DLB Project List 2014

advertisement
PROJECT LIST
• Dental Office for Austin Oral Surgery (2014)
Austin, Texas. 4805 sf, 6+ chair office for Oral Surgeons. Suite in new one-story, multitenant office building (including Attic Storage / Mechanical).
• Dental Office for Dr. John C. Baines (2014)
Austin, Texas. 2877 sf, 5 chair office for General Dentist. Suite in new one-story, multitenant office building (including Attic Storage / Mechanical).
• Private Residence (2014)
Austin, Texas. 5608 sf, extensive remodel of existing residence (6 bedroom / 6.5 bath);
Architect of Record: Phil Pokorny Architecture, LLC
• Dental Office for Dr. Ann Dimick (2013)
Bee Cave, Texas. 2824 sf, 7 chair office for Pediatric Dentist. Suite in one-story, multitenant office building.
• Dental Office for Dr. Pejman Khosravian (2013)
Austin, Texas. 2714 sf, 7 chair office for Endodontist. Suite in two-story, multi-tenant
office building.
• Veterinarian Remodel for Dr. Robert Griffith (2013)
Austin, Texas. 160 sf, Surgery remodel for Veterinarian.
• Dental Office for Dr. Amy Urban (2012)
Austin, Texas. 2454 sf, 6 chair office for General Dentist. Suite in multi-story, mixed use
office building.
• Oral Surgery Office for Dr. Paul Casmedes (2012)
Austin, Texas. 3219 sf, 6 chair office for Oral Surgeon. Suite in existing multi-story, multitenant office building.
• Dental Office Remodel for Drs. Don Taylor & Ashley Strickland (2012)
Buda, Texas. 318 sf, remodel of existing Dental Office.
• Design Consulting Services for Drs. Mhairi Russell & Tim Bollans (2012)
Salmon Arm, BC, Canada. Preliminary Design for 2481 SF Dental Office.
• Design Consulting Services for Dr. Jay Raynor (2012)
Keene, NH. Preliminary Design for 2372 SF Dental Office.
• Dental Office Remodel / Expansion for Dr. Mai Ferrara (2012)
Austin, Texas. 800 sf, remodel / expansion for Orthodontist. Suite in existing one story,
multi-tenant office building.
• Dental Office Remodel / Expansion for Dr. Lisa Burkett (2012)
Austin, Texas. 476 sf, 1 chair remodel / expansion for Prosthedontist. Suite in existing
two story, multi-tenant office building.
DLB Architect Project List
Pg. 2 of 12
• Dental Office for Drs. Jeff & Meredith Hom (2011)
Austin, Texas. 2004 sf, 5 chair office for Endodontists. Suite in new, one story (with attic)
office building.
• Dental Office for BLT Salido (2011)
Cedar Park, Texas. 4945 sf, 7 chair office for Pediatric Dentist. One-story building with
masonry/stucco exterior (with Attic Storage).
• Dental Office for Dr. Scott Furrow (2011)
Leander, Texas. 3096 sf (Phase One), 6 chair office for Pediatric Dentist. One-story
building with masonry/stucco exterior.
• Dental Office for Monica Goldenberg/Sonrisa (2010)
Georgetown, Texas. 3782 sf, 9 chair office for Orthodontist. One-story building with
masonry/stucco exterior on multi-building site.
• Dental Office for Dr. Joanna Davis/Sonrisa (2010)
Georgetown, Texas. 2929 sf, 6 chair office for Endodontist. One-story building with
masonry/stucco exterior on multi-building site.
• Dental Office for Dr. Mandy Holley/Sonrisa (2010)
Georgetown, Texas. 3496 sf, 6 chair office for General Dentist. One-story building with
masonry/stucco exterior on multi-building site.
• Oral Surgery Office for Austin Oral Surgery/Sonrisa (2010)
Georgetown, Texas. 4250 sf, 6 chair office for Oral Surgeon. One-story building with
masonry/stucco exterior on multi-building site.
