CURRICULUM VITAE A. Noordheen Muttanchetty Post, Namakkal – 637013, India +919600797347 noordheen@hotmail.com CARRIER OBJECTIVE A position using proven skills and seeking responsible assignments in a career where the job demands challenging efforts and where professional skills will be the prime motive towards the success of personal and organizational goals CARRIER PROFILE More than 12 years experience in the field of Inspection in Pipeline welding, NDT, Tank Fabrication & Erection welding, Structural steel fabrication & Erection welding, Equipment installation & commissioning from various Organizations. Familiar with several international CARRIER PROFILEcodes like API 650,1104, ASME Sec IX, B31.3, B31.1, 31.4. Goal oriented individual, Organized, Motivated, Problem solver and hard worker. EDUCATIONAL QUALIFICATION Passed Diploma in Mechanical Engineering with FIRST class from M.I.E.T. Polytechnic Trichy, India April - 1996 CERTIFICATION Passed AWS - Certified Welding Inspector AWS/CWI Certificate No. : 09012101 Passed CSWIP 3.1 - Level 2 Welding Inspector CSWIP 3.1 level 2 Certificate No. : 48342 ASNT Level II Certification in MT, PT, RT & UT ASNT Level II Certification in Radiographic Testing Film Interpretation (RTFI) PIPING ENGINEERING Certification from Kagira Drawing Solution PERSONAL PROFILE NAME FATHER’S NAME DATE OF BIRTH MARITAL STATUS NATIONALITY RELIGION PASSPORT NO PP DATE OF EXPIRY LANGUAGES KNOWN DRIVING LICENSE : A. Noordheen : N. Abdul Latheef : 11-07-1976 : Married : Indian : Muslim : Z 1162008 : 22-September-2015 : Speak, Read & Write in English & Tamil Speak in Hindi & Urdu : Driving License for Saudi Arabia valid up to May 2013 Driving license for India valid up to July 2019 Page 1 of 4 RECENT PROJECTS WORKED CLIENT PERIOD COMPANY PROJECT : Royal Commission for Jubail & Yanbu, Saudi Arabia/ Azmeel / Saudi Tumpane : December 2009 to April 2010 : Engineers & Contractors Corporation Saudi Lebanese co., : COMMUNITY SITE DEVELOPMENT 1. Welding inspection of 2 x 12,000 m3 Volume capacity Steel Tanks fabrication & erection including station piping, Jubail, Saudi Arabia. CLIENT PERIOD COMPANY PROJECT : Saline Water Conversion Corporation (SWCC), Saudi Arabia / Yuksel Insaat Saudia Co., Ltd., Saudi Arabia : July 2008 To December 2009 : Engineers & Contractors Corporation Saudi Lebanese co., : PS 1 – EASTERN PROVINCE WATER TRANSMISSION SYSTEM PHASE 2, JUBAIL, SAUDI ARABIA. 1. Welding inspection of 3 x 140,000 m3 Volume capacity Steel Tanks fabrication & erection including station piping, Jubail, Saudi Arabia. 2. Welding inspection of 5 x 50,000 m3 Volume capacity Steel Tanks including station piping, Khobar & Dammam, Saudi Arabia CLIENT PERIOD COMPANY PROJECT : Saudi Electricity Company (SEC), Ar Riyad, Saudi Arabia / Arabian Bemco Contracting Co., Ltd., Saudi Arabia : December 2006 To July 2008 : Engineers & Contractors Corporation Saudi Lebanese co., : RIYADH POWER PLANT NO.9. PP9 EXTENSION – III (Block F) RIYADH TANK FARM 1. Welding Inspection of 4x 50,000 m3 Volume capacity Crude oil storage Steel Tanks fabrication & erection including station piping, Riyadh, Saudi Arabia. DETAILS OF THE OTHER PROJECTS WORKED Fabrication and Erection of Pipe line, Hydrant pit, Tie in Projects Airfield facilities upgrade for KAIA development, King Abdul Aziz International Airport, Jeddah, Saudi Arabia. Installation and commissioning of Chain conveyor & bypass conveyors for Ford India Ltd., ( From Body shop through Paint shop until end of Trim & Chassis final assembly) Installation and commissioning of Resistant spot welding machines, GMAW station, Jigs & Fixtures for Ford India Ltd., (Bodyshop sub assembly, under body assembly & main assembly area.) Installation and commissioning of 1x1800T, 5x1000T SCHULER Mechanical Press line with Erection of 50T & 15T Over head crane Erection & Commissioning of Cement Vertical Roller Mill expansion Project for Dalmiya Cements (Bharat) ltd., (Including 2000 T steel structural galleries, platforms, ducts fabrication & erection, Erection & Commissioning of Deep pan conveyors, Belt conveyors, Screw Conveyors, Bucket Elevators etc.,) Erection & commissioning of 4.5 lacks m3 / Hr Gas Volume capacity Kirloskar AAF Bagfilter with Airslides for Dalmiya Cements (Bharat) Ltd. Page 2 of 4 WORK EXPERIENCE Engineers & Contractors Corp. Saudi Lebanese co. (ENCOCORP), Saudi Arabia, Welding Inspector From August 2006 To April 2010 Review of drawing