Asset

Guildhall

Museum, 70 Fore St

Eastgate Clock

Cemetery Chapel

Task

Replace Marmoleum flooring in Council Chamber

Install emergency lighting and signs

Loose slates above Cottage overhang

Inspect and repair glass roof

Professional drainage clean

Replace boiler and heating system

Restore plasterwork in Council Chamber

Artefacts and contents need reviewing

Cap chimneys

Repair Weir Panel

Add small sink to toilet

Downpipe at rear of Guildhall in neighbour's garden - repair

Fire Risk Assessment to be updated

Totnes Town Council Buildings Maintenance 2015/16

Agreed budget

£10,000

Cost

£4,316

Initial estimate

Notes

£250

£850

Current flooring has deteriorated and is causing trip hazards

Under further investigation

Roof is leaking and we have no record of when it was last inspected or repaired

Drains are blocked

Boiler is still working but could fail at any time; it is also inefficient

Chamber walls and ceiling in a poor condition

Ownership and curation of items is unknown or haphazard

Scaffolding required to reach the chimney

Damaged artefact

H & S regulations

Garage doors to be repaired and repainted

CCTV installation

General maintenace of the space including weed control

Sash windows in Mitchell Room need repair

Tiles at top of stairs outside rear entrance need re-laying

Guttering needs to be cleaned and repaired

Repairs to stone walls

Conservation of the fireplace in the Loom Room

Chimneys - capping and sweeping

Chimney plasterwork

Action drains survey

Contribution to Duke of Somerset towards redecoration approx every 4 years

£6,000

Council needs to decide future of this building: find new tenant; budget for it as owned asset; sell; get planning permission

£4,000

£800

£6,780

£750

£600

Subject to budget

Further investigation has revealed that the damage is much more extensive and the cost will be considerably higher c£5,000 iro £120,000 See report by Architectural Heritage Fund

There has been no evidence from local funeral directors that they would like to use the building regularly - we have had one 2 hour booking in the last year that it's been back in

Town Council stewardship.

We have previously held discussions with SHDC Planning and Conservation Officers about the possibility of change of use to residential or employment. There were mixed feelings about this: residential is likely to be a sensitive issue and there are no guarantees that approval woudl be granted. Employment would require complex alterations to the fabric of the building.

Cemetery

Guildhall Cottage

Guildhall Flat

Civic Hall

St Mary's Churchyard

General

Totnes Town Council Buildings Maintenance 2015/16

Monument testing throughout

Deal with overgrown paths

Inspect boundary walls and clear of growth

Tree Management Plan

Hedges to be cut both sides and tops

Chimneys to be swept and capped

Budget for continual low-level repairs to plaster/walls as a result of damp

Garage doors to be repainted and repaired

Tenancy expected to end soon so we will need to find and bed-in a new tenant

Sound Insulation Measures

Strip tiles on both faces and rehang

Repair and repaint asbetos soffits around entire roof and remove brackets

New asbestos survey

Internal roof space - structural survey

Defibrillator

Electrical Works

Drainage channels need to be cleared regularly

Repairs to cracked drainage channels

Repairs, removal of vegetation and repointing of walls

Redecorate and overhaul iron gates

Repair substandard table tombs

Monitor cracks and leaning parts of retaining walls and gate piers

£29,000

Ivy on Wellingtons Jewellers to be removed

Loose paving stones at main door

Tree works - Cherry, Elder, Pear

Bay Tree growing into the wall behind No 7

Coronation Road - fencing to be replaced/repaired

Fingerposts in town - remove inaccurate signs

£29,000

£3,000

£600

£10,000

This could mean repair or it could mean leaving them now as grassed areas

Action points

Ongoing problems with damp which cannot be fixed because of the age of the building

All from grant funding

Received. No difficult issues arisen.

£1,000

Estimate

Add this to grounds maintenance contract

Need to confirm if this is our responsibility or the church

Removal of vegetation arranged with Grounds Maintenance for this winter

Arranged with Grounds Maintenance

Grounds Maintenance to clear vegetation - roots will need to be dealt with over the winter