• Dental Office for Drs. Allen & Laura Adair (2010)
Austin, Texas. Remodel and addition (2 operatories) to existing office for General
Dentists.
• Dental Office for Dr. Paul Gates (2009)
Round Rock, Texas. 4088 sf, 10 chair office for Orthodontist. Suite in new, two story
office building.
• Dental Office for Dr. Greg Thiel (2009)
Austin, Texas. 2381 sf, 8 chair office for Pediatric Dentist. Suite in existing, three story
office building.
• Dental Office for Dr. Divya Shetty (2009)
Austin, Texas. 2562 sf, 6 chair office for General Dentist. Suite in new, one story office
building.
• Dental Office for Dr. Robert L. Machen (2009)
Austin, Texas. 2998 sf, 6 chair office for Periodontist. Suite in new, one story (with attic)
office building.
• Dental Office for Dr. Jeffrey Trester (2009)
Ventura, California. 1619 sf, 4 chair office for General Dentist. Suite in new, two story
office building.
DLB Architect Project List
Pg. 3 of 12
• Dental Office for Drs. Morrow, Lai & Edwards (2009)
Tulsa, Oklahoma. 6492 sf, 14 chair office for Pediatric Dental Group. Suite in new, one
story office building.
• Design Consulting Services for Dr. David Hennington (2009)
Georgetown, Texas. Preliminary Design for 4 chair, 2052 sf office for General Dentist.
• Design Consulting Services for Dr. Robert Griffith (2009)
Austin, Texas. Preliminary Design for remodel of existing Veterinary Hospital.
• Design Consulting Services for Dr. Fidel Del Toro (2009)
Austin, Texas. Preliminary Design for 5 chair, 2996 sf office for Orthodontist.
• Dental Office for Dr. Brad Spano (2008)
Charlottesville, Virginia. 3834 sf, 9 chair office for General Dentist. Suite in new, three
story office building.
• Dental Office for Dr. Lucinda Garcia (2008)
Austin, Texas. Remodel and addition (3 operatories) to existing office for General
Dentist.
• Dental Office for Dr. Tory Trevino (2008)
Pharr, Texas. 4951 sf, 8 treatment chair office for Pediatric Dentist. One-story building
with masonry/stucco exterior on multi-building site.
• Oral Surgery Office for Austin Oral Surgery (2008)
Austin, Texas. 4518 sf, 6 chair office for three Oral Surgeons. Suite in new, one story
(with attic) office building.
• Dental Office for Dr. Mark Friedrich (2007)
Round Rock, Texas. 2521 sf, 5 chair office for General Dentist. Suite in new, one story
(with attic) office building.
• Dental Office for Drs. Morrow & Lai (2007)
Tulsa, Oklahoma. Remodel and addition (3 operatories) to existing office for Pediatric
Dentists.
• Design Consulting Services for Dr. Stan Shelton (2007)
San Antonio, TX. Preliminary Design/Design Development for 5 chair, 2656 sf office for
General Dentist.
• Design Consulting Services for Drs. Freeze & Singletary (2007)
Austin, TX. Preliminary Design for 9 chair, 4410 sf office for Pediatric Dentists.
• Design Consulting Services for Drs. Vaughn & Flores (2007)
Austin, TX. Preliminary Design for 7 chair, 2777 sf office for Periodontists.
• Design Consulting Services for Dr. Andrew Ducote (2007)
Round Rock, TX. Preliminary Design for 7 chair, 3097 sf office for General Dentist.
• Design Consulting Services for Dr. Robert Bosland (2007)
DLB Architect Project List
Pg. 4 of 12
Germantown, MD. Preliminary Design for 1475 SF Chiropractic Office.
• The Dog Park (2007)
Austin, Texas. Preliminary Design for 100+ kennel dog boarding facility.
• Dental Office for Drs. Carl and Scott Herring (2006)
Elgin, Texas. Remodel and addition (4 to 6 operatories) to existing, free-standing office
for General Dentists.
