CRISTOPHER VALDEZ BONSATO Current Address: Current Number: Email Address #09 Arayat Ext. Marikina Village Nangka, Marikina City Philippines (+63)9276874710/+966549277544 chris2pher_7980@yahoo.com Objective: To enhance my knowledge and experience, and develop my career in the field of Electronics and Communication Engineering or in any field related to my course of discipline. I now wish to develop my career further, and am therefore looking for a new and suitably challenging position. Work History: May 26, 2012- Nov.30,2012 Mobily Telecommunication Transmission NOC Front Office Engineer Khuraiz Road Danah Compound Riyadh K.S.A. 1st level Troubleshooting of All Equipment alarms of Huawei Transmission in KSA. Trouble shooting and monitoring of Transmission and Datacom services by using T2000 and N2000 respectively. Escalation of Service effecting. Integration of TXN and Datacom Network Elements with NOC (Network Operation Centre) for centralize monitoring of the NEs on Huawei NMS (T2000 and U2000) for routine O&M, performance measurement and graded fault management. Identify the location and severity (Critical/Major/Minor) of the alarm or event of systems and initiate recovery actions, notification procedures if required. Event Management/Trouble Ticket management using MD5200. Configuration and knowledge of Huawei SDH. Knowledge of Huawei DWDM. DWDM/SDH troubleshooting, escalation and rectification of TXN related issues. Monitoring and troubleshooting of Internet traffic using CACTI tool. Give technical support to Field Engineers. Monitor alarms and performance information on the 24x7 basis. Customer complaints handling and coordinating with OLO’s(Other Local operators). First and second line fault Diagnostics, troubleshoot and escalate (If required) to concerned department and follow-up the issue to recover the alarms in agreed SLA. Making of DWDM performance report. Service effecting alarms of 2G and 3G sites. DWDM Performance report of Huawei equipment. Oct.8, 2011-Present Freelance Engineer Telecom Equipment Installation site survey and Commissioning and Traffic migration. Deployment of Huawei DWDM and OSN6800,OSN8800,OSN7500,OSN3500,OSN2500 OSN1500, Metro1000, RTN620 Equipments Installation Testing and Commissioning migration and Upgrades using Toolkit. Responsible for installing rack and DWDM,SDH,PDH ,etc., equipments Huawei BWS1600G/OSN Optical Network optimization. Installation and commissioning of ADX100 ZTE ZXCTN 9008, 9004 Installation. Broadband Installation and Repair for costumers. Installation and Commissioning for Fiber Home AN5116 /AN5116-06B equipments that can support GPON /EPON for Fiber To The Home (FTTH) FTTx domestic installation Customer Premise Equipment ( CPE ) - ONU / ONT Focus and experience on maintaining quality standards Supervision and able to drive teams. Able to make the right decisions by yourself and solve problems without escalating to management Provisioning dedicated circuits for GPON/FTTH connectivity and MPLS/Ethernet/Data services. Jumpering / terminate from MDF/DDF using proper tools for standard Installation. Carry out end to end testing to resolve issues and prepare the lines of parameters for a trouble free installation. Installation of Huawei UA5000 and Huawei Smartax MA5616, RTN620 Equipments. Performs MDF/Cabinet jumpering and Rehabilitation. Assist all installer for technical problem in the field that the encounter for the installation and repair. Configure of modems such as Prolink, Aztech, Siemens, ZTE, and Huawei Customer complaint handling Prepare the presentation to Huawei Installation and Commissioning for Huawei NodeB 3800/3900 Using Anritzu OTDR ,Site master, Power meter EXPO Spectrum Analyzer (FTB400, FTB200) March 05, 2010-Sept.15, 2011 E-Formula Electronics Philippines Inc. NOC Engineer / Optical Network Engineer 4th NL Bldg.Shaw Blvd.Mandaluyong City Philippines Network Operation Center (NOC) under SMART and Globe Telecom Projects Philippines. Using Huawei T2000 and U2000 software and equipment upgrade using Toolkit. Upload New NE at NMS Create test trail, and support engineers for acceptance, migration/cutover activity Participate also in commissioning and acceptance test. Support Field engineers and assess