP 1.6 Our RFP Process, Terms and Conditions a. Offer Validity Period: In submitting a Proposal the Respondent agrees that their offer will remain open for acceptance by the Buyer for [number] calendar months from the Deadline for Proposals. b. This RFP is subject to the RFP Process, Terms and Conditions (shortened to RFP-Terms) described in Section 6. We have made the following variations to the RFP- Terms: i. Replace the first sentence of paragraph 6.3b. with, “All requests for clarification must be made through the GETS question/answer function.” ii. Replace the last sentence of paragraph 6.4a. with, ” Respondents submitting a Proposal through GETS will receive an automatically generated email acknowledgement of its receipt.” iii. In paragraph 6.8, replace the term “shortlist” with “select(ion) as preferred”. iv. Replace Paragraphs 6.8b and c. with, “In deciding which Respondent(s) to exclude from further evaluation or select as preferred, the Buyer will take into account the results of the evaluation and may take into account degree to which the Respondent accepts the Proposed Contract and the outcome of due diligence undertaken.” v. In paragraph 6.12, add the following sub-paragraph (6.12e), “If an issue or complaint remains unresolved following best endeavours at resolution with the Buyer’s Point of Contact, the issue or complaint may be escalated by emailing the Ministry’s Education Infrastructure Service Procurement Team: EIS.Procurement@education.govt.nz (Email title: Issue with RFP [Procurement Title - GETS reference number]). vi. Replace the first sentence of paragraph 6.13a. with, “All enquiries regarding the RFP must be directed to the Buyer’s Point of Contact through the GETS question/answer function (except as described in paragraph 6.12e.).” vii. Delete paragraph 6.23c. viii. Replace definition of Respondent with: A person, organisation, business or other entity that submits a Proposal in response to the RFP. The term “Respondent” includes its officers, employees, contractors, consultants, agents, representatives and, in the case of a joint venture, consortium or similar arrangement, the parties to that arrangement. ix. Add definition “the Ministry”: the Ministry of Education. x. Add definition “Named Personnel”: The Respondent’s individual personnel that the Page 7 of 27 Buyer has a Requirement to name in the Contract and who will undertake specific roles for the duration of the Contract (or other timeframe as set by the Buyer). xi. Add definition “Approved ICT Installation Contractors”: An ICT installation contractor that has been approved by the Ministry to work in schools, and is included in the Approved ICT Installation Contractors list published at: ICT Contractors Policy and Procedures xii. Add definition “Tender Notice”: Notification of additions or changes that have been made to a tender that are issued to a potential supplier when the potential supplier has subscribed to the tender through the GETS subscription function. 1.7 Later changes to the RFP or RFP process a. If, after publishing this RFP, we need to change anything about the RFP, or RFP process, or want to provide potential suppliers with additional information, we will let all potential suppliers know by issuing a notice through GETS. By subscribing to the Tender Notice for this RFP, you will automatically be sent notifications of any changes through GETS by email. Page 8 of 27 SECTION 2: Our Requirements [Requirements should be framed in terms of: pre-conditions or absolute requirements (“The Respondent must have...”) strong preference (“The Respondent should have...”) preference (“Preference may be given to Respondents with...”)] 2.1 Project Background a. [Describe the project (of which this procurement is a part) in enough detail to provide potential suppliers with the context to the procurement and to in turn enable a clear understanding of the overall Requirements. May include: history to the project: what has lead to the project being undertaken the overall outcome sought overview of the programme of which this project is a part indicative budget timeframes scope/nature of the project (e.g. size, new build, refurbishment, remediation, description of the site) how this procurement fits into the overall procurement strategy for the project how other elements of the project have been or will be procured.] 2.2 Pre-conditions[Optional section] [Pre-conditions are mandatory Requirements. They must be polar (yes/no) relevant, demonstrable, not open to interpretation and not reversible once the tender closes. Any Respondent/Proposal that does not meet all pre-conditions must be excluded from further evaluation. Pre-conditions must be limited to: legal or financial capacity commercial or operational capacity or capacity to deliver appropriate technical skills or expertise or relevant experience Examples of pre-conditions include: minimum qualification and/or membership of professional body minimum level of relevant recent experience health and safety certification minimum availability Requirements (e.g. must be able to commence on the intended start date) minimum capacity Requirements.] a. To be considered for this opportunity Respondents/Proposals must satisfy all of the following preconditions: [pre-condition] b. Those Respondents that are not able to satisfy all pre-conditions should conclude that they are unable to meet our Requirements and will not benefit from submitting a Proposal. c. Proposals that are evaluated to have not met all of the pre-conditions will be excluded from further evaluation. 