GOVERNMENT OF THE PEOPLE'S REPUBLIC OF BANGLADESH

advertisement
GOVERNMENT OF THE PEOPLE’S REPUBLIC OF
BANGLADESH
MINISTRY OF COMMUNICATION
ROADS AND HIGHWAYS DEPARTMENT
Maintenance and Rehabilitation Needs Report
of 2012 – 2013 for RHD Paved Roads
HDM Circle, RHD
November, 2012
PREFACE
The Annual Maintenance and Rehabilitation Needs Report is the flagship publication of HDM
circle. This is the 13th Maintenance and Rehabilitation needs report prepared from the HDM-4
output. The RMMS database and the HDM-4 model have been utilized to derive yearly
maintenance periodic budget demand for RHD. By this analysis, the time and location of
maintenance requirement for the RHD Road network has been identified and prioritized in
accordance with NPV/Cost ratio. Socio-economic and political factors, not considered in this
analysis, are extremely important in prioritizing maintenance treatments. It is hoped that this
approach will be adopted in future years. The list of on-going projects has been prepared after
collecting those from concerned offices. Projects, which are in progress and not completed
before the start of roughness survey have been kept out of the HDM analysis to avoid
duplication in the maintenance program and to find out actual immediate demands. However,
few segments already completed or ongoing may appear in the HDM output because those were
not reported by the field offices before the HDM run and hence were not excluded.
Finally, the officers of HDM Circle must be appreciated for their relentless effort in publishing
this report.
Mr. Md. Jawed Alam
Superintending Engineer (Addl Charge)
HDM Circle
Roads & Highways Department
Executive Summary
The Annual Maintenance and Rehabilitation Needs Report illustrates the required investments
for maintenance of the whole road network of Roads & Highways Department. The Highway
Development and Management (HDM-4) Model (HDM-4 software), mainly an economic tool,
has been used to project the total maintenance need of RHD Road network and also to select
and prioritize maintenance work on the basis of NPV/Cost ratio. For this purpose, the analysis
has been carried out in the two sequences. . Firstly, All roads have been analyzed to assess the
overall long-term maintenance need of the RHD road network. The overall maintenance need
has been found to be 70,913.82 million taka for the year 2012-2013, 20099.14 million taka for
the year 2013-2014, 13322.68 million taka for the year 2014-2015 and 11470.38 million taka
for the year 2015-2016 and 10358.24 million taka for the year 2016-2017. It is evident from the
analysis that, the investment needs tend to decrease considerably provided that the first year
requirements are met fully. So, efforts should be given to maximize the first year maintenance
in order to minimize backlogs. Secondly ongoing projects, which are in progress and were not
completed before the start of Roughness survey, have been excluded from the HDM run to
project the immediate maintenance requirement and it has been projected to be 39791.33
million taka. Since the prioritization of projects using NPV/Cost favors the more heavily
trafficked roads, Zilla roads will not have priority for maintenance and rehabilitation works due
to their low traffic volume. So, a separate prioritization process has been adopted for the
recovery of zilla roads as suggested by the Road Master Plan.
iii
Table of Contents
Sl. No.
Content
Executive Summary
Chapter 1: Introduction
1.1
Introduction
1.2
Objectives of the Analysis
1.3
Methodology
1.3.1 The Data of RMMS Database
1.3.2 Road User Cost Data
1.3.3 Unit Cost of Work and Maintenance Standard
1.3.4 HDM 4 Export Tool
1.3.5 Analysis and Presentation
1.4
Scope and Limitations
1.5
Road and Bridge Asset Management System
1.6
Needs Report Output
Chapter 2: Current Network Condition
2.1
The RHD Road Network
Chapter 3: HDM 4 Program Analysis
3.1
3.2
3.3
3.4
Principles of Life Cycle Analysis
Description of Treatments
Maintenance Strategies
Unit cost
Chapter 4: Results of HDM 4 Analysis
Page no.
iii
01
01
02
02
02
02
02
02
02
02
02
03
04
04
09
09
09
11
13
15
4.1
4.2
4.3
Field validation of Result
Network Result (Unconstrained)
Demand Excluding Ongoing Projects
15
15
17
4.4
4.5
Pavement Strengthening
Overall Needs
19
20
Chapter 5: Findings and Recommendation
5.1
5.2
Major Findings
Recommendations
22
22
23
List of Tables
Table 1.1:
RHD road network
Table 1.2:
Lengths of roads included in the HDM analysis
Table 2.1:
Table 2.2:
Table 2.3:
RHD Road Network length surveyed for roughness survey 2012.
Qualitative Descriptors of IRI Values
Overall RHD Road Network condition (Survey 2012) (data in km)
Table 2.4:
Table 2.5:
Table 2.6:
Road condition of National Highways based on IRI (Survey 2012) (data in km)
Table 3.1:
Table 3.2:
Table 3.3:
Figure 4.1:
Table 4.2:
Table 4.3:
Table 4.4:
Table 4.5:
Table 4.6:
Table 4.7:
Table 4.8
Table 4.8
Table 4.10:
Table 4.11
Table 4.12:
Table 4.13:
Table 5.1:
Table 5.2:
Road condition of Regional Highways based on IRI (Survey 2012) (in km)
Road condition of Zilla Roads based on IRI (Survey 2012) (data in km)
Maintenance and rehabilitation treatments and assumptions used in HDM
Compound maintenance standards for HDM-4 programme analysis in 2012-13
Unit costs of treatment
Total unconstrained demand of capital works for next five years (2013-17)
Total capital works demands (Mill Tk) for the next five years.
Periodic maintenance demand (Mill Tk) for the next five years.
Partial reconstruction demand (Mill Tk) for the next five years
Full reconstruction demand (Mill Tk) for the next five years
Routine maintenance demand (Mill Tk) for the next five years
Lengths of different work category in all classes of roads (Km)
Capital demand of National/Regional Roads 2012-13 (excluding ongoing projects)
Funding needs of Zilla roads networks for 2012-13 (excluding ongoing
projects) in Million taka.
Required Length of different Road Class for Capital works in next five
years (Excluding ongoing Works)
Overall Maintenance Needs by category
Overall Maintenance Needs by category for National and Regional roads
(in million taka)
Overall Maintenance Needs by category for Zilla roads (in million taka)
Overall Maintenance Needs 2013-2017
Immediate Maintenance Needs 2012-13
List of Figures
Figure 2.1:
Figure 2.2:
Figure 2.3
Figure 2.4:
Figure 2.5:
Figure 4.1:
Figure 4.2:
Figure 4.3:
Figure 4.4:
Average network roughness by road classes in different years
Average Roughness of Road Network in different years
Road condition of National Highways based on IRI values (Survey: 2012).
Road condition of Regional Highways based on IRI values (Survey: 2012).
Road condition of Zilla Road based on IRI values (Survey: 2012).
Unconstrained demand of capital works for the next five years.
Zone wise capital needs of National and Regional Highways in 2012-13
(excluding ongoing projects) in Million Taka.
Zone wise capital needs of Zilla Roads (excluding ongoing projects) in
Million Taka.
Decreasing trend of length of roads that requires treatment (Excluding
Ongoing Projects)
Appendices
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Appendix F:
Appendix G:
1st Year Unconstrained Capital Works for National and Regional
Highways sorted by NPV/Cost . (Excluding ongoing projects)
1st Year Unconstrained Periodic Works for National and Regional
Roads. (Excluding ongoing projects)
1st Year Unconstrained Rehabilitation Works for National and Regional
Highways sorted by Zone and Division. (Excluding ongoing projects)
Zilla Road Recovery Programme by Zone and Division. (Excluding
ongoing projects)
1st Year Unconstrained Periodic works of Zilla Roads sorted by Zone
and Division. (Excluding ongoing projects)
Recurrent Costs by Zone and Division.
Analysis of the roads sections included in the Emergency Rehabilitation
of Damaged Roads Project.
CHAPTER 1: INTRODUCTION
1.1 Overview
RHD is the road authority in Bangladesh which is responsible for the management of major road
network that includes National Highways, Regional Highways and Zilla Roads. Total RHD paved
road network is around 18,250 km (86 % of total length) of which 3,476.55 km is National Highway,
4,105 km is Regional Highway and the rest 10,666 km is Zilla Roads. Proper Maintenance and
management of these assets is a fundamental requirement which is vital to the national economy. For
optimization of the fund disbursement to maintain this road network RHD has been using the
Highway Development and Management (HDM-4) Model (HDM-4 software) as an economic tool
since 1999-2000. Since then, a Road Maintenance and Rehabilitation Needs Report (MRNR) is
published every year to asses 5-year investment plan to meet acceptable levels of service provision for
the RHD road network. The current Maintenance and Rehabilitation Needs Report of 2012-13 is a
continuation of the process.
This year’s analysis has been carried out on about 17,494 km of paved National, Regional and Zilla
roads. All roads have been analysed to assess the overall long-term maintenance need of the RHD
road network. Ongoing projects, however, have been excluded from the HDM analysis to project the
immediate maintenance requirement. Few segments either completed or ongoing may appear in the
HDM outputs because they were not reported by concerned offices before the HDM analysis.
The outputs from HDM-4 are based on the Road Maintenance and Management System (RMMS)
database of RHD. This report provides recommendations for Managers and Engineers in RHD to
improve the road network in a cost effective manner.
Table 1.1: RHD Road Network
Road Class
Number
Of Roads
Total Length
(Km)
Paved Length
(Km)
Unpaved Length
(Km)
Not
Surveyed
(Km)
National Highway
71
3,537.91
3476.55
12.26
49.20
Regional
Highway
121
4,278.08
4104.27
84.63
89.17
Zilla Roads
641
13,637.75
10,665.93
1706.94
1264.88
Total
833
21,453.74
18,246.75
1803.73
1403.26
Table 1.2: Length of roads included in the analysis
Network Name
Analyzed length (km)
All Roads
Analyzed length (km) Excluding
National Highways
3489.019
1757.95
Regional Highways
4006.56
1479.16
Zilla Roads
9998.746
3766.96
Total
17494.325
7004.07
1
ongoing projects
1.2 Objectives of the analysis:
The main objectives of this analysis are:
•
To project the total maintenance need of RHD Road network.
•
To select and prioritize the maintenance works based on NPV over financial cost ratio.
•
To develop a 5-year investment plan to meet acceptable levels of service provision for the
RHD network.
•
To provide a database for preparing RAMS map that combines all relevant information and
shows decision makers where they can most effectively allocate funds for maintenance and
rehabilitation.
•
To provide recommendations for Managers and Engineers in RHD to improve the road
network in a cost effective manner.
1.3 Methodology:
Data required for the analysis are mainly primary in nature and obtained through field surveys.
1.3.1 The data of RMMS Database:
The data of RMMS database is the fundamental input to HDM 4 analysis.
In 2004, RHD undertook a major survey of its network covering around 15,000 km of roads. The
survey was comprehensive and included a full inventory, current condition (including deflection
measurements), pavement structure and traffic flows. In 2006 further surveys were undertaken,
originally intended to complete the remaining 5,000 kilometres that were not surveyed in 2004. Only
around 2,000 km of Zilla Roads omitted in 2004 were surveyed and around 1,500 km of National
Roads were re-surveyed. This year (2012) a comprehensive Road Roughness Survey was conducted
by the Data Collection Division of HDM Circle. The Roughness Survey of this year conducted by the
HDM Circle is one of the critical inputs to HDM 4 analysis. Roughometer III was used to obtain
roughness data.
Last year’s Road Condition data, Traffic volume etc were used in the analysis as the Road Condition
Survey and Classified Traffic Count Survey were not undertaken in 2011-12.
1.3.2
Road User Cost Data:
The Road User Cost (RUC) data were provided by the Economic Circle of RHD and since the RUC
survey was not conducted last year, previous year’s data were used in the analysis.
1.3.3
Unit cost of work and maintenance standard:
The same maintenance standard set previously was used in the analysis. The unit cost of work was
obtained from RHD Schedule of Rates, 2011.
2
1.3.4 HDM 4 Export Tool:
The HDM 4 export tool, mainly a software used to make the data of RMMS database useable by the
Highway Development and Management Software (HDM 4).
1.3.5 Analysis and presentation:
After analysis of data by HDM 4 software, the result obtained is presented in tabular and graphical
form.
1.4 Scope and Limitation:
All the unpaved roads were excluded from the analysis. Some road lengths could not be analysed due
to non-availability of road condition data. Besides, the present version of the HDM 4 software that
RHD has been using for a long time (Version- 1.3) is not capable of doing the socio-economic
analysis and hence the socio-economic variables are excluded from the analysis.
1.5 Road and Bridge Asset Management System:
Since 2005-06 maintenance programme, RHD introduced a new procedure which streamlined the
planning of its maintenance and rehabilitation works, to support their responsibility to actively
manage the nation’s network of roads and bridges. Each year this system is being further improved
and developed in order to improve the selection and prioritisation of maintenance works.
“RAMS”, short for Road and Bridge Asset Management System, brings together all RHD’s current
databases and analytical procedures. The final output of RAMS is the RAMS Map: a single GISbased map for each Division which combines all relevant information and shows decision makers
where they can most effectively allocate funds for maintenance and rehabilitation.
The strength of the RAMS Map is its simplicity. It presents information in a highly visual, graphical
format and uses a minimal set of symbols and colours. RAMS relies on output from the Bridge
Maintenance Management System (BMMS), HDM, and therefore the data in RMMS. The quality of
the RAMS Output is therefore heavily dependent on the quality of the data included in these
databases. It should be noted that this Maintenance Needs Report deals only with the needs of roads
and road pavements and does not address needs for bridges and structures.
1.6 Needs Report Output:
This report presents the results of HDM-4 analysis for National, Regional and Zilla road networks.
None of this work is improvement or development work – it is simply the work required to restore the
existing road network to its original condition. It should therefore be classified as maintenance work
and funded 100% through the Revenue Budget.
Rehabilitation is referred to as “backlog maintenance” as it is the result of under-investment in
maintenance in the past. Separate budget sub-codes should be assigned for routine maintenance,
periodic maintenance and rehabilitation in order that monitoring of expenditure can be effectively
carried out. The road network maintenance and rehabilitation needs for National, Regional and Zilla
Road Networks are presented in Appendix A to E. Recurrent costs of the whole road network has
been shown in Appendix-F.
It must be stressed, however, that HDM-4 is not a design tool. The Road Asset Management System
(RAMS) approach emphasizes that the nominal treatment recommended in the output must be
confirmed and detailed through a more comprehensive survey, investigation and design process.
3
CHAPTER 2: CURRENT NETWORK CONDITION.
2.1 The RHD Road Network:
Table 2.1 shows the extent of the roads covered by the roughness surveys carried out in early 2012.
About 13,000 km of road (71% of paved roads) were surveyed. Table 2.1 shows the surveyed lengths
of different zones under RHD and Figure 2.1 gives the Average Roughness of Roads in last five years
and
Table 2.1: Road Networks Lengths Surveyed for Roughness
Figure 2.1: Average Roughness of different classes of Roads in different years
IRI
Survey Year
4
It is found that the National road roughness has decreased from International Roughness Index 6.05 to
5.24, Regional road roughness has increased from IRI 3.47 to 6.38 and Zilla roads roughness has
decreased from 8.41 to 7.87 indicating an overall improvement of the road network.
The road condition can be grossly categorized into descriptive bands based on roughness. These
categories are shown in table 2.2. Different ranges are adopted for each road class to reflect their
relative importance and the level of service that should be expected from each road class.
Table 2.2: Qualitative descriptors of IRI values
National Highway
Regional Highway
Zila Road
IRI Values
Good
0 – 3.9
0 – 4.9
0 – 5.9
Fair
4.0 – 5.9
5.0 – 6.9
6.0 – 7.9
Poor
6.0 – 7.9
7.0 – 8.9
8.0 – 9.9
Bad
8.0 – 9.9
9.0 – 10.9
10.0 – 11.9
Very Bad
≥10.0
≥11.0
≥12.0
Based on the above categories, following tables and figures show the network condition by Zone and
road class.
Table 2.3: Overall RHD Road Network condition (Survey 2012) (data in km)
Good
Fair
Poor
Bad
Very Bad
Road
Length
%
Length
%
Length
%
Length
%
Length
%
National
1010.49
30.70 1,236.22 41.19
502.46
15.69
336.14
9.43
62.90
3.00
Regional
746.44
18.02 1,550.07 45.69
895.29
25.61
248.49
8.45
80.56
2.23
Zilla Road
1098.90
11.99 2,413.38 38.86 1,711.78 27.82
939.45
18.16
152.76
3.19
Total
2855.83
21.99 5199.670 40.04 3109.522 23.95 1524.074 11.74
296.22
2.28
Figure 2.2: Average Roughness of Road Network in different years
5
Table 2.4: Road condition of All Roads based on IRI (Survey 2012) (data in km)
RHD zone
Good
Fair
Poor
Bad
Very Bad
Dhaka
915.33
984.29
579.58
89.53
2.15
Comilla
91.34
327.44
446.50
362.01
81.34
Chittagong
0.00
255.76
588.48
275.25
31.90
Gopalganj
115.24
388.00
128.15
119.82
0.00
Rangpur
790.68
1011.79
441.54
135.71
0.00
Rajshahi
561.12
597.08
274.34
61.75
11.30
Khulna
71.74
582.74
347.98
289.57
132.43
Barisal
129.47
409.99
217.79
190.43
37.09
Sylhet
180.92
642.58
85.17
0.00
0.00
Fair
Poor
Bad
Very Bad
K
hu
ln
a
Good
ha
hi
Figure 2.3: Condition of National Highways based on IRI (Survey 2012)
1200
800
600
400
200
R
Zones
6
Sy
lh
et
l
ri
sa
Ba
aj
s
an
gp
ur
R
nj
op
al
ga
G
ng
go
hi
tta
C
C
om
ill
a
0
D
ha
ka
Length (Km)
1000
Table 2.5: Road condition of Regional Highways based on IRI (Survey 2012) (data in km)
Zone
Good
Fair
Poor
Bad
Very Bad
Dhaka
338.25
231.91
195.26
65.73
0.00
Comilla
0.00
153.60
77.59
19.00
10.84
Chittagong
0.00
23.75
186.07
85.72
31.90
Gopalganj
0.00
81.00
23.34
39.05
0.00
Rangpur
85.74
106.29
97.85
0.00
0.00
Rajshahi
117.30
206.93
103.05
17.00
0.00
Khulna
44.98
361.30
145.86
22.00
37.81
Barisal
113.23
96.39
40.98
0.00
0.00
Sylhet
46.94
288.90
25.30
0.00
0.00
Good
Fair
op
al
ga
nj
R
Figure 2.4: Road condition of Regional Highways based on IRI (Survey 2012)
Poor
Bad
Very Bad
400
300
250
200
150
100
50
7
Sy
lh
et
isa
l
Ba
r
hu
ln
a
K
an
gp
ur
Zones
R
aj
sh
ah
i
G
ag
on
g
C
hi
tt
ill
a
C
om
ha
ka
0
D
Length of Road (Km)
350
Table 2.6: Road condition of Zilla Roads based on IRI (Survey 2012) (data in km)
Zone
Good
Fair
Poor
Bad
Very Bad
Dhaka
296.09
445.32
328.06
23.79
0.00
Comilla
56.77
44.03
319.74
293.77
29.62
Chittagong
0.00
93.47
227.64
117.93
0.00
Gopalganj
12.62
250.26
78.80
80.78
0.00
Rangpur
489.44
701.03
281.24
31.83
0.00
Rajshahi
201.08
344.50
161.29
18.36
11.30
Khulna
8.76
84.77
94.73
182.55
90.41
Barisal
16.23
214.88
160.42
190.43
21.43
Sylhet
17.92
235.12
59.87
0.00
0.00
Figure 2.5: Road condition of Zilla Roads based on IRI (Survey 2012)
Good
Fair
Poor
Bad
Very Bad
800
Length of Roads (Km)
700
600
500
400
300
200
100
0
Dhaka
Comilla
Chittagong Gopalganj
Rangpur
Zones
8
Rajshahi
Khulna
Barisal
Sylhet
CHAPTER 3: HDM-4 PROGRAMME ANALYSIS
3.1 Principles of Life Cycle Analysis.
The life cycle analysis in HDM-4 predicts the pavement conditions (performance), the required
treatments and costs and benefits over a specified period (in this case 20 years) under a user-defined
maintenance strategy. The costs used in this analysis include cost of capital investment, maintenance
costs and vehicle operating costs.
The costs of two scenarios are compared:
- The “do minimum maintenance” scenario (either routine maintenance or a “holding strategy”).
- The “with maintenance” scenario.
Details of treatments considered in Bangladesh can be seen in Table 3.1. Maintenance strategies were
set for these treatments based on road condition, traffic and roughness data for different classes of
roads (see Table 3.2). Holding strategy has been included (see Table 3.2), which means that DBST /
carpeting has to be provided instead of going for higher treatment if there is shortage of funds to keep
the roads at maintainable condition. DBST was considered for National and Regional roads and
carpeting for Zilla roads.
The benefits and costs of the above scenarios are compared for a HDM-4 life cycle analysis of 20
years. The Net Present Value (NPV)/costs were utilized to prioritize treatment options at a 12%
discount rate. NPV/cost was chosen to obtain maximum benefits as it produces highest benefits when
there is crisis in funding.
3.2 Description of Treatments:
The HDM analysis considers a number of treatments representing the most commonly used types of
maintenance work items in Bangladesh. Table 3.1 provides details of these treatments and the
assumptions made for HDM.
9
Table 3.1: Maintenance and rehabilitation treatments and assumptions used in HDM
Routine
Maintenance:
Off-pavement works:
Patching
Crack Sealing
Periodic
Maintenance:
Preparatory Patching
Preparatory Edge Repair
DBST
Bituminous Carpeting
Overlay
Rehabilitation
Partial Reconstruction
Complete
Reconstruction
Holding
Treatment
Includes all regular works along a road such as maintaining
shoulders, roadside vegetation control, cleaning side drains and
pipe culverts, maintenance of signs and signals.
Repair of potholes based on a standard pothole unit of 0.01m3 per
pothole. The quantity of pothole repairing shall not be more than
1% of the total surface.
Sealing to cracks using Seal Coat/Fog Seal. It assumes a
maximum in any one kilometre of 5% area affected.
Patching potholes and regulating surface irregularities prior to
undertaking the treatments like DBST or DBS Overlay. Should
not be more than 2% of the total quantity of overlay for National
roads and maximum of 5% for Regional roads.
Allows for restoring pavement edges that have been damaged by
vehicles leaving the road to drive onto the shoulder prior to
undertaking the treatments like DBST or DBS Overlay.
Applying two layers of surface treatments on the prepared road
surface. The total thickness has been specified as 25mm. This is
applied in medium to highly trafficked road. Life expectancy
assumed to be 3 years.
This is a 40 mm thick manual overlay used in low trafficked
roads in place of dense bituminous overlay. Life expectancy has
been taken as 2 to 4 years.
Machine laid premixed dense bituminous surfacing overlay 50 –
80 mm thick used in medium to highly trafficked roads.
Carefully controlled overlay may be applied in response to badly
damaged road surface or high roughness so as to obtain a
predefined roughness level (2.5 to 3 IRI). Life expectancy
assumed to be 5 years.
Reconstruction of the upper pavement layers following
scarification of the existing damaged surface and re-compaction.
Normally a 150-200 mm crushed aggregate base with a dense
bituminous surfacing of between 75 and 195mm, depending on
traffic level. This is a treatment to overcome higher roughness or
higher levels of surface cracking resulting from delayed
maintenance. Life expectancy should be 10 years prior to major
periodic maintenance. Full design of the pavement must be
undertaken prior to treatment. Shoulder rehabilitation would also
be provided where necessary.
A major reconstruction on the existing alignment and within the
same overall dimension limits. The road is not widened. The
pavement must be fully designed prior to construction and
shoulder rehabilitation provided where necessary. Life
expectancy should be 10 years before major periodic
maintenance. Applied where there are extremely high levels of
roughness and extensive cracking.
DBST triggered when rehabilitation is required but budget
constraints do not permit the preferred treatment. Expected to
last for 3 years
10
3.3 Maintenance Strategies:
Table 3.2 shows the compound maintenance standards adopted for HDM analysis for the different
classes of roads. These standards are based on experience and analysis of road conditions in
Bangladesh, and are considered to be a reliable basis for HDM-4 to estimate economic performance of
the network. Final treatment designs must be separately established.
Compound maintenance standards have been modified slightly, but are similar to the previous years’
standards. The slight modification relates to the introduction of a DBST in the holding strategy of
National and Regional roads when the roughness will exceed 12 IRI under all damage percentage and
traffic volumes. Similarly, carpeting was introduced in the holding strategy of Zilla roads for
roughness greater than 12 IRI.
Corridor roads (N1, N2, N3, N4, N5, N6, N7 and N8) were given higher priority and hence they were
analyzed separately as they accommodate the major share of traffic and will be the part of the Asian
Highway Network in the near future. Hence, periodic maintenance was considered at 4 IRI. The other
National highways, Regional highways and Zilla roads were considered for periodic maintenance at 5,
5.5 and 6 IRI respectively. “Holding maintenance strategy” was considered to maintain roads using
DBST when funding is limited and higher treatments cannot be provided. Application of DBST can
then delay further road deterioration.
Table 3.2 : Compound maintenance standards for HDM-4 programme analysis in 2011-12
Holding Standard without Reconstruction for National and Regional Roads
Roughness
Range (IRI)
All Damage
(%)
Traffic Range (MT-AADT)
100 - 1999
2000 - 3999
<5%
6000 - 9999
> 10000
Routine
5 - 10%
<12
4000 - 5999
Routine
10 - 20%
Routine
Routine
20 - 30%
Routine
> 30%
DBST 25mm
DBST 25mm
DBST 25mm
DBST 25mm
> 12.00
All
DBST 25mm
Holding Standard with Reconstruction for National and Regional Roads
Roughness
Range (IRI)
All Damage
(%)
Traffic Range (MT-AADT)
100 - 1999
2000 - 3999
<5%
6000 - 9999
> 10000
Routine
5 - 10%
<12
4000 - 5999
Routine
10 - 20%
Routine
DBST 25mm
20 - 30%
Routine
> 30%
DBST 25mm
All
Full Recon
110mm
DBST 25mm
DBST 25mm
> 12.00
Full Recon
135mm
11
Full Recon 150mm
Full Recon
180mm
Full Recon
195mm
Holding Standard with Reconstruction for Zilla Roads
Roughness
Range (IRI)
Traffic Range (MT-AADT)
All Damage
(%)
100 - 999
1000-1999
2000-2999
3000-3999
>4000
0 -10%
Routine
Routine
Routine
Routine
Routine
10-20%
Routine
Routine
20-30%
Routine
<12
Carpet 40mm
Carpet 40mm
>30%
> 12.00
Carpet 40mm
All
Full Rec 75mm
Compound Maintenance Standards for National Corridor Roads
Roughness
Range (IRI)
Cracking
Range (%)
Traffic Range (MT-AADT)
100 - 1999
2000 - 3999
< 25%
4000 - 5999
6000 - 9999
> 10000
Routine
< 4.0
>= 25%
4.00 - < 7.00
DBST 25mm
Overlay 50mm
All
Overlay 50mm
Overlay 80mm
Overlay 60mm
Overlay 80mm
Overlay 50mm
7.00 - < 9.00
All
9.00 - < 12.00
All
Rehab 120mm
Rehab 140mm
Rehab
150mm
Rehab 180
Rehab 195mm
> 12.00
All
Full Rec
120mm
Full Rec 140mm
Full Recon
150mm
Full Recon
180mm
Full Recon
195mm
Compound Maintenance Standards for Other National Roads
Roughness Range
(IRI)
Cracking
Range (%)
Traffic Range (MT-AADT)
100 - 1999
2000 - 3999
< 25%
4000 - 5999
6000 - 9999
> 10000
Routine
< 5.0
>= 25%
5.00 - < 7.00
DBST 25mm
Overlay 50mm
All
Overlay 50mm
Overlay 50mm
Overlay 80mm
7.00 - < 9.00
All
Overlay 60mm
9.00 - < 12.00
All
Rehab 110mm
Rehab 135mm
Rehab
150mm
Rehab 180 mm
Rehab 195mm
> 12.00
All
Full Recon
110mm
Full Recon
135mm
Full Recon
150mm
Full Recon
180mm
Full Recon
195mm
12
Compound Maintenance Standards for Regional Roads
Roughness Range
(IRI)
Traffic Range (MT-AADT)
Cracking
Range (%)
100 - 1999
2000 - 2999
3000 - 3999
< 25%
Routine
>= 25%
DBST 25mm
4000 - 4999
> 5000
< 5.5.0
5.50 - < 7.00
All
Overlay 50mm
7.00 - < 9.00
All
9.00 - < 12.00
All
Rehab 110mm
Rehab 135mm
Rehab 150mm
> 12.00
All
Full Recon
110mm
Full Recon 135mm
Full Recon 150mm
Overlay 60mm
Overlay 50mm
Overlay 60mm
Compound Maintenance Standards for Zilla Roads
Roughness Range
(IRI)
Cracking
Range (%)
Traffic Range (MT-AADT)
100-999
1000-1999
2000-2999
< 25%
3000-3999
>4000
Carpet 40mm
Overlay
50mm
Routine
< 6.0
>= 25%
6.0 - < 7.00
Seal 15mm
All
Carpet 40mm
7.00 - < 9.00
All
9.00 - < 12.00
All
Rehab- 75mm
> 12.00
All
Full Rec 75mm
Overlay
50mm
3.4 Unit Costs.
Table 3.3 shows the unit cost of different work prepared in accordance with the RHD Schedule of
Rates 2011.
Table 3.3` Unit costs of Treatment.
Work Class
Work Type
Predominant Activity
Routine Maintenance Outside Carriageway
Routine
Routine
Maintenance
Patching Potholes
Resurfacing
Asphalt
Unit
50,000 Per Km
1,272 Per m2
189 Per m2
Crack Sealing
1,272 Per m2
Edge Repair
Periodic
Fin Cost (Tk)
Seal Coat 15 mm
189 Per m2
DBST
300 Per m2
Mix Bituminous Carpeting 40mm
13
2
641 Per m
Overlay 40 mm
598 Per m2
Overlay 50 mm
740 Per m2
Overlay 60 mm
883 Per m2
Overlay 80 mm
1,168 Per m2
Overlay 100 mm
1,454 Per m2
Overlay 120 mm
1,739 Per m2
Partial Reconstruction 75 mm
2,294 Per m2
Partial Reconstruction 100 mm
2,651 Per m2
Partial Reconstruction 110 mm
2,793 Per m2
Partial Reconstruction 120 mm
2,936 Per m2
Partial Reconstruction 135 mm
3,424 Per m2
Partial Reconstruction 140 mm
3,495 Per m2
Partial Reconstruction 150 mm
3,638 Per m2
Partial Reconstruction 180 mm
4,340 Per m2
Partial Reconstruction 195 mm
4,554 Per m2
Full Reconstruction 75 mm
3,498 Per m2
Full Reconstruction 100 mm
3,770 Per m2
Full Reconstruction 110 mm
3,912 Per m2
Full Reconstruction 120 mm
4,055 Per m2
Reconstruction Full Reconstruction Full Reconstruction 135 mm
4,329 Per m2
Full Reconstruction 140 mm
4,614 Per m2
Full Reconstruction 150 mm
4,757 Per m2
Full Reconstruction 180 mm
5,459 Per m2
Full Reconstruction 195 mm
5,673 Per m2
Resurfacing
Rehabilitation
Partial
Reconstruction
14
CHAPTER 4: RESULTS OF HDM-4 ANALYSIS.
4.1 Analysis Procedure:
The analysis was carried out in the following sequences.
•
•
Run all roads to obtain the overall funding needs. This will also allow a comparison between
last years results to get a picture of overall changes in network condition.
Remove all segments currently ongoing and run HDM-4 to get the immediate funding needs
for the year 2012-2013.
4.2 Network Results (Unconstrained):
Like the previous years, HDM-4 analysis was carried out for all road networks to get the overall
picture of needs. This has produced a detailed work programme for the full 20-years analysis period.
However, only the first five years should be considered when estimating the future funding needs due
to the uncertainty about future conditions and availability of funds.
The unconstrained capital cost of initial 5 years for all analyzed road lengths are given in figure 4.1
below. Here, the total five years cost for capital works; i.e. periodic maintenance, partial and full
reconstruction, is 100,912.88 million taka wherein the average demand per year is around 20,000
million taka.
Figure 4.1: Total unconstrained demand of capital works for next five years (2013-17).
15
Table 4.2: Total Capital works demands for the next five years (in Million Taka)
Road Class
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
National
27196.31
2536.10
1419.72
642.71
404.94
32199.79
Regional
17709.46
2393.43
1015.28
778.28
686.50
22582.96
Zilla
23559.21
9987.60
5417.93
4194.02
2971.37
46130.13
Total
68464.99
14917.14
7852.93
5615.01
4062.81
100912.88
Table 4.3: Periodic Maintenance Demands (Million Taka) for the Next Five Years
Road Class
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
National
9073.52
2301.84
1418.12
609.79
404.94
13808.20
Regional
5870.20
1709.11
1010.64
777.19
481.25
9848.38
Zilla
7773.04
856.50
1592.19
1241.26
517.68
11980.67
Total
22716.76
4867.45
4020.95
2628.24
1403.87
35637.26
Table 4.4: Partial Reconstruction Demands (Million Taka) for the Next Five Years
Road Class
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
National
6275.30
234.27
1.61
32.92
0.00
6544.10
Regional
3955.68
567.50
4.64
1.09
205.25
4734.15
Zilla
11787.57
9055.95
3789.51
2862.75
2221.17
29716.94
Total
22018.55
9857.72
3795.75
2896.76
2426.42
40995.20
Table 4.5: Full Reconstruction Demands (Million Taka) for the Next Five Years
Road Class
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
National
11847.49
0.00
0.00
0.00
0.00
11847.49
Regional
7883.59
116.83
0.00
0.00
0.00
8000.42
Zilla
3998.59
75.15
36.22
90.02
232.53
4432.51
Total
23729.68
191.98
36.22
90.02
232.53
24280.42
16
Table 4.6: Routine Maintenance Demands (Million Taka) for the Next Five Years
Road Class
National
Regional
Zilla
2012-13
2013-14
2015-16
2016-17
TOTAL
305.12
721.61
729.83
763.39
801.75
3321.70
422.62
996.76
1006.67
1080.82
1160.84
4667.72
1721.09
3463.62
3733.26
4011.15
4332.83
17261.95
5181.99
5469.76
5855.36
6295.42
25251.37
2448.83
Total
2014-15
Tables 4.2 to 4.6 shows the class wise (Capital works and Routine Maintenance costs) demand
required for the first five years of analysis. Analyzed length for 2012-13 analysis is 17,494.33 Km
against 18,17.7 Km of 2011-12, 17,482 Km of 2010-11, 16,821 km of 2009-10 and 16,924 km in
2008-09 analysis. All sets of figures are from analyses including ongoing projects.
Table 4.7: Lengths of different work category in all classes of roads (Km)
Road Class
Treatment Type
2012-13
2013-14
2014-15
2015-16
2016-17
Periodic Maintenance
1970.87
489.88
241.75
170.69
107.44
National
Partial Reconstruction
346.73
16.40
0.10
1.94
0.00
Highways
Full Reconstruction
483.91
0.00
0.00
0.00
0.00
2801.51
506.28
241.85
172.63
107.44
Periodic Maintenance
2523.48
570.17
314.38
301.87
218.46
Partial Reconstruction
321.10
47.79
0.64
0.10
25.03
Full Reconstruction
489.49
8.40
0.00
0.00
0.00
3334.07
626.36
315.02
301.97
243.49
Periodic Maintenance
4627.57
491.11
881.19
728.86
364.49
Zilla
Partial Reconstruction
2000.82
1513.82
614.36
488.75
381.54
Roads
Full Reconstruction
431.92
8.85
4.10
10.26
26.86
Zilla Road Total
7060.31
2013.78
1499.65
1227.87
772.89
13195.89
3146.42
2056.52
1702.47
1123.82
National H. Total
Regional
Highways
Regional H. Total
Grand Total
4.3 Demand excluding ongoing projects:
List of ongoing projects were collected from concerned authorities and also the list of ongoing works
of the previous year was collected. Ongoing segments were then excluded from HDM run and
remaining sections were analysed separately. This was done to avoid duplication of the current year’s
maintenance programme and to ascertain the actual immediate need of capital budget.
17
Table 4.8 Capital demand of National/Regional Roads 2012-13 (excluding on- going projects)
(million taka)
Zone
Periodic
Partial Recon
Full Recon
Total
Barisal
456.91
875.44
978.18
2310.53
Chittagong
872.70
1059.42
2335.29
4267.40
Comilla
527.71
429.73
1390.54
2347.97
Dhaka
3179.07
1045.91
1260.77
5485.75
Gopalgonj
167.33
129.17
428.80
725.30
Khulna
1089.90
807.17
2750.26
4647.34
Rajshahi
1284.55
808.99
288.47
2382.02
Rangpur
1888.27
1039.13
406.60
3334.00
Sylhet
682.18
79.79
580.72
1342.68
Total
10148.62
6274.75
10419.63
26842.99
Figure 4.2: Zone wise capital needs of National and Regional Highways in year 2012-13
18
Table 4.9: Funding Needs of Zilla Roads Networks for 2012-2013 (Excluding Ongoing Projects)
(million taka)
Zone
Periodic
Partial Recon
Full Recon
Grand Total
Barisal
485.79
194.27
70.42
750.48
Chittagong
385.14
690.84
180.21
1256.19
Comilla
678.35
882.95
326.88
1888.18
Dhaka
210.10
1589.03
330.06
2129.18
Gopalgonj
93.60
41.34
2.61
137.55
Khulna
589.29
591.20
258.39
1438.87
Rajshahi
428.23
620.17
137.31
1185.71
Rangpur
734.81
1357.17
127.31
2219.30
Sylhet
93.47
128.17
0.0
221.65
Total
3698.78
6095.14
1433.19
11227.11
Figure 4.3: Zone wise capital needs of Zilla Road Network in year 2011-2012
4.4 Pavement Strengthening:
The 2008-09 Needs Report included an evaluation of the requirements for strengthening of national
roads, based on RMMS deflection data. This was intended to highlight the issue of inherent weakness
of many roads in Bangladesh. The treatments proposed were indicative. It was not intended that any
work of this nature should be carried out without undertaking a detailed survey and investigation
19
Table 4.10: Required Length of different Road Class for Capital works in next five years
(Excluding ongoing Works)
(in Km)
Road Class
Treatment Type
2012-13
2013-14
2014-15
2015-16
2016-17
Periodic Maintenance
1367.8
283.44
186.59
96.29
68.81
National
Partial Reconstruction
214.97
7.81
0.1
1.94
0
Highways
Full Reconstruction
228.15
0
0
0
0
National H. Total
1810.92
291.25
186.69
98.23
68.81
Periodic Maintenance
1627.89
379.79
215.49
160.89
146.55
Partial Reconstruction
194.8
30.48
0.64
0.1
25.03
Full Reconstruction
296.75
8.4
0
0
0
Regional H. Total
2119.44
418.67
216.13
160.99
171.58
Periodic Maintenance
2143.7
223.36
473.43
399.96
173.36
Zilla
Partial Reconstruction
1030
751.28
283.83
194.73
193.55
Roads
Full Reconstruction
151.96
0.5
0.8
1.8
0
Zilla Road Total
3325.66
975.14
758.06
596.49
366.91
7256.02
1685.06
1160.88
855.71
607.3
Regional
Highways
Grand Total
Figure 4.4: Decreasing trend of length of roads that requires treatment (in Km)
followed by an engineering design. The latest road condition surveys have provided up to date
deflection data for the RHD network, although the frequency of measurement is not sufficient to base
detailed design on. It is suggested that before initiating any strengthening work, the design has to be
done according to the current pavement condition (deflection) of the respective road.
4.5 Overall Needs:
The initial run of HDM, including ongoing projects, is indicative of the longer-term needs of the
network. Roads excluded from the run on the ground works on them are currently in progress or
20
recently completed, will require periodic maintenance before the end of the five year period and thus
the five-year plan should be based on the “All Roads” HDM Output.
Table 4.11: Overall Maintenance Needs by Work Category (Million Taka)
Work Type
Routine Maintenance
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
2448.83
5181.99
5469.76
5855.36
6295.42
25251.37
Periodic Maintenance
22716.76
4867.45
4020.95
2628.24
1403.87
35637.26
Partial Recon
22018.55
9857.72
3795.75
2896.76
2426.42
40995.20
Full Recon
23729.68
191.98
36.22
90.02
232.53
24280.42
20099.14
13322.68
11470.38
10358.24
70913.82
Total
126164.3
The Road Master Plan makes a strong case for separating the assessment of Zilla roads from that of
National and Regional Roads. It can be seen from Tables 4.11 and 4.12 that the needs of Zilla Roads
are predominantly rehabilitation and reconstruction, hence the proposal in RMP for a “Zilla Road
Recovery Programme”. In the past two years, no Zilla roads have featured in the PMP because the
prioritization using NPV/C favours more heavily trafficked roads. It is therefore important that a
separate prioritization process is adopted for Zilla Roads.
The results of the HDM analysis show that, in the first five years, the budget demand for Zilla Roads
is higher than that for National and Regional Roads. The overall figures translate into a need to invest
more in Zilla Roads over the next five years. It is therefore strongly recommended that separate
budget provision is made for Zilla Roads for the next five years.
Table 4.12: Overall Maintenance Needs by Work Category for National and Regional Roads (Million
Taka)
Work Type
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
Routine Maintenance
727.74
1718.37
1736.50
1844.21
1962.59
7989.42
Periodic Maintenance
14943.72
4010.94
2428.75
1386.98
886.19
23656.59
Partial Recon
10230.98
801.77
6.25
34.01
205.25
11278.25
Full Recon
19731.08
116.83
0.00
0.00
0.00
19847.91
Total
45633.52
6647.91
4171.5
3265.2
3054.03
62772.17
Table 4.13: Overall Maintenance Needs by Work Category for Zilla Roads (Million Taka)
Work Type
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
Routine Maintenance
1721.09
3463.62
3733.26
4011.15
4332.83
17261.95
Periodic Maintenance
7773.04
856.50
1592.19
1241.26
517.68
11980.67
Partial Recon
11787.57
9055.95
3789.51
2862.75
2221.17
29716.94
Full Recon
3998.59
75.15
36.22
90.02
232.53
4432.51
9151.18
8205.18
Total
25280.29
13451.22
21
7304.21
63392.07
CHAPTER 5: FINDINGS AND RECOMMENDATIONS
5.1 Major Findings:
•
The overall or total maintenance needs for the coming five years are:
Table 5.1: Overall Maintenance Needs for the next five years (2013-2017) in Million Taka
Year
2012-13
2013-14
2014-15
2015-16
2016-17
TOTAL
Total
70913.82
20099.14
13322.68
11470.38
10358.24
126164.3
•
The immediate maintenance need for the year 2012-13 is:
Table 5.2: Immediate Maintenance Needs 2012-2013 (Million Taka)
Maintenance Backlog
Routine
Maintenance
1721.22
•
Periodic
Maintenance
13847.4
Partial
Reconstruction
12369.89
Total
Need
Full
Reconstruction
11852.82
39791.33
The overall maintenance needs for National and Regional Highways as well as for Zilla roads
have decreased in comparison to the previous year’s analysis indicating an overall
improvement.
22
5.2 Recommendations:
•
Since HDM-4 is basically an economic tool for selection and prioritisation of road
maintenance options, Field visits and design verification must be undertaken before finalising
treatment option.
•
It is evident from the analysis that, the investment needs tend to decrease considerably
provided that the first year requirements are met completely. So, efforts should be given to
maximize the first year maintenance in order to minimize backlogs.
•
Routine maintenance has to be done properly and should be the first budget priority.
•
Since the prioritisation of projects using NPV/Cost favours the more heavily trafficked roads,
adoption of a separate prioritisation process for zilla roads is recommended.
•
Small contracts should be avoided in the maintenance programme to improve quality of
works.
(Munmun Biswas)
(Mahmudul Islam Khan)
(Md. Arshad Ali)
Asssistant Engineer
Sub Divisional Engineer (C.C.)
HDM Specialist
HDM Operation Division
Data Collection Sub Division
(A K Mohhammad Fazlul Karim)
(Md. Jawed Alam)
Executive Engineer
Superintending Engineer, RHD
(Addl Charge)
(Addl Charge)
HDM Operation Division
23
HDM Circle
Appendix-A
1st Year Unconstrained Capital Works for National
and Regional Highways sorted by NPV/Cost.
