Power Projection Enhancement Team (PPET) Assessment Checklist FY02 TABLE OF CONTENTS Title Page 1 Bookmark 2 Go to Page SIDPERS 3-6 Go to Page Reassignment Processing 7-8 Go to Page E-1/E-4 Advancements 9 Go to Page SGT/SSG Promotions 10 Go to Page Suspension Of Favorable Personnel Actions 11 Go to Page AWOL/DFR Controls 12 Go to Page 13-15 Go to Page 16 Go to Page 16 Go to Page Officer Reassignment Processing 17-18 Go to Page Enlisted Reassignment Processing 19-21 Go to Page 22 Go to Page 23-24 25-27 Go to Page Go to Page 28-31 Go to Page 32 Go to Page 33-34 Go to Page Table Of Contents Work Center Supervisor PSC/BDE/BNS1 Battalion S1 (BNS1) Management: Promotions: Enlisted Promotions Enlisted Promotion Worksheet (DA Form 3355-E) AAA-294 – SGT/SSG Recommended List for Promotion Reassignments: Personnel Readiness: MOS Medical Review Board (MMRB) PERSTEMPO Unit Status Reporting (USR) SIDPERS Interface Management (PAS) Personnel Processing: Transition Center Replacement Center Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 1 WORK CENTER SUPERVISOR PSC/BDE/BNS-1 NCOIC: UNIT: E-Mail Address: AREAS 1. LOCAL SYSTEM TABLES MANAGEMENT: a. b. Pg. 1 Of 1 Are all the below tables populated: (1) T14, Suspense Instructions? (2) T16, Authentication Details? (3) T43, Order Distribution Scheme? (4) T51, Command Sequence Information? (5) T71, Mailing/Distribution Address? (6) T72, Letterhead Details? (7) T73, Office Symbol? (8) T78, Authority Line? Has the Order Control Log been set? 2. REFERENCE MATERIAL: YES XXX XXX NO XXX XXX REMARKS XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX XXX XXXXXXXXXXXXXXXXX XX a. FORSCOM PPET HomePage http://www.forscom.army.mil/ppet b. Hastily Executed Lookup Program (H.E.L.P.) SCP0409-00. c. PERSCOM SIDPERS-3 Procedures and Guidelines http://www-perscom.army.mil/tagd/sidpers3/page1.htm. d. MILPER Messages. http://perscomnd04.army.mil/milpermsgs.nsf e. Army Publications and Regulations. http://www.usapa.army.mil/ 3. ACCOUNT MANAGEMENT: XXX a. Are new SIDPERS-3 Users trained IAW Local and PERSCOM security procedures and guidelines? b. Are there primary and secondary active Tarantella and SIDPERS account? c. Have all departed personnel user accounts been retired? d. Have all user accounts of personnel on leave or TDY been disabled upon departure? e. Has the Security Automation System Manager been provided a copy of all Tarantella and SIDPERS-3 user IDs and password since date of last password change? f. Are user accounts reviewed monthly to ensure system security is maintained? g. Are passwords changed every 90 days or IAW local policy? REMARKS/RECOMMENDATIONS <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 2 SIDPERS (BNS1) NCOIC: Pg. 1 Of 4 CLERK: UNIT: E-Mail Address: 1. GENERAL INFORMATION a. # Of 75B personnel assigned/authorized? b. # Of non-75B personnel assigned SIDPERS duty? c. # Of personnel trained in SIDPERS 3? d. # Of UPC’s assigned? ___________ ___________ ___________ ___________ 2. REFERENCE MATERIAL: Are the following updated reference materials on hand thru automated or hard copy: YES NO a. Hastily Executed Lookup Program? b. AR 600-8-6, dated 24 September 1998? c. AR 600-8-11 dated I October 1990? d. AR 600-8-101dated 1 March 1997? e. AR 600-8-105 dated 24 October 1994? f. AR 614-100 dated 31 October 1997 Change 1? g. AR 600-8-19 dated 2 October 2000? h. AR 600-8-2 dated 30 October 1987? i. DA PAM 600-8 Management and Administrative Procedures? j. AR 630-10 (Absence Without Leave, Desertion, And Administration Of Personnel Involved In Civilian Court Procedures)? k. AR 190-9 (Absentee Deserter Apprehension Program And Surrender Of Military Personnel To Military Civilian Law Enforcement Agencies)? l. Unit SOP? m. Local SIDPERS MOI/LOIs? REMARKS/RECOMMENDATIONS Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 3 SIDPERS (BNS1) NCOIC: Pg. 2 Of 4 CLERK: UNIT: AREA 3. PERSONNEL PROCESSING E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXX a. Are soldiers’ required to properly in-process the installation prior to reporting to the unit? b. Are BN staff activities/units accomplishing the requirements specified in the Personnel Inprocessing Record, DA Form 5123-1-R? c. Does the BNS1 conduct a final check of soldier’s in-processing to ensure non-deployment conditions are corrected or reported to the commander? d. Does the BNS1 follow-up on all suspense actions required for soldier’s readiness processing requirements? Note: See AR 600-8-101, Chapter 4, Levels 1 and 2. e. Are soldiers arriving to the unit with PERSTEMPO historical report? Note: Identify high deployers. f. Is the DA Form 647 being maintained IAW AR 600-8-6? 4. MAINTAIN PERSONNEL REPORTS a. Are the following files/reports maintained IAW AR 25-400-2? (1) AAA-162 (Unit Personnel Accountability Report)? (2) AAA-165 (Unit Personnel Accountability Notices)? (3) AAA-342 (Alpha Roster)? (4) AAA-095 (Suspension of Favorable Personnel Action Management Report)? (5) AAA-161 (Unit Manning Report)? (6) AAA-344 (Personnel Edit Report)? (7) AAA-117 (Unit Enlisted Advancement Report)? (8) AAA-294 (Unit Eligibility Roster)? b. Does the unit annotate the Unit Commander’s Finance Report monthly with all newly arrived/departed personnel and provide it to the Finance Office? REMARKS/RECOMMENDATIONS Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 4 SIDPERS (BNS1) NCOIC: Pg. 3 Of 4 CLERK: UNIT: AREA 5. UNIT PERSONNEL ACCOUNTABILITY REPORT (AAA-162) RECONCILIATION E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX a. Is the battalion producing the report twice monthly to reconcile with the PAS? b. Are unit historical copies produced monthly in conjunction with the Unit Status Reporting (USR) submission? c. Does the strength reported on USRs match the AAA-162? d. Are corrective measures taken to ensure transactions are submitted during or immediately after reconciliation? e. Does the unit conduct a PAI whenever a f. Change of Command occurs or as directed? Is it forwarded to the PAS for review? g. Are PAIs procedures IAW AR 600-8-6? 6. Submission of Arrival Transactions: a. Does the unit attempt to submit arrivals on soldiers immediately upon signing into the unit? Is the soldier annotated on the AAA-162 upon arrival to the unit? b. Does the Work Center Supervisor (WCS) ensure that temporary arrivals are not submitted? c. Does the unit notify the PAS when they are unable to submit a regular arrival after three days? d. Are arrival transactions revoked for erroneously arrived soldiers? 