2.3 Required solution a. [Describe the Requirements to be supplied including: whether project management, design, engineering or quantity surveying services what is to be constructed Page 9 of 27 outcomes sought deliverables (e.g. plans) the scope of engagement site considerations timeframes]. b. [Optional: to be included if the services relate to Information and Communication Technology (ICT) network installation][The Project includes the Requirement for the following Information and Communication Technology (ICT) network design/products/installations: [structured cabling (cabling and connectivity constructed according to standardised rules to facilitate integration of voice, data, video, and other signals) product supply and installation services] [and/or] [wireless integration services product supply and installation services]. [ICT Network design, products and installations must comply with the Ministry’s ICT Cabling Infrastructure Policy and Standards for Schools and the Supplier must sub-contract ICT installation to one of the Ministry’s Approved ICT Installation Contractors (All Ministry approved ICT Installation Contractors have been police vetted). Any change to ICT network design must approved by the Ministry prior to installation.] c. The supplier will be required to comply with the requirements and recommendations of the Health and Safety in Employment Act: 1992 and any subsequent amendments. The Supplier’s personnel will be responsible for Health and Safety compliance on site. While work is in progress, the project panager and/or an outside agency may randomly audit health and safety procedures. Asbestos discovery is to be notified to the project manager and/or the Buyer immediately and relevant Worksafe protocols must be followed. Any accident, incident or near miss must be notified to the project manager and/or the Buyer immediately. d. [To be included if the engagement is likely to involve unsupervised access to students at the School during normal school hours for that school][All Supplier’s personnel (including those of all subconsultants) accessing the School during normal school hours [time am – time pm][normal school hours for that School]will be required to be police vetted (a review by the school Board of Trustees of a person’s criminal conviction information held by the New Zealand Police Licensing and Vetting Service Centre). An adverse police vetting may result in the vetted person being refused access to the School.] e. The supplier will be required to maintain the following insurance: Public Liability insurance of no less than $5,000,000 per occurrence [CCCS (over $50,000)] Professional Indemnity insurance of no less than five times the fee with a maximum of $2,000,000 [CCCS (over $50,000)] which must be maintained for a minimum of six years after completion of the services. f. [Optional: to be included if the engagement involves design services][Design must comply with the Ministry’s Development Compliance Framework (DCF), the Property Strategy 2011-2021 and Property Management Policies for safe, flexible and inspiring learning environments as set out at State Schools Design Standards, including: access for students with special education needs acoustics Building Warrant of Fitness (BWOF) environmental best practice guidelines for schools fire safety and design heating and ventilation health and safety in schools code of practice Page 10 of 27 weather-tightness requirements durability energy efficiency. Modern Learning Environments (MLE) design design quality requirements.] 2.4 Capability a. [The capability (skills and expertise) required by the Respondent in terms of specific skills and expertise (refer to specification where available) as evidenced by: membership of professional body/association relevant certification/accreditation or similar the nature and amount of recent experience relevant to the current procurement e.g. no less than three years recent experience undertaking projects of a similar size/nature to the Requirements][experience with a particular school or with schools in general cannot be specified. As an alternative, consider stating “Preference may be given to Respondents with experience delivering works of a similar nature/size in institutional or comparable settings”] track record. b. [Optional] The Requirement for Named Personnel (e.g. Lead Architect) and the capability (skills and expertise) Requirements as evidenced by: minimum qualifications and/or membership of professional body/association relevant certification/accreditation or similar the nature and amount of experience recent relevant experience.] track record. 