(Excluding ongoing projects)
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Chittagong
Comilla
Khulna
Chittagong
Dhaka
Comilla
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Comilla
Dhaka
Dhaka
Chittagong
Chittagong
Rangpur
Dhaka
Dhaka
Comilla
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Division
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Gazipur
Chittagong
Feni
Chuadanga
Chittagong
Narsingdi
Feni
Gazipur
Gazipur
Dhaka
Narayanganj
Tangail
Gazipur
Feni
Narsingdi
Narsingdi
Chittagong
Chittagong
Thakurgaon
Gazipur
Gazipur
Laxmipur
Chittagong
Dohazari
Chittagong
Chittagong
Dohazari
Narsingdi
Dhaka
Tangail
Gazipur
Narayanganj
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
N106
N104
R745
N106
N2
N104
R301
R301
N302
N105
N4
R301
N104
N2
N2
N106
N1
N5
R310
R303
R143
N106
R170
N106
N106
N1
N2
N302
N4
R505
R201
Road Name
Chainage
Tongi-Pachdona Road
Km 002.60-002.70
Tongi-Pachdona Road
Km 002.80-004.10
Tongi-Pachdona Road
Km 006.30-006.50
Tongi-Pachdona Road
Km 006.60-006.80
Tongi-Pachdona Road
Km 001.90-002.50
Tongi-Pachdona Road
Km 004.20-004.70
Tongi-Pachdona Road
Km 005.60-005.90
Tongi-Pachdona Road
Km 004.90-005.40
Tongi-Pachdona Road
Km 001.30-001.40
Tongi-Pachdona Road
Km 000.01-000.06
Chittagong-Rangamati Road
Km 022.60-023.00
Feni-Noakhali Road
Km 002.50-002.60
Kushtia -Jhenaidah Road
Km 097.26-097.30
Chittagong-Rangamati Road
Km 021.80-022.20
Dhaka-Sylhet-Jaflong Road
Km 033.58-033.65
Feni-Noakhali Road
Km 011.40-011.50
Tongi-Pachdona Road
Km 006.90-007.50
Tongi-Pachdona Road
Km 000.06-000.71
Tongi-Ashulia-Zerabo-EPZ Road
Km 000.00-006.50
Madanpur-Joydevpur
Km 006.50-006.60
Joydebpur-Jamalpur Road
Km 074.35-075.15
Tongi-Pachdona Road
Km 000.01-000.06
Feni-Noakhali Road
Km 000.40-000.70
Dhaka-Sylhet-Jaflong Road
Km 058.95-059.00
Dhaka-Sylhet-Jaflong Road
Km 058.95-059.00
Chittagong-Rangamati Road
Km 012.90-013.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 219.48-219.78
Dhaka -Utholi-Banglabandh Road
Km 434.54-439.41
Joydebpur-Itakhola Road
Km 001.90-002.20
Tongi By-Pass Road
Km 000.60-000.70
Maijdi-Chandraganj Road
Km 015.50-015.52
Chittagong-Rangamati Road
Km 015.30-016.10
Patiya-Chokoria Road
Km 020.70-020.90
Chittagong-Rangamati Road
Km 023.60-027.80
Chittagong-Rangamati Road
Km 013.70-014.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 298.78-300.48
Dhaka-Sylhet-Jaflong Road
Km 029.89-030.12
Tongi-Ashulia-Zerabo-EPZ Road
Km 017.44-017.55
Joydebpur-Jamalpur Road
Km 078.55-078.75
Nabinagar-Kaliakoir Road
Km 014.00-015.83
Tarabo-Demraghat Road
Km 000.00-002.12
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10 21334 Regional Overlay 60mm @ IRI 5.5-9
S
1.30 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 21334 Regional DBST 25mm @ 25% Crk
S
0.50 21334 Regional DBST 25mm @ 25% Crk
S
0.10 21334 Regional Overlay 60mm @ IRI 5.5-9
L
0.05 30316 Regional DBST 25mm @ 25% Crk
S
0.40 11451 National Overlay 80mm @ IRI 5-9
S
0.10 12376 National Overlay 50mm @ IRI 5
S
0.04
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 11451 National Overlay 80mm @ IRI 5-9
R
0.06 16426 National Overlay 50mm @ IRI 4
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.60
8310 Regional Overlay 60mm @ IRI 5.5-9
S
0.64 30316 Regional DBST 25mm @ 25% Crk
S
6.50 21914 National Overlay 80mm @ IRI 5-9
S
0.10
9061 National Overlay 50mm @ IRI 5-7
S
0.80 15112 National Overlay 80mm @ IRI 4-9
R
0.05 30316 Regional DBST @ Traff >6000
S
0.30 11451 National Overlay 80mm @ IRI 5-9
L
0.05 11451 National Overlay 80mm @ IRI 4-9
R
0.05 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
4.87 11451 National Overlay 80mm @ IRI 4-9
S
0.30 17870 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 10199 Regional Overlay 60mm @ IRI 5.5-9
S
0.02
5722 Regional Overlay 60mm @ IRI 5.5-9
S
0.80 11451 National Overlay 80mm @ IRI 5-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
4.20 11451 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Overlay 50mm @ IRI 5
S
1.70 11451 National Overlay 80mm @ IRI 4-9
R
0.22
9061 National Overlay 50mm @ IRI 4-7
S
0.11 18611 National Overlay 80mm @ IRI 5-9
S
0.20 15112 National Overlay 80mm @ IRI 4-9
S
1.83 17384 Regional DBST @ Traff >6000
S
2.12 19185 Regional Overlay 60mm @ IRI 5.5-9
Appendix-A: Page:1 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
0.349 40.02
17.62
4.531 38.79 215.19
0.697 38.12
31.61
0.792 33.73
33.74
2.106 33.50
81.76
1.743 31.24
66.66
0.415 28.79
42.73
0.692 27.90
67.67
0.436 27.67
13.63
0.124 27.65
10.78
1.910 26.05
56.27
0.303 25.99
11.59
0.147 25.68
4.50
1.910 24.14
52.14
0.217 22.30
9.26
0.461 22.11
12.12
2.102 22.09
55.26
1.928 21.98 137.15
53.556 21.80 1441.83
0.214 21.52
6.02
3.753 21.31 104.56
0.142 21.26
9.93
1.383 20.86
32.62
0.257 20.51
6.45
0.257 20.51
6.45
0.477 20.44
10.58
1.753 20.41
43.78
24.267 20.36 587.78
2.128 20.25
56.96
0.342 20.20
9.04
0.067 20.15
1.40
3.997 19.92
88.08
0.518 19.69
12.48
20.570 19.66 447.43
0.908 19.62
24.18
9.459 19.58 226.76
0.524 19.46
16.48
0.816 19.37
19.53
1.235 19.36
33.74
3.381 19.30 229.48
8.720 19.18 270.49
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Chittagong
N106
Dhaka
Gazipur
N105
Dhaka
Gazipur
N4
Comilla
Brahmanbaria N102
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Dhaka
Narsingdi
N2
Dhaka
Narayanganj N1
Rangpur
Lalmonirhat
N509
Comilla
Noakhali
N104
Dhaka
Tangail
N4
Khulna
Satkhira
N715
Rangpur
Lalmonirhat
N509
Khulna
Jessore
N707
Dhaka
Narsingdi
N2
Khulna
Jessore
N7
Chittagong Chittagong
N106
Dhaka
Tangail
N4
Rangpur
Bogra
N5
Chittagong Chittagong
N1
Khulna
Satkhira
N715
Khulna
Jessore
N7
Khulna
Chuadanga
R745
Dhaka
Narayanganj N1
Chittagong Chittagong
N106
Khulna
Jessore
N7
Rangpur
Thakurgaon
N5
Rajshahi
Natore
N6
Comilla
Brahmanbaria N2
Comilla
Feni
N104
Dhaka
Mymensingh N3
Dhaka
Gazipur
R301
Khulna
Satkhira
N715
Dhaka
Narsingdi
N2
Chittagong Chittagong
N106
Chittagong Cox's Bazar
R170
Chittagong Dohazari
N1
Comilla
Noakhali
N104
Dhaka
Narsingdi
N2
Comilla
Brahmanbaria N102
Rajshahi
Natore
N502
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chittagong-Rangamati Road
Km 013.10-013.50
Madanpur-Joydevpur
Km 029.44-030.24
Joydebpur-Jamalpur Road
Km 021.47-026.75
Comilla-Brahmanbaria Road
Km 072.19-072.34
Feni-Noakhali Road
Km 045.58-045.99
Dhaka -Comilla -Chittagong-Teknaf RoKm 174.38-174.58
Dhaka-Sylhet-Jaflong Road
Km 017.70-027.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 036.28-037.78
Barabari-Burimary Road
Km 049.94-050.84
Feni-Noakhali Road
Km 038.00-038.20
Joydebpur-Jamalpur Road
Km 075.45-078.55
Benapole Town Old Section
Km 004.20-004.40
Barabari-Burimary Road
Km 062.75-062.95
Jessore Town Old Section
Km 001.40-001.50
Dhaka-Sylhet-Jaflong Road
Km 041.54-041.64
Dauladia-Mongla Road
Km 148.62-148.72
Chittagong-Rangamati Road
Km 016.30-017.20
Joydebpur-Jamalpur Road
Km 040.99-041.19
Dhaka -Utholi-Banglabandh Road
Km 164.12-174.36
Dhaka -Comilla -Chittagong-Teknaf RoKm 228.86-228.96
Benapole Town Old Section
Km 003.60-004.00
Dauladia-Mongla Road
Km 153.46-153.56
Kushtia -Jhenaidah Road
Km 091.96-092.46
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.30-009.40
Chittagong-Rangamati Road
Km 014.90-015.20
Dauladia-Mongla Road
Km 145.42-145.52
Dhaka -Utholi-Banglabandh Road
Km 405.10-405.20
Kashinathpur-Natore-Rajshahi Road Km 102.22-102.42
Dhaka-Sylhet-Jaflong Road
Km 077.14-077.24
Feni-Noakhali Road
Km 002.80-005.10
Dhaka -Mymensingh Road
Km 074.60-077.20
Tongi-Pachdona Road
Km 001.50-001.70
Benapole Town Old Section
Km 004.80-005.00
Dhaka-Sylhet-Jaflong Road
Km 033.65-041.54
Chittagong-Rangamati Road
Km 019.30-021.20
Patiya-Chokoria Road
Km 063.10-063.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 305.08-305.78
Feni-Noakhali Road
Km 041.78-041.88
Dhaka-Sylhet-Jaflong Road
Km 029.89-030.12
Comilla-Brahmanbaria Road
Km 072.44-072.66
Bogra -Natore Road
Km 044.26-045.26
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40 11451 National Overlay 50mm @ IRI 5
S
0.80 11451 National Overlay 80mm @ IRI 5-9
S
5.28 19452 National Overlay 80mm @ IRI 4-9
S
0.15 11451 National Overlay 80mm @ IRI 5-9
S
0.41 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
9.70 17148 National Overlay 50mm @ IRI 4
R
1.50 11451 National Overlay 80mm @ IRI 4-9
S
0.90
9061 National Overlay 60mm @ IRI 7-9
S
0.20 10253 National Overlay 80mm @ IRI 5-9
S
3.10 15112 National Overlay 80mm @ IRI 4-9
S
0.20
9061 National Overlay 60mm @ IRI 7-9
S
0.20
9061 National Overlay 50mm @ IRI 5-7
S
0.10 11451 National Overlay 80mm @ IRI 5-9
R
0.10 16426 National Overlay 50mm @ IRI 4
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.90 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
10.23 10530 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National DBST @ Traff >6000
S
0.40
9061 National Overlay 60mm @ IRI 7-9
S
0.10
9061 National Overlay 60mm @ IRI 7-9
S
0.50
5536 Regional Overlay 60mm @ IRI 5.5-9
L
0.10 11451 National DBST @ Traff >6000
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.10 12330 National Overlay 80mm @ IRI 4-9
S
2.30 11225 National Overlay 80mm @ IRI 5-9
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
0.20 21334 Regional DBST @ Traff >6000
S
0.20
9061 National Overlay 60mm @ IRI 7-9
S
7.89 16426 National Overlay 50mm @ IRI 4
S
1.90 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.10 10253 National Overlay 80mm @ IRI 5-9
L
0.22
9061 National Overlay 50mm @ IRI 4-7
S
0.22 11451 National Overlay 80mm @ IRI 5-9
S
1.00
9061 National Overlay 60mm @ IRI 7-9
Appendix-A: Page:2 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
1.211 18.97
31.17
4.807 18.91 112.25
33.074 18.46 828.26
0.714 18.39
20.94
2.072 18.37
44.11
1.251 18.32
31.10
37.960 18.25 1249.48
9.013 18.25 203.11
3.081 18.21
69.66
0.924 18.20
17.90
18.704 18.13 418.59
0.685 17.99
16.37
0.574 17.95
13.02
0.510 17.91
14.78
0.343 17.82
9.00
0.551 17.80
15.87
5.037 17.71 104.57
1.235 17.59
26.82
62.667 17.56 1492.52
0.210 17.45
16.76
1.369 17.44
31.74
0.311 17.37
7.93
1.556 17.36
31.30
0.183 17.34
14.49
1.432 17.28
26.84
0.477 17.26
13.32
0.494 17.22
10.75
1.202 17.21
28.06
0.617 17.19
14.40
10.980 17.18 218.59
16.051 17.04 337.77
0.346 16.98
18.33
0.685 16.94
16.01
30.875 16.87 939.24
9.071 16.81 165.27
0.302 16.80
6.33
3.860 16.78
81.83
0.461 16.77
8.38
0.617 16.73
16.69
1.081 16.73
28.48
3.510 16.72
70.73
Appendix-A
Annual Needs Report
2012-2013
Zone
Chittagong
Khulna
Comilla
Dhaka
Chittagong
Chittagong
Dhaka
Chittagong
Chittagong
Dhaka
Dhaka
Comilla
Rangpur
Rangpur
Chittagong
Chittagong
Chittagong
Rajshahi
Rangpur
Comilla
Chittagong
Dhaka
Comilla
Rangpur
Chittagong
Rangpur
Chittagong
Khulna
Chittagong
Dhaka
Dhaka
Rangpur
Khulna
Dhaka
Dhaka
Rajshahi
Rangpur
Dhaka
Chittagong
Dhaka
Khulna
Division
Cox's Bazar
Jhenaidah
Noakhali
Tangail
Dohazari
Chittagong
Tangail
Chittagong
Dohazari
Tangail
Narsingdi
Feni
Lalmonirhat
Bogra
Dohazari
Dohazari
Dohazari
Rajshahi
Lalmonirhat
Feni
Cox's Bazar
Gazipur
Noakhali
Lalmonirhat
Cox's Bazar
Bogra
Chittagong
Chuadanga
Chittagong
Narayanganj
Narsingdi
Bogra
Chuadanga
Tangail
Tangail
Naogaon
Bogra
Gazipur
Cox's Bazar
Gazipur
Jessore
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R170
N703
N104
N4
N1
N106
N4
N106
N1
N4
N2
N104
N509
N515
N1
N1
N1
N6
N509
N104
R170
R310
N104
N509
R170
N515
N1
R745
N1
N1
N2
N515
R745
N4
N4
R547
N515
N4
R170
N105
N707
Road Name
Chainage
Patiya-Chokoria Road
Km 064.40-065.10
Jhenaidah Town Old Section
Km 003.40-003.47
Feni-Noakhali Road
Km 039.90-040.00
Joydebpur-Jamalpur Road
Km 080.25-080.55
Dhaka -Comilla -Chittagong-Teknaf RoKm 303.08-303.38
Chittagong-Rangamati Road
Km 014.10-014.60
Joydebpur-Jamalpur Road
Km 072.85-073.15
Chittagong-Rangamati Road
Km 027.80-030.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 303.98-304.18
Joydebpur-Jamalpur Road
Km 085.25-086.25
Dhaka-Sylhet-Jaflong Road
Km 063.97-064.11
Feni-Noakhali Road
Km 008.60-009.20
Barabari-Burimary Road
Km 059.45-059.55
Bogra 2nd Town By-Pass Road
Km 006.70-010.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 304.68-304.88
Dhaka -Comilla -Chittagong-Teknaf RoKm 314.58-315.17
Dhaka -Comilla -Chittagong-Teknaf RoKm 313.38-314.48
Kashinathpur-Natore-Rajshahi Road Km 142.55-144.98
Barabari-Burimary Road
Km 048.24-048.94
Feni-Noakhali Road
Km 010.40-010.60
Patiya-Chokoria Road
Km 069.20-069.40
Joydebpur-Itakhola Road
Km 000.20-001.70
Feni-Noakhali Road
Km 048.79-049.17
Barabari-Burimary Road
Km 061.35-062.45
Patiya-Chokoria Road
Km 064.00-064.20
Bogra 2nd Town By-Pass Road
Km 014.30-016.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 199.68-200.38
Kushtia -Jhenaidah Road
Km 090.36-091.76
Dhaka -Comilla -Chittagong-Teknaf RoKm 200.48-200.68
Dhaka -Comilla -Chittagong-Teknaf RoKm 037.88-039.13
Dhaka-Sylhet-Jaflong Road
Km 052.76-052.87
Bogra 2nd Town By-Pass Road
Km 013.90-014.00
Kushtia -Jhenaidah Road
Km 088.56-090.26
Joydebpur-Jamalpur Road
Km 039.89-039.99
Joydebpur-Jamalpur Road
Km 086.35-087.64
Naogaon-Badalgachhi-Rohonpur
Km 022.49-023.49
Bogra 2nd Town By-Pass Road
Km 000.50-003.70
Joydebpur-Jamalpur Road
Km 017.27-019.47
Patiya-Chokoria Road
Km 065.30-065.80
Madanpur-Joydevpur
Km 028.84-029.14
Jessore Town Old Section
Km 001.60-003.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.70
4887 Regional Overlay 60mm @ IRI 7-9
S
0.07 11451 National Overlay 80mm @ IRI 5-9
S
0.10 10253 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 5-9
S
0.30 15112 National Overlay 80mm @ IRI 4-9
S
2.20 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
R
0.14 11669 National Overlay 50mm @ IRI 4
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.10
9061 National Overlay 50mm @ IRI 5-7
S
3.70 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.59 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
2.43 11451 National Overlay 80mm @ IRI 4-9
S
0.70
9061 National Overlay 60mm @ IRI 7-9
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
1.50 17870 Regional DBST @ Traff >6000
S
0.38 11451 National Overlay 80mm @ IRI 5-9
S
1.10
9061 National Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
1.70 11451 National Overlay 80mm @ IRI 5-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
1.40
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
R
1.25 11451 National Overlay 80mm @ IRI 4-9
L
0.11 12877 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
1.70
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National DBST @ Traff >6000
S
1.29 11451 National Overlay 80mm @ IRI 4-9
S
1.00
4887 Regional Overlay 50mm @ IRI 5-7
S
3.20 11451 National Overlay 80mm @ IRI 5-9
S
2.20 16227 National Overlay 80mm @ IRI 4-9
S
0.50
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National DBST @ Traff >6000
S
1.80 11451 National Overlay 80mm @ IRI 5-9
Appendix-A: Page:3 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.522 16.70
0.336 16.68
0.477 16.68
1.852 16.63
1.753 16.60
2.387 16.55
1.408 16.49
10.503 16.49
1.152 16.49
6.091 16.41
0.545 16.41
2.766 16.39
0.287 16.38
22.232 16.38
1.152 16.33
3.222 16.32
5.976 16.23
14.601 16.18
2.396 16.17
0.922 16.01
0.721 15.99
4.261 15.98
2.352 15.97
3.158 15.96
0.604 15.96
10.215 15.84
3.457 15.82
4.356 15.79
1.103 15.72
7.511 15.70
0.685 15.69
0.601 15.60
5.290 15.59
0.185 15.56
7.876 15.52
2.030 15.51
19.228 15.48
17.239 15.44
1.511 15.42
0.541 15.40
11.157 15.40
NPV
50.11
7.08
8.63
41.78
37.17
42.84
32.76
206.03
24.27
141.05
16.12
59.25
6.76
446.09
26.35
68.71
126.80
291.72
53.07
18.08
14.11
263.76
46.38
74.25
12.41
198.25
69.08
81.83
21.90
145.57
13.28
10.60
98.14
13.19
165.84
39.22
364.54
410.38
29.02
38.09
264.75
Appendix-A
Annual Needs Report
2012-2013
Zone
Rangpur
Khulna
Dhaka
Dhaka
Chittagong
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Rajshahi
Chittagong
Rajshahi
Sylhet
Sylhet
Rajshahi
Chittagong
Khulna
Dhaka
Comilla
Gopalganj
Khulna
Rajshahi
Rangpur
Rangpur
Chittagong
Gopalganj
Comilla
Khulna
Chittagong
Dhaka
Khulna
Dhaka
Khulna
Dhaka
Dhaka
Khulna
Sylhet
Dhaka
Rajshahi
Chittagong
Division
Bogra
Jessore
Gazipur
Munshiganj
Chittagong
Tangail
Narayanganj
Manikganj
Munshiganj
Narsingdi
Natore
Cox's Bazar
Pabna
Habiganj
Sylhet
Natore
Chittagong
Khulna
Tangail
Feni
Faridpur
Jessore
Sirajganj
Lalmonirhat
Bogra
Chittagong
Faridpur
Noakhali
Satkhira
Chittagong
Narayanganj
Chuadanga
Gazipur
Jessore
Narayanganj
Narayanganj
Jessore
Sylhet
Munshiganj
Sirajganj
Dohazari
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R545
N7
R313
N8
N1
N4
N1
R506
R812
N2
N6
R170
N6
N2
R250
N6
N1
N7
N4
N104
N803
N7
R451
N509
N502
N1
N803
N104
R765
N1
N1
R745
N105
N706
N2
N2
N706
N2
R820
R451
N1
Road Name
Chainage
Bogra-Joypurhat Road
Km 000.70-007.30
Dauladia-Mongla Road
Km 150.32-150.72
Mawna-Monohardi Road
Km 023.27-023.87
Dhaka -Patuakhali Road
Km 003.60-004.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 219.08-219.48
Joydebpur-Jamalpur Road
Km 084.95-085.25
Dhaka -Comilla -Chittagong-Teknaf RoKm 035.18-036.08
Aricha -Daulatpur-Tangail Road
Km 001.20-001.70
Fatullah -Mawa Road
Km 008.83-010.22
Dhaka-Sylhet-Jaflong Road
Km 030.12-033.47
Kashinathpur-Natore-Rajshahi Road Km 102.42-103.92
Patiya-Chokoria Road
Km 071.70-072.20
Kashinathpur-Natore-Rajshahi Road Km 046.20-048.55
Dhaka-Sylhet-Jaflong Road
Km 181.52-185.62
Sylhet-Jakiganj Road
Km 023.95-024.15
Kashinathpur-Natore-Rajshahi Road Km 112.12-113.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 218.18-218.48
Dauladia-Mongla Road
Km 204.28-206.23
Joydebpur-Jamalpur Road
Km 086.25-086.35
Feni-Noakhali Road
Km 009.30-009.80
Faridpur Town Old section
Km 005.40-005.50
Dauladia-Mongla Road
Km 153.66-153.96
Nalka-Sirajganj Road
Km 013.27-014.74
Barabari-Burimary Road
Km 047.44-048.24
Bogra -Natore Road
Km 030.86-032.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 225.28-225.58
Faridpur Town Old section
Km 002.30-002.60
Feni-Noakhali Road
Km 046.69-048.09
Khulna-Satkhira Road
Km 029.49-029.69
Dhaka -Comilla -Chittagong-Teknaf RoKm 226.38-226.78
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.40-012.40
Kushtia -Jhenaidah Road
Km 096.56-096.66
Madanpur-Joydevpur
Km 032.24-036.94
Jessore -Benapole Road
Km 036.63-037.91
Dhaka-Sylhet-Jaflong Road
Km 000.00-000.13
Dhaka-Sylhet-Jaflong Road
Km 000.00-000.13
Jessore -Benapole Road
Km 036.63-037.91
Dhaka-Sylhet-Jaflong Road
Km 284.76-286.26
Zinzira-Srinagar Road
Km 029.21-040.18
Nalka-Sirajganj Road
Km 012.25-013.27
Dhaka -Comilla -Chittagong-Teknaf RoKm 278.48-278.78
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
6.60
7933 Regional DBST @ Traff >6000
S
0.40
9061 National Overlay 50mm @ IRI 4-7
S
0.60
5572 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 11451 National DBST @ Traff >6000
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
R
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
1.39 13225 Regional Overlay 60mm @ IRI 5.5-9
S
3.36 15267 National Overlay 80mm @ IRI 4-9
S
1.50 11451 National Overlay 80mm @ IRI 4-9
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
2.35 11451 National Overlay 80mm @ IRI 4-9
S
4.10 11451 National Overlay 50mm @ IRI 4
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
1.48 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
L
1.95 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.30
9061 National Overlay 50mm @ IRI 4-7
S
1.47
4887 Regional Overlay 60mm @ IRI 7-9
S
0.80
9061 National Overlay 60mm @ IRI 7-9
S
1.14
9061 National Overlay 60mm @ IRI 7-9
S
0.30 11451 National DBST @ Traff >6000
S
0.30 24928 National DBST @ Traff >6000
S
1.40 11451 National Overlay 80mm @ IRI 5-9
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 11451 National Overlay 80mm @ IRI 4-9
R
3.00 11451 National Overlay 50mm @ IRI 4
S
0.10
5536 Regional DBST 25mm @ 25% Crk
S
4.70 11451 National Overlay 50mm @ IRI 5
R
1.28 11451 National Overlay 80mm @ IRI 5-9
L
0.13 21762 National Overlay 50mm @ IRI 4
R
0.13 21762 National Overlay 50mm @ IRI 4
L
1.28 11451 National Overlay 80mm @ IRI 5-9
S
1.50 11451 National Overlay 80mm @ IRI 4-9
S
10.97
4887 Regional Overlay 50mm @ IRI 5-7
L
1.02
4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:4 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
8.901 15.39
1.044 15.35
1.867 15.31
1.050 15.29
2.338 15.24
1.827 15.15
5.452 15.06
1.612 15.03
4.798 15.01
20.730 14.97
9.013 14.89
1.802 14.83
14.103 14.82
16.042 14.82
0.685 14.81
8.911 14.79
1.753 14.78
10.760 14.74
0.609 14.72
2.305 14.72
0.510 14.72
0.783 14.71
5.032 14.68
2.738 14.66
3.899 14.64
0.771 14.64
0.630 14.64
7.594 14.55
0.574 14.55
2.799 14.52
12.120 14.48
0.125 14.47
17.908 14.46
7.877 14.46
0.391 14.44
0.391 14.44
7.877 14.44
9.260 14.42
30.756 14.42
3.161 14.39
1.432 14.39
NPV
442.23
25.55
36.11
73.41
43.59
37.55
101.36
29.66
120.25
437.96
182.02
31.79
258.10
454.52
12.81
162.73
36.30
252.88
12.17
42.87
9.82
18.37
90.44
53.37
75.86
51.60
41.58
139.65
11.14
50.17
316.39
6.24
386.17
175.58
8.33
8.33
175.28
181.19
591.37
55.71
32.45
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Rangpur
Dhaka
Dhaka
Chittagong
Dhaka
Rajshahi
Rangpur
Dhaka
Khulna
Dhaka
Dhaka
Chittagong
Dhaka
Comilla
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Rangpur
Dhaka
Rangpur
Khulna
Dhaka
Comilla
Dhaka
Rangpur
Khulna
Rangpur
Dhaka
Dhaka
Rangpur
Chittagong
Khulna
Dhaka
Dhaka
Rangpur
Rangpur
Sylhet
Khulna
Division
Gazipur
Gaibanda
Narsingdi
Tangail
Dohazari
Narayanganj
Natore
Bogra
Munshiganj
Jessore
Jamalpur
Narayanganj
Cox's Bazar
Tangail
Noakhali
Narsingdi
Narsingdi
Narsingdi
Gazipur
Mymensingh
Joypurhat
Narayanganj
Dinajpur
Jhenaidah
Tangail
Feni
Mymensingh
Bogra
Chuadanga
Bogra
Gazipur
Gazipur
Bogra
Chittagong
Jessore
Narsingdi
Mymensingh
Lalmonirhat
Panchgarh
Sylhet
Jhenaidah
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N105
R585
N2
N4
N1
R113
N6
N515
N8
N708
N4
N105
N110
N4
N104
N2
N2
N2
N3
N3
R550
N1
R585
R745
N4
N104
N3
N515
R745
N515
R303
N3
N5
N1
N707
N2
N3
N509
N5
N2
N7
Road Name
Chainage
Madanpur-Joydevpur
Km 030.24-032.24
Gobindagnj-Fulbari-Dinajpur Road
Km 047.02-050.12
Dhaka-Sylhet-Jaflong Road
Km 027.49-027.65
Joydebpur-Jamalpur Road
Km 079.85-080.25
Dhaka -Comilla -Chittagong-Teknaf RoKm 303.48-303.88
Madanpur-Sayedpur Road
Km 001.30-001.80
Kashinathpur-Natore-Rajshahi Road Km 100.52-102.22
Bogra 2nd Town By-Pass Road
Km 010.70-013.30
Dhaka -Patuakhali Road
Km 014.20-014.60
Jessore Town Old Section
Km 000.00-000.20
Joydebpur-Jamalpur Road
Km 130.81-137.61
Madanpur-Joydevpur
Km 006.60-014.34
Link Road-Cox's Bazar Road
Km 006.00-006.20
Joydebpur-Jamalpur Road
Km 087.64-090.79
Feni-Noakhali Road
Km 046.19-046.29
Dhaka-Sylhet-Jaflong Road
Km 054.55-054.91
Dhaka-Sylhet-Jaflong Road
Km 054.55-054.91
Dhaka-Sylhet-Jaflong Road
Km 042.82-051.75
Dhaka -Mymensingh Road
Km 036.75-039.78
Dhaka -Mymensingh Road
Km 085.70-088.80
Mokamtala-Joypurhat Road
Km 024.12-025.02
Dhaka -Comilla -Chittagong-Teknaf RoKm 018.58-018.78
Gobindagnj-Fulbari-Dinajpur Road
Km 098.76-099.46
Kushtia -Jhenaidah Road
Km 099.66-101.26
Joydebpur-Jamalpur Road
Km 084.35-084.95
Feni-Noakhali Road
Km 010.00-010.30
Dhaka -Mymensingh Road
Km 074.30-074.50
Bogra 2nd Town By-Pass Road
Km 003.70-006.70
Kushtia -Jhenaidah Road
Km 085.66-088.06
Bogra 2nd Town By-Pass Road
Km 013.30-013.90
Tongi By-Pass Road
Km 000.90-001.40
Dhaka -Mymensingh Road
Km 045.35-047.05
Dhaka -Utholi-Banglabandh Road
Km 161.37-164.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 174.58-175.38
Jessore Town Old Section
Km 005.70-005.90
Dhaka-Sylhet-Jaflong Road
Km 041.54-041.64
Dhaka -Mymensingh Road
Km 067.90-069.10
Barabari-Burimary Road
Km 070.45-071.55
Dhaka -Utholi-Banglabandh Road
Km 443.44-443.84
Dhaka-Sylhet-Jaflong Road
Km 278.89-279.29
Dauladia-Mongla Road
Km 104.82-105.32
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
2.00 11451 National Overlay 80mm @ IRI 5-9
S
3.10
4887 Regional Overlay 60mm @ IRI 7-9
R
0.15 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
2.60 11451 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National DBST @ Traff >6000
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
6.80
9061 National Overlay 50mm @ IRI 4-7
S
7.74 11451 National Overlay 50mm @ IRI 5
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
3.15 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
L
0.36
8983 National Overlay 50mm @ IRI 4-7
R
0.36
8983 National Overlay 50mm @ IRI 4-7
S
8.93 13453 National Overlay 50mm @ IRI 4
S
3.03 11451 National DBST @ Traff >6000
S
3.10 11451 National Overlay 80mm @ IRI 4-9
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
R
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.70
4887 Regional Overlay 60mm @ IRI 7-9
S
1.60
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National DBST @ Traff >6000
S
3.00 11451 National Overlay 80mm @ IRI 5-9
S
2.40
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.50 10199 Regional DBST 25mm @ 25% Crk
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
2.75 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 5-9
L
0.10 16426 National Overlay 50mm @ IRI 4
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
1.10
9061 National Overlay 50mm @ IRI 5-7
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:5 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
12.018 14.37
10.611 14.37
0.945 14.37
2.469 14.36
2.305 14.35
1.743 14.34
10.215 14.34
15.623 14.33
0.741 14.32
1.202 14.31
18.918 14.27
27.890 14.20
1.136 14.15
19.077 14.05
0.510 14.02
0.942 14.02
0.942 14.02
34.946 14.01
8.460 13.97
19.138 13.94
3.081 13.91
1.235 13.90
2.396 13.89
5.477 13.88
3.655 13.87
1.383 13.86
0.371 13.86
18.026 13.85
8.215 13.81
3.605 13.79
0.677 13.78
10.215 13.73
16.536 13.73
5.005 13.72
1.103 13.70
0.369 13.66
7.408 13.63
3.158 13.61
1.975 13.60
2.469 13.59
3.004 13.56
NPV
213.28
186.72
16.76
48.10
46.29
31.58
198.74
274.21
47.10
25.33
436.54
676.13
20.31
350.49
9.04
21.68
21.68
882.80
540.48
361.89
52.47
29.80
40.74
88.10
71.55
23.48
22.64
305.74
131.44
60.92
30.09
190.22
367.01
84.77
22.48
8.43
124.65
63.90
39.96
41.45
66.86
Appendix-A
Annual Needs Report
2012-2013
Zone
Division
Dhaka
Khulna
Dhaka
Barisal
Chittagong
Chittagong
Rajshahi
Rajshahi
Rangpur
Rajshahi
Comilla
Chittagong
Chittagong
Chittagong
Dhaka
Dhaka
Rangpur
Comilla
Khulna
Chittagong
Khulna
Rangpur
Rangpur
Rangpur
Dhaka
Comilla
Comilla
Dhaka
Chittagong
Barisal
Comilla
Dhaka
Sylhet
Chittagong
Dhaka
Comilla
Rangpur
Gopalganj
Rajshahi
Khulna
Khulna
Dhaka
Kushtia
Narsingdi
Patuakhali
Chittagong
Chittagong
Pabna
Pabna
Kurigram
Rajshahi
Noakhali
Cox's Bazar
Dohazari
Chittagong
Gazipur
Kishoreganj
Dinajpur
Brahmanbaria
Chuadanga
Chittagong
Chuadanga
Panchgarh
Lalmonirhat
Bogra
Jamalpur
Chandpur
Brahmanbaria
Tangail
Cox's Bazar
Patuakhali
Brahmanbaria
Tangail
Habiganj
Chittagong
Mymensingh
Brahmanbaria
Gaibanda
Faridpur
Rajshahi
Khulna
Jessore
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N302
N704
N2
N8
N1
N1
N604
N6
N506
N6
N104
R170
N1
N1
N3
R360
R585
N2
R745
N106
R745
N5
N509
N5
N4
R140
N2
N403
R170
N8
N2
N4
N2
R160
N3
N2
R585
N803
N6
N709
N7
Road Name
Chainage
Tongi-Ashulia-Zerabo-EPZ Road
Km 006.50-017.44
Jhenaidah-Dasuria Road
Km 040.40-040.80
Dhaka-Sylhet-Jaflong Road
Km 027.65-029.85
Dhaka -Patuakhali Road
Km 187.22-187.82
Dhaka -Comilla -Chittagong-Teknaf RoKm 220.48-222.98
Dhaka -Comilla -Chittagong-Teknaf RoKm 171.18-171.48
Pabna Town Old Section
Km 003.40-007.57
Kashinathpur-Natore-Rajshahi Road Km 041.68-041.85
Rangpur-Barobari-Kurigram Road
Km 047.20-050.04
Kashinathpur-Natore-Rajshahi Road Km 145.73-149.67
Feni-Noakhali Road
Km 042.28-042.68
Patiya-Chokoria Road
Km 067.40-068.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 283.78-284.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 182.98-183.08
Dhaka -Mymensingh Road
Km 015.30-015.40
Mymensingh -Bhairab Road
Km 095.58-095.98
Gobindagnj-Fulbari-Dinajpur Road
Km 096.36-097.96
Dhaka-Sylhet-Jaflong Road
Km 074.24-074.54
Kushtia -Jhenaidah Road
Km 081.36-081.76
Chittagong-Rangamati Road
Km 017.30-018.60
Kushtia -Jhenaidah Road
Km 095.46-096.46
Dhaka -Utholi-Banglabandh Road
Km 447.44-447.64
Barabari-Burimary Road
Km 069.25-070.45
Dhaka -Utholi-Banglabandh Road
Km 174.36-201.28
Joydebpur-Jamalpur Road
Km 144.11-146.30
Comilla-Begumganj Road
Km 042.37-042.47
Dhaka-Sylhet-Jaflong Road
Km 084.64-085.24
Mirzapur Town old Section
Km 000.00-004.00
Patiya-Chokoria Road
Km 069.90-071.00
Dhaka -Patuakhali Road
Km 187.82-189.12
Dhaka-Sylhet-Jaflong Road
Km 087.94-092.14
Joydebpur-Jamalpur Road
Km 099.09-100.59
Dhaka-Sylhet-Jaflong Road
Km 188.63-190.50
Hathazari-Khagrachhari Road
Km 025.10-025.40
Dhaka -Mymensingh Road
Km 073.60-073.80
Dhaka-Sylhet-Jaflong Road
Km 084.34-084.54
Gobindagnj-Fulbari-Dinajpur Road
Km 043.92-047.02
Faridpur Town Old section
Km 006.20-006.72
Kashinathpur-Natore-Rajshahi Road Km 113.60-117.22
Khulna City By-Pass Road
Km 016.20-016.30
Dauladia-Mongla Road
Km 150.82-153.06
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
10.94 15146 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National Overlay 80mm @ IRI 5-9
S
2.21 11451 National Overlay 80mm @ IRI 4-9
S
0.60
9061 National Overlay 60mm @ IRI 7-9
S
2.50 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
4.17 11451 National Overlay 80mm @ IRI 5-9
S
0.17 11451 National Overlay 80mm @ IRI 4-9
S
2.83 11451 National Overlay 80mm @ IRI 5-9
S
3.94 11451 National Overlay 80mm @ IRI 4-9
S
0.40 10253 National Overlay 80mm @ IRI 5-9
S
1.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
R
0.10
8665 National Overlay 50mm @ IRI 4-7
S
0.40
4887 Regional Overlay 60mm @ IRI 7-9
S
1.60
4887 Regional DBST @ Traff 4000-6000
S
0.30 12330 National DBST @ Traff >6000
S
0.40
5536 Regional Overlay 60mm @ IRI 5.5-9
S
1.30 11451 National Overlay 80mm @ IRI 5-9
S
1.00
5536 Regional DBST 25mm @ 25% Crk
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.20
9061 National Overlay 60mm @ IRI 7-9
S
26.93 20036 National Overlay 80mm @ IRI 4-9
S
2.19 11451 National Overlay 80mm @ IRI 4-9
S
0.10
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 12330 National Overlay 50mm @ IRI 4
S
4.00 11451 National DBST @ Traff >6000
S
1.10
4887 Regional Overlay 50mm @ IRI 5-7
S
1.30
9061 National Overlay 50mm @ IRI 4-7
S
4.20 11451 National Overlay 80mm @ IRI 4-9
S
1.50
6524 National Overlay 50mm @ IRI 4-7
S
1.87
8158 National Overlay 50mm @ IRI 4-7
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.20 12330 National Overlay 80mm @ IRI 4-9
S
3.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.52
9061 National DBST @ Traff >6000
S
3.62 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
2.24
9061 National Overlay 50mm @ IRI 4-7
Appendix-A: Page:6 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
86.522 13.55 1447.53
2.404 13.52
47.87
13.637 13.51 250.00
2.054 13.50
40.25
19.981 13.45 331.83
1.852 13.44
33.78
28.791 13.43 477.28
1.034 13.41
22.41
15.600 13.40 310.79
23.657 13.40 391.28
2.120 13.39
33.78
4.324 13.38
67.02
2.881 13.37
53.95
0.630 13.37
14.62
0.391 13.36
10.00
1.369 13.32
23.04
2.174 13.27 107.92
0.556 13.24
33.65
1.369 13.23
20.99
7.276 13.22 112.70
1.235 13.18
56.05
0.988 13.14
19.29
4.107 13.12
77.53
161.798 13.12 3272.90
12.757 13.12 270.52
0.342 13.11
5.67
2.349 13.08
58.74
7.212 13.07 431.12
3.324 13.06
55.89
3.732 13.06
77.73
25.928 13.05 477.72
4.478 13.04 101.40
7.313 13.04 182.21
0.385 13.02
18.78
1.235 13.02
19.36
1.235 13.00
21.77
8.899 13.00 148.84
0.706 12.98
30.11
21.734 12.94 381.62
0.601 12.93
11.44
5.846 12.91 114.77
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Rajshahi
Chittagong
Dhaka
Dhaka
Rangpur
Gopalganj
Comilla
Dhaka
Comilla
Dhaka
Khulna
Khulna
Dhaka
Chittagong
Chittagong
Dhaka
Dhaka
Dhaka
Gopalganj
Rangpur
Dhaka
Dhaka
Rajshahi
Khulna
Dhaka
Comilla
Rangpur
Comilla
Khulna
Khulna
Chittagong
Dhaka
Chittagong
Khulna
Sylhet
Rangpur
Dhaka
Khulna
Comilla
Chittagong
Division
Munshiganj
Rajshahi
Chittagong
Gazipur
Gazipur
Joypurhat
Faridpur
Noakhali
Gazipur
Noakhali
Gazipur
Magura
Jessore
Gazipur
Dohazari
Khagrachari
Manikganj
Gazipur
Mymensingh
Rajbari
Dinajpur
Narsingdi
Munshiganj
Rajshahi
Jhenaidah
Narayanganj
Noakhali
Dinajpur
Chandpur
Satkhira
Magura
Cox's Bazar
Narayanganj
Chittagong
Khulna
Sylhet
Lalmonirhat
Gazipur
Magura
Noakhali
Chittagong
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N8
R685
N1
N3
N3
R550
N7
N104
N3
N104
R313
N7
N707
R303
N1
R160
R506
N4
N3
R710
R585
N2
N8
N6
N7
N1
N104
R585
R140
N715
N7
N110
N1
N1
N7
N210
N509
R303
N7
N104
R160
Road Name
Chainage
Dhaka -Patuakhali Road
Km 010.70-011.00
Rajshahi -Chowmasia Road
Km 022.20-026.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 176.58-176.88
Dhaka -Mymensingh Road
Km 048.65-049.03
Dhaka -Mymensingh Road
Km 048.65-049.03
Mokamtala-Joypurhat Road
Km 025.02-028.12
Dauladia-Mongla Road
Km 060.12-060.22
Feni-Noakhali Road
Km 041.40-041.58
Dhaka -Mymensingh Road
Km 055.40-055.80
Feni-Noakhali Road
Km 038.70-039.40
Mawna-Monohardi Road
Km 035.37-035.47
Dauladia-Mongla Road
Km 089.61-089.71
Jessore Town Old Section
Km 006.10-006.76
Tongi By-Pass Road
Km 000.20-000.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 309.18-309.88
Hathazari-Khagrachhari Road
Km 055.80-055.82
Aricha -Daulatpur-Tangail Road
Km 000.00-001.20
Joydebpur-Jamalpur Road
Km 019.67-021.37
Dhaka -Mymensingh Road
Km 059.20-059.30
Ahaladipur-Kushtia Road
Km 038.31-038.41
Gobindagnj-Fulbari-Dinajpur Road
Km 095.06-095.26
Dhaka-Sylhet-Jaflong Road
Km 052.76-052.87
Dhaka -Patuakhali Road
Km 019.10-019.90
Kashinathpur-Natore-Rajshahi Road Km 117.22-118.02
Dauladia-Mongla Road
Km 107.22-108.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 026.08-034.88
Feni-Noakhali Road
Km 035.50-035.74
Gobindagnj-Fulbari-Dinajpur Road
Km 089.76-089.86
Comilla-Begumganj Road
Km 046.10-046.40
Benapole Town Old Section
Km 007.30-009.50
Dauladia-Mongla Road
Km 083.21-085.51
Link Road-Cox's Bazar Road
Km 005.40-005.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 035.18-035.68
Dhaka -Comilla -Chittagong-Teknaf RoKm 200.78-201.08
Dauladia-Mongla Road
Km 204.28-206.23
Sylhet Twn By-Pass Road
Km 005.70-006.40
Barabari-Burimary Road
Km 059.55-061.35
Tongi By-Pass Road
Km 000.00-000.10
Dauladia-Mongla Road
Km 097.61-097.91
Feni-Noakhali Road
Km 044.78-045.48
Hathazari-Khagrachhari Road
Km 023.40-023.50
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
3.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Overlay 80mm @ IRI 4-9
L
0.38 11451 National Overlay 80mm @ IRI 4-9
R
0.38 11451 National Overlay 80mm @ IRI 4-9
S
3.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10
7248 National Overlay 50mm @ IRI 4-7
S
0.18 10253 National Overlay 50mm @ IRI 5
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.70 10253 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
7850 National Overlay 50mm @ IRI 4-7
S
0.66 11451 National Overlay 80mm @ IRI 5-9
S
0.10 10199 Regional Overlay 60mm @ IRI 5.5-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.02
3362 Regional DBST 25mm @ 25% Crk
S
1.20
4887 Regional Overlay 50mm @ IRI 5-7
S
1.70 16574 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National DBST @ Traff >6000
S
0.10
3636 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional DBST @ Traff 4000-6000
R
0.11
8987 National Overlay 50mm @ IRI 4-7
S
0.80 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Overlay 80mm @ IRI 4-9
S
0.90 11451 National Overlay 80mm @ IRI 4-9
R
8.80 11451 National Overlay 80mm @ IRI 4-9
S
0.24 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30
8774 Regional Overlay 60mm @ IRI 5.5-9
S
2.20
9061 National Overlay 50mm @ IRI 5-7
S
2.30
7850 National Overlay 50mm @ IRI 4-7
S
0.10 11451 National Overlay 80mm @ IRI 5-9
L
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
R
1.95 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National DBST @ Traff >6000
S
1.80
9061 National Overlay 60mm @ IRI 7-9
S
0.10 10199 Regional DBST 25mm @ 25% Crk
S
0.30
7850 National Overlay 50mm @ IRI 4-7
S
0.70 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
Appendix-A: Page:7 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.852 12.91
10.909 12.91
1.901 12.89
2.195 12.89
2.195 12.89
8.899 12.83
0.381 12.79
0.539 12.78
2.469 12.75
3.509 12.75
0.342 12.71
0.381 12.68
3.656 12.67
0.342 12.66
3.872 12.65
0.018 12.65
3.382 12.64
10.915 12.64
0.185 12.60
0.277 12.58
0.272 12.57
0.319 12.56
4.939 12.55
4.807 12.54
4.815 12.53
54.471 12.52
1.620 12.52
0.287 12.52
1.064 12.46
6.316 12.46
8.764 12.45
0.568 12.45
3.046 12.44
1.654 12.43
12.847 12.42
1.262 12.42
6.161 12.41
0.136 12.40
1.143 12.38
4.488 12.36
0.349 12.36
NPV
29.26
187.77
34.58
34.33
34.33
146.98
8.78
9.34
38.89
47.62
5.04
9.24
68.25
6.33
72.85
0.65
57.00
203.11
9.63
4.34
12.48
5.76
76.56
92.94
96.20
925.03
25.04
5.48
16.76
125.49
196.76
9.98
51.40
29.28
258.09
65.53
105.51
5.22
27.05
68.48
5.89
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Narsingdi
N2
Dhaka
Gazipur
R301
Comilla
Feni
N104
Rangpur
Thakurgaon
N5
Gopalganj Gopalganj
N805
Comilla
Brahmanbaria N2
Dhaka
Dhaka
N5
Dhaka
Narayanganj R113
Chittagong Chittagong
N1
Sylhet
Habiganj
N2
Dhaka
Gazipur
N3
Comilla
Brahmanbaria N2
Chittagong Chittagong
N1
Dhaka
Mymensingh N3
Chittagong Chittagong
R160
Chittagong Dohazari
N1
Dhaka
Gazipur
N105
Khulna
Magura
N702
Barisal
Barisal
N8
Comilla
Noakhali
N104
Rangpur
Dinajpur
R585
Khulna
Magura
N7
Chittagong Chittagong
N1
Rangpur
Bogra
R550
Chittagong Khagrachari
R160
Rajshahi
Pabna
N705
Sylhet
Sylhet
N2
Rajshahi
Pabna
N604
Chittagong Cox's Bazar
R172
Chittagong Chittagong
R160
Sylhet
Sylhet
N2
Chittagong Chittagong
N1
Sylhet
Sylhet
N210
Rangpur
Panchgarh
N5
Chittagong Chittagong
R163
Dhaka
Mymensingh N3
Dhaka
Mymensingh N3
Dhaka
Narayanganj N1
Dhaka
Tangail
N4
Khulna
Khulna
N7
Rajshahi
Natore
N502
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Dhaka-Sylhet-Jaflong Road
Km 033.58-033.65
Tongi-Pachdona Road
Km 008.40-009.30
Feni-Noakhali Road
Km 005.30-005.90
Dhaka -Utholi-Banglabandh Road
Km 403.60-403.80
Bhanga-Mollahhat Road
Km 004.10-004.90
Dhaka-Sylhet-Jaflong Road
Km 078.44-079.54
Dhaka -Utholi-Banglabandh Road
Km 017.70-017.81
Madanpur-Sayedpur Road
Km 002.30-005.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 176.98-179.48
Dhaka-Sylhet-Jaflong Road
Km 185.62-187.02
Dhaka -Mymensingh Road
Km 033.55-036.75
Dhaka-Sylhet-Jaflong Road
Km 082.64-084.14
Dhaka -Comilla -Chittagong-Teknaf RoKm 171.78-171.98
Dhaka -Mymensingh Road
Km 088.80-090.00
Hathazari-Khagrachhari Road
Km 026.00-029.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 251.94-254.84
Madanpur-Joydevpur
Km 036.94-040.14
Jessore -Magura Road
Km 035.89-038.59
Dhaka -Patuakhali Road
Km 148.45-148.55
Feni-Noakhali Road
Km 034.20-035.30
Gobindagnj-Fulbari-Dinajpur Road
Km 090.26-091.36
Dauladia-Mongla Road
Km 090.11-092.21
Dhaka -Comilla -Chittagong-Teknaf RoKm 173.18-174.38
Mokamtala-Joypurhat Road
Km 002.60-005.30
Hathazari-Khagrachhari Road
Km 042.60-042.70
Paksey -Iswardi-Dasuria
Km 009.30-009.40
Dhaka-Sylhet-Jaflong Road
Km 190.50-190.80
Pabna Town Old Section
Km 000.00-001.90
Chokoria-Baderkhali Road
Km 011.80-011.90
Hathazari-Khagrachhari Road
Km 023.90-024.10
Dhaka-Sylhet-Jaflong Road
Km 279.39-280.09
Dhaka -Comilla -Chittagong-Teknaf RoKm 227.56-227.76
Sylhet Twn By-Pass Road
Km 002.60-005.30
Dhaka -Utholi-Banglabandh Road
Km 447.14-447.44
Chittagong -Chandragona Road
Km 013.10-013.40
Dhaka -Mymensingh Road
Km 108.48-109.00
Dhaka -Mymensingh Road
Km 108.48-109.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 006.70-009.00
Joydebpur-Jamalpur Road
Km 098.19-098.29
Dauladia-Mongla Road
Km 217.66-219.36
Bogra -Natore Road
Km 056.76-062.81
Cway Length
Road
AADT
Work Name
(km)
Side
Class
L
0.06
9032 National DBST 25mm @ 25% Crk
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Overlay 50mm @ IRI 5
S
1.10 12330 National Overlay 50mm @ IRI 4
R
0.11
9061 National Overlay 50mm @ IRI 4-7
S
3.10
4887 Regional DBST @ Traff 4000-6000
S
2.50 11451 National Overlay 80mm @ IRI 4-9
S
1.40
8158 National Overlay 50mm @ IRI 4-7
S
3.20 11451 National Overlay 80mm @ IRI 4-9
S
1.50 12330 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.20 11451 National DBST @ Traff >6000
S
3.00
4887 Regional Overlay 60mm @ IRI 7-9
S
2.90 11451 National Overlay 80mm @ IRI 4-9
S
3.20 11451 National Overlay 80mm @ IRI 5-9
S
2.70 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 5-9
S
1.10
4887 Regional DBST @ Traff 4000-6000
S
2.10
7850 National Overlay 50mm @ IRI 4-7
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
2.70
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
3362 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.30
8158 National Overlay 50mm @ IRI 4-7
S
1.90 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
2.70 11451 National DBST @ Traff >6000
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
L
0.52 11451 National Overlay 80mm @ IRI 4-9
R
0.52 11451 National Overlay 80mm @ IRI 4-9
R
2.30
8665 National Overlay 50mm @ IRI 4-7
S
0.10
6524 National Overlay 50mm @ IRI 4-7
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
6.05
9061 National DBST @ Traff >6000
Appendix-A: Page:8 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.071 12.33
3.282 12.29
2.864 12.28
0.988 12.26
3.048 12.25
4.306 12.25
0.290 12.25
4.043 12.23
16.195 12.22
5.480 12.21
25.839 12.20
9.260 12.20
1.235 12.19
2.223 12.14
9.709 12.14
15.826 12.13
19.228 12.11
16.224 12.11
0.601 12.10
7.425 12.09
1.494 12.04
8.319 12.03
7.507 12.00
9.242 11.98
0.198 11.96
0.593 11.95
1.174 11.95
12.699 11.92
0.313 11.92
0.551 11.92
4.321 11.91
1.399 11.88
4.868 11.88
1.482 11.87
0.861 11.85
3.210 11.84
3.210 11.84
9.448 11.82
0.313 11.82
9.795 11.79
8.731 11.79
NPV
2.91
51.28
44.46
18.20
67.34
90.01
4.34
176.86
279.27
120.62
427.71
182.65
21.24
133.22
144.29
270.95
315.98
256.84
10.26
110.81
67.32
191.26
122.17
128.34
2.82
9.61
26.82
186.98
5.68
9.27
63.53
20.53
241.67
25.05
13.14
46.94
46.94
201.32
5.80
184.21
311.70
Appendix-A
Annual Needs Report
2012-2013
Zone
Khulna
Comilla
Khulna
Barisal
Comilla
Chittagong
Chittagong
Dhaka
Dhaka
Chittagong
Chittagong
Rangpur
Chittagong
Khulna
Chittagong
Dhaka
Rajshahi
Chittagong
Khulna
Khulna
Chittagong
Dhaka
Chittagong
Dhaka
Khulna
Dhaka
Rangpur
Gopalganj
Comilla
Sylhet
Khulna
Khulna
Khulna
Rajshahi
Dhaka
Dhaka
Dhaka
Chittagong
Khulna
Khulna
Gopalganj
Division
Khulna
Chandpur
Jessore
Barisal
Noakhali
Chittagong
Chittagong
Narsingdi
Munshiganj
Dohazari
Chittagong
Thakurgaon
Dohazari
Magura
Cox's Bazar
Tangail
Natore
Chittagong
Jessore
Chuadanga
Khagrachari
Kishoreganj
Chittagong
Munshiganj
Khulna
Gazipur
Panchgarh
Sariatpur
Noakhali
Sylhet
Meherpur
Jessore
Satkhira
Natore
Gazipur
Dhaka
Gazipur
Chittagong
Khulna
Satkhira
Sariatpur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R760
R140
N706
R870
R142
N1
N1
N2
N8
N1
N106
N5
N1
N7
R172
N4
N502
N1
N707
R745
R160
R364
N1
N8
N709
R301
N5
R861
N104
N2
R745
N7
N715
N6
N105
N105
R310
N1
N7
R760
R861
Road Name
Chainage
Khulna-Satkhira Road
Km 016.57-016.80
Comilla-Begumganj Road
Km 038.59-038.99
Jessore -Benapole Road
Km 023.20-024.10
Barisal-Pirojpur Road
Km 003.80-004.50
Begamganj-Ramganj Road
Km 028.99-029.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 218.48-218.58
Dhaka -Comilla -Chittagong-Teknaf RoKm 216.08-216.68
Dhaka-Sylhet-Jaflong Road
Km 027.49-027.65
Dhaka -Patuakhali Road
Km 013.80-014.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 254.94-255.14
Chittagong-Rangamati Road