7. Submission of Departure Transactions: a. Does the unit wait until a pending loss record is in SIDPERS 3 prior to submitting departure transactions? b. Does the unit ensure departure transactions are not submitted on soldier’s separating or retiring? c. Does the unit verify the Transition Center is submitting departure transactions within 24 hours of effective date? d. Does the unit notify the PSB when a gaining UIC is not reflected in SIDPERS-3 and a soldier is within 30 days from his/her PCS? e. Are departure transactions submitted NLT the next workday after the soldier departs the unit? f. Are departure transactions submitted in error, revoked on the same day or as soon as discovered? <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 5 SIDPERS (BNS1) NCOIC: Pg. 4 Of 4 CLERK: UNIT: AREA 6. UNIT PERSONNEL ACCOUNTABILITY NOTICES (AAA-165) RECONCILIATION E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX a. Do Battalions and separate companies annotate any changes on the latest copy of the AAA-165 until action is taken and a new report printed? b. Are BNS1’s and separate companies working and resolving all notices as soon as possible? 7. UNIT MANNING REPORT (AAA-161) a. Does the unit ensure that the current MTOE document is correct in SIDPERS-3? b. Are all changes manually posted to the AAA–161 upon receipt and SIDPERS transactions updated submitted as necessary? c. Are all soldiers in a unit assigned a position number reflected on the AAA–161? Note: Soldiers should not remain assigned to position number 9992 (Incoming Assigned Personnel) beyond 7 days after arrival in a unit. d. Are assigned soldiers who cannot be properly slotted reflected as “Reassignable Overstrength?” 8. ALPHA ROSTER (AAA-342) a. Does the BNS1 view or print this report? b. Are RSC Codes 1D, 1Q, 2Y, 3B, and 3E immediately resolved? REMARKS/RECOMMENDATIONS Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 6 REASSIGNMENT PROCESSING (BNS1) NCOIC: CLERK: Pg. 1 Of 2 UNIT: AREA 1. ARE THE FOLLOWING REFERENCES AVAILABLE: E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXXXXXXX a. AR 600-8-11 (Reassignment) & Update to CH 7, dated 5 Aug 99? b. AR 600-8-105 Military Orders 28 Oct 94)? c. AR 614-30 (Overseas Service) 16 May 97? d. AR 614-100 (Officer Assignment Policies, Details and Transfers) 15 Jul 84? e. AR 614-200 (Selection of Enlisted Soldiers for Training and Assignment) 31 Oct 97? 2. REASSIGNMENT PROCESSING: a. Do clerks have access to SIDPERS-3 with their own ID and password? a. b. Do clerks print the SIDPERS-3 Reassignment Interview Schedule (AAA-287) weekly to determine who must attend upcoming levy briefings? c. Is the clerk printing the SIDPERS-3 Reassignment Notices (Memorandum, AAA-231) weekly and distributing to soldiers in a timely manner? d. Does the Bn S1 screen the reassignment notice for special processing requirements and schedule the BnS1 Interview? e. Is the S1 conducting the BnS1 interview prior to soldier attending the levy briefing by completing the First Endorsement on the AAA231? f. Does the Bn S1 generate a Deficiency Notice from the Bn Cdr report (AAA-049) for each soldier on AI? Is corrective action initiated before sending the soldier to Reassignments Section for an interview? g. Does the unit ensure that soldiers attend their scheduled levy briefing? h. Does the Bn S1 ensure that all documentation and requirements for the soldiers AI are completed & forwarded to Reassignments Section for orders issuance? i. Are reassignment orders received at least 90 days prior to soldier’s report date? j. Does the unit submit DPRT transactions to update the database on EDAS/local/or intra-unit reassignments? b. c. d. e. f. g. h. i. j. Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 7 REASSIGNMENT PROCESSING (BNS1) NCOIC: CLERK: Pg. 2 Of 2 UNIT: E-Mail Address: AREA YES NO REMARKS 3. PROCESSING DELATION/DEFERMENT XXX XXX XXXXXXXXXXXXXXXXXXXXXX a. Is the S-1/orderly room aware of policies and procedures for requesting deletion or deferment of AI and counsels/assists soldiers with applications? b. Is the S-1/orderly room ensuring requests for deletion/deferment are submitted within 30 calendar days from the EDAS cycle date, or if a situation arises after the initial 30 day period, the request is submitted within 72 hours? c. Is the Bn S1 aware of the procedures to request for early arrival? Are requests submitted in a timely manner? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 8 E1 – E4 ADVANCEMENTS (BNS1) NCOIC: CLERK: Pg. 1 Of 1 UNIT: AREA E-Mail Address: YES NO REMARKS a. Is the current AAA-117 Report reconciled against the previous months report to determine if previous actions have processed? b. Does S1 screen AAA-117 Report for additions/deletions/grade discrepancies, and are the reports annotated with current data? If changes are made, are they then transferred to ad hoc query? c. Does promotion clerk compute waiver allocations utilizing the AAA-119 (E2-E3 only)? d. Does the unit use a battalion roll-up to compute E4 waiver allocations using AUTHORIZED E4 strength only? e. Are allocations computed correctly? f. Are units excluding soldiers from waiver computations IAW AR 600-8-19, chapter 2, para 2-5h? (Army Civilian Acquired Skills Program, Stripes for Education, Ranger and CMF 18) g. Do commanders review the AAA-117 report to determine advancement potential of each soldier by indicating “YES/NO” next to the soldier’s name? Does the commander sign the report? Does the battalion commander circle “YES/NO” and sign the report for all specialist advancements with waiver? h. Are soldiers denied automatic advancement to PV2, PFC and SPC on a DA Form 4187E prepared using SIDPERS-3 and using proper codes and submitting transaction on the 20th of the month prior? i. Is a DA Form 4187E (SIDPERS-3 generated) prepared for those soldiers selected for advancement? j. Is a copy of the AAA-117 report forwarded to the Promotions Section after completion and verification along with waiver computation worksheet, ADHOC query, and two copies of DA Form 4187 on each soldier selected for advancement? k. Is the PSB suspense being met for turn-in of AAA-117? l. Is the original AAA-117 Report, waiver computation worksheet (AAA-119), ADHOC query and copy of