STANDARD GENERAL NOTES Rev. 9/19/2013 1. THE AGENCY RESPONSIBLE FOR MAINTENANCE OF THE TRAFFIC SIGNALS AND RELATED COMMUNICATIONS EQUIPMENT IS BROWARD COUNTY TRAFFIC ENGINEERING DIVISION (BCTED). ALL TRAFFIC SIGNAL AND RELATED COMMUNICATION EQUIPMENT WHEN USING PAY ITEM SERIES: 632, 633, 635, 650, 660, 663, 670, 683, 684, 685, 686 AND 784 FOR THIS CONTRACT SHALL BE COMPATIBLE WITH BCTED'S CENTRAL COMPUTER NETWORK SYSTEM. PRIOR TO ANY PURCHASING OF THE ABOVE PRODUCTS, ENSURE THEY HAVE BEEN APPROVED FOR SYSTEM COMPATIBILITY BY THE MAINTAINING AGENCY. 2. THE CONTRACTOR SHALL MAKE ALL VIDEO DETECTORS INSTALLED AS PART OF THE PROJECT FULLY OPERATIONAL IN ACCORDANCE WITH THEIR ASSOCIATED ISOLATED INTERSECTION SIGNAL TIMING CHART WITHIN 24 HOURS OF THEIR INSTALLATION. INITIAL DETECTION ZONES SHALL BE DIMENSIONED 6' x 60' PER LANE, 10' AHEAD OF STOP BARS. 3. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE UTILITY COMPANY TWO (2) FULL WORKING DAYS IN ADVANCE OF ANY EXCAVATION INVOLVING ITS UTILITIES SO THAT A COMPANY REPRESENTATIVE CAN BE PRESENT. THE LOCATION OF THE UTILITIES SHOWN IN THE PLANS ARE APPROXIMATE ONLY. THE EXACT LOCATION SHALL BE DETERMINED BY THE CONTRACTOR DURING CONSTRUCTION. UTILITY OWNERS: COMPANIES BROWARD COUNTY TRAFFIC ENG. TELEPHONE NUMBERS 954-847-2745 CONTACT PERSON ROBERT BLOUNT GREG LOVAGLIO 4. THE CONTRACTOR SHALL PROVIDE FOUR COPIES OF MARKED-UP (AS-BUILT) CONSTRUCTION PLANS, AND ONE CAD FILE OF SUCH, SEVEN (7) DAYS PRIOR TO THE SIGNAL INSPECTION BY THE MAINTAINING AGENCY. THE CONTACTOR SHALL BE REQUIRED TO BECOME FAMILIAR WITH AND COMPLY WITH BCTED’S INSPECTION PROCEDURE. 5. ALL PULL BOXES SHALL BE COMPOSITE TYPE. STANDARD PULL BOXES SHALL BE STAMPED "BROWARD COUNTY TRAFFIC SIGNAL" ON THE COVER. LARGE PULL BOXES SHALL BE STAMPED "BROWARD COUNTY TRAFFIC FIBER OPTICS" ON THE COVER AND HAVE THE FOLLOWING DIMENSIONS PER APPLICATION. FOR FIBER PULL BOXES SIZE SHALL BE 24" x 36" x 36” DEEP, AND FOR FIBER SPLICE BOXES SIZE SHALL BE 30” X 48” X 36” DEEP WITH 2-LIDS. 6. THE CONTRACTOR SHALL CONTACT THE BROWARD OPERATIONS SIGNALIZATION/LIGHTING COORDINATOR FOR ALL SIGNALIZATION INSPECTIONS AT THE BROWARD OPERATIONS CENTER - (954) 776-4300. 