Km 005.30-005.60
Dhaka -Utholi-Banglabandh Road
Km 404.10-404.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 284.58-285.68
Dauladia-Mongla Road
Km 085.61-087.21
Chokoria-Baderkhali Road
Km 014.80-015.30
Joydebpur-Jamalpur Road
Km 057.92-059.72
Bogra -Natore Road
Km 041.86-043.36
Dhaka -Comilla -Chittagong-Teknaf RoKm 227.08-227.46
Jessore Town Old Section
Km 003.50-004.30
Kushtia -Jhenaidah Road
Km 092.86-093.66
Hathazari-Khagrachhari Road
Km 040.10-040.70
Battoli - Kishoreganj Road
Km 003.00-003.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 217.88-218.18
Dhaka -Patuakhali Road
Km 012.50-012.70
Khulna City By-Pass Road
Km 016.40-017.00
Tongi-Pachdona Road
Km 026.03-026.43
Dhaka -Utholi-Banglabandh Road
Km 458.76-468.26
Monohar -Shariatpur Road
Km 001.30-001.40
Feni-Noakhali Road
Km 048.49-048.79
Dhaka-Sylhet-Jaflong Road
Km 276.19-276.99
Kushtia -Jhenaidah Road
Km 062.78-064.38
Dauladia-Mongla Road
Km 154.36-154.46
Benapole Town Old Section
Km 006.10-007.20
Kashinathpur-Natore-Rajshahi Road Km 090.02-100.52
Madanpur-Joydevpur
Km 028.00-028.84
Madanpur-Joydevpur
Km 018.00-027.84
Joydebpur-Itakhola Road
Km 010.48-011.36
Dhaka -Comilla -Chittagong-Teknaf RoKm 210.48-211.18
Dauladia-Mongla Road
Km 206.23-211.26
Khulna-Satkhira Road
Km 055.56-055.66
Monohar -Shariatpur Road
Km 001.00-001.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.23
4887 Regional Overlay 60mm @ IRI 7-9
S
0.40
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.90
7314 National Overlay 50mm @ IRI 5-7
S
0.70
4887 Regional Overlay 50mm @ IRI 5-7
S
0.01
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.60 11451 National DBST @ Traff >6000
L
0.15
9061 National Overlay 50mm @ IRI 4-7
S
0.30 11451 National DBST @ Traff >6000
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.30 13468 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
1.60
7850 National Overlay 50mm @ IRI 4-7
S
0.50
4887 Regional Overlay 50mm @ IRI 5-7
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
1.50
9061 National Overlay 50mm @ IRI 5-7
S
0.38 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Overlay 80mm @ IRI 5-9
S
0.80
5536 Regional DBST 25mm @ 25% Crk
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
0.09
3019 Regional DBST @ Traff 2000-4000
S
0.30 11451 National DBST @ Traff >6000
S
0.20 11451 National DBST @ Traff >6000
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
9.50 11451 National Overlay 80mm @ IRI 4-9
S
0.10
4885 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National DBST @ Traff >6000
S
0.80 11451 National Overlay 80mm @ IRI 4-9
S
1.60
4283 Regional Overlay 50mm @ IRI 5-7
S
0.10
9061 National DBST 25mm @ 25% Crk
S
1.10
9061 National Overlay 50mm @ IRI 5-7
S
10.50
7507 National Overlay 50mm @ IRI 4-7
S
0.84 10730 National Overlay 80mm @ IRI 5-9
S
9.84 11312 National DBST @ Traff >6000
S
0.88
6578 Regional Overlay 60mm @ IRI 5.5-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
5.03 11451 National Overlay 80mm @ IRI 4-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4885 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:9 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.855 11.79
1.394 11.77
3.288 11.75
2.010 11.75
0.108 11.74
0.584 11.72
0.948 11.71
0.431 11.70
0.556 11.69
1.103 11.67
1.432 11.65
0.988 11.59
6.175 11.59
6.096 11.59
1.566 11.59
11.646 11.58
4.306 11.56
2.680 11.56
4.412 11.54
0.988 11.53
1.811 11.53
0.023 11.50
0.526 11.50
0.371 11.49
3.605 11.47
1.211 11.47
46.918 11.46
0.287 11.45
0.548 11.43
4.939 11.38
4.593 11.38
0.124 11.36
3.158 11.32
40.007 11.31
5.071 11.30
17.750 11.29
2.886 11.28
3.688 11.27
34.923 11.25
0.373 11.23
0.287 11.22
NPV
12.41
22.44
65.95
35.64
1.24
9.59
51.73
7.26
28.83
18.18
24.57
16.17
97.93
127.45
27.72
182.95
78.43
38.24
75.02
39.24
24.19
1.07
29.68
18.89
58.38
19.38
758.96
4.38
28.67
82.80
69.70
4.47
57.02
864.81
70.75
916.57
36.81
47.02
635.40
5.40
4.30
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Dhaka
Khulna
Dhaka
Khulna
Rangpur
Chittagong
Comilla
Rangpur
Rajshahi
Khulna
Dhaka
Dhaka
Khulna
Dhaka
Gopalganj
Rajshahi
Gopalganj
Dhaka
Barisal
Khulna
Rangpur
Rajshahi
Sylhet
Chittagong
Dhaka
Dhaka
Dhaka
Chittagong
Rajshahi
Dhaka
Dhaka
Dhaka
Dhaka
Rangpur
Sylhet
Comilla
Chittagong
Chittagong
Khulna
Chittagong
Division
Gazipur
Dhaka
Khulna
Dhaka
Satkhira
Dinajpur
Chittagong
Feni
Panchgarh
Pabna
Chuadanga
Narsingdi
Gazipur
Kushtia
Gazipur
Rajbari
Pabna
Sariatpur
Manikganj
Barisal
Satkhira
Thakurgaon
Rajshahi
Habiganj
Chittagong
Narsingdi
Narayanganj
Tangail
Dohazari
Natore
Narsingdi
Narsingdi
Dhaka
Narsingdi
Dinajpur
Habiganj
Comilla
Khagrachari
Dohazari
Magura
Dohazari
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N4
R812
N709
N501
N715
R585
N1
N104
N5
N6
R745
N2
R301
R710
R310
R710
N705
R861
R505
N809
R765
N5
N603
N2
N1
R212
R113
N4
N1
N6
N2
N2
N105
R301
R585
N2
R140
R160
N1
N7
N1
Road Name
Chainage
Joydebpur-Jamalpur Road
Km 000.00-017.27
Fatullah -Mawa Road
Km 000.00-008.83
Khulna City By-Pass Road
Km 013.90-016.10
Mirpur Bridge-Dhour Road
Km 009.10-010.50
Benapole Town Old Section
Km 005.30-005.40
Gobindagnj-Fulbari-Dinajpur Road
Km 097.96-098.76
Dhaka -Comilla -Chittagong-Teknaf RoKm 170.48-171.08
Feni-Noakhali Road
Km 007.40-008.50
Dhaka -Utholi-Banglabandh Road
Km 447.64-458.76
Kashinathpur-Natore-Rajshahi Road Km 048.65-051.25
Kushtia -Jhenaidah Road
Km 093.86-095.16
Dhaka-Sylhet-Jaflong Road
Km 041.64-042.60
Tongi-Pachdona Road
Km 024.70-025.93
Ahaladipur-Kushtia Road
Km 067.65-067.95
Joydebpur-Itakhola Road
Km 005.20-005.50
Ahaladipur-Kushtia Road
Km 007.40-008.30
Paksey -Iswardi-Dasuria
Km 005.70-006.60
Monohar -Shariatpur Road
Km 001.80-001.90
Nabinagar-Kaliakoir Road
Km 000.00-009.10
Barishal-Lakshmipur Road
Km 002.50-002.85
Khulna-Satkhira Road
Km 029.89-029.99
Dhaka -Utholi-Banglabandh Road
Km 400.60-402.00
Rajshahi Town By-Pass Road
Km 017.60-020.83
Dhaka-Sylhet-Jaflong Road
Km 187.43-188.53
Dhaka -Comilla -Chittagong-Teknaf RoKm 211.38-213.18
Akdaria -Agarpur Road
Km 008.80-009.00
Madanpur-Sayedpur Road
Km 001.80-002.00
Joydebpur-Jamalpur Road
Km 026.75-036.49
Dhaka -Comilla -Chittagong-Teknaf RoKm 291.08-292.18
Kashinathpur-Natore-Rajshahi Road Km 083.92-090.02
Dhaka-Sylhet-Jaflong Road
Km 051.75-051.89
Dhaka-Sylhet-Jaflong Road
Km 051.75-051.89
Madanpur-Joydevpur
Km 027.84-028.00
Tongi-Pachdona Road
Km 029.83-029.93
Gobindagnj-Fulbari-Dinajpur Road
Km 099.66-100.86
Dhaka-Sylhet-Jaflong Road
Km 115.94-131.24
Comilla-Begumganj Road
Km 013.86-013.96
Hathazari-Khagrachhari Road
Km 051.50-051.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 276.88-277.08
Dauladia-Mongla Road
Km 075.31-075.41
Dhaka -Comilla -Chittagong-Teknaf RoKm 311.28-312.98
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
17.27 15927 National Overlay 80mm @ IRI 4-9
S
8.83 13225 Regional DBST @ Traff >6000
S
2.20 11451 National Overlay 80mm @ IRI 5-9
S
1.40
9061 National Overlay 60mm @ IRI 7-9
S
0.10
9061 National DBST @ Traff >6000
S
0.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 5-9
S
11.12 11451 National Overlay 80mm @ IRI 4-9
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
1.30
5536 Regional DBST @ Traff 4000-6000
S
0.96 16426 National Overlay 50mm @ IRI 4
S
1.23
4285 Regional Overlay 60mm @ IRI 7-9
S
0.30
4484 Regional Overlay 50mm @ IRI 5-7
S
0.30
6578 Regional Overlay 60mm @ IRI 5.5-9
S
0.90
6238 Regional Overlay 60mm @ IRI 5.5-9
S
0.90 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4885 Regional Overlay 50mm @ IRI 5-7
S
9.10 13534 Regional Overlay 60mm @ IRI 5.5-9
S
0.35 11451 National DBST @ Traff >6000
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
1.40 11451 National Overlay 80mm @ IRI 4-9
S
3.23 11451 National Overlay 80mm @ IRI 5-9
S
1.10
8158 National Overlay 50mm @ IRI 4-7
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
9.74 11451 National Overlay 50mm @ IRI 4
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
6.10 11451 National Overlay 80mm @ IRI 4-9
L
0.14
8987 National Overlay 50mm @ IRI 4-7
R
0.14
8987 National Overlay 50mm @ IRI 4-7
S
0.16 12144 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.20
4887 Regional Overlay 50mm @ IRI 5-7
S
15.30
9332 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
3362 Regional Overlay 50mm @ IRI 7-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:10 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
114.575 11.22 1743.44
11.930 11.17 604.91
13.219 11.16 208.29
4.182 11.16
68.43
0.136 11.15
4.15
2.297 11.14
32.92
3.704 11.14
58.21
5.315 11.13
74.74
54.924 11.12 961.75
15.623 11.11 245.01
1.606 11.11
53.12
3.762 11.10
71.27
4.436 11.08
67.63
0.861 11.03
14.35
0.896 11.00
10.68
3.310 10.99
44.56
5.334 10.99
79.50
0.287 10.98
4.20
43.154 10.97 754.09
0.503 10.93
22.83
0.136 10.90
5.30
6.914 10.90 112.06
19.408 10.89 298.22
4.306 10.88
89.59
9.482 10.88 145.64
0.685 10.88
8.42
0.585 10.86
9.26
38.164 10.85 706.77
5.885 10.85
94.97
36.654 10.85 561.28
0.402 10.83
5.95
0.402 10.83
5.95
0.937 10.82
12.52
0.361 10.82
4.92
3.445 10.81
47.93
59.894 10.80 1104.10
0.349 10.80
5.42
0.198 10.80
2.55
0.955 10.79
15.48
0.766 10.78
13.34
9.235 10.76 140.25
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Noakhali
N104
Khulna
Satkhira
R760
Khulna
Khulna
N7
Comilla
Brahmanbaria N2
Khulna
Khulna
N709
Khulna
Khulna
N709
Dhaka
Manikganj
N5
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Rangpur
Gaibanda
R585
Dhaka
Gazipur
N3
Dhaka
Mymensingh R371
Dhaka
Tangail
N4
Sylhet
Habiganj
N2
Chittagong Dohazari
R170
Rangpur
Gaibanda
R585
Khulna
Kushtia
R710
Dhaka
Dhaka
N501
Khulna
Chuadanga
R745
Chittagong Cox's Bazar
N110
Chittagong Dohazari
N1
Gopalganj Rajbari
R710
Rajshahi
Rajshahi
N603
Sylhet
Sylhet
R250
Chittagong Chittagong
N1
Chittagong Dohazari
N1
Sylhet
Sylhet
N2
Barisal
Barisal
N8
Rajshahi
Rajshahi
R685
Sylhet
Sylhet
N2
Rajshahi
Natore
N6
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Gopalganj Faridpur
N803
Dhaka
Narsingdi
R114
Khulna
Kushtia
R710
Dhaka
Tangail
N4
Chittagong Chittagong
R151
Chittagong Chittagong
N106
Barisal
Barisal
N8
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Feni-Noakhali Road
Km 036.80-036.90
Khulna-Satkhira Road
Km 048.56-049.56
Dauladia-Mongla Road
Km 223.26-223.56
Dhaka-Sylhet-Jaflong Road
Km 077.44-078.34
Khulna City By-Pass Road
Km 017.00-018.00
Khulna City By-Pass Road
Km 017.00-018.00
Dhaka -Utholi-Banglabandh Road
Km 057.46-065.56
Dhaka -Comilla -Chittagong-Teknaf RoKm 190.28-193.88
Dhaka -Comilla -Chittagong-Teknaf RoKm 224.18-225.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 195.28-195.58
Gobindagnj-Fulbari-Dinajpur Road
Km 050.12-051.72
Dhaka -Mymensingh Road
Km 015.30-015.40
Sherpur-Nakla-Mymensingh
Km 034.70-034.77
Joydebpur-Jamalpur Road
Km 100.89-102.59
Dhaka-Sylhet-Jaflong Road
Km 140.75-141.07
Patiya-Chokoria Road
Km 019.70-020.20
Gobindagnj-Fulbari-Dinajpur Road
Km 028.15-040.65
Ahaladipur-Kushtia Road
Km 052.65-052.85
Mirpur Bridge-Dhour Road
Km 010.90-011.10
Kushtia -Jhenaidah Road
Km 084.56-085.56
Link Road-Cox's Bazar Road
Km 005.00-005.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 302.58-302.98
Ahaladipur-Kushtia Road
Km 009.90-009.91
Rajshahi Town By-Pass Road
Km 009.30-017.20
Sylhet-Jakiganj Road
Km 017.10-020.65
Dhaka -Comilla -Chittagong-Teknaf RoKm 205.18-205.78
Dhaka -Comilla -Chittagong-Teknaf RoKm 275.58-276.58
Dhaka-Sylhet-Jaflong Road
Km 273.59-274.49
Dhaka -Patuakhali Road
Km 148.55-149.25
Rajshahi -Chowmasia Road
Km 010.00-011.20
Dhaka-Sylhet-Jaflong Road
Km 274.69-275.39
Kashinathpur-Natore-Rajshahi Road Km 104.02-112.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 216.78-217.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 228.76-228.86
Faridpur Town Old section
Km 003.10-004.60
Nayapur-Raipura Road
Km 028.99-054.78
Ahaladipur-Kushtia Road
Km 066.85-067.15
Joydebpur-Jamalpur Road
Km 073.55-074.15
Baraiyerhat-Fatikchhari Road
Km 004.50-004.60
Chittagong-Rangamati Road
Km 005.90-006.10
Dhaka -Patuakhali Road
Km 140.65-143.85
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10 10253 National Overlay 50mm @ IRI 5
S
1.00
4887 Regional DBST @ Traff 4000-6000
S
0.30
9684 National Overlay 50mm @ IRI 4-7
S
0.90 12330 National Overlay 50mm @ IRI 4
R
1.00 11451 National DBST @ Traff >6000
L
1.00 11451 National DBST @ Traff >6000
S
8.10 11451 National Overlay 80mm @ IRI 4-9
S
3.60 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
1.60
4887 Regional Overlay 50mm @ IRI 5-7
L
0.10
8665 National Overlay 50mm @ IRI 4-7
S
0.07
4887 Regional DBST @ Traff 4000-6000
S
1.70
6524 National Overlay 50mm @ IRI 4-7
S
0.32
9332 National DBST 25mm @ 25% Crk
S
0.50
4887 Regional DBST @ Traff 4000-6000
S
12.50
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional DBST 25mm @ 25% Crk
S
0.20
9061 National Overlay 60mm @ IRI 7-9
S
1.00
5536 Regional DBST 25mm @ 25% Crk
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.01
6238 Regional DBST 25mm @ 25% Crk
S
7.90 11451 National Overlay 80mm @ IRI 5-9
S
3.55
4887 Regional DBST @ Traff 4000-6000
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
S
0.90 11451 National Overlay 50mm @ IRI 4
S
0.70 11451 National DBST @ Traff >6000
S
1.20
6330 Regional DBST @ Traff >6000
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
8.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 50mm @ IRI 4
S
1.50 11315 National Overlay 50mm @ IRI 5
S
25.79
3806 Regional Overlay 50mm @ IRI 7-9
S
0.30
4484 Regional Overlay 50mm @ IRI 5-7
S
0.60 15112 National Rehab 195mm @ IRI 9-12
S
0.10
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 13468 National DBST @ Traff >6000
S
3.20 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:11 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.292 10.75
1.482 10.73
1.096 10.71
3.523 10.68
1.507 10.68
1.507 10.68
45.909 10.67
19.261 10.67
8.357 10.67
1.457 10.66
4.593 10.65
0.391 10.65
0.104 10.64
4.969 10.63
0.593 10.63
0.498 10.63
35.884 10.61
0.272 10.60
0.597 10.59
1.359 10.59
1.136 10.58
2.371 10.57
0.021 10.56
47.469 10.54
5.510 10.53
5.136 10.53
4.782 10.52
3.523 10.51
1.262 10.51
1.630 10.49
4.321 10.47
48.671 10.47
1.753 10.46
0.444 10.46
4.549 10.46
50.746 10.44
0.861 10.43
10.511 10.43
0.198 10.42
0.278 10.40
19.228 10.38
NPV
3.74
60.37
22.45
64.23
77.03
77.03
578.22
305.66
110.09
22.11
62.98
7.97
4.31
93.78
26.34
17.77
507.86
9.47
9.39
51.44
15.19
36.89
0.83
705.84
220.34
73.38
71.64
63.20
67.63
61.18
55.85
690.94
28.28
7.92
70.06
733.91
11.19
108.22
3.16
13.86
281.79
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Narsingdi
N2
Dhaka
Kishoreganj
R360
Gopalganj Rajbari
R710
Khulna
Jhenaidah
N7
Barisal
Barisal
N809
Dhaka
Tangail
N4
Khulna
Jessore
R755
Chittagong Dohazari
N1
Rajshahi
Natore
N6
Sylhet
Sylhet
R281
Khulna
Kushtia
R710
Gopalganj Gopalganj
N805
Comilla
Brahmanbaria N2
Dhaka
Munshiganj
R812
Dhaka
Narayanganj N1
Chittagong Chittagong
N106
Chittagong Chittagong
N1
Khulna
Meherpur
R745
Sylhet
Sylhet
N2
Dhaka
Narayanganj R111
Khulna
Jhenaidah
N7
Comilla
Noakhali
N104
Comilla
Noakhali
N104
Rangpur
Dinajpur
R585
Chittagong Chittagong
R163
Dhaka
Dhaka
N501
Rajshahi
Rajshahi
R685
Khulna
Magura
N7
Chittagong Chittagong
N1
Barisal
Barisal
N809
Comilla
Chandpur
R140
Rajshahi
Rajshahi
R685
Khulna
Jessore
R755
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Barisal
Barisal
N8
Khulna
Magura
N7
Khulna
Meherpur
R745
Khulna
Jhenaidah
R748
Dhaka
Manikganj
R506
Khulna
Kushtia
R710
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Dhaka-Sylhet-Jaflong Road
Km 017.60-017.70
Mymensingh -Bhairab Road
Km 108.89-109.38
Ahaladipur-Kushtia Road
Km 003.90-005.60
Dauladia-Mongla Road
Km 122.92-125.72
Barishal-Lakshmipur Road
Km 000.00-000.10
Joydebpur-Jamalpur Road
Km 059.82-068.65
Jessore -Chuknagar Road
Km 003.30-003.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 281.18-283.58
Kashinathpur-Natore-Rajshahi Road Km 068.12-078.52
Rajnagar-Charkhai Road
Km 071.52-082.76
Ahaladipur-Kushtia Road
Km 053.95-054.25
Bhanga-Mollahhat Road
Km 000.90-004.00
Dhaka-Sylhet-Jaflong Road
Km 085.44-087.74
Fatullah -Mawa Road
Km 012.82-018.82
Dhaka -Comilla -Chittagong-Teknaf RoKm 003.70-005.40
Chittagong-Rangamati Road
Km 013.00-013.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 244.34-244.44
Kushtia -Jhenaidah Road
Km 064.98-065.08
Dhaka-Sylhet-Jaflong Road
Km 282.46-284.66
Signboard -Narayanganj Road
Km 000.00-003.20
Dauladia-Mongla Road
Km 115.02-116.12
Feni-Noakhali Road
Km 042.68-042.98
Feni-Noakhali Road
Km 044.38-044.78
Gobindagnj-Fulbari-Dinajpur Road
Km 092.06-095.06
Chittagong -Chandragona Road
Km 013.60-013.80
Mirpur Bridge-Dhour Road
Km 012.40-013.98
Rajshahi -Chowmasia Road
Km 028.70-029.00
Dauladia-Mongla Road
Km 065.02-069.02
Dhaka -Comilla -Chittagong-Teknaf RoKm 243.14-243.34
Barishal-Lakshmipur Road
Km 001.30-001.80
Comilla-Begumganj Road
Km 045.90-046.00
Rajshahi -Chowmasia Road
Km 015.80-019.00
Jessore -Chuknagar Road
Km 026.90-027.33
Feni-Noakhali Road
Km 037.10-038.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 179.58-182.88
Dhaka -Patuakhali Road
Km 147.05-148.25
Dauladia-Mongla Road
Km 092.31-097.51
Kushtia -Jhenaidah Road
Km 070.88-071.02
Chuadanga-Kaliganj Road
Km 055.70-056.30
Aricha -Daulatpur-Tangail Road
Km 005.00-005.20
Ahaladipur-Kushtia Road
Km 051.75-051.95
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10 17174 National Rehab 195mm @ IRI 9-12
S
0.48
4887 Regional DBST @ Traff 4000-6000
S
1.70
6238 Regional Overlay 60mm @ IRI 5.5-9
S
2.80 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
8.82 13569 National Overlay 80mm @ IRI 4-9
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
2.40 11451 National Overlay 80mm @ IRI 4-9
S
10.39 11451 National Overlay 80mm @ IRI 4-9
S
11.24
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
3.10 11451 National DBST @ Traff >6000
S
2.30 11451 National Overlay 80mm @ IRI 4-9
S
6.00
8882 Regional Overlay 60mm @ IRI 5.5-9
R
1.70
8665 National Overlay 50mm @ IRI 4-7
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.10
4283 Regional DBST @ Traff 4000-6000
S
2.20 11451 National Overlay 80mm @ IRI 4-9
S
3.20 15970 Regional DBST 25mm @ 25% Crk
S
1.10
6605 National Overlay 50mm @ IRI 4-7
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National Overlay 80mm @ IRI 5-9
S
3.00
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
1.58
9061 National DBST @ Traff >6000
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
4.00
7248 National Overlay 50mm @ IRI 4-7
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.50
9061 National Overlay 60mm @ IRI 7-9
S
0.10
8774 Regional Overlay 60mm @ IRI 5.5-9
S
3.20
6330 Regional Overlay 60mm @ IRI 5.5-9
S
0.43
4887 Regional Overlay 50mm @ IRI 5-7
S
0.90 10253 National Overlay 50mm @ IRI 5
S
3.30 11451 National Overlay 80mm @ IRI 4-9
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
5.20
7850 National Overlay 50mm @ IRI 4-7
S
0.14
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
Appendix-A: Page:12 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.305 10.36
0.658 10.35
6.030 10.35
16.825 10.34
0.823 10.33
54.480 10.32
1.027 10.31
12.129 10.31
62.449 10.31
31.261 10.29
0.408 10.29
5.590 10.28
14.199 10.27
21.023 10.27
6.513 10.26
1.783 10.25
0.658 10.25
0.136 10.24
13.581 10.22
6.023 10.22
3.290 10.22
1.852 10.22
4.260 10.22
8.612 10.20
0.574 10.18
1.884 10.17
1.027 10.16
16.682 10.16
1.185 10.16
1.789 10.16
0.355 10.15
10.953 10.14
1.223 10.14
2.631 10.13
20.915 10.12
7.211 10.12
19.813 10.11
0.396 10.11
1.816 10.11
0.672 10.11
0.685 10.10
NPV
23.81
25.47
83.27
281.40
13.11
866.32
12.27
176.50
873.07
414.17
15.33
262.89
205.88
354.36
127.74
17.34
10.40
4.98
195.86
228.52
61.13
26.70
53.74
113.06
8.17
71.54
13.64
305.70
17.73
26.64
5.35
136.06
18.91
32.65
342.32
107.46
382.99
6.48
29.58
9.92
9.76
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Khulna
N7
Comilla
Brahmanbaria N102
Dhaka
Munshiganj
R820
Chittagong Dohazari
N1
Rajshahi
Pabna
N705
Dhaka
Narsingdi
N2
Rangpur
Rangpur
N506
Khulna
Satkhira
R760
Khulna
Khulna
R760
Gopalganj Faridpur
N803
Dhaka
Gazipur
R301
Khulna
Jhenaidah
N704
Khulna
Magura
N7
Comilla
Chandpur
R140
Khulna
Chuadanga
R745
Rangpur
Bogra
N502
Dhaka
Mymensingh N3
Khulna
Magura
N7
Chittagong Chittagong
N1
Rangpur
Panchgarh
N5
Rangpur
Dinajpur
R585
Dhaka
Gazipur
N105
Dhaka
Dhaka
N501
Khulna
Jhenaidah
N7
Khulna
Kushtia
N704
Khulna
Kushtia
R710
Dhaka
Dhaka
N501
Chittagong Dohazari
N1
Khulna
Magura
N7
Gopalganj Rajbari
R710
Comilla
Noakhali
N104
Comilla
Chandpur
R860
Dhaka
Narsingdi
N2
Sylhet
Sylhet
R250
Dhaka
Mymensingh N3
Rangpur
Panchgarh
N5
Khulna
Magura
N7
Rajshahi
Natore
N502
Dhaka
Narayanganj R113
Dhaka
Gazipur
R301
Chittagong Chittagong
N1
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Dauladia-Mongla Road
Km 221.96-223.06
Comilla-Brahmanbaria Road
Km 053.40-053.50
Zinzira-Srinagar Road
Km 016.73-022.91
Dhaka -Comilla -Chittagong-Teknaf RoKm 292.28-294.88
Paksey -Iswardi-Dasuria
Km 008.30-009.20
Dhaka-Sylhet-Jaflong Road
Km 054.91-058.95
Rangpur-Barobari-Kurigram Road
Km 003.00-003.10
Khulna-Satkhira Road
Km 051.26-053.76
Khulna-Satkhira Road
Km 000.50-000.70
Faridpur Town Old section
Km 002.10-002.20
Tongi-Pachdona Road
Km 004.10-004.20
Jhenaidah-Dasuria Road
Km 008.00-012.90
Dauladia-Mongla Road
Km 069.42-070.32
Comilla-Begumganj Road
Km 039.09-039.49
Kushtia -Jhenaidah Road
Km 083.86-084.06
Bogra -Natore Road
Km 008.10-008.80
Dhaka -Mymensingh Road
Km 090.00-094.00
Dauladia-Mongla Road
Km 098.01-100.31
Dhaka -Comilla -Chittagong-Teknaf RoKm 214.68-215.78
Dhaka -Utholi-Banglabandh Road
Km 439.41-443.44
Gobindagnj-Fulbari-Dinajpur Road
Km 095.26-096.36
Madanpur-Joydevpur
Km 043.14-048.66
Mirpur Bridge-Dhour Road
Km 011.10-012.40
Dauladia-Mongla Road
Km 110.72-112.62
Jhenaidah-Dasuria Road
Km 023.50-024.10
Ahaladipur-Kushtia Road
Km 070.45-070.65
Mirpur Bridge-Dhour Road
Km 001.70-002.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 255.44-255.54
Dauladia-Mongla Road
Km 087.61-089.51
Ahaladipur-Kushtia Road
Km 013.11-013.41
Feni-Noakhali Road
Km 033.20-033.50
Mostafapur-Chandpur Road
Km 070.56-070.66
Dhaka-Sylhet-Jaflong Road
Km 063.97-064.11
Sylhet-Jakiganj Road
Km 024.15-031.05
Dhaka -Mymensingh Road
Km 072.20-073.10
Dhaka -Utholi-Banglabandh Road
Km 468.26-475.34
Dauladia-Mongla Road
Km 102.02-102.12
Bogra -Natore Road
Km 053.16-053.36
Madanpur-Sayedpur Road
Km 000.00-001.30
Tongi-Pachdona Road
Km 002.70-002.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 209.08-209.28
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.10
9684 National Overlay 50mm @ IRI 4-7
S
0.10
9061 National Overlay 60mm @ IRI 7-9
S
6.18
4579 Regional DBST @ Traff 4000-6000
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
0.90 11451 National Overlay 80mm @ IRI 5-9
S
4.04 11451 National Overlay 80mm @ IRI 4-9
S
0.10
9061 National Overlay 60mm @ IRI 7-9
S
2.50
4887 Regional DBST @ Traff 4000-6000
S
0.20
4887 Regional DBST @ Traff 4000-6000
S
0.10 24928 National Overlay 50mm @ IRI 5
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
S
4.90 11451 National DBST @ Traff >6000
S
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.40
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.70
5705 National DBST @ Traff 4000-6000
S
4.00 11451 National Overlay 80mm @ IRI 4-9
S
2.30
7850 National Overlay 50mm @ IRI 4-7
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
4.03 11451 National Overlay 80mm @ IRI 4-9
S
1.10
4887 Regional Overlay 50mm @ IRI 5-7
S
5.52 11451 National Overlay 80mm @ IRI 5-9
S
1.30
9061 National Overlay 60mm @ IRI 7-9
S
1.90
6605 National Overlay 50mm @ IRI 4-7
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.20
4484 Regional Overlay 50mm @ IRI 5-7
S
0.30 10311 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
1.90
7850 National Overlay 50mm @ IRI 4-7
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
0.30 13490 National DBST @ Traff >6000
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
L
0.14
8884 National DBST 25mm @ 25% Crk
S
6.90
4887 Regional DBST @ Traff 4000-6000
S
0.90 11451 National Overlay 80mm @ IRI 4-9
S
7.08 11451 National Overlay 80mm @ IRI 4-9
S
0.10
7850 National Overlay 50mm @ IRI 4-7
S
0.20
6500 National DBST @ Traff >6000
S
1.30
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:13 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
4.019 10.07
0.336 10.04
7.744 10.04
13.740 10.03
5.334 10.03
24.953 10.01
0.342 10.01
3.705 10.01
0.306 10.00
0.444
9.99
1.832
9.98
8.859
9.98
5.408
9.97
1.394
9.96
0.685
9.96
0.951
9.94
26.241
9.93
8.764
9.91
6.918
9.90
19.903
9.90
3.158
9.90
33.144
9.89
3.883
9.88
5.911
9.88
3.605
9.87
0.574
9.86
1.185
9.85
0.551
9.84
7.378
9.84
0.437
9.82
0.608
9.82
0.342
9.81
0.177
9.81
9.374
9.80
5.556
9.80
33.174
9.80
0.381
9.80
0.272
9.80
3.976
9.79
1.832
9.78
1.712
9.78
NPV
77.39
5.01
258.77
205.01
72.54
352.55
5.08
140.75
12.16
6.52
17.88
404.32
79.39
19.17
9.32
34.14
415.75
166.05
100.89
293.06
40.23
444.88
57.62
106.21
48.29
7.05
10.51
8.16
138.78
16.61
24.94
5.52
6.26
328.69
65.62
483.46
7.14
9.94
55.20
17.53
20.68
Appendix-A
Annual Needs Report
2012-2013
Zone
Barisal
Comilla
Dhaka
Khulna
Gopalganj
Khulna
Chittagong
Comilla
Sylhet
Dhaka
Rangpur
Dhaka
Gopalganj
Dhaka
Dhaka
Dhaka
Khulna
Rajshahi
Rangpur
Chittagong
Dhaka
Chittagong
Rangpur
Dhaka
Chittagong
Comilla
Gopalganj
Sylhet
Khulna
Khulna
Comilla
Comilla
Barisal
Rangpur
Rangpur
Khulna
Rangpur
Dhaka
Rangpur
Chittagong
Rangpur
Division
Barisal
Comilla
Sherpur
Chuadanga
Sariatpur
Jessore
Cox's Bazar
Chandpur
Habiganj
Gazipur
Lalmonirhat
Munshiganj
Faridpur
Gazipur
Tangail
Tangail
Satkhira
Natore
Gaibanda
Chittagong
Manikganj
Dohazari
Gaibanda
Narayanganj
Chittagong
Comilla
Sariatpur
Sylhet
Khulna
Kushtia
Comilla
Chandpur
Jhalokati
Bogra
Bogra
Jessore
Lalmonirhat
Kishoreganj
Lalmonirhat
Chittagong
Rangpur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N8
R140
R371
R745
R861
N707
N110
R140
N2
R301
N509
R820
N804
N3
N4
N4
R765
N602
R585
R163
R506
N1
N5
N1
R163
R140
R861
N210
N7
R710
R141
R140
R870
N502
N502
R755
N509
N2
N509
N1
N5
Road Name
Chainage
Dhaka -Patuakhali Road
Km 149.25-157.50
Comilla-Begumganj Road
Km 010.70-010.90
Sherpur-Nakla-Mymensingh
Km 034.77-035.20
Kushtia -Jhenaidah Road
Km 076.48-077.18
Monohar -Shariatpur Road
Km 002.60-002.80
Jessore Town Old Section
Km 004.60-004.70
Link Road-Cox's Bazar Road
Km 006.50-007.70
Comilla-Begumganj Road
Km 051.60-051.70
Dhaka-Sylhet-Jaflong Road
Km 187.13-187.33
Tongi-Pachdona Road
Km 006.50-006.60
Barabari-Burimary Road
Km 062.95-066.05
Zinzira-Srinagar Road
Km 041.88-042.58
Bhanga-Faridpur Road
Km 030.20-030.80
Dhaka -Mymensingh Road
Km 039.78-044.65
Joydebpur-Jamalpur Road
Km 082.75-084.35
Joydebpur-Jamalpur Road
Km 102.79-103.49
Khulna-Satkhira Road
Km 024.89-024.99
Natore Town old Section
Km 004.89-005.41
Gobindagnj-Fulbari-Dinajpur Road
Km 052.72-053.02
Chittagong -Chandragona Road
Km 030.60-030.70
Aricha -Daulatpur-Tangail Road
Km 003.10-003.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 309.98-310.98
Dhaka -Utholi-Banglabandh Road
Km 278.06-279.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 000.90-001.00
Chittagong -Chandragona Road
Km 030.40-030.50
Comilla-Begumganj Road
Km 014.76-014.96
Monohar -Shariatpur Road
Km 003.70-004.00
Sylhet Twn By-Pass Road
Km 000.10-002.50
Dauladia-Mongla Road
Km 224.46-224.46
Ahaladipur-Kushtia Road
Km 052.95-053.75
Lalmai-Sonaimuri Road
Km 000.00-000.10
Comilla-Begumganj Road
Km 080.30-080.70
Barisal-Pirojpur Road
Km 008.00-008.70
Bogra -Natore Road
Km 027.06-027.46
Bogra -Natore Road
Km 016.90-017.10
Jessore -Chuknagar Road
Km 012.80-012.90
Barabari-Burimary Road
Km 066.05-069.25
Dhaka-Sylhet-Jaflong Road
Km 071.71-071.94
Barabari-Burimary Road
Km 092.77-092.97
Dhaka -Comilla -Chittagong-Teknaf RoKm 244.54-244.84
Dhaka -Utholi-Banglabandh Road
Km 306.06-323.96
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
8.25
9061 National Overlay 60mm @ IRI 7-9
S
0.20
4909 Regional DBST @ Traff 4000-6000
S
0.43
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4885 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National DBST @ Traff >6000
S
1.20 11451 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
8158 National Overlay 50mm @ IRI 4-7
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
S
3.10
9061 National Overlay 60mm @ IRI 7-9
S
0.70
4887 Regional DBST @ Traff 4000-6000
S
0.60 11451 National Overlay 50mm @ IRI 5
S
4.87 11451 National Overlay 80mm @ IRI 4-9
S
1.60 11451 National Overlay 80mm @ IRI 4-9
S
0.70
6524 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.52 11451 National Overlay 80mm @ IRI 5-9
S
0.30
4331 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
S
1.44
4731 National Overlay 50mm @ IRI 4-9
R
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30
4885 Regional Overlay 60mm @ IRI 7-9
S
2.40 11451 National DBST @ Traff >6000
S
0.00
9684 National Full Recon 180mm @ IRI 12
S
0.80
4887 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.40 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.70
4887 Regional DBST @ Traff 4000-6000
S
0.40
9061 National Overlay 60mm @ IRI 7-9
S
0.20
5705 National Overlay 50mm @ IRI 5-9
S
0.10
3292 Regional DBST @ Traff 2000-4000
S
3.20
9061 National Overlay 60mm @ IRI 7-9
S
0.23 11451 National Overlay 80mm @ IRI 4-9
S
0.20
9061 National Overlay 60mm @ IRI 7-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
17.90
8871 National Overlay 50mm @ IRI 4-7
Appendix-A: Page:14 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
29.218
9.78 434.91
0.287
9.75
9.20
1.606
9.74
20.62
2.396
9.74
29.48
0.685
9.71
8.14
0.165
9.71
7.70
7.072
9.70
93.04
0.361
9.68
5.23
0.783
9.68
14.49
1.832
9.68
17.35
10.611
9.66 148.82
0.968
9.64
36.40
2.286
9.63
42.09
36.270
9.61 430.25
9.746
9.61 137.90
2.046
9.60
35.73
0.342
9.60
5.39
3.249
9.60
42.29
1.027
9.59
11.72
0.342
9.58
5.39
2.639
9.57
36.90
5.482
9.57
78.04
5.397
9.57
80.64
1.721
9.56
16.09
0.342
9.56
5.37
0.585
9.55
9.52
1.027
9.55
12.01
4.327
9.55 158.16
0.105
9.54
0.98
1.087
9.53
37.05
0.143
9.53
4.22
1.494
9.52
24.19
0.951
9.52
33.09
1.369
9.51
20.13
0.574
9.51
7.14
0.136
9.51
4.41
10.953
9.51 145.03
1.408
9.50
19.69
0.685
9.50
9.64
1.975
9.50
28.92
67.078
9.50 1217.54
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Narayanganj N105
Dhaka
Munshiganj
N8
Khulna
Kushtia
R710
Dhaka
Tangail
N4
Dhaka
Gazipur
R313
Rangpur
Joypurhat
R545
Comilla
Brahmanbaria N2
Khulna
Satkhira
R765
Chittagong Dohazari
N1
Comilla
Comilla
R141
Khulna
Satkhira
R765
Khulna
Khulna
N7
Dhaka
Gazipur
R315
Dhaka
Tangail
N4
Khulna
Jhenaidah
N704
Gopalganj Faridpur
N7
Comilla
Chandpur
R860
Khulna
Chuadanga
R747
Comilla
Chandpur
R140
Comilla
Brahmanbaria N102
Rangpur
Gaibanda
R585
Khulna
Jessore
N708
Comilla
Comilla
R140
Comilla
Comilla
R140
Sylhet
Sylhet
N2
Rangpur
Bogra
N502
Dhaka
Mymensingh N3
Rajshahi
Pabna
R601
Gopalganj Rajbari
R710
Rangpur
Bogra
N502
Khulna
Magura
N7
Comilla
Comilla
R140
Comilla
Noakhali
R142
Rajshahi
Naogaon
R547
Dhaka
Gazipur
R301
Chittagong Khagrachari
R160
Chittagong Chittagong
N106
Comilla
Chandpur
R140
Dhaka
Narayanganj N1
Comilla
Comilla
R140
Rangpur
Panchgarh
N5
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Madanpur-Joydevpur
Km 000.00-006.50
Dhaka -Patuakhali Road
Km 033.10-034.93
Ahaladipur-Kushtia Road
Km 054.45-056.05
Joydebpur-Jamalpur Road
Km 072.65-072.85
Mawna-Monohardi Road
Km 004.80-004.90
Bogra-Joypurhat Road
Km 118.29-118.39
Dhaka-Sylhet-Jaflong Road
Km 075.44-076.94
Khulna-Satkhira Road
Km 024.69-024.79
Dhaka -Comilla -Chittagong-Teknaf RoKm 300.68-300.88
Lalmai-Sonaimuri Road
Km 007.00-007.10
Khulna-Satkhira Road
Km 026.19-026.29
Dauladia-Mongla Road
Km 192.19-202.22
Mawna-Nabinagar Road
Km 034.40-034.60
Joydebpur-Jamalpur Road
Km 074.15-074.35
Jhenaidah-Dasuria Road
Km 000.00-000.10
Dauladia-Mongla Road
Km 041.20-041.50
Mostafapur-Chandpur Road
Km 064.86-064.96
Kushtia -Chuadanga Road
Km 025.30-025.34
Comilla-Begumganj Road
Km 053.40-053.50
Comilla-Brahmanbaria Road
Km 074.36-074.46
Gobindagnj-Fulbari-Dinajpur Road
Km 003.90-005.10
Jessore Town Old Section
Km 001.40-001.60
Comilla-Begumganj Road
Km 011.50-011.70
Comilla-Begumganj Road
Km 020.49-021.19
Dhaka-Sylhet-Jaflong Road
Km 277.19-278.79
Bogra -Natore Road
Km 019.90-026.16
Dhaka -Mymensingh Road
Km 064.90-067.50
Pabna-Natakhola Ferry Ghat Road
Km 045.87-047.07
Ahaladipur-Kushtia Road
Km 024.61-024.71
Bogra -Natore Road
Km 028.26-028.36
Dauladia-Mongla Road
Km 078.21-082.91
Comilla-Begumganj Road
Km 014.16-014.26
Begamganj-Ramganj Road
Km 004.00-004.10
Naogaon-Badalgachhi-Rohonpur
Km 022.29-022.49
Tongi-Pachdona Road
Km 004.70-004.90
Hathazari-Khagrachhari Road
Km 035.00-035.10
Chittagong-Rangamati Road
Km 003.90-004.10
Comilla-Begumganj Road
Km 030.61-032.29
Dhaka -Comilla -Chittagong-Teknaf RoKm 005.60-006.10
Comilla-Begumganj Road
Km 018.99-020.29
Dhaka -Utholi-Banglabandh Road
Km 443.84-446.84
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
6.50
9061 National DBST @ Traff >6000
S
1.83 11451 National Overlay 80mm @ IRI 4-9
S
1.60
4887 Regional DBST 25mm @ 25% Crk
S
0.20 15112 National Rehab 195mm @ IRI 9-12
S
0.10
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.50 12330 National Overlay 50mm @ IRI 4
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
10.03
7406 National Overlay 60mm @ IRI 7-9
S
0.20
2048 Regional DBST @ Traff 2000-4000
S
0.20 15112 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National DBST 25mm @ 25% Crk
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.04
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
1.20
6027 Regional DBST @ Traff >6000
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.20
4887 Regional DBST @ Traff 4000-6000
S
0.70
4887 Regional Overlay 50mm @ IRI 5-7
S
1.60 11451 National Overlay 80mm @ IRI 4-9
S
6.26
9061 National Overlay 60mm @ IRI 7-9
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
1.20
3019 Regional Overlay 50mm @ IRI 5-7
S
0.10
3636 Regional Overlay 50mm @ IRI 5-7
S
0.10
9061 National Overlay 50mm @ IRI 5-7
S
4.70
7850 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10
9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 21334 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 13468 National Overlay 80mm @ IRI 5-9
S
1.68
4887 Regional DBST @ Traff 4000-6000
R
0.50
8665 National DBST 25mm @ 25% Crk
S
1.30
4887 Regional Overlay 50mm @ IRI 5-7
S
3.00 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:15 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
6.583
9.49
11.297
9.49
2.174
9.48
3.504
9.44
0.177
9.44
0.342
9.44
5.872
9.43
0.342
9.43
1.185
9.42
0.358
9.42
0.342
9.42
41.501
9.41
0.153
9.41
3.504
9.41
0.136
9.40
1.803
9.40
0.342
9.39
0.146
9.39
0.298
9.39
1.783
9.38
1.630
9.37
1.202
9.37
0.287
9.35
2.305
9.32
9.877
9.32
21.859
9.31
16.051
9.30
2.317
9.29
0.298
9.29
0.287
9.29
18.791
9.29
0.292
9.29
0.342
9.27
0.381
9.27
3.664
9.27
0.198
9.26
1.317
9.26
2.418
9.26
0.988
9.25
4.343
9.24
14.890
9.23
NPV
270.14
157.85
67.79
32.62
1.99
5.49
82.57
5.22
16.45
5.64
5.21
754.83
5.13
32.54
4.38
23.91
5.37
1.95
4.74
15.87
57.19
15.27
8.48
34.63
135.50
295.31
184.31
27.21
3.86
4.45
297.82
4.63
5.13
4.98
33.21
2.81
17.96
78.03
35.98
64.62
204.27
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Jhenaidah
R748
Rajshahi
Rajshahi
N6
Rajshahi
Rajshahi
N6
Dhaka
Narayanganj N1
Dhaka
Manikganj
N5
Khulna
Jhenaidah
N704
Rangpur
Gaibanda
R585
Dhaka
Gazipur
N3
Rangpur
Rangpur
N5
Comilla
Chandpur
R140
Dhaka
Jamalpur
N4
Chittagong Chittagong
N1
Dhaka
Gazipur
N3
Barisal
Bhola
N809
Comilla
Chandpur
R140
Khulna
Jessore
R755
Comilla
Feni
N104
Rangpur
Rangpur
N5
Khulna
Chuadanga
R745
Khulna
Chuadanga
R745
Dhaka
Mymensingh N309
Dhaka
Narayanganj N1
Dhaka
Gazipur
N3
Chittagong Chittagong
N1
Khulna
Jhenaidah
R748
Khulna
Chuadanga
R747
Rangpur
Bogra
N502
Rangpur
Rangpur
N506
Khulna
Chuadanga
R747
Khulna
Jessore
R755
Sylhet
Sylhet
N2
Dhaka
Narsingdi
R212
Khulna
Meherpur
R745
Sylhet
Sylhet
N2
Khulna
Khulna
N7
Khulna
Khulna
N7
Comilla
Chandpur
R140
Rangpur
Lalmonirhat
N509
Comilla
Chandpur
R140
Chittagong Chittagong
N1
Comilla
Brahmanbaria N2
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chuadanga-Kaliganj Road
Km 065.10-065.30
Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73
Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73
Dhaka -Comilla -Chittagong-Teknaf RoKm 025.08-025.88
Dhaka -Utholi-Banglabandh Road
Km 051.03-057.46
Jhenaidah-Dasuria Road
Km 007.70-007.90
Gobindagnj-Fulbari-Dinajpur Road
Km 040.65-043.92
Dhaka -Mymensingh Road
Km 014.80-015.30
Dhaka -Utholi-Banglabandh Road
Km 294.48-306.06
Comilla-Begumganj Road
Km 049.60-049.70
Joydebpur-Jamalpur Road
Km 143.01-143.41
Dhaka -Comilla -Chittagong-Teknaf RoKm 223.68-224.18
Dhaka -Mymensingh Road
Km 019.60-022.30
Barishal-Lakshmipur Road
Km 030.79-040.88
Comilla-Begumganj Road
Km 039.99-040.29
Jessore -Chuknagar Road
Km 027.53-028.13
Feni-Noakhali Road
Km 001.70-002.20
Dhaka -Utholi-Banglabandh Road
Km 323.96-358.07
Kushtia -Jhenaidah Road
Km 081.86-081.96
Kushtia -Jhenaidah Road
Km 082.76-083.66
Mymensingh Town By-Pass Road
Km 005.16-007.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 001.10-001.20
Dhaka -Mymensingh Road
Km 023.20-023.98
Dhaka -Comilla -Chittagong-Teknaf RoKm 209.38-210.08
Chuadanga-Kaliganj Road
Km 056.40-056.90
Kushtia -Chuadanga Road
Km 034.04-034.44
Bogra -Natore Road
Km 017.10-019.90
Rangpur-Barobari-Kurigram Road
Km 000.00-003.00
Kushtia -Chuadanga Road
Km 033.54-033.94
Jessore -Chuknagar Road
Km 034.23-037.83
Dhaka-Sylhet-Jaflong Road
Km 192.73-198.03
Akdaria -Agarpur Road
Km 008.00-008.80
Kushtia -Jhenaidah Road
Km 054.18-062.08
Dhaka-Sylhet-Jaflong Road
Km 265.99-266.99
Dauladia-Mongla Road
Km 211.26-212.92
Dauladia-Mongla Road
Km 211.26-212.92
Comilla-Begumganj Road
Km 072.30-072.40
Barabari-Burimary Road
Km 056.35-056.65
Comilla-Begumganj Road
Km 051.80-052.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 218.58-219.08
Dhaka-Sylhet-Jaflong Road
Km 079.74-082.44
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
L
0.75 11451 National Overlay 80mm @ IRI 4-9
R
0.75 11451 National Overlay 80mm @ IRI 4-9
R
0.80 11451 National Overlay 80mm @ IRI 4-9
S
6.43
7636 National Overlay 50mm @ IRI 4-7
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
3.27
4887 Regional Overlay 50mm @ IRI 5-7
L
0.50
8665 National Overlay 60mm @ IRI 7-9
S
11.58
4405 National Overlay 50mm @ IRI 4-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.40
9061 National Overlay 60mm @ IRI 7-9
S
0.50 11451 National Rehab 195mm @ IRI 9-12
L
2.70 11451 National Overlay 80mm @ IRI 4-9
S
10.09
9061 National Overlay 50mm @ IRI 5-7
S
0.30
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.60
4887 Regional DBST @ Traff 4000-6000
S
0.50 11732 National DBST @ Traff >6000
S
34.11 11451 National Overlay 80mm @ IRI 4-9
S
0.10
5536 Regional DBST @ Traff 4000-6000
S
0.90
5536 Regional Overlay 60mm @ IRI 5.5-9
S
2.24 11451 National Overlay 80mm @ IRI 5-9
R
0.10 11451 National Rehab 195mm @ IRI 9-12
L
0.78 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.50
4887 Regional DBST 25mm @ 25% Crk
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
2.80
5705 National DBST @ Traff 4000-6000
S
3.00
9061 National Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
3.60
4887 Regional DBST @ Traff 4000-6000
S
5.30 11451 National Overlay 80mm @ IRI 4-9
S
0.80
4887 Regional DBST @ Traff 4000-6000
S
7.90
4283 Regional Overlay 50mm @ IRI 5-7
S
1.00 11451 National Overlay 50mm @ IRI 4
L
1.66
9061 National Overlay 60mm @ IRI 7-9
R
1.66
9061 National Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.30
9061 National Overlay 60mm @ IRI 7-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
2.70 12330 National Overlay 50mm @ IRI 4
Appendix-A: Page:16 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
0.722
9.22
9.96
6.198
9.21
70.51
6.198
9.21
70.51
4.873
9.19
63.22
23.981
9.18 420.88
1.350
9.17
16.80
9.379
9.17 120.32
2.334
9.17
37.41
44.017
9.17 630.36
0.355
9.16
5.25
1.319
9.16
18.67
10.526
9.16
96.08
22.758
9.16 336.89
28.971
9.15 468.80
1.083
9.15
15.81
0.815
9.15
25.07
1.334
9.15
55.80
207.193
9.12 2668.13
0.136
9.12
3.52
3.081
9.12
38.42
17.724
9.11 197.79
1.721
9.11
15.32
7.090
9.10
87.50
4.391
9.09
49.25
0.716
9.08
23.78
1.253
9.07
20.66
3.845
9.07 125.95
8.612
9.07 124.61
1.253
9.07
20.65
4.891
9.06 148.88
32.719
9.03 471.23
1.055
9.02
32.25
22.679
9.02 272.67
3.915
9.01
52.59
5.699
9.01
79.33
5.699
9.01
79.33
0.373
9.01
5.52
1.027
9.00
13.56
1.211
9.00
17.01
10.910
9.00
98.22
10.569
8.99 162.11
Appendix-A
Annual Needs Report
2012-2013
Zone
Gopalganj
Sylhet
Dhaka
Khulna
Comilla
Comilla
Gopalganj
Khulna
Dhaka
Dhaka
Khulna
Barisal
Barisal
Dhaka
Khulna
Dhaka
Dhaka
Barisal
Dhaka
Khulna
Dhaka
Chittagong
Khulna
Khulna
Dhaka
Khulna
Sylhet
Comilla
Dhaka
Rajshahi
Dhaka
Chittagong
Chittagong
Chittagong
Comilla
Khulna
Dhaka
Chittagong
Rangpur
Comilla
Rangpur
Division
Sariatpur
Sylhet
Gazipur
Chuadanga
Comilla
Chandpur
Faridpur
Khulna
Gazipur
Gazipur
Magura
Barisal
Barisal
Gazipur
Jhenaidah
Narayanganj
Gazipur
Pirojpur
Manikganj
Khulna
Mymensingh
Chittagong
Jhenaidah
Satkhira
Narsingdi
Jhenaidah
Sunamganj
Chandpur
Narayanganj
Natore
Tangail
Chittagong
Rangamati
Rangamati
Chandpur
Meherpur
Manikganj
Chittagong
Lalmonirhat
Chandpur
Dinajpur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R861
N2
R310
R747
R140
R140
N7
N7
N105
R301
N702
N8
N8
R301
R748
N105
R301
R870
R506
N7
N3
R163
R748
R765
R212
R745
R370
R140
N1
N502
N4
N1
R161
R161
R140
R745
R505
N1
N509
R140
R585
Road Name
Chainage
Monohar -Shariatpur Road
Km 000.10-000.60
Dhaka-Sylhet-Jaflong Road
Km 271.19-271.89
Joydebpur-Itakhola Road
Km 011.50-034.73
Kushtia -Chuadanga Road
Km 034.54-035.94
Comilla-Begumganj Road
Km 010.00-010.60
Comilla-Begumganj Road
Km 054.00-054.10
Dauladia-Mongla Road
Km 036.30-041.00
Dauladia-Mongla Road
Km 217.26-217.56
Madanpur-Joydevpur
Km 029.14-029.44
Tongi-Pachdona Road
Km 002.50-002.60
Jessore -Magura Road
Km 026.19-026.79
Dhaka -Patuakhali Road
Km 169.50-171.00
Dhaka -Patuakhali Road
Km 169.50-171.00
Tongi-Pachdona Road
Km 005.90-006.30
Chuadanga-Kaliganj Road
Km 051.80-052.30
Madanpur-Joydevpur
Km 017.54-018.00
Tongi-Pachdona Road
Km 000.00-000.01
Barisal-Pirojpur Road
Km 053.37-053.97
Aricha -Daulatpur-Tangail Road
Km 010.30-010.70
Dauladia-Mongla Road
Km 191.39-191.89
Dhaka -Mymensingh Road
Km 071.10-072.20
Chittagong -Chandragona Road
Km 011.90-013.00
Chuadanga-Kaliganj Road
Km 053.40-055.60
Khulna-Satkhira Road
Km 033.89-036.89
Akdaria -Agarpur Road
Km 000.00-000.20
Kushtia -Jhenaidah Road
Km 101.96-103.76
Mymensingh -Sunamganj Road
Km 072.36-073.29
Comilla-Begumganj Road
Km 039.59-039.89
Dhaka -Comilla -Chittagong-Teknaf RoKm 024.48-025.07
Bogra -Natore Road
Km 046.66-047.16
Joydebpur-Jamalpur Road
Km 073.15-073.55
Dhaka -Comilla -Chittagong-Teknaf RoKm 243.44-244.04
Rangamati -Bandarban Road
Km 015.50-015.90
Rangamati -Bandarban Road
Km 015.50-015.90
Comilla-Begumganj Road
Km 073.10-073.20
Kushtia -Jhenaidah Road
Km 069.08-069.68
Nabinagar-Kaliakoir Road
Km 009.10-009.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 225.98-226.08
Barabari-Burimary Road
Km 089.47-091.77
Comilla-Begumganj Road
Km 043.20-045.70
Gobindagnj-Fulbari-Dinajpur Road
Km 102.66-102.86
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.50
4885 Regional Overlay 50mm @ IRI 5-7