• Dental Office for Dr. Richard Hlista (2006)
Austin, Texas. 2026 sf, 3 chair office for Prosthedontist. Suite in existing, three-story
office building.
• Dental Consulting/Design Services for Dr. Martha Murphy (2006)
Gaithersburg, Maryland. Suite in existing office building for General Dentist.
• Dental Office for Dr. Larry Lindsay (2006)
Austin, Texas. 3016 sf, 7 chair office for General Dentist. Suite in new, two-story office
building.
• Dental Office for Dr. Glen Wainwright (2006)
Austin, Texas. 2821 sf, 6 treatment chair office for General Dentist. Suite in new, onestory office building.
• Dental Office for Drs. David Reeves and Gary Reinhardt (2006)
Cedar Park, Texas. 4573 sf, 4 treatment chair office for Periodontist and 3 treatment
chair office for Oral Surgeon. Two separate suites in one-story building with
masonry/siding exterior on multi-building site.
• Dental Consulting/Design Services for Dr. David M. Ferguson (2006)
Austin, Texas. Remodel of existing periodontal office.
• Dental Office for Dr. David Gordon (2006)
Austin, Texas. 2400 sf, 4 treatment chair office for General Dentist. Suite in existing,
four-story multi-use building.
• Dental Office for Dr. Stephen Sherwood (2005)
Austin, Texas. 3376 sf, 7 chair office for Pediatric Dentist. Suite in new, two-story office
building.
• Dental Office for Dr. Tony Bain (2005)
Pflugerville, Texas. 4295 sf, 9 treatment chair office for Pediatric Dentist. One-story
building with masonry/siding exterior on multi-building site.
• Dental Office for Drs. Mark and Kim Rabatin (2005)
Uniontown, Pennsylvania. 2978 sf, 6 chair shared office for General Dentist and
Periodontist. Suite in new, two-story office building.
• Dental Consulting/Design Services for Drs. Dale & Carrie Gallagher (2005)
Austin, Texas. Remodel of existing building for Oral Surgeons.
• Dental Consulting/Design Services for Dr. Jennifer Crandall (2005)
DLB Architect Project List
Pg. 5 of 12
Windsor, California. Remodel of existing historic building for General Dentist.
• Dental Office for Dr. Chris Cornman (2005)
Georgetown, Texas. 2494 sf, 6 treatment chair office for General Dentist. One-story
building with masonry/stucco exterior.
• Dental Office for Dr. John K. Jones/Austin Surgical Arts (2004)
Austin, Texas. 1883 sf, 2 treatment chair office for Oral Surgeon. Suite in new, one-story
office building.
• Dental Office for Dr. Lisa Burkett (2004)
Austin, Texas. 2026 sf, 3 chair office for Prosthedontist. Suite in existing, three-story
office building.
• Dental Office for Drs. Barry Rouch & Ron Barnett (2003)
Austin, Texas. 1985 sf, 6 chair office for Orthodontists. Suite in existing, two-story office
building.
• Dental Office for Drs. Danny Watts & Pamela Singletary (2003)
Austin, Texas. 3046 sf, 6 chair office for Pediatric Dentist. Addition to Existing Suite in
three-story office building.
• Dental Consulting/Design Services for Dr. David M. Ferguson (2003)
Austin, Texas. Remodel of existing periodontal office.
• Veterinary Office for Dr. Kelly Drake (2003)
Round Rock, Texas. 3441 sf, hospital and boarding facility for Veterinarian. One-story
building with metal roof and masonry/stucco exterior.
• Dental Consulting/Design Services for Dr. Michael Williamson (2003)
Austin, Texas. Remodel of existing periodontal office.
• Exterior Office Building Remodel - 102 Westlake Drive (2002)
Austin, Texas. Exterior remodel and Lobby Renovation of Existing Building.
• Private Residence for Pamela Day (2002)
Lubbock, Texas. New 2400 sf residence.