2.5 Capacity a. [The resource requirements (e.g. suitable personnel) and the availability of those requirements in relation to the timeframe requirements (including for Named Personnel)] b. [Optional][Contingency Requirements for ensuring that sufficient resources will be available throughout the engagement to ensure full delivery by the anticipated completion date.] 2.6 Contract term a. It is anticipated that the Contract will commence [Date]. b. The Contract will expire upon completion (once all deliverables have been delivered), anticipated to be [Date] or as agreed with the Supplier. 2.7 Documents a. Documents attached to the GETS Tender Notice for this RFP and which form part of this RFP are: RFP (pdf) Response Form Part A (Word document) Response Form Part B (Word document) Proposed Contract [Other (specify)] Page 11 of 27 a. SECTION 3: Our Evaluation Approach 3.1 Evaluation model a. Proposals will be evaluated and scored against the criteria listed below using a weighted attribute evaluation method. 3.2 Pre-conditions[Optional section] a. [Respondents/Proposals must meet all pre-conditions listed in Our Requirements (Section 2). If in the Ministry’s assessment a Respondent/Proposal does not meet any pre-condition, it will be excluded from further evaluation. Only those Proposals that meet all pre-conditions will be evaluated further. Other parts of the Proposal may inform the Buyer’s decision as to whether a pre-condition has been met.] 3.3 Evaluation criteria Value for money will be ascertained through evaluation of [Price and] the following criteria: [Evaluation criteria must not be amended. Approval of EIS Procurement is required to amend criteria weightings.] Criterion Weighting Proposed Solution (Comprehensiveness, deliverability and robustness, understanding of the requirements) goods/services/deliverables Method and approach Systems and processes 30% Relationship management Health and safety Risk management [if relevant] [coordination/management of sub-consultants] Capability (skills and expertise of the Respondent/Named Personnel/sub-consultants) Qualifications/professional memberships/certifications/accreditations Experience 15% Track record [optional if relevant] [experience working with sub-consultants] Capacity (Resource requirements of the Respondent/Named Personnel/subconsultants]) Sufficiency of resources 15% Availability of resources Sufficiency of back-up resources (contingency) Price 40% Page 12 of 27 100% 3.4 Scoring a. The following scoring scale will be used in evaluating Proposals. Scores by individual panel members may be modified through a moderation process across the whole evaluation panel. Rating Definition Score EXCELLENT Exceeds the criterion to provide substantial additional benefit and/or reduction of risk 9-10 GOOD Exceeds the criterion to provide some additional benefit and/or reduction of risk 6-8 ACCEPTABLE Meets the criterion 5 MINOR DEFICIENCY Does not meet the criterion due to minor deficiency or risk MAJOR DEFICIENCY Does not meet the criterion due to major deficiency or risk UNACCEPTABLE Does not comply, insufficient information provided or unacceptable deficiency or risk 3-4 1-2 0 b. A Proposal/Respondent may be excluded from further evaluation and/or selection if it scores less than five (a rating of less than acceptable as described in paragraph 3.4a) for any one or more of the evaluation criteria. 3.5 Price a. The Buyer seeks to obtain the best value-for-money over whole-of-life. This means achieving the optimal outcome for the appropriate price. b. [Detail how Price will be analysed in order to determine a single comparable Price for each proposal] [E.g. “Respondents will be required to propose a single fixed Price” or “ Respondents rates will be applied to the following scenario in order to determine a single Price: (Role A rate x 20 hours) + Role B rate x 45 hours)] c. Proposal Price will be scored (out of 10) using the following formula: Proposal A’s score = (Lowest Proposal Adjusted Price / Proposal A’s Adjusted Price) x 10 d. If a Respondent offers a Price that is substantially lower than other Proposals (an abnormally low bid), the Buyer may seek to verify with the Respondent that the Respondent is capable of fully delivering all of the Requirements and meeting all of the conditions of the Proposed Contract for the Price quoted. 