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
23.23
6578 Regional Overlay 60mm @ IRI 5.5-9
S
1.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60
4909 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
4.70 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
S
0.60
3649 National Overlay 50mm @ IRI 5-9
S
1.50
9061 National Overlay 60mm @ IRI 7-9
S
1.50
9061 National Overlay 60mm @ IRI 7-9
S
0.40 21334 Regional Full Recon 150mm @ IRI 12
S
0.50
4887 Regional DBST @ Traff 4000-6000
S
0.46 11451 National Overlay 80mm @ IRI 5-9
S
0.01 30316 Regional DBST 25mm @ 25% Crk
S
0.60
3892 Regional DBST 25mm @ 25% Crk
S
0.40
3019 Regional Overlay 50mm @ IRI 7-9
S
0.50
7406 National Overlay 50mm @ IRI 4-7
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
1.10
4887 Regional DBST @ Traff 4000-6000
S
2.20
4887 Regional Overlay 50mm @ IRI 5-7
S
3.00
4887 Regional DBST 25mm @ 25% Crk
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
1.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.93
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.59 11451 National Overlay 80mm @ IRI 4-9
S
0.50
9061 National DBST @ Traff >6000
S
0.40 15112 National Rehab 195mm @ IRI 9-12
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.60
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 17384 Regional Full Recon 150mm @ IRI 12
S
0.10
9061 National DBST 25mm @ 25% Crk
S
2.30
9061 National Overlay 60mm @ IRI 7-9
S
2.50
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
4887 Regional DBST 25mm @ 25% Crk
Appendix-A: Page:17 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.435
8.98
4.321
8.98
79.668
8.96
4.384
8.96
2.166
8.96
0.355
8.94
28.241
8.93
1.780
8.92
1.803
8.90
1.832
8.89
2.286
8.89
5.134
8.89
5.134
8.89
7.328
8.88
0.764
8.88
2.740
8.87
0.041
8.87
0.815
8.87
0.724
8.87
1.683
8.87
6.791
8.86
1.494
8.86
6.384
8.86
4.076
8.86
0.574
8.85
5.167
8.85
1.746
8.84
1.083
8.84
6.503
8.83
0.679
8.83
7.007
8.83
3.556
8.83
1.274
8.83
1.274
8.83
0.373
8.82
1.722
8.82
7.361
8.80
0.128
8.80
7.873
8.80
8.775
8.79
0.274
8.79
NPV
17.20
47.91
789.45
70.07
28.51
5.13
371.24
24.47
19.82
15.93
33.64
70.52
70.52
63.66
25.60
30.02
1.61
24.07
8.40
31.80
88.61
47.34
91.52
131.92
7.75
74.01
24.03
15.07
70.92
18.87
61.04
46.22
17.10
17.10
5.41
23.41
63.99
3.76
102.72
115.96
8.79
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Chittagong
R163
Chittagong Chittagong
N1
Rangpur
Rangpur
N506
Chittagong Rangamati
N106
Khulna
Chuadanga
R745
Chittagong Chittagong
N1
Dhaka
Gazipur
R310
Dhaka
Mymensingh N3
Dhaka
Gazipur
R315
Barisal
Barisal
N8
Khulna
Jessore
R755
Dhaka
Gazipur
R301
Khulna
Kushtia
N704
Chittagong Rangamati
N106
Comilla
Comilla
R140
Barisal
Patuakhali
N8
Khulna
Jessore
R755
Rangpur
Bogra
N502
Khulna
Satkhira
R765
Comilla
Brahmanbaria N102
Khulna
Jhenaidah
N704
Khulna
Jessore
R755
Rangpur
Lalmonirhat
N506
Rangpur
Lalmonirhat
N509
Khulna
Satkhira
R765
Chittagong Dohazari
N1
Rajshahi
Pabna
R601
Rajshahi
Rajshahi
R685
Khulna
Jhenaidah
R748
Comilla
Comilla
R141
Dhaka
Gazipur
N4
Chittagong Chittagong
N106
Chittagong Chittagong
R163
Comilla
Brahmanbaria R220
Dhaka
Mymensingh N3
Comilla
Comilla
R140
Chittagong Chittagong
N1
Gopalganj Gopalganj
R850
Dhaka
Narayanganj R113
Khulna
Khulna
N7
Khulna
Jessore
N706
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chittagong -Chandragona Road
Km 029.00-029.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 206.08-208.98
Rangpur-Barobari-Kurigram Road
Km 019.45-019.85
Chittagong-Rangamati Road
Km 041.90-043.30
Kushtia -Jhenaidah Road
Km 071.02-071.98
Dhaka -Comilla -Chittagong-Teknaf RoKm 241.30-243.04
Joydebpur-Itakhola Road
Km 000.00-000.10
Dhaka -Mymensingh Road
Km 094.00-097.20
Mawna-Nabinagar Road
Km 034.80-036.10
Dhaka -Patuakhali Road
Km 143.85-147.05
Jessore -Chuknagar Road
Km 037.83-038.11
Tongi-Pachdona Road
Km 005.40-005.60
Jhenaidah-Dasuria Road
Km 045.38-045.48
Chittagong-Rangamati Road
Km 041.30-041.60
Comilla-Begumganj Road
Km 016.06-016.26
Dhaka -Patuakhali Road
Km 180.42-187.22
Jessore -Chuknagar Road
Km 003.70-003.80
Bogra -Natore Road
Km 028.66-028.86
Khulna-Satkhira Road
Km 030.89-030.99
Comilla-Brahmanbaria Road
Km 072.76-072.86
Jhenaidah-Dasuria Road
Km 001.20-002.60
Jessore -Chuknagar Road
Km 014.30-014.40
Rangpur-Barobari-Kurigram Road
Km 027.35-033.00
Barabari-Burimary Road
Km 053.34-056.25
Khulna-Satkhira Road
Km 025.09-025.19
Dhaka -Comilla -Chittagong-Teknaf RoKm 301.08-302.18
Pabna-Natakhola Ferry Ghat Road
Km 038.07-038.97
Rajshahi -Chowmasia Road
Km 012.40-012.50
Chuadanga-Kaliganj Road
Km 064.50-064.70
Lalmai-Sonaimuri Road
Km 014.00-014.10
Joydebpur-Jamalpur Road
Km 021.37-021.47
Chittagong-Rangamati Road
Km 000.00-000.20
Chittagong -Chandragona Road
Km 007.00-007.10
Sarail-Habiganj Road
Km 007.35-007.40
Dhaka -Mymensingh Road
Km 097.20-106.60
Comilla-Begumganj Road
Km 011.20-011.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 219.78-219.98
Tekerhat-Mollahhat Road
Km 025.90-026.00
Madanpur-Sayedpur Road
Km 011.10-011.20
Dauladia-Mongla Road
Km 202.22-204.28
Jessore -Benapole Road
Km 024.40-024.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
2.90 11451 National Overlay 80mm @ IRI 4-9
S
0.40
7068 National Overlay 50mm @ IRI 5-7
S
1.40 11451 National Rehab 195mm @ IRI 9-12
S
0.96
4887 Regional Overlay 50mm @ IRI 5-7
S
1.75 11451 National Overlay 80mm @ IRI 4-9
S
0.10 17870 Regional DBST @ Traff >6000
S
3.20 11451 National Overlay 80mm @ IRI 4-9
S
1.30
2048 Regional DBST @ Traff 2000-4000
S
3.20 11451 National Overlay 80mm @ IRI 4-9
S
0.28
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 21334 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.20
4887 Regional DBST 25mm @ 25% Crk
S
6.80
9061 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
9061 National Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
1.40 11451 National DBST @ Traff >6000
S
0.10
3292 Regional DBST @ Traff 2000-4000
S
5.65
9061 National Overlay 50mm @ IRI 5-7
S
2.90
9061 National Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
1.10 11451 National DBST @ Traff >6000
S
0.90
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
6330 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
4887 Regional DBST @ Traff 4000-6000
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 19452 National Rehab 195mm @ IRI 9-12
S
0.20 13468 National Overlay 80mm @ IRI 5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.05
6240 Regional DBST @ Traff >6000
S
9.40 11451 National Overlay 80mm @ IRI 4-9
S
0.20
4887 Regional DBST 25mm @ 25% Crk
S
0.20 11451 National DBST @ Traff >6000
S
0.10
3497 Regional Overlay 50mm @ IRI 7-9
S
0.10
5419 Regional DBST @ Traff 4000-6000
S
2.06 11451 National Overlay 80mm @ IRI 4-9
S
0.30
7314 National Overlay 60mm @ IRI 7-9
Appendix-A: Page:18 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.685
8.79
24.825
8.78
1.148
8.78
24.095
8.78
2.897
8.77
9.980
8.77
0.287
8.76
19.749
8.76
0.995
8.75
19.228
8.75
0.804
8.74
3.664
8.74
0.988
8.72
5.163
8.71
0.277
8.71
19.521
8.70
0.287
8.69
0.574
8.68
0.136
8.68
1.844
8.68
2.524
8.68
0.136
8.67
16.225
8.67
9.940
8.65
0.287
8.65
1.956
8.64
1.738
8.64
0.342
8.63
0.287
8.62
0.355
8.62
2.305
8.61
1.317
8.61
0.330
8.61
0.068
8.60
58.572
8.60
0.287
8.59
0.351
8.58
0.287
8.58
0.138
8.57
12.783
8.57
1.307
8.57
NPV
9.87
307.75
15.55
201.99
41.14
133.04
8.78
254.78
31.03
247.65
11.24
31.30
12.69
42.96
7.63
207.95
3.40
8.32
4.42
15.51
108.14
4.02
224.36
126.10
4.51
89.29
19.63
3.01
9.03
4.94
20.10
14.00
4.53
1.28
621.79
8.27
10.36
3.41
4.33
154.60
19.62
Appendix-A
Annual Needs Report
2012-2013
Road
No
Barisal
Jhalokati
R870
Rangpur
Nilphamari
R570
Sylhet
Sylhet
N210
Khulna
Jessore
R765
Rangpur
Bogra
N5
Dhaka
Kishoreganj
R364
Comilla
Noakhali
N104
Khulna
Jessore
N707
Chittagong Chittagong
N106
Comilla
Comilla
R141
Comilla
Chandpur
R140
Comilla
Brahmanbaria N102
Comilla
Chandpur
R140
Rangpur
Bogra
R550
Gopalganj Faridpur
N7
Chittagong Chittagong
N1
Khulna
Jessore
R755
Khulna
Chuadanga
R745
Dhaka
Tangail
N4
Dhaka
Gazipur
N3
Rajshahi
Pabna
N6
Khulna
Jessore
R755
Khulna
Chuadanga
R747
Comilla
Feni
N104
Chittagong Chittagong
N1
Comilla
Feni
N104
Dhaka
Narayanganj N1
Khulna
Kushtia
R710
Khulna
Khulna
R760
Chittagong Dohazari
N1
Comilla
Noakhali
N104
Comilla
Chandpur
R860
Dhaka
Gazipur
N3
Chittagong Dohazari
R170
Chittagong Dohazari
R170
Chittagong Rangamati
N106
Dhaka
Gazipur
R301
Comilla
Chandpur
R140
Dhaka
Tangail
N4
Comilla
Comilla
R141
Dhaka
Jamalpur
N4
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Barisal-Pirojpur Road
Km 023.75-025.47
Sayedpur-Nilphamari Road
Km 009.40-012.50
Sylhet Twn By-Pass Road
Km 009.50-010.60
Khulna-Satkhira Road
Km 010.50-010.60
Dhaka -Utholi-Banglabandh Road
Km 201.28-245.52
Battoli - Kishoreganj Road
Km 000.00-003.00
Feni-Noakhali Road
Km 032.40-032.90
Jessore Town Old Section
Km 001.10-001.20
Chittagong-Rangamati Road
Km 018.60-019.30
Lalmai-Sonaimuri Road
Km 004.40-006.80
Comilla-Begumganj Road
Km 042.67-043.10
Comilla-Brahmanbaria Road
Km 077.06-077.16
Comilla-Begumganj Road
Km 041.37-041.97
Mokamtala-Joypurhat Road
Km 002.40-002.60
Dauladia-Mongla Road
Km 049.70-052.57
Dhaka -Comilla -Chittagong-Teknaf RoKm 228.96-229.26
Jessore -Chuknagar Road
Km 000.00-000.40
Kushtia -Jhenaidah Road
Km 084.36-084.46
Joydebpur-Jamalpur Road
Km 039.99-040.99
Dhaka -Mymensingh Road
Km 014.70-014.80
Kashinathpur-Natore-Rajshahi Road Km 044.05-044.15
Jessore -Chuknagar Road
Km 013.50-014.10
Kushtia -Chuadanga Road
Km 041.94-044.77
Feni-Noakhali Road
Km 014.70-014.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 219.98-220.48
Feni-Noakhali Road
Km 012.40-012.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 001.00-001.10
Ahaladipur-Kushtia Road
Km 052.15-052.55
Khulna-Satkhira Road
Km 029.10-030.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 280.38-280.78
Feni-Noakhali Road
Km 038.20-038.60
Mostafapur-Chandpur Road
Km 069.36-069.76
Dhaka -Mymensingh Road
Km 048.15-048.58
Patiya-Chokoria Road
Km 013.00-013.50
Patiya-Chokoria Road
Km 007.90-008.00
Chittagong-Rangamati Road
Km 041.20-041.30
Tongi-Pachdona Road
Km 000.80-000.86
Comilla-Begumganj Road
Km 073.30-074.50
Joydebpur-Jamalpur Road
Km 091.09-091.29
Lalmai-Sonaimuri Road
Km 001.50-004.30
Joydebpur-Jamalpur Road
Km 127.61-130.71
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.72
4887 Regional Overlay 60mm @ IRI 7-9
S
3.10
3900 Regional Overlay 50mm @ IRI 5-7
S
1.10 11451 National DBST @ Traff >6000
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
44.23 13193 National Overlay 80mm @ IRI 4-9
S
3.00
3019 Regional Full Recon 135mm @ IRI 12
S
0.50 13564 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.70 11451 National Full Recon 195mm @ IRI 12
S
2.40
4887 Regional Overlay 60mm @ IRI 7-9
S
0.43
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 15273 National Overlay 50mm @ IRI 5
S
0.60
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
2.87
5397 National Overlay 50mm @ IRI 4-9
S
0.30 11451 National Overlay 50mm @ IRI 4
S
0.40
4887 Regional DBST 25mm @ 25% Crk
S
0.10
5536 Regional Overlay 60mm @ IRI 5.5-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
L
0.10
8665 National Overlay 50mm @ IRI 4-7
S
0.10
7153 National DBST @ Traff >6000
S
0.60
3292 Regional Overlay 50mm @ IRI 7-9
S
2.83
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.30 11451 National Rehab 195mm @ IRI 9-12
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
1.40
4887 Regional Overlay 60mm @ IRI 7-9
S
0.40 11451 National Rehab 195mm @ IRI 9-12
S
0.40 10253 National Overlay 80mm @ IRI 5-9
S
0.40
4887 Regional Overlay 60mm @ IRI 7-9
S
0.43 11451 National Overlay 80mm @ IRI 4-9
S
0.50
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
3516 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
L
0.06
9143 Regional Rehab 150mm @ IRI 9-12
S
1.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
2.80
4887 Regional Overlay 60mm @ IRI 7-9
S
3.10
9061 National Overlay 60mm @ IRI 7-9
Appendix-A: Page:19 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
5.891
8.56
82.82
8.899
8.56
98.01
1.983
8.54
53.26
0.136
8.54
3.99
269.791
8.54 3250.65
8.911
8.54
73.81
2.901
8.53
34.66
1.905
8.52
15.73
17.821
8.52 144.86
8.514
8.51 117.15
1.472
8.51
16.37
0.313
8.50
5.16
2.113
8.50
28.29
0.685
8.49
8.57
10.920
8.49 178.33
1.331
8.49
19.28
0.543
8.47
16.83
0.342
8.47
4.31
6.173
8.46
64.48
0.391
8.46
6.85
0.180
8.46
7.25
1.722
8.44
22.64
8.875
8.43 121.18
1.921
8.43
15.69
10.910
8.42
91.93
5.255
8.42
41.99
2.180
8.41
17.21
1.148
8.40
14.71
5.228
8.40
72.09
7.376
8.40
59.56
1.910
8.40
16.31
1.369
8.39
19.19
2.590
8.39
26.84
0.940
8.39
10.31
0.183
8.39
1.70
2.180
8.38
17.24
0.769
8.38
6.31
4.481
8.37
61.54
1.811
8.36
18.69
10.473
8.36 143.72
10.611
8.36 147.09
Appendix-A
Annual Needs Report
2012-2013
Zone
Khulna
Chittagong
Dhaka
Khulna
Chittagong
Barisal
Khulna
Chittagong
Comilla
Khulna
Khulna
Khulna
Khulna
Khulna
Chittagong
Barisal
Khulna
Comilla
Dhaka
Barisal
Comilla
Comilla
Dhaka
Dhaka
Rangpur
Khulna
Gopalganj
Chittagong
Dhaka
Rangpur
Rajshahi
Comilla
Comilla
Rajshahi
Dhaka
Rangpur
Dhaka
Dhaka
Comilla
Comilla
Sylhet
Division
Jessore
Chittagong
Gazipur
Jhenaidah
Chittagong
Barisal
Satkhira
Chittagong
Comilla
Jessore
Jhenaidah
Jessore
Magura
Jhenaidah
Chittagong
Barisal
Jhenaidah
Noakhali
Narayanganj
Jhalokati
Feni
Chandpur
Gazipur
Narayanganj
Bogra
Chuadanga
Rajbari
Dohazari
Manikganj
Gaibanda
Sirajganj
Noakhali
Comilla
Natore
Narayanganj
Dinajpur
Tangail
Tangail
Chandpur
Chandpur
Sylhet
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R765
N1
R313
R748
R151
N8
R765
N1
R141
N7
R748
R765
N7
N704
N1
N8
R745
R142
N1
R870
N104
R140
R301
N1
R550
R747
R710
R170
R505
R555
N5
R142
R140
N502
N105
R585
N4
N4
R140
R860
R250
Road Name
Chainage
Khulna-Satkhira Road
Km 011.20-011.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 170.18-170.38
Mawna-Monohardi Road
Km 000.00-000.90
Chuadanga-Kaliganj Road
Km 053.20-053.30
Baraiyerhat-Fatikchhari Road
Km 003.50-004.20
Dhaka -Patuakhali Road
Km 132.45-138.85
Khulna-Satkhira Road
Km 025.29-025.79
Dhaka -Comilla -Chittagong-Teknaf RoKm 203.58-204.98
Lalmai-Sonaimuri Road
Km 007.60-013.80
Dauladia-Mongla Road
Km 187.49-188.19
Chuadanga-Kaliganj Road
Km 049.30-049.50
Khulna-Satkhira Road
Km 010.70-010.90
Dauladia-Mongla Road
Km 076.11-076.61
Jhenaidah-Dasuria Road
Km 013.20-020.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 245.34-245.84
Dhaka -Patuakhali Road
Km 126.85-132.05
Kushtia -Jhenaidah Road
Km 114.36-114.46
Begamganj-Ramganj Road
Km 023.05-024.95
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.20-009.30
Barisal-Pirojpur Road
Km 023.25-023.55
Feni-Noakhali Road
Km 012.90-014.60
Comilla-Begumganj Road
Km 081.00-081.10
Tongi-Pachdona Road
Km 000.80-000.86
Dhaka -Comilla -Chittagong-Teknaf RoKm 026.08-034.88
Mokamtala-Joypurhat Road
Km 009.60-011.00
Kushtia -Chuadanga Road
Km 025.64-030.64
Ahaladipur-Kushtia Road
Km 043.01-044.71
Patiya-Chokoria Road
Km 006.90-007.00
Nabinagar-Kaliakoir Road
Km 009.40-014.00
Palashbari-Gaibandah Road
Km 017.80-021.02
Dhaka -Utholi-Banglabandh Road
Km 129.61-132.71
Begamganj-Ramganj Road
Km 008.20-008.60
Comilla-Begumganj Road
Km 017.29-017.39
Bogra -Natore Road
Km 055.96-056.16
Madanpur-Joydevpur
Km 014.34-017.54
Gobindagnj-Fulbari-Dinajpur Road
Km 062.42-065.42
Joydebpur-Jamalpur Road
Km 068.65-069.05
Joydebpur-Jamalpur Road
Km 069.25-069.75
Comilla-Begumganj Road
Km 065.10-065.90
Mostafapur-Chandpur Road
Km 071.26-071.46
Sylhet-Jakiganj Road
Km 075.45-086.57
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.90
3019 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70
3019 Regional Overlay 50mm @ IRI 5-7
S
6.40 11451 National Rehab 195mm @ IRI 9-12
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
1.40 11451 National Overlay 80mm @ IRI 4-9
S
6.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70
7406 National Overlay 50mm @ IRI 4-7
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional DBST @ Traff 4000-6000
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
7.60 11451 National Overlay 80mm @ IRI 5-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
5.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
1.90
5770 Regional Overlay 60mm @ IRI 5.5-9
R
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
1.70 11451 National Rehab 195mm @ IRI 9-12
S
0.10 10297 Regional DBST @ Traff >6000
R
0.06 21334 Regional Full Recon 150mm @ IRI 12
L
8.80 11451 National Overlay 80mm @ IRI 4-9
S
1.40
3234 Regional Overlay 50mm @ IRI 5-7
S
5.00
4887 Regional DBST @ Traff 4000-6000
S
1.70
4887 Regional DBST @ Traff 4000-6000
S
0.10
3516 Regional Overlay 50mm @ IRI 7-9
S
4.60 17384 Regional Rehab 150mm @ IRI 9-12
S
3.22
4887 Regional DBST @ Traff 4000-6000
S
3.10 11451 National Overlay 80mm @ IRI 4-9
S
0.40
9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.20
6500 National Overlay 50mm @ IRI 5-7
S
3.20 11451 National Overlay 50mm @ IRI 5
S
3.00
4331 Regional Overlay 60mm @ IRI 7-9
S
0.40 16332 National Full Recon 195mm @ IRI 12
S
0.50 16332 National Full Recon 195mm @ IRI 12
S
0.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
11.12
3019 Regional Overlay 50mm @ IRI 7-9
Appendix-A: Page:20 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
1.148
8.35
15.53
1.235
8.35
15.18
1.785
8.33
20.35
0.342
8.30
4.23
1.388
8.30
15.07
121.752
8.29 1006.60
1.711
8.29
23.29
11.985
8.29 140.19
22.379
8.28 299.78
2.415
8.27
37.32
0.772
8.26
9.45
0.272
8.25
8.39
4.009
8.24
44.81
49.608
8.24 554.31
3.992
8.23
50.65
99.084
8.23 813.26
0.287
8.23
4.08
6.503
8.23
67.62
0.609
8.23
6.19
0.861
8.22
12.87
29.780
8.22 232.33
0.148
8.21
5.75
1.119
8.20
8.97
55.340
8.19 667.51
4.019
8.17
45.96
7.361
8.17 202.14
2.225
8.17
68.02
0.183
8.17
1.83
84.597
8.16 720.74
4.374
8.16 119.87
18.627
8.15 187.49
1.369
8.15
15.75
0.138
8.15
3.88
0.574
8.15
7.96
12.193
8.14 147.97
10.272
8.13 111.39
11.678
8.13
96.20
14.598
8.13 120.25
2.422
8.12
33.53
0.574
8.11
8.64
22.402
8.11 246.40
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Kishoreganj
R360
Dhaka
Gazipur
R313
Rajshahi
Rajshahi
R685
Rajshahi
Sirajganj
R451
Dhaka
Narsingdi
R301
Comilla
Noakhali
R141
Chittagong Dohazari
N1
Comilla
Feni
N104
Chittagong Chittagong
N106
Rajshahi
Naogaon
R547
Khulna
Jessore
R755
Rajshahi
Natore
N502
Comilla
Noakhali
R140
Rangpur
Dinajpur
R585
Comilla
Brahmanbaria N102
Dhaka
Sherpur
R460
Comilla
Chandpur
R140
Sylhet
Habiganj
N2
Chittagong Chittagong
R163
Rangpur
Bogra
N502
Khulna
Jessore
R755
Gopalganj Rajbari
R710
Comilla
Feni
N104
Khulna
Jessore
R765
Comilla
Noakhali
R140
Khulna
Jessore
R755
Comilla
Chandpur
R140
Rajshahi
Pabna
R601
Chittagong Dohazari
R170
Sylhet
Sylhet
R250
Dhaka
Narayanganj N1
Barisal
Bhola
R890
Khulna
Satkhira
R760
Rangpur
Bogra
N502
Sylhet
Sylhet
R250
Chittagong Dohazari
N1
Comilla
Brahmanbaria N102
Comilla
Comilla
R141
Chittagong Rangamati
N106
Dhaka
Gazipur
N3
Dhaka
Mymensingh N3
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Mymensingh -Bhairab Road
Km 102.68-108.89
Mawna-Monohardi Road
Km 021.97-022.17
Rajshahi -Chowmasia Road
Km 026.00-028.30
Nalka-Sirajganj Road
Km 012.25-013.27
Tongi-Pachdona Road
Km 030.63-030.73
Lalmai-Sonaimuri Road
Km 032.52-033.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 279.18-279.28
Feni-Noakhali Road
Km 016.90-017.00
Chittagong-Rangamati Road
Km 002.10-002.60
Naogaon-Badalgachhi-Rohonpur
Km 020.09-021.89
Jessore -Chuknagar Road
Km 030.63-030.73
Bogra -Natore Road
Km 051.56-052.66
Comilla-Begumganj Road
Km 135.17-135.67
Gobindagnj-Fulbari-Dinajpur Road
Km 065.42-066.60
Comilla-Brahmanbaria Road
Km 071.59-071.79
Jamalpur-Sherpur-Bangaon Road
Km 002.50-006.71
Comilla-Begumganj Road
Km 049.90-050.40
Dhaka-Sylhet-Jaflong Road
Km 133.25-138.15
Chittagong -Chandragona Road
Km 029.80-030.10
Bogra -Natore Road
Km 010.60-010.80
Jessore -Chuknagar Road
Km 016.40-016.80
Ahaladipur-Kushtia Road
Km 016.51-016.81
Feni-Noakhali Road
Km 008.50-008.60
Khulna-Satkhira Road
Km 000.00-001.10
Comilla-Begumganj Road
Km 132.97-133.17
Jessore -Chuknagar Road
Km 021.90-022.00
Comilla-Begumganj Road
Km 055.70-056.70
Pabna-Natakhola Ferry Ghat Road
Km 039.67-042.77
Patiya-Chokoria Road
Km 006.30-006.40
Sylhet-Jakiganj Road
Km 003.30-010.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 000.70-000.90
Bhola -Char Manika Road
Km 007.20-007.77
Khulna-Satkhira Road
Km 054.16-055.36
Bogra -Natore Road
Km 007.50-008.10
Sylhet-Jakiganj Road
Km 014.10-017.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 278.38-278.48
Comilla-Brahmanbaria Road
Km 072.34-072.44
Lalmai-Sonaimuri Road
Km 018.00-018.80
Chittagong-Rangamati Road
Km 043.30-043.50
Dhaka -Mymensingh Road
Km 049.03-055.40
Dhaka -Mymensingh Road
Km 077.20-085.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
6.22
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
5572 Regional DBST @ Traff 4000-6000
S
2.30
4887 Regional DBST @ Traff 4000-6000
R
1.02
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
9193 National Overlay 50mm @ IRI 5-7
S
0.50 13468 National Overlay 80mm @ IRI 5-9
S
1.80
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.10
6500 National Overlay 50mm @ IRI 5-7
S
0.50 10112 Regional Overlay 60mm @ IRI 5.5-9
S
1.18
4887 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
4.21
4422 Regional Overlay 50mm @ IRI 5-7
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
4.90
9332 National Overlay 50mm @ IRI 4-7
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
5705 National Overlay 50mm @ IRI 5-9
S
0.40
3292 Regional DBST 25mm @ 25% Crk
S
0.30
3636 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 10112 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
3292 Regional DBST @ Traff 2000-4000
S
1.00
4887 Regional Overlay 60mm @ IRI 7-9
S
3.10
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
3516 Regional Overlay 50mm @ IRI 7-9
S
6.90
7545 Regional Overlay 60mm @ IRI 5.5-9
R
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.57
4887 Regional Overlay 60mm @ IRI 7-9
S
1.20
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60
5705 National Overlay 50mm @ IRI 5-9
S
3.00
7088 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.80
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
6.37 11451 National Overlay 80mm @ IRI 4-9
S
8.50 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:21 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
19.986
8.10
0.247
8.10
3.227
8.10
4.742
8.10
0.324
8.09
2.166
8.09
2.258
8.09
0.303
8.09
3.292
8.09
3.429
8.09
0.342
8.08
3.158
8.07
1.867
8.07
1.607
8.07
3.627
8.07
12.358
8.06
1.774
8.06
19.174
8.06
1.027
8.05
0.574
8.05
0.543
8.04
0.893
8.04
2.180
8.03
3.765
8.03
0.747
8.03
0.136
8.03
3.547
8.03
5.987
8.03
0.183
8.02
28.771
8.02
4.360
8.01
1.951
8.01
3.758
8.01
1.722
8.01
13.069
8.00
2.258
8.00
2.297
7.99
2.888
7.99
4.360
7.99
43.309
7.98
52.474
7.98
NPV
244.30
5.77
101.06
53.01
3.75
28.33
17.32
4.74
37.58
36.25
4.11
41.22
22.65
47.41
28.13
132.86
23.12
230.47
13.37
7.37
13.41
12.00
16.52
51.43
9.45
3.27
46.06
60.74
1.85
294.56
32.79
23.24
44.15
20.30
140.61
17.13
17.41
37.87
32.85
426.70
516.84
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Jessore
R755
Dhaka
Gazipur
R313
Chittagong Chittagong
R163
Sylhet
Habiganj
N2
Khulna
Satkhira
N715
Rajshahi
Naogaon
R547
Comilla
Chandpur
R140
Khulna
Jessore
R755
Dhaka
Tangail
N4
Comilla
Feni
N104
Comilla
Feni
N104
Comilla
Feni
N104
Comilla
Feni
N104
Khulna
Jessore
N7
Comilla
Feni
N104
Sylhet
Sylhet
N2
Comilla
Chandpur
R140
Barisal
Barisal
R870
Chittagong Dohazari
N1
Chittagong Dohazari
R170
Sylhet
Sylhet
N210
Chittagong Rangamati
N106
Comilla
Feni
N104
Comilla
Feni
N104
Comilla
Feni
N104
Chittagong Chittagong
R163
Chittagong Chittagong
R163
Comilla
Brahmanbaria N102
Barisal
Barisal
N8
Dhaka
Tangail
N4
Khulna
Bagerhat
R771
Chittagong Rangamati
N106
Dhaka
Tangail
N4
Comilla
Feni
N104
Comilla
Comilla
R140
Comilla
Noakhali
R142
Comilla
Brahmanbaria N102
Comilla
Feni
N104
Khulna
Khulna
R760
Comilla
Chandpur
R140
Dhaka
Mymensingh N3
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Jessore -Chuknagar Road
Km 007.30-011.60
Mawna-Monohardi Road
Km 001.70-002.70
Chittagong -Chandragona Road
Km 010.40-010.70
Dhaka-Sylhet-Jaflong Road
Km 141.07-145.55
Benapole Town Old Section
Km 000.00-000.10
Naogaon-Badalgachhi-Rohonpur
Km 030.99-031.99
Comilla-Begumganj Road
Km 063.30-064.00
Jessore -Chuknagar Road
Km 006.40-007.20
Joydebpur-Jamalpur Road
Km 069.05-069.25
Feni-Noakhali Road
Km 006.60-006.70
Feni-Noakhali Road
Km 005.90-006.00
Feni-Noakhali Road
Km 006.10-006.20
Feni-Noakhali Road
Km 007.30-007.40
Dauladia-Mongla Road
Km 145.82-146.42
Feni-Noakhali Road
Km 012.70-012.90
Dhaka-Sylhet-Jaflong Road
Km 275.49-275.89
Comilla-Begumganj Road
Km 047.00-047.70
Barisal-Pirojpur Road
Km 004.70-004.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 280.28-280.38
Patiya-Chokoria Road
Km 011.20-012.00
Sylhet Twn By-Pass Road
Km 006.60-006.90
Chittagong-Rangamati Road
Km 040.30-041.20
Feni-Noakhali Road
Km 009.20-009.30
Feni-Noakhali Road
Km 010.30-010.40
Feni-Noakhali Road
Km 010.60-010.70
Chittagong -Chandragona Road
Km 021.60-021.80
Chittagong -Chandragona Road
Km 009.70-009.90
Comilla-Brahmanbaria Road
Km 072.66-072.76
Dhaka -Patuakhali Road
Km 132.15-132.35
Joydebpur-Jamalpur Road
Km 069.75-072.65
Rupsha-Bagerhat Road
Km 031.08-031.18
Chittagong-Rangamati Road
Km 041.60-041.90
Joydebpur-Jamalpur Road
Km 075.15-075.45
Feni-Noakhali Road
Km 014.60-014.70
Comilla-Begumganj Road
Km 009.50-009.80
Begamganj-Ramganj Road
Km 001.70-002.10
Comilla-Brahmanbaria Road
Km 080.06-082.33
Feni-Noakhali Road
Km 016.70-016.90
Khulna-Satkhira Road
Km 020.00-020.30
Comilla-Begumganj Road
Km 081.40-081.90
Dhaka -Mymensingh Road
Km 067.50-067.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
4.30
4887 Regional Overlay 60mm @ IRI 7-9
S
1.00
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
4.48 11451 National Overlay 80mm @ IRI 4-9
S
0.10
9061 National DBST @ Traff >6000
S
1.00
3019 Regional Overlay 50mm @ IRI 7-9
S
0.70
4887 Regional Overlay 50mm @ IRI 5-7
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 16332 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National DBST @ Traff >6000
S
0.70
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.80
3019 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National DBST @ Traff >6000
S
0.90 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
2.90 15188 National Rehab 195mm @ IRI 9-12
S
0.10
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30 15112 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
4909 Regional Overlay 60mm @ IRI 7-9
S
0.40
9769 Regional Overlay 60mm @ IRI 5.5-9
S
2.27 15273 National DBST @ Traff >6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 11451 National Rehab 195mm @ IRI 9-12
Appendix-A: Page:22 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
14.718
7.98
1.775
7.97
1.027
7.97
27.657
7.96
0.136
7.96
1.879
7.96
2.167
7.95
2.738
7.94
5.839
7.94
2.258
7.94
2.258
7.94
2.258
7.94
2.258
7.94
11.451
7.94
4.438
7.93
0.741
7.93
3.232
7.92
0.342
7.90
2.336
7.90
1.378
7.90
0.541
7.90
16.568
7.90
2.180
7.89
2.180
7.89
2.180
7.89
0.685
7.89
0.685
7.89
2.336
7.89
3.811
7.88
57.754
7.88
0.186
7.87
6.540
7.87
6.657
7.87
2.367
7.86
1.307
7.86
1.369
7.85
3.348
7.84
4.516
7.84
1.120
7.84
1.867
7.83
9.220
7.83
NPV
195.99
19.18
13.24
324.17
4.73
23.29
29.38
36.99
47.00
16.83
16.83
16.83
16.83
88.06
33.05
26.88
36.49
3.85
17.51
13.33
16.36
126.79
16.23
16.23
16.23
5.97
8.61
17.58
29.95
462.78
2.28
48.54
49.16
17.75
14.10
16.73
106.62
33.23
14.00
23.04
72.25
Appendix-A
Annual Needs Report
2012-2013
Zone
Khulna
Chittagong
Barisal
Khulna
Khulna
Barisal
Comilla
Chittagong
Comilla
Khulna
Gopalganj
Chittagong
Comilla
Khulna
Barisal
Barisal
Comilla
Rajshahi
Comilla
Gopalganj
Comilla
Khulna
Khulna
Rajshahi
Khulna
Khulna
Khulna
Comilla
Comilla
Khulna
Khulna
Dhaka
Khulna
Khulna
Comilla
Comilla
Rajshahi
Chittagong
Comilla
Gopalganj
Chittagong
Division
Jessore
Dohazari
Jhalokati
Jhenaidah
Jhenaidah
Jhalokati
Chandpur
Chittagong
Noakhali
Kushtia
Rajbari
Rangamati
Chandpur
Jessore
Barisal
Barisal
Feni
Nawabganj
Chandpur
Sariatpur
Feni
Jessore
Jessore
Natore
Khulna
Kushtia
Satkhira
Feni
Noakhali
Jessore
Jessore
Manikganj
Satkhira
Jessore
Noakhali
Chandpur
Rajshahi
Dohazari
Chandpur
Sariatpur
Dohazari
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N7
N1
R870
N7
N704
R870
R140
R163
R142
R710
R710
N106
R140
N7
N8
N8
N104
R547
R140
R861
N104
N707
R755
R548
R760
R710
R765
N104
R142
N7
N7
R506
R765
N7
R142
R140
N603
R170
R140
R861
N1
Road Name
Chainage
Dauladia-Mongla Road
Km 143.42-143.52
Dhaka -Comilla -Chittagong-Teknaf RoKm 279.28-280.28
Barisal-Pirojpur Road
Km 017.55-018.05
Dauladia-Mongla Road
Km 105.52-106.82
Jhenaidah-Dasuria Road
Km 007.20-007.50
Barisal-Pirojpur Road
Km 025.57-026.87
Comilla-Begumganj Road
Km 053.60-053.80
Chittagong -Chandragona Road
Km 031.20-031.30
Begamganj-Ramganj Road
Km 002.90-003.90
Ahaladipur-Kushtia Road
Km 059.95-060.55
Ahaladipur-Kushtia Road
Km 015.71-016.11
Chittagong-Rangamati Road
Km 039.50-039.60
Comilla-Begumganj Road
Km 079.70-079.80
Dauladia-Mongla Road
Km 143.12-143.22
Dhaka -Patuakhali Road
Km 132.05-132.15
Dhaka -Patuakhali Road
Km 132.35-132.45
Feni-Noakhali Road
Km 000.70-000.90
Naogaon-Badalgachhi-Rohonpur
Km 089.77-091.67
Comilla-Begumganj Road
Km 064.10-064.30
Monohar -Shariatpur Road
Km 003.00-003.40
Feni-Noakhali Road
Km 012.00-012.40
Jessore Town Old Section
Km 001.50-001.60
Jessore -Chuknagar Road
Km 021.00-021.30
Naogaon-Atrai-Natore Road
Km 037.29-038.99
Khulna-Satkhira Road
Km 028.70-029.00
Ahaladipur-Kushtia Road
Km 061.35-062.95
Khulna-Satkhira Road
Km 040.69-040.79
Feni-Noakhali Road
Km 006.20-006.60
Begamganj-Ramganj Road
Km 008.70-010.60
Dauladia-Mongla Road
Km 148.82-150.22
Dauladia-Mongla Road
Km 144.82-145.42
Aricha -Daulatpur-Tangail Road
Km 003.90-005.00
Khulna-Satkhira Road
Km 022.60-022.80
Dauladia-Mongla Road
Km 145.52-145.82
Begamganj-Ramganj Road
Km 004.40-007.50
Comilla-Begumganj Road
Km 076.90-077.50
Rajshahi Town By-Pass Road
Km 006.90-009.30
Patiya-Chokoria Road
Km 012.50-012.90
Comilla-Begumganj Road
Km 046.70-046.90
Monohar -Shariatpur Road
Km 002.10-002.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 278.78-279.08
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
5636 National Overlay 50mm @ IRI 4-9
S
1.00 11451 National Rehab 195mm @ IRI 9-12
S
0.50
4887 Regional Overlay 50mm @ IRI 5-7
S
1.30 11451 National Rehab 195mm @ IRI 9-12
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
1.30
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
1.00
9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.60
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40
3636 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 10297 Regional DBST 25mm @ 25% Crk
S
0.10
5636 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
1.90
3019 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional DBST @ Traff 4000-6000
S
0.40
4885 Regional DBST @ Traff 4000-6000
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
3292 Regional DBST @ Traff 2000-4000
S
1.70
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
1.60
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.40 11451 National Rehab 195mm @ IRI 9-12
S
1.90
9769 Regional Overlay 60mm @ IRI 5.5-9
S
1.40 11451 National Rehab 195mm @ IRI 9-12
S
0.60 11451 National Full Recon 195mm @ IRI 12
S
1.10
3019 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
3.10
9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
2.40
3802 National Overlay 50mm @ IRI 5-9
S
0.40
3019 Regional Overlay 50mm @ IRI 5-7
S
0.20
8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.40
4885 Regional Overlay 60mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:23 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.287
7.83
18.010
7.83
1.435
7.82
22.454
7.82
1.803
7.82
4.450
7.82
0.709
7.81
0.287
7.81
3.423
7.81
1.722
7.80
1.190
7.80
2.413
7.78
0.148
7.78
0.287
7.77
2.413
7.77
2.413
7.77
3.442
7.76
3.669
7.76
0.287
7.75
0.543
7.75
8.875
7.74
2.413
7.74
0.408
7.74
3.549
7.73
1.120
7.72
4.593
7.72
0.136
7.71
7.130
7.70
6.503
7.69
25.213
7.69
13.176
7.68
1.975
7.68
0.574
7.68
6.773
7.68
10.611
7.67
2.240
7.65
9.145
7.65
0.737
7.65
1.033
7.64
1.369
7.64
6.773
7.64
NPV
4.15
136.59
20.40
171.54
19.88
56.23
8.84
4.00
42.09
21.74
15.35
17.81
5.45
4.08
17.78
17.78
25.52
35.99
8.12
15.76
64.51
17.84
12.58
41.89
15.61
57.39
3.40
52.09
73.06
186.48
95.03
19.17
7.23
49.05
133.60
27.73
111.97
6.70
11.26
12.82
49.12
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Rangamati
N106
Chittagong Dohazari
N1
Comilla
Chandpur
R140
Khulna
Jessore
R755
Khulna
Satkhira
R765
Khulna
Jhenaidah
N7
Comilla
Chandpur
R140
Khulna
Jhenaidah
N7
Rangpur
Dinajpur
R585
Khulna
Jhenaidah
R745
Comilla
Feni
N104
Chittagong Khagrachari
R160
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Gopalganj Rajbari
R710
Rangpur
Dinajpur
R585
Comilla
Brahmanbaria N2
Rangpur
Bogra
N515
Rajshahi
Pabna
N704
Chittagong Rangamati
N106
Comilla
Chandpur
R140
Rajshahi
Rajshahi
N603
Gopalganj Madaripur
R860
Khulna
Jhenaidah
N703
Comilla
Feni
N104
Chittagong Chittagong
N1
Comilla
Brahmanbaria N102
Rajshahi
Pabna
R601
Dhaka
Narayanganj N1
Gopalganj Madaripur
R860
Barisal
Barisal
N8
Comilla
Comilla
R141
Comilla
Feni
N104
Comilla
Noakhali
R142
Dhaka
Munshiganj
R820
Comilla
Chandpur
R140
Chittagong Khagrachari
R160
Dhaka
Gazipur
N4
Khulna
Jessore
N706
Rajshahi
Naogaon
R547
Dhaka
Mymensingh N3
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chittagong-Rangamati Road
Km 047.16-047.36
Dhaka -Comilla -Chittagong-Teknaf RoKm 278.18-278.38
Comilla-Begumganj Road
Km 068.80-068.90
Jessore -Chuknagar Road
Km 015.20-016.30
Khulna-Satkhira Road
Km 031.09-032.39
Dauladia-Mongla Road
Km 116.92-117.22
Comilla-Begumganj Road
Km 074.90-075.90
Dauladia-Mongla Road
Km 121.32-122.92
Gobindagnj-Fulbari-Dinajpur Road
Km 103.46-103.56
Kushtia -Jhenaidah Road
Km 110.56-110.66
Feni-Noakhali Road
Km 015.00-016.70
Hathazari-Khagrachhari Road
Km 046.70-049.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 213.18-213.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 213.78-213.88
Ahaladipur-Kushtia Road
Km 000.40-000.60
Gobindagnj-Fulbari-Dinajpur Road
Km 053.54-054.02
Dhaka-Sylhet-Jaflong Road
Km 074.84-075.24
Bogra 2nd Town By-Pass Road
Km 000.00-000.10
Jhenaidah-Dasuria Road
Km 070.40-081.39
Chittagong-Rangamati Road
Km 033.60-039.50
Comilla-Begumganj Road
Km 082.00-082.10
Rajshahi Town By-Pass Road
Km 002.30-003.90
Mostafapur-Chandpur Road
Km 002.90-003.90
Jhenaidah Town Old Section
Km 003.30-003.40
Feni-Noakhali Road
Km 006.70-007.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 196.48-196.58
Comilla-Brahmanbaria Road
Km 071.79-072.19
Pabna-Natakhola Ferry Ghat Road
Km 047.07-047.87
Dhaka -Comilla -Chittagong-Teknaf RoKm 012.60-016.50
Mostafapur-Chandpur Road
Km 004.60-005.00
Dhaka -Patuakhali Road
Km 138.85-139.05
Lalmai-Sonaimuri Road
Km 024.42-024.52
Feni-Noakhali Road
Km 011.20-011.40
Begamganj-Ramganj Road
Km 000.50-001.50
Zinzira-Srinagar Road
Km 040.28-041.48
Comilla-Begumganj Road
Km 084.72-084.92
Hathazari-Khagrachhari Road
Km 049.20-050.00
Joydebpur-Jamalpur Road
Km 019.47-019.67
Jessore -Benapole Road
Km 029.40-030.10
Naogaon-Badalgachhi-Rohonpur
Km 019.19-020.09
Dhaka -Mymensingh Road
Km 059.30-064.80
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.10
3292 Regional Overlay 50mm @ IRI 5-7
S
1.30
4887 Regional DBST @ Traff 4000-6000
S
0.30
6605 National Overlay 60mm @ IRI 7-9
S
1.00
4887 Regional Overlay 60mm @ IRI 7-9
S
1.60
6605 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
1.70 11451 National Rehab 195mm @ IRI 9-12
S
2.40
3362 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
6238 Regional DBST @ Traff >6000
S
0.48
4331 Regional Overlay 60mm @ IRI 7-9
S
0.40 12330 National Overlay 50mm @ IRI 4
S
0.10 11451 National Overlay 50mm @ IRI 5
S
10.99
6607 National Overlay 60mm @ IRI 7-9
S
5.90 11451 National Full Recon 195mm @ IRI 12
S
0.10 10297 Regional Overlay 60mm @ IRI 5.5-9
S
1.60
3802 National Overlay 50mm @ IRI 5-9
S
1.00
5672 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.80
3019 Regional Overlay 50mm @ IRI 7-9
R
3.90 11451 National Overlay 80mm @ IRI 4-9
S
0.40
5672 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.00
9769 Regional Overlay 60mm @ IRI 5.5-9
S
1.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 10297 Regional DBST @ Traff >6000
S
0.80
3362 Regional Overlay 50mm @ IRI 7-9
S
0.20 16227 National Rehab 195mm @ IRI 9-12
S
0.70
7314 National Overlay 60mm @ IRI 7-9
S
0.90
3019 Regional Overlay 50mm @ IRI 5-7
S
5.50 11451 National Overlay 80mm @ IRI 4-9
Appendix-A: Page:24 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
4.360
7.64
3.565
7.64
0.373
7.63
3.158
7.63
1.766
7.63
1.214
7.61
3.734
7.61
6.013
7.60
0.342
7.60
0.287
7.60
30.460
7.60
4.760
7.59
2.491
7.59
2.491
7.59
0.282
7.59
1.629
7.59
1.566
7.58
0.381
7.57
50.530
7.57
129.763
7.55
0.436
7.54
6.096
7.54
3.423
7.53
2.336
7.53
10.695
7.53
2.297
7.52
9.187
7.52
1.545
7.52
27.062
7.52
1.369
7.51
4.648
7.51
0.361
7.51
4.360
7.50
3.423
7.49
4.182
7.49
0.296
7.49
1.587
7.49
4.610
7.49
3.311
7.48
1.715
7.48
34.497
7.47
NPV
31.42
26.18
4.55
37.89
50.42
15.82
45.93
90.73
4.10
3.58
220.99
48.99
18.05
18.05
8.00
15.40
15.67
5.86
692.19
919.92
5.24
73.57
33.69
16.68
76.39
16.40
65.55
18.09
299.57
12.99
33.31
4.32
30.87
39.95
47.10
9.96
15.53
34.95
43.27
16.21
318.18
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Chandpur
R140
Chittagong Chittagong
R151
Comilla
Noakhali
R140
Khulna
Jessore
R765
Comilla
Comilla
R140
Dhaka
Narayanganj N1
Chittagong Dohazari
N1
Comilla
Comilla
R141
Khulna
Satkhira
R765
Rajshahi
Nawabganj
R547
Comilla
Brahmanbaria N102
Rajshahi
Sirajganj
N5
Comilla
Comilla
R140
Barisal
Bhola
N809
Khulna
Jessore
N707
Rangpur
Bogra
R550
Comilla
Feni
N104
Rajshahi
Naogaon
R547
Chittagong Dohazari
N1
Chittagong Chittagong
N1
Comilla
Feni
N104
Gopalganj Madaripur
R860
Dhaka
Narayanganj N1
Khulna
Jessore
N7
Chittagong Chittagong
N1
Rajshahi
Sirajganj
N405
Rangpur
Thakurgaon
N5
Dhaka
Gazipur
R301
Chittagong Chittagong
N1
Khulna
Chuadanga
R745
Comilla
Brahmanbaria N102
Rangpur
Thakurgaon
N5
Khulna
Jessore
N7
Dhaka
Gazipur
N3
Rangpur
Bogra
R550
Khulna
Jessore
R755
Khulna
Jhenaidah
N7
Comilla
Comilla
R140
Chittagong Chittagong
N1
Khulna
Magura
N7
Gopalganj Faridpur
N803
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Comilla-Begumganj Road
Km 070.00-071.20
Baraiyerhat-Fatikchhari Road
Km 000.90-001.50
Comilla-Begumganj Road
Km 136.97-137.37
Khulna-Satkhira Road
Km 013.80-016.00
Comilla-Begumganj Road
Km 026.59-026.69
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.20-009.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 280.78-281.18
Lalmai-Sonaimuri Road
Km 030.62-031.52
Khulna-Satkhira Road
Km 030.29-030.39
Naogaon-Badalgachhi-Rohonpur
Km 091.87-094.57
Comilla-Brahmanbaria Road
Km 072.86-074.36
Dhaka -Utholi-Banglabandh Road
Km 132.71-134.51
Comilla-Begumganj Road
Km 013.46-013.66
Barishal-Lakshmipur Road
Km 030.39-030.69
Jessore Town Old Section
Km 001.20-001.40
Mokamtala-Joypurhat Road
Km 005.60-005.80
Feni-Noakhali Road
Km 009.80-010.00
Naogaon-Badalgachhi-Rohonpur
Km 023.49-023.79
Dhaka -Comilla -Chittagong-Teknaf RoKm 276.58-276.88
Dhaka -Comilla -Chittagong-Teknaf RoKm 197.28-197.38
Feni-Noakhali Road
Km 005.10-005.30
Mostafapur-Chandpur Road
Km 007.50-007.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 001.30-002.50
Dauladia-Mongla Road
Km 138.86-139.32
Dhaka -Comilla -Chittagong-Teknaf RoKm 194.48-194.88
Elenga-Hatikamrul Road
Km 036.25-040.81
Dhaka -Utholi-Banglabandh Road
Km 405.20-408.20
Tongi-Pachdona Road
Km 008.00-008.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 194.28-194.48
Kushtia -Jhenaidah Road
Km 071.98-073.98
Comilla-Brahmanbaria Road
Km 055.10-055.21
Dhaka -Utholi-Banglabandh Road
Km 416.07-422.27
Dauladia-Mongla Road
Km 146.62-148.02
Dhaka -Mymensingh Road
Km 014.70-014.80
Mokamtala-Joypurhat Road
Km 011.20-014.20
Jessore -Chuknagar Road
Km 033.33-034.13
Dauladia-Mongla Road
Km 117.32-117.72
Comilla-Begumganj Road
Km 029.49-030.61
Dhaka -Comilla -Chittagong-Teknaf RoKm 193.88-194.28
Dauladia-Mongla Road
Km 100.71-101.21
Faridpur Town Old section
Km 002.60-003.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.60
3019 Regional Overlay 50mm @ IRI 7-9
S
0.40 10112 Regional Overlay 60mm @ IRI 5.5-9
S
2.20
4887 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
L
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
2.70
3019 Regional Overlay 50mm @ IRI 7-9
S
1.50 11451 National Full Recon 195mm @ IRI 12
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.30
9061 National DBST 25mm @ 25% Crk
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
3234 Regional Overlay 50mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.30
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
R
1.20 11451 National Rehab 195mm @ IRI 9-12
S
0.46
5636 National Overlay 50mm @ IRI 4-9
S
0.40 11451 National Rehab 195mm @ IRI 9-12
S
4.56 11451 National DBST @ Traff >6000
S
3.00
3083 National Overlay 50mm @ IRI 4-9
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.00
4887 Regional Overlay 60mm @ IRI 7-9
S
0.11 11451 National Full Recon 195mm @ IRI 12
S
6.20
3083 National Overlay 50mm @ IRI 4-9
S
1.40 11451 National Rehab 195mm @ IRI 9-12
R
0.10
8665 National Overlay 50mm @ IRI 4-7
S
3.00
3234 Regional Overlay 50mm @ IRI 7-9
S
0.80
4887 Regional DBST @ Traff 4000-6000
S
0.40
6605 National Overlay 60mm @ IRI 7-9
S
1.12
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.50
7850 National Overlay 60mm @ IRI 7-9
S
0.50 24928 National Rehab 195mm @ IRI 9-12
Appendix-A: Page:25 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
4.600
7.47
1.190
7.47
1.494
7.46
2.989
7.46
0.313
7.46
0.609
7.45
9.343
7.45
3.305
7.45
0.136
7.44
5.214
7.44
34.159
7.44
10.816
7.44
0.697
7.43
0.408
7.43
4.827
7.42
0.574
7.42
4.360
7.42
0.564
7.42
6.773
7.41
2.336
7.41
4.516
7.41
0.709
7.41
24.709
7.41
1.372
7.41
7.290
7.40
8.222
7.40
9.395
7.39
0.138
7.39
4.827
7.38
8.613
7.37
2.354
7.37
19.417
7.37
28.828
7.37
0.391
7.36
8.612
7.36
1.087
7.36
1.618
7.35
3.688
7.35
9.047
7.35
2.272
7.34
11.955
7.34
NPV
55.54
12.53
16.95
83.41
4.04
5.60
66.03
39.81
3.20
50.71
240.98
99.30
7.70
12.95
34.21
5.68
30.50
5.46
47.64
16.53
31.41
8.96
179.24
21.65
52.27
191.15
110.79
3.19
33.99
91.36
16.37
242.13
214.19
5.97
84.47
29.22
22.00
43.68
62.72
29.15
86.13
Appendix-A
Annual Needs Report
2012-2013
Road
No
Gopalganj Sariatpur
R860
Chittagong Dohazari
N1
Rangpur
Rangpur
N506
Comilla
Brahmanbaria N102
Khulna
Jhenaidah
R745
Khulna
Jhenaidah
R745
Chittagong Chittagong
R151
Comilla
Chandpur
R140
Dhaka
Tangail
N4
Chittagong Rangamati
N106
Chittagong Dohazari
N1
Rangpur
Gaibanda
R585
Khulna
Jhenaidah
N7
Dhaka
Gazipur
R315
Khulna
Jhenaidah
N7
Sylhet
Sylhet
N210
Dhaka
Gazipur
R315
Khulna
Jhenaidah
N7
Khulna
Jhenaidah
N7
Chittagong Chittagong
N1
Khulna
Jhenaidah
N7
Comilla
Chandpur
R140
Sylhet
Sylhet
R250
Khulna
Jhenaidah
R748
Khulna
Satkhira
R765
Rangpur
Rangpur
N506
Comilla
Chandpur
R140
Dhaka
Gazipur
N3
Barisal
Barisal
N8
Khulna
Jessore
R765
Khulna
Chuadanga
R747
Chittagong Khagrachari
R160
Khulna
Meherpur
R745
Dhaka
Narayanganj N1
