Coordinator 27 April 2011 terje.tjelta@telenor.com All MARCH ninth consortium meeting (CM9) minutes The ninth MARCH consortium meeting was held in Heidelberg, 31 March - 1 April 2011. The meeting agenda is given in Annex 1 and the list of participant in Annex 2. 1) Location The meeting was held in Heidelberg right after Celtic Event 2011, where MARCH had one of the demonstration and a stand. 2) WP1 Management WP leader Terje Tjelta a) Partnership issues, next meetings host and venues b) Deliverable D1.2 (M36) IPR issues. Dropped, but can be reopened. Ed Terje Tjelta c) Deliverable D1.3 (M40) Final report. Ed Terje Tjelta CM10 and CM11 project ending came up late at the meeting, as it was about to be closed such that the original plans could not be discussed. A draft simplified outline D1.3 was discussed briefly: 1 Introduction 2 Scenarios and economics 3 Multilink technologies 4 Multilink network architecture 5 Multilink network demonstrated 6 Conclusions References Decisions and actions Project ending left out for an email/network meeting after CM10 No issues for D1.2, unclear what the purpose could be. The deliverable is dropped. Continue D1.2 as indicated 3) WP3 Business and economics WPL Telenor, Terje Tjelta, acting a) Task 3.3 Market development. TL Telvent, Daniel Seixas Deliverable D3.5 (M33) Consumer spending and forecasts ... . Ed Daniel Seixas There were contributions from Telenor, but none present from Spanish partners. Since this deliverable will be done by Telenor and Spanish partners, the discussion was postponed to after the meeting. 1 Decisions and actions No action taken. 4) WP5 Modular network architecture WPL Telenor, Terje Tjelta, acting Task 5.2 Recommended network architecture (TL Telenor, Håkon Lønsethagen) Milestone M5.2 (M32) Network modules and network architecture. Ed Håkon Lønsethagen Deliverable D5.2 (M40) Recommended multilink architecture … Ed Håkon Lønsethagen The summary of the disciussioin is provie din the pwerpoint by Håkon: https://telenor.projectcoordinator.net/main.php/MARCH-WP5-CM9Heidelb.pptx?fileitem=13828172 Decisions and actions Contributions per partner: Telenor Editor WLAN offload, roaming? Multi-operator operations support Real-time Network status information – provided via 3GPP … TUCN Use of MIMO, dynamic configuration, reduced rate feedback channel QoS profile for Heterogeneous networks, simulation, cost in terms of D,PL, Throughput BME? – review? – on MIMO, lower layers Lividi API toward the network socket layer Real-time Network status information – provided via an overlay Ruggedcom QOS oriented Admission control, and load balancing Interfaces for adm, ctrl, load balancing, and ML operations Using or extending existing interfaces, or new interfaces needed? Also considering multi-provider settings LiveU LiveU will investigate the impact of the transport protocols in the end-to-end solution, and will contribute to specifications of the transport protocol to the multilink architecture. (Deliverable D5.2) MIF API investigation MPTCP investigation Collaborative paper: Paper? On UE – MLG interaction/interoperation, integration with 3GPP (IP/higher layers) Timeline: Final M5.2 – End of April Editor: 15th April – Updated extended outline All: 27th April – final contribution 2 Editor: 29th April – Draft final contribution Draft final D5.2 – End of June 5) WP6 Demonstration WPL Lividi, Hans Ole Rafaelsen a) Milestone M6.1 (M28) Definitions of demonstrations. Ed Antonio Alfaro b) Deliverable D6.1 (M39) Pub. demo. of multilink network capabilities. Ed Hans Ole Rafaelsen M6.1 delayed – Will make M6.1 into first version of D6 LiveU – Demonstrate their current product(s) – Streaming from anywhere to anywhere • Ruggedcom – Will demonstrate their Radio Resource Manager server in use with LiveU and/or Lividi Norwegian demonstrator – Telenor, Simula and Lividi – Will put up a testbed at Fornebu • 3G • LTE (hopefully) • WiFi • WiMax (hopefully) – Lividi want to demonstrate (scalable) video streaming continuity while moving around and access to different links changes – Other partners are welcome to participate Decisions and action points Action points – LveU and Gravity to start testing integration – Setup of Telenor infrastructure – Create a drawing that shows how each part fit together (Hans Ole) – Terje will look on PCC issues with regard to demo/workshop 6) WP7 Dissemination and exploitation WPL BME, Janos Bito a) Task 7.1 Workshops and conferences (TL BME, Janos Bito) Deliverable D7.5 Second International Workshop (Editor BME, Janos Bito) b) Task 7.2 Website (TL Gravity, Tamas Urbancsek) c) Task 7.3 Standardisation (TL Telenor, Terje Tjelta) 3 Action: Included in Deliverable D7.6 MARCH exploitation, dissemination and standardisation (Editor BME, Péter Kántor) d) Task 7.4 Exploitation plan (TL LiveU, Bezalel Finkelstien) Deliverable D7.6 MARCH exploitation, dissemination and standardisation (Editor BME, Péter Kántor) Common Deliverable Deliverable D7.6 MARCH exploitation, dissemination and standardisation (Editor BME, Péter Kántor) Task 7.1: Summary of dissemination activities so far Deliverables: 11 deliverables Milestones: 7 milestones Workshops - National: 1 workshop (in Norway) + + MARCH presentations at students’ information day at BME + TUCN info day for students - International: 1 workshop (in Tel Aviv) Publications - Published in journals: 7 publications - Published in conference proceedings: 13 publications - Presentations in workshops: 10 presentations - Posters: 1 poster Actions TUCN will send a short description about dissemination at their info day for students LiveU will send information about dissemination at LiveU resellers day TUCN’s publication (“Capacity Analyses for IEEE 802.11n Narrowband and Wideband Channel Modeling”) and BME’s publication (“Adaptive Link Assignment Applied in Case of Video Streaming in a Multilink Environment” and “Measurement Data for FSO and Eband Radio Propagation Modeling”) were approved Partners are forced to write joint papers o BME and TUCN are going to provide a joint paper Deliverable D7.5 – Second International Workshop Actions Date: One day between 24 and 26 of May 2011 Location: Oslo, Norway Contact person/Chair: János Bitó BME/Gravity (Peter K. and Tamas U.): Registration: at the MARCH web Broadcast by LiveU BME (Peter K.): Announcements will be sent out Noam will contact with Easy Wireless Project (EWL) about a joint workshop Agenda approved: One day workshop 24 and 26 of May 2011, Oslo, Norway 10:00-10:10 welcome (Local representative + chair) 10:10-11:00 MARCH main pres + demo(Lividi, LiveU, Rudgedcom, Gravity) o Terje + Peter/Noam 11:00-11:50 Easy main + demo Lunch 11:50-13:00 8 presentation (4 March + 4 Easy) 2 sections (2x2 +2x2) 4 13:00-14:00 Business panel session (moderator: Audun MARCH) o Easy wireless, Telenor, 14:00-14:10 break 14:10-15:30 Technology (4 presentations, Sess. Chair:) 15:30-15:40 Closing Partners come up with tentative titles for the papers and demonstrations with proposals for panellists Broadcast: by LiveU Task 7.2 Website Actions Péter Kántor: Regular refreshment Péter Kántor: Make public material easily accessible Task 7.3 Standardisation Editor (Peter K.): Deliverable D7.4– Standardisation Activities is merged to Deliverable