7. THE CONTRACTOR SHALL CONTACT THE PLANNING DEPARTMENT TRAFFIC ENGINEER NO LESS THAN (5) FIVE FULL WORKING DAYS PRIOR TO CUTTING THE INDUCTIVE LOOPS INTO THE STRUCTURE COURSE, IN ORDER TO PERFORM A FINAL INSPECTION PRIOR TO FINAL ACCEPTANCE. CONTACT KARA SCHAWRTZ AT (954) 7774364 OR E-MAIL kara.schwartz@dot.state.fl.us. TMS LOCATIONS: STA: STA: 8. ALL EXISTING SIGNALIZATION EQUIPMENT TO REMAIN, INCLUDING LOOP ASSEMBLIES, IS ASSUMED TO BE IN GOOD WORKING ORDER UNLESS BCTED IS NOTIFIED IN WRITING PRIOR TO THE START OF CONSTRUCTION. ANY SUBSEQUENT DAMAGE TO THE SIGNAL EQUIPMENT SHALL BE REPAIRED BY THE CONTRACTOR 9. WHEN COMMUNICATIONS TO AN INTERSECTION MUST BE DISRUPTED BY A CONTRACTOR TO PERFORM WORK, THE CONTRACTOR SHALL PROVIDE AN ADVANCE TWO DAY NOTICE IN WRITING TO THE BROWARD COUNTY TRAFFIC ENGINEERING DIVISION. THIS NOTIFICATION SHALL BE CONVEYED VIA ELECTRONIC MAIL (EMAIL) TO THE TRAFFIC SIGNAL SUPERVISOR AT tecommunications@broward.org . NOTIFICATION SHALL INCLUDE CONTACT PERSON, TELEPHONE NUMBER, PURPOSE, LOCATION AND DURATION. THE DISRUPTION SHALL LAST FOR NO MORE THAN 3 CONSECUTIVE BUSINESS DAYS. WHERE POSSIBLE, THE DISRUPTION SHALL BE AT OFF PEAK HOURS BEGINNING AT 9:00AM AND ENDING AT 3:00PM. 10. PRIOR TO BEGINNING CONSTRUCTION, CONTRACTOR SHALL PROVIDE WRITTEN NOTICE OF COMMENCEMENT, VIA E-MAIL, TO teinspection@broward.org . NOTICE SHALL INCLUDE THE DATE OF COMMENCEMENT, LOCATION AND TYPE OF WORK, AND INFORMATION REGARDING ANY MALFUNCTIONING SIGNAL EQUIPMENT. STANDARD PAY ITEM NOTES 101-1 THE CONTRACTOR SHALL PROVIDE ALL NECESSARY EQUIPMENT INCLUDING A TWO-MAN BUCKET OR PLATFORM LIFT TRUCK FOR THE USE BY THE ENGINEER DURING INSPECTION OF TRAFFIC SIGNALS. 639-1-123 INCLUDES THE COST OF PROVIDING CONCRETE STUB POLE TO MOUNT SIGNAL DISCONNECT. STUB POLE SHALL BE EXPOSED 10’ ABOVE GRADE WITH DISCONNECT MOUNTED AT 8’ TO BOTTOM. DISCONNECT SHALL USE BREAKERS, NO FUSES OR EXTERNAL SWITCHES PERMITTED. SURGE ARRESTOR SHALL BE WIRED ON THE LOAD SIDE OF THE DISCONNECT. 649-3x-xxx A GIVEN MAST ARM/POLE ASSEMBLY LOCATION SHALL BE FIELD VERIFIED AND IDENTIFIED AS FREE OF CONFLICTS AND/OR OBJECTS BY THE CONTRACTOR PRIOR TO PROCUREMENT OF THE ASSOCIATED MAST ARM/POLE ASSEMBLY. MAST ARMS SHALL BE INSTALLED PERPENDICULAR TO APPROACH. 650-1-xxx ALL TRAFFIC SIGNAL HEADS SHALL BE STANDARD, NOT LIGHTWEIGHT. DRAIN HOLES AS REQUIRED UNDER SECTION 650-3.9 OF THE STANDARD SPECIFICATIONS SHALL BE PROVIDED FOR EACH SIGNAL SECTION OF A HORIZONTAL SIGNAL. A REFLECTIVE BORDER SHALL BE INCLUDED IN ALL BACKPLATES FOR ALL APPROACHES. 646-1-11 ALL PEDESTALS SHALL BE PROVIDED WITH TRANSFORMER BASES. 