during commissioning and acceptance. Deployment of Huawei WDM1600G and OSN6800, OSN7500, OSN3500, OSN2500, OSN1500, Metro 1000, Huawei UA5000 and Huawei Smartax MA5616, RTN620 Equipments. Do supervisory levels, commissioning, acceptance, design, inventory, and support and maintenance. Installation Testing and Commissioning Migration using Toolkit and Upgrades. Conduct cutovers for the sites to bring them into existing network. Responsible for installing rack and SDH,PDH ,etc., equipments Laying and Patching of Fiber Optic Cable/ Structure Cabling. Termination of power to rectifier Termination. Upload New NE at NMS Enable ASON Nodes. Create test trail, and support engineers for acceptance, migration/cutover activity. Participate also in commissioning and acceptance test. Installed Fiber drop from DJ up to client conduct JDSU-ODTR test all parameter specially the loss of the fiber. Preparing of materials to be used for splicing of copper and fiber optic cables. Trouble shooting of break fiber, high alteration and other type of trouble Checking of project status and present to Project Managers Testing and isolation of copper network fault using Dynatel and JDSU Copper tester. Pre-testing of fiber joint using Light source and power meter. Termination of fiber optic using pig tail or patch cord to distribution cabinet and ODF. January 21, 2008-Feb.28.2010 Huawei Technologies Philippines Inc. Optical Network Engineer 53th Flr. PBCom Tower Ayala Makati City Philippines Job Description: Network Operation Center (NOC) under SMART and Globe Telecom Projects Philippines. Using Huawei T2000 and U2000 software and equipment upgrade using Toolkit. O&M Technical and Deployment of Huawei DWDM and OSN6800,OSN8800,OSN7500,OSN3500,OSN2500 OSN1500, Metro1000, RTN620 Equipments Do supervisory levels to the subcontractor, commissioning, acceptance, design, inventory, and support and maintenance. Installation Testing and Commissioning migration and Upgrades. Responsible for installing rack and DWDM,SDH,PDH ,etc., equipments Huawei BWS1600G/OSN Optical Network optimization. Conduct cutovers for the sites to bring them into existing network. Upload New NE at NMS Enable ASON Nodes. Assist the trouble shooting on sub contractors according to project requirement Perform the necessary analysis to solve optical network problems such as service interruption Perform network optimization data analysis Provide technical creativity in solving problems Checking of project status and present to Project Managers Network parameters consistent check on weekly basis according to project requirement Prepare the presentation to Huawei customers. Recommend parameters change and perform advance analysis Review the daily system alarms and assist maintenance team to solve the problems Carry out new feature trial testing and advice on parameters usage Carry out high level network performance management and improvement Customer complaint handling Laying and Patching of Fiber Optic Cable and installing fiber tray. Termination of power to rectifier. Termination of power to rectifier Termination of E1’s/UTP and fiber Structure Cabling. Performs quality check related telecom works jobs encountered during installation And testing, and prepares reports to the project manger escalate the status of the project. Support Field engineers and assess the subcontractor during commissioning and acceptance. Installed Fiber drop from DJ up to client conduct JDSU-ODTR test all parameter specially the loss of the fiber. Installed mediacon modem to client conduct Lan to Lan isolation and FE testing for E1 or Fast E. Trouble shooting of break fiber, high alteration and other type of trouble Testing and isolation of copper network fault using Dynatel and JDSU Copper tester. Pre-testing of fiber joint using Light source and power meter. Termination of fiber optic using pig tail or patch cord to distribution cabinet and ODF. June 09, 2007-Dec.09, 2007 Fibercom Telecom Philippines Inc. Project Implementation Technician 14th Flr.PSE Bldg.Ortigas Center Pasig City Philippines Job Description: Responsible for installing rack and SDH, PDH, etc., ECI equipments specially XDM1000,XDM100,Hi-FOCUS Installation Testing and Commissioning , Laying and