Attachment I3 - 17G2 Task Group Status Report 01-10-14

advertisement
API SC 17
SUBCOMMITTEE ON SUBSEA PRODUCTION SYSTEMS
API 17G2 Riserless Subsea Pumping Systems
TASK GROUP STATUS
10 JANUARY 2014
API 17G2 RISERLESS SUBSEA PUMPING SYSTEMS
STATUS REPORT
TABLE OF CONTENTS
1.
STATUS ................................................................................................................................. 1
2.
MEMBERSHIP ..................................................................................................................... 1
3.
WORK IN PROGRESS ........................................................................................................ 2
i
API 17G2 RISERLESS SUBSEA PUMPING SYSTEMS
STATUS REPORT
1. STATUS
The 17G2 Riserless Subsea Pumping Systems Group is meeting on a quarterly frequency via
telecoms. Earlier meetings dedicated time to solicit membership from individuals with coveted skill
sets, obtain alignment of what should be included/excluded in the document, and schematic reviews
of known systems that are in service globally. Membership is robust but still lacking in a couple
areas necessary to complete deliverables (i.e. expertise to develop and mature the equivalents of
Annex B and C for spooled fluid conduit products and their associated deployment configurations).
It was decided that the G2 Document will follow the same format as the main 17G document. As
such, draft clauses for Scope, System Requirements, and Functional Requirements are at various
stages of development, review, and editing at this time. The G2 Group is sharing work in progress
and documentation with the other Baby G teams in an effort to obtain alignment. In addition, some of
the work product is relevant to other Baby G’s as there are a couple overlap team initiatives (i.e. fluid
conduit subject matter is common with G3 Riserless Light Well Intervention efforts and composite
design methodology as it relates to mechanical performance is common with the G1 Non Ferrous
Alloys effort).
2. MEMBERSHIP
Tables 1 list the current roster for the API task group:
TABLE 2: API “BABY 17G2” TASK GROUP MEMBERS
API 17G2 – Riserless Subsea Pumping Systems
Name
Mike Hess (Chair)
Alai Alavi
Andy Henderson
Bill Barry
Charles Tavner
David Bell
Frans Janssen
Jim McAllister
Joe Savoy
John Smith
Mark Johnson
Martin van Onna
Mitch Holloway
Neil Crawford
Phil Walsh
Ramsay Cook
Ryan Addison
Sterling Lewis
Troy Theal
William Siersdorfer
Bart Steuten
Mike Swift
Mirick Cox
Mitch Dziekonski
Brian Skeels
Shell
Bechtel OG&C
Oceaneering
Atlantic Wave LLC
Magma
Bechtel OG&C
Shell
Shell
Wild Well Control
Global Coil Tubing
FTO Services
Airborne
Oceaneering
Blue Ocean
Magma
Blue Ocean
Tenaris
ExxonMobil
Chevron
One Subsea
Airborne
Hess Corporation
ExxonMobil
Titanium Engineers
FMC Techologies
1
API 17G2 RISERLESS SUBSEA PUMPING SYSTEMS
STATUS REPORT
3. WORK IN PROGRESS
o
Subteams have volunteered to write the various clauses in the document with the main G2 team
providing review and edits.
o
Clause 1 (Scope) first draft is complete and being edited by the main G2 team.
o
Clause 2 (Normative References) is deferred at this time and will be addressed later as the other
clauses and annexes mature.
o
Clause 3 (Terms, Definitions, etc.) is being ever greened as the subject matter of riserless subsea
pumping systems is developed in the document.
o
Clause 4 (System Requirements) is partially drafted and distributed for review by the main G2
team.
o
Clause 5 (Functional Requirements) is partially drafted and distributed for review by the main
G2 team.
o
The next G2 team telecom is scheduled for January 12th 2014.