Gopalganj Sariatpur
R861
Khulna
Jhenaidah
N7
Rangpur
Bogra
N502
Dhaka
Tangail
N4
Rangpur
Bogra
R550
Rajshahi
Natore
R548
Chittagong Chittagong
N106
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Mostafapur-Chandpur Road
Km 019.88-020.18
Dhaka -Comilla -Chittagong-Teknaf RoKm 292.18-292.28
Rangpur-Barobari-Kurigram Road
Km 003.10-019.25
Comilla-Brahmanbaria Road
Km 074.46-075.96
Kushtia -Jhenaidah Road
Km 107.36-110.46
Kushtia -Jhenaidah Road
Km 114.56-114.66
Baraiyerhat-Fatikchhari Road
Km 003.20-003.30
Comilla-Begumganj Road
Km 052.80-053.00
Joydebpur-Jamalpur Road
Km 120.41-120.51
Chittagong-Rangamati Road
Km 046.40-046.96
Dhaka -Comilla -Chittagong-Teknaf RoKm 279.08-279.18
Gobindagnj-Fulbari-Dinajpur Road
Km 005.10-028.15
Dauladia-Mongla Road
Km 107.12-107.22
Mawna-Nabinagar Road
Km 032.50-033.60
Dauladia-Mongla Road
Km 108.12-108.22
Sylhet Twn By-Pass Road
Km 007.20-009.40
Mawna-Nabinagar Road
Km 000.00-030.60
Dauladia-Mongla Road
Km 112.72-114.12
Dauladia-Mongla Road
Km 130.22-135.52
Dhaka -Comilla -Chittagong-Teknaf RoKm 214.18-214.38
Dauladia-Mongla Road
Km 116.22-116.82
Comilla-Begumganj Road
Km 064.50-065.00
Sylhet-Jakiganj Road
Km 010.70-013.50
Chuadanga-Kaliganj Road
Km 052.50-053.00
Khulna-Satkhira Road
Km 032.59-033.79
Rangpur-Barobari-Kurigram Road
Km 019.25-019.45
Comilla-Begumganj Road
Km 036.99-038.49
Dhaka -Mymensingh Road
Km 014.80-015.30
Dhaka -Patuakhali Road
Km 123.75-126.85
Khulna-Satkhira Road
Km 011.80-012.70
Kushtia -Chuadanga Road
Km 033.04-033.44
Hathazari-Khagrachhari Road
Km 051.20-051.40
Kushtia -Jhenaidah Road
Km 064.48-064.68
Dhaka -Comilla -Chittagong-Teknaf RoKm 001.20-001.30
Monohar -Shariatpur Road
Km 005.00-005.20
Dauladia-Mongla Road
Km 114.42-114.82
Bogra -Natore Road
Km 003.60-004.50
Joydebpur-Jamalpur Road
Km 123.01-123.31
Mokamtala-Joypurhat Road
Km 000.00-002.40
Naogaon-Atrai-Natore Road
Km 029.58-035.89
Chittagong-Rangamati Road
Km 022.20-022.30
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
16.15
7068 National DBST @ Traff >6000
S
1.50 11451 National Full Recon 195mm @ IRI 12
S
3.10
4887 Regional DBST @ Traff 4000-6000
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
3019 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional DBST 25mm @ 25% Crk
S
0.10
3779 National Overlay 50mm @ IRI 4-9
S
0.56 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
23.05
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.10
2048 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.20 11451 National DBST @ Traff >6000
S
30.60
3372 Regional Overlay 50mm @ IRI 7-9
S
1.40
6605 National Overlay 50mm @ IRI 4-7
S
5.30
5636 National Overlay 50mm @ IRI 4-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.60
6605 National Overlay 50mm @ IRI 4-7
S
0.50
4887 Regional DBST @ Traff 4000-6000
S
2.80
7545 Regional Overlay 60mm @ IRI 5.5-9
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
1.20
4887 Regional DBST 25mm @ 25% Crk
S
0.20
7068 National Overlay 60mm @ IRI 7-9
S
1.50
8423 Regional Overlay 60mm @ IRI 5.5-9
R
0.50
8665 National Overlay 60mm @ IRI 7-9
S
3.10 11451 National Full Recon 195mm @ IRI 12
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
3362 Regional Overlay 50mm @ IRI 7-9
S
0.20
4283 Regional DBST @ Traff 4000-6000
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
4885 Regional Overlay 50mm @ IRI 5-7
S
0.40
6605 National Overlay 50mm @ IRI 4-7
S
0.90
5705 National DBST @ Traff 4000-6000
S
0.30
3779 National Overlay 50mm @ IRI 4-9
S
2.40
4887 Regional Overlay 60mm @ IRI 7-9
S
6.31
3019 Regional DBST @ Traff 2000-4000
S
0.10 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:26 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.027
7.34
2.491
7.34
21.941
7.33
34.859
7.33
4.211
7.32
0.342
7.31
0.094
7.31
0.285
7.31
0.287
7.31
12.099
7.30
2.258
7.29
31.312
7.29
2.530
7.29
1.780
7.29
2.530
7.29
3.967
7.28
60.053
7.28
4.019
7.28
17.013
7.28
4.983
7.27
1.989
7.27
0.716
7.27
12.198
7.26
1.711
7.26
1.630
7.26
0.685
7.26
5.629
7.25
2.334
7.24
73.973
7.24
3.081
7.24
1.253
7.23
0.397
7.23
0.272
7.22
2.608
7.22
0.501
7.21
1.148
7.21
1.223
7.20
0.861
7.20
8.215
7.20
6.236
7.20
2.258
7.20
NPV
12.02
17.45
612.52
243.80
112.66
3.76
1.96
7.15
3.44
83.32
15.62
712.97
18.10
15.04
18.09
90.78
662.49
54.65
266.25
34.59
27.01
19.02
125.82
19.34
43.23
7.68
58.67
31.22
511.11
33.51
15.66
3.51
6.30
18.12
5.46
15.47
34.26
9.89
84.23
159.87
15.25
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Chittagong
N106
Comilla
Feni
N104
Gopalganj Rajbari
R710
Khulna
Jessore
R765
Comilla
Feni
N104
Chittagong Chittagong
N1
Khulna
Jhenaidah
N7
Khulna
Kushtia
R710
Dhaka
Kishoreganj
R360
Dhaka
Tangail
N4
Rajshahi
Rajshahi
R685
Khulna
Jhenaidah
R748
Gopalganj Rajbari
R710
Comilla
Chandpur
R140
Rajshahi
Rajshahi
R685
Sylhet
Sylhet
R250
Khulna
Jessore
R755
Khulna
Jhenaidah
R748
Barisal
Barisal
N8
Khulna
Jessore
R755
Rangpur
Thakurgaon
N5
Dhaka
Dhaka
N3
Khulna
Khulna
N7
Rajshahi
Sirajganj
N5
Dhaka
Tangail
N4
Chittagong Chittagong
R163
Rajshahi
Sirajganj
R451
Comilla
Feni
N104
Comilla
Noakhali
R142
Dhaka
Dhaka
N3
Khulna
Jessore
N7
Khulna
Jessore
N7
Khulna
Jessore
N7
Chittagong Chittagong
N1
Comilla
Feni
N104
Comilla
Brahmanbaria N102
Chittagong Rangamati
N106
Dhaka
Narayanganj N1
Dhaka
Munshiganj
R812
Dhaka
Kishoreganj
R360
Gopalganj Gopalganj
R850
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chittagong-Rangamati Road
Km 022.50-022.60
Feni-Noakhali Road
Km 011.70-012.00
Ahaladipur-Kushtia Road
Km 009.60-009.70
Khulna-Satkhira Road
Km 012.90-013.20
Feni-Noakhali Road
Km 014.80-015.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 198.08-198.18
Dauladia-Mongla Road
Km 107.02-107.12
Ahaladipur-Kushtia Road
Km 048.75-051.45
Mymensingh -Bhairab Road
Km 109.68-116.10
Joydebpur-Jamalpur Road
Km 036.49-036.59
Rajshahi -Chowmasia Road
Km 007.00-010.00
Chuadanga-Kaliganj Road
Km 058.80-064.20
Ahaladipur-Kushtia Road
Km 026.11-026.71
Comilla-Begumganj Road
Km 082.20-082.50
Rajshahi -Chowmasia Road
Km 029.82-030.12
Sylhet-Jakiganj Road
Km 013.50-014.10
Jessore -Chuknagar Road
Km 028.23-030.13
Chuadanga-Kaliganj Road
Km 057.10-058.70
Dhaka -Patuakhali Road
Km 160.80-169.00
Jessore -Chuknagar Road
Km 030.83-032.33
Dhaka -Utholi-Banglabandh Road
Km 399.80-400.60
Dhaka -Mymensingh Road
Km 009.10-010.00
Dauladia-Mongla Road
Km 188.77-189.49
Dhaka -Utholi-Banglabandh Road
Km 146.71-147.11
Joydebpur-Jamalpur Road
Km 114.46-117.51
Chittagong -Chandragona Road
Km 022.50-022.80
Nalka-Sirajganj Road
Km 005.90-006.90
Feni-Noakhali Road
Km 006.00-006.10
Begamganj-Ramganj Road
Km 022.55-022.95
Dhaka -Mymensingh Road
Km 009.10-010.00
Dauladia-Mongla Road
Km 148.72-148.82
Dauladia-Mongla Road
Km 148.02-148.12
Dauladia-Mongla Road
Km 143.72-143.82
Dhaka -Comilla -Chittagong-Teknaf RoKm 201.08-201.18
Feni-Noakhali Road
Km 000.20-000.40
Comilla-Brahmanbaria Road
Km 055.21-057.41
Chittagong-Rangamati Road
Km 039.60-040.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 016.60-016.90
Fatullah -Mawa Road
Km 010.42-011.32
Mymensingh -Bhairab Road
Km 095.98-102.68
Tekerhat-Mollahhat Road
Km 033.00-033.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10
6238 Regional Overlay 60mm @ IRI 5.5-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
2.70
4887 Regional DBST @ Traff 4000-6000
S
6.42
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
3.00
6330 Regional Overlay 60mm @ IRI 5.5-9
S
5.40
4887 Regional DBST @ Traff 4000-6000
S
0.60
3636 Regional DBST @ Traff 2000-4000
S
0.30 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
0.60
7545 Regional Overlay 60mm @ IRI 5.5-9
S
1.90
4887 Regional DBST @ Traff 4000-6000
S
1.60
4887 Regional DBST @ Traff 4000-6000
S
8.20 11451 National Full Recon 195mm @ IRI 12
S
1.50
4887 Regional DBST @ Traff 4000-6000
S
0.80 11451 National Rehab 195mm @ IRI 9-12
L
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.72
7406 National Overlay 50mm @ IRI 4-7
S
0.40 11451 National Rehab 195mm @ IRI 9-12
S
3.05
3779 National Overlay 50mm @ IRI 4-9
S
0.30
7612 Regional Overlay 60mm @ IRI 5.5-9
S
1.00
4965 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40
7837 Regional Overlay 60mm @ IRI 5.5-9
R
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
5636 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.20 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
R
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
S
6.70
4887 Regional Overlay 50mm @ IRI 5-7
S
0.70
3497 Regional Overlay 50mm @ IRI 7-9
Appendix-A: Page:27 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
2.258
7.20
15.25
6.633
7.19
44.79
0.386
7.19
3.94
0.861
7.19
10.55
4.827
7.18
32.89
2.336
7.18
16.01
1.998
7.18
14.37
3.668
7.16
95.95
9.008
7.16 221.66
2.305
7.15
16.49
11.557
7.14 104.01
7.736
7.14 201.76
0.845
7.12
21.34
1.143
7.12
12.22
0.861
7.12
10.59
2.614
7.11
28.37
2.581
7.11
67.05
2.292
7.10
59.49
199.182
7.10 1359.27
2.038
7.10
54.11
14.752
7.09 101.37
12.594
7.09 110.21
2.532
7.09
36.47
8.974
7.09
64.37
10.230
7.08 117.11
1.027
7.08
8.04
3.423
7.08
28.82
2.258
7.08
15.00
1.369
7.07
12.23
12.594
7.07 109.90
2.608
7.07
18.17
2.608
7.07
18.17
0.324
7.06
4.27
2.608
7.06
17.73
4.360
7.06
29.04
48.301
7.05 321.40
9.654
7.05
64.58
6.878
7.05
48.49
3.081
7.04
34.59
21.997
7.04 213.65
2.010
7.03
23.13
Appendix-A
Annual Needs Report
2012-2013
Zone
Chittagong
Dhaka
Barisal
Rangpur
Comilla
Comilla
Comilla
Chittagong
Rangpur
Sylhet
Khulna
Khulna
Dhaka
Dhaka
Dhaka
Khulna
Khulna
Comilla
Khulna
Khulna
Khulna
Chittagong
Rajshahi
Chittagong
Comilla
Chittagong
Barisal
Sylhet
Khulna
Dhaka
Dhaka
Chittagong
Khulna
Gopalganj
Chittagong
Dhaka
Chittagong
Chittagong
Dhaka
Chittagong
Chittagong
Division
Chittagong
Gazipur
Barisal
Bogra
Comilla
Noakhali
Noakhali
Chittagong
Lalmonirhat
Sylhet
Jhenaidah
Satkhira
Gazipur
Narsingdi
Gazipur
Kushtia
Jessore
Comilla
Jhenaidah
Magura
Jessore
Chittagong
Rajshahi
Chittagong
Chandpur
Dohazari
Barisal
Habiganj
Jessore
Gazipur
Narayanganj
Rangamati
Khulna
Faridpur
Chittagong
Dhaka
Chittagong
Chittagong
Narsingdi
Dohazari
Chittagong
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N1
R313
N8
N502
R140
N104
R142
N1
N506
N2
N7
R765
R302
R210
R311
R710
R755
R140
R745
N7
N7
N106
N603
R163
R140
R170
N809
R220
R765
R301
N1
N106
N7
N803
R163
N501
N1
N1
R310
N1
R163
Road Name
Chainage
Dhaka -Comilla -Chittagong-Teknaf RoKm 213.28-213.78
Mawna-Monohardi Road
Km 017.47-017.77
Dhaka -Patuakhali Road
Km 120.65-123.75
Bogra -Natore Road
Km 012.30-013.10
Comilla-Begumganj Road
Km 012.30-013.36
Feni-Noakhali Road
Km 045.48-045.58
Begamganj-Ramganj Road
Km 026.35-027.25
Dhaka -Comilla -Chittagong-Teknaf RoKm 199.58-199.68
Rangpur-Barobari-Kurigram Road
Km 022.65-022.85
Dhaka-Sylhet-Jaflong Road
Km 273.49-273.59
Dauladia-Mongla Road
Km 108.22-110.32
Khulna-Satkhira Road
Km 023.40-024.40
Kaliganj Bazr Road
Km 003.80-004.20
Shahepratap-Narsingdi Road
Km 000.00-004.73
Joydebpur -Ordinance Factory
Km 003.50-003.60
Ahaladipur-Kushtia Road
Km 045.00-048.25
Jessore -Chuknagar Road
Km 000.60-001.20
Comilla-Begumganj Road
Km 024.99-025.09
Kushtia -Jhenaidah Road
Km 110.86-112.46
Dauladia-Mongla Road
Km 076.81-077.31
Dauladia-Mongla Road
Km 142.12-142.82
Chittagong-Rangamati Road
Km 015.20-015.30
Rajshahi Town By-Pass Road
Km 004.60-006.30
Chittagong -Chandragona Road
Km 021.80-022.50
Comilla-Begumganj Road
Km 035.09-035.89
Patiya-Chokoria Road
Km 000.80-000.90
Barishal-Lakshmipur Road
Km 000.40-000.70
Sarail-Habiganj Road
Km 022.18-022.28
Khulna-Satkhira Road
Km 013.30-013.70
Tongi-Pachdona Road
Km 000.86-000.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 020.08-020.18
Chittagong-Rangamati Road
Km 043.50-046.40
Dauladia-Mongla Road
Km 212.92-213.88
Faridpur Town Old section
Km 004.60-005.40
Chittagong -Chandragona Road
Km 000.30-000.50
Mirpur Bridge-Dhour Road
Km 005.10-008.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 195.58-195.88
Dhaka -Comilla -Chittagong-Teknaf RoKm 185.28-185.98
Joydebpur-Itakhola Road
Km 034.73-043.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 255.54-255.64
Chittagong -Chandragona Road
Km 024.50-024.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.50 11451 National Full Recon 195mm @ IRI 12
S
0.30
3571 Regional Overlay 50mm @ IRI 7-9
S
3.10 11451 National Full Recon 195mm @ IRI 12
S
0.80
5705 National Overlay 50mm @ IRI 5-9
S
1.06
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.90
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
7068 National Overlay 50mm @ IRI 5-7
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
2.10
6605 National Overlay 50mm @ IRI 4-7
S
1.00
4887 Regional Overlay 60mm @ IRI 7-9
S
0.40
3076 Regional Overlay 50mm @ IRI 7-9
S
4.73
8494 Regional DBST 25mm @ 25% Crk
S
0.10
2929 Regional Overlay 50mm @ IRI 7-9
S
3.25
4887 Regional Overlay 60mm @ IRI 7-9
S
0.60
4887 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.60
4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.70
5636 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.70
3802 National Overlay 50mm @ IRI 5-9
S
0.70
7612 Regional DBST @ Traff >6000
S
0.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10
3516 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.10
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.04 21334 Regional Full Recon 150mm @ IRI 12
R
0.10 11451 National Rehab 195mm @ IRI 9-12
S
2.90 11451 National Full Recon 195mm @ IRI 12
S
0.95 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
3.20 10311 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.70 11451 National Rehab 195mm @ IRI 9-12
S
8.27
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40
7612 Regional Overlay 60mm @ IRI 5.5-9
Appendix-A: Page:28 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
12.457
7.02
0.470
7.02
73.128
7.01
2.297
7.01
1.534
7.00
2.413
7.00
1.223
6.99
2.336
6.98
0.574
6.98
2.305
6.97
7.125
6.97
3.423
6.97
1.169
6.96
8.031
6.95
0.198
6.94
11.111
6.94
0.815
6.94
0.373
6.93
5.477
6.93
4.815
6.93
2.031
6.93
2.258
6.92
6.477
6.91
0.951
6.91
2.297
6.91
0.198
6.91
5.993
6.90
0.342
6.89
1.148
6.88
0.985
6.88
2.305
6.88
63.218
6.88
8.332
6.88
18.872
6.88
0.660
6.87
12.643
6.86
6.890
6.86
16.458
6.86
28.307
6.86
2.608
6.86
1.369
6.86
NPV
83.52
4.82
489.55
20.34
39.26
16.02
31.22
15.57
6.96
16.27
92.76
38.06
13.54
204.47
1.56
114.63
16.31
4.13
56.45
45.24
26.95
14.67
71.67
24.02
27.42
1.41
40.05
2.12
13.48
6.63
15.87
410.41
80.85
123.86
7.06
78.10
44.86
112.95
286.03
17.43
11.17
Appendix-A
Annual Needs Report
2012-2013
Road
No
Rangpur
Bogra
N502
Comilla
Brahmanbaria N102
Dhaka
Narayanganj N1
Khulna
Jhenaidah
N7
Chittagong Chittagong
N106
Khulna
Khulna
N7
Khulna
Khulna
N7
Dhaka
Gazipur
R302
Chittagong Chittagong
R163
Khulna
Kushtia
R710
Chittagong Chittagong
N1
Comilla
Brahmanbaria N2
Dhaka
Mymensingh N3
Rangpur
Bogra
N502
Dhaka
Gazipur
R301
Dhaka
Narayanganj N1
Khulna
Jessore
N7
Gopalganj Rajbari
R710
Dhaka
Narayanganj N1
Comilla
Brahmanbaria R220
Dhaka
Mymensingh N3
Khulna
Magura
N7
Chittagong Dohazari
N1
Comilla
Chandpur
R140
Dhaka
Narayanganj N1
Khulna
Jessore
N7
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Khulna
Jessore
R755
Comilla
Chandpur
R140
Dhaka
Narayanganj N1
Sylhet
Sylhet
R250
Chittagong Dohazari
N1
Rangpur
Dinajpur
R585
Dhaka
Mymensingh N3
Khulna
Khulna
N7
Chittagong Chittagong
R163
Gopalganj Faridpur
N7
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Comilla
Chandpur
R140
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Bogra -Natore Road
Km 002.40-003.60
Comilla-Brahmanbaria Road
Km 053.50-055.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 002.50-002.80
Dauladia-Mongla Road
Km 106.82-107.02
Chittagong-Rangamati Road
Km 004.20-004.30
Dauladia-Mongla Road
Km 215.46-215.54
Dauladia-Mongla Road
Km 215.46-215.54
Kaliganj Bazr Road
Km 005.00-005.20
Chittagong -Chandragona Road
Km 007.40-008.30
Ahaladipur-Kushtia Road
Km 048.35-048.55
Dhaka -Comilla -Chittagong-Teknaf RoKm 213.88-214.18
Dhaka-Sylhet-Jaflong Road
Km 074.54-074.74
Dhaka -Mymensingh Road
Km 073.80-074.30
Bogra -Natore Road
Km 004.50-004.90
Tongi-Pachdona Road
Km 001.40-001.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 003.60-003.70
Dauladia-Mongla Road
Km 146.42-146.62
Ahaladipur-Kushtia Road
Km 039.41-039.91
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.30-009.40
Sarail-Habiganj Road
Km 014.08-014.18
Dhaka -Mymensingh Road
Km 064.80-064.90
Dauladia-Mongla Road
Km 070.42-071.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 290.58-291.08
Comilla-Begumganj Road
Km 054.20-055.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 021.88-024.18
Dauladia-Mongla Road
Km 188.29-188.77
Dhaka -Comilla -Chittagong-Teknaf RoKm 201.18-202.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 215.78-216.08
Jessore -Chuknagar Road
Km 011.80-012.10
Comilla-Begumganj Road
Km 060.30-062.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 017.80-018.48
Sylhet-Jakiganj Road
Km 062.25-075.35
Dhaka -Comilla -Chittagong-Teknaf RoKm 309.88-309.98
Gobindagnj-Fulbari-Dinajpur Road
Km 059.42-062.42
Dhaka -Mymensingh Road
Km 069.10-071.10
Dauladia-Mongla Road
Km 220.66-220.76
Chittagong -Chandragona Road
Km 023.70-024.40
Dauladia-Mongla Road
Km 055.72-060.12
Dhaka -Comilla -Chittagong-Teknaf RoKm 183.18-185.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 194.88-195.28
Comilla-Begumganj Road
Km 040.47-040.57
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.20
5705 National Overlay 50mm @ IRI 5-9
S
1.60 11451 National Full Recon 195mm @ IRI 12
R
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 13468 National DBST @ Traff >6000
L
0.08 11451 National Overlay 80mm @ IRI 4-9
R
0.08 11451 National Overlay 80mm @ IRI 4-9
S
0.20
3076 Regional Overlay 50mm @ IRI 5-7
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 12330 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.40
5705 National Overlay 50mm @ IRI 5-9
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.50
3636 Regional DBST 25mm @ 25% Crk
R
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.10
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.70 11451 National Rehab 195mm @ IRI 9-12
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.90
4887 Regional Overlay 60mm @ IRI 7-9
R
2.30 11451 National Rehab 195mm @ IRI 9-12
S
0.48
7406 National Overlay 50mm @ IRI 4-7
S
0.90 11451 National Rehab 195mm @ IRI 9-12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
2.00
4887 Regional Overlay 50mm @ IRI 5-7
R
0.68 11451 National Rehab 195mm @ IRI 9-12
S
13.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
3.00
4331 Regional Overlay 60mm @ IRI 7-9
S
2.00 11451 National DBST @ Traff >6000
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.70
7612 Regional DBST @ Traff >6000
S
4.40
7248 National DBST @ Traff >6000
S
1.90 11451 National Rehab 195mm @ IRI 9-12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10
8774 Regional DBST @ Traff >6000
Appendix-A: Page:29 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.445
6.85
35.564
6.84
7.824
6.84
5.068
6.84
0.198
6.83
0.650
6.82
0.650
6.82
0.585
6.82
2.969
6.80
0.685
6.80
7.474
6.80
1.235
6.80
3.087
6.80
1.148
6.80
2.290
6.79
2.608
6.79
5.216
6.79
0.655
6.79
2.274
6.78
0.342
6.78
2.920
6.77
15.705
6.76
10.296
6.76
3.193
6.76
53.015
6.74
1.665
6.74
19.694
6.74
7.474
6.73
1.027
6.73
5.961
6.72
15.582
6.71
44.106
6.71
2.628
6.71
10.269
6.71
4.910
6.69
2.151
6.69
0.951
6.69
7.934
6.69
44.671
6.68
9.187
6.68
0.143
6.67
NPV
29.79
228.32
51.49
33.98
6.88
6.53
6.53
5.84
31.81
7.08
48.50
10.18
24.76
9.28
15.21
17.05
34.89
13.63
15.43
2.09
19.34
106.18
69.15
34.40
357.64
22.81
132.74
48.02
10.89
69.25
104.58
421.37
17.17
101.45
173.59
14.35
23.25
239.10
298.70
58.18
4.09
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Khulna
Barisal
Khulna
Khulna
Comilla
Comilla
Chittagong
Comilla
Khulna
Comilla
Khulna
Chittagong
Khulna
Sylhet
Khulna
Chittagong
Khulna
Khulna
Gopalganj
Rajshahi
Rangpur
Dhaka
Rajshahi
Chittagong
Khulna
Chittagong
Comilla
Sylhet
Comilla
Chittagong
Chittagong
Chittagong
Comilla
Chittagong
Dhaka
Gopalganj
Dhaka
Khulna
Khulna
Sylhet
Division
Gazipur
Satkhira
Jhalokati
Jessore
Satkhira
Chandpur
Chandpur
Chittagong
Noakhali
Jessore
Comilla
Jessore
Dohazari
Kushtia
Sylhet
Jessore
Dohazari
Satkhira
Magura
Sariatpur
Naogaon
Bogra
Gazipur
Pabna
Chittagong
Jessore
Chittagong
Comilla
Sylhet
Chandpur
Chittagong
Rangamati
Chittagong
Noakhali
Chittagong
Narayanganj
Faridpur
Sherpur
Khulna
Magura
Sylhet
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R302
R765
R870
N707
R765
R140
R140
N1
R141
N707
R140
N7
N1
N704
N210
N7
R170
R760
N702
R861
R547
N502
R302
N6
R163
R755
R151
R141
R250
R140
N1
N106
R163
N104
N106
R202
N803
R371
N709
N702
R250
Road Name
Chainage
Kaliganj Bazr Road
Km 005.60-005.70
Khulna-Satkhira Road
Km 041.29-043.00
Barisal-Pirojpur Road
Km 041.77-042.87
Jessore Town Old Section
Km 005.90-006.10
Khulna-Satkhira Road
Km 018.80-019.50
Comilla-Begumganj Road
Km 050.80-051.30
Comilla-Begumganj Road
Km 068.50-068.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 214.38-214.58
Lalmai-Sonaimuri Road
Km 034.62-034.72
Jessore Town Old Section
Km 003.40-003.50
Comilla-Begumganj Road
Km 023.79-024.89
Dauladia-Mongla Road
Km 144.02-144.72
Dhaka -Comilla -Chittagong-Teknaf RoKm 314.48-314.58
Jhenaidah-Dasuria Road
Km 042.60-042.90
Sylhet Twn By-Pass Road
Km 010.70-010.99
Dauladia-Mongla Road
Km 148.42-148.62
Patiya-Chokoria Road
Km 010.20-011.10
Khulna-Satkhira Road
Km 036.30-036.70
Jessore -Magura Road
Km 034.49-035.79
Monohar -Shariatpur Road
Km 001.50-001.70
Naogaon-Badalgachhi-Rohonpur
Km 017.27-019.09
Bogra -Natore Road
Km 009.10-010.20
Kaliganj Bazr Road
Km 004.60-004.70
Kashinathpur-Natore-Rajshahi Road Km 025.27-040.35
Chittagong -Chandragona Road
Km 008.60-009.40
Jessore -Chuknagar Road
Km 001.30-003.20
Baraiyerhat-Fatikchhari Road
Km 000.00-000.80
Lalmai-Sonaimuri Road
Km 022.10-022.12
Sylhet-Jakiganj Road
Km 021.85-023.95
Comilla-Begumganj Road
Km 066.00-066.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 188.18-188.88
Chittagong-Rangamati Road
Km 046.96-047.16
Chittagong -Chandragona Road
Km 010.90-011.60
Feni-Noakhali Road
Km 045.99-046.19
Chittagong-Rangamati Road
Km 013.50-013.70
Bhulta-Rampura Road
Km 007.20-009.10
Faridpur Town Old section
Km 000.20-000.70
Sherpur-Nakla-Mymensingh
Km 035.20-035.60
Khulna City By-Pass Road
Km 006.80-006.90
Jessore -Magura Road
Km 042.79-042.99
Sylhet-Jakiganj Road
Km 010.20-010.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
3076 Regional Overlay 50mm @ IRI 7-9
S
1.72
4887 Regional DBST 25mm @ 25% Crk
S
1.10
2223 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.70
4887 Regional DBST @ Traff 4000-6000
S
0.50
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.70
5636 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.29 11451 National DBST @ Traff >6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.90
3181 Regional Overlay 50mm @ IRI 5-7
S
0.40
4116 Regional DBST @ Traff 4000-6000
S
1.30 11451 National Rehab 195mm @ IRI 9-12
S
0.20
4885 Regional Overlay 50mm @ IRI 5-7
S
1.81
3019 Regional Overlay 50mm @ IRI 5-7
S
1.10
5705 National DBST @ Traff 4000-6000
S
0.10
3076 Regional DBST @ Traff 2000-4000
S
15.08
6210 National Overlay 50mm @ IRI 4-7
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
1.90
4887 Regional DBST @ Traff 4000-6000
S
0.80
3019 Regional Overlay 50mm @ IRI 5-7
S
0.02
5257 Regional DBST 25mm @ 25% Crk
S
2.10
4887 Regional DBST 25mm @ 25% Crk
S
0.90
4887 Regional Overlay 50mm @ IRI 5-7
S
0.70 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.70
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.90
4887 Regional DBST 25mm @ 25% Crk
S
0.50 24928 National Overlay 80mm @ IRI 5-9
S
0.40
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.50
7545 Regional DBST @ Traff >6000
Appendix-A: Page:30 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.292
6.66
2.330
6.66
2.584
6.66
5.216
6.65
0.951
6.65
1.795
6.65
0.313
6.65
4.983
6.64
0.367
6.64
2.608
6.64
3.485
6.63
2.214
6.63
2.569
6.63
6.731
6.62
0.523
6.62
5.216
6.61
1.588
6.61
0.593
6.61
29.166
6.61
0.574
6.61
3.456
6.60
1.494
6.60
0.138
6.60
57.447
6.60
2.669
6.60
2.581
6.60
1.587
6.60
0.034
6.59
2.853
6.59
2.725
6.59
16.350
6.58
4.360
6.58
2.396
6.57
4.827
6.56
4.516
6.56
1.821
6.56
5.062
6.55
1.253
6.55
2.244
6.55
5.216
6.55
0.865
6.55
NPV
3.26
50.35
21.06
34.11
29.04
20.01
3.65
31.60
4.09
17.02
39.96
28.87
16.26
44.60
10.88
34.01
12.85
14.51
195.15
5.73
26.44
36.44
3.24
534.56
27.73
49.11
12.45
0.89
69.06
32.77
107.67
27.05
24.78
30.05
27.82
44.71
39.14
10.67
14.88
33.59
22.57
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Noakhali
N104
Dhaka
Gazipur
R313
Khulna
Jessore
N7
Dhaka
Tangail
N4
Dhaka
Tangail
N4
Khulna
Khulna
N7
Comilla
Feni
N104
Dhaka
Mymensingh N3
Comilla
Feni
N104
Gopalganj Gopalganj
R850
Rajshahi
Nawabganj
R547
Chittagong Chittagong
N106
Dhaka
Mymensingh N3
Khulna
Chuadanga
R747
Khulna
Satkhira
R765
Dhaka
Manikganj
R506
Rajshahi
Sirajganj
R451
Chittagong Dohazari
N1
Comilla
Brahmanbaria N2
Dhaka
Gazipur
R313
Khulna
Jhenaidah
N7
Gopalganj Faridpur
N803
Comilla
Comilla
R140
Khulna
Chuadanga
R745
Barisal
Pirojpur
R870
Dhaka
Narayanganj N1
Barisal
Bhola
R890
Dhaka
Gazipur
R301
Khulna
Chuadanga
R745
Khulna
Khulna
N7
Comilla
Chandpur
R140
Chittagong Dohazari
N1
Khulna
Magura
N7
Chittagong Cox's Bazar
N110
Chittagong Dohazari
N1
Rajshahi
Rajshahi
N603
Khulna
Kushtia
N704
Khulna
Jhenaidah
R748
Comilla
Chandpur
R140
Khulna
Magura
N702
Dhaka
Tangail
N4
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Feni-Noakhali Road
Km 039.40-039.60
Mawna-Monohardi Road
Km 031.67-032.87
Dauladia-Mongla Road
Km 148.12-148.42
Joydebpur-Jamalpur Road
Km 108.46-108.56
Joydebpur-Jamalpur Road
Km 103.59-104.99
Dauladia-Mongla Road
Km 220.76-220.86
Feni-Noakhali Road
Km 010.70-011.20
Dhaka -Mymensingh Road
Km 058.00-059.20
Feni-Noakhali Road
Km 017.10-017.20
Tekerhat-Mollahhat Road
Km 005.40-005.60
Naogaon-Badalgachhi-Rohonpur
Km 099.87-100.07
Chittagong-Rangamati Road
Km 023.40-023.60
Dhaka -Mymensingh Road
Km 074.50-074.60
Kushtia -Chuadanga Road
Km 036.14-036.44
Khulna-Satkhira Road
Km 036.89-039.99
Aricha -Daulatpur-Tangail Road
Km 001.70-003.10
Nalka-Sirajganj Road
Km 006.90-009.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 308.98-309.18
Dhaka-Sylhet-Jaflong Road
Km 075.24-075.44
Mawna-Monohardi Road
Km 022.37-022.77
Dauladia-Mongla Road
Km 119.82-121.22
Faridpur Town Old section
Km 000.80-001.50
Comilla-Begumganj Road
Km 021.29-021.39
Kushtia -Jhenaidah Road
Km 077.48-077.78
Barisal-Pirojpur Road
Km 052.17-052.47
Dhaka -Comilla -Chittagong-Teknaf RoKm 020.78-020.88
Bhola -Char Manika Road
Km 035.77-047.57
Tongi-Pachdona Road
Km 006.80-006.90
Kushtia -Jhenaidah Road
Km 079.76-079.86
Dauladia-Mongla Road
Km 223.66-224.46
Comilla-Begumganj Road
Km 057.00-058.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 277.08-278.18
Dauladia-Mongla Road
Km 071.32-073.92
Link Road-Cox's Bazar Road
Km 005.50-005.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 294.88-295.18
Rajshahi Town By-Pass Road
Km 003.90-004.60
Jhenaidah-Dasuria Road
Km 040.90-041.50
Chuadanga-Kaliganj Road
Km 049.60-051.40
Comilla-Begumganj Road
Km 034.29-034.89
Jessore -Magura Road
Km 028.29-029.49
Joydebpur-Jamalpur Road
Km 091.76-097.39
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20 10253 National Rehab 195mm @ IRI 9-12
S
1.20
4741 Regional Overlay 60mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10
3779 National Overlay 50mm @ IRI 4-9
S
1.40
5901 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
0.10
9193 National DBST 25mm @ 25% Crk
S
0.20
2343 Regional Overlay 50mm @ IRI 7-9
S
0.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
3.10
4887 Regional Overlay 60mm @ IRI 7-9
S
1.40
3019 Regional Overlay 50mm @ IRI 7-9
S
2.60
4965 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 12330 National Rehab 195mm @ IRI 9-12
S
0.40
5572 Regional Rehab 150mm @ IRI 9-12
S
1.40
6605 National Overlay 50mm @ IRI 4-7
S
0.70 24928 National Overlay 50mm @ IRI 5
S
0.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
R
0.10 11451 National Overlay 80mm @ IRI 4-9
S
11.80
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 21334 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.80
9684 National DBST @ Traff >6000
S
1.40
4887 Regional Overlay 60mm @ IRI 7-9
S
1.10 11451 National Full Recon 195mm @ IRI 12
S
2.60 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.70
3802 National Overlay 50mm @ IRI 5-9
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
1.80
4887 Regional DBST @ Traff 4000-6000
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
1.20
3649 National Overlay 50mm @ IRI 5-9
S
5.63
6524 National Overlay 50mm @ IRI 4-7
Appendix-A: Page:31 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.565
6.54
4.107
6.54
7.824
6.54
0.287
6.54
5.013
6.54
2.725
6.53
8.605
6.53
7.408
6.53
0.143
6.53
0.574
6.53
0.386
6.53
4.516
6.52
0.617
6.52
0.940
6.52
10.611
6.52
3.011
6.51
3.532
6.50
5.216
6.50
4.610
6.49
4.904
6.49
4.626
6.49
4.151
6.49
0.334
6.49
0.645
6.48
1.027
6.48
1.152
6.48
40.390
6.48
2.290
6.47
0.215
6.47
1.383
6.47
5.080
6.47
24.835
6.47
58.331
6.47
2.686
6.46
7.824
6.46
2.667
6.46
13.461
6.46
2.757
6.46
2.054
6.45
4.572
6.45
17.870
6.45
NPV
22.28
42.86
50.45
2.84
59.59
17.39
53.69
52.44
3.89
5.11
3.09
27.64
4.97
10.04
108.89
24.75
82.17
33.05
30.19
31.48
56.06
36.49
3.74
16.01
10.37
11.51
417.21
14.50
4.89
45.33
55.07
152.32
377.29
17.06
49.26
30.07
86.94
67.12
20.15
45.73
162.66
Appendix-A
Annual Needs Report
2012-2013
Zone
Rajshahi
Chittagong
Chittagong
Dhaka
Rajshahi
Comilla
Chittagong
Khulna
Rajshahi
Rangpur
Comilla
Khulna
Khulna
Khulna
Comilla
Comilla
Chittagong
Dhaka
Sylhet
Rangpur
Comilla
Comilla
Dhaka
Gopalganj
Khulna
Dhaka
Dhaka
Gopalganj
Dhaka
Chittagong
Chittagong
Chittagong
Khulna
Dhaka
Barisal
Rajshahi
Dhaka
Khulna
Chittagong
Comilla
Khulna
Division
Rajshahi
Dohazari
Rangamati
Narsingdi
Naogaon
Comilla
Dohazari
Jessore
Rajshahi
Thakurgaon
Chandpur
Khulna
Chuadanga
Khulna
Chandpur
Comilla
Chittagong
Sherpur
Habiganj
Rangpur
Comilla
Feni
Gazipur
Madaripur
Khulna
Munshiganj
Mymensingh
Faridpur
Gazipur
Rangamati
Dohazari
Chittagong
Jessore
Tangail
Bhola
Sirajganj
Gazipur
Khulna
Chittagong
Comilla
Satkhira
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N6
R170
N106
R212
R547
R140
R170
N7
R685
N5
R140
N7
R745
N7
R140
R141
N1
R460
N2
N5
R141
N104
R301
R860
R760
N8
N3
N803
N3
R161
N1
N1
R765
N4
N809
R451
N3
N7
R151
R140
R765
Road Name
Chainage
Kashinathpur-Natore-Rajshahi Road Km 118.02-124.57
Patiya-Chokoria Road
Km 012.10-012.20
Chittagong-Rangamati Road
Km 040.00-040.30
Akdaria -Agarpur Road
Km 015.61-017.79
Naogaon-Badalgachhi-Rohonpur
Km 021.89-022.29
Comilla-Begumganj Road
Km 004.35-004.78
Patiya-Chokoria Road
Km 008.90-009.10
Dauladia-Mongla Road
Km 141.52-141.92
Rajshahi -Chowmasia Road
Km 030.32-032.34
Dhaka -Utholi-Banglabandh Road
Km 422.27-434.54
Comilla-Begumganj Road
Km 032.79-034.09
Dauladia-Mongla Road
Km 220.86-221.86
Kushtia -Jhenaidah Road
Km 075.08-075.38
Dauladia-Mongla Road
Km 219.36-219.56
Comilla-Begumganj Road
Km 055.30-055.50
Lalmai-Sonaimuri Road
Km 028.12-030.22
Dhaka -Comilla -Chittagong-Teknaf RoKm 210.38-210.48
Jamalpur-Sherpur-Bangaon Road
Km 000.70-001.20
Dhaka-Sylhet-Jaflong Road
Km 148.21-149.41
Dhaka -Utholi-Banglabandh Road
Km 279.50-285.98
Lalmai-Sonaimuri Road
Km 014.20-014.50
Feni-Noakhali Road
Km 002.60-002.80
Tongi-Pachdona Road
Km 001.70-001.90
Mostafapur-Chandpur Road
Km 001.10-001.40
Khulna-Satkhira Road
Km 004.30-004.60
Dhaka -Patuakhali Road
Km 012.70-013.80
Dhaka -Mymensingh Road
Km 073.10-073.60
Faridpur Town Old section
Km 001.50-002.10
Dhaka -Mymensingh Road
Km 055.80-058.00
Rangamati -Bandarban Road
Km 003.40-003.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 305.98-308.98
Dhaka -Comilla -Chittagong-Teknaf RoKm 210.08-210.18
Khulna-Satkhira Road
Km 007.50-010.40
Joydebpur-Jamalpur Road
Km 120.61-121.61
Barishal-Lakshmipur Road
Km 029.39-030.29
Nalka-Sirajganj Road
Km 003.40-005.90
Dhaka -Mymensingh Road
Km 022.30-023.20
Dauladia-Mongla Road
Km 220.06-220.66
Baraiyerhat-Fatikchhari Road
Km 001.60-003.00
Comilla-Begumganj Road
Km 025.29-026.09
Khulna-Satkhira Road
Km 032.39-032.59
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
6.55
7109 National Overlay 50mm @ IRI 4-7
S
0.10
3019 Regional DBST 25mm @ 25% Crk
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
2.18
3019 Regional Overlay 50mm @ IRI 7-9
S
0.40
3019 Regional Overlay 50mm @ IRI 5-7
S
0.42
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
3516 Regional Overlay 50mm @ IRI 7-9
S
0.40
5636 National Overlay 50mm @ IRI 4-9
S
2.02
4887 Regional Overlay 60mm @ IRI 7-9
S
12.27
3083 National Overlay 50mm @ IRI 4-9
S
1.30
4887 Regional DBST @ Traff 4000-6000
S
1.00
9474 National DBST @ Traff >6000
S
0.30
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Overlay 50mm @ IRI 5-7
S
2.10
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.50
4422 Regional Overlay 60mm @ IRI 7-9
S
1.20
6671 National Overlay 50mm @ IRI 4-7
S
6.48
4731 National Overlay 50mm @ IRI 4-9
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 12376 National Full Recon 195mm @ IRI 12
S
0.20 21334 Regional Full Recon 150mm @ IRI 12
S
0.30
5672 Regional DBST @ Traff 4000-6000
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.60 24928 National Rehab 195mm @ IRI 9-12
S
2.20 11451 National Overlay 80mm @ IRI 4-9
S
0.10
2326 Regional Overlay 50mm @ IRI 7-9
S
3.00 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.90
4887 Regional Overlay 50mm @ IRI 5-7
S
1.00
3779 National Overlay 50mm @ IRI 4-9
S
0.90
9061 National DBST @ Traff >6000
S
2.50
4965 Regional Overlay 60mm @ IRI 7-9
L
0.90 11451 National DBST @ Traff >6000
S
0.60 11451 National Full Recon 195mm @ IRI 12
S
1.40
3019 Regional Overlay 50mm @ IRI 5-7
S
0.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional DBST @ Traff 4000-6000
Appendix-A: Page:32 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
25.516
6.45
0.089
6.44
7.240
6.44
4.100
6.44
0.762
6.43
1.869
6.43
0.365
6.43
1.378
6.43
6.921
6.42
42.083
6.42
1.862
6.41
1.729
6.40
1.027
6.40
5.450
6.40
0.595
6.39
7.554
6.39
2.491
6.38
1.711
6.38
4.698
6.38
24.337
6.37
0.907
6.37
4.516
6.37
4.155
6.37
0.408
6.37
0.445
6.36
6.791
6.36
3.087
6.36
18.993
6.35
13.581
6.35
0.183
6.35
61.774
6.35
2.491
6.33
8.325
6.32
2.871
6.32
1.223
6.31
8.557
6.31
2.445
6.31
16.349
6.30
2.777
6.30
2.505
6.30
0.272
6.30
NPV
326.38
1.61
44.24
32.31
5.31
19.43
3.07
17.99
70.02
381.18
47.82
56.06
9.87
34.05
6.67
70.13
15.18
12.08
54.28
287.60
10.14
27.30
25.89
8.67
13.16
50.01
24.23
115.21
105.46
1.42
389.64
15.04
92.39
29.79
31.71
66.12
76.12
100.66
20.27
25.88
7.21
Appendix-A
Annual Needs Report
2012-2013
Zone
Gopalganj
Dhaka
Chittagong
Dhaka
Dhaka
Dhaka
Barisal
Rangpur
Comilla
Gopalganj
Chittagong
Rajshahi
Dhaka
Chittagong
Rajshahi
Khulna
Comilla
Rangpur
Chittagong
Chittagong
Rajshahi
Dhaka
Rajshahi
Khulna
Dhaka
Khulna
Khulna
Dhaka
Gopalganj
Comilla
Barisal
Comilla
Khulna
Khulna
Chittagong
Khulna
Khulna
Comilla
Khulna
Sylhet
Rajshahi
Division
Rajbari
Gazipur
Cox's Bazar
Gazipur
Gazipur
Manikganj
Bhola
Gaibanda
Comilla
Sariatpur
Chittagong
Nawabganj
Narsingdi
Chittagong
Naogaon
Jessore
Chandpur
Bogra
Chittagong
Chittagong
Sirajganj
Tangail
Sirajganj
Khulna
Dhaka
Satkhira
Satkhira
Narsingdi
Sariatpur
Noakhali
Bhola
Chandpur
Jessore
Satkhira
Dohazari
Jessore
Khulna
Noakhali
Kushtia
Sylhet
Nawabganj
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R710
R315
R172
N3
R315
R315
R890
R585
R140
R861
N106
R547
R212
N1
R547
N7
R140
R550
N1
N1
R451
N4
R451
R760
R803
R760
R760
R114
R861
R141
R890
R140
R755
R765
N1
N707
N7
R140
R710
R250
R547
Road Name
Chainage
Ahaladipur-Kushtia Road
Km 016.81-021.31
Mawna-Nabinagar Road
Km 036.10-036.20
Chokoria-Baderkhali Road
Km 016.10-017.83
Dhaka -Mymensingh Road
Km 012.80-014.30
Mawna-Nabinagar Road
Km 031.00-031.50
Mawna-Nabinagar Road
Km 044.80-045.00
Bhola -Char Manika Road
Km 073.99-097.50
Gobindagnj-Fulbari-Dinajpur Road
Km 001.10-001.60
Comilla-Begumganj Road
Km 017.49-018.89
Monohar -Shariatpur Road
Km 003.40-003.60
Chittagong-Rangamati Road
Km 014.00-014.10
Naogaon-Badalgachhi-Rohonpur
Km 094.57-096.07
Akdaria -Agarpur Road
Km 001.30-008.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 216.68-216.78
Naogaon-Badalgachhi-Rohonpur
Km 026.69-027.39
Dauladia-Mongla Road
Km 139.82-140.92
Comilla-Begumganj Road
Km 058.60-059.40
Mokamtala-Joypurhat Road
Km 007.70-008.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 196.58-197.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 200.38-200.48
Nalka-Sirajganj Road
Km 009.70-010.80
Joydebpur-Jamalpur Road
Km 108.66-109.16
Nalka-Sirajganj Road
Km 009.50-009.70
Khulna-Satkhira Road
Km 000.00-000.30
Jurain-Abdullahpur Road
Km 000.00-026.31
Khulna-Satkhira Road
Km 056.06-056.96
Khulna-Satkhira Road
Km 057.36-058.16
Nayapur-Raipura Road
Km 026.60-028.99
Monohar -Shariatpur Road
Km 005.80-006.20
Lalmai-Sonaimuri Road
Km 031.82-032.22
Bhola -Char Manika Road
Km 008.47-015.37
Comilla-Begumganj Road
Km 069.10-069.80
Jessore -Chuknagar Road
Km 021.30-021.70
Khulna-Satkhira Road
Km 019.60-021.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 305.78-305.98
Jessore Town Old Section
Km 004.70-005.70
Dauladia-Mongla Road
Km 217.56-217.66
Comilla-Begumganj Road
Km 133.57-134.87
Ahaladipur-Kushtia Road
Km 056.25-057.95
Sylhet-Jakiganj Road
Km 000.00-003.30
Naogaon-Badalgachhi-Rohonpur
Km 081.12-081.42
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
4.50
3636 Regional DBST @ Traff 2000-4000
S
0.10
2048 Regional DBST 25mm @ 25% Crk
S
1.73
4887 Regional Overlay 60mm @ IRI 7-9
R
1.50
8665 National Overlay 50mm @ IRI 4-7
S
0.50
2048 Regional DBST @ Traff 2000-4000
S
0.20
2048 Regional Overlay 50mm @ IRI 5-7
S
23.50
4887 Regional Overlay 60mm @ IRI 7-9
S
0.50
6187 Regional Overlay 60mm @ IRI 5.5-9
S
1.40
4887 Regional DBST 25mm @ 25% Crk
S
0.20
4885 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.50
3019 Regional Overlay 50mm @ IRI 7-9
S
6.70
4887 Regional DBST @ Traff 4000-6000
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.70
3019 Regional Overlay 50mm @ IRI 7-9
S
1.10
5636 National Overlay 50mm @ IRI 4-9
S
0.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.80
3234 Regional Overlay 50mm @ IRI 7-9
S
0.70 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.10
4965 Regional Overlay 60mm @ IRI 7-9
S
0.50
3779 National Overlay 50mm @ IRI 4-9
S
0.20
4965 Regional Overlay 50mm @ IRI 5-7
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
26.31
4887 Regional Overlay 60mm @ IRI 7-9
S
0.90
4887 Regional DBST 25mm @ 25% Crk
S
0.80
4887 Regional DBST 25mm @ 25% Crk
S
2.39
3019 Regional DBST @ Traff 2000-4000
S
0.40
4885 Regional Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional DBST @ Traff 4000-6000
S
6.90
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40
3292 Regional DBST @ Traff 2000-4000
S
2.10
4887 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.00 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.30 10112 Regional DBST @ Traff >6000
S
1.70
4887 Regional Overlay 60mm @ IRI 7-9
S
3.30
7545 Regional Overlay 60mm @ IRI 5.5-9
S
0.30
3019 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:33 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
6.336
6.29 133.82
0.077
6.29
0.90
6.460
6.28
62.10
10.217
6.28 122.59
0.420
6.27
8.65
0.324
6.27
2.25
78.982
6.26 779.21
1.711
6.26
16.88
1.950
6.25
48.50
0.272
6.24
4.97
2.258
6.24
13.22
2.897
6.23
24.47
8.970
6.23 214.62
2.725
6.23
16.57
1.315
6.23
12.76
3.858
6.23
51.66
2.384
6.22
26.02
2.297
6.21
18.36
12.800
6.21
76.98
2.402
6.20
14.22
3.765
6.20
27.04
1.435
6.19
14.00
0.574
6.18
4.29
0.459
6.18
13.22
114.616
6.18 1104.93
1.334
6.17
27.84
1.186
6.17
26.92
2.317
6.16
49.34
1.127
6.16
10.48
0.569
6.15
15.72
23.618
6.15 228.85
2.192
6.15
23.66
0.543
6.15
10.88
2.853
6.15
78.72
5.216
6.15
31.23
26.081
6.14 157.53
2.725
6.14
16.34
1.927
6.14
48.91
5.819
6.14
54.30
14.458
6.13 109.54
0.579
6.13
4.02
Appendix-A
Annual Needs Report
2012-2013
Zone
Rangpur
Sylhet
Khulna
Dhaka
Comilla
Dhaka
Chittagong
Khulna
Chittagong
Dhaka
Chittagong
Rajshahi
Dhaka
Khulna
Dhaka
Comilla
Chittagong
Comilla
Khulna
Rajshahi
Khulna
Chittagong
Khulna
Khulna
Khulna
Khulna
Khulna
Khulna
Khulna
Khulna
Khulna
Rangpur
Khulna
Rangpur
Rajshahi
Chittagong
Khulna
Rajshahi
Chittagong
Chittagong
Khulna
Division
Thakurgaon
Habiganj
Chuadanga
Gazipur
Comilla
Narayanganj
Dohazari
Jhenaidah
Chittagong
Gazipur
Chittagong
Pabna
Narayanganj
Jessore
Gazipur
Noakhali
Khagrachari
Noakhali
Chuadanga
Natore
Jhenaidah
Dohazari
Jessore
Kushtia
Kushtia
Magura
Magura
Magura
Magura
Jhenaidah
Kushtia
Bogra
Jessore
Gaibanda
Sirajganj
Chittagong
Jhenaidah
Nawabganj
Dohazari
Dohazari
Jessore
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N5
N2
R745
N3
R141
N2
N1
N7
R163
R313
N1
N6
N1
N7
R301
N104
R160
R142
R747
N502
R745
N1
R755
N704
N704
N7
N7
N7
N7
N7
N704
R545
R765
R585
N5
R163
R745
R547
N1
N1
N707
Road Name
Chainage
Dhaka -Utholi-Banglabandh Road
Km 402.00-403.60
Dhaka-Sylhet-Jaflong Road
Km 138.15-138.25
Kushtia -Jhenaidah Road
Km 081.76-081.86
Dhaka -Mymensingh Road
Km 023.20-023.98
Lalmai-Sonaimuri Road
Km 024.62-027.62
Dhaka-Sylhet-Jaflong Road
Km 000.13-017.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 304.88-305.08
Dauladia-Mongla Road
Km 105.32-105.52
Chittagong -Chandragona Road
Km 024.40-024.50
Mawna-Monohardi Road
Km 003.40-004.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 233.46-241.30
Kashinathpur-Natore-Rajshahi Road Km 041.85-044.05
Dhaka -Comilla -Chittagong-Teknaf RoKm 000.00-000.70
Dauladia-Mongla Road
Km 141.02-141.42
Tongi-Pachdona Road
Km 001.10-001.30
Feni-Noakhali Road
Km 035.74-036.50
Hathazari-Khagrachhari Road
Km 041.00-041.50
Begamganj-Ramganj Road
Km 021.85-022.45
Kushtia -Chuadanga Road
Km 041.04-041.84
Bogra -Natore Road
Km 045.96-046.66
Kushtia -Jhenaidah Road
Km 112.56-114.26
Dhaka -Comilla -Chittagong-Teknaf RoKm 275.38-275.58
Jessore -Chuknagar Road
Km 017.00-018.70
Jhenaidah-Dasuria Road
Km 040.30-040.40
Jhenaidah-Dasuria Road
Km 040.80-040.90
Dauladia-Mongla Road
Km 070.32-070.42
Dauladia-Mongla Road
Km 071.12-071.32
Dauladia-Mongla Road
Km 073.92-074.02
Dauladia-Mongla Road
Km 103.62-104.40
Dauladia-Mongla Road
Km 104.42-104.82
Jhenaidah-Dasuria Road
Km 041.50-042.60
Bogra-Joypurhat Road
Km 012.90-013.90
Khulna-Satkhira Road
Km 001.50-007.30
Gobindagnj-Fulbari-Dinajpur Road
Km 051.72-052.12
Dhaka -Utholi-Banglabandh Road
Km 137.51-143.61
Chittagong -Chandragona Road
Km 017.60-018.00
Kushtia -Jhenaidah Road
Km 115.06-115.86
Naogaon-Badalgachhi-Rohonpur
Km 084.87-087.07
Dhaka -Comilla -Chittagong-Teknaf RoKm 254.84-254.94
Dhaka -Comilla -Chittagong-Teknaf RoKm 310.98-311.28
Jessore Town Old Section
Km 004.30-004.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.60 11451 National Rehab 195mm @ IRI 9-12
S
0.10
9332 National Rehab 180mm @ IRI 9-12
S
0.10
5536 Regional Rehab 150mm @ IRI 9-12
R
0.78 11451 National Overlay 80mm @ IRI 4-9
S
3.00
5257 Regional Overlay 60mm @ IRI 5.5-9
S
16.88 18233 National Overlay 50mm @ IRI 4
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
7612 Regional DBST 25mm @ 25% Crk
S
0.80
3019 Regional Overlay 50mm @ IRI 7-9
S