660-4-11 INCLUDES THE COST OF SUNSHIELDS AND POINT DISCHARGE DISSIPATION TERMINALS FOR EACH CAMERA. AN INTEGRATED MENU-DRIVEN INTERFACE, COAX LINE PROTECTORS AND CAMERA POWER PROTECTORS ARE ALSO INCLUDED, AND REQUIRED, UNDER THIS PAY ITEM. 670-5-13x CONTROLLER ASSEMBLY SHALL BE 2070 TS2 TYPE 1 SHELF-MOUNT WITHIN A TYPE VI CABINET AND 16 CHANNEL CONFLICT MONITOR W. ETHERNET PORT. CONTROLLER SHALL INCLUDE A MINIMUM OF 14 LOAD SWITCH BAYS. CONTROLLER SHALL PROVIDE TOTAL UTILITY AND INTEROPERABILITY WITH BROWARD COUNTY'S UTCS COMPUTER SYSTEM. THE TOP OF THE CONTROLLER PAD SHALL BE 0.5 FT ABOVE HIGHEST ROADWAY ELEVATION. CABINET BASES SHALL BE 46” X 30” IN SIZE. A POWER TRANSFER SWITCH SHALL BE INCLUDED ON THE INSIDE OF THE CABINET. CABINET SHALL BE PROVIDED WITH SUNSHIELDS (TOP, EAST, WEST, AND SOUTH FACES) AND ANTI-GRAFFITI COATING ON ALL SIDES, EXCEPT POLICE DOOR. 690-xx THE CONTRACTOR SHALL DELIVER ALL REMOVED TRAFFIC SIGNAL EQUIPMENT, EXCEPT CONCRETE STRAIN POLES, TO THE BROWARD COUNTY TRAFFIC ENGINEERING DIVISION LOCATED AT: 2300 W COMMERCIAL BLVD. , FT. LAUDERDALE, FL. 33309. (954) 847-2600. THE CONTRACTOR SHALL CONTACT BCTED (7) FULL WORKING DAYS PRIOR TO DELIVERY. REMOVED CONCRETE STRAIN POLES SHALL BE DISPOSED OF AT THE CONTRACTOR'S EXPENSE IN A MANNER AND LOCATION APPROVED BY THE ENGINEER PRIOR TO REMOVAL. ALSO INCLUDES THE COST OF REMOVING, CAREFULLY STOCKPILING, AND RE-INSTALLING GPS PREEMPTION EQUIPMENT ONTO NEW SIGNAL SYSTEM. CONTRACTOR SHALL ENSURE GPS PRE-EMPTION IS FULLY FUNCTIONING AS REQUIRED BY BCTED. 700-5-xx ILLUMINATED STREET SIGNS SHALL BE LED TYPE. CONDITIONAL GENERAL NOTES USAGE 11. ALL SPLICES OF LOOP WIRE TO LEAD-IN CABLE SHALL BE LOCATED IN PULL BOXES AND SOLDERED AND TAPED WITH A WATERPROOF COATING APPLIED IN A MANNER APPROVED BY THE ENGINEER. USE ONLY WHEN LOOPS ARE REQUIRED IN THE PROJECT. 12. TRAFFIC CONTROL PLANS - THE TRAFFIC CONTROL PLANS FOR THE PROJECT SHALL COMPLY WITH THE LATEST EDITION OF THE DESIGN STANDARDS, MUTCD AND THE STANDARD SPECIFICATIONS, THE CONTRACTOR MAY BE DIRECTED BY THE PROJECT ENGINEER TO DEVELOP AND IMPLEMENT MODIFICATIONS TO THE TRAFFIC SIGNAL OPERATIONS (I.E. TIMING AND PHASING) FOR SIGNALS LOCATED WITHIN THE PROJECT LIMITS. THE CONTRACTOR'S RESPONSE TIME TO ALL REPORTED MALFUNCTIONS OF TRAFFIC SIGNALS AND RELATED EQUIPMENT WITHIN THE PROJECT LIMITS SHALL BE WITHIN TWO (2) HOURS OF NOTIFICATION. THE CONTRACTOR SHALL RESTORE ALL MALFUNCTIONING TRAFFIC SIGNAL EQUIPMENT TO ITS LEVEL OF OPERATION PRIOR TO THE MALFUNCTION WITHIN TWENTY-FOUR (24) HOURS OF NOTIFICATION. USE ONLY FOR STAND-ALONE SIGNAL PROJECTS WHICH DON'T HAVE ROADWAY PLANS WITH A TCP. CONDITIONAL PAY ITEM NOTES 668-14 TYPE IV CABINET SHALL BE PROVIDED TO HOUSE SIGNAL AMPLIFIER AND/OR JUNCTION POINT. 