• Dental Office for Dr. Linda Burke (2002)
Harlingen, Texas. 5698 sf, 9 treatment chair office for Pediatric Dentist with adjacent
Office Space. One-story building with tile roof and stone/masonry exterior.
• Dental Office for Dr. Paul Casmedes/Austin Surgical Arts (2002)
Lakeway, Texas. 2320 sf, 3 treatment chair office for Oral Surgeon. Suite in existing,
two-story office building.
• Dental Office for Dr. Stacy Miller (2001)
Lakeway, Texas. 3024 sf, 8 treatment chair office for Orthodontist. Two-story building
(lease space above) with metal roof and stone/masonry exterior.
• Dental Office for Dr. Kurt Delius (2001)
Austin, Texas. 3000 sf, 6 chair office for Periodontist. One-story building with metal roof
DLB Architect Project List
Pg. 6 of 12
and masonry/stucco exterior on multi-building site.
• Dental Office for Dr. Robert Ferguson (2001)
Austin, Texas. 3000 sf, 6 chair office for General Dentist. One-story building with metal
roof and masonry/stucco exterior on multi-building site.
• Residence Renovation for Susan and Renea Hicks (2001)
Austin, Texas. 1200 sf, complete renovation and addition to existing house.
• Dental Office for Dr. Scott Franklin (2001)
Austin, Texas. 2800 sf, 9 treatment chair office for Orthodontist/Pediatric Dentist.
Remodel/expansion of existing office suite.
• Dermatology Office for Dr. William Ramsdell (2001)
Austin, Texas. 6421 sf, 9 treatment room office for Dermatologist. Suite in existing, twostory office building.
• Dental Office for Dr. Donald Taylor (2001)
Buda, Texas. 2841 sf, 7 treatment chair office for General Dentist/Pediatric Dentist. Onestory building in Historic Downtown District.
• Veterinary Office for Dr. Robert Griffith (2001)
Cedar Park, Texas. ~12,000 sf, hospital and boarding facility for Veterinarian. One-story
building with metal roof and masonry/stucco exterior.
• Chiropractic Office for Dr. Michiel Rorick (2001)
Houston, Texas. 6900 sf, Office for Chiropractor. One-story Office on multi-building site
with 1800 sf second story apartment (with two-car garage). “Texas” regional style.
• Dental Office for Dr. Larry Molenda (2000)
San Marcos, Texas. 2224 sf, 4 chair office for General Dentist. One-story building on
multi-building site in regional “Texas” style.
• Dental Office for Drs. Chris & Jennifer Hoppe (2000)
Cedar Park, Texas. 4023 sf, 9 chair office for GP/Pedo/Ortho. One-story building on 2.0
ac site in regional “Texas” style.
• Dental Office for Dr. Mitch Moore (2000)
Austin, Texas. 1500 sf, 3 chair office for General Dentist. Suite in new, two-story office
building.
• Dental Office for Dr. Gail Nicosia (1999)
Austin, Texas. 1212 sf, 3 chair office for Periodontist. Suite in existing, single-story office
building.
• Private Residence Remodel and Addition for Walter & Sue Saad (1997)
Austin, Texas. Remodel of 1156 sf and addition of 791 sf to existing residence.
• Dental Office for Drs. Joe R. Neeley and Dora Nemeth (1999)
Austin, Texas. 500 sf, remodel and addition to existing office for General Dentists. Suite
in existing, multi-story office building.
DLB Architect Project List
Pg. 7 of 12
• Dental Office for Drs. Allen & Laura Adair (1998)
Dripping Springs, Texas. 2906 sf, 6 treatment chair office for General Dentists. One-story
building on 2.0 ac site in regional “Texas” style.
• Dental Consulting/Design Services for Dr. John Glennon (1998)
Austin, Texas. 2189 sf, 6 treatment chair office for General Dentist. Suite in existing,
one-story condo project.
• Dental Office for Dr. Brian Scaff (1998)
Austin, Texas. 1893 sf, 4 treatment chair office for General Dentist. Suite in new, onecondo project.
