18,083ft² UNIT (5) (Total) 25,000ft² UNIT (3) 5,630ft² UNIT (4) 10,000

advertisement
Notes:
Contractors must verify all dimensions on site before commencing any work or
shop drawings. This drawing is not to be scaled. Use figured dimensions only.
Subject to statutory approvals and survey.
Gutter to be Culverted
at water main crossing
point
AREAS
Building areas are liable to adjustment over the course of the design process
due to the ongoing construction detailing developments.
10 Parking
Spaces
UNIT (1)
(2)
UNIT (5)
(Total)
EMPLOYMENT USE (B1/B2/B8) Schedule of Area
SERVICE YARD
0.53 ACRE
UNIT 1
UNIT 2
UNIT 3
B8
B1 (1st Floor)
TOTAL
HGV Turning
UNIT 4
Gates
UNIT 5
5A
5B
5C
5D
5E
5F
5G
TOTAL
UNIT (3)
TOTAL:
26 Parking
Spaces
(4)
Sto
First Floor Offices
ne
yL
an
e
Yard
Existing Building
Sliding Gate
03 LA DOOR OMITTED FROM UNIT 5D.
02 UNIT 2, 4, 5 SUBDIVISION &
AREA SCHEDULE AMMENDED
01 UNTIL 5 AMENDED. .
HGV TURNING HEAD AMENDED.
revisions
Uppe
r Bou
rne E
c
h
a
r
e
c
t
h
w
i
o
t
EMPLOYMENT USE AREA
TOTAL CAR PARKING PROVISION
Project
o
e
T: +44 (0) 121 234 7500
OVERALL SITE AREA
02.07.15 AMR
FOR APPROVAL
nd La
ne
TOTAL INDUSTRIAL AREA
08.07.15 AMR
02.07.15 LAF
c
d
s
t
s
F: +44 (0) 121 234 7501
Job Number 3860
BOURNE END MILLS
0
5m
10m
15m
20m
25m
30m
35m
40m
45m
50m
Client
Scale Bar 1:300
Drawing Title
Drawing Size A1
Proposed Site Layout
Employment Option 4
Drawn AMR
Date 29/06/2015
Scale 1:300
Cadfile 3860-30
Reviewed by
Drawing No.
Rev.
TM
3860-30
03
Download