Notes: Contractors must verify all dimensions on site before commencing any work or shop drawings. This drawing is not to be scaled. Use figured dimensions only. Subject to statutory approvals and survey. Gutter to be Culverted at water main crossing point AREAS Building areas are liable to adjustment over the course of the design process due to the ongoing construction detailing developments. 10 Parking Spaces UNIT (1) (2) UNIT (5) (Total) EMPLOYMENT USE (B1/B2/B8) Schedule of Area SERVICE YARD 0.53 ACRE UNIT 1 UNIT 2 UNIT 3 B8 B1 (1st Floor) TOTAL HGV Turning UNIT 4 Gates UNIT 5 5A 5B 5C 5D 5E 5F 5G TOTAL UNIT (3) TOTAL: 26 Parking Spaces (4) Sto First Floor Offices ne yL an e Yard Existing Building Sliding Gate 03 LA DOOR OMITTED FROM UNIT 5D. 02 UNIT 2, 4, 5 SUBDIVISION & AREA SCHEDULE AMMENDED 01 UNTIL 5 AMENDED. . HGV TURNING HEAD AMENDED. revisions Uppe r Bou rne E c h a r e c t h w i o t EMPLOYMENT USE AREA TOTAL CAR PARKING PROVISION Project o e T: +44 (0) 121 234 7500 OVERALL SITE AREA 02.07.15 AMR FOR APPROVAL nd La ne TOTAL INDUSTRIAL AREA 08.07.15 AMR 02.07.15 LAF c d s t s F: +44 (0) 121 234 7501 Job Number 3860 BOURNE END MILLS 0 5m 10m 15m 20m 25m 30m 35m 40m 45m 50m Client Scale Bar 1:300 Drawing Title Drawing Size A1 Proposed Site Layout Employment Option 4 Drawn AMR Date 29/06/2015 Scale 1:300 Cadfile 3860-30 Reviewed by Drawing No. Rev. TM 3860-30 03