promotion orders filed in accordance with AR 25-400-2? m. Are there any illegal promotions? n. Are advancement certificates (DA Form 4874) prepared for those soldiers advanced to SPC? o. Are SIDPERS transactions submitted on SPC/CPL and below who are reduced? <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 9 SGT/SSG PROMOTION (BNS1) NCOIC: Pg. 1 Of 1 CLERK: UNIT: AREA E-Mail Address: YES NO REMARKS a. Does the commander use the Enlisted Promotion Report (AAA-294) to identify soldiers eligible for promotion to SGT/SSG? b. Does the commander complete the DA Form 3355 Section A for those soldiers recommended and nonrecommended for promotion? c. Does the promotion authority complete DA Form 3355, Section A by entering the signature block, signature and checking approval or disapproval? d. Does the promotion authority review DA Form 3355 and DA Form 4856 on non-recommendation for final decision IAW AR 600-8-19, Para 3-12h and Milper-Message 00-238? e. Does the promotion authority properly appoint the promotion board? f. Does the S-1 promotion clerk review the DA Form 3355 with the soldier to determine accuracy and completeness? g. Is soldier's signature obtained on the worksheet? h. Are promotion boards convened prior to the 15th of the month? i. Does promotion authority convene a promotion board and, after the board adjourns, review the board proceedings, and personally approve or disapprove the report within 3 working days? j. Does the promotion authority file the original reports of the board proceedings, DA FM 3356 and DA FM 3357? k. Are tracking systems established to monitor reevaluations, point adjustments, initial promotion packet submission, & the 24-month revalidation process to the Promotions Section? l. Are soldier’s identified/removed from the Promotion Standing List (IAW AR 600-8-19, Para 3-31? Are requests for removal forwarded to the PSB? m. Are copies of the unit EDAS C-10 and AAA-095 report authenticated by the unit commander and forwarded to the Promotions Section by the established suspense date? n. Does the promotion clerk review the EDAS C-10 for accuracy, ensure all recommended soldiers are listed on the report and report all discrepancies to the Promotion Section for corrective action? o. Does the S-1 ensure that the latest promotion points are posted on the EDAS C10 Report, initialed by the soldiers, and filed? p. Does promotion clerk provide source documents to notify the Promotion Section of reductions involving SGT/SSG personnel? <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 10 SUSPENSION OF FAVORABLE PERSONNEL ACTIONS(BNS1) NCOIC: CLERK: UNIT: AREA Pg. 1 Of 1 E-Mail Address: YES NO REMARKS a. Does the company commander request S-1 to prepare DA Form 268-E (SIDPERS-3) and does the company commander ensure it is authenticated? b. Does the S-1/separate company orderly room furnish a copy of AAA-O95 Report and DA Form 268-E to S-2 and retention? c. Does the S1 forward a copy of the DA Fm 268 to the servicing Finance and Accounting Office? d. Does the S-1/separate company orderly room update and annotate the AAA-O95 Report file copy identifying FLAG and ERUP codes? e. Is the S-1/separate company orderly room sending the AAA-O95 Report to the commander for review and signature? f. Are ERUP codes being submitted by retention and verified by the S1? g. Is the S-1/separate company orderly room retaining the final copy of DA Form 268 in a separate folder for one year? h. Does the unit verify the accuracy of the flagged soldiers on the AAA-160? i. Are “initial” and “removal” FLAG transactions submitted with the correct effective date? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 11 AWOL AND DFR CONTROL (BNS1) NCOIC: CLERK: Pg. 1 Of 1 UNIT: AREA YES E-Mail Address: NO REMARKS a. Whenever a soldier is absent without authorized leave, does the commander conduct an immediate inquiry to determine the soldier's true status? b. Based on the latest AAA- 162 report, dated____________, is there any soldier listed in an AWOL/DFR duty status? c. Does the S-1/separate company unit clerk prepare a DA Form 4187 for submission to PSB and FAO upon notification that a soldier is AWOL (24 hours after scheduled return date)? d. Does the S-1/separate company notify the local Provost Marshal within 24 hours of soldier's absence and provide information, which could lead to early apprehension? e. Does S-1/unit commander initiate Suspense of Favorable Actions (FLAG) utilizing SIDPERS 3 immediately upon determination that a soldier is AWOL? f. Does S-1/unit commander initiate action regarding reporting of derogatory information and suspense of access? Is DA Form 5248-R submitted to S-2? g. Is a signed copy of the personal property inventory retained by the S-1/separate company for inclusion in the DFR packet? h. Does the S-1/separate company prepare a letter notifying absentee's next of kin by 10th day of absence? i. Does the S-1/separate company drop individual from the rolls from the unit at 0001 hours on the 31st consecutive day of AWOL? j. Does S-1/separate company submit the DFR SIDPERS transactions? k. Does S-1/separate company prepare a DA Form 4187 for DFR? l. Does the unit commander complete DD Form 553 and forward a copy to the local provost marshal office? m. Does the unit commander complete DD Form 458 and forward along with DFR packet to PSB? n. Does the unit forward the original copy of the DFR packet within 48 hours after soldier has been placed in a DFR status? o. Are files maintained IAW DA PAM 25-400-2? