Computer Science Project Seminar CSC 400 Vincenzo Cassella 7 March 2016 Project Progress Report For Vacation Property Management Cassella, Page 2 of 5 Statement of Project Vacation property management project provides a sophisticated commercial web site that will give the client the international exposure that GetawayToPlaya.com, will need to attract new clients. Management tools will be provided for administration of the sales and rental properties. This web management tool incorporates a data base of all available properties (rentals and sales), a link that will introduce a calendar of availability of the specific rental properties with a pricing according to season, weekly or daily pricing, a list of contacts, and a general description of the area. This project incorporates two Microsoft office applications, Front Page® and Microsoft’s Office Access®. The web pages will utilize Microsoft Front Page® and the data base that incorporates the web pages is Microsoft’s Office Access®. Progress To Date The progression of the project is actually, at this point, ahead of the tentative schedule. The gathering of the initial information is complete and on schedule and ninety percent of all images that are required has been collected. Seventy-five percent of the web pages have been designed and therefore, if there is a delay in the designing phase, the time allotted for the gathering of images will compensate for the time lost in the design stage. The creation of the database phase is in its initiate stage, ahead of schedule. At the present, the first phases are tentively ahead of schedule so that the progression of the project has more time for the coding phase. Cassella, Page 3 of 5 Difficulties Project Difficulties: The difficulties associate with this project is that the designer has the lack of knowledge with designing a web site, databases, and most importantly binding the web site and the database to become seamlessly unified. The initial phase of designing a web page was an uneasy task due to the lack of knowledge of the designer designing a web site and binding it to some type of database. Another difficulty that must be addressed is that the designer is very unfamiliar with data bases. Implementation of Microsoft’s Office Access® will become a time consuming undertaking. Binding the web site with a database, which in the view of this writer, is the most difficult element of the project only for the reason of the designer’s lack of knowledge of HTML, SQL (Structured Query Language used for data bases) and the web site and the database must work seamlessly. Encountered Difficulties Designing of the web pages have been, to this point, relatively easy due to the fact that there is forth generation software (Microsoft Front Page®) that made implementation easy without having to learn HTML (Hypertext Markup Language). Nevertheless, some HTML coding will be needed to manipulate the web pages, although, it should not be a problem. Anticipated Difficulties Cassella, Page 4 of 5 Time is the only anticipated difficulty that afflicts this project. With the scope of the project and other academic considerations this designer will stay ahead of schedule in order to compensate for the latter more difficult phase. Work Remaining The work remaining consists of designing the database with incorporated correct fields. Designing Web Pages, as earlier stated will be completed in advance of the schedule. The Coding will seize most of the remaining time scheduled. A detailed outline shall be presented November 22, 2004. and to conclude the project a manual detailing the procedures of the project and the final manuscript shall be presented December 16, 2004. Project Schedule Tentative Scheduling Start Finish Generation of Project 09/28/04 12/16/04 Gather initial information 08/31/04 09/23/04 Final Progress Schedule 09/24/04 10/07/04 Gather All Images 09/27/04 11/24/04 Design Web Pages 10/08/04 11/24/04 Design database 11/26/04 12/10/04 Coding 11/30/04 12/10/04 Detailed Outline 11/12/04 11/22/04 Cassella, Page 5 of 5 Project Presentation 11/22/04 12/16/04 Finalizing Manuscripts 12/03/04 12/14/04 Manual 12/12/04 12/15/04 In-Class Demos 12/10/04 12/16/04 Project Presentation 12/03/04 12/16/04 Final Manuscript Milestones 12/16/04 12/16/04 All change that have been made is to allow time to reference the coding needed to seamlessly finalize the project. Commentary At this moment in time, the project is progressing ahead of schedule without the much anticipated need to gain knowledge of new coding. The time saved not having to acquire text and learn to implement the necessary features has made this project an enjoyable learning experience.