3.6 Optional evaluation process and due diligence a. In addition to the evaluation of Proposals, the following process and due diligence may be undertaken with one or more Respondents and the results may be taken into account in the evaluation process: reference checks Respondents interviews and/or presentations other checks against the Respondent e.g. Credit check, Companies Office inspection of Respondent’s audited accounts Police vetting of Respondent’s personnel. Page 13 of 27 SECTION 4: Pricing information 1.1 Pricing information to be provided by Respondents a. [To be added] Page 14 of 27 SECTION 5: Our Proposed Contract 5.1 Proposed Contract a. The Proposed Contract ([contract type e.g. CCCS]) is attached to the GETS Tender Notice for this RFP. b. Key terms and conditions of the Proposed Contract include: insurance levels [all changes to the standard terms of contract templates] [other]. c. The Buyer’s strong preference is that Proposals do not contain proposed amendments to the Contract. However, if a Respondent does wish to include proposed amendments, these must be detailed in the Section 6 of the Response Form (Part B). d. The Buyer is not required to accept any proposed amendment. e. The Buyer may, at its sole discretion, assign a premium to a Proposal in respect of the acceptance of any proposed amendment that the Buyer considers alters the risks, benefits or cost of the proposed Contract. Page 15 of 27 SECTION 6: RFP Process, Terms and Conditions RFP Process, Terms and Conditions can be found at RFP Process Terms and Conditions. Page 16 of 27 SECTION 7: Response Form Part A: Nonprice Criteria [QUESTIONS IN SECTION 7 (RESPONSE FORM) OF THE RFP TEMPLATE ARE SAMPLES ONLY AND MUST BE AMENDED/ADDED TO/DELETED TO SUIT THE REQUIREMENTS OF THE PROCUREMENT. THERE MUST BE AT LEAST ONE QUESTION FOR EACH EVALUATION SUB-CRITERIA (EXCEPT UNDERSTANDING OF THE REQUIREMENT AND TRACK RECORD).] PART A AND PART B OF THE RESPONSE FORM MUST BE SUBMITTED AS SEPERATE DOCUMENTS [Procurement Title and Reference number (if available)] Respondent name [Respondent’s trading name] 1. Proposed Solution 1.1 Outline the your proposed solution including how it will achieve the outcome sought. Weighting: 40% [Answer] 1.2 Describe the systems and processes to be employed to deliver the proposed solution [Answer] 1.3 Describe how the relationship between the Respondent (you/your organisation) and the Buyer will be managed during the engagement including: name of the account manager contact points and availability accountabilities issue resolution and escalation process regular meetings [Answer] 1.4 Describe how it is intended that progress will be measured and reported including: proposed key performance indicators nature and frequency of reporting [Answer] 1.5 Detail the significant risks associated with the Requirements and your proposed solution and describe the proposed treatment for each (how each risk will be eliminated, minimised and/or managed). EIS01Jul15 [Answer] 1.6 Confirm that you will meet all health and safety requirements detailed in our Requirements. If unable to confirm, provide an explanation. Append a copy of your organisation’s Heath and Safety Plan template. [Confirmed / Not Confirmed: [Explanation]] 1.7 Describe how sub-consultants will be coordinated/managed [Answer] 1.8 [Optional to be included if the engagement relates to ICT cabling installation]Confirm that ICT Network design, products and installations will comply with the Ministry’s ICT Cabling Infrastructure Policy and Standards for Schools. If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 1.9 [Optional to be included if the engagement involves design services]Confirm that design will comply with the Ministry of Education’s Development Compliance Framework (DCF), the Property Strategy 2011-2021 and Property Management Policies for safe, flexible and inspiring learning environments as set out at State Schools Design Standards. If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 2. Capability Weighting 15% [For closed RFP with Respondents short-listed from an open ROI] [This section provides the opportunity for you to update/supplement information provided in their ROI Response (If there is no updated/supplementary information, respond with “N/A”] 2.1 [Single stage open RFP only (for two stage ROI/RFP processes, this question should be in the preceding ROI)] Provide an overview of your organisation’s relevant capability (skills and expertise) including: ownership / management structure main and secondary areas of business history of the organisation including number of years of operating in the relevant market membership of relevant professional bodies/associations relevant certifications/accreditations. [Answer] 2.2 [Single stage open RFP only (for two stage ROI/RFP processes, this question should be in the preceding ROI)]Provide an overview of the your organisation’s experience within the last Page 18 of 27 [number] years with delivering engagements of a similar nature to the Requirements including (for each engagement): the customer’s names dates and locations a brief description of the project a brief description of what your organisation delivered [Answer] 2.3 Nominate personnel for the following specific roles (Named Personnel). For each Named Personnel, append a curriculum vitae to your Proposal that includes: full name relevant qualifications/certifications/accreditation membership of relevant professional bodies/associations a brief overview of their recent employment history including: o employers and locations o dates employed o roles and responsibilities an overview of engagements within the last [number] years undertaken the specific role or similar including a brief description: o the project o the Named Personnel’s responsibilities, duties and degree of involvement. [List the specific roles for which the Respondent is required to nominate a Named Personnel] [e.g. Lead Architect] [Answer] [e.g. Quantity Surveyor] [Answer] 2.4 Identify those services to be undertaken directly by your organisation and those to be undertaken by sub-consultants. Identify the sub-consultants proposed for these services, their relevant experience, key Named Personnel and experience of successful working with your organisation. [Answer] 3. Capacity Weighting 15% [For closed RFP with Respondents short-listed from an open ROI] [This section provides the opportunity for you to update/supplement information provided in their ROI Response (If there is no updated/supplementary information, respond Page 19 of 27 with “N/A”] 3.1 Outline your plan for ensuring that sufficient suitable personnel will be available to fully deliver the Requirements by the anticipated completion date including: what resources to be assigned to deliver the Requirements (including numbers and whether your personnel or sub-consultants) any recruitment required to meet capacity Requirements and associated risks scalability of resources back-up resources (contingency planning). [Answer] 3.2 Detail potential resource constraints or circumstances that may affect your capacity to deliver the Requirements by the anticipated completion date (e.g. other engagements/contracts). [Answer] 3.3 For each Named Personnel, confirm their availability as detailed in our Requirements. If unable to confirm provide an explanation. [List the Specific Roles for which the Respondent is required to nominate Named Personnel e.g. e.g. Lead Architect [Availability Confirmed/Not Confirmed: [Explanation]] e.g. quantity Surveyor] [Availability Confirmed/Not Confirmed: [Explanation]] [Answer] 3.4 [For closed RFPs following open ROI only] Detail any changes to capacity that may have occurred since submission of your ROI response (e.g. changes to resource availability resulting from recently accepted engagements/commitments). [Answer] SECTION 7: Response Form Part B: Price, Due Diligence and Declaration PART A AND PART B OF THE RESPONSE FORM MUST BE SUBMITTED AS SEPERATE DOCUMENTS [Procurement Title and Reference number (if available)] 1. Respondent’s Details Respondent name: [Respondent’s trading name] Full legal name (if different) [Legal name] Physical address [Main or head office] Page 20 of 27 Postal address [E.g. P.O Box address] Registered office [Registered office if applicable] Business website [URL] Type of entity (legal status) [E.g. sole trader/partnership/limited liability company] Registration number [Company registration number if applicable] Country of residence [Country where the Respondent is resident for tax purposes] GST registration number [NZ GST number OR Overseas based] 2. Joint Venture / Consortium or similar arrangement (leave blank if not applicable) Type of arrangement [Type of arrangement] Participants [Names of organisations participating in the arrangement] Details [Any other relevant information such as name of lead organisation, history] 3. Respondent’s Contact Person Contact person [Full name of the person authorised to represent the Respondent] Title/position [Title/position of the person authorised to represent the Respondent] Telephone number [Area code - number] Mobile number [Prefix - number] Email address [Email address] 4. Pre-conditions [Optional Section] Respondents that do not meet all pre-conditions should conclude that they are unable to meet the Requirements and will not benefit from submitting a Proposal. Any Respondent that the Buyer determines does not satisfactorily meet all of the pre-conditions will have their Proposal excluded from further evaluation. 4.1 [pre-condition] 5. Price 5.1 Meets or does not meet the pre-condition [Yes / No] Weighting 40% Provide the total Price for the full delivery of all Requirements and including a breakdown of all costs, rates, fees, expenses and associated charges. [Answer] Page 21 of 27 6. The Contract 6.1 Confirm your full acceptance of the Proposed Contract. If unable to confirm, detail all proposed amendments you wish to make and including the impact on price and the delivery of the Requirements. [[Confirmed / Not Confirmed: For each endorsement listed, you must provide the following detail: reference to the Proposed Contract clause at issue a full describe of the endorsement the reason for requesting the endorsement.] 7. Assumptions 7.1 State any assumption you have made in preparing your Proposal. Where an assumption may influence the Price, state how the assumption will impact of on the Price. [Answer] 8. Referees [For closed RFPs following open ROI, delete if referees have been requested in the preceding ROI] Supply the details of two referees from the list of your customers detailed in Part A Question 2.2. You must ensure that the referees have agreed to be referees and are aware that they may be contacted by the Buyer. By providing these contact details you authorise the Buyer contacting these referees, collecting information about your organisation and using such information for the evaluation (including due diligence) of your Proposal. You also agree that information provided by referees will be confidential to the Buyer. Referee One Organisation name [Organisation name] Contact name: [Contact name] Telephone [Contact telephone number] Email [email address] Referee Two Organisation name [Organisation name] Contact name [Contact name] Telephone [Contact telephone number] Email [email address] 9. Insurance Page 22 of 27 9.1 Confirm that for this engagement the you will maintain Public Liability insurance of no less than $5,000,000 per occurrence [CCCS (over $50,000)] If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 9.2 Confirm that you maintain Professional Indemnity insurance of no less than five times the fee with a maximum of $2,000,000 per occurrence [CCCS (over $50,000)] If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 10. Due Diligence The Buyer may undertake checks to assess the risk of entering into a Contract with a Respondent. A Proposal may be excluded from further evaluation or selection as preferred if the Buyer determines that entering into a Contract with a Respondent represents a significant risk to the Buyer. In this section “the Respondent” includes any joint venture/consortium participant as listed in Section 2. 10.1 Confirm that there are no events, matters or circumstances, actual, contemplated or threatened, that have or may represent a risk to the Buyer or affect the Respondent’s its ability to successfully perform the Contract including (but not limited to): 10.1..1 actions of insolvency proceedings, bankruptcy, administration (voluntary or otherwise), statutory management, compulsory winding up, receivership or similar 10.1..2 legal proceedings, investigation or the threat of investigation by any regulatory or investigative authority such as the Commerce Commission, Serious Fraud Office or the Financial Markets Authority 10.1..3 structural/ownership changes (e.g. merger, sale, restructure) 10.1..4 disputes (e.g. union dispute, legal dispute, court action) 10.1..5 legal proceedings, investigation or the threat of investigation by any regulatory or investigative authority such as the Commerce Commission, Serious Fraud Office or the Financial Markets Authority 10.1..6 being declared a threat to national security or the confidentiality of sensitive government information 10.1..7 being designated as a terrorist by New Zealand Police. If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 10.2 Confirm that your organisation is not a “phoenix” organisation or similar (an organisation which has an association with (e.g. common directors/shareholders) or that is used to take on the business of a failed organisation or an organisation considered to have a poor reputation). If unable to confirm, provide an explanation including the name of the organisation from which your organisation is a phoenix organisation. [Confirmed / Not Confirmed: [Explanation]] Page 23 of 27 10.3 Confirm that that no director, principal or Named Personnel of the Respondent: 10.3..1 Is the subject of any legal proceedings, investigation or the threat of investigation by any regulatory or investigative authority such as the Commerce Commission, Serious Fraud Office or the Financial Markets Authority 10.3..2 has been convicted of a criminal offence related to business or professional conduct 10.3..3 has been declared to be bankrupt, in receivership or liquidation 10.3..4 has made a false declaration 10.3..5 has had a serious performance issue in relation to a previous contract 10.3..6 has been convicted of professional misconduct or any serious crime or offence (or has any pending) 10.3..7 has performed an act or omission which has adversely reflected on the commercial integrity of the Supplier 10.3..8 has failed to pay taxes, duties or other levies 10.3..9 has been declared a threat to national security or the confidentiality of sensitive government information 10.3..10 is not a person or organisation designated as a terrorist by New Zealand Police. If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 11. Police Vetting [To be included if the engagement is likely to involve unsupervised access to students at the School during normal school hours for that school] 11.1 Confirm that all of the your personnel (including those of all sub-consultants) accessing the School during normal school hours [time am – time pm] [normal school hours for that school] have agreed to being police vetted (a review by the school Board of Trustees of a person’s criminal conviction information held by the New Zealand Police Licensing and Vetting Service Centre)(An adverse police vetting may result in the vetted person being refused access to the School). If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 12. 