specification and conduct welder/welding operator qualification test according to ASME IX Conducting & monitoring inspection activities as per ITP & contract specification Responsible for Shell horizontal & vertical joints Fit up, Visual inspection & reports submission. Controlling of the consumables as per WPS and procedure Welding inspection of Before, During & After Welding Responsible for Shell Peaking, Banding, Plumbness, Roundness, and other kind of dimensional inspection as per API 650 code & report submission. Responsible for Coloumn, shell nozzle, roof nozzle and other attachments orientation inspection & report submission Monitoring and assigning NDT activities to the team of NDT technicians (PT, MT, Vacuum Box test & pneumatic RF pad test etc.) Giving Radiographic test offer to the third party inspection, reviewing RT films & submitting to the client Inspection of incoming materials against purchase orders. Verification of test certificates given by the suppliers against Standards, Dimensional checks, verification of quantity as per order etc. Stage by stage inspection for fabrication & erection. Familiar with P&ID, isometrics, layouts, fabrication drawing etc. Participated in the preparation and review of the final QC dossier/Inspection records and handing over to plant team and the client. G.B. Engg. Enterprises Pvt., Ltd.,India From January 2002 To June 2006. QA/QC Inspector Knowledge in purchase order, delivery notes, receiving, handling and storage of piping material. Receiving & inspection of pipes, valves, gaskets, studs, bolts and other pipe fittings. Knowledge in studying isometric and fabrication drawing. Inspection of weld joint preparations, fit-up alignment, dimensional tolerances and visual check on weld. Knowledge in shop pipe spool fabrication and implementing spool identification systems. Knowledge in verifying the dimensions and inspecting the alignment of pipes and fitting. During welding conducting the In-process welding inspection, checking the pre heat and inter pass temperature, electrical parameters and inspecting proper cleaning between the weld beads. Witnessing of hydro test, service test, leak test & pneumatic tests Coordinating with client inspection and project management team Follow-up on corrective action of non-conforming products. Page 3 of 4 Ford India Ltd., Chennai, India From February 1998 To December 2001. Production Technician Process setup and commissioning of Stamping & Bodyshop Trained in manual Co-ordinate Measuring Machine ( ZEISS, GERMAN ) for measuring co-ordinate point of stamped parts and bodyshop parts Involved in PSW measurement Studies PP, Ppk data analysis & Involved in Fixtures R & R Study in the launch pace. Quality online inspection and final inspection of finished products with the aid of CMM and other engineering measuring devices. First piece Buy off signing-parts produced according to master samples Identifying nonconforming parts and separation of rejected products labeling with respective tags. Done MIG welding in Centre body pillar assembly, K frame assembly, Underbody assembly & Resistance seamless welding for fuel tank assembly Preparation of Work Procedure Sheet (WPS) Performed Nugget test to know the spot weld quality & Water Immersion quality test for fuel tank seamless welding Attending and solving customer concerns Member of SPC Chart and QS Implementation task force member of stamping department. Dalmiya Cements (Bharat) Ltd., Dalmiyapuram, India From Jan 1997 to Jan 1998. Apprenticeship Trainee Preparing BOM ( Bill of Material ) & Material indent rising for the steel structural fabrication QCS ( Quality Comparison Statement ) preparation for the decision to select the suppliers / contractors. Project material issuing & Contractor follow up for the Fabrication and Erection work to speed up the project work Doing reconciliation after the completion of the work Erection & Commissioning of Cement Vertical Roller Mill, Deep pan conveyors, Belt conveyors, Screw Conveyors, Bucket Elevators and etc., Erection & commissioning of 4.5 lacks m3 / Hr Gas Volume capacity Kirloskar AAF Bagfilter with Airslides COMPUTER KNOWLEDGES Windows operating system ( Windows 7, Vista, XP) Microsoft office package (Word, Excel, Powerpont) Adobe acrobat professional Auto cad DECLARATION I hereby declar e that all the inf ormation stated above are true and correct to the best of my knowledge and belief . A. Noordheen Page 4 of 4