Issue WHAT. Describe operational need the item will fill. Summarize general program approach. Maximize use of commercial products, processes at all levels—system thru component All key performance requirements included in spec, with methods to determine compliance WHEN. Schedule. Include development time, testing, training, required fielding dates, expected life of item once fielded, length of any anticipated CLS. Trade off desired performance Comes From: Section IPT Notes Program Summary. Requirement Document Performance Spec Market Research/ Commerciality Determination Requirements Document/ User Input Market Research Results IPT Input Program Structure. Attach pictorial schedule showing key program events. [Blank Schedule at end of template] to use available commercial items when time or cost are critical constraints Put unmet user needs back into tech base for later upgrade 03/07/16 Acquisition Strategy and Milestone Decision Documentation – Exercise – MMAP II 6E-1 Issue WHO. Sources. Assess possible sources’ impacts on cost, performance, schedule risks and resulting risk management approach. Best sources may not always propose. Assess methods to encourage contractor interest in proposing. Tailor approach to likely sources. Quality sources with experience & good past performance require less oversight. HOW. Risk Management. Determine and analyze risk areas. Describe strategy to track and mitigate key risk drivers. Tailor risk management to likely sources. Past performance is a key risk reduction measure IPTs and partnering reduce risk by raising issues early for team resolution Consider using AMC Function Support Templates (AMC Pam 70-25) as aids. 03/07/16 Comes From: Section IPT Notes Program Structure. Ž Buy Commercial or Operational Requirements Document Market Research Results Commerciality Determination Design: Ktr Gov’t Develop:Ktr Gov’t Test: Ktr Gov’t Maintain: CLS ICS Gov’t Program Structure. Market Research Results AMC Pamphlet 70-25 templates, if used Acquisition Strategy and Milestone Decision Documentation – Exercise – MMAP II 6E-2 Issue Test and Evaluation. Integrate T&E into program to ensure item meets need and to provide sufficient info for MDA decisions Section IPT Notes Program Structure. Performance specification Market Research Results Combine governmentcontractor T&E, contractor certifications and warranties to eliminate unnecessary or redundant testing. Government tests only critical performance issues that define program success Test to degree of certainty MDA needs for sound decision. Contract Approach. For current and subsequent program phases. Consider competition, component breakout Comes From: Use of good performance spec increases competition Integrate component breakout decision in early program planning Limit evaluation factors to key discriminators; include cost & past performance always 03/07/16 Contracting Strategy: Requirement Document Commerciality Determination FAR Best Value Low Bid Competitive Sole Source Cost Fixed Price Acquisition Strategy and Milestone Decision Documentation – Exercise – MMAP II 6E-3 Issue HOW MUCH. Quantities required. Include items required/ anticipated for R&D, T&E, LRIP, and production Comes From: Requirements Document Section IPT Notes Program Structure. ____ Development Items or Prototypes ____ Total Items ____ Years of Support Other _______________ _______________ 03/07/16 Acquisition Strategy and Milestone Decision Documentation – Exercise – MMAP II 6E-4 Acquisition Program Baseline This document comprises the approved baseline for the program. Our intent is that the program be managed within the performance, schedule, and financial constraints identified here. We agree to support the required funding in the Planning, Programming, and Budgeting System (PPBS). This baseline contains the key performance, schedule, and cost parameters that are the basis for satisfying the identified mission need. It is a summary document, and does not include detailed program requirements or content. As long as the program is being managed within the framework established by this baseline, in-progress reviews will not be required. __________________________________________ Program Manager Date: __________________________________________ Milestone Decision Authority Date: 3/7/2016 Acquisition Strategy and Milestone Decision Documentation – Exercise – 6E-5 MMAP II REFERENCE: SECTION A: PERFORMANCE Performance DEVELOPMENT BASELINE Approval Date:____________ Threshold/Objective/ 3/7/2016 REVISED BASELINE/ PROGRAM REVIEW Approval Date:____________ Threshold/Objective CONTRACT SPECIFICATION For Information Only Acquisition Strategy and Milestone Decision Documentation – Exercise – 6E-6 MMAP II SECTION B: SCHEDULE Schedule DEVELOPMENT BASELINE Approval Date:____________ Threshold/Objective 3/7/2016 REVISED BASELINE/ PROGRAM REVIEW Approval Date:____________ Threshold/Objective CONTRACT SPECIFICATION For Information Only Acquisition Strategy and Milestone Decision Documentation – Exercise – 6E-7 MMAP II SECTION C: COST DEVELOPMENT BASELINE Cost Approval Date:____________ Threshold/Objective REVISED BASELINE/ PROGRAM REVIEW Approval Date:____________ Threshold/Objective CONTRACT SPECIFICATION For Information Only BASE YEAR $ (FY) Total RDTE Total Procurement Cost Total MILCON Total O&S Average Unit Procurement Cost (FY Constant $) Total Procurement Quantities ACRONYMS: 3/7/2016 Acquisition Strategy and Milestone Decision Documentation – Exercise – 6E-8 MMAP II