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 12 ENLISTED PROMOTIONS NCOIC: Pg. 1 Of 4 CLERK UNIT: AREA Are the necessary references and reports on hand to process Enlisted promotion actions: a. Hastily Executed Lookup Program? b. AR 600-8-105 dated 24 October 1994? c. AR 600-8-19 dated 2 October 2000? d. Local SIDPERS MOI/LOIs UNIT SOP? 1. ACCOUNTABILITY AND ACCURACY OF DA FORM 3355-ES AND EDAS C10: E-Mail Address: YES NO XXX XXX XXX XXX REMARKS XXXXXXXXXXXXXXXXX a. Does Promotion Section conduct monthly reconciliation of promotion packets using EDAS C10? b. Are all promotion packets accounted for? c. Are promotions packets properly maintained and contain all supporting documentation? d. Are systems in place to monitor initial promotion packet submitted & forwarded to the unit? e. Are unit promotion board proceedings received within 3 working days after the board convening date? f. Are systems in place to monitor requests for reevaluation/point adjustments? g. Are systems in place to monitor the 24-month revalidation process? h. Are systems in place to ensure timely submission of promotion points into EDAS/TAPDB? i. Are systems in place to monitor soldier’s promotion eligibility using the by-name list? j. Are systems in place to ensure EDAS transaction updates SIDPERS 3? k. Are incoming promotable SPCs/SGTs identified during in processing? l. Are outgoing promotable SPCs/SGTs identified during out-processing to ensure that they hand-carry their promotion packet to their next duty station? m. Are clerks familiar with EDAS/TAPDB promotion functions? n. Does the Promotion Section have access to PERNET/EDAS/MS51? o. Does the Promotion Section have SIDPERS3 access? REMARKS/RECOMMENDATIONS: Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 13 ENLISTED PROMOTIONS NCOIC: Pg. 2 Of 4 CLERK UNIT: AREA 2. ACCURACY AND TIMELINESS OF PROMOTION ORDERS SGT/SSG: E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXX a. Are promotions orders produced and maintained IAW AR 600-8-105? b. Does the promotion section verify that soldiers are in a promotable status prior to orders being published? c. Do all promotion orders contain pertinent information related to a soldier’s promotion (i.e. NCOES waiver, Exception to Policy granted by HQDA, Conditional Promotion, etc.)? d. Are orders published at least two duty days prior to the effective date of promotion? 3. MONITORING THE AAA-117 REPORT: a. Is there a system in place to ensure timely submission of the AAA-117 report from the units? b. Are the AAA-117 reports reviewed prior to acceptance from the units for accuracy? c. Is the promotions section auditing 10% of units serviced? 4. MONITOR EDAS C10: a. Does the section have an EDAS C10 report on file for each unit serviced? b. Are all EDAS C10 reports monitored and updated to reflect soldier promotion, in/outprocessing soldiers, or promotion point changes? 5. SENIOR PROMOTION ORDERS DISTRIBUTION: a. Are queries run to identify NCOs eligible for promotion? b. Are copies of promotion orders distributed NLT two working days prior to the effective date of promotion? c. Are NCOs eligibility verified prior to promotion? 6. EDAS By-Name-List Management: Are Non-Promotion Reason Codes coded in EDAS in a timely manner and are all codes correct? 7. Promotion Standing List Removal Management: Is DA PERSCOM policies and procedures for removing soldiers from the Promotion Standing List followed? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 14 ENLISTED PROMOTIONS NCOIC: Pg. 3 Of 4 CLERK UNIT: AREA 8. E5/E6 Conditional Promotions Management: E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXX a. Are request for conditional promotions to SGT being processed IAW MILPER Messages 01-108 and 01-236? b. Are all fully eligible SSG’s being conditionally promoted when the cutoff for promotion has been met? c. Are soldiers being administratively reduced when NCOES requirements are not meet within 12 months of promotion effective date? d. Is EDAS/SIDPERS being screened to determine conditional promotion eligibility prior to conditionally promoting soldiers? RECOMMENDATIONS/REMARKS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 15 ENLISTED PROMOTIONS Pg. 4 Of 4 ENLISTED PROMOTION WORKSHEET (DA FORM 3355-E) NCOIC: CLERK: ELEMENT UNIT: YES/NO ELEMENT TYPE APPROVAL AUTHORITY NAME AWARDS/DECORATION SSN MILITARY EDUCATION RECOMMENDED GR/MOS WAIVERS REQUIRED CIVILIAN EDUCATION DUTY PERFORMANCE POINTS TOTAL BOARD POINTS YES/NO E-Mail Address: ELEMENT YES/NO RECOMMENDED INDIV BOARD RECORDER (INIT/TOTAL REEVAL) PROMOTION AUTH (INIT/TOTAL REEVAL) SOURCE DOCUMENTS PROMOTION BOARD PROCEEDINGS EDAS SCREEN PRINTOUT TOTAL ADMIN ISTRATIVE POINTS TOTAL PROMOTION POINTS RESPONSIBLE OFFICIAL APFT SCORES WEAPON QUAL AAA-294 – SGT/SSG Recommended List for Promotion ELEMENT YES/NO ELEMENT ZONE OF CONSIDERATION NAME PROMOTION SCORES PROMOTION POINTS DATE YES/NO ELEMENT YES/NO RECOMMENDED MOS REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 16 OFFICER REASSIGNMENT PROCESSING NCOIC: CLERK: AREA 1. AVAILABILITY OF REQUIRED ITEMS: a. Are all of these references available: UNIT: Pg. 1 Of 2 E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXXX XXX XXX XXX XXX (1) AR 600-8-11 (Reassignment) 1 Oct 94? (2) AR 600-8-105 (Military Orders) 28 Oct 94? (3) AR 614-30 (Overseas Service) 25 Sep 98? (4) AR 614-100 (Officer Assignment Policies? (5) Details and Transfers) 17 Sep 90? (6) DA Pam 600-8-30(PAS)? (7) DA Pam 600-8-31 (Bde/Bn)? (8) DA Pam 600-8-32 (PSB/MPD)? (9) DA Pam 600-8-33 (G1/AG)? b. Do all soldiers have a current desktop SOP? 2. TOPMIS PROCESSING: XXXXXXXXXXXXXXXXXX a. Does Officer Reassignment Section have access to PERNET/TOPMIS/TOPMIS II? b. Does the Officer Reassignment Section print the summary report on TOPMIS II weekly and obtain the RFOs for all officers who were placed on AI during the previous week? c. Is the clerk inputting the non-EDAS assignment instructions in SIDPERS-3 prior to creating the reassignment folder? d. Does the PSB have procedures to identify soldiers on AI without assignments in SIDPERS? e. Is the clerk notifying the officer to attend the levy briefing? f. Does the Officer Reassignment Section have a system to follow the reassignment process from receipt of the RFO until distribution of the PCS orders to the unit/officer? REMARKS/RECOMMENDATIONS: Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 17 OFFICER REASSIGNMENT PROCESSING NCOIC: CLERK: UNIT: AREA 3. MANAGE PERSONNEL ASSIGNMENTS: Pg. 2 Of 2 E-Mail Address: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXXX a. Does individual reassignment files contain applicable documents? (1) Assignments requiring security clearances, ______ of ______ files reviewed contained appropriate documentation. (2) Assignments requiring APFT verification, _____ of ______ files reviewed contained appropriate documentation. (3) Assignments requiring TDY documentation, _____ of ______ files reviewed contain appropriate documentation. (4) Assignments requiring special qualifications, _____ of ______ files reviewed contain appropriate documentation. b. Are Special Management Command (SMC) assignments managed properly? c. Does the Officer Reassignment Section suspense units for documentation that verifies soldier’s eligibility for an assignment? 