General Description
Full Service Business Park?
Attainment or Non-Attainment?
View from Highway?
Distance from Residential?
Distance from Schools?
Distance from Public Park?
Utilities - Electric
Is electric service available?
Specifications of power?
Is dual feed service available?
Transmission voltage (kV)
Total sustained interruptions annually?
Total momentary interruptions annually?
Total outage duration? (hours yearly)
Distance to nearest substation?
Average rate per kWh for industry?
Name of electric provider?
Utilities - Water
Are water lines run throughout the park?
Size of line?
Static pressure of the line?
Residual pressure of the line?
Flow per minute of the line?
What is the municipal excess water capacity?
Average water rate per $1,000 gallons?
Who is the water provider?
Utilties - Sewer
Are sewer lines and lift stations at the park?
Size of sewer line?
What is the excess sewer capactity?
Average sewer rate per 1,000 gallons?
Who is the sewer provider?
Yes
Attainment
Excellent
1 mile
4 miles
6 miles
1
2
8
Yes
12.5 kV distribution vo
No
69
4 miles
$5.24
AEP Southwestern Elec
Yes
6 inch
60 p.s.i.
5 p.s.i.
380 gallons per minute
2 million gallons per da
$3.35
City of Atlanta
Yes
8 inch
1 million gallons per da
$3.16
City of Atlanta
Utilities - Natural Gas
Are natural gas lines in the park?
Size of the line?
Gas rate per 1,000 cubic feet?
Name of gas provider?
Utilities - Telecommunications
If fiber currently at the park?
Name of provider?
Are ther high speed providers avaialble?
Name of provider?
Solid Waste
Name of solid waste provider?
Miles to nearest landfill?
Miles to nearest hazardous waste landfill?
Environmental
Has a Phase 1 been completed on the product
Geotechnical been completed?
Weslands deliniation on property?
Archeological study on property?
Endangered spcies study on property?
Transportation
Traffic congestion at entrance to park?
Safety of entrance to park?
Number of roads accessing the park?
Likely commuting time for employees
Is access to park controlled with traffic light?
Highway Access
Distance in miles to major highways?
U.S. Highway 59
Interstate 30
Interstate 20
Yes
2 inches
$6.06
Centerpoint Energy
Yes
Fidelity Communication
Yes
GoZoe Wireless/AT&T
Waste Management/C
37
37
Yes
No
No
No
No
Low
Good
1
Less than 30 minutes
No
Adjacent
24
43
Airport Access
Distance to major hub or regional airport?
Shreveport Regional
American, Delta, United, Allegiant
Texarkana Regional Airport
American, Delta, United, Allegiant
Hall Miller Municipal Airport
N/A
Rail Access
Rail access to the industrial park?
Distance to nearest rail storage yard?
Emergency/Security
Provider of police protection?
24 hour police protection?
Responsiveness of police protections to park?
Provider of fire protection service?
Volunteer or full time?
Area fire insurance classification?
Distance to nearest fire station?
Are fire hydrants installed in the park?
Is there a separate fire suppression system in park?
Distance to nearest medical services?
Name of medical provider?
Financial
State income tax rate?
Franchise tax rate?
Excise tax rate?
Machinery and Equipment
State sales tax rate?
Exempt?
Local sales tax rate?
Exempt?
Total tax rate?
Building Materials
State sales tax rate?
Exempt?
Local sales tax rate?
60 miles
30 miles
2 miles
No
35 miles
0
0
0
6.25%
Yes
2%
Yes
0%
6.25%
No
2%
Atlanta, Texas Police D
Yes
Excellent
Atlanta, Texas Fire Dep
Full time with voluntee
3
4 miles
Yes
Yes
4 miles
Christus St. Michael Atl
Exempt?
Total tax rate?
Construction Labor
State sales tax rate?
Exempt?
Local sales tax rate?
Exempt?
Total tax rate?
Non-Manufacturing Equipment
State sales tax rate?
Exempt?
Local sales tax rate?
Exempt?
Total tax rate?
Pollution Control Equipment
State sales tax rate?
Exempt?
Local sales tax rate?
Exempt?
Total tax rate?
Manufacturer's Use of Energy Fuel
State sales tax rate?
Exempt?
Local sales tax rate?
Exempt?
Total tax rate?
Apportionment Formula
Property percentage
Payroll
Sales
Incentives
Grants
Tax Abatements
Utility Incentives
Cash Incentives
Recruting and Training
6.25%
No
2%
No
8.25%
6.25%
No
2%
No
8.25%
0
0
0
No
8.25%
6.25%
No
2%
No
8.25%
2.363777
6.2
8.25%
Yes - Industrial Lots at
Yes
Yes
Yes
Yes
State Enterprise Zone
Foreign Trande Zone
Yes
No
ltage