649-3x-xxx THE FLORIDA DEPARTMENT OF TRANSPORTATION WILL PROCURE THE TRAFFIC SIGNAL MAST ARMS FOR THIS PROJECT IN ADVANCE OF THE CONSTRUCTION CONTRACT. THESE MAST ARMS MAY BE AVAILABLE FOR PICK-UP AT THE FDOT WEST PALM BEACH OPERATIONS CENTER AT 7900 FOREST HILL BLVD., WEST PALM BEACH, FLORIDA OR THE CONTRACTOR MAY FURNISH TO THE DEPARTMENT A REQUEST FOR DELIVERY OF THESE ITEMS BY THE VENDOR TO A LOCATION SPECIFIED BY THE CONTRACTOR WITHIN ONE WEEK AFTER EXECUTION OF THE CONSTRUCTION CONTRACT. IF THE MAST ARMS ARE AVAILABLE FOR PICK-UP AT THE FDOT WEST PALM BEACH OPERATIONS CENTER, THE CONTRACTOR WILL BE RESPONSIBLE FOR LOADING, TRANSPORTATION TO THE PROJECT SITE, UNLOADING, AND ANY INCIDENTAL COSTS. IF IT IS POSSIBLE TO DELIVER TO A SITE OF THE CONTRACTOR'S CHOICE, THE CONTRACTOR IS RESPONSIBLE FOR UNLOADING, STORAGE, AND DELIVERY TO THE PROJECT SITE AND ANY INCIDENTAL COSTS. DELIVERY SHALL BE MADE FIFTEEN USAGE USE ONLY FOR LONG RUNS OF INTERCONNECT WHERE SIGNAL AMPLIFICATION IS REQUIRED, AS PER BROWARD COUNTY INSTRUCTIONS. USE ONLY FOR PROJECTS THAT WILL BE PROCURING SIGNAL MAST ARMS IN ADVANCE OF LETTING. (ADVANCE PROCUREMENT PROJECTS). 13. WHEN THE DEPARTMENT OF TRANSPORTATION DETERMINES THAT THE NEED FOR A TRAFFIC SIGNAL IS CRITICAL TO THE PUBLIC WELFARE, EARLY TURN ON OF THE SIGNAL WILL BE REQUIRED BEFORE THE COMPLETION OF THE CONTRACT. IF THIS NEED ARISES, THE FLORIDA DEPARTMENT OF TRANSPORTATION WILL ASSUME THE RESPONSIBILITY FOR MAINTENANCE AND LIABILITY, OR NEGOTIATE WITH THE CONTRACTOR FOR MAINTENANCE AND LIABILITY, FOR SUCH A SIGNAL. NEW SIGNALS SHALL NOT BE PLACED ON FULL COLOR OPERATION UNTIL THE DATE OF INSPECTION, EXCEPT AS STATED ABOVE. NEW SIGNALS SHALL BE FLASHED NO LESS THAN A WEEK OR MORE THAN TWO WEEKS PRIOR TO THE INSPECTION. SIGNAL HEADS MUST BE BAGGED WITH BURLAP OR TURNED BACK UNTIL THIS TIME. USE ONLY FOR PROJECTS THAT HAVE A NEWLY INSTALLED SIGNALIZED INTERSECTION (I.E. WHERE THERE WERE NO SIGNALS PRIOR TO PROJECT). (15) CALENDAR DAYS AFTER THE RECEIPT OF THE DELIVERY REQUEST BY THE VENDOR. THE CONTRACTOR SHALL HAVE A REPRESENTATIVE