5. PRODUCTION OF REASSIGNMENT ORDERS: a. Are reassignment orders produced IAW PERSCOM Regulatory guidelines? b. Are control procedures in place to ensure that soldiers receive orders in a timely manner? c. Are procedures in-place to accurately calculate DLOS/Availability date? d. Are orders published at least 90 days prior to DLOS? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 18 ENLISTED REASSIGNMENT PROCESSING NCOIC: CLERK: UNIT: AREAS E-Mail Address: YES NO 1. REFERENCE MATERIALS: XXX XXX Are all of these references available: (1) AR 600-8-11 (Reassignment) 1 Oct 94? (2) AR 600-8-105 (Military Orders) 28 Oct 94? (3) AR 614-30 (Overseas Service) 25 Sep 98? (4) AR 614-200 (Selection of Enlisted Soldiers for Training and Assignment) 31 Oct 97? (5) DA Pam 600-8-30(PAS)? (6) DA Pam 600-8-31 (Bde/Bn)? (7) DA Pam 600-8-32 (PSB/MPD)? (8) DA Pam 600-8-33 (G1/AG)? (9) Local Policies and Procedures? XXX XXX 2. EDAS CYCLE PROCESSING: XXX XXX REMARKS XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXX a. Does Reassignment Section have PERNET and EDAS access? b. Does Reassignment Section have access to SIDPERS-3? c. Does the Reassignment Section print the EDAS FTP files to include LOSS, LOSD, DELDEF and MODF each week and compare data with the SIDPERS EDAS Cycle to identify discrepancies? d. Does the Reassignment Section print the SIDPERS-3 EDAS Soldier Losing Assignments AAA-234 each week? e. Is the PAS notified when the weekly EDAS file has not been received? f. Does each reassignment packet contain the SIDPERS-3 losing assignment sheets? Have they been compared for accuracy and steps taken in SIDPERS-3 to resolve discrepancies? g. Are Non-EDAS AIs being populated when EDAS assignment did not processed in SIDPERS? h. Does the Reassignment Section have written procedural guidance for the S1s on reassignment processing in SIDPERS-3? i. Does the Reassignment Section take the appropriate action to delete a soldier’s AI when they have not reenlisted/extended to meet Service Remaining Requirements within 30 days from EDAS Cycle Date? j. Does Reassignment Section submit requests for deletion/deferment to arrive at PERSCOM within 60 calendar days of EDAS cycle date, or within 72 hours after situation occurs (after the initial 60 days)? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 19 ENLISTED REASSIGNMENT PROCESSING NCOIC: CLERK: UNIT: AREAS E-Mail Address: YES NO 2. EDAS CYCLE PROCESSING (Cont.): REMARKS XXX XXX XXXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXXXX k. Upon receipt of transition orders for personnel separating/retiring, is the appropriate action taken to delete the soldier from his/her EDAS assignment? 3. MANAGE PERSONNEL ASSIGNMENTS: a. Is Reassignment Section conducting initial screening of the EDAS Cycle IAW AR 600-8-11, Table 2-4? b. Is the Reassignment Section processing initial reassignment notifications IAW AR 600-8-11, Table 2-6? c. Do individual reassignment files contain applicable documents? (1) Assignments requiring security clearances, ______ of ______ files reviewed contained appropriate documentation. (2) Assignments requiring APFT verification, _____ of ______ files reviewed contained appropriate documentation. (3) Assignments requiring TDY documentation, _____ of ______ files reviewed contain appropriate documentation. (4) Assignments requiring special qualifications, _____ of ______ files reviewed contain appropriate documentation. (5) Assignments requiring reenlistment or extensions, _______ of _______ files reviewed contain appropriate documentation? Are the Reassignment Section deleting soldiers within 30 days of AI if the appropriate documentation is not received from the unit? d. Does the Reassignment Section suspense units for documentation that verifies soldier’s qualification for an assignment? e. Does Reassignment Section verify if the soldier’s availability date is the same as their DLOS & takes action if there are discrepancies? REMARKS/RECOMMENDATIONS: Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 20 ENLISTED REASSIGNMENT PROCESSING NCOIC: CLERK: UNIT: AREAS E-Mail Address: YES NO 5. PRODUCTION OF REASSIGNMENT ORDERS: XXX XXX REMARKS XXXXXXXXXXXXXXXXXX a. Are reassignment orders produced IAW PERSCOM guidelines? b. Are control procedures in place to ensure that soldiers receive orders in a timely manner? c. Are orders produced and distributed IAW regulatory guidelines? d. Are PCS orders administratively correct e. (IAW AR 600-8-105), especially as to the availability date vs. DEROS date, report date, name/UPC of gaining unit, and special instructions from EDAS? f. Are PCS orders published at least 90 days prior to DLOS? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 21 MOS MEDICAL REVIEW BOARD (MMRB) Name, Rank: E-Mail Address AREAS 1. AVAILABILITY OR REQUIRED ITEMS a. Does MMRB clerk have a copy of AR 600-60 and AR 40–501 or are the regulations readily available on the MMRB clerk's computer desktop? b. Does the command have comprehensive standard operating procedures (SOP) for conducting MMRBs? c. Has MMRB clerk coordinated with the hospital to receive a list of P3/P4 profiles on recurring basis? d. Are MMRBs conducted monthly, as a minimum? e. Are soldiers with P3 profiles scheduled for the first MMRB possible, after MMRB clerk receives profile from the hospital? f. What is the average MMRB processing time (from receipt of the profile from the hospital to the time the approval authority signs the MMRB results)? g. Are soldiers scheduled to appear before MMRBs briefed on the procedures? h. Are automated tracking systems established to monitor soldiers pending MMRBs? i. Does the MMRB clerk monitor the progress of soldiers: (1) Placed in a probationary status, MEB? SECTION: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXXXX Average MMRB processing time = XXX XXX XXX XXX (2) Recommended for reclassification? (3) Referred to the physical disability system? j. Is MMRB section involved in the USR laydown process to verify the accuracy of personnel reported non-deployable due to MMRB proceedings? k. Are departing soldiers screened to determine if they have a P3 profile and are pending MMRB action? