SOWG DOCUMENTARIAN REPORT (OPPORTUNITY) Monday, May 12, 2008; MER B Opportunity planning Sol 1529 SOWG Chair: Wendy Calvin SOWG Doc: Pamela Smith KOP: Brenda Franklin LTP: Scott McLennan TAP: Richard Springer TDL: Walt Hoffman TUL: Colette Lohr MM: Richard Morris RP: Paolo Bellutta Pancam PUL: Elaina McCartney ECAM/MI PUL: Brenda Franklin Meeting Schedule: MER-B Science Planning Sol 1530: Tuesday, May 13: 8:00 PDT Science Kick-Off/SOWG: The rover is in automode. We had an X-band uplink fault on sol 1526 having to do with an unusable telecom alignment. Sols 1527 and 1528 were not uplinked. We will go back to 1526 to recover remote sensing activities and to sol 1527 to repeat the IDD resistance test diagnostics. From the sol 1528 TDL report: X-band fault. Earth was below the rover deck. We did not get sol 1526 onboard and chose not to uplink 1527 and 1528. 3361 data products in flash; 804 mbits available; 0.55 tau; 417 solar array W-hrs; downlink pass was 78 mbits. Other than the X-band fault, the rover is in good shape. LTP Report: Today we will do a fault recovery, IDD diagnostic, Garrels pan -- repeating parts one and two, 13F soil, and remote sensing. As the sol path continues, we will try to recover the next part of the Garrels pan, more IDD diagnostics and then drive on to Cape Verde. We had some dust clearing over the weekend. Flash is in pretty good shape -- negative unsent. Recommendation is about 340 mbits which is the number from the 1526 plan. PDL Reports: PC: Received a couple of retransmitted full frames from sol 1514 photometry experiment, a couple of taus, and runout sequences. APXS/MB: No report. MI Nothing new. MT: Nothing new. RAT: Nothing new. Sol Path: 1523-1524-1525 IDD Diagnostics; APXS - Ar (1524 & 1525); Remote Sensing 1526 Pancam Garrels Pan (Pts.1&2), 13F Soil; APXS Ar; Remote sensing 1527-1528 IDD Motion Diagnostics; Garrels Pan (Pts. 3&4); Remote Sensing 1529 Fault Recovery; IDD Diagnostics; Garrels Pan (Repeat Parts 1&2); 13F Soil; R/S 1530 IDD Diagnostics; Garrels Pan; Remote Sensing 1531 Goal: continue drive to image Cape Verde cliff face Lien List (updated 4/23/08) --3x1 Loco R2/L2 mosaic at 8:45 of canyon wall --Front search --RAT Z-axis characterization: IDD activity, ~20 min, coldest temp one sol and warmest temp on a second sol. Do after drive to Cape Verde is complete. --RAT bit imaging before each RAT use. --APXS: Typical soil (spherule-free soil) – verify instrument calibration Cobbles in Victoria Ar (weekly as resources permit; last done sol 1520) --Post-drive rear-looking Navcams After each drive; 2x1 standard tier --Analyze Fresh Dust Deposit Pancam, MI, APXS, MB Flash: Data products in flash, Sol 1528: 3361 DPs (keep < 6000) Flash available (to science), Sol 1528: 655 mbits (< 200 is trouble) Unsent data in flash, Sol 1528: 0 mbits Expected downlinks, Sol 1529: 27 mbits Recommended, Sol 1529: ~340 mbits Skel: Sol 1529 X-Band Recovery/IDD Diagnostics/RS Start End DUR HGA 25290 11:35 11:55 0:20 Eng Keepout 11:57 12:27 0:30 Comm Blip 11:59 12:04 0:05 IDD Diagnostics (Resistance Test) 12:27 Margin + Cleanup 12:42 12:57 0:15 NAP 12:57 15:26 2:29 FSW Keepout 15:26 15:40 0:14 BCB History + Pre-ODY Tau 15:40 ODY Prep 15:44 15:52 0:08 RUHF 45291 ( 27Mb @ 92 az & 128k) NAP 16:10 18:18 2:07 Wake for Deep Sleep 18:18 18:30 0:12 Deep Sleep 18:30 7:00 12:30 NAP 7:00 8:08 1:08 FSW Keepout 8:08 8:22 0:14 Generic Camera Heating for Hazcam 8:22 IDD Diagnostics (Resistance Test) 8:30 Margin + Cleanup 8:45 9:00 0:15 NAP 9:00 10:30 1:30 AM Science 10:30 13:00 2:30 HGA 25300 12:40 13:00 0:20 12:42 0:15 15:44 0:04 15:52 16:06 0:14 8:45 8:45 0:23 0:15 Science Requested Activities: Observation P2600 D0815 P1158 P1158 P1158 P2633 D0815 P1158 P1158 P1158 P2601 P2587 P2111 P2292 P2122 P2293 Sol 1529 ENG Pancam Tau Sol 1529 IDD resistance test with imaging Front Haz half 4bpp Front Haz half 4bpp Front Haz half 4bpp Sol 1529 PreODY Pancam New Tau SAW 1530 IDD resistance test with imaging Front Haz half 4bpp Front Haz half 4bpp Front Haz half 4bpp AM 1530 Pancam Tau AM 1530 Pancam 13F soil 13F target 13F caltarget AM 1530 Pancam Garrels Pan redo Part 1 and 2 Part1 15 pointings L257R1 Caltarget L257R1 Part2 15 pointings L257R1 APAM (09:45) From the TDL report: 416 W-hr predict; engineering request -- heating for the hazcam electronics. As in the 1527 plan, the IDD diagnostic will involve joint 1 and 2 resistance testing. What’s In/What’s Out Everything is in the plan. Power: Start of Plan SOL 1529 11:57:00 Battery SOC 18.69 Battery Usable Amphrs 17.10 Bus Voltage 32.72 End of Plan SOL 1530 12:59:50 Battery SOC 18.81 Battery Usable Amphrs 17.22 Bus Voltage 32.46 Data Summary: Data acquired in today’s plan: Critical: 34.78 mbits Total: 355.16 mbits Downlinked: 26.79 mbits Master Submaster Walkthrough (13:00) A Delta Master Submaster Walkthrough was held at 14:00 due to timing issues associated with a real-time activate. Sequence Report Walkthrough (16:10) Carry Forward: