Oscar Hernández San Valentin 987 N. Laredo Tamaulipas, Mx 88000 Home (01152) 867-131-22-35 Cell (01152) 867-126-04-97 Objective: Looking for a Production Manager position, to lead a group of associates towards achievement of company’s goals Summary: 11 years of experience in a Production-Planning Manager position, leading up to 300 associates to the achievement of company’s goals, with a philosophy of Continuous Improvement in terms of Quality, Cost, Processing Cycle and Productivity. Plus, 3 years as Recruiting, Hiring and Training Supervisor Business Experience: 2007 to date Springfield Wire de Mexico SA de CV Nuevo Laredo Tamaulipas Mx Business Unit Manager Responsible for leading up to 100 associates in achieving production requirements, being responsible for Production forecasting, productivity and staffing as well The Business Unit itself was complemented with the staff of Quality Engineer, Process Engineer, Industrial Engineer and Planning Supervisor. Acomplishments: This unit, at one time, produced over 2.7 mm/year A new line was introduced During this period, we implemented a new line May-Oct 2007 Industrias Tricon de Mexico SA de CV Nuevo Laredo Tamaulipas Mx Quality Coordinator: Along with the responsibilities of a Quality Coordinator, I was responsible to implement 5 S’s, Lean Manufacturing, beginning with the implementation of One Piece Flow. During this period I was assigned to Production and the project was not finished because of change of job 2004 to 2007 Proliance International S.A. de C.V. Nuevo Laredo Tamaulipas Mx Training Supervisor: Responsible for covering the training needs for all associates. Training needs are determined by the Training Needs Detection process, which involves all department managers by making an evaluation of every subordinate. These training needs are then included in an annual plan, which is covered by both, internal and external providers. Responsible too, for the in-house scholar education for Elementary, High and Junior High school levels Responsible also, for the Food Service provided to our employees by serving as liaison with the supplier. This responsibility included the need to improve customer’s satisfaction. Satisfaction surveys are applied to monitor it. Accomplishments: Several projects have been assigned during this period, such as: 1.- Equipment for new offices 2.- Equipment for new dinning room 3.- Organization of recognition events 4.- Off site training events 2002 to 2004 Lettershop International S.A. de C.V. Nuevo Laredo Tamaulipas Mx Production Manager Responsible for leading up to 300 associates in achieving production requirements, being responsible for Production forecasting, productivity and staffing as well. Accomplishments: 1981 to 2002 1995 to Present Re-design of Plant Layout, earning a 40 % in space for Warehouse usage, thus, creating savings on USA warehouse costs Elimination of a third shift, resulting in savings due to functions duplication Increasing daily worked hours, both first and second shifts to eliminate Saturday’s hours, resulting in savings due to utilities, transportation, etc Salary scale proposal. This aimed to : 1. Reduce turnover 2. Increase efficiency 3. Improve quality Implementation of Kambans in testing phase Implementation of comprehensive and reliable Production forecasting procedures according to our USA associates needs NCH Promotional Services de México S.A. de C.V. Nuevo Laredo Tamaulipas Mx Production Planning Manager Responsible for leading 200 associates in achieving production requirements. As Planning Manager, I am also responsible for forecasting receipts, production, productivity and staffing. Also, responsible for preparing Annual Budgets. Accomplishments: As Production Manager Developed my department by implementing new processes by growing from 50 to 200 associates Increased Productivity by 100 % Reduced Processing Cycle by 30 % Implementation of Self Directed Work Teams Implemented Kamban Implemented Poke Yoke devices As Planning Manager Planning accuracy of +/- 1.0 % Reduced Budget creation time from 2 weeks to 3 days 1994 to 1995 Training & Quality Manager As Training Manager, responsible for Plant’s Training Program As Quality Manager, responsible for a team of quality inspectors, that not only identified errors, but proposed corrective solutions Accomplishments: As Training Manager Implemented a Training Program Gave training to Supervisors and Managers on Self-Directed Work Teams and Kaizen As Quality Manager Improved Quality by 1000 % 1987 to 1993 Quality Control and Scheduling Coordinator As Quality Control Coordinator, responsible for: Final Payment Approval (timely and accurately) Approval Department (approve jobs within customers limits) As Quality Control Coordinator Reporting Quality and finding corrective actions Liaison between Mexican operations and USA Customer Service Managers As Plant Scheduler, responsible for planning and maintenance of Production Systems Accomplishments: As Quality Control Coordinator Lead a team to develop and implement a Quality System through all Mexican Operations As Scheduling Coordinator Participation in other Plants in the implementation and audit of the Production System. 1981 to 1986 Production Supervisor Responsible for Daily Production Scheduling and staffing to attain Production goals with a staff of 120 people Accomplishments Lead teams during this time from a 100 % Manual process to a semi-automated process Developed a production line that allowed associates to work either standing up or seated. Great communication with my people, being able to gain their confidence and support Education Industrial Production Engineer at Instituto Tecnologico de Nuevo Laredo 1981 Specialized Education Bilingual, Organizational Development 2006, Introduction to ISO-9001 2006, Leader Auditor for ISO 9001 2006, Introduction to Six Sigma (Green Belt) 2005, 8 D’s 2004, Introduction to Lean Manufacturing 2004, Lean Manufacturing 2001, Introduction to Outlook 2000, 2001, Ms-Access and Ms-Excel special 2000, Introduction to Self Directed Work Teams 1999, Diagnostic and Continuous Improvement 1998, Leadership Development 1997, Total Quality Workshop 1994. Personal Born 1958; Married; Family; Excellent Health