PRESENT AT THE TIME OF DELIVERY FOR INSPECTION AND ACCEPTANCE OF THE ITEMS. ANY PRODUCT REJECTED AT THIS TIME MUST BE RETURNED IMMEDIATELY TO THE VENDOR FOR REPLACEMENT BY HIM WITHIN 30 CALENDAR DAYS. THE CONTRACTOR IS RESPONSIBLE FOR TRANSPORTATION FROM THE PLACE OF DELIVERY TO THE PROJECT SITE. THIS DELIVERY INCLUDES ALL COSTS SUCH AS LOADING, UNLOADING, AND ANY INCIDENTAL COSTS. 650-X-XXX APPEND THE FOLLOWING VERBIAGE TO STANDARD PAY ITEM NOTE 650-X-XXX SHOWN ABOVE: INCLUDES THE COST OF ARTICULATED SIGNAL BRACKETS THAT ALLOWS A 30 DEGREE CIRCULAR ADJUSTMENT OF HORIZONTAL SIGNAL HEADS. INCLUDE/APPEND THIS NOTE WHEN MAST ARMS CANNOT BE CONSTRUCTED PERPENDICULAR TO APPROACH 14. ALL LOOP ASSEMBLIES SHALL BE 6 FT. WIDE. LOOPS L-2 AND L-6 SHALL HAVE 2-4-2 WINDINGS AND BE 20 FT. LONG, PLACED 2 FT. BEHIND THE STOP BAR. LOOPS FOR PROTECTED OR PROTECTED/PERMISSIVE LEFT TURN MOVEMENTS SHALL HAVE 1-2-1 WINDINGS AND BE 60 FT. LONG, PLACED 10 FT. AHEAD OF STOP BAR. ALL OTHER LOOPS SHALL HAVE 1-2-1 WINDINGS AND BE 40 FT. LONG, PLACED 10 FT. AHEAD OF STOP BAR. ALL LOOP ASSEMBLY WIRE SHALL CONFORM TO IMSA SPECIFICATION 51-1-1984 WITH THE FOLLOWING EXCEPTION; ALL LOOP WIRE SHALL BE AWG #14 STANDED 19/27, PVC INSULATED AT 0.8mm THICKNESS, NYLON JACKET AT 0.25mm THICKNESS, INSULATION VOLTAGE RATING OF 600 VOLTS, MAXIMUM TEMPERATURE RATING OF 90 DEGREES CENTIGRADE. USE ONLY WHEN LOOPS ARE REQUIRED IN THE PROJECT. 632-8-ABC INCLUDES THE COST OF PROVIDING THE FOLLOWING SLACK FOR PULL BOXES NOT ADJACENT TO CONTROLLER CABINETS; 1) A MINIMUM 20 FT. FOR CABLE WITH 15 OR 25 PAIRS, AND 2) A MINIMUM OF 10 FT. FOR CABLES WITH 50 OR 75 PAIRS. INCLUDES THE COST OF PROVIDING THE FOLLOWING SLACK FOR PULL BOXES ADJACENT TO CONTROLLER CABINETS; 1) A MINIMUM 40 FT. FOR CABLE WITH 15 OR 25 PAIRS, AND 2) A MINIMUM OF 10 FT. FOR CABLES WITH 50 OR 75 PAIRS. USE ON ALL PROJECTS THAT INCLUDE COPPER INTERCONNECT. 15. CONTROLLER CABINET SHALL BE ORIENTED SUCH THAT CABINET DOOR OPENS AWAY FROM INTERSECTION. INCLUDE THIS NOTE WHEN FIELD CONDITIONS (CONSTRUCTABILITY) ALLOWS CABINET TO BE ORIENTED WITH DOOR OPENING AWAY FROM INTERSECTION. EVERY ATTEMPT SHOULD BE MADE TO PROVIDE THIS CONDITION. 633-1-ABC INCLUDES THE COST OF PROVIDING A MINIMUM 50 FT. OF SLACK IN PULL BOXES NOT ADJACENT TO CONTROLLER CABINET, AND 100 FT. OF SLACK IN PULL BOXES ADJACENT TO CONTROLLER CABINET. USE ON ALL PROJECTS THAT INCLUDE FIBER INTERCONNECT.