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 22 PERSTEMPO Name, Rank: E-Mail Address AREAS 1. INSTALLATION LEVEL SECTION: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXXXX a. Is there published guidance to subordinate commands? b. Is periodic training scheduled for new PERSTEMPO clerks/managers? c. Are PERSTEMPO accounts cancelled when clerks rotate? d. Are procedures in place to manage high deployers at the installation level? e. Are request to exceed thresholds processed IAW PERSTEMPO business rules? f. Is the installation PERSTEMPO Manager conducting periodic checks to ensure units are entering creditable events into the system? 2. UNIT LEVEL a. Have units appointed primary and alternate PERSTEMPO clerks? b. Have primary and alternate PERSTEMPO clerks received training via the train the trainer program or from the online module? c. Does the primary and alternate clerks have valid PERSTEMPO accounts? d. Are accounts /passwords shared? e. Are clerks knowledgeable on how to log into AKO and PERSTEMPO and enter PERSTEMPO data? f. Do PERSTEMPO clerks maintain a list of all managed AHRIs with a signature? g. Are CDRs/1SGs authenticating data before it is entered into the PERSTEMPO system? h. Are CDRs/1SGs checking data entered into the system to ensure it is accurate? i. Are source documents maintained for each creditable event entered into the system? (Unit Training Files Marks # 35041b) REMARKS/RECOMMENDATIONS: Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 23 PERSTEMPO Name, Rank: E-Mail Address AREAS 2. UNIT LEVEL (Cont.) j. Is PERSTEMPO included as part of inprocessing and out-processing procedures? k. Are high deployers managed IAW PERSTEMPO Business Rules? l. Is the commander informed of potential high deployers? m. Are letters prepared and forwarded IAW the time line specified in the business rules? n. Does the unit ensure departing clerks PERSTEMPO accounts are cancelled? o. Are the following references on hand automated or hard copy: (1) Local command policy? SECTION: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXXXX XXX XXX (2) PERSTEMPO User's Manual (latest version)? (3) PERSTEMPO Business Rules (latest version)? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 24 UNIT STATUS REPORTING Name, Rank: E-Mail Address SECTION: AREA YES NO REMARKS XXX XXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX a. Total by category: XXX XXX (1) Required = XXX XXX (2) Authorized = XXX XXX (3) Assigned = XXX XXX (4) Available = XXX XXX b. Total by Grade: XXX XXX (1) Required = XXX XXX (2) Authorized = XXX XXX (3) Assigned = XXX XXX (4) Available = XXX XXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX 1. REFERENCES & MATERIALS: Are the following references & materials available: (1) AR 220-1 w/applicable changes and messages? (2) DA PAM 611-21? (3) Unit Accountability Report, AAA-162? (4) Enlisted MOS Inventory by name, AAA- 163? 2. PERSONNEL ACCOUNTABILITY c. Is supporting documentation presented at USR turn in to reflect changes to reconcile the AAA-162 and the AAA-163? d. When are the above reports reconciled? 3. DETERMING REQUIRED STRENGTH a. Is the MTOE/TDA used to determine required strength? b. Does Required Strength exclude augmented TDA for non-TOE positions? c. Does Required Strength include authorized PROFIS personnel? d. Is the current PROFIS roster dated within 30 days of USR? PROFIS updated monthly? 4. DETERMING ASSIGNED STRENGTH a. Is assigned strength percentage determined by comparing assigned versus required strength? b. Are PROFIS personnel assigned to required PROFIS positions? c. Is assigned strength adjusted to the “as of” date of the USR? (15th of the month)? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 25 UNIT STATUS REPORTING Name, Rank: E-Mail Address SECTION: AREA 5. DETERMINE AVAILAVBLE PERSONNEL: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX a. Is there a list of non-availables by name and condition? b. Are personnel attached to other units excluded? 6. DETERME AVAILABLE STRENGTH PERCENTAGE a. Is available strength percentage based on a comparison of available strength and required strength? b. Are PROFIS personnel included? 7. Determine Available MOS QUALIFIED PERSONNEL a. Is available MOSQ percentage based on a comparison of available strength and required strength? b. Does MOSQ exceed available strength? c. Are officers counted on a one for one basis? d. Using the first 3 characters of the MOSC, are enlisted soldiers MOSQ when they can be used in their PMOSC, SMOSC, AMOSC or an MOSC that can be substituted for the above IAW DA PAM 611-21? e. Using the first 4 characters of the MOSC, are Warrant Officers MOSQ when they can be used in their PMOSC, SMOSC, AMOSC or an MOSC that can be substituted for the above IAW DA PAM 611-21? f. Have PROFIS personnel been awarded Area of Concentration (AOC) and Additional Skill Identifier (ASI)? g. Are personnel in over-strength skills reported as excess? 8. DETERMINE AVAILABLE SENIOR GRADE PERCENTAGE a. Is available SR Grade percentage based on a comparison of the number of available Commissioned officer, Warrant Officer & SGT-CSM to required SR grade personnel? b. Are PROFIS counted in the SR grade calculation when MOSQ? 9. CALCULATE PERSONNEL LEVEL a. Are P-levels calculated IAW AR 220-1 para 4-7 step 10? b. Are composite P-levels calculated IAW AR 220-1 para 10-5.b table 10-1? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 26 UNIT STATUS REPORTING Name, Rank: E-Mail Address SECTION: AREA 10. DETERMINE PERSONNEL TURNOVER PERCENTAGE: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX Is turnover is based on comparing the number of personnel reassigned or separated from the reporting unit during the 3 months preceding the “as of” date of the report to assigned strength on the “as of” date? 11. MANDATORY REMARKS: a. Are top 10 critical MOSs identified? b. Are remarks required IAW para 4-10? 12. MANNING PRIORITY: a. Is the utilization guidance in AR 614-200 para 3-10a (10) & d (7) being considered when computing MOSQ? b. What’s the procedure for identifying available personnel for Squad Crew Manning? c. Are personnel assigned to “OTHER MTOE positions battle rostered to a squad crew for USR reporting? d. Are personnel serving in SD, BMM, & TD who are available battle rostered to a squad crew for USR reporting? 13. AUTHENTICATION OF PERSONNEL REMARKS: Does the G1/S1 write or validate the personnel remarks in the ready remarks and overall personnel narrative sections of the unit status report? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 27 SIDPERS INTERFACE MANAGEMENT (PAS) The PAS falls within the managerial framework and field unit organization of the military personnel system. The PAS can be divided into five major functional areas. These areas are Management, Communications, Customer Support, Training and System Database Maintenance. NOTE!!!!!!!!! The SIDPERS portion will significantly change "after" the fielding of the Super Server - Host Terminal Data Server (HTDS) concept. Name, Rank: E-Mail Address SECTION: AREAS 1. REFERENCE MATERIALS: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXX a. FORSCOM PPET HomePage http://www.forscom.army.mil/ppet b. Hastily Executed Lookup Program (H.E.L.P.) SCP0409-00. c. PERSCOM SIDPERS-3 Procedures and Guidelines http://www-perscom.army.mil/tagd/sidpers3/page1.htm. d. MILPER Messages. http://perscomnd04.army.mil/milpermsgs.nsf e. Army Publications and Regulations. http://www.usapa.army.mil/ 2. MANAGEMENT RESPONSIBILITIES: a. Does the PAS chief and the Dragon Master plan, direct, control, and coordinate the PAS operation? b. Does PAS publish memorandums of instruction about its operations for local administrators and SIDPERS users? c. Does the PAS systematically disseminate to users the SIDPERS procedural updates and changes received from PERSCOM in messages, bulletins, and other publications? d. Does the PAS chief and Dragon Master develop contingency plans for use during partial or full mobilizations, civil disorder, war and natural disasters? e. Does the PAS chief and Dragon Master manage the SIDPERS-3 database of record (HTDS)? f. Do the PAS chief and Dragon Master review user procedures and directs SIDPERS-3 performance monitoring and measuring programs to ensure accuracy and timeliness of data? g. Does the PAS management monitor a viable schedule to control the flow of data to and from the PAS SIDPERS-3 database of record (HTDS)? h. Is management constantly reviewing system input and output queues to ensure that required processing and direct reporting to PERSCOM comply with higher headquarters procedures? i. Is PAS maintaining a SIDPERS-3 Software library including all Software Version Description documents? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 28 SIDPERS INTERFACE MANAGEMENT (PAS) Name, Rank: E-Mail Address SECTION: AREAS YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXX 4. CUSTOMER SUPPORT: XXX XXX XXXXXXXXXXXXXXX Is the PAS System Administrator: XXX XXX 3. COMMUNICATIONS: a. Are there controls in-place to monitor and manage SIDPERS-3 data flow for external sites (TAPDB, DJMS, ISM, ORG, TAADS, etc…? b. Are logs being maintained of all out-going and incoming transactions? c. Is PAS logging, filing and providing guidance for software updates? d. Is the PAS establishing connectivity to all sites in both tactical and garrison environments? a. Attempting to assist/resolve problem telephonically with Work Center operators? b. If the problem appears isolated to a specific transaction type, is the PAS operator checking to see if there is reference to this problem in the PERSCOM Error Resolution Handbook and if so, following the recommended course of action? c. Recording the symptoms/problems that the user is experiencing and actions that lead to the problems? Also recording any visible damages to hardware that the Work Center operator has noted? d. Applying common solutions for similar problems that have occurred in the past, if applicable? e. If above checks do not resolve the problem, is the Dragon Master and/or the PAS chief? f. If the above procedures do not correct the problem, is FSD contacted and diagnostic checks performed as directed by the FSD? REMARKS/RECOMMENDATIONS: Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 29 SIDPERS INTERFACE MANAGEMENT (PAS) Name, Rank: E-Mail Address SECTION: AREAS 5. TRAINING: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXX Note: The PAS must assess the quality of data and originator input to identify training requirements. The Training NCO must have the tools to become knowledgeable in all areas of BNS1, G1/AG, PSB or MPD and PAS-level procedures. XXX XXX 6. DATABASE MAINTENANCE AND VERIFICATION: XXX XXX Is the PAS managing and/or knowledgeable with the following reports IAW PERSCOM procedures and regulatory guidance: XXX XXX Is the Training NCO: a. Conducting assistance visits to BNS1 quarterly unless the BNS1 requests additional assistance. Recommend PAS analyst designated for the units accompany the training NCO on the assistance visit? b. Scheduling sustainment-training classes for SIDPERS-3 users newly assigned PSB/BDE/BNS1 clerks? c. Scheduling classes or informational briefings for different levels of responsibility, such as commanders, personnel sergeants, first sergeants, and battalion adjutants or S1s, BNS1, clerks, PAS System Administrators, and PSB or PSC clerks and Work Center Supervisors? d. Facilitating cross training among PAS personnel? e. Has the Security Automation System Manager been appointed in writing? f. Has the Security Automation System Manager been provided a copy of all Type 1 & SIDPERS-3 user IDs and date of last password change? g. Are user accounts reviewed monthly to ensure system security is maintained? Are passwords changed every 90 days? XXXXXXXXXXXXXXX a. EDAS Cycle Audit Sheet (AAA-002)? b. TADDS Processing Error Report (Line Error) (AAA071)? c. TAPDB Organization Change Report (AAA-080)? d. Total Army Locator Report (AAA-083)? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 30 SIDPERS INTERFACE MANAGEMENT (PAS) Name, Rank: E-Mail Address SECTION: AREAS 6. DATABASE MAINTENANCE AND VERIFICATION (Cont.): YES NO REMARKS XXX XXX XXXXXXXXXXXXXXX e. Organization Reconciliation Report (AAA-084)? f. SIDPERS/TAADS Comparison (AAA-087)? g. TAADS-R Listing (AAA-088)? h. Authorized Strength File Listing (AAA-089)? i. SIDPERS/TAADS Update Report (AAA-090)? j. Suspension of Favorable Personnel Actions Management Report (AAA-095)? k. Interface Input Transaction List (AAA-105)? l. Interface Outlogger (AAA-107)? m. Personnel Due to Depart Between YYYYMMDD and YYYYMMDD (AAA-108)? n. Unit Enlisted Advancement Report (AAA-117)? o. Report Of AWOLs by Name (AAA-160)? p. Unit Manning Report Position & Incumbent Data (AAA161)? q. Unit Personnel Accountability Report (AAA-162)? r. Unit Personnel Accountability Notices (AAA-165)? s. E-5/E-6 Recommendation List For Promotion of Enlisted Personnel (AAA-242)? t. Alpha Roster (AAA-342)? u. Personnel Edit Report (AAA-344)? v. External error report (AAA-351)? w. Monitoring and resolving DJMS (JUMPS) feedback (Part IV of AAA-351)? x. Internal error report (AAA-650)? y. SIDPERS-3 System Communications Configuration Report (AAA-996)? z. SIDPERS-3 Internal Audit Trail Report (AAA-997)? aa. Performs Organization/Authorization maintenance? bb. Reconciles 30 day past due notices from TAPDB? cc. Reconciles Monthly Database Deviation Report MA1/MA2? dd. Reconciles all Strength Reports related with all pertinent WCS and/or SIDPERS operators? <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 31 PERSONNEL PROCESSING - TRANSITION CENTER (TC) The impact of improper personnel accountability results in bad accounting data, which causes under or over funding for future budgets, denied retention due to reduction to forces based on installation strength reported promotions and personnel distribution. Name, Rank: E-Mail Address SECTION: AREAS 1. REFERENCE MATERIALS: YES NO REMARKS XXX XXX XXXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXXXXXXX XXX XXX a. FORSCOM PPET HomePage http://www.forscom.army.mil/ppet b. Hastily Executed Lookup Program (H.E.L.P.) SCP0409-00. c. PERSCOM SIDPERS-3 Procedures and Guidelines http://www-perscom.army.mil/tagd/sidpers3/page1.htm. d. MILPER Messages. http://perscomnd04.army.mil/milpermsgs.nsf e. Army Publications and Regulations. http://www.usapa.army.mil/ 2. TRANSITION CENTER MANAGEMENT AND SIDPERS CLERK: a. Is there a listing (ADHOC Query etc.) of soldiers eligible for potential separation? b. Is the listing being provided to the units to verify applicable soldiers for scheduling of initial pre-separation briefing within 120 days of Expiration of Term Of Service (ETS) or Retirement? c. Are the appropriate SIDPERS transactions prepared, submitted and processed? d. Is the management or SIDPERS clerk coordinating with the Units and Post Retention to resolve record status codes of 1Q (Top of the system separation)? e. Are there any measurement in-place to identify shortfalls and possible need for sustainment training? Is the TC SIDPERS clerk managing and/or knowledgeable with the following reports IAW PERSCOM procedures and regulatory guidance: (1) Monthly Database Deviation Report MA1/MA2? (2) Suspension of Favorable Personnel Actions Management Report (AAA-095)? (3) Personnel Edit Report (AAA-344)? (4) Alpha Roster (AAA-342)? (5) Unit Personnel Accountability Report (AAA-162)? (6) Unit Personnel Accountability Notices (AAA-165)? (7) External Error Report (AAA-351) coordinate with PAS? (8) Report Of AWOLs by Name (AAA-160)? <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 32 PERSONNEL PROCESSING - REPLACEMENT CENTER In-processing welcomes and brings the individual soldier and family members on board and provides an orderly process resulting in validation and reporting of individual soldier readiness for worldwide deployment to the gaining commander. This is accomplished through a series of in-processing points that gather and certify information about the soldier and his family, normally within 72 hours. Name, Rank: E-Mail Address SECTION: AREA YES 1. REFERENCE MATERIALS: XXX NO XXX REMARKS XXXXXXXXXXXXXXX a. FORSCOM PPET HomePage http://www.forscom.army.mil/ppet b. Hastily Executed Lookup Program (H.E.L.P.) SCP04-09-00. c. PERSCOM SIDPERS-3 Procedures and Guidelines http://www-perscom.army.mil/tagd/sidpers3/page1.htm. d. MILPER Messages. http://perscomnd04.army.mil/milpermsgs.nsf e. Army Publications and Regulations. http://www.usapa.army.mil/ 2. REPLACEMENT OPERATIONS: XXX XXX XXXXXXXXXXXXXXX a. Are Replacement SIDPERS-3 clerks trained on current SIDPERS-3 IAW PERSCOM procedures, Local Policies, and all pertinent Army Regulations? b. Are SIDPERS transactions being updated and processed IAW AR 600-8-6 strength reporting period? Note: The accounting period covers the 24-hour period beginning at 000l and ending at 2400 for each calendar day. c. Are soldiers who go AWOL en route, properly accounted for? d. Are there any soldiers on the 30 days past due report to the replacement UICs? e. Is commander of the installation or division replacement unit/activity ensuring that an assigned-notjoined (ASNJ) SIDPERS-3 transaction is submitted when the soldier does not physically arrive on the report date IAW orders? f. Are ASNJ and DFR soldiers "clearing the installation book”? Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 33 PERSONNEL PROCESSING - REPLACEMENT CENTER Name, Rank: E-Mail Address SECTION: AREA 2. REPLACEMENT OPERATIONS (Cont.): YES NO REMARKS XXX XXX XXXXXXXXXXXXXXX g. Is the replacement unit commander following procedures in AR 630-10 to attempt to locate the soldier? Note: This includes contacting the losing unit commander, the losing installation PSB, the career branch at PERSCOM, and unit of attachment (if TDY en route). h. Is the assigned-not-joined entry being followed by a join transaction (when the soldier arrives a few days later), an AWOL duty status transaction (when the replacement unit commander's inquiries find no information) and a dropped-from-rolls (DFR) transaction 30 days after the report date? i. If the commander's inquiry finds the soldier was diverted to another assignment (at another installation) or attached to a unit at another installation, is the SIDPERS-3 ASNJ entry revoked? j. When the ASNJ action leads to DFR, is the DFR packet assembled and forwarded to the US Army Deserter Information Point, Indianapolis, IN 46249, DSN 699-3700? k. Is the AAA-162 report printed (at a minimum) weekly? l. Does the Replacement Clerk conduct a daily reconciliation of the AAA 162, AAA-165 and Alpha Roster (AAA-342)? m. Are corrective measures taken to re-synchronize the database and all noted discrepancies researched and corrected? n. Are there any measurement in-place to identify shortfalls and possible need for sustainment training? o. Is management constantly reviewing system input to ensure that it is IAW PERSCOM procedures and guidelines? REMARKS/RECOMMENDATIONS: <BACK TO TABLE OF CONTENTS> Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 34 This Page Is Intentionally Left Blank. Power Projection Enhancement Team Assessment Checklist, Dated 6 March 2016 35