• Dental Consulting/Design Services for Dr. Donald Taylor (1998)
Buda, Texas. 2114 sf, 4 treatment chair office for General Dentist. Suite in new, onestory office building.
• Orthodontic Office for Dr. Albert Owen, III (1998)
Austin, Texas. 900 sf, 4 chair orthodontic Office. Suite in existing one-story office
building.
• Consulting/Design Services for Dr. Bob Griffith (1998)
Austin, Texas. 5000 sf, two-story addition to existing Veterinary Office.
• Dental Consulting/Design Services for Drs. Dennis & Marie Stiles (1998)
German town, Maryland. 2100 sf, 4 treatment chair office for General Dentists. Suite in
new, three-story office building.
• Orthodontic Office for Dr. Barry Rouch (1998)
Austin, Texas. 2120 sf, 5 chair orthodontic Office. Suite in new two-story office building.
• Dental Consulting/Design Services for Dr. John Britton (1998)
Laredo, Texas. 2250 sf, 5 treatment chair office for Oral Surgeon. Suite in new, onestory office complex.
• Master Plan Consulting for St. John Neumann Catholic Church (1998)
Austin, Texas. Joint venture planning services with Fazio Architects, Inc. in assessing
current needs of, and planning future developments of Catholic Church. 20+ ac site.
• Dental Consulting/Design Services for Dr. Bruce Schrader (1998)
Austin, Texas. 2400 sf, remodel of existing, 5 treatment chair office for General Dentist.
• Preliminary Design/Consulting for Greater Mt. Zion Baptist Church (1998)
Austin, Texas. 5400 sf/one acre site. Joint venture preliminary design services with
Fazio Architects, Inc. in adding new fellowship hall to existing church.
• Dental Consulting/Design Services for Dr. Holly Harris (1998)
Austin, Texas. 1200 sf, remodel of existing, 3 treatment chair office for General Dentist.
• Orthodontic Office for Dr. Louis Anderson (1998)
Katy, Texas. 4220 sf orthodontic Office. One and one-half story building on 1.5 ac site in
regional “Texas” style.
DLB Architect Project List
Pg. 8 of 12
• Dental Consulting/Design Services for Drs. Mizzell, Weil & Asarch (1998)
Houston, Texas. 8623 sf, three adjacent suites for Orthodontist, Oral Surgeon and
Pediatric Dentist in existing two-story office building.
• Private Residence for Tana Busch (1997)
Leander, Texas. New 2000 sf lake residence.
• Dental Office for Dr. Joni Wallace (1997)
Austin, Texas. 1300 sf, 3 treatment chair office for General Dentist. Suite in existing,
multi-story office building.
• Dental Office for Dr. Byron Smith (1997)
Austin, Texas. 2500 sf, 7 treatment chair office for Pediatric Dentist. Suite in existing,
multi-story office building.
• Dental Consulting/Design Services for Dr. Michael Wong (1997)
San Mateo, CA. Addition (800 sf) and remodel (1100 sf) of existing, five treatment chair
office for General Dentist.
• Dental Consulting/Design Services for Dr. Eric Debbane (1997)
San Francisco, California. 1200 sf, 3 treatment chair office for General Dentist. Suite in
new, multi-story office building.
• Bell #3 Building (1997)
Cedar Park, Texas. Contract Architectural Services for Ralph Thibodeau, AIA. New,
Construction documents for 5000 sf, free-standing utility building.
• Dental Consulting/Design Services for Dr. David M. Ferguson (1997)
Austin, Texas. Addition and remodel of existing periodontal office.
• Master Plan for St. Louis Catholic Church (1997)
Austin, Texas. Joint venture planning services with Fazio Architects, Inc. in assessing
current needs of, and planning future developments of largest Catholic Church within the
Austin Diocese. 19.46 ac site.
• Dental Consulting/Design Services for Dr. William O'Gara (1997)
Reno, Nevada. 3250 sf, 7 treatment chair office for Orthodontist. Suite in new, one-story
office project.