Patching of Fiber Optic Cable and installing Warren and Brown fiber tray. Termination of power to rectifier. I have extensive experience in installation and maintenance of SDH equipment via fiber optics, and Inside Plan Technician as well. I am also proficient in the use of different kinds of data testing equipment. Termination of power to rectifier Termination of E1’s/UTP and fiber Structure Cabling Performs quality check related telecom works jobs encountered during installation. Feb.12, 2004 -May 30, 2007 PageCom Telecommunication Inc. Fields Operation Engineer/Project Engineer BF Homes Paranaque City Philippines Job Description: Responsible for installing rack and SDH, PDH, etc., TELLABS Equipments (T7100, T6345,T6340,T6320,|T6325,T8160,T8140). Installation Testing and Commissioning Laying and Patching of Fiber Optic Cable and installing fiber tray. Termination of power to rectifier Termination of E1’s/UTP and fiber Structure Cabling Performs quality check related telecom works jobs encountered during installation And testing. Survey for Outside Plant and Telephone Line Installations. Projects Implemented: GLOBE Telecom Philippines Metro Backbone Optical Transmission Network (Huawei DWDM Optix BWS1600, OSN6800, OSN8800,OSN 7500, 3500, Metro1000, Metro100, 2500) Testing and Commissioning. Installation Testing Commissioning of ECI Equipments (HiFocus 5, XDM-1000, XDM-500, XDM-100, BG-40 BG-20) for optical Transmission equipments Metro Backbone Optical Transmission Network (MBOTN), Huawei OSN 7500, 3500 and DWDM1600G.Installation of Alcatel 1662 SMC3G BAYANTEL Telecom Bayantel Wireless Link, Installation of ECI XDM1000, XDM-100, Equipments for Optical Transmission. SMART Communication Installation Testing Commissioning MSAP1 to MSAP4 (Multi Station Access Protocol) Project Tellabs 6350 and 6345 equipment. Installation NERA CE Link, City Link, and Inter Link Radio, Radwind Airmux for IP Radio. SMART Communication Installation Testing Commissioning FITL (Fiber in the Loop) Project Tellabs 6340 and Tellabs 6320, Tellabs 6325 Equipments, Huawei 7500, 3500, and 1500 Globe Innove Communication MSDDN Project (Multi Service Digital Distribution Network) Project Tellabs 8160 and Tellabs 8140 Equipments. Philippine Long Distance Telephone Company (PLDT) Globe Communication Internet Protocol Back Bone (IPBB) Project Tellabs 8840 and Tellabs 8160 Installation of Alcatel 1662 SMC, MSAP Project Installation Testing and Commissioning of OSN800 EQUIPMENTS HANDLED: EXPO Spectrum Analyzer (FTB400, FTB200) Fluke Tester, Sunrise, EXPO Gig Ethernet Tester Acterna, ANDO, and NOYES Power Meter Acterna Variable Attenuator, Acterna Light source Tester Acterna Test Pad Data Tester, Anritzu Data Tester Sunrise, Acterna SDH Tester, Sunrise, EXPO Fast Ethernet Tester Training Attended: Oct.11-13, 2011 Huawei NODE B Installation Standard, Provisioning and Maintenance Operation Sept.26-30, 2011 Fiber To The Home (FTTH) Technology by: Fiber Home Dec.04, 2007 Radwind Airmux Installation Provisioning and maintenance Operation. Dec. 08, 2006 Tellabs 6300 Ethernet-Over-SDH Operation and Management June 13-15 2005 Tellabs 8800 CLC Provisioning and maintenance operation May-June 2003 ON- the Job Training Philippine Long Distance Telephone Company (PLDT) Sampaloc, Metro Manila, Telephone Line Installation and Cabling of telephone And testing of telephone lines. EDUCATIONAL ATTAINMENT: 1997-2003 Bachelor of Science in Electronics and Communication Engineering Central Colleges of the Philippines #54 Aurora Blvd., Quezon City 1993-1997 Burgos National High School Poblacion Burgos, Pangasinan 1987-1993 Papallasen, Elementary School Brgy. Papallasen Burgos, Pangasinan SEMINARS ATTENDED: Sept. 15, 2003 Digital Audio Broadcasting Central Colleges of the Philippines Feb.22, 2003 Teleconferences Central Colleges of the Philippine PC Assembly Central Colleges of the Philippines Jan.26, 2003 SPOKEN DIALECTS: English, Filipino, Ilocano PERSONAL INFORMATION: Date of Birth: Place of Birth: Civil: Religion: Father's Name: Mother’s Name: Brgy. Papallasen Burgos, Pangasinan Single Roman Catholic Claro Bonilla Bonsato Marcelina Valdez Bonsato Drivers License: License No. : Professional Drive Restriction N0.1&2 N02-11-015759