7.83 11451 National Overlay 80mm @ IRI 4-9
S
2.20
7153 National Overlay 50mm @ IRI 4-7
R
0.70 11451 National DBST @ Traff >6000
S
0.40
5636 National Overlay 50mm @ IRI 4-9
S
0.20 21334 Regional Full Recon 150mm @ IRI 12
S
0.76 10253 National Overlay 50mm @ IRI 5
S
0.50
3019 Regional Overlay 50mm @ IRI 7-9
S
0.60
7837 Regional Overlay 60mm @ IRI 5.5-9
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
0.70
9061 National DBST @ Traff >6000
S
1.70
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.70
3292 Regional DBST @ Traff 2000-4000
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.79 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
1.10 11451 National Full Recon 195mm @ IRI 12
S
1.00
4887 Regional DBST @ Traff 4000-6000
S
5.80
4887 Regional Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
6.10
6306 National Overlay 50mm @ IRI 4-7
S
0.40
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
2.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:34 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
29.504
6.13
2.192
6.12
1.349
6.11
10.957
6.11
10.791
6.11
102.612
6.11
5.286
6.10
5.621
6.10
0.136
6.09
1.420
6.09
92.211
6.08
8.383
6.08
1.527
6.08
1.409
6.07
4.580
6.07
3.229
6.07
0.986
6.07
2.054
6.07
2.987
6.06
0.951
6.06
4.880
6.05
5.403
6.05
2.309
6.04
2.842
6.04
2.842
6.04
2.842
6.03
5.683
6.03
2.842
6.03
22.392
6.03
11.367
6.03
31.258
6.03
1.359
6.03
16.650
6.03
5.395
6.03
23.242
6.03
1.369
6.02
2.738
6.01
4.249
6.01
2.608
6.00
7.708
6.00
7.824
6.00
NPV
175.15
13.60
8.10
82.66
100.23
910.82
31.43
33.58
1.94
10.59
760.68
71.07
47.31
18.24
27.20
27.63
8.12
18.20
26.06
14.97
47.79
31.84
45.43
16.81
16.81
16.79
33.59
16.79
132.33
67.17
184.64
31.47
176.16
32.34
197.52
8.77
24.74
32.24
15.25
44.14
46.15
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Rangpur
Chittagong
Chittagong
Dhaka
Khulna
Khulna
Dhaka
Gopalganj
Rajshahi
Khulna
Dhaka
Dhaka
Khulna
Chittagong
Chittagong
Khulna
Khulna
Comilla
Khulna
Khulna
Gopalganj
Khulna
Khulna
Khulna
Rangpur
Chittagong
Khulna
Chittagong
Chittagong
Sylhet
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Dhaka
Khulna
Gopalganj
Chittagong
Rajshahi
Division
Narsingdi
Bogra
Chittagong
Khagrachari
Gazipur
Magura
Khulna
Gazipur
Faridpur
Rajshahi
Jessore
Narayanganj
Narayanganj
Khulna
Dohazari
Dohazari
Jessore
Jhenaidah
Noakhali
Satkhira
Magura
Sariatpur
Satkhira
Khulna
Khulna
Dinajpur
Chittagong
Khulna
Chittagong
Cox's Bazar
Sylhet
Narayanganj
Narayanganj
Narayanganj
Narayanganj
Narayanganj
Narayanganj
Kushtia
Sariatpur
Chittagong
Rajshahi
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R301
R550
N1
R160
R313
N7
R760
N3
N803
N603
N708
N1
N1
N7
N1
N1
R755
N7
R140
R765
N702
R861
R765
N709
N709
R585
N1
N709
R163
N110
R281
N1
N1
N1
N1
N1
N1
N704
R861
R163
N6
Road Name
Chainage
Tongi-Pachdona Road
Km 031.03-031.13
Mokamtala-Joypurhat Road
Km 014.20-016.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 217.08-217.18
Hathazari-Khagrachhari Road
Km 078.32-078.52
Mawna-Monohardi Road
Km 034.97-035.07
Dauladia-Mongla Road
Km 069.32-069.42
Khulna-Satkhira Road
Km 017.70-018.90
Dhaka -Mymensingh Road
Km 019.60-022.30
Faridpur Town Old section
Km 005.50-005.90
Rajshahi Town By-Pass Road
Km 006.30-006.90
Jessore Town Old Section
Km 001.90-002.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 016.50-016.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 020.98-021.78
Dauladia-Mongla Road
Km 219.56-220.06
Dhaka -Comilla -Chittagong-Teknaf RoKm 303.38-303.48
Dhaka -Comilla -Chittagong-Teknaf RoKm 304.58-304.68
Jessore -Chuknagar Road
Km 022.10-023.10
Dauladia-Mongla Road
Km 104.40-104.42
Comilla-Begumganj Road
Km 131.57-132.67
Khulna-Satkhira Road
Km 026.49-029.39
Jessore -Magura Road
Km 042.99-043.49
Monohar -Shariatpur Road
Km 001.90-002.10
Khulna-Satkhira Road
Km 021.90-022.50
Khulna City By-Pass Road
Km 016.10-016.20
Khulna City By-Pass Road
Km 016.30-016.40
Gobindagnj-Fulbari-Dinajpur Road
Km 103.66-105.94
Dhaka -Comilla -Chittagong-Teknaf RoKm 202.08-202.38
Khulna City By-Pass Road
Km 013.80-013.90
Chittagong -Chandragona Road
Km 019.90-020.40
Link Road-Cox's Bazar Road
Km 005.80-006.00
Rajnagar-Charkhai Road
Km 068.52-071.52
Dhaka -Comilla -Chittagong-Teknaf RoKm 016.90-017.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 017.70-017.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 018.48-018.58
Dhaka -Comilla -Chittagong-Teknaf RoKm 018.78-018.98
Dhaka -Comilla -Chittagong-Teknaf RoKm 019.68-020.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 021.78-021.88
Jhenaidah-Dasuria Road
Km 042.90-043.32
Monohar -Shariatpur Road
Km 004.10-004.30
Chittagong -Chandragona Road
Km 000.00-000.10
Kashinathpur-Natore-Rajshahi Road Km 124.57-124.98
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
1.80
3234 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
3019 Regional DBST @ Traff 2000-4000
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.20
4887 Regional Overlay 60mm @ IRI 7-9
R
2.70 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.60
3802 National Overlay 50mm @ IRI 5-9
R
0.20 11451 National Rehab 195mm @ IRI 9-12
R
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.80 11451 National DBST @ Traff >6000
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.00
3292 Regional DBST 25mm @ 25% Crk
S
0.01 11451 National Full Recon 195mm @ IRI 12
S
1.10 10112 Regional DBST @ Traff >6000
S
2.90
4887 Regional DBST @ Traff 4000-6000
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.20
4885 Regional DBST @ Traff 4000-6000
S
0.60
4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.29
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.50
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
3.00
4887 Regional Overlay 60mm @ IRI 7-9
R
0.20 11451 National Full Recon 195mm @ IRI 12
R
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.20 11451 National Full Recon 195mm @ IRI 12
R
0.40 11451 National Full Recon 195mm @ IRI 12
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.42 11451 National Full Recon 195mm @ IRI 12
S
0.20
4885 Regional Overlay 60mm @ IRI 7-9
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.41
7109 National Overlay 60mm @ IRI 7-9
Appendix-A: Page:35 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.153
6.00
5.167
5.99
2.764
5.99
0.178
5.99
0.136
5.99
2.842
5.98
4.481
5.98
24.891
5.98
9.109
5.98
2.286
5.98
4.610
5.97
2.881
5.97
1.940
5.97
10.757
5.96
2.725
5.95
2.725
5.95
1.359
5.95
0.341
5.94
1.630
5.94
3.940
5.94
10.419
5.93
0.272
5.93
1.722
5.93
2.842
5.92
2.842
5.92
6.813
5.92
8.642
5.92
2.842
5.91
1.711
5.90
5.372
5.90
10.269
5.90
5.839
5.89
2.920
5.89
2.920
5.89
5.839
5.89
11.678
5.89
2.920
5.89
11.992
5.89
0.685
5.89
0.131
5.88
2.582
5.88
NPV
2.86
38.58
16.21
3.13
1.63
16.64
40.73
219.09
51.98
23.58
27.88
16.84
61.14
63.87
15.82
15.82
26.56
1.98
40.03
104.94
62.33
6.03
17.64
16.64
16.64
65.28
50.06
16.61
10.95
31.17
91.05
33.67
16.84
16.84
33.67
67.35
16.84
69.15
5.46
3.33
26.68
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Chuadanga
R745
Rangpur
Joypurhat
R545
Comilla
Comilla
R141
Chittagong Chittagong
R163
Dhaka
Narayanganj N1
Dhaka
Narayanganj N1
Chittagong Dohazari
R170
Sylhet
Sylhet
N2
Comilla
Chandpur
R140
Chittagong Khagrachari
R160
Chittagong Chittagong
N1
Khulna
Jhenaidah
N7
Dhaka
Gazipur
R313
Rangpur
Lalmonirhat
N506
Khulna
Jhenaidah
N704
Gopalganj Gopalganj
R850
Rajshahi
Natore
N502
Comilla
Brahmanbaria R220
Gopalganj Madaripur
R860
Comilla
Noakhali
R142
Rangpur
Kurigram
N506
Khulna
Jessore
N708
Khulna
Khulna
N709
Rangpur
Rangpur
N517
Dhaka
Narayanganj N1
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Comilla
Comilla
R141
Chittagong Chittagong
N1
Dhaka
Narayanganj N1
Chittagong Chittagong
N1
Chittagong Chittagong
N106
Dhaka
Tangail
N4
Chittagong Chittagong
N1
Dhaka
Gazipur
R313
Dhaka
Kishoreganj
R212
Khulna
Khulna
N7
Comilla
Noakhali
N104
Khulna
Magura
N7
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Kushtia -Jhenaidah Road
Km 079.46-079.56
Bogra-Joypurhat Road
Km 120.09-120.78
Lalmai-Sonaimuri Road
Km 014.70-017.80
Chittagong -Chandragona Road
Km 031.00-031.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 024.18-024.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 024.38-024.47
Patiya-Chokoria Road
Km 003.30-003.50
Dhaka-Sylhet-Jaflong Road
Km 192.63-192.73
Comilla-Begumganj Road
Km 071.40-071.50
Hathazari-Khagrachhari Road
Km 037.10-039.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 243.34-243.44
Dauladia-Mongla Road
Km 118.02-119.62
Mawna-Monohardi Road
Km 033.47-033.57
Rangpur-Barobari-Kurigram Road
Km 021.15-022.55
Jhenaidah-Dasuria Road
Km 007.50-007.70
Tekerhat-Mollahhat Road
Km 031.40-031.80
Bogra -Natore Road
Km 047.16-048.06
Sarail-Habiganj Road
Km 002.30-002.40
Mostafapur-Chandpur Road
Km 016.38-016.48
Begamganj-Ramganj Road
Km 000.00-000.30
Rangpur-Barobari-Kurigram Road
Km 042.90-045.30
Jessore Town Old Section
Km 000.20-001.10
Khulna City By-Pass Road
Km 000.10-000.20
Rangpur Town Old Section
Km 000.00-002.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 018.98-019.68
Dhaka -Comilla -Chittagong-Teknaf RoKm 187.58-187.68
Dhaka -Comilla -Chittagong-Teknaf RoKm 187.88-188.18
Lalmai-Sonaimuri Road
Km 022.22-023.02
Dhaka -Comilla -Chittagong-Teknaf RoKm 189.68-190.18
Dhaka -Comilla -Chittagong-Teknaf RoKm 025.88-026.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 185.98-186.28
Chittagong-Rangamati Road
Km 005.60-005.90
Joydebpur-Jamalpur Road
Km 110.56-110.76
Dhaka -Comilla -Chittagong-Teknaf RoKm 170.17-170.18
Mawna-Monohardi Road
Km 006.35-006.47
Akdaria -Agarpur Road
Km 017.79-022.31
Dauladia-Mongla Road
Km 216.56-217.26
Feni-Noakhali Road
Km 040.30-041.00
Dauladia-Mongla Road
Km 074.02-074.62
Feni-Noakhali Road
Km 046.29-046.69
Dhaka -Comilla -Chittagong-Teknaf RoKm 182.88-182.98
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.69
4887 Regional DBST @ Traff 4000-6000
S
3.10
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional DBST 25mm @ 25% Crk
R
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.09 11451 National Full Recon 195mm @ IRI 12
S
0.20
3516 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
2.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.60
6605 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
1.40
7068 National Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.40
3497 Regional DBST @ Traff 2000-4000
S
0.90
9061 National DBST @ Traff >6000
S
0.10
4488 Regional Overlay 50mm @ IRI 5-7
S
0.10
3019 Regional DBST 25mm @ 25% Crk
S
0.30
9769 Regional DBST 25mm @ 25% Crk
S
2.40
2992 National Overlay 50mm @ IRI 5-9
S
0.90 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.50
9126 National DBST @ Traff >6000
R
0.70 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.80
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 11451 National Rehab 195mm @ IRI 9-12
R
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30 13468 National Rehab 195mm @ IRI 9-12
S
0.20
3779 National Overlay 50mm @ IRI 4-9
S
0.01 11451 National Full Recon 195mm @ IRI 12
S
0.11
3019 Regional DBST 25mm @ 25% Crk
S
4.52
3019 Regional Overlay 50mm @ IRI 7-9
S
0.70 11451 National Full Recon 195mm @ IRI 12
S
0.70 10253 National Rehab 195mm @ IRI 9-12
S
0.60 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:36 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.215
5.88
0.932
5.87
11.267
5.87
0.136
5.87
2.920
5.87
2.744
5.87
0.365
5.86
2.920
5.85
0.148
5.85
4.421
5.85
2.803
5.84
5.328
5.84
0.136
5.82
4.792
5.82
5.707
5.81
0.543
5.81
1.223
5.81
0.209
5.81
0.099
5.81
0.408
5.81
6.890
5.81
25.575
5.81
2.842
5.80
4.051
5.80
20.437
5.80
2.958
5.80
8.875
5.80
2.888
5.79
11.679
5.79
5.761
5.79
8.887
5.79
5.348
5.79
0.574
5.79
0.263
5.78
0.094
5.78
8.489
5.78
19.892
5.78
12.478
5.77
17.050
5.76
9.654
5.76
2.978
5.76
NPV
4.44
24.56
100.58
3.44
16.77
15.77
2.24
16.88
3.78
35.06
16.04
63.27
1.53
43.80
32.49
11.45
18.46
1.29
1.89
8.14
66.51
146.79
16.30
102.08
116.06
16.80
50.39
25.43
67.65
32.67
50.39
29.57
4.96
1.49
1.50
61.99
112.51
68.72
96.21
52.76
16.80
Appendix-A
Annual Needs Report
2012-2013
Zone
Chittagong
Chittagong
Comilla
Comilla
Khulna
Khulna
Khulna
Chittagong
Chittagong
Comilla
Khulna
Sylhet
Gopalganj
Chittagong
Rajshahi
Chittagong
Dhaka
Khulna
Khulna
Comilla
Chittagong
Dhaka
Rangpur
Chittagong
Chittagong
Khulna
Khulna
Dhaka
Rajshahi
Khulna
Rajshahi
Comilla
Khulna
Sylhet
Khulna
Dhaka
Khulna
Rangpur
Gopalganj
Khulna
Dhaka
Division
Chittagong
Chittagong
Comilla
Feni
Magura
Khulna
Kushtia
Chittagong
Chittagong
Comilla
Jhenaidah
Habiganj
Faridpur
Dohazari
Sirajganj
Dohazari
Tangail
Jhenaidah
Jhenaidah
Chandpur
Dohazari
Narayanganj
Rangpur
Chittagong
Cox's Bazar
Kushtia
Kushtia
Narayanganj
Sirajganj
Satkhira
Pabna
Noakhali
Kushtia
Habiganj
Jhenaidah
Tangail
Chuadanga
Gaibanda
Gopalganj
Kushtia
Narayanganj
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N1
N1
R141
N104
N7
N709
N704
N1
N1
R141
N704
N2
N804
N1
R451
N1
N4
N704
N704
R140
N1
R113
N5
N106
N110
N704
N704
N1
R451
R765
N705
R142
N704
N2
N704
N4
R745
R585
N805
N704
N1
Road Name
Chainage
Dhaka -Comilla -Chittagong-Teknaf RoKm 183.08-183.18
Dhaka -Comilla -Chittagong-Teknaf RoKm 185.08-185.28
Lalmai-Sonaimuri Road
Km 000.40-001.20
Feni-Noakhali Road
Km 011.50-011.70
Dauladia-Mongla Road
Km 074.62-075.31
Khulna City By-Pass Road
Km 005.00-005.10
Jhenaidah-Dasuria Road
Km 038.70-038.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 197.38-198.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 243.04-243.14
Lalmai-Sonaimuri Road
Km 019.00-020.60
Jhenaidah-Dasuria Road
Km 002.60-002.80
Dhaka-Sylhet-Jaflong Road
Km 145.65-148.15
Bhanga-Faridpur Road
Km 030.00-030.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 284.28-284.58
Nalka-Sirajganj Road
Km 001.30-002.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 300.88-301.08
Joydebpur-Jamalpur Road
Km 080.95-081.75
Jhenaidah-Dasuria Road
Km 007.10-007.20
Jhenaidah-Dasuria Road
Km 020.80-020.82
Comilla-Begumganj Road
Km 067.10-067.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 304.18-304.38
Madanpur-Sayedpur Road
Km 005.40-011.10
Dhaka -Utholi-Banglabandh Road
Km 291.38-294.48
Chittagong-Rangamati Road
Km 005.00-005.10
Link Road-Cox's Bazar Road
Km 005.20-005.40
Jhenaidah-Dasuria Road
Km 066.66-070.40
Jhenaidah-Dasuria Road
Km 035.30-035.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 017.10-017.70
Nalka-Sirajganj Road
Km 002.70-003.40
Khulna-Satkhira Road
Km 022.90-023.30
Paksey -Iswardi-Dasuria
Km 009.20-009.30
Begamganj-Ramganj Road
Km 028.25-028.99
Jhenaidah-Dasuria Road
Km 021.40-021.60
Dhaka-Sylhet-Jaflong Road
Km 153.41-153.51
Jhenaidah-Dasuria Road
Km 012.90-013.20
Joydebpur-Jamalpur Road
Km 081.75-082.35
Kushtia -Jhenaidah Road
Km 077.98-078.58
Gobindagnj-Fulbari-Dinajpur Road
Km 000.00-000.50
Bhanga-Mollahhat Road
Km 000.00-000.10
Jhenaidah-Dasuria Road
Km 024.10-024.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 002.80-003.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.80
4887 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.68 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.70 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.60
5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.50
6671 National DBST 25mm @ 25% Crk
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
1.40
4965 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.80 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.02 11451 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
5.70
5074 Regional DBST 25mm @ 25% Crk
S
3.10
4405 National Overlay 50mm @ IRI 4-9
S
0.10 13468 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
3.74 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.60 11451 National Full Recon 195mm @ IRI 12
S
0.70
4965 Regional Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional DBST @ Traff 4000-6000
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.75
4887 Regional DBST @ Traff 4000-6000
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
6671 National Overlay 50mm @ IRI 4-7
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Full Recon 195mm @ IRI 12
S
0.60
4887 Regional DBST @ Traff 4000-6000
S
0.50
6187 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
R
0.80 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:37 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.978
5.76
5.956
5.76
1.146
5.76
4.360
5.75
20.236
5.75
2.842
5.75
2.842
5.75
12.908
5.74
2.803
5.74
5.865
5.74
5.683
5.74
4.631
5.73
5.683
5.73
8.175
5.73
4.792
5.73
5.606
5.73
18.440
5.72
2.842
5.71
0.568
5.71
0.940
5.71
5.450
5.71
6.800
5.71
11.650
5.70
1.783
5.70
5.372
5.70
108.375
5.69
2.842
5.69
17.517
5.69
2.010
5.69
0.543
5.69
2.803
5.69
1.015
5.69
5.683
5.68
0.391
5.68
8.525
5.68
17.424
5.68
1.289
5.68
1.711
5.67
2.842
5.67
5.683
5.66
20.865
5.66
NPV
16.80
33.59
30.83
23.66
113.97
16.16
15.99
71.85
15.75
53.61
31.92
73.00
31.90
45.73
32.65
31.43
105.58
15.90
3.18
9.28
30.39
131.52
128.26
9.70
30.09
604.30
15.84
97.65
14.24
12.78
15.61
25.89
31.63
4.03
47.44
96.94
29.31
14.59
15.94
31.52
113.71
Appendix-A
Annual Needs Report
2012-2013
Road
No
Gopalganj Gopalganj
N805
Gopalganj Gopalganj
N805
Gopalganj Gopalganj
N805
Comilla
Brahmanbaria R220
Dhaka
Tangail
R506
Khulna
Jessore
N708
Barisal
Jhalokati
R870
Gopalganj Faridpur
N7
Rangpur
Gaibanda
R585
Rajshahi
Nawabganj
R547
Dhaka
Narayanganj N1
Chittagong Chittagong
N106
Comilla
Brahmanbaria R220
Barisal
Barisal
N8
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Gopalganj Faridpur
N7
Khulna
Kushtia
N704
Comilla
Noakhali
N104
Sylhet
Sylhet
N2
Dhaka
Gazipur
R313
Dhaka
Narayanganj R113
Sylhet
Moulavi Bazar R282
Chittagong Cox's Bazar
N110
Gopalganj Faridpur
N7
Chittagong Dohazari
R170
Rangpur
Rangpur
N517
Khulna
Khulna
N7
Rangpur
Dinajpur
R585
Khulna
Kushtia
N704
Chittagong Chittagong
R163
Comilla
Feni
N104
Comilla
Comilla
R140
Gopalganj Faridpur
N804
Rangpur
Panchgarh
N5
Khulna
Jessore
N706
Dhaka
Tangail
N4
Khulna
Khulna
N709
Rajshahi
Rajshahi
N603
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Bhanga-Mollahhat Road
Km 000.70-000.90
Bhanga-Mollahhat Road
Km 004.90-005.00
Bhanga-Mollahhat Road
Km 004.00-004.10
Sarail-Habiganj Road
Km 002.10-002.20
Aricha -Daulatpur-Tangail Road
Km 036.71-038.41
Jessore Town Old Section
Km 001.30-001.40
Barisal-Pirojpur Road
Km 038.07-039.87
Dauladia-Mongla Road
Km 041.50-041.60
Gobindagnj-Fulbari-Dinajpur Road
Km 002.40-003.90
Naogaon-Badalgachhi-Rohonpur
Km 081.42-082.62
Dhaka -Comilla -Chittagong-Teknaf RoKm 024.28-024.38
Chittagong-Rangamati Road
Km 021.70-021.80
Sarail-Habiganj Road
Km 000.40-000.50
Dhaka -Patuakhali Road
Km 140.45-140.65
Dhaka -Comilla -Chittagong-Teknaf RoKm 188.88-189.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 190.18-190.28
Dauladia-Mongla Road
Km 034.80-035.30
Jhenaidah-Dasuria Road
Km 038.50-038.60
Feni-Noakhali Road
Km 036.90-037.10
Dhaka-Sylhet-Jaflong Road
Km 279.29-279.39
Mawna-Monohardi Road
Km 033.07-033.37
Madanpur-Sayedpur Road
Km 002.00-002.30
Juri-Lathidila Road
Km 015.40-015.99
Link Road-Cox's Bazar Road
Km 006.20-006.50
Dauladia-Mongla Road
Km 041.00-041.20
Patiya-Chokoria Road
Km 007.40-007.80
Rangpur Town Old Section
Km 002.50-002.60
Dauladia-Mongla Road
Km 215.54-216.05
Gobindagnj-Fulbari-Dinajpur Road
Km 054.02-057.72
Jhenaidah-Dasuria Road
Km 020.82-021.10
Chittagong -Chandragona Road
Km 032.10-033.27
Feni-Noakhali Road
Km 017.30-019.50
Comilla-Begumganj Road
Km 021.49-023.69
Bhanga-Faridpur Road
Km 030.80-031.10
Dhaka -Utholi-Banglabandh Road
Km 446.84-447.14
Jessore -Benapole Road
Km 032.10-032.90
Joydebpur-Jamalpur Road
Km 121.91-122.01
Khulna City By-Pass Road
Km 006.30-006.50
Rajshahi Town By-Pass Road
Km 017.20-017.60
Feni-Noakhali Road
Km 042.98-043.08
Dhaka -Comilla -Chittagong-Teknaf RoKm 222.98-223.18
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
4488 Regional Overlay 50mm @ IRI 5-7
S
1.70
2847 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.80
2223 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.50
6187 Regional DBST @ Traff >6000
S
1.20
3019 Regional DBST @ Traff 2000-4000
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
4488 Regional Overlay 50mm @ IRI 5-7
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.50 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 10253 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.58
4391 Regional Overlay 60mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.40
3516 Regional Overlay 50mm @ IRI 7-9
S
0.10
9111 National DBST @ Traff >6000
S
0.51 11451 National Overlay 80mm @ IRI 4-9
S
3.70
4331 Regional Overlay 50mm @ IRI 5-7
S
0.28 11451 National Full Recon 195mm @ IRI 12
S
1.17
4887 Regional DBST @ Traff 4000-6000
S
2.20
9193 National DBST 25mm @ 25% Crk
S
2.20
4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.80
7314 National Overlay 60mm @ IRI 7-9
S
0.10
3779 National Overlay 50mm @ IRI 4-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
Appendix-A: Page:38 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.683
5.66
2.842
5.66
2.842
5.65
0.209
5.65
3.549
5.65
2.842
5.65
3.730
5.65
2.842
5.65
2.038
5.64
1.097
5.63
2.920
5.62
2.258
5.62
0.209
5.62
5.683
5.61
5.917
5.61
2.958
5.61
14.208
5.61
2.842
5.61
3.442
5.61
2.305
5.60
0.408
5.60
4.120
5.60
1.274
5.59
8.058
5.58
5.683
5.58
0.731
5.58
0.180
5.58
5.258
5.58
10.622
5.58
7.957
5.57
1.589
5.57
3.152
5.57
7.464
5.57
8.525
5.56
5.532
5.56
3.784
5.56
0.287
5.55
5.683
5.54
11.367
5.54
2.920
5.54
5.333
5.53
NPV
31.81
15.90
15.89
1.28
26.23
15.88
25.82
15.71
44.10
20.29
16.06
11.90
1.30
31.54
32.51
16.26
78.04
15.61
18.32
13.08
6.86
23.16
8.14
44.23
31.07
5.33
4.44
41.37
77.73
43.43
39.74
78.39
68.13
46.41
29.80
34.35
2.92
31.15
61.63
15.98
28.80
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Kushtia
N704
Rangpur
Thakurgaon
N5
Gopalganj Gopalganj
R850
Khulna
Magura
N702
Khulna
Kushtia
N704
Chittagong Dohazari
N1
Chittagong Chittagong
N1
Khulna
Jhenaidah
N7
Chittagong Chittagong
R163
Khulna
Magura
N7
Khulna
Magura
N702
Rangpur
Bogra
N502
Dhaka
Gazipur
R303
Dhaka
Gazipur
N3
Comilla
Feni
N1
Dhaka
Narsingdi
R301
Rangpur
Kurigram
N506
Comilla
Comilla
R140
Chittagong Dohazari
R170
Dhaka
Manikganj
R506
Comilla
Brahmanbaria N2
Dhaka
Gazipur
R313
Khulna
Khulna
R760
Sylhet
Sylhet
N2
Dhaka
Narayanganj R202
Dhaka
Munshiganj
R820
Chittagong Rangamati
R161
Rajshahi
Natore
R548
Khulna
Khulna
R760
Khulna
Jessore
R755
Dhaka
Munshiganj
R813
Dhaka
Dhaka
R112
Chittagong Dohazari
N1
Chittagong Chittagong
R163
Barisal
Bhola
N809
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Rangpur
Dinajpur
R585
Dhaka
Tangail
N4
Chittagong Chittagong
R151
Rangpur
Joypurhat
R550
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Jhenaidah-Dasuria Road
Km 024.50-024.80
Dhaka -Utholi-Banglabandh Road
Km 408.20-410.87
Tekerhat-Mollahhat Road
Km 001.20-001.50
Jessore -Magura Road
Km 035.79-035.89
Jhenaidah-Dasuria Road
Km 025.90-026.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 255.14-255.44
Dhaka -Comilla -Chittagong-Teknaf RoKm 244.04-244.34
Dauladia-Mongla Road
Km 125.72-129.42
Chittagong -Chandragona Road
Km 020.90-021.40
Dauladia-Mongla Road
Km 077.51-078.21
Jessore -Magura Road
Km 031.69-034.49
Bogra -Natore Road
Km 013.30-015.10
Tongi By-Pass Road
Km 000.10-000.20
Dhaka -Mymensingh Road
Km 012.80-014.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 169.88-170.17
Tongi-Pachdona Road
Km 031.33-032.86
Rangpur-Barobari-Kurigram Road
Km 046.00-047.20
Comilla-Begumganj Road
Km 026.19-026.49
Patiya-Chokoria Road
Km 008.80-008.90
Aricha -Daulatpur-Tangail Road
Km 006.80-006.90
Dhaka-Sylhet-Jaflong Road
Km 082.44-082.64
Mawna-Monohardi Road
Km 019.27-019.37
Khulna-Satkhira Road
Km 009.00-009.60
Dhaka-Sylhet-Jaflong Road
Km 278.79-278.89
Bhulta-Rampura Road
Km 004.40-004.70
Zinzira-Srinagar Road
Km 010.47-016.73
Rangamati -Bandarban Road
Km 027.20-027.70
Naogaon-Atrai-Natore Road
Km 039.29-040.17
Khulna-Satkhira Road
Km 021.70-027.80
Jessore -Chuknagar Road
Km 020.90-021.00
Muktarpur - Munshiganj Road
Km 002.00-002.50
Narayanganj -Rampura Road
Km 000.00-017.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 302.18-302.58
Chittagong -Chandragona Road
Km 024.90-027.00
Barishal-Lakshmipur Road
Km 025.15-025.19
Dhaka -Comilla -Chittagong-Teknaf RoKm 195.88-196.48
Dhaka -Comilla -Chittagong-Teknaf RoKm 189.28-189.68
Gobindagnj-Fulbari-Dinajpur Road
Km 081.60-083.00
Joydebpur-Jamalpur Road
Km 082.35-082.75
Baraiyerhat-Fatikchhari Road
Km 017.60-017.80
Mokamtala-Joypurhat Road
Km 016.00-024.12
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
2.66
3083 National Overlay 50mm @ IRI 4-9
S
0.30
2343 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
3.70
5636 National Overlay 50mm @ IRI 4-9
S
0.50
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
2.80 11451 National Full Recon 195mm @ IRI 12
S
1.80
5705 National Overlay 50mm @ IRI 5-9
S
0.10 10199 Regional Full Recon 150mm @ IRI 12
L
1.50
8665 National Overlay 50mm @ IRI 4-7
S
0.29 11451 National Full Recon 195mm @ IRI 12
S
1.53
4887 Regional DBST 25mm @ 25% Crk
S
1.20
2992 National Overlay 50mm @ IRI 5-9
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
0.10
3516 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20 12330 National Full Recon 195mm @ IRI 12
S
0.10
3571 Regional Overlay 50mm @ IRI 5-7
S
0.60
3206 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Overlay 50mm @ IRI 5-7
S
6.26
5393 Regional Overlay 60mm @ IRI 5.5-9
S
0.50
3019 Regional Overlay 50mm @ IRI 5-7
S
0.88
1939 Regional Overlay 50mm @ IRI 7-9
S
6.10
4887 Regional DBST @ Traff 4000-6000
S
0.10
3292 Regional DBST @ Traff 2000-4000
S
0.50
3788 Regional DBST @ Traff 2000-4000
S
17.50
3019 Regional Overlay 50mm @ IRI 7-9
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
2.10
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.04
9061 National DBST @ Traff >6000
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
1.40
2707 Regional DBST @ Traff 2000-4000
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.20
1484 Regional Overlay 50mm @ IRI 7-9
S
8.12
3234 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:39 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
8.525
5.53
8.340
5.53
0.940
5.52
2.842
5.52
11.367
5.52
7.824
5.51
8.724
5.51
12.263
5.51
1.711
5.51
6.741
5.50
79.567
5.50
5.167
5.50
1.799
5.49
11.486
5.49
8.496
5.48
2.340
5.48
3.508
5.48
0.445
5.48
0.086
5.46
1.324
5.45
5.839
5.44
0.157
5.44
1.879
5.43
2.920
5.43
1.096
5.43
21.994
5.41
0.940
5.41
1.835
5.41
9.055
5.40
0.136
5.39
0.445
5.39
29.229
5.38
11.211
5.37
7.188
5.36
0.050
5.36
10.880
5.35
11.834
5.35
1.902
5.34
11.522
5.34
0.397
5.34
23.316
5.33
NPV
46.15
64.69
8.37
15.51
61.43
42.02
47.06
137.29
10.22
52.34
432.53
38.55
9.65
120.51
45.63
36.92
30.56
8.55
1.04
7.18
31.31
1.34
17.40
15.67
10.86
145.40
8.11
12.97
152.22
2.14
8.54
254.48
59.00
42.59
2.99
55.99
61.99
36.61
60.22
3.12
169.36
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Mymensingh R314
Barisal
Patuakhali
R881
Comilla
Chandpur
R140
Chittagong Dohazari
R171
Dhaka
Dhaka
R801
Sylhet
Sylhet
N2
Barisal
Barisal
N8
Chittagong Chittagong
N1
Dhaka
Munshiganj
R813
Comilla
Chandpur
R140
Khulna
Kushtia
N704
Khulna
Khulna
R760
Rangpur
Kurigram
N506
Chittagong Chittagong
N1
Khulna
Khulna
R760
Chittagong Chittagong
R163
Chittagong Chittagong
N1
Khulna
Jessore
R755
Chittagong Chittagong
R163
Khulna
Satkhira
R760
Chittagong Chittagong
N1
Chittagong Chittagong
N1
Comilla
Noakhali
N104
Rangpur
Lalmonirhat
N506
Khulna
Jessore
N7
Rangpur
Dinajpur
R585
Dhaka
Gazipur
N3
Chittagong Chittagong
N1
Comilla
Brahmanbaria N2
Dhaka
Mymensingh R314
Comilla
Noakhali
R141
Rajshahi
Rajshahi
N603
Rangpur
Bogra
R545
Sylhet
Habiganj
N2
Dhaka
Sherpur
R371
Dhaka
Narayanganj N1
Khulna
Jessore
N7
Chittagong Chittagong
R151
Dhaka
Gazipur
R313
Khulna
Khulna
R760
Comilla
Brahmanbaria N2
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Gafargaon-Mawna Road
Km 011.90-012.10
Amtali-Kuakata Road
Km 032.82-040.70
Comilla-Begumganj Road
Km 084.92-085.12
Banshkhali -Chunti Road
Km 002.90-003.00
Jurain-Chasara Road
Km 000.00-010.00
Dhaka-Sylhet-Jaflong Road
Km 276.99-277.19
Dhaka -Patuakhali Road
Km 139.05-140.45
Dhaka -Comilla -Chittagong-Teknaf RoKm 171.48-171.78
Muktarpur - Munshiganj Road
Km 000.40-001.60
Comilla-Begumganj Road
Km 083.72-084.52
Jhenaidah-Dasuria Road
Km 036.60-036.90
Khulna-Satkhira Road
Km 000.70-001.20
Rangpur-Barobari-Kurigram Road
Km 042.00-042.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 186.28-187.58
Khulna-Satkhira Road
Km 010.90-011.50
Chittagong -Chandragona Road
Km 018.20-019.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 171.08-171.18
Jessore -Chuknagar Road
Km 013.00-013.30
Chittagong -Chandragona Road
Km 007.20-007.30
Khulna-Satkhira Road
Km 058.26-058.46
Dhaka -Comilla -Chittagong-Teknaf RoKm 200.68-200.78
Dhaka -Comilla -Chittagong-Teknaf RoKm 187.68-187.88
Feni-Noakhali Road
Km 043.08-043.68
Rangpur-Barobari-Kurigram Road
Km 033.00-036.00
Dauladia-Mongla Road
Km 144.72-144.82
Gobindagnj-Fulbari-Dinajpur Road
Km 083.60-084.66
Dhaka -Mymensingh Road
Km 047.95-048.15
Dhaka -Comilla -Chittagong-Teknaf RoKm 229.26-229.76
Dhaka-Sylhet-Jaflong Road
Km 085.24-085.44
Gafargaon-Mawna Road
Km 010.60-010.80
Lalmai-Sonaimuri Road
Km 035.72-037.97
Rajshahi Town By-Pass Road
Km 000.00-000.10
Bogra-Joypurhat Road
Km 007.30-011.30
Dhaka-Sylhet-Jaflong Road
Km 153.11-153.21
Sherpur-Nakla-Mymensingh
Km 055.36-058.36
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.00-009.20
Dauladia-Mongla Road
Km 150.22-150.32
Baraiyerhat-Fatikchhari Road
Km 019.10-019.20
Mawna-Monohardi Road
Km 007.27-007.47
Khulna-Satkhira Road
Km 033.60-034.87
Dhaka-Sylhet-Jaflong Road
Km 074.74-074.84
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
1346 Regional Overlay 50mm @ IRI 7-9
S
7.87
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 10297 Regional Rehab 150mm @ IRI 9-12
S
0.10
1514 Regional Overlay 50mm @ IRI 5-7
S
10.00
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.40 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
1.20
3788 Regional DBST @ Traff 2000-4000
S
0.80 10297 Regional DBST @ Traff >6000
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.50
4887 Regional DBST 25mm @ 25% Crk
S
0.70
2992 National Overlay 50mm @ IRI 5-9
S
1.30 11451 National Full Recon 195mm @ IRI 12
S
0.60
3206 Regional Overlay 50mm @ IRI 7-9
S
1.00
7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
3292 Regional DBST @ Traff 2000-4000
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.20
4887 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
3.00
2992 National Overlay 50mm @ IRI 5-9
S
0.10
5636 National Full Recon 150mm @ IRI 12
S
1.06
2707 Regional DBST @ Traff 2000-4000
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
1346 Regional DBST @ Traff 100-2000
S
2.24
4887 Regional DBST @ Traff 4000-6000
S
0.10
3802 National DBST 25mm @ 25% Crk
S
4.00
7130 Regional Rehab 150mm @ IRI 9-12
S
0.10
6671 National DBST @ Traff >6000
S
3.00
3786 Regional Overlay 50mm @ IRI 5-7
R
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
1484 Regional Overlay 50mm @ IRI 7-9
S
0.20
3571 Regional Overlay 50mm @ IRI 7-9
S
1.27
4116 Regional Overlay 60mm @ IRI 7-9
S
0.10 12330 National Full Recon 195mm @ IRI 12
Appendix-A: Page:40 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.313
5.33
15.203
5.33
2.943
5.32
0.198
5.31
46.676
5.31
5.839
5.31
39.783
5.31
8.759
5.30
1.067
5.30
1.186
5.29
8.525
5.28
0.766
5.28
2.010
5.28
38.460
5.28
1.879
5.27
3.423
5.27
2.920
5.26
0.408
5.26
0.131
5.26
0.296
5.25
2.059
5.25
5.917
5.25
14.217
5.24
8.604
5.23
1.835
5.23
1.437
5.23
4.487
5.23
15.674
5.23
5.839
5.23
0.148
5.23
3.354
5.22
0.180
5.22
53.946
5.22
0.185
5.22
9.395
5.22
5.761
5.21
1.871
5.20
0.198
5.19
0.355
5.19
4.742
5.19
2.920
5.18
NPV
2.04
135.15
15.83
1.14
356.74
30.63
208.68
45.50
20.15
26.15
44.11
14.67
16.69
198.69
16.88
19.18
15.05
6.44
2.85
3.67
10.59
30.40
75.36
59.40
9.34
27.12
23.49
82.02
30.19
2.61
75.66
2.82
276.85
3.30
67.64
29.38
9.19
1.19
2.50
37.54
14.91
Appendix-A
Annual Needs Report
2012-2013
Road
No
Rajshahi
Naogaon
R547
Chittagong Chittagong
N1
Chittagong Cox's Bazar
N110
Barisal
Patuakhali
R881
Rangpur
Joypurhat
R545
Rajshahi
Pabna
R604
Sylhet
Sylhet
N2
Khulna
Khulna
R760
Comilla
Chandpur
R140
Comilla
Comilla
R141
Rajshahi
Sirajganj
N5
Rajshahi
Pabna
N6
Khulna
Kushtia
N704
Dhaka
Gazipur
R302
Khulna
Khulna
R760
Chittagong Chittagong
N106
Chittagong Dohazari
N1
Dhaka
Kishoreganj
N2
Chittagong Chittagong
N106
Barisal
Bhola
R890
Chittagong Chittagong
N1
Comilla
Brahmanbaria N2
Khulna
Jessore
R755
Chittagong Chittagong
R160
Khulna
Kushtia
N704
Sylhet
Moulavi Bazar N208
Khulna
Jhenaidah
N704
Chittagong Chittagong
N106
Dhaka
Dhaka
N501
Sylhet
Sylhet
N210
Chittagong Chittagong
N1
Dhaka
Gazipur
N3
Khulna
Khulna
N709
Khulna
Jhenaidah
N703
Gopalganj Faridpur
N7
Rajshahi
Naogaon
R547
Dhaka
Narayanganj N1
Barisal
Barisal
N809
Khulna
Jessore
N708
Dhaka
Gazipur
N3
Rajshahi
Pabna
N6
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Naogaon-Badalgachhi-Rohonpur
Km 004.47-014.87
Dhaka -Comilla -Chittagong-Teknaf RoKm 217.78-217.88
Link Road-Cox's Bazar Road
Km 005.60-005.80
Amtali-Kuakata Road
Km 031.42-032.72
Bogra-Joypurhat Road
Km 119.79-119.89
Tebunia-Hamkuria Road
Km 013.20-013.40
Dhaka-Sylhet-Jaflong Road
Km 284.66-284.76
Khulna-Satkhira Road
Km 000.40-000.50
Comilla-Begumganj Road
Km 036.19-036.79
Lalmai-Sonaimuri Road
Km 020.70-022.00
Dhaka -Utholi-Banglabandh Road
Km 150.51-161.37
Kashinathpur-Natore-Rajshahi Road Km 044.15-046.20
Jhenaidah-Dasuria Road
Km 023.40-023.50
Kaliganj Bazr Road
Km 005.90-006.20
Khulna-Satkhira Road
Km 030.60-033.60
Chittagong-Rangamati Road
Km 021.20-021.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 300.48-300.68
Dhaka-Sylhet-Jaflong Road
Km 072.04-074.18
Chittagong-Rangamati Road
Km 005.10-005.30
Bhola -Char Manika Road
Km 004.00-007.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 198.18-199.58
Dhaka-Sylhet-Jaflong Road
Km 087.74-087.94
Jessore -Chuknagar Road
Km 018.80-020.80
Hathazari-Khagrachhari Road
Km 021.60-023.20
Jhenaidah-Dasuria Road
Km 034.10-034.30
Moulvibazar-Sylhet Road
Km 013.40-030.60
Jhenaidah-Dasuria Road
Km 007.90-008.00
Chittagong-Rangamati Road
Km 014.60-014.90
Mirpur Bridge-Dhour Road
Km 008.30-009.10
Sylhet Twn By-Pass Road
Km 002.50-002.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 244.44-244.54
Dhaka -Mymensingh Road
Km 047.05-047.25
Khulna City By-Pass Road
Km 003.10-003.20
Jhenaidah Town Old Section
Km 002.30-003.30
Dauladia-Mongla Road
Km 036.20-036.30
Naogaon-Badalgachhi-Rohonpur
Km 016.97-017.17
Dhaka -Comilla -Chittagong-Teknaf RoKm 037.78-037.88
Barishal-Lakshmipur Road
Km 000.70-001.30
Jessore Town Old Section
Km 001.60-001.70
Dhaka -Mymensingh Road
Km 022.30-023.20
Kashinathpur-Natore-Rajshahi Road Km 048.55-048.65
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
10.40
3109 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
1.30
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20
3778 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.60
4887 Regional Overlay 50mm @ IRI 5-7
S
1.30
5257 Regional Overlay 60mm @ IRI 5.5-9
S
10.86 11451 National Rehab 195mm @ IRI 9-12
S
2.05
7153 National Overlay 50mm @ IRI 4-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
3076 Regional DBST @ Traff 2000-4000
S
3.00
3937 Regional Overlay 50mm @ IRI 5-7
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.14 10258 National Overlay 80mm @ IRI 4-9
S
0.20 13468 National Full Recon 195mm @ IRI 12
S
3.20
4887 Regional DBST @ Traff 4000-6000
S
1.40 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.00
3292 Regional DBST 25mm @ 25% Crk
S
1.60
4406 Regional DBST 25mm @ 25% Crk
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
17.20
7159 National Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.80
9855 National Rehab 180mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.00 11451 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
3019 Regional DBST 25mm @ 25% Crk
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
R
0.90 11451 National DBST @ Traff >6000
S
0.10 11451 National Rehab 195mm @ IRI 9-12
Appendix-A: Page:41 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
29.313
5.18 226.70
2.764
5.17
14.00
4.241
5.17
22.06
2.511
5.17
21.32
0.342
5.17
5.38
0.626
5.17
4.48
2.920
5.17
14.91
0.153
5.17
1.93
2.183
5.16
20.30
4.814
5.16
39.59
244.291
5.16 1275.70
7.822
5.16
54.70
2.842
5.16
14.35
0.415
5.15
6.21
9.395
5.15
83.57
9.031
5.14
43.60
5.606
5.13
28.15
13.223
5.12
80.51
4.516
5.12
21.81
4.347
5.12
97.91
25.816
5.11 127.88
5.839
5.11
29.21
2.717
5.11
49.11
2.213
5.11
39.60
5.683
5.10
28.40
53.868
5.09 317.42
3.192
5.08
15.88
6.773
5.08
32.29
11.223
5.08
53.92
2.842
5.08
14.26
3.114
5.07
15.46
4.487
5.07
22.75
2.842
5.07
14.24
18.440
5.06
89.78
2.842
5.06
14.08
0.180
5.06
2.56
2.842
5.06
14.07
16.980
5.05
84.84
2.931
5.05
14.63
3.779
5.04
94.09
2.244
5.04
11.32
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Mymensingh R371
Chittagong Chittagong
R151
Dhaka
Manikganj
R315
Dhaka
Munshiganj
N8
Comilla
Comilla
R140
Gopalganj Faridpur
N804
Dhaka
Mymensingh R314
Dhaka
Narayanganj N1
Dhaka
Narayanganj R202
Chittagong Chittagong
N1
Sylhet
Sylhet
R250
Comilla
Chandpur
R140
Comilla
Brahmanbaria N2
Rajshahi
Pabna
R603
Rangpur
Joypurhat
R545
Dhaka
Mymensingh R371
Comilla
Chandpur
R140
Dhaka
Gazipur
R303
Chittagong Chittagong
N1
Chittagong Cox's Bazar
N110
Khulna
Khulna
N7
Chittagong Chittagong
N1
Dhaka
Gazipur
R313
Khulna
Jessore
R755
Gopalganj Rajbari
R710
Rangpur
Dinajpur
R585
Rajshahi
Naogaon
R547
Dhaka
Gazipur
N105
Chittagong Chittagong
N106
Sylhet
Sylhet
N2
Chittagong Chittagong
N1
Sylhet
Sylhet
N210
Comilla
Chandpur
R140
Sylhet
Sylhet
N210
Chittagong Rangamati
N106
Chittagong Chittagong
N1
Dhaka
Tangail
N4
Chittagong Chittagong
R163
Sylhet
Sylhet
N2
Dhaka
Narayanganj R202
Dhaka
Narayanganj N1
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Sherpur-Nakla-Mymensingh
Km 030.40-031.00
Baraiyerhat-Fatikchhari Road
Km 018.00-018.20
Mawna-Nabinagar Road
Km 039.40-043.30
Dhaka -Patuakhali Road
Km 022.50-022.80
Comilla-Begumganj Road
Km 029.09-029.19
Bhanga-Faridpur Road
Km 027.70-028.00
Gafargaon-Mawna Road
Km 011.50-011.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 020.18-020.78
Bhulta-Rampura Road
Km 005.10-005.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 214.58-214.68
Sylhet-Jakiganj Road
Km 031.05-040.43
Comilla-Begumganj Road
Km 039.89-039.99
Dhaka-Sylhet-Jaflong Road
Km 084.54-084.64
Pabna-Paksey (EPZ) Road
Km 021.81-025.78
Bogra-Joypurhat Road
Km 117.79-117.99
Sherpur-Nakla-Mymensingh
Km 000.00-018.10
Comilla-Begumganj Road
Km 038.49-038.59
Tongi By-Pass Road
Km 000.30-000.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 170.38-170.48
Link Road-Cox's Bazar Road
Km 007.70-008.00
Dauladia-Mongla Road
Km 191.19-191.39
Dhaka -Comilla -Chittagong-Teknaf RoKm 179.48-179.58
Mawna-Monohardi Road
Km 025.17-025.27
Jessore -Chuknagar Road
Km 003.90-005.40
Ahaladipur-Kushtia Road
Km 026.81-029.51
Gobindagnj-Fulbari-Dinajpur Road
Km 070.40-070.70
Naogaon-Badalgachhi-Rohonpur
Km 044.39-044.49
Madanpur-Joydevpur
Km 040.14-043.14
Chittagong-Rangamati Road
Km 023.00-023.20
Dhaka-Sylhet-Jaflong Road
Km 282.26-282.46
Dhaka -Comilla -Chittagong-Teknaf RoKm 217.18-217.78
Sylhet Twn By-Pass Road
Km 006.40-006.60
Comilla-Begumganj Road
Km 085.12-085.52
Sylhet Twn By-Pass Road
Km 010.60-010.70
Chittagong-Rangamati Road
Km 030.00-033.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 226.08-226.18
Joydebpur-Jamalpur Road
Km 121.61-121.91
Chittagong -Chandragona Road
Km 016.50-016.60
Dhaka-Sylhet-Jaflong Road
Km 275.39-275.49
Bhulta-Rampura Road
Km 005.90-007.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 034.88-035.18
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.60
4887 Regional DBST @ Traff 4000-6000
S
0.20
1484 Regional Overlay 50mm @ IRI 7-9
S
3.90
2048 Regional Overlay 50mm @ IRI 5-7
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.40
1346 Regional Overlay 50mm @ IRI 7-9
R
0.60 11451 National Full Recon 195mm @ IRI 12
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
9.38
3155 Regional Overlay 50mm @ IRI 7-9
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
0.10 12330 National Full Recon 195mm @ IRI 12
S
3.96
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20
2947 Regional DBST @ Traff 2000-4000
S
18.10
4540 Regional DBST 25mm @ 25% Crk
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
0.30 10199 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
7406 National Full Recon 180mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
5572 Regional DBST 25mm @ 25% Crk
S
1.50
4887 Regional DBST 25mm @ 25% Crk
S
2.70
3636 Regional DBST 25mm @ 25% Crk
S
0.30
2707 Regional Overlay 50mm @ IRI 7-9
S
0.10
1661 Regional DBST @ Traff 100-2000
S
3.00 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.40 10297 Regional Rehab 150mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
3.00 11451 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National Rehab 180mm @ IRI 9-12
S
0.30
3779 National Overlay 50mm @ IRI 4-9
S
0.10
7612 Regional DBST 25mm @ 25% Crk
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.10
4887 Regional Overlay 60mm @ IRI 7-9
R
0.30 11451 National Rehab 195mm @ IRI 9-12
Appendix-A: Page:42 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.889
5.04
0.397
5.04
6.310
5.04
8.759
5.03
0.178
5.03
8.957
5.03
0.626
5.02
20.343
5.02
2.614
5.02
3.410
5.01
26.280
5.01
1.897
5.01
2.920
5.01
8.915
5.01
0.272
5.01
26.869
5.00
1.832
5.00
5.398
5.00
2.920
5.00
9.693
5.00
4.790
5.00
2.958
4.99
0.124
4.99
2.038
4.99
3.801
4.98
0.861
4.98
0.089
4.97
85.250
4.96
4.516
4.96
5.839
4.96
13.092
4.96
5.683
4.95
5.885
4.95
2.842
4.95
52.000
4.94
1.868
4.93
0.861
4.93
0.136
4.92
2.920
4.92
4.792
4.92
6.823
4.92
NPV
15.06
2.45
28.61
43.55
3.66
44.09
4.63
100.04
20.89
16.74
172.21
9.28
14.42
56.42
3.99
386.80
8.90
26.37
14.29
47.90
23.61
14.47
1.05
22.23
60.50
6.38
1.45
418.40
21.02
28.63
64.90
27.84
29.47
13.91
245.33
9.04
7.21
1.45
14.21
37.56
33.55
Appendix-A
Annual Needs Report
2012-2013
Road
No
Rangpur
Bogra
N515
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Dhaka
Gazipur
R302
Rajshahi
Naogaon
R547
Chittagong Chittagong
N1
Khulna
Bagerhat
N7
Dhaka
Gazipur
R313
Rajshahi
Nawabganj
R547
Dhaka
Tangail
N4
Khulna
Magura
N702
Dhaka
Gazipur
R311
Sylhet
Moulavi Bazar N208
Comilla
Chandpur
R140
Barisal
Barisal
N8
Chittagong Dohazari
N1
Dhaka
Mymensingh R371
Comilla
Comilla
R140
Comilla
Chandpur
R140
Gopalganj Sariatpur
R861
Dhaka
Gazipur
N3
Comilla
Chandpur
R140
Khulna
Chuadanga
R745
Rajshahi
Nawabganj
R547
Chittagong Dohazari
N1
Rangpur
Bogra
N502
Dhaka
Sherpur
R460
Comilla
Noakhali
N104
Chittagong Chittagong
N1
Dhaka
Mymensingh R314
Dhaka
Dhaka
R504
Dhaka
Gazipur
R313
Dhaka
Sherpur
R371
Khulna
Magura
N7
Comilla
Noakhali
N104
Khulna
Jessore
N7
Rajshahi
Naogaon
R547
Comilla
Chandpur
R140
Dhaka
Gazipur
R311
Rangpur
Dinajpur
R585
Dhaka
Gazipur
R311
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Bogra 2nd Town By-Pass Road
Km 014.00-014.30
Feni-Noakhali Road
Km 041.20-041.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 176.88-176.98
Kaliganj Bazr Road
Km 006.40-007.04