• Private Residence for Brooke & Pamela Day (1997)
Austin, Texas. Remodel of 4000 sf residence.
• Jewell Residence Restoration (1996)
Copperas Cove, Texas. Contract Architectural Services for Ralph Thibodeau, AIA.
Construction documents for renovation of historic residence.
• Dental Consulting Services for Dr. David Phelps (1996)
Greenville, Texas. Addition and remodel of existing dental office.
• Orthodontic Office for Dr. Elizabeth Long (1996)
Austin, Texas. Remodel of 1521 sf orthodontic Office with 644 sf addition in retail strip
center.
DLB Architect Project List
Pg. 9 of 12
• Dripping Springs Animal Hospital (1996)
Dripping Springs, Texas. Contract Architectural Services for Ralph Thibodeau, AIA.
Construction documents for new veterinary Office.
• Copperas Cove Public Library (1996)
Copperas Cove, Texas. Contract Architectural Services for Ralph Thibodeau, AIA.
Schematic design drawings for proposed public library. 19,250 sf, one-story structure.
• Bell & Son Shop Building (1996)
Cedar Park, Texas. Contract Architectural Services for Ralph Thibodeau, AIA. New,
Construction documents for 4500 sf, free-standing utility building.
• Allin Residence Restoration (1996)
Copperas Cove, Texas. Contract Architectural Services for Ralph Thibodeau, AIA.
Construction documents for renovation of historic residence to accommodate Chamber of
Commerce and historical displays.
• Hutch’s Body Shop #2 (1996)
Cedar Park, Texas. Contract Architectural Services for Ralph Thibodeau, AIA.
Construction documents for 1950 sf auto service center on large multi-building site.
• 1206 Koenig Lane Joint Venture/First Texas Honda (1996)
Austin, Texas. Contract Architectural Services for Ralph Thibodeau, AIA. Construction
documents for remodel of existing restaurant to accommodate used car dealership. 2985
sf one-story building.
• Dental Office for Dr. John Reilly (1995)
Frankfort, Illinois. 1250 sf, 3 treatment chair office for General Dentist. Suite in new,
one-story office project.
• Dental Office for Dr. Matthew Steinberg (1995)
Austin, Texas. 2560 sf, 5 treatment chair office for General Dentist. Suite in new, twostory condominium project.
• Dental Office for Dr. Kevin Metsger (1995)
Greensburg, Pennsylvania. 2800 sf, 6 treatment chair office for General Dentist. Suite
in new, two-story condominium project.
• Jack Sansing Dental Office (1995)
Austin, Texas. Pro bona architectural services (floor plan) for Dental Office for HIV
patients.
• Dental Office for Dr. Eric Townsend (1995)
Ponte Vedra, Florida. 3500 sf, 7 treatment chair office for General Dentist. Suite in new,
one-story condominium project.
• Hime & Hime Orthodontics (1995)
Austin, Texas. 3824 sf orthodontic Office for husband and wife team. One and one-half
story building on .46 ac site in regional “Texas” style.
• Griffith Small Animal Hospital (1995)
DLB Architect Project List
Pg. 10 of 12
Austin, Texas. Waiting Room/Business Office remodel of existing veterinary Office.
• Schmidt Residence Remodel and Addition (1993)
Rockford, Illinois. Kitchen, Dining and Family Room remodel with Sun Room addition.
• Younge Residence (1989)
Rochester, Minnesota. Schematic design for 3800 sf private residence on wooded site.
• Perspective Renderings (1982-present)
Color and b&w three-dimensional renderings of buildings and interiors.
T.H.E. Design, Inc.
• Dental Office Designs (1989-1994)
Almost 100 designs of full buildings, tenant improvements and renovations of dental
practices in USA and Canada. General and specialty practices including: GP,
Orthodontic, Oral Surgery, Periodontic, Pediatric and Endodontic.
(List of projects completed at T.H.E. Design, Inc. is available upon request).