12.1 Conflicts of Interest Confirm that you are not aware of any circumstance that may represent an actual, potential or perceived Conflict of Interest between your interests and the Respondent’s duties and responsibilities in delivering to the Requirements. If unable to confirm provide an explanation. [Confirmed / Not Confirmed: [Explanation]] 12.2 Confirm that you are not aware of any of the Buyer’s personnel having any interest in, or association with you that may give rise to any perceived, potential or actual Conflicts of Interest. If unable to confirm, provide an explanation. [Confirmed / Not Confirmed: [Explanation]] Page 24 of 27 Page 25 of 27 13. Respondent’s Declaration Subject Declaration Declaration 13.1 RFP Process, Terms and Conditions I have read and fully understand this RFP, including the RFP Process, Terms and Conditions (shortened to RFP-Terms detailed in Section 6, as amended by Section 1, paragraph 1.6) and related notifications (notices and clarifications). I confirm that the Respondent agrees to be bound by them. [Agree/Disagree] 13.2 Collection of further information The Respondent authorises the Buyer to: [Agree/Disagree] a. collect any information about the Respondent, except commercially sensitive pricing information, from any relevant third party, including a referee, or previous or existing client b. use such information in the evaluation of this Proposal. The Respondent agrees that all such information will be confidential to the Buyer. 13.3 Requirements I have read and fully understand the nature and extent of Our Requirements (Section 2). I confirm that the Respondent has the necessary capability and capacity to fully meet or exceed the Requirements. [Agree/Disagree] 13.4 Ethics In submitting this Proposal the Respondent confirms that it: [Agree/Disagree] a. has not entered into any improper, illegal, collusive or anti-competitive arrangements with any Competitor b. has not directly or indirectly approached any representative of the Buyer (other than the Point of Contact) to lobby or solicit information in relation to the RFP c. has not attempted to influence, or provide any form of personal inducement, reward or benefit to any representative of the Buyer. 13.5 Offer Validity Period I confirm that this Proposal, including the Price, remains open for acceptance for the Offer Validity Period stated in Section 1, paragraph 1.6. [Agree/Disagree] 13.6 Conflict of Interest declaration All Conflicts of Interest that the Respondent is aware of have been reported in the Conflict of Interest Section of the Response Form. Where a Conflict of Interest arises during the RFP [Agree/Disagree] Page 26 of 27 process the Respondent will report it immediately to the Buyer’s Point of Contact. DECLARATION I declare that in submitting the Proposal and this declaration: a. the information provided is true, accurate and complete and not misleading in any material respect b. the Proposal does not contain Intellectual Property that will breach a third party’s rights c. I have secured all appropriate authorisations to submit this Proposal, to make the statements and to provide the information in the Proposal and I am not aware of any impediments to entering into a Contract to deliver the Requirements. d. I understand that the falsification of information, supplying misleading information or the suppression of material information in this declaration and the Proposal may result in the Proposal being eliminated from further participation in the RFP process and may be grounds for termination of any Contract awarded as a result of the RFP. By signing this declaration the signatory below confirms that he/she has been authorised by the Respondent to make this declaration on its behalf. Signature: [Signature of the person authorised to represent the Respondent] Full name: [Full name of the person authorised to represent the Respondent] Title/position: [Title/position of the person authorised to represent the Respondent] Respondent name: [Respondent’s trading name] Date: [Date] 14. Respondent Checklist 14.1 All sections of the Response Form have been completed. 14.2 Parts A and B of the Response Form are to be submitted as separate documents 14.3 14.4 14.5 The Respondent’s Declaration has been completed and signed by the person authorised to represent the Respondent The following additional material has been included with the Proposal: [Curriculum vitae for each Named Personnel] [Other]. Referees detailed in the Proposal have agreed to be referees and are aware that they may be contacted by the Buyer. Page 27 of 27