D7.6 MARCH exploitation, dissemination and standardisation A template and contributions provided so far are available on the PC Actions Partners are forced to provide contributions Editor (Peter K.): Standardisation chapter of Deliverable D7.6 will be divided according to standardisation bodies Task 7.4 Exploitation plan A template and contributions provided so far into Deliverable D7.6 - MARCH exploitation, dissemination and standardisation are available on the PC Actions Partners are forced to provide contributions into Deliverable D7.6 - MARCH exploitation, dissemination and standardisation Editor (Peter K.): Deliverable D7.7 is merged to Deliverable D7.6 - MARCH exploitation, dissemination and standardisation Editor (Peter K.): Exploitation and dissemination chapter of D7.6 will be converted into running text WP7 overall WP Leader (Janos B.): A conference call will be organised within two weeks regarding all the tasks exploitation, dissemination, standardisation and publication activities where each partner should express their plans, intentions about their contributions 5 Annex 1 Agenda MARCH consortium meeting 9 (CM9) 31 March – 1 April 2011, Heidelberg, Germany Draft CM9 Agenda 1) WP1 Management. WPL Telenor, Terje Tjelta a. Partnership issues, follow–up MTR, next meetings host and venues b. Deliverable D1.2 (M36) IPR issues. Dropped, but can be reopened. Ed Terje Tjelta c. Deliverable D1.3 (M40) Final report. Ed Terje Tjelta 2) WP3 Business and economics. WPL Telenor, Terje Tjelta, acting a. Task 3.3 Market development. TL Telvent, Daniel Seixas Deliverable D3.5 (M33) Consumer spending and forecasts ... . Ed Daniel Seixas 3) WP5 Modular network architecture. WPL Telenor, Terje Tjelta, acting a. Task 5.2 Recommended network architecture (TL Telenor, Håkon Lønsethagen) Milestone M5.2 (M32) Network modules and network architecture. Ed Håkon Lønsethagen Deliverable D5.2 (M40) Recommended multilink architecture … Ed Håkon Lønsethagen 4) WP6 Demonstration. WPL Lividi, Frank Eliassen a. Milestone M6.1 (M28) Definitions of demonstrations. Ed Sara Munoz b. Deliverable D6.1 (M39) Pub. demo. of multilink network capabilities. Ed Frank Eliassen 5) WP7 Dissemination and exploitation. WPL BME, Janos Bito a. Task 7.1 Workshops and conferences. TL BME, Janos Bito Deliverable D7.5 (M36) Second International Workshop. Ed Janos Bito b. Task 7.2 Website. TL Gravity, Tamas Urbancsek c. Task 7.3 Standardisation. TL Telenor, Terje Tjelta Deliverable D7.4 (M30) Standardisation activities. Merged with D7.6/D7.7. Ed Peter Kantor d. Task 7.4 Exploitation plan. TL LiveU, Bezalel Finkelstien Deliverable D7.6 (M36) Exploitation plans. Ed Bezalel Finkelstien Deliverable D7.7 (M40) Published papers. Ed Peter Kantor M5.2 D3.5 Celtic Event 01 03 02 (D1.2) D1.3 D5.2 D6.1 D7.7 (D7.4) D7.5 D7.6 04 05 06 07 Time table Thursday 0900 - 1030 1100 - 1230 1245 -1515 1530 - 1700 Friday 0900-1045 1115-1300 Order of the day 1030 Coffee/Tea 1230 Lunch 1515 Coffee/Tea 6 08 09 Topic General, (D1.2), D1.3, D3.5 M5.2/D5.2 D7.5, D7.6. D7.7, (D7.4) PCC/M5.2/D5.2 M5.2/D5.2 M6.1/D6.1/Wrap-up MARCH Doc. 25 Annex 2 Participants Partner Telenor Participant Terje Tjelta Håkon Lønsethagen János Bitó Péter Horváth Not present Not present Not present Tudor Palade Tamas Urbancsek Audun Fosselie Hansen Hans Ole Rafaelsen Peter Sheynkman Noam Amram Bezalel Finkelstien Not present BME Bitnet Telvent TCLM TUCN Gravity Simula Lividi WiNetworks/RuggedCom LiveU INDRA From left: Peter Herrmann (Celtic, project officer), Tamas, Peter K, Terje, Tudor, Noam, Håkon, Peter S, Hans Ole, Janos, and Bezalel (Audun had left the meeting) 7