Walter Vackar Developments
• Vackar House Addition (1989)
Austin, Texas. In-fill, poolside guest house addition to main residence.
• LakeLine (1989)
Austin, Texas. 405 acre, multi-use suburban development with regional shopping mall
as anchor (100 ac -- separate development). Master plan and site plan development
studies for retail, office and residential structures.
• Raleigh Center (1988)
Raleigh, North Carolina. Schematic design for 89,654 sf mixed-use office/retail urban
development. Six-story building (with attached parking structure) as part of downtown
revitalization project.
• City Place (1988)
San Diego, California. Schematic design for 155,471 sf mixed-use office/retail
development. Six-story building (with underground parking facility) as part of extensive
downtown redevelopment project.
D.C.M., Inc.
• Bag ‘n Baggage (1988)
Lubbock, Texas. High-end, luggage and leathergoods retail facility.
• County Seat (1988)
Color, perspective renderings for retail clothing stores.
DLB Architect Project List
Pg. 11 of 12
• Tenant Improvements (1987)
Austin, Texas. Variety of Tenant Improvements for Transwestern Properties, Coldwell
Banker, Austin Regional Office, and other clients.
Cox/Croslin Associates
• Garner-Betts Juvenile Detention Center (1987)
Austin, Texas. Regional juvenile detention facility including courtroom, administrative
office and residential/detention units.
Clark James Coupland Architects
• Ski Resort Master Plan (1987)
Killington, Vermont. Ski and Recreation Resort Master plan.
Pierce, Goodwin, Alexander + Spencer
• Old Main Building -- West Texas State University (1987)
Canyon, Texas. Renovation of prominent/historical classroom building to accommodate
President’s Office, Boardrooms, Administrative and Academic uses.
• English/Evans -- Sam Houston State University (1986)
Huntsville, Texas. Renovation of existing university classroom structures and new
construction of structure linking the two buildings.
• Halley Site Redevelopment -- Sam Houston State University (1986)
Huntsville, Texas. 25,995 sf. Construction of new promenade, garden walls and
terminus along major axis. Part of larger university master plan.
Phil Pokorny + Company, Inc.
• Waco Truck & Tire Center (1985)
Waco, Texas. Automotive Service Center.
• Thundercreek Office Park (1985)
Austin, Texas. 24,550 sf professional office park. Two, two-story buildings on 1.44 ac
site (unbuilt).
• Courtyard Townhouses (1984)
Austin, Texas. 25,995 sf. Twelve residential units. (Phase one built).
• Lake Charles Firestone (1984)
Lake Charles, Louisiana. Automotive Service Center.
• The Eminence Office Park -- Master Plan (1984)
Austin, Texas. Master plan for six, two-story office buildings on 5.07 ac site.
DLB Architect Project List
Pg. 12 of 12
• Abilene Firestone & Retail Buildings (1984)
Abilene, Texas. Retail and Automotive Service Buildings.
• Argonne Forest Duplex Development (1984)
Austin, Texas. 90,704 sf residential development. Forty duplex units on 9.48 ac site.
• Western Oaks Shopping Center (1984)
Austin, Texas. 108,000 sf mixed-use retail/office development. Ten buildings on 15.44
ac site (unbuilt).
• Laguna Waterway Improvement Project (1983)
Austin, Texas. Land use study.
• The Echelon Parking Garage (1983)
Austin, Texas. Two-level parking structure (unbuilt).
• The Vistas Office Park (1983)
San Antonio, Texas. 74,041 sf professional office park. Seven, two-story buildings on
5.04 ac hillside site.
Austin, Texas. 84,700 sf professional office park. Eight, two- story buildings on 18.4 ac
hillside site.
• Vackar Lake House (1982)
Lake Travis, Texas. Private residence (unbuilt).
• Posse Residence (1982)
Rollingwood, Texas. Private residence.
• Arcadia Condominiums (1982)
Austin, Texas. 60,537 sf condominium development. Nine, one- and two-story buildings
(plus clubhouse) on 4.17 ac site.
Download