Naogaon-Badalgachhi-Rohonpur
Km 027.39-028.49
Dhaka -Comilla -Chittagong-Teknaf RoKm 211.18-211.38
Dauladia-Mongla Road
Km 224.46-224.56
Mawna-Monohardi Road
Km 023.87-025.17
Naogaon-Badalgachhi-Rohonpur
Km 097.47-098.37
Joydebpur-Jamalpur Road
Km 057.82-057.92
Jessore -Magura Road
Km 038.59-040.49
Joydebpur -Ordinance Factory
Km 003.90-004.10
Moulvibazar-Sylhet Road
Km 000.00-013.40
Comilla-Begumganj Road
Km 040.29-040.47
Dhaka -Patuakhali Road
Km 157.50-160.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 303.88-303.98
Sherpur-Nakla-Mymensingh
Km 032.60-034.70
Comilla-Begumganj Road
Km 007.80-008.50
Comilla-Begumganj Road
Km 079.60-079.70
Monohar -Shariatpur Road
Km 004.40-004.50
Dhaka -Mymensingh Road
Km 018.00-019.40
Comilla-Begumganj Road
Km 085.52-085.61
Kushtia -Jhenaidah Road
Km 075.58-076.18
Naogaon-Badalgachhi-Rohonpur
Km 096.17-097.07
Dhaka -Comilla -Chittagong-Teknaf RoKm 283.58-283.78
Bogra -Natore Road
Km 026.16-027.06
Jamalpur-Sherpur-Bangaon Road
Km 001.80-002.50
Feni-Noakhali Road
Km 039.80-039.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 171.98-173.18
Gafargaon-Mawna Road
Km 018.30-018.70
Hemayetpur-Manikganj Road
Km 003.20-004.00
Mawna-Monohardi Road
Km 018.07-018.27
Sherpur-Nakla-Mymensingh
Km 035.60-035.90
Dauladia-Mongla Road
Km 069.02-069.32
Feni-Noakhali Road
Km 035.30-035.50
Dauladia-Mongla Road
Km 153.56-153.66
Naogaon-Badalgachhi-Rohonpur
Km 044.89-044.99
Comilla-Begumganj Road
Km 039.49-039.59
Joydebpur -Ordinance Factory
Km 002.00-002.20
Gobindagnj-Fulbari-Dinajpur Road
Km 068.30-069.80
Joydebpur -Ordinance Factory
Km 001.10-001.30
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.20 10253 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.64
3076 Regional DBST 25mm @ 25% Crk
S
1.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
9684 National Full Recon 180mm @ IRI 12
S
1.30
5572 Regional Full Recon 150mm @ IRI 12
S
0.90
3019 Regional DBST @ Traff 2000-4000
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
1.90 11451 National Full Recon 195mm @ IRI 12
S
0.20
2929 Regional Overlay 50mm @ IRI 5-7
S
13.40 12587 National Overlay 80mm @ IRI 5-9
S
0.18
8774 Regional Full Recon 150mm @ IRI 12
S
3.30
9061 National Rehab 180mm @ IRI 9-12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
2.10
4887 Regional Overlay 50mm @ IRI 5-7
S
0.70
4909 Regional Overlay 50mm @ IRI 5-7
S
0.10 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
4885 Regional DBST @ Traff 4000-6000
L
1.40 11451 National Full Recon 195mm @ IRI 12
S
0.09 10297 Regional Full Recon 150mm @ IRI 12
S
0.60
4887 Regional Overlay 60mm @ IRI 7-9
S
0.90
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.90
9061 National Rehab 180mm @ IRI 9-12
S
0.70
4422 Regional Overlay 60mm @ IRI 7-9
S
0.10 10253 National Full Recon 195mm @ IRI 12
S
1.20 11451 National Rehab 195mm @ IRI 9-12
S
0.40
1346 Regional Overlay 50mm @ IRI 7-9
S
0.80
4187 Regional Overlay 60mm @ IRI 7-9
S
0.20
3571 Regional DBST 25mm @ 25% Crk
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30 11451 National Rehab 195mm @ IRI 9-12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
1661 Regional DBST @ Traff 100-2000
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
0.20
2929 Regional Overlay 50mm @ IRI 5-7
S
1.50
2707 Regional Overlay 50mm @ IRI 7-9
S
0.20
2929 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:43 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
6.731
4.91
3.565
4.91
2.997
4.90
0.885
4.90
12.596
4.88
4.983
4.88
2.515
4.87
21.265
4.87
0.823
4.86
2.305
4.86
55.397
4.86
0.397
4.85
67.828
4.85
3.453
4.85
53.047
4.84
2.151
4.84
6.577
4.84
2.558
4.83
1.963
4.83
0.136
4.83
47.032
4.82
1.865
4.82
2.801
4.82
1.790
4.82
5.450
4.82
14.467
4.82
2.396
4.82
2.258
4.81
27.918
4.81
0.626
4.81
2.803
4.81
0.148
4.81
4.414
4.80
6.731
4.80
6.384
4.80
1.871
4.79
0.089
4.79
1.871
4.78
0.397
4.78
4.306
4.78
0.397
4.77
NPV
33.46
16.71
14.39
15.50
59.52
23.20
11.96
100.46
12.57
11.20
265.97
1.96
296.14
16.35
246.18
10.38
44.17
21.67
9.22
1.68
222.09
8.75
22.37
10.26
25.63
66.90
12.92
10.25
134.38
4.25
20.99
2.21
21.49
32.29
30.27
8.47
1.37
8.71
1.95
30.80
2.09
Appendix-A
Annual Needs Report
2012-2013
Road
No
Gopalganj Madaripur
R860
Chittagong Chittagong
N1
Comilla
Comilla
R141
Khulna
Jhenaidah
N7
Dhaka
Gazipur
N3
Comilla
Brahmanbaria N2
Sylhet
Sylhet
N2
Rajshahi
Nawabganj
R547
Comilla
Feni
N104
Rajshahi
Nawabganj
R547
Dhaka
Jamalpur
N4
Khulna
Khulna
N7
Dhaka
Munshiganj
N8
Dhaka
Narayanganj R111
Rajshahi
Sirajganj
R451
Sylhet
Sylhet
N210
Khulna
Jhenaidah
N7
Chittagong Cox's Bazar
R180
Barisal
Patuakhali
R881
Dhaka
Jamalpur
N4
Chittagong Rangamati
N106
Comilla
Comilla
R140
Comilla
Chandpur
R140
Dhaka
Tangail
N4
Chittagong Chittagong
R160
Dhaka
Gazipur
R315
Rajshahi
Nawabganj
R547
Sylhet
Sylhet
N2
Khulna
Khulna
N7
Khulna
Jhenaidah
N7
Sylhet
Moulavi Bazar R282
Comilla
Brahmanbaria R220
Khulna
Jhenaidah
N7
Dhaka
Gazipur
R303
Chittagong Chittagong
R151
Rangpur
Thakurgaon
N5
Dhaka
Narayanganj N1
Comilla
Feni
N104
Rajshahi
Sirajganj
N5
Dhaka
Tangail
N4
Chittagong Chittagong
N1
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Mostafapur-Chandpur Road
Km 006.30-007.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 189.08-189.28
Lalmai-Sonaimuri Road
Km 006.80-007.00
Dauladia-Mongla Road
Km 129.42-129.72
Dhaka -Mymensingh Road
Km 010.00-012.70
Dhaka-Sylhet-Jaflong Road
Km 079.54-079.74
Dhaka-Sylhet-Jaflong Road
Km 271.89-271.99
Naogaon-Badalgachhi-Rohonpur
Km 083.32-083.37
Feni-Noakhali Road
Km 017.20-017.30
Naogaon-Badalgachhi-Rohonpur
Km 087.07-089.57
Joydebpur-Jamalpur Road
Km 127.15-127.61
Dauladia-Mongla Road
Km 190.39-190.59
Dhaka -Patuakhali Road
Km 018.80-019.10
Signboard -Narayanganj Road
Km 003.20-006.60
Nalka-Sirajganj Road
Km 000.00-001.30
Sylhet Twn By-Pass Road
Km 000.00-000.10
Dauladia-Mongla Road
Km 112.62-112.72
Laharpur-Laboni More Road
Km 000.20-000.30
Amtali-Kuakata Road
Km 017.00-018.29
Joydebpur-Jamalpur Road
Km 143.41-143.51
Chittagong-Rangamati Road
Km 049.26-049.36
Comilla-Begumganj Road
Km 003.40-004.35
Comilla-Begumganj Road
Km 046.00-046.10
Joydebpur-Jamalpur Road
Km 105.09-107.46
Hathazari-Khagrachhari Road
Km 018.50-019.50
Mawna-Nabinagar Road
Km 033.60-033.70
Naogaon-Badalgachhi-Rohonpur
Km 083.37-084.87
Dhaka-Sylhet-Jaflong Road
Km 266.99-267.09
Dauladia-Mongla Road
Km 191.89-192.19
Dauladia-Mongla Road
Km 136.62-136.92
Juri-Lathidila Road
Km 006.10-009.10
Sarail-Habiganj Road
Km 013.68-013.78
Dauladia-Mongla Road
Km 116.12-116.22
Tongi By-Pass Road
Km 000.70-000.90
Baraiyerhat-Fatikchhari Road
Km 009.00-009.20
Dhaka -Utholi-Banglabandh Road
Km 403.80-404.10
Dhaka -Comilla -Chittagong-Teknaf RoKm 009.00-009.20
Feni-Noakhali Road
Km 017.00-017.10
Dhaka -Utholi-Banglabandh Road
Km 143.61-146.71
Joydebpur-Jamalpur Road
Km 125.61-127.15
Dhaka -Comilla -Chittagong-Teknaf RoKm 226.28-226.38
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.80
4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
5636 National Rehab 150mm @ IRI 9-12
L
2.70
8665 National Overlay 50mm @ IRI 4-7
S
0.20 12330 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.05
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
9193 National Full Recon 180mm @ IRI 12
S
2.50
3019 Regional Overlay 50mm @ IRI 5-7
S
0.46
3779 National Overlay 50mm @ IRI 4-9
S
0.20
7406 National Full Recon 180mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
3.40 15970 Regional Rehab 150mm @ IRI 9-12
S
1.30
4965 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
6605 National Full Recon 180mm @ IRI 12
S
0.10
4993 Regional DBST @ Traff 4000-6000
S
1.29
3019 Regional Overlay 50mm @ IRI 5-7
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.95
3942 Regional Overlay 50mm @ IRI 5-7
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
2.37
3779 National Overlay 50mm @ IRI 4-9
S
1.00
5045 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
2048 Regional Full Recon 135mm @ IRI 12
S
1.50
3019 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
7406 National Full Recon 180mm @ IRI 12
S
0.30
5636 National Full Recon 150mm @ IRI 12
S
3.00
4391 Regional Overlay 60mm @ IRI 7-9
S
0.10
6240 Regional DBST 25mm @ 25% Crk
S
0.10
6605 National Full Recon 180mm @ IRI 12
S
0.20 10199 Regional Full Recon 150mm @ IRI 12
S
0.20
1484 Regional Overlay 50mm @ IRI 7-9
S
0.30 11451 National Rehab 195mm @ IRI 9-12
L
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
9193 National Full Recon 180mm @ IRI 12
S
3.10
6306 National Overlay 50mm @ IRI 4-7
S
1.54
3779 National Overlay 50mm @ IRI 4-9
S
0.10 11451 National Rehab 195mm @ IRI 9-12
Appendix-A: Page:44 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.968
4.77
5.917
4.77
2.795
4.76
4.561
4.76
23.958
4.76
5.839
4.76
2.920
4.76
0.561
4.76
2.170
4.73
4.828
4.73
1.309
4.73
4.790
4.73
8.759
4.72
60.027
4.72
3.732
4.72
2.842
4.72
2.058
4.71
0.148
4.71
3.497
4.71
1.983
4.70
1.946
4.70
3.379
4.70
1.865
4.70
6.828
4.69
3.485
4.69
0.921
4.68
2.897
4.68
2.920
4.68
7.409
4.68
5.692
4.67
7.095
4.67
0.136
4.66
2.170
4.66
3.599
4.65
0.397
4.65
5.532
4.65
5.761
4.65
2.170
4.65
11.812
4.64
4.432
4.64
2.612
4.63
NPV
28.46
27.64
12.88
22.58
194.60
27.39
13.73
2.53
9.76
25.81
7.58
22.33
40.88
285.74
21.94
13.26
9.17
2.43
27.47
8.86
8.72
26.77
8.52
46.41
19.27
4.03
14.71
13.51
34.29
26.59
37.04
1.03
9.81
16.35
2.33
24.93
26.22
9.59
87.99
32.62
12.10
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Rangamati
N106
Chittagong Rangamati
N106
Chittagong Rangamati
N106
Khulna
Jhenaidah
N7
Chittagong Rangamati
N106
Sylhet
Sylhet
N2
Dhaka
Munshiganj
N8
Rajshahi
Nawabganj
R547
Khulna
Satkhira
R760
Dhaka
Narsingdi
R114
Khulna
Jessore
N7
Khulna
Khulna
N7
Dhaka
Tangail
N4
Comilla
Noakhali
R141
Rajshahi
Naogaon
R547
Chittagong Khagrachari
R160
Comilla
Brahmanbaria N2
Gopalganj Rajbari
R710
Comilla
Chandpur
R140
Chittagong Rangamati
N106
Chittagong Rangamati
N106
Chittagong Rangamati
R161
Chittagong Rangamati
R161
Chittagong Chittagong
N1
Dhaka
Kishoreganj
N2
Chittagong Chittagong
R160
Dhaka
Sherpur
R460
Comilla
Comilla
R140
Khulna
Jessore
N7
Comilla
Noakhali
N104
Comilla
Feni
N1
Dhaka
Jamalpur
N4
Khulna
Satkhira
N715
Comilla
Chandpur
R140
Sylhet
Sylhet
N2
Chittagong Chittagong
N106
Chittagong Chittagong
R163
Comilla
Noakhali
N104
Chittagong Rangamati
N106
Sylhet
Sylhet
R281
Comilla
Chandpur
R140
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chittagong-Rangamati Road
Km 051.76-051.86
Chittagong-Rangamati Road
Km 052.16-052.26
Chittagong-Rangamati Road
Km 053.26-053.36
Dauladia-Mongla Road
Km 135.52-135.92
Chittagong-Rangamati Road
Km 053.46-053.56
Dhaka-Sylhet-Jaflong Road
Km 265.69-265.99
Dhaka -Patuakhali Road
Km 016.50-016.70
Naogaon-Badalgachhi-Rohonpur
Km 098.57-099.07
Khulna-Satkhira Road
Km 040.56-040.76
Nayapur-Raipura Road
Km 026.10-026.20
Dauladia-Mongla Road
Km 143.22-143.42
Dauladia-Mongla Road
Km 221.86-221.96
Joydebpur-Jamalpur Road
Km 122.71-123.01
Lalmai-Sonaimuri Road
Km 035.32-035.62
Naogaon-Badalgachhi-Rohonpur
Km 028.49-030.29
Hathazari-Khagrachhari Road
Km 083.82-084.12
Dhaka-Sylhet-Jaflong Road
Km 076.94-077.14
Ahaladipur-Kushtia Road
Km 044.71-044.75
Comilla-Begumganj Road
Km 081.90-082.00
Chittagong-Rangamati Road
Km 054.46-054.56
Chittagong-Rangamati Road
Km 054.72-054.82
Rangamati -Bandarban Road
Km 018.20-018.30
Rangamati -Bandarban Road
Km 018.20-018.30
Dhaka -Comilla -Chittagong-Teknaf RoKm 244.84-245.34
Dhaka-Sylhet-Jaflong Road
Km 071.94-072.04
Hathazari-Khagrachhari Road
Km 029.00-031.40
Jamalpur-Sherpur-Bangaon Road
Km 006.71-015.60
Comilla-Begumganj Road
Km 004.78-007.80
Dauladia-Mongla Road
Km 188.19-188.29
Feni-Noakhali Road
Km 038.60-038.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 169.21-169.38
Joydebpur-Jamalpur Road
Km 130.71-130.81
Benapole Town Old Section
Km 002.50-002.60
Comilla-Begumganj Road
Km 082.50-082.60
Dhaka-Sylhet-Jaflong Road
Km 270.99-271.19
Chittagong-Rangamati Road
Km 016.10-016.30
Chittagong -Chandragona Road
Km 013.40-013.60
Feni-Noakhali Road
Km 048.09-048.49
Chittagong-Rangamati Road
Km 053.36-053.46
Rajnagar-Charkhai Road
Km 061.59-067.22
Comilla-Begumganj Road
Km 084.52-084.72
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.40
5636 National Full Recon 150mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.50
3019 Regional Overlay 50mm @ IRI 5-7
S
0.20
4116 Regional Overlay 50mm @ IRI 5-7
S
0.10
3019 Regional DBST 25mm @ 25% Crk
S
0.20
5636 National Full Recon 150mm @ IRI 12
S
0.10
9684 National Full Recon 180mm @ IRI 12
S
0.30
3779 National Overlay 50mm @ IRI 4-9
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
1.80
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30
3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 12330 National Full Recon 195mm @ IRI 12
S
0.03
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.50 11451 National Full Recon 195mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.40
4887 Regional Full Recon 150mm @ IRI 12
S
8.89
4887 Regional DBST @ Traff 4000-6000
S
3.03
4909 Regional Overlay 60mm @ IRI 7-9
S
0.10
7406 National Full Recon 180mm @ IRI 12
S
0.10 10253 National Full Recon 195mm @ IRI 12
S
0.17 11451 National Full Recon 195mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10 10297 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
5.63
4682 Regional Overlay 60mm @ IRI 7-9
S
0.20 10297 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:45 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.946
4.63
1.946
4.63
1.946
4.63
7.590
4.63
1.946
4.62
8.759
4.62
5.839
4.61
0.966
4.61
0.626
4.60
0.096
4.60
3.599
4.60
2.619
4.60
0.861
4.59
0.430
4.59
3.720
4.59
0.564
4.59
5.839
4.58
0.555
4.58
2.038
4.58
1.946
4.58
1.946
4.58
0.151
4.58
0.151
4.58
15.571
4.58
2.920
4.58
40.828
4.57
13.456
4.57
13.517
4.57
2.507
4.57
2.258
4.57
4.934
4.56
2.058
4.55
2.058
4.55
1.963
4.55
5.839
4.54
5.294
4.52
2.697
4.52
11.507
4.52
1.946
4.52
19.320
4.52
3.926
4.52
NPV
8.59
8.59
8.59
35.09
8.58
39.98
26.62
4.59
3.45
1.28
16.09
11.77
6.18
8.23
26.88
4.32
26.39
2.46
9.04
8.51
8.51
2.88
2.88
69.80
13.21
181.67
263.43
91.22
11.33
9.73
22.03
8.90
8.83
8.69
26.22
23.48
12.40
51.44
8.39
101.15
17.26
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Comilla
R141
Chittagong Chittagong
N106
Comilla
Feni
N104
Chittagong Khagrachari
R160
Dhaka
Mymensingh R371
Barisal
Bhola
N809
Dhaka
Narayanganj N1
Chittagong Dohazari
N1
Khulna
Khulna
N7
Dhaka
Mymensingh R314
Rangpur
Dinajpur
R585
Rajshahi
Natore
N502
Rangpur
Joypurhat
R545
Khulna
Khulna
N7
Chittagong Dohazari
N1
Barisal
Bhola
N809
Khulna
Jessore
N7
Comilla
Brahmanbaria N2
Rajshahi
Pabna
N705
Comilla
Comilla
R141
Chittagong Khagrachari
R160
Khulna
Khulna
R760
Chittagong Rangamati
N106
Dhaka
Dhaka
N5
Khulna
Chuadanga
R745
Khulna
Jhenaidah
N7
Dhaka
Mymensingh R314
Dhaka
Manikganj
R315
Khulna
Jhenaidah
N7
Dhaka
Gazipur
N3
Chittagong Chittagong
N1
Khulna
Chuadanga
R745
Chittagong Dohazari
N1
Comilla
Noakhali
R143
Khulna
Kushtia
N704
Khulna
Jessore
N708
Rajshahi
Natore
N502
Dhaka
Tangail
R506
Rajshahi
Natore
N6
Rajshahi
Sirajganj
N5
Rangpur
Joypurhat
R545
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Lalmai-Sonaimuri Road
Km 007.30-007.50
Chittagong-Rangamati Road
Km 017.20-017.30
Feni-Noakhali Road
Km 002.20-002.50
Hathazari-Khagrachhari Road
Km 039.50-040.10
Sherpur-Nakla-Mymensingh
Km 031.00-032.40
Barishal-Lakshmipur Road
Km 026.49-028.19
Dhaka -Comilla -Chittagong-Teknaf RoKm 012.40-012.60
Dhaka -Comilla -Chittagong-Teknaf RoKm 246.74-246.94
Dauladia-Mongla Road
Km 189.49-189.59
Gafargaon-Mawna Road
Km 007.50-008.00
Gobindagnj-Fulbari-Dinajpur Road
Km 083.00-083.60
Bogra -Natore Road
Km 056.16-056.46
Bogra-Joypurhat Road
Km 117.29-117.49
Dauladia-Mongla Road
Km 223.06-223.26
Dhaka -Comilla -Chittagong-Teknaf RoKm 312.98-313.38
Barishal-Lakshmipur Road
Km 025.29-025.79
Dauladia-Mongla Road
Km 142.82-143.12
Dhaka-Sylhet-Jaflong Road
Km 084.14-084.34
Paksey -Iswardi-Dasuria
Km 006.60-008.30
Lalmai-Sonaimuri Road
Km 004.30-004.40
Hathazari-Khagrachhari Road
Km 080.02-080.22
Khulna-Satkhira Road
Km 001.60-001.90
Chittagong-Rangamati Road
Km 059.12-059.62
Dhaka -Utholi-Banglabandh Road
Km 000.30-000.40
Kushtia -Jhenaidah Road
Km 090.26-090.36
Dauladia-Mongla Road
Km 135.92-136.62
Gafargaon-Mawna Road
Km 010.80-011.50
Mawna-Nabinagar Road
Km 044.70-044.80
Dauladia-Mongla Road
Km 114.82-115.02
Dhaka -Mymensingh Road
Km 015.60-017.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 227.46-227.56
Kushtia -Jhenaidah Road
Km 096.46-096.56
Dhaka -Comilla -Chittagong-Teknaf RoKm 295.18-298.78
Maijdi-Chandraganj Road
Km 000.00-000.10
Jhenaidah-Dasuria Road
Km 045.48-046.48
Jessore Town Old Section
Km 001.90-002.10
Bogra -Natore Road
Km 036.76-038.96
Aricha -Daulatpur-Tangail Road
Km 038.41-047.81
Kashinathpur-Natore-Rajshahi Road Km 103.92-104.02
Dhaka -Utholi-Banglabandh Road
Km 134.51-137.51
Bogra-Joypurhat Road
Km 118.69-118.79
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30 12376 National Full Recon 195mm @ IRI 12
S
0.60
4887 Regional Rehab 150mm @ IRI 9-12
S
1.40
4887 Regional Overlay 50mm @ IRI 5-7
S
1.70
9061 National Rehab 180mm @ IRI 9-12
R
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
7406 National Full Recon 180mm @ IRI 12
S
0.50
1346 Regional Overlay 50mm @ IRI 7-9
S
0.60
2707 Regional DBST @ Traff 2000-4000
S
0.30
9061 National Rehab 180mm @ IRI 9-12
S
0.20
2947 Regional DBST 25mm @ 25% Crk
S
0.20
9684 National Full Recon 180mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.50
9061 National Rehab 180mm @ IRI 9-12
S
0.30
5636 National Full Recon 150mm @ IRI 12
S
0.20 12330 National Full Recon 195mm @ IRI 12
S
1.70 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
0.50
3555 National DBST @ Traff 2000-4000
L
0.10
9159 National Full Recon 180mm @ IRI 12
S
0.10
5536 Regional Full Recon 150mm @ IRI 12
S
0.70
5636 National DBST @ Traff 4000-6000
S
0.70
1346 Regional Overlay 50mm @ IRI 5-7
S
0.10
2048 Regional Rehab 135mm @ IRI 9-12
S
0.20
6605 National Full Recon 180mm @ IRI 12
L
2.20
8665 National Overlay 50mm @ IRI 4-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
5536 Regional Full Recon 150mm @ IRI 12
S
3.60 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4563 Regional DBST 25mm @ 25% Crk
S
1.00 11451 National Full Recon 195mm @ IRI 12
L
0.20 11451 National Full Recon 195mm @ IRI 12
S
2.20
9061 National Rehab 180mm @ IRI 9-12
S
9.40
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
3.00
6306 National Overlay 50mm @ IRI 4-7
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
Appendix-A: Page:46 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.844
4.52
2.647
4.52
6.773
4.50
6.444
4.50
4.384
4.50
27.327
4.50
6.851
4.49
7.530
4.49
2.507
4.49
0.783
4.49
0.815
4.48
4.822
4.48
0.272
4.48
5.239
4.48
10.277
4.48
8.037
4.48
5.398
4.47
5.839
4.47
37.617
4.46
1.865
4.46
0.376
4.46
0.459
4.46
0.642
4.46
2.807
4.45
1.636
4.45
1.003
4.45
1.096
4.45
0.713
4.44
4.116
4.44
17.982
4.44
3.309
4.44
1.636
4.44
70.367
4.43
0.096
4.43
37.915
4.43
5.839
4.43
35.365
4.43
19.625
4.43
2.244
4.42
11.431
4.42
1.349
4.42
NPV
12.43
11.73
28.94
28.40
24.04
118.50
30.15
33.36
11.14
4.44
13.06
20.75
2.91
22.92
43.90
34.68
23.43
25.70
168.00
7.95
2.75
5.58
9.90
12.37
6.78
46.52
5.97
3.08
17.29
152.65
14.38
6.76
302.41
0.73
164.03
25.58
150.38
140.52
9.93
81.11
5.93
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Narayanganj R202
Chittagong Chittagong
N1
Comilla
Brahmanbaria N102
Chittagong Chittagong
R163
Chittagong Chittagong
R151
Sylhet
Sylhet
N2
Gopalganj Gopalganj
N806
Sylhet
Sylhet
N210
Rajshahi
Naogaon
R547
Rangpur
Lalmonirhat
N509
Comilla
Chandpur
R140
Rangpur
Bogra
N502
Khulna
Jessore
N708
Barisal
Bhola
N809
Barisal
Bhola
N809
Barisal
Bhola
N809
Dhaka
Munshiganj
N8
Khulna
Jessore
N707
Gopalganj Rajbari
R710
Khulna
Jhenaidah
N7
Dhaka
Jamalpur
N4
Rajshahi
Naogaon
R547
Sylhet
Habiganj
N2
Comilla
Noakhali
N104
Rangpur
Bogra
R550
Comilla
Comilla
R141
Dhaka
Tangail
N4
Rajshahi
Sirajganj
N5
Sylhet
Sylhet
N210
Rangpur
Dinajpur
R585
Khulna
Jessore
N706
Khulna
Magura
N702
Khulna
Jhenaidah
N704
Dhaka
Mymensingh R314
Comilla
Chandpur
R140
Comilla
Chandpur
R860
Comilla
Chandpur
R140
Barisal
Barisal
R870
Dhaka
Jamalpur
N4
Comilla
Chandpur
R140
Rajshahi
Natore
N502
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Bhulta-Rampura Road
Km 001.50-001.70
Dhaka -Comilla -Chittagong-Teknaf RoKm 227.76-227.86
Comilla-Brahmanbaria Road
Km 077.16-079.06
Chittagong -Chandragona Road
Km 013.90-016.40
Baraiyerhat-Fatikchhari Road
Km 009.70-011.00
Dhaka-Sylhet-Jaflong Road
Km 268.19-268.49
Bhatiapara-Kalna Road
Km 002.80-003.00
Sylhet Twn By-Pass Road
Km 005.30-005.70
Naogaon-Badalgachhi-Rohonpur
Km 017.17-017.27
Barabari-Burimary Road
Km 077.98-078.08
Comilla-Begumganj Road
Km 038.99-039.09
Bogra -Natore Road
Km 028.36-028.66
Jessore Town Old Section
Km 001.10-001.30
Barishal-Lakshmipur Road
Km 025.05-025.15
Barishal-Lakshmipur Road
Km 025.19-025.29
Barishal-Lakshmipur Road
Km 026.39-026.49
Dhaka -Patuakhali Road
Km 019.90-020.10
Jessore Town Old Section
Km 000.10-001.10
Ahaladipur-Kushtia Road
Km 013.41-013.71
Dauladia-Mongla Road
Km 136.92-138.86
Joydebpur-Jamalpur Road
Km 143.51-143.61
Naogaon-Badalgachhi-Rohonpur
Km 014.87-015.96
Dhaka-Sylhet-Jaflong Road
Km 153.51-153.71
Feni-Noakhali Road
Km 036.50-036.80
Mokamtala-Joypurhat Road
Km 008.50-009.30
Lalmai-Sonaimuri Road
Km 007.50-007.60
Joydebpur-Jamalpur Road
Km 059.72-059.82
Dhaka -Utholi-Banglabandh Road
Km 147.11-150.51
Sylhet Twn By-Pass Road
Km 006.90-007.20
Gobindagnj-Fulbari-Dinajpur Road
Km 066.60-068.30
Jessore -Benapole Road
Km 030.20-030.40
Jessore -Magura Road
Km 040.49-042.79
Jhenaidah-Dasuria Road
Km 000.10-000.20
Gafargaon-Mawna Road
Km 012.10-012.30
Comilla-Begumganj Road
Km 079.80-080.30
Mostafapur-Chandpur Road
Km 069.06-069.16
Comilla-Begumganj Road
Km 080.70-081.00
Barisal-Pirojpur Road
Km 000.40-000.50
Joydebpur-Jamalpur Road
Km 140.91-143.01
Comilla-Begumganj Road
Km 040.57-041.37
Bogra -Natore Road
Km 055.66-055.96
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
1.90 15273 National Full Recon 195mm @ IRI 12
S
2.50
5687 Regional DBST 25mm @ 25% Crk
S
1.30
1484 Regional Overlay 50mm @ IRI 7-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
2860 National Overlay 50mm @ IRI 5-9
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
0.30
9061 National Rehab 180mm @ IRI 9-12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.00
9500 National Full Recon 180mm @ IRI 12
S
0.30
4887 Regional DBST 25mm @ 25% Crk
S
1.94
5636 National Overlay 50mm @ IRI 4-9
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
1.09
3109 Regional DBST @ Traff 2000-4000
S
0.20
6671 National Full Recon 180mm @ IRI 12
S
0.30 10253 National Full Recon 195mm @ IRI 12
S
0.80
3234 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
3.40 11451 National Rehab 195mm @ IRI 9-12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
1.70
2707 Regional DBST @ Traff 2000-4000
S
0.20
7314 National DBST @ Traff >6000
S
2.30 11451 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.20
1346 Regional DBST @ Traff 100-2000
S
0.50 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
2.10
9061 National Rehab 180mm @ IRI 9-12
S
0.80
8774 Regional Full Recon 150mm @ IRI 12
S
0.30
6500 National Rehab 180mm @ IRI 9-12
Appendix-A: Page:47 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.871
4.42
3.309
4.41
44.155
4.41
3.396
4.41
2.578
4.41
8.759
4.41
0.386
4.40
11.367
4.40
0.840
4.39
2.058
4.39
1.832
4.38
4.822
4.38
4.487
4.38
2.058
4.38
2.058
4.38
2.058
4.38
5.839
4.38
23.238
4.37
0.437
4.37
5.879
4.37
1.983
4.37
1.449
4.36
5.613
4.35
6.540
4.35
2.297
4.35
1.897
4.35
2.305
4.34
79.984
4.33
8.525
4.33
2.309
4.33
0.375
4.32
53.721
4.32
2.058
4.32
0.148
4.32
9.815
4.31
1.349
4.31
5.889
4.31
1.417
4.31
32.530
4.30
17.090
4.30
4.822
4.29
NPV
4.89
14.30
183.86
49.36
13.92
38.17
2.79
49.45
3.54
8.58
7.80
20.29
19.89
8.59
8.59
8.59
25.26
98.27
5.48
125.37
8.23
22.68
23.89
26.70
12.55
7.88
10.00
350.47
36.48
29.03
7.51
235.11
8.44
2.15
41.17
5.91
24.68
6.14
134.03
71.74
19.57
Appendix-A
Annual Needs Report
2012-2013
Zone
Rajshahi
Barisal
Khulna
Dhaka
Gopalganj
Chittagong
Chittagong
Sylhet
Dhaka
Khulna
Comilla
Chittagong
Rangpur
Khulna
Dhaka
Rangpur
Rangpur
Rangpur
Khulna
Sylhet
Comilla
Dhaka
Rajshahi
Chittagong
Barisal
Chittagong
Rangpur
Chittagong
Sylhet
Comilla
Sylhet
Khulna
Comilla
Khulna
Sylhet
Khulna
Dhaka
Khulna
Comilla
Khulna
Comilla
Road
No
Pabna
N705
Bhola
N809
Jessore
R755
Mymensingh R314
Madaripur
R860
Rangamati
R161
Chittagong
R151
Habiganj
N2
Gazipur
R310
Jessore
N7
Noakhali
R140
Dohazari
N1
Lalmonirhat
N509
Magura
N702
Gazipur
N3
Lalmonirhat
N509
Dinajpur
R585
Dinajpur
R585
Kushtia
N704
Habiganj
N2
Chandpur
R140
Gazipur
R313
Nawabganj
R547
Rangamati
N106
Barisal
N809
Dohazari
N1
Lalmonirhat
N506
Rangamati
N106
Sylhet
N2
Brahmanbaria N2
Sylhet
N210
Jessore
N7
Brahmanbaria R220
Jhenaidah
N7
Habiganj
N2
Kushtia
N704
Gazipur
R310
Satkhira
N715
Noakhali
N104
Chuadanga
R745
Noakhali
R140
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Paksey -Iswardi-Dasuria
Km 005.20-005.70
Barishal-Lakshmipur Road
Km 030.69-030.79
Jessore -Chuknagar Road
Km 026.40-026.50
Gafargaon-Mawna Road
Km 015.30-015.50
Mostafapur-Chandpur Road
Km 005.30-006.20
Rangamati -Bandarban Road
Km 021.20-021.40
Baraiyerhat-Fatikchhari Road
Km 021.70-021.80
Dhaka-Sylhet-Jaflong Road
Km 145.55-145.65
Joydebpur-Itakhola Road
Km 007.20-007.40
Dauladia-Mongla Road
Km 139.42-139.52
Comilla-Begumganj Road
Km 134.87-135.17
Dhaka -Comilla -Chittagong-Teknaf RoKm 304.38-304.58
Barabari-Burimary Road
Km 092.97-093.37
Jessore -Magura Road
Km 043.49-043.68
Dhaka -Mymensingh Road
Km 010.00-012.70
Barabari-Burimary Road
Km 056.25-056.35
Gobindagnj-Fulbari-Dinajpur Road
Km 058.12-059.12
Gobindagnj-Fulbari-Dinajpur Road
Km 086.06-087.16
Jhenaidah-Dasuria Road
Km 030.40-030.50
Dhaka-Sylhet-Jaflong Road
Km 187.33-187.43
Comilla-Begumganj Road
Km 071.50-071.70
Mawna-Monohardi Road
Km 035.67-035.87
Naogaon-Badalgachhi-Rohonpur
Km 098.37-098.47
Chittagong-Rangamati Road
Km 048.36-048.66
Barishal-Lakshmipur Road
Km 003.85-003.95
Dhaka -Comilla -Chittagong-Teknaf RoKm 302.98-303.08
Rangpur-Barobari-Kurigram Road
Km 024.35-027.35
Chittagong-Rangamati Road
Km 054.56-054.72
Dhaka-Sylhet-Jaflong Road
Km 275.89-276.19
Dhaka-Sylhet-Jaflong Road
Km 077.24-077.44
Sylhet Twn By-Pass Road
Km 009.40-009.50
Dauladia-Mongla Road
Km 139.32-139.42
Sarail-Habiganj Road
Km 018.38-018.58
Dauladia-Mongla Road
Km 129.72-130.22
Dhaka-Sylhet-Jaflong Road
Km 187.02-187.13
Jhenaidah-Dasuria Road
Km 030.70-031.00
Joydebpur-Itakhola Road
Km 001.70-001.90
Benapole Town Old Section
Km 003.50-003.60
Feni-Noakhali Road
Km 033.50-034.20
Kushtia -Jhenaidah Road
Km 084.46-084.56
Comilla-Begumganj Road
Km 132.67-132.97
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.50 11451 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
3292 Regional DBST 25mm @ 25% Crk
S
0.20
1346 Regional Overlay 50mm @ IRI 7-9
S
0.90
5179 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
1301 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.20
6578 Regional Full Recon 150mm @ IRI 12
S
0.10
5636 National Rehab 150mm @ IRI 9-12
S
0.30 10112 Regional Rehab 150mm @ IRI 9-12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.40
9061 National Rehab 180mm @ IRI 9-12
S
0.19 11451 National Full Recon 195mm @ IRI 12
R
2.70
8665 National Overlay 50mm @ IRI 4-7
S
0.10
9061 National Rehab 180mm @ IRI 9-12
S
1.00
4331 Regional Overlay 50mm @ IRI 5-7
S
1.10
2707 Regional DBST @ Traff 2000-4000
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
8158 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional DBST 25mm @ 25% Crk
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
3.00
9061 National Rehab 180mm @ IRI 9-12
S
0.17
9061 National Full Recon 180mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 12330 National Rehab 195mm @ IRI 9-12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
5636 National Full Recon 150mm @ IRI 12
S
0.20
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.50
5636 National Full Recon 150mm @ IRI 12
S
0.11
8158 National Full Recon 180mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20 17870 Regional Full Recon 150mm @ IRI 12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.70 11451 National Full Recon 195mm @ IRI 12
S
0.10
5536 Regional Full Recon 150mm @ IRI 12
S
0.30 10112 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:48 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
11.064
4.29
2.058
4.28
0.136
4.28
0.313
4.28
3.848
4.28
0.376
4.28
0.198
4.28
2.305
4.28
3.272
4.28
1.618
4.28
4.414
4.27
4.303
4.27
6.430
4.27
6.951
4.27
23.958
4.26
1.607
4.26
2.871
4.26
1.494
4.26
2.842
4.26
2.807
4.25
2.943
4.25
3.599
4.25
0.091
4.25
5.838
4.24
2.058
4.24
2.803
4.23
48.225
4.23
3.211
4.22
8.759
4.22
4.610
4.22
2.842
4.21
2.100
4.21
0.685
4.21
10.142
4.21
3.143
4.21
8.525
4.21
7.459
4.20
2.058
4.20
22.344
4.20
1.799
4.20
5.889
4.19
NPV
47.44
8.41
1.20
1.70
25.48
2.69
0.96
9.86
12.75
7.18
18.94
18.32
26.36
29.04
174.28
6.58
15.90
22.52
11.84
11.81
12.73
14.92
0.74
23.62
8.32
11.60
195.72
12.94
36.56
19.61
11.84
8.84
2.60
42.66
13.09
35.10
31.40
8.15
92.71
7.07
23.90
Appendix-A
Annual Needs Report
2012-2013
Road
No
Rajshahi
Natore
N602
Comilla
Noakhali
R140
Barisal
Pirojpur
R870
Rajshahi
Pabna
N705
Rangpur
Bogra
N502
Khulna
Jhenaidah
N7
Chittagong Rangamati
N106
Sylhet
Habiganj
N2
Barisal
Patuakhali
N8
Rangpur
Thakurgaon
N5
Khulna
Satkhira
R765
Khulna
Khulna
N7
Barisal
Jhalokati
R870
Chittagong Rangamati
N106
Sylhet
Sylhet
N2
Chittagong Rangamati
N106
Sylhet
Sylhet
N2
Comilla
Chandpur
R140
Gopalganj Sariatpur
R861
Khulna
Jessore
R755
Dhaka
Jamalpur
N4
Dhaka
Tangail
N4
Rangpur
Lalmonirhat
N509
Comilla
Brahmanbaria N2
Chittagong Chittagong
R163
Dhaka
Gazipur
R311
Khulna
Jessore
N7
Dhaka
Gazipur
R315
Rajshahi
Nawabganj
R547
Khulna
Jhenaidah
N7
Sylhet
Sylhet
N2
Rajshahi
Natore
N502
Khulna
Satkhira
N715
Khulna
Satkhira
N715
Dhaka
Gazipur
R310
Barisal
Jhalokati
R870
Khulna
Satkhira
N715
Sylhet
Sylhet
N2
Chittagong Rangamati
N106
Chittagong Chittagong
R152
Rajshahi
Nawabganj
R547
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Natore Town old Section
Comilla-Begumganj Road
Barisal-Pirojpur Road
Paksey -Iswardi-Dasuria
Bogra -Natore Road
Dauladia-Mongla Road
Chittagong-Rangamati Road
Dhaka-Sylhet-Jaflong Road
Dhaka -Patuakhali Road
Dhaka -Utholi-Banglabandh Road
Khulna-Satkhira Road
Dauladia-Mongla Road
Barisal-Pirojpur Road
Chittagong-Rangamati Road
Dhaka-Sylhet-Jaflong Road
Chittagong-Rangamati Road
Dhaka-Sylhet-Jaflong Road
Comilla-Begumganj Road
Monohar -Shariatpur Road
Jessore -Chuknagar Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Barabari-Burimary Road
Dhaka-Sylhet-Jaflong Road
Chittagong -Chandragona Road
Joydebpur -Ordinance Factory
Dauladia-Mongla Road
Mawna-Nabinagar Road
Naogaon-Badalgachhi-Rohonpur
Dauladia-Mongla Road
Dhaka-Sylhet-Jaflong Road
Bogra -Natore Road
Benapole Town Old Section
Benapole Town Old Section
Joydebpur-Itakhola Road
Barisal-Pirojpur Road
Benapole Town Old Section
Dhaka-Sylhet-Jaflong Road
Chittagong-Rangamati Road
Heako-Ramgarh Road
Naogaon-Badalgachhi-Rohonpur
Chainage
Km 003.19-003.59
Km 131.27-131.57
Km 049.77-049.97
Km 004.50-004.60
Km 027.46-028.26
Km 114.12-114.42
Km 050.66-051.06
Km 188.53-188.63
Km 189.62-202.09
Km 404.30-405.10
Km 025.89-026.09
Km 223.56-223.66
Km 042.87-042.97
Km 033.30-033.60
Km 238.20-238.30
Km 049.96-050.46
Km 257.11-257.31
Km 083.42-083.72
Km 002.90-003.00
Km 023.20-025.70
Km 140.61-140.91
Km 078.75-079.85
Km 077.88-077.98
Km 092.14-092.44
Km 008.40-008.50
Km 001.40-001.50
Km 153.06-153.46
Km 037.90-039.40
Km 089.57-089.77
Km 119.62-119.82
Km 269.59-269.79
Km 043.36-044.26
Km 000.40-000.60
Km 002.30-002.50
Km 000.10-000.20
Km 013.25-013.55
Km 000.10-000.40
Km 280.09-280.56
Km 048.66-049.26
Km 001.20-002.20
Km 096.07-096.17
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
7237 National Overlay 60mm @ IRI 7-9
S
0.30 10112 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
2897 National Overlay 50mm @ IRI 5-9
S
0.80
9061 National Rehab 180mm @ IRI 9-12
S
0.30
6605 National Full Recon 180mm @ IRI 12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.10
8158 National Full Recon 180mm @ IRI 12
S
12.48
9061 National Rehab 180mm @ IRI 9-12
S
0.80 11451 National Rehab 195mm @ IRI 9-12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
9684 National Full Recon 180mm @ IRI 12
S
0.10
2223 Regional DBST @ Traff 2000-4000
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.50
9061 National Full Recon 180mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.30 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
4885 Regional DBST @ Traff 4000-6000
S
2.50
3292 Regional DBST @ Traff 2000-4000
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
1.10 11497 National Rehab 195mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
2929 Regional DBST 25mm @ 25% Crk
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
1.50
2048 Regional Overlay 50mm @ IRI 5-7
S
0.20
3019 Regional Rehab 135mm @ IRI 9-12
S
0.20
6605 National Full Recon 180mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.90 11451 National Rehab 195mm @ IRI 9-12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.10 17870 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.47 11451 National Full Recon 195mm @ IRI 12
S
0.60
9061 National Full Recon 180mm @ IRI 12
S
1.00
1398 Regional Overlay 50mm @ IRI 7-9
S
0.10
3019 Regional DBST 25mm @ 25% Crk
Appendix-A: Page:49 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.116
4.19
5.889
4.19
2.697
4.19
0.287
4.18
12.860
4.18
6.174
4.18
7.784
4.18
2.807
4.18
200.535
4.17
14.752
4.17
2.697
4.17
2.619
4.17
0.136
4.16
5.950
4.16
2.305
4.15
9.729
4.15
4.610
4.15
5.889
4.15
0.141
4.15
3.396
4.15
5.950
4.14
25.355
4.14
2.058
4.14
8.759
4.14
1.300
4.14
0.094
4.14
7.484
4.14
2.427
4.13
1.703
4.13
4.640
4.12
5.839
4.12
19.638
4.12
4.116
4.11
4.116
4.11
3.795
4.11
4.046
4.10
6.174
4.10
13.576
4.10
11.675
4.09
1.926
4.09
0.091
4.08
NPV
11.38
23.88
11.36
1.49
51.64
24.41
31.04
11.60
801.59
59.62
11.43
10.66
2.09
23.61
9.69
38.52
19.37
23.78
1.43
41.51
23.43
106.36
8.10
35.52
5.47
0.71
29.26
10.34
6.74
18.68
23.77
81.85
15.95
15.95
15.62
16.70
23.84
54.99
45.58
9.96
0.76
Appendix-A
Annual Needs Report
2012-2013
Zone
Rangpur
Barisal
Comilla
Chittagong
Rajshahi
Khulna
Dhaka
Rangpur
Chittagong
Khulna
Dhaka
Chittagong
Chittagong
Gopalganj
Barisal
Chittagong
Dhaka
Barisal
Rangpur
Rajshahi
Comilla
Rajshahi
Dhaka
Khulna
Chittagong
Chittagong
Sylhet
Sylhet
Dhaka
Rangpur
Rangpur
Rajshahi
Khulna
Khulna
Barisal
Comilla
Khulna
Dhaka
Rangpur
Comilla
Comilla
Road
No
Dinajpur
R585
Bhola
N809
Noakhali
N104
Rangamati
N106
Nawabganj
R547
Jessore
R755
Gazipur
R302
Dinajpur
R585
Rangamati
N106
Jessore
R755
Gazipur
R313
Rangamati
N106
Dohazari
R170
Rajbari
R710
Bhola
R890
Rangamati
N106
Gazipur
R311
Jhalokati
R870
Lalmonirhat
N509
Natore
N502
Chandpur
R140
Pabna
N604
Munshiganj
N8
Jessore
N7
Chittagong
R151
Chittagong
N1
Habiganj
N2
Sylhet
N2
Kishoreganj
R360
Lalmonirhat
N506
Bogra
N514
Rajshahi
R685
Chuadanga
R745
Kushtia
N704
Jhalokati
R870
Noakhali
R140
Kushtia
N704
Gazipur
R311
Dinajpur
R586
Brahmanbaria N102
Chandpur
R140
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Gobindagnj-Fulbari-Dinajpur Road
Km 080.30-081.00
Barishal-Lakshmipur Road
Km 030.29-030.39
Feni-Noakhali Road
Km 041.58-041.78
Chittagong-Rangamati Road
Km 055.42-055.82
Naogaon-Badalgachhi-Rohonpur
Km 098.47-098.57
Jessore -Chuknagar Road
Km 018.70-018.80
Kaliganj Bazr Road
Km 001.80-003.00
Gobindagnj-Fulbari-Dinajpur Road
Km 079.30-079.90
Chittagong-Rangamati Road
Km 056.12-059.12
Jessore -Chuknagar Road
Km 005.50-006.30
Mawna-Monohardi Road
Km 020.97-021.07
Chittagong-Rangamati Road
Km 033.00-033.30
Patiya-Chokoria Road
Km 012.20-012.50
Ahaladipur-Kushtia Road
Km 016.11-016.51
Bhola -Char Manika Road
Km 047.57-051.17
Chittagong-Rangamati Road
Km 050.46-050.66
Joydebpur -Ordinance Factory
Km 001.50-002.00
Barisal-Pirojpur Road
Km 010.75-011.95
Barabari-Burimary Road
Km 062.45-062.75
Bogra -Natore Road
Km 039.46-041.46
Comilla-Begumganj Road
Km 043.10-043.20
Pabna Town Old Section
Km 001.90-003.40
Dhaka -Patuakhali Road
Km 007.40-007.80
Dauladia-Mongla Road
Km 139.52-139.82
Baraiyerhat-Fatikchhari Road
Km 012.40-013.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 175.98-176.58
Dhaka-Sylhet-Jaflong Road
Km 131.24-131.25
Dhaka-Sylhet-Jaflong Road
Km 286.26-286.41
Mymensingh -Bhairab Road
Km 011.20-011.30
Rangpur-Barobari-Kurigram Road
Km 023.12-023.95
Bogra (Banani)-Matidali Road
Km 007.50-007.91
Rajshahi -Chowmasia Road
Km 012.30-012.40
Kushtia -Jhenaidah Road
Km 093.66-093.86
Jhenaidah-Dasuria Road
Km 043.32-044.12
Barisal-Pirojpur Road
Km 008.90-009.30
Comilla-Begumganj Road
Km 135.67-136.17
Jhenaidah-Dasuria Road
Km 044.12-045.02
Joydebpur -Ordinance Factory
Km 002.60-003.10
Fulbari Bus Stand-Dinajpur Road
Km 000.00-003.27
Comilla-Brahmanbaria Road
Km 079.06-079.16
Comilla-Begumganj Road
Km 054.10-054.20
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.70
2707 Regional Overlay 50mm @ IRI 7-9
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.20 10253 National Full Recon 195mm @ IRI 12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
3292 Regional Rehab 135mm @ IRI 9-12
S
1.20
3076 Regional Overlay 50mm @ IRI 7-9
S
0.60
2707 Regional Overlay 50mm @ IRI 7-9
S
3.00
3555 National Overlay 50mm @ IRI 5-9
S
0.80
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
3571 Regional DBST 25mm @ 25% Crk
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.30
3019 Regional Rehab 135mm @ IRI 9-12
S
0.40
3636 Regional DBST 25mm @ 25% Crk
S
3.60
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.50
2929 Regional Overlay 50mm @ IRI 7-9
S
1.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
9061 National Rehab 180mm @ IRI 9-12
S
2.00
9061 National Rehab 180mm @ IRI 9-12
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
1.50
7342 National Overlay 50mm @ IRI 5-7
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.30
5636 National Full Recon 150mm @ IRI 12
S
1.40
1484 Regional Overlay 50mm @ IRI 5-7
S
0.60 11451 National Rehab 195mm @ IRI 9-12
S
0.01
9332 National Full Recon 180mm @ IRI 12
S
0.15 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.83
9061 National Rehab 180mm @ IRI 9-12
L
0.41
9159 National DBST @ Traff >6000
S
0.10
6330 Regional Full Recon 150mm @ IRI 12
S
0.20
5536 Regional Rehab 150mm @ IRI 9-12
S
0.80 11451 National Rehab 195mm @ IRI 9-12
S
0.40
4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 10112 Regional Full Recon 150mm @ IRI 12
S
0.90 11451 National Full Recon 195mm @ IRI 12
S
0.50
2929 Regional Overlay 50mm @ IRI 7-9
S
3.27
6695 Regional DBST 25mm @ 25% Crk
S
0.10 15273 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:50 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.010
4.08
2.058
4.07
4.360
4.07
7.784
4.07
0.852
4.07
1.266
4.07
3.508
4.07
1.722
4.07
8.142
4.07
10.789
4.07
0.074
4.06
5.950
4.06
2.348
4.06
0.563
4.06
48.552
4.06
3.892
4.06
0.992
4.05
16.184
4.05
4.822
4.05
32.150
4.04
1.799
4.04
7.853
4.04
13.235
4.04
6.478
4.04
2.777
4.04
14.051
4.03
0.365
4.03
3.550
4.03
1.767
4.03
13.358
4.02
1.404
4.02
1.799
4.02
2.452
4.02
23.849
4.01
1.369
4.01
9.815
4.01
35.665
4.01
0.992
4.01
4.735
4.00
1.813
4.00
1.865
4.00
NPV
10.86
8.00
16.67
30.23
3.32
5.12
17.77
9.29
43.27
44.12
0.96
23.06
9.46
7.25
198.32
15.06
5.26
65.87
18.73
124.85
7.01
44.23
52.84
25.85
13.72
56.68
1.46
14.48
6.94
51.59
23.59
6.88
9.59
95.43
18.76
38.08
139.56
5.39
58.31
6.92
7.22
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Comilla
Chittagong
Dhaka
Khulna
Dhaka
Rangpur
Comilla
Chittagong
Barisal
Comilla
Khulna
Dhaka
Sylhet
Gopalganj
Barisal
Rajshahi
Comilla
Chittagong
Barisal
Dhaka
Rangpur
Khulna
Khulna
Barisal
Rajshahi
Barisal
Barisal
Rajshahi
Rajshahi
Dhaka
Khulna
Dhaka
Rangpur
Rangpur
Khulna
Barisal
Barisal
Barisal
Barisal
Barisal
Division
Dhaka
Chandpur
Rangamati
Munshiganj
Jessore
Narayanganj
Nilphamari
Comilla
Chittagong
Jhalokati
Comilla
Jessore
Narayanganj
Habiganj
Gopalganj
Jhalokati
Natore
Noakhali
Dohazari
Bhola
Gazipur
Lalmonirhat
Jhenaidah
Jhenaidah
Barisal
Natore
Barisal
Bhola
Natore
Pabna
Jamalpur
Khulna
Manikganj
Lalmonirhat
Lalmonirhat
Magura
Barisal
Barisal
Jhalokati
Jhalokati
Jhalokati
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N5
R140
N106
R820
N7
R202
N518
R140
N1
R870
R141
N7
N1
N2
R850
R870
N602
R141
N1
N809
R313
N506
N7
N7
N809
N502
N809
N809
N502
R601
N4
R760
R315
N509
N509
N7
N809
R870
R870
R870
R870
Road Name
Chainage
Dhaka -Utholi-Banglabandh Road
Km 004.50-004.60
Comilla-Begumganj Road
Km 053.50-053.60
Chittagong-Rangamati Road
Km 051.86-052.16
Zinzira-Srinagar Road
Km 026.11-029.21
Dauladia-Mongla Road
Km 150.72-150.82
Bhulta-Rampura Road
Km 002.90-003.10
Sayedpur Town Old Section
Km 000.20-001.00
Comilla-Begumganj Road
Km 001.23-001.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 245.94-246.17
Barisal-Pirojpur Road
Km 009.40-010.20
Lalmai-Sonaimuri Road
Km 014.10-014.20
Dauladia-Mongla Road
Km 141.42-141.52
Dhaka -Comilla -Chittagong-Teknaf RoKm 036.08-036.28
Dhaka-Sylhet-Jaflong Road
Km 140.55-140.75
Tekerhat-Mollahhat Road
Km 008.90-009.80
Barisal-Pirojpur Road
Km 012.25-013.15
Natore Town old Section
Km 002.59-002.89
Lalmai-Sonaimuri Road
Km 031.72-031.82
Dhaka -Comilla -Chittagong-Teknaf RoKm 246.94-247.14
Barishal-Lakshmipur Road
Km 026.19-026.39
Mawna-Monohardi Road
Km 019.77-020.57
Rangpur-Barobari-Kurigram Road
Km 023.95-024.35
Dauladia-Mongla Road
Km 116.82-116.92
Dauladia-Mongla Road
Km 117.22-117.32
Barishal-Lakshmipur Road
Km 002.00-002.10
Bogra -Natore Road
Km 041.46-041.86
Barishal-Lakshmipur Road
Km 005.05-005.25
Barishal-Lakshmipur Road
Km 025.79-026.19
Bogra -Natore Road
Km 054.16-055.66
Pabna-Natakhola Ferry Ghat Road
Km 027.24-027.44
Joydebpur-Jamalpur Road
Km 143.61-144.11
Khulna-Satkhira Road
Km 006.80-006.90
Mawna-Nabinagar Road
Km 044.00-044.70
Barabari-Burimary Road
Km 091.77-092.77
Barabari-Burimary Road
Km 080.78-080.98
Dauladia-Mongla Road
Km 075.41-076.11
Barishal-Lakshmipur Road
Km 001.80-002.00
Barisal-Pirojpur Road
Km 000.50-000.60
Barisal-Pirojpur Road
Km 009.30-009.40
Barisal-Pirojpur Road
Km 010.20-010.30
Barisal-Pirojpur Road
Km 010.65-010.75
Cway Length
Road
AADT
Work Name
(km)
Side
Class
L
0.10
9159 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
9061 National Rehab 180mm @ IRI 9-12
S
3.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.20
6255 Regional DBST @ Traff >6000
S
0.80
4662 National DBST @ Traff 4000-6000
S
0.17
3942 Regional Overlay 50mm @ IRI 5-7
S
0.23 11451 National Overlay 80mm @ IRI 4-9
S
0.80
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
5636 National Full Recon 150mm @ IRI 12
R
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.20
9332 National Full Recon 180mm @ IRI 12
S
0.90
2343 Regional Overlay 50mm @ IRI 7-9
S
0.90
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
7237 National DBST @ Traff >6000
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.80
3571 Regional DBST @ Traff 2000-4000
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.10
6605 National Full Recon 180mm @ IRI 12
S
0.10
6605 National Full Recon 180mm @ IRI 12
S
0.10
9061 National Rehab 180mm @ IRI 9-12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
1.50
6500 National Rehab 180mm @ IRI 9-12
S
0.20
1096 Regional Overlay 50mm @ IRI 7-9
S
0.50
9061 National Full Recon 180mm @ IRI 12
S
0.10
3206 Regional Overlay 50mm @ IRI 7-9
S
0.70
2048 Regional Overlay 50mm @ IRI 5-7
S
1.00
9061 National Rehab 180mm @ IRI 9-12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.70 11451 National Full Recon 195mm @ IRI 12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:51 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.807
4.00
1.865
4.00
4.559
3.99
40.744
3.98
1.871
3.98
0.346
3.97
1.284
3.97
0.603
3.97
2.289
3.97
10.789
3.96
1.878
3.96
2.159
3.96
5.683
3.95
5.613
3.95
2.584
3.95
12.138
3.95
0.630
3.95
1.494
3.95
2.017
3.95
4.116
3.95
0.594
3.95
8.233
3.95
2.432
3.95
2.432
3.95
1.607
3.95
8.233
3.94
4.116
3.94
8.233
3.94
24.112
3.94
0.386
3.94
10.291
3.93
0.313
3.93
1.133
3.93
16.075
3.92
4.116
3.92
25.342
3.92
4.116
3.92
1.799
3.92
1.799
3.92
1.799
3.92
1.799
3.92
NPV
11.10
7.21
17.56
164.06
7.03
5.31
19.92
3.42
11.11
43.01
7.30
8.45
22.01
21.96
16.93
48.28
9.20
6.02
9.47
15.51
7.33
30.93
9.40
9.40
6.12
30.84
15.49
30.92
89.76
1.76
38.47
2.20
5.12
60.58
15.32
96.95
15.38
6.86
6.86
6.86
6.86
Appendix-A
Annual Needs Report
2012-2013
Road
No
Barisal
Jhalokati
R870
Chittagong Chittagong
N1
Chittagong Rangamati
N106
Dhaka
Mymensingh N3
Rangpur
Kurigram
N506
Khulna
Satkhira
N715
Comilla
Comilla
R141
Barisal
Pirojpur
R870
Khulna
Jhenaidah
N7
Khulna
Khulna
N7
Khulna
Khulna
N7
Khulna
Khulna
R760
Sylhet
Habiganj
N2
Dhaka
Mymensingh R314
Rajshahi
Naogaon
R549
Comilla
Comilla
R140
Comilla
Noakhali
R142
Comilla
Noakhali
R142
Comilla
Noakhali
R142
Rangpur
Dinajpur
R585
Dhaka
Narayanganj N1
Comilla
Chandpur
R860
Dhaka
Mymensingh R314
Chittagong Rangamati
N106
Comilla
Chandpur
R140
Barisal
Jhalokati
R870
Dhaka
Gazipur
N3
Khulna
Satkhira
R765
Khulna
Satkhira
R765
Comilla
Chandpur
R860
Comilla
Brahmanbaria N102
Rajshahi
Rajshahi
N6
Chittagong Chittagong
R163
Comilla
Comilla
R140
Comilla
Chandpur
R860
Dhaka
Tangail
N4
Gopalganj Gopalganj
N806
Rangpur
Bogra
N515
Khulna
Satkhira
N715
Comilla
Chandpur
R140
Khulna
Chuadanga
R745
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Barisal-Pirojpur Road
Km 013.15-013.25
Dhaka -Comilla -Chittagong-Teknaf RoKm 225.78-225.98
Chittagong-Rangamati Road
Km 055.82-056.12
Dhaka -Mymensingh Road
Km 106.60-106.70
Rangpur-Barobari-Kurigram Road
Km 041.80-042.00
Benapole Town Old Section
Km 000.60-002.30
Lalmai-Sonaimuri Road
Km 007.10-007.30
Barisal-Pirojpur Road
Km 048.37-049.57
Dauladia-Mongla Road
Km 121.22-121.32
Dauladia-Mongla Road
Km 213.88-215.46
Dauladia-Mongla Road
Km 213.88-215.46
Khulna-Satkhira Road
Km 007.90-008.00
Dhaka-Sylhet-Jaflong Road
Km 115.44-115.54
Gafargaon-Mawna Road
Km 010.20-010.60
Badalgachhi-Joypurhat Road
Km 004.90-005.10
Comilla-Begumganj Road
Km 013.36-013.46
Begamganj-Ramganj Road
Km 003.90-004.00
Begamganj-Ramganj Road
Km 004.10-004.20
Begamganj-Ramganj Road
Km 004.30-004.40
Gobindagnj-Fulbari-Dinajpur Road
Km 074.90-075.80
Dhaka -Comilla -Chittagong-Teknaf RoKm 034.88-035.18
Mostafapur-Chandpur Road
Km 070.76-070.96
Gafargaon-Mawna Road
Km 003.40-003.80
Chittagong-Rangamati Road
Km 053.56-054.46
Comilla-Begumganj Road
Km 082.60-083.42
Barisal-Pirojpur Road
Km 023.15-023.25
Dhaka -Mymensingh Road
Km 019.40-019.60
Khulna-Satkhira Road
Km 019.50-019.60
Khulna-Satkhira Road
Km 018.70-018.80
Mostafapur-Chandpur Road
Km 070.66-070.76
Comilla-Brahmanbaria Road
Km 079.16-080.06
Kashinathpur-Natore-Rajshahi Road Km 124.98-125.08
Chittagong -Chandragona Road
Km 010.00-010.10
Comilla-Begumganj Road
Km 017.39-017.49
Mostafapur-Chandpur Road
Km 070.06-070.26
Joydebpur-Jamalpur Road
Km 103.49-103.59
Bhatiapara-Kalna Road
Km 001.20-002.70
Bogra 2nd Town By-Pass Road
Km 000.10-000.50
Benapole Town Old Section
Km 002.60-003.50
Comilla-Begumganj Road
Km 052.70-052.80
Kushtia -Jhenaidah Road
Km 082.56-082.76
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
9061 National Full Recon 180mm @ IRI 12
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
2992 National Overlay 50mm @ IRI 5-9
S
1.70
9061 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
6605 National Full Recon 180mm @ IRI 12
L
1.58 11451 National Full Recon 195mm @ IRI 12
R
1.58 11451 National Full Recon 195mm @ IRI 12
S
0.10
3206 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40
1346 Regional Overlay 50mm @ IRI 5-7
S
0.20
1779 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
0.90
2707 Regional Overlay 50mm @ IRI 7-9
L
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
1346 Regional Overlay 50mm @ IRI 7-9
S
0.90
9061 National Full Recon 180mm @ IRI 12
S
0.82 10297 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
L
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.90 15273 National Full Recon 195mm @ IRI 12
S
0.10
7109 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
6524 National Full Recon 180mm @ IRI 12
S
1.50
2860 National Overlay 50mm @ IRI 5-9
S
0.40 11451 National Rehab 195mm @ IRI 9-12
S
0.90
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
5536 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:52 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.799
3.92
3.892
3.92
5.838
3.91
2.920
3.91
0.574
3.91
34.989
3.91
3.795
3.91
16.184
3.91
2.432
3.91
61.544
3.91
61.544
3.91
0.313
3.91
2.920
3.89
0.626
3.89
0.382
3.89
1.832
3.89
1.799
3.89
1.799
3.89
1.799
3.89
2.584
3.89
8.642
3.88
2.697
3.88
0.793
3.88
17.513
3.88
12.020
3.88
1.799
3.88
7.785
3.88
1.799
3.88
1.799
3.88
1.799
3.88
20.670
3.88
2.134
3.87
1.349
3.87
1.832
3.86
2.697
3.86
2.096
3.86
2.897
3.86
8.974
3.86
18.523
3.86
1.865
3.86
3.599
3.86
NPV
6.86
14.40
21.80
11.19
3.75
128.96
14.19
63.71
9.32
234.81
234.81
2.15
11.13
3.27
1.64
6.99
6.74
6.74
6.74
12.30
32.87
10.65
3.77
64.86
47.14
6.79
29.36
6.81
6.81
6.81
75.58
8.26
5.30
6.95
10.59
7.65
18.37
35.06
67.34
6.96
13.01
Appendix-A
Annual Needs Report
2012-2013
Zone
Barisal
Dhaka
Gopalganj
Rajshahi
Khulna
Rajshahi
Chittagong
Dhaka
Comilla
Rangpur
Comilla
Khulna
Chittagong
Khulna
Chittagong
Khulna
Comilla
Chittagong
Comilla
Khulna
Barisal
Chittagong
Khulna
Barisal
Comilla
Khulna
Khulna
Khulna
Barisal
Barisal
Rajshahi
Comilla
Sylhet
Khulna
Rangpur
Rangpur
Chittagong
Barisal
Dhaka
Rangpur
Khulna
Division
Jhalokati
Gazipur
Faridpur
Natore
Satkhira
Nawabganj
Rangamati
Tangail
Chandpur
Lalmonirhat
Comilla
Magura
Rangamati
Satkhira
Chittagong
Chuadanga
Comilla
Dohazari
Noakhali
Khulna
Pirojpur
Rangamati
Satkhira
Barisal
Laxmipur
Jessore
Jessore
Jessore
Barisal
Barisal
Naogaon
Chandpur
Sylhet
Satkhira
Lalmonirhat
Gaibanda
Chittagong
Jhalokati
Dhaka
Lalmonirhat
Chuadanga
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R870
R301
N7
N502
R765
R547
N106
N4
R140
N509
R140
N702
N106
R765
R163
R745
R140
R170
R141
R760
R870
N106
R765
N8
R143
R755
R755
R755
N8
N8
R549
R140
R250
R765
N509
R555
R163
R870
N501
N509
R745
Road Name
Barisal-Pirojpur Road
Tongi-Pachdona Road
Dauladia-Mongla Road
Bogra -Natore Road
Khulna-Satkhira Road
Naogaon-Badalgachhi-Rohonpur
Chittagong-Rangamati Road
Joydebpur-Jamalpur Road
Comilla-Begumganj Road
Barabari-Burimary Road
Comilla-Begumganj Road
Jessore -Magura Road
Chittagong-Rangamati Road
Khulna-Satkhira Road
Chittagong -Chandragona Road
Kushtia -Jhenaidah Road
Comilla-Begumganj Road
Patiya-Chokoria Road
Lalmai-Sonaimuri Road
Khulna-Satkhira Road
Barisal-Pirojpur Road
Chittagong-Rangamati Road
Khulna-Satkhira Road
Dhaka -Patuakhali Road
Maijdi-Chandraganj Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Badalgachhi-Joypurhat Road
Comilla-Begumganj Road
Sylhet-Jakiganj Road
Khulna-Satkhira Road
Barabari-Burimary Road
Palashbari-Gaibandah Road
Chittagong -Chandragona Road
Barisal-Pirojpur Road
Mirpur Bridge-Dhour Road
Barabari-Burimary Road
Kushtia -Jhenaidah Road
Chainage
Km 025.47-025.57
Km 026.43-026.81
Km 055.30-055.40
Km 038.96-039.46
Km 026.09-026.19
Km 091.67-091.87
Km 049.36-049.96
Km 102.59-102.79
Km 082.10-082.20
Km 044.84-047.44
Km 026.99-028.89
Km 029.49-031.69
Km 052.26-053.26
Km 025.79-025.89
Km 030.50-030.60
Km 095.16-095.46
Km 014.96-015.06
Km 000.30-000.70
Km 035.22-035.32
Km 011.90-013.70
Km 050.17-051.87
Km 054.82-055.42
Km 025.19-025.29
Km 171.00-173.80
Km 014.00-014.10
Km 005.40-005.50
Km 006.30-006.40
Km 007.20-007.30
Km 168.42-169.00
Km 171.00-174.20
Km 000.30-003.40
Km 081.10-081.40
Km 062.15-062.25
Km 024.99-025.09
Km 049.14-049.94
Km 014.40-017.80
Km 008.50-008.60
Km 043.27-043.47
Km 010.50-010.90
Km 083.98-087.68
Km 081.96-082.06
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.38
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
7248 National Rehab 180mm @ IRI 9-12
S
0.50
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3019 Regional Rehab 135mm @ IRI 9-12
S
0.60
9061 National Full Recon 180mm @ IRI 12
S
0.20
6524 National Full Recon 180mm @ IRI 12
S
0.10 10297 Regional Full Recon 150mm @ IRI 12
S
2.60
9061 National Rehab 180mm @ IRI 9-12
S
1.90
4887 Regional DBST @ Traff 4000-6000
S
2.20 11451 National Rehab 195mm @ IRI 9-12
S
1.00
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
5536 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
3516 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.80
3206 Regional Overlay 50mm @ IRI 5-7
S
1.70
4887 Regional Rehab 150mm @ IRI 9-12
S
0.60
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
2.80
9061 National Full Recon 180mm @ IRI 12
S
0.10
4563 Regional DBST @ Traff 4000-6000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.58
9061 National Full Recon 180mm @ IRI 12
S
3.20
9061 National Full Recon 180mm @ IRI 12
S
3.10
1779 Regional Overlay 50mm @ IRI 7-9
S
0.30 10297 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
9061 National Rehab 180mm @ IRI 9-12
S
3.40
2956 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
2223 Regional DBST @ Traff 2000-4000
S
0.40
9061 National Rehab 180mm @ IRI 9-12
S
3.70
9061 National Full Recon 180mm @ IRI 12
S
0.10
5536 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:53 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.799
3.86
5.419
3.86
2.134
3.85
10.291
3.85
1.799
3.85
1.703
3.85
11.675
3.85
4.191
3.85
2.290
3.85
41.795
3.85
3.318
3.85
49.357
3.84
19.459
3.84
1.799
3.84
1.799
3.83
3.678
3.83
1.832
3.83
0.793
3.83
1.897
3.83
5.637
3.83
22.927
3.83
11.675
3.82
1.799
3.82
57.567
3.82
0.090
3.82
1.799
3.82
1.799
3.82
1.799
3.82
11.937
3.82
65.861
3.82
5.922
3.82
5.889
3.81
1.799
3.81
1.799
3.81
12.860
3.81
9.760
3.81
1.734
3.81
0.272
3.81
5.612
3.80
76.152
3.80
1.799
3.80
NPV
6.76
21.12
8.19
37.66
6.77
6.28
42.88
15.25
8.60
154.37
52.78
192.09
71.29
6.74
6.73
13.73
6.89
3.13
7.13
28.67
88.27
42.59
6.71
209.83
0.89
6.74
6.74
6.74
43.46
239.65
30.63
21.85
6.72
6.70
47.10
52.08
6.45
3.40
20.51
274.78
6.41
Appendix-A
Annual Needs Report
2012-2013
Zone
Khulna
Rangpur
Khulna
Chittagong
Barisal
Chittagong
Chittagong
Rangpur
Gopalganj
Barisal
Dhaka
Khulna
Rangpur
Barisal
Chittagong
Khulna
Chittagong
Khulna
Gopalganj
Comilla
Rajshahi
Rajshahi
Rangpur
Rangpur
Chittagong
Barisal
Chittagong
Khulna
Barisal
Sylhet
Comilla
Rajshahi
Rajshahi
Gopalganj
Comilla
Comilla
Khulna
Chittagong
Sylhet
Rajshahi
Chittagong
Division
Jhenaidah
Dinajpur
Jessore
Khagrachari
Barisal
Chittagong
Chittagong
Dinajpur
Sariatpur
Bhola
Gazipur
Chuadanga
Kurigram
Bhola
Chittagong
Magura
Dohazari
Chuadanga
Faridpur
Noakhali
Naogaon
Sirajganj
Bogra
Gaibanda
Chittagong
Bhola
Rangamati
Jhenaidah
Barisal
Habiganj
Noakhali
Rajshahi
Sirajganj
Faridpur
Chandpur
Comilla
Chuadanga
Chittagong
Sylhet
Naogaon
Chittagong
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R745
R585
N7
R160
N809
R163
R163
R585
R860
N809
R313
R745
N506
N809
R163
N7
R170
R745
N803
R142
R549
N5
N515
R555
R163
R890
R161
R748
R870
N2
R140
R685
N5
N7
R140
R141
R745
N1
N206
R547
R163
Road Name
Chainage
Kushtia -Jhenaidah Road
Km 099.56-099.66
Gobindagnj-Fulbari-Dinajpur Road
Km 069.80-070.40
Dauladia-Mongla Road
Km 143.82-144.02
Hathazari-Khagrachhari Road
Km 042.70-046.70
Barishal-Lakshmipur Road
Km 003.75-003.85
Chittagong -Chandragona Road
Km 007.30-007.40
Chittagong -Chandragona Road
Km 007.10-007.20
Gobindagnj-Fulbari-Dinajpur Road
Km 059.12-059.42
Mostafapur-Chandpur Road
Km 018.98-019.18
Barishal-Lakshmipur Road
Km 024.55-025.05
Mawna-Monohardi Road
Km 025.27-028.37
Kushtia -Jhenaidah Road
Km 092.46-092.86
Rangpur-Barobari-Kurigram Road
Km 036.00-041.80
Barishal-Lakshmipur Road
Km 028.19-029.39
Chittagong -Chandragona Road
Km 009.40-009.50
Dauladia-Mongla Road
Km 097.91-098.01
Patiya-Chokoria Road
Km 002.60-003.20
Kushtia -Jhenaidah Road
Km 084.06-084.36
Faridpur Town Old section
Km 006.10-006.20
Begamganj-Ramganj Road
Km 008.60-008.70
Badalgachhi-Joypurhat Road
Km 005.80-007.80
Dhaka -Utholi-Banglabandh Road
Km 122.31-129.61
Bogra 2nd Town By-Pass Road
Km 010.40-010.70
Palashbari-Gaibandah Road
Km 003.50-007.00
Chittagong -Chandragona Road
Km 008.30-008.40
Bhola -Char Manika Road
Km 051.17-052.07
Rangamati -Bandarban Road
Km 004.10-004.40
Chuadanga-Kaliganj Road
Km 044.40-044.50
Barisal-Pirojpur Road
Km 000.60-003.60
Dhaka-Sylhet-Jaflong Road
Km 133.15-133.25
Comilla-Begumganj Road
Km 133.17-133.57
Rajshahi -Chowmasia Road
Km 012.50-012.60
Dhaka -Utholi-Banglabandh Road
Km 122.21-122.31
Dauladia-Mongla Road
Km 055.42-055.72
Comilla-Begumganj Road
Km 055.10-055.30
Lalmai-Sonaimuri Road
Km 030.52-030.62
Kushtia -Jhenaidah Road
Km 085.56-085.66
Dhaka -Comilla -Chittagong-Teknaf RoKm 202.38-203.48
Keean Bridge-Nayarpool Road
Km 000.70-000.97
Naogaon-Badalgachhi-Rohonpur
Km 038.09-038.49
Chittagong -Chandragona Road
Km 009.60-009.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
5536 Regional Full Recon 150mm @ IRI 12
S
0.60
2707 Regional Overlay 50mm @ IRI 5-7
S
0.20
5636 National Full Recon 150mm @ IRI 12
S
4.00
3362 Regional Rehab 135mm @ IRI 9-12
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4331 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.50
9061 National Full Recon 180mm @ IRI 12
S
3.10
5572 Regional Full Recon 150mm @ IRI 12
S
0.40
5536 Regional Full Recon 150mm @ IRI 12
S
5.80
2992 National Overlay 50mm @ IRI 5-9
S
1.20
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7850 National Full Recon 180mm @ IRI 12
S
0.60
3516 Regional Overlay 50mm @ IRI 7-9
S
0.30
5536 Regional Full Recon 150mm @ IRI 12
S
0.10
9061 National Rehab 180mm @ IRI 9-12
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
2.00
1779 Regional Overlay 50mm @ IRI 7-9
S
7.30
5355 National Overlay 50mm @ IRI 4-9
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
3.50
2956 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.90
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
2326 Regional Overlay 50mm @ IRI 5-7
S
0.10
5607 Regional Full Recon 150mm @ IRI 12
S
3.00
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
9332 National Full Recon 180mm @ IRI 12
S
0.40 10112 Regional Full Recon 150mm @ IRI 12
S
0.10
6330 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
7248 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
5536 Regional Rehab 150mm @ IRI 9-12
S
1.10 11451 National Full Recon 195mm @ IRI 12
S
0.26 14220 National DBST @ Traff >6000
S
0.40
1661 Regional DBST @ Traff 100-2000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:54 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.799
3.80
1.722
3.80
4.057
3.80
34.983
3.80
2.058
3.79
1.734
3.79
1.734
3.79
4.046
3.79
2.697
3.78
10.291
3.78
54.562
3.78
6.543
3.78
16.659
3.77
24.698
3.77
1.799
3.77
2.732
3.77
1.159
3.77
5.398
3.77
1.607
3.77
1.799
3.76
3.821
3.76
27.815
3.76
8.525
3.76
10.048
3.76
1.734
3.75
12.138
3.75
0.548
3.74
1.806
3.74
40.827
3.74
2.807
3.74
7.852
3.74
1.799
3.74
3.114
3.73
8.195
3.73
3.730
3.73
1.930
3.73
1.349
3.73
42.563
3.73
0.687
3.73
0.356
3.73
1.799
3.73
NPV
6.41
8.91
15.39
129.69
7.45
6.42
6.41
15.23
10.37
37.10
201.24
23.00
104.85
88.82
6.62
10.06
5.52
19.05
5.81
6.52
18.17
151.21
31.69
51.43
6.35
45.75
2.32
6.33
153.66
10.38
28.40
6.40
11.50
29.84
13.48
7.08
4.95
155.47
10.42
4.59
6.54
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Chittagong
Khulna
Comilla
Rajshahi
Khulna
Comilla
Rajshahi
Khulna
Khulna
Rangpur
Rangpur
Khulna
Khulna
Barisal
Comilla
Khulna
Khulna
Barisal
Khulna
Khulna
Rajshahi
Comilla
Chittagong
Comilla
Rangpur
Rangpur
Comilla
Chittagong
Rajshahi
Khulna
Chittagong
Dhaka
Comilla
Gopalganj
Khulna
Barisal
Barisal
Chittagong
Chittagong
Rajshahi
Division
Mymensingh
Chittagong
Magura
Noakhali
Naogaon
Jhenaidah
Chandpur
Pabna
Chuadanga
Chuadanga
Joypurhat
Dinajpur
Satkhira
Chuadanga
Barisal
Chandpur
Jhenaidah
Jessore
Barisal
Khulna
Magura
Pabna
Chandpur
Chittagong
Chandpur
Bogra
Lalmonirhat
Noakhali
Bandarban
Natore
Jessore
Dohazari
Narayanganj
Noakhali
Madaripur
Satkhira
Barisal
Jhalokati
Chittagong
Khagrachari
Pabna
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R371
R163
N7
R142
R547
R745
R140
R603
R747
R747
R545
R585
N715
R747
N809
R140
N7
N7
N8
R760
N7
R604
R140
R163
R140
R545
N509
R141
R161
N502
N7
R170
R202
R141
N8
N715
N809
R870
R160
R160
R601
Road Name
Sherpur-Nakla-Mymensingh
Chittagong -Chandragona Road
Dauladia-Mongla Road
Begamganj-Ramganj Road
Naogaon-Badalgachhi-Rohonpur
Kushtia -Jhenaidah Road
Comilla-Begumganj Road
Pabna-Paksey (EPZ) Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Bogra-Joypurhat Road
Gobindagnj-Fulbari-Dinajpur Road
Benapole Town Old Section
Kushtia -Chuadanga Road
Barishal-Lakshmipur Road
Comilla-Begumganj Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dhaka -Patuakhali Road
Khulna-Satkhira Road
Dauladia-Mongla Road
Tebunia-Hamkuria Road
Comilla-Begumganj Road
Chittagong -Chandragona Road
Comilla-Begumganj Road
Bogra-Joypurhat Road
Barabari-Burimary Road
Lalmai-Sonaimuri Road
Rangamati -Bandarban Road
Bogra -Natore Road
Dauladia-Mongla Road
Patiya-Chokoria Road
Bhulta-Rampura Road
Lalmai-Sonaimuri Road
Dhaka -Patuakhali Road
Benapole Town Old Section
Barishal-Lakshmipur Road
Barisal-Pirojpur Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Pabna-Natakhola Ferry Ghat Road
Chainage
Km 030.00-030.40
Km 009.90-010.00
Km 089.51-089.61
Km 008.10-008.20
Km 049.43-050.63
Km 114.26-114.36
Km 049.70-049.90
Km 009.50-010.20
Km 033.44-033.54
Km 033.94-034.04
Km 119.89-120.09
Km 103.56-103.66
Km 005.00-005.30
Km 034.44-034.54
Km 000.10-000.40
Km 053.80-054.00
Km 117.72-118.02
Km 141.92-142.12
Km 148.25-148.45
Km 029.00-029.10
Km 097.51-097.61
Km 019.50-019.60
Km 055.50-055.70
Km 009.50-009.60
Km 045.70-045.90
Km 000.60-000.70
Km 038.74-044.84
Km 034.52-034.62
Km 057.74-057.94
Km 056.46-056.76
Km 143.52-143.72
Km 003.70-005.50
Km 001.00-001.30
Km 034.72-034.82
Km 045.57-045.58
Km 004.00-004.20
Km 002.85-003.75
Km 010.30-010.65
Km 017.70-018.40
Km 080.32-080.52
Km 020.24-023.34
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional DBST @ Traff 4000-6000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7850 National Full Recon 180mm @ IRI 12
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
1.20
1661 Regional DBST @ Traff 100-2000
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
3297 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
6605 National Full Recon 180mm @ IRI 12
S
0.20
5636 National Full Recon 150mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7850 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
8774 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
6.10
9061 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
9061 National Full Recon 180mm @ IRI 12
S
0.20
5636 National Full Recon 150mm @ IRI 12
S
1.80
3516 Regional Overlay 50mm @ IRI 7-9
S
0.30
6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.01 11451 National Full Recon 195mm @ IRI 12
S
0.20
9061 National Rehab 180mm @ IRI 9-12
S
0.90
9061 National Full Recon 180mm @ IRI 12
S
0.34
4887 Regional Rehab 150mm @ IRI 9-12
S
0.70
5045 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
3019 Regional DBST @ Traff 2000-4000
S
3.10
1096 Regional Overlay 50mm @ IRI 7-9
Appendix-A: Page:55 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.593
3.73
1.799
3.72
2.732
3.72
1.799
3.72
1.067
3.72
1.349
3.72
3.730
3.71
2.192
3.71
1.963
3.71
1.963
3.71
3.599
3.71
1.799
3.71
6.174
3.71
1.963
3.71
10.791
3.71
3.730
3.70
7.297
3.70
4.318
3.70
4.487
3.70
1.963
3.70
2.732
3.70
1.471
3.70
3.730
3.69
1.349
3.69
3.690
3.69
1.472
3.69
98.057
3.69
1.930
3.69
3.335
3.69
6.174
3.69
3.775
3.69
3.288
3.68
1.307
3.68
1.930
3.68
0.521
3.68
3.215
3.68
18.523
3.68
4.653
3.68
2.440
3.68
0.178
3.67
5.987
3.67
NPV
6.32
6.54
9.94
6.45
13.36
5.04
13.40
10.47
7.11
7.11
12.88
6.44
21.56
7.10
39.42
13.36
26.46
15.80
16.80
7.12
9.87
5.44
13.33
5.06
13.25
5.04
347.16
6.99
12.37
21.62
13.91
13.70
6.13
6.98
1.89
11.37
65.02
17.21
10.31
2.36
26.16
Appendix-A
Annual Needs Report
2012-2013
Zone
Sylhet
Comilla
Comilla
Chittagong
Chittagong
Sylhet
Dhaka
Barisal
Barisal
Barisal
Comilla
Barisal
Chittagong
Comilla
Khulna
Khulna
Comilla
Rangpur
Comilla
Rajshahi
Khulna
Comilla
Khulna
Comilla
Chittagong
Comilla
Rangpur
Khulna
Barisal
Comilla
Comilla
Khulna
Khulna
Comilla
Comilla
Rajshahi
Rangpur
Chittagong
Rangpur
Khulna
Gopalganj
Division
Sylhet
Chandpur
Chandpur
Chittagong
Chittagong
Habiganj
Manikganj
Jhalokati
Pirojpur
Pirojpur
Chandpur
Jhalokati
Rangamati
Chandpur
Magura
Satkhira
Comilla
Lalmonirhat
Noakhali
Naogaon
Khulna
Comilla
Satkhira
Chandpur
Bandarban
Comilla
Bogra
Satkhira
Patuakhali
Noakhali
Chandpur
Jessore
Satkhira
Chandpur
Chandpur
Naogaon
Lalmonirhat
Chittagong
Joypurhat
Jessore
Gopalganj
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N2
R140
R140
R163
N1
N2
R315
R870
R870
R870
R140
R870
N106
R140
N7
R765
R141
N509
R141
R547
R760
R141
R765
R140
R161
R141
N502
N715
N8
N104
R140
R765
R765
R140
R860
R549
N509
R151
R545
R765
R850
Road Name
Chainage
Dhaka-Sylhet-Jaflong Road
Km 274.49-274.69
Comilla-Begumganj Road
Km 064.00-064.10
Comilla-Begumganj Road
Km 049.20-049.60
Chittagong -Chandragona Road
Km 031.10-031.20
Dhaka -Comilla -Chittagong-Teknaf RoKm 203.48-203.58
Dhaka-Sylhet-Jaflong Road
Km 138.35-138.55
Mawna-Nabinagar Road
Km 045.00-048.10
Barisal-Pirojpur Road
Km 026.87-027.07
Barisal-Pirojpur Road
Km 049.57-049.77
Barisal-Pirojpur Road
Km 049.97-050.17
Comilla-Begumganj Road
Km 078.10-078.20
Barisal-Pirojpur Road
Km 013.55-013.75
Chittagong-Rangamati Road
Km 051.06-051.76
Comilla-Begumganj Road
Km 072.40-072.50
Dauladia-Mongla Road
Km 082.91-083.21
Khulna-Satkhira Road
Km 023.30-023.40
Lalmai-Sonaimuri Road
Km 030.22-030.32
Barabari-Burimary Road
Km 078.78-080.78
Lalmai-Sonaimuri Road
Km 033.12-033.32
Naogaon-Badalgachhi-Rohonpur
Km 063.23-064.23
Khulna-Satkhira Road
Km 007.10-007.80
Lalmai-Sonaimuri Road
Km 013.80-014.00
Khulna-Satkhira Road
Km 022.80-022.90
Comilla-Begumganj Road
Km 065.00-065.10
Rangamati -Bandarban Road
Km 058.04-061.17
Lalmai-Sonaimuri Road
Km 000.10-000.40
Bogra -Natore Road
Km 015.10-016.90
Benapole Town Old Section
Km 005.40-006.10
Dhaka -Patuakhali Road
Km 177.30-180.42
Feni-Noakhali Road
Km 040.00-040.20
Comilla-Begumganj Road
Km 071.70-072.10
Khulna-Satkhira Road
Km 013.70-013.80
Khulna-Satkhira Road
Km 024.79-024.89
Comilla-Begumganj Road
Km 073.20-073.30
Mostafapur-Chandpur Road
Km 069.16-069.36
Badalgachhi-Joypurhat Road
Km 010.85-011.85
Barabari-Burimary Road
Km 080.98-083.98
Baraiyerhat-Fatikchhari Road
Km 004.60-004.70
Bogra-Joypurhat Road
Km 118.39-118.69
Khulna-Satkhira Road
Km 013.20-013.30
Tekerhat-Mollahhat Road
Km 018.80-018.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
9332 National Rehab 180mm @ IRI 9-12
S
3.10
2048 Regional Rehab 135mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
7850 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
2.00
9061 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.00
1661 Regional DBST @ Traff 100-2000
S
0.70
3206 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
3.14
4887 Regional DBST 25mm @ 25% Crk
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
1.80
5705 National Rehab 150mm @ IRI 9-12
S
0.70
9061 National Full Recon 180mm @ IRI 12
S
3.12
9061 National Full Recon 180mm @ IRI 12
S
0.20 10253 National Full Recon 195mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.00
1779 Regional DBST @ Traff 100-2000
S
3.00
9061 National Full Recon 180mm @ IRI 12
S
0.10
1484 Regional DBST 25mm @ 25% Crk
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
2343 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:56 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.839
3.67
1.897
3.67
7.459
3.67
1.799
3.66
4.048
3.66
4.384
3.66
22.118
3.66
3.599
3.66
3.599
3.66
3.599
3.66
1.963
3.66
3.599
3.66
13.621
3.66
1.963
3.66
8.195
3.66
1.799
3.66
1.963
3.65
41.163
3.65
3.730
3.65
0.889
3.65
2.192
3.65
3.756
3.65
1.799
3.64
1.897
3.64
5.464
3.64
5.692
3.63
24.276
3.63
14.407
3.63
64.112
3.63
4.516
3.63
5.885
3.63
1.799
3.63
1.799
3.63
1.963
3.63
3.599
3.62
0.904
3.62
61.745
3.62
0.094
3.62
5.398
3.62
1.799
3.62
0.287
3.62
NPV
21.20
6.78
26.48
6.44
14.48
16.27
78.64
12.81
12.81
12.82
7.11
12.81
47.51
7.11
29.28
6.42
7.04
142.61
13.31
11.21
13.48
13.44
6.40
6.72
84.86
20.30
86.41
49.25
221.82
15.45
21.75
6.37
6.37
7.05
12.73
11.02
212.34
0.77
18.86
6.36
1.34
Appendix-A
Annual Needs Report
2012-2013
Zone
Rajshahi
Comilla
Chittagong
Rangpur
Barisal
Khulna
Comilla
Comilla
Khulna
Barisal
Barisal
Khulna
Dhaka
Khulna
Rangpur
Khulna
Chittagong
Khulna
Rajshahi
Khulna
Comilla
Barisal
Khulna
Comilla
Khulna
Rajshahi
Khulna
Comilla
Rajshahi
Khulna
Khulna
Khulna
Chittagong
Khulna
Khulna
Khulna
Barisal
Khulna
Rangpur
Comilla
Chittagong
Division
Pabna
Noakhali
Khagrachari
Gaibanda
Patuakhali
Satkhira
Chandpur
Chandpur
Jessore
Barisal
Jhalokati
Magura
Narayanganj
Satkhira
Bogra
Chuadanga
Rangamati
Kushtia
Pabna
Jhenaidah
Chandpur
Jhalokati
Jessore
Noakhali
Chuadanga
Naogaon
Jessore
Chandpur
Rajshahi
Magura
Jessore
Jessore
Rangamati
Kushtia
Jessore
Jessore
Patuakhali
Jessore
Lalmonirhat
Comilla
Bandarban
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R603
R142
R160
R585
R881
R765
R140
R140
R755
N8
R870
N7
R113
N715
N502
R745
N106
R710
R603
N704
R140
R870
R755
N104
R747
R549
R765
R140
R685
R720
R765
N7
R161
N704
N706
R755
R881
R755
N509
R141
R161
Road Name
Pabna-Paksey (EPZ) Road
Begamganj-Ramganj Road
Hathazari-Khagrachhari Road
Gobindagnj-Fulbari-Dinajpur Road
Amtali-Kuakata Road
Khulna-Satkhira Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Jessore -Chuknagar Road
Dhaka -Patuakhali Road
Barisal-Pirojpur Road
Dauladia-Mongla Road
Madanpur-Sayedpur Road
Benapole Town Old Section
Bogra -Natore Road
Kushtia -Jhenaidah Road
Chittagong-Rangamati Road
Ahaladipur-Kushtia Road
Pabna-Paksey (EPZ) Road
Jhenaidah-Dasuria Road
Comilla-Begumganj Road
Barisal-Pirojpur Road
Jessore -Chuknagar Road
Feni-Noakhali Road
Kushtia -Chuadanga Road
Badalgachhi-Joypurhat Road
Khulna-Satkhira Road
Comilla-Begumganj Road
Rajshahi -Chowmasia Road
Magura-Narail Road
Khulna-Satkhira Road
Dauladia-Mongla Road
Rangamati -Bandarban Road
Jhenaidah-Dasuria Road
Jessore -Benapole Road
Jessore -Chuknagar Road
Amtali-Kuakata Road
Jessore -Chuknagar Road
Barabari-Burimary Road
Lalmai-Sonaimuri Road
Rangamati -Bandarban Road
Chainage
Km 004.40-007.60
Km 004.20-004.30
Km 050.00-051.20
Km 053.12-053.54
Km 000.00-011.90
Km 041.19-041.29
Km 050.40-050.80
Km 034.09-034.29
Km 012.70-012.80
Km 174.20-177.30
Km 023.55-023.75
Km 085.51-085.61
Km 011.20-011.88
Km 007.20-007.30
Km 013.10-013.30
Km 091.76-091.96
Km 062.12-062.52
Km 048.25-048.35
Km 012.80-015.20
Km 000.40-001.20
Km 056.70-057.00
Km 011.95-012.25
Km 030.13-030.23
Km 032.90-033.20
Km 035.94-036.14
Km 003.60-004.90
Km 010.60-010.70
Km 035.89-036.19
Km 028.30-028.40
Km 028.80-029.10
Km 007.30-007.50
Km 140.92-141.02
Km 002.90-003.10
Km 045.02-045.18
Km 024.80-025.30
Km 030.73-030.83
Km 032.72-032.82
Km 030.53-030.63
Km 078.08-078.78
Km 030.32-030.52
Km 056.54-056.64
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
3.20
3297 Regional Overlay 50mm @ IRI 7-9
S
0.10
9769 Regional Full Recon 150mm @ IRI 12
S
1.20
3362 Regional Rehab 135mm @ IRI 9-12
S
0.42
4331 Regional Rehab 150mm @ IRI 9-12
S
11.90
3019 Regional DBST @ Traff 2000-4000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
3.10
9061 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7850 National Full Recon 180mm @ IRI 12
S
0.68
5419 Regional DBST 25mm @ 25% Crk
S
0.10
9061 National Full Recon 180mm @ IRI 12
S
0.20
5705 National Rehab 150mm @ IRI 9-12
S
0.20
5536 Regional Full Recon 150mm @ IRI 12
S
0.40
3555 National Overlay 50mm @ IRI 5-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
2.40
3297 Regional Overlay 50mm @ IRI 7-9
S
0.80
9061 National Full Recon 180mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 13564 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.30
1779 Regional DBST @ Traff 100-2000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
1047 Regional Overlay 50mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
5636 National Full Recon 150mm @ IRI 12
S
0.20
2326 Regional DBST @ Traff 2000-4000
S
0.16 11451 National Rehab 195mm @ IRI 9-12
S
0.50
7314 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
9061 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
Appendix-A: Page:57 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
10.021
3.62
1.799
3.62
10.495
3.62
5.718
3.61
11.111
3.61
1.799
3.61
7.459
3.61
3.703
3.61
1.799
3.61
63.844
3.61
3.599
3.61
2.732
3.60
0.804
3.60
2.058
3.60
2.697
3.60
3.272
3.59
1.211
3.59
1.799
3.59
7.516
3.58
17.034
3.58
5.624
3.58
5.398
3.57
1.799
3.57
9.576
3.57
3.926
3.56
1.175
3.56
1.799
3.56
5.457
3.56
1.349
3.56
0.579
3.56
3.599
3.56
2.388
3.56
0.173
3.56
5.975
3.56
10.230
3.56
1.799
3.56
0.852
3.55
1.799
3.55
14.407
3.55
2.898
3.55
0.829
3.55
NPV
42.59
6.27
37.05
20.54
154.04
6.34
26.07
12.93
6.36
219.54
12.63
9.62
6.90
6.98
9.51
10.93
6.70
6.33
34.66
57.90
19.48
18.77
6.29
33.77
13.66
14.10
6.26
19.09
4.83
2.53
12.51
8.43
2.02
21.19
36.06
6.28
3.03
6.26
48.58
10.48
2.78
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Jessore
N7
Comilla
Comilla
R140
Comilla
Noakhali
N104
Comilla
Noakhali
R142
Khulna
Jhenaidah
R745
Gopalganj Madaripur
R860
Comilla
Comilla
R140
Comilla
Chandpur
R860
Comilla
Chandpur
R860
Comilla
Chandpur
R860
Khulna
Jhenaidah
R745
Khulna
Jessore
R755
Rangpur
Bogra
R545
Khulna
Jhenaidah
R748
Comilla
Chandpur
R140
Khulna
Satkhira
N715
Khulna
Satkhira
R765
Khulna
Jhenaidah
R748
Khulna
Jhenaidah
R748
Dhaka
Gazipur
R310
Rangpur
Bogra
R550
Khulna
Satkhira
R765
Comilla
Noakhali
R142
Khulna
Meherpur
R745
Chittagong Rangamati
R161
Comilla
Chandpur
R140
Comilla
Chandpur
R140
Comilla
Brahmanbaria R220
Barisal
Jhalokati
R870
Khulna
Chuadanga
R745
Khulna
Khulna
R760
Rangpur
Joypurhat
R545
Comilla
Noakhali
R142
Chittagong Bandarban
R161
Comilla
Chandpur
R140
Chittagong Chittagong
R163
Chittagong Chittagong
N106
Rangpur
Bogra
N502
Chittagong Chittagong
N106
Comilla
Chandpur
R140
Chittagong Chittagong
N106
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Dauladia-Mongla Road
Comilla-Begumganj Road
Feni-Noakhali Road
Begamganj-Ramganj Road
Kushtia -Jhenaidah Road
Mostafapur-Chandpur Road
Comilla-Begumganj Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Kushtia -Jhenaidah Road
Jessore -Chuknagar Road
Bogra-Joypurhat Road
Chuadanga-Kaliganj Road
Comilla-Begumganj Road
Benapole Town Old Section
Khulna-Satkhira Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Joydebpur-Itakhola Road
Mokamtala-Joypurhat Road
Khulna-Satkhira Road
Begamganj-Ramganj Road
Kushtia -Jhenaidah Road
Rangamati -Bandarban Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Sarail-Habiganj Road
Barisal-Pirojpur Road
Kushtia -Jhenaidah Road
Khulna-Satkhira Road
Bogra-Joypurhat Road
Begamganj-Ramganj Road
Rangamati -Bandarban Road
Comilla-Begumganj Road
Chittagong -Chandragona Road
Chittagong-Rangamati Road
Bogra -Natore Road
Chittagong-Rangamati Road
Comilla-Begumganj Road
Chittagong-Rangamati Road
Chainage
Km 154.46-154.96
Km 026.49-026.59
Km 043.68-044.08
Km 000.30-000.50
Km 112.46-112.56
Km 016.48-016.50
Km 024.89-024.99
Km 070.26-070.56
Km 069.76-070.06
Km 070.96-071.26
Km 114.46-114.56
Km 026.50-026.80
Km 000.30-000.50
Km 065.00-065.10
Km 047.70-047.90
Km 004.40-004.80
Km 030.99-031.09
Km 053.30-053.40
Km 058.70-058.80
Km 005.10-005.20
Km 005.80-007.70
Km 024.40-024.69
Km 026.25-026.35
Km 069.68-069.78
Km 002.80-002.90
Km 068.60-068.80
Km 076.60-076.70
Km 016.78-017.08
Km 031.77-033.37
Km 088.06-088.56
Km 030.50-030.60
Km 118.79-119.79
Km 022.95-023.05
Km 056.64-057.74
Km 069.80-070.00
Km 000.10-000.30
Km 004.70-005.00
Km 002.30-002.40
Km 004.10-004.20
Km 058.40-058.60
Km 004.30-004.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.50
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.20
9769 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.02
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
3292 Regional Rehab 135mm @ IRI 9-12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
6578 Regional Full Recon 150mm @ IRI 12
S
1.90
3234 Regional Overlay 50mm @ IRI 5-7
S
0.28
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
2326 Regional DBST 25mm @ 25% Crk
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
6240 Regional Overlay 60mm @ IRI 5.5-9
S
1.60
2223 Regional Overlay 50mm @ IRI 5-7
S
0.50
5536 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.00
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7837 Regional Full Recon 150mm @ IRI 12
S
1.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 13468 National Full Recon 195mm @ IRI 12
S
0.10
5705 National Rehab 150mm @ IRI 9-12
S
0.10 13468 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 13468 National Full Recon 195mm @ IRI 12
Appendix-A: Page:58 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
9.355
3.54
1.963
3.54
15.431
3.54
3.599
3.54
1.799
3.54
0.190
3.54
1.963
3.54
5.398
3.54
5.398
3.54
5.398
3.54
1.349
3.54
3.798
3.53
2.207
3.53
1.897
3.53
3.926
3.53
8.233
3.53
1.799
3.53
1.799
3.52
1.897
3.52
1.570
3.52
5.454
3.52
5.128
3.52
1.799
3.51
1.799
3.51
0.086
3.50
2.943
3.50
1.471
3.50
1.027
3.50
4.593
3.50
8.440
3.50
1.963
3.50
17.993
3.50
1.799
3.49
21.808
3.49
3.926
3.49
3.468
3.49
9.191
3.49
1.349
3.49
3.114
3.48
3.867
3.48
9.343
3.48
NPV
31.32
6.79
53.52
12.15
6.25
0.65
6.78
18.65
18.64
18.64
4.80
13.32
7.48
6.55
13.51
27.35
6.19
6.22
6.54
5.04
23.24
17.60
6.19
6.18
0.56
10.42
5.25
3.24
24.38
27.60
6.73
60.75
6.06
75.06
13.38
11.82
31.34
4.61
10.60
13.11
31.77
Appendix-A
Annual Needs Report
2012-2013
Zone
Comilla
Rajshahi
Khulna
Khulna
Khulna
Comilla
Rangpur
Rajshahi
Barisal
Khulna
Khulna
Barisal
Barisal
Comilla
Comilla
Chittagong
Dhaka
Comilla
Comilla
Comilla
Gopalganj
Comilla
Comilla
Chittagong
Khulna
Comilla
Comilla
Comilla
Comilla
Gopalganj
Gopalganj
Khulna
Khulna
Chittagong
Chittagong
Khulna
Chittagong
Dhaka
Comilla
Khulna
Khulna
Division
Chandpur
Natore
Jessore
Jessore
Jessore
Chandpur
Bogra
Nawabganj
Barisal
Magura
Jhenaidah
Jhalokati
Barisal
Chandpur
Comilla
Chittagong
Tangail
Noakhali
Chandpur
Chandpur
Faridpur
Noakhali
Comilla
Rangamati
Khulna
Chandpur
Noakhali
Chandpur
Chandpur
Faridpur
Faridpur
Jhenaidah
Satkhira
Chittagong
Khagrachari
Jessore
Cox's Bazar
Mymensingh
Chandpur
Kushtia
Kushtia
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R860
N502
R755
R755
R755
R140
N502
R547
N809
R720
N7
R870
N809
R140
R141
N106
N4
R142
R140
R140
N7
N104
R141
N106
R760
R140
R142
R140
R860
N7
N7
R745
R765
N1
R160
R755
R170
R314
R140
R710
R710
Road Name
Chainage
Mostafapur-Chandpur Road
Km 074.46-074.80
Bogra -Natore Road
Km 048.06-051.56
Jessore -Chuknagar Road
Km 028.13-028.23
Jessore -Chuknagar Road
Km 032.33-032.43
Jessore -Chuknagar Road
Km 034.13-034.23
Comilla-Begumganj Road
Km 071.20-071.40
Bogra -Natore Road
Km 004.90-007.50
Naogaon-Badalgachhi-Rohonpur
Km 083.12-083.32
Barishal-Lakshmipur Road
Km 002.10-002.50
Magura-Narail Road
Km 012.40-012.80
Dauladia-Mongla Road
Km 110.32-110.72
Barisal-Pirojpur Road
Km 017.25-017.55
Barishal-Lakshmipur Road
Km 003.95-005.05
Comilla-Begumganj Road
Km 072.50-072.90
Lalmai-Sonaimuri Road
Km 031.52-031.72
Chittagong-Rangamati Road
Km 004.60-004.70
Joydebpur-Jamalpur Road
Km 100.59-100.89
Begamganj-Ramganj Road
Km 002.70-002.90
Comilla-Begumganj Road
Km 034.89-035.09
Comilla-Begumganj Road
Km 074.50-074.90
Dauladia-Mongla Road
Km 060.22-060.42
Feni-Noakhali Road
Km 041.88-042.28
Lalmai-Sonaimuri Road
Km 020.60-020.70
Chittagong-Rangamati Road
Km 047.36-048.36
Khulna-Satkhira Road
Km 005.50-006.70
Comilla-Begumganj Road
Km 072.90-073.10
Begamganj-Ramganj Road
Km 027.95-028.25
Comilla-Begumganj Road
Km 066.90-067.10
Mostafapur-Chandpur Road
Km 064.16-064.86
Dauladia-Mongla Road
Km 044.20-044.30
Dauladia-Mongla Road
Km 045.00-045.10
Kushtia -Jhenaidah Road
Km 107.26-107.36
Khulna-Satkhira Road
Km 026.29-026.49
Dhaka -Comilla -Chittagong-Teknaf RoKm 228.46-228.76
Hathazari-Khagrachhari Road
Km 051.60-053.30
Jessore -Chuknagar Road
Km 033.23-033.33
Patiya-Chokoria Road
Km 071.50-071.70
Gafargaon-Mawna Road
Km 018.70-019.60
Comilla-Begumganj Road
Km 051.70-051.80
Ahaladipur-Kushtia Road
Km 052.55-052.65
Ahaladipur-Kushtia Road
Km 056.05-056.25
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.34
4887 Regional Full Recon 150mm @ IRI 12
S
3.50
6500 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
2.60
5705 National Rehab 150mm @ IRI 9-12
S
0.20
3019 Regional DBST 25mm @ 25% Crk
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.40
1047 Regional Overlay 50mm @ IRI 7-9
S
0.40
6605 National Rehab 180mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
1.10
9061 National Full Recon 180mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 13468 National Rehab 195mm @ IRI 9-12
S
0.30
6524 National Full Recon 180mm @ IRI 12
S
0.20
9769 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
7248 National Full Recon 180mm @ IRI 12
S
0.40 10253 National Full Recon 195mm @ IRI 12
S
0.10
5257 Regional Full Recon 150mm @ IRI 12
S
1.00
9061 National Full Recon 180mm @ IRI 12
S
1.20
3206 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
5397 National Full Recon 150mm @ IRI 12
S
0.10
5397 National Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
1.70
3362 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.90
1346 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:59 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
6.172
3.48
56.262
3.48
1.799
3.48
1.799
3.48
1.799
3.48
3.926
3.48
35.065
3.48
0.183
3.48
8.233
3.47
0.689
3.47
7.599
3.47
5.398
3.47
22.640
3.46
5.885
3.46
3.783
3.46
2.459
3.46
6.287
3.46
3.599
3.46
3.599
3.46
7.852
3.45
5.463
3.45
8.720
3.45
1.897
3.45
20.132
3.45
1.778
3.45
3.926
3.45
5.398
3.45
3.919
3.44
12.595
3.44
2.388
3.44
2.388
3.44
1.799
3.44
3.599
3.44
9.926
3.44
14.868
3.44
1.799
3.44
2.840
3.43
1.550
3.43
1.897
3.43
1.799
3.43
3.599
3.43
NPV
20.97
185.09
6.13
6.13
6.13
13.51
119.48
1.35
27.28
2.70
26.42
18.20
74.80
20.75
12.85
8.48
20.55
11.99
12.14
26.85
18.39
28.24
6.42
66.07
23.75
13.40
18.22
13.16
42.30
8.33
8.33
6.07
12.08
33.43
49.93
6.06
9.86
5.77
6.33
6.05
12.10
Appendix-A
Annual Needs Report
2012-2013
Zone
Barisal
Chittagong
Chittagong
Khulna
Chittagong
Chittagong
Gopalganj
Comilla
Dhaka
Khulna
Chittagong
Khulna
Comilla
Comilla
Chittagong
Dhaka
Barisal
Rangpur
Khulna
Comilla
Khulna
Comilla
Chittagong
Gopalganj
Comilla
Comilla
Khulna
Khulna
Chittagong
Comilla
Barisal
Khulna
Comilla
Comilla
Comilla
Khulna
Khulna
Comilla
Comilla
Chittagong
Comilla
Division
Pirojpur
Chittagong
Chittagong
Jessore
Chittagong
Chittagong
Faridpur
Noakhali
Narayanganj
Chuadanga
Chittagong
Jessore
Chandpur
Chandpur
Cox's Bazar
Tangail
Jhalokati
Lalmonirhat
Chuadanga
Comilla
Kushtia
Comilla
Chittagong
Sariatpur
Comilla
Comilla
Satkhira
Magura
Khagrachari
Chandpur
Pirojpur
Satkhira
Chandpur
Comilla
Chandpur
Chuadanga
Chuadanga
Chandpur
Noakhali
Chittagong
Chandpur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R870
R163
N1
N706
N1
R163
N803
R142
R202
R747
N106
N708
R860
R140
R170
R506
R870
N506
R747
R141
R710
R140
R163
R861
R141
R141
R765
N7
R160
R140
R870
R765
R140
R141
R140
R745
R745
R140
R142
R163
R860
Road Name
Chainage
Barisal-Pirojpur Road
Km 047.37-048.37
Chittagong -Chandragona Road
Km 010.10-010.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 175.38-175.58
Jessore -Benapole Road
Km 025.40-026.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 205.78-206.08
Chittagong -Chandragona Road
Km 010.70-010.90
Faridpur Town Old section
Km 002.20-002.30
Begamganj-Ramganj Road
Km 027.25-027.55
Bhulta-Rampura Road
Km 000.60-000.90
Kushtia -Chuadanga Road
Km 041.84-041.94
Chittagong-Rangamati Road
Km 003.70-003.90
Jessore Town Old Section
Km 002.10-002.70
Mostafapur-Chandpur Road
Km 064.96-065.16
Comilla-Begumganj Road
Km 064.30-064.50
Patiya-Chokoria Road
Km 063.90-064.00
Aricha -Daulatpur-Tangail Road
Km 047.81-053.28
Barisal-Pirojpur Road
Km 008.70-008.90
Rangpur-Barobari-Kurigram Road
Km 022.55-022.65
Kushtia -Chuadanga Road
Km 037.44-037.54
Lalmai-Sonaimuri Road
Km 001.20-001.50
Ahaladipur-Kushtia Road
Km 059.45-059.95
Comilla-Begumganj Road
Km 015.86-016.06
Chittagong -Chandragona Road
Km 030.10-030.40
Monohar -Shariatpur Road
Km 006.40-006.80
Lalmai-Sonaimuri Road
Km 022.00-022.10
Lalmai-Sonaimuri Road
Km 022.12-022.22
Khulna-Satkhira Road
Km 021.70-021.90
Dauladia-Mongla Road
Km 100.31-100.71
Hathazari-Khagrachhari Road
Km 031.40-035.00
Comilla-Begumganj Road
Km 047.90-049.20
Barisal-Pirojpur Road
Km 051.87-052.17
Khulna-Satkhira Road
Km 029.39-029.49
Comilla-Begumganj Road
Km 077.50-077.70
Lalmai-Sonaimuri Road
Km 024.52-024.62
Comilla-Begumganj Road
Km 076.70-076.90
Kushtia -Jhenaidah Road
Km 083.66-083.86
Kushtia -Jhenaidah Road
Km 075.38-075.58
Comilla-Begumganj Road
Km 078.20-079.60
Begamganj-Ramganj Road
Km 022.45-022.55
Chittagong -Chandragona Road
Km 020.50-020.80
Mostafapur-Chandpur Road
Km 071.46-074.46
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.00
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
1.00
7314 National Rehab 180mm @ IRI 9-12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 24928 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20 13468 National Full Recon 195mm @ IRI 12
R
0.60
3249 National Overlay 50mm @ IRI 5-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
5.47
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7068 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
3750 Regional DBST @ Traff 2000-4000
S
0.10
5257 Regional Full Recon 150mm @ IRI 12
S
0.10
5257 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
7850 National Rehab 180mm @ IRI 9-12
S
3.60
3019 Regional Rehab 135mm @ IRI 9-12
S
1.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
5257 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
5536 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.40
7103 Regional DBST @ Traff >6000
S
0.10
7837 Regional Full Recon 150mm @ IRI 12
S
0.30
7612 Regional DBST 25mm @ 25% Crk
S
3.00
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:60 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
17.993
3.43
5.398
3.43
5.917
3.43
20.459
3.43
12.145
3.43
3.599
3.43
3.309
3.42
5.398
3.42
1.307
3.42
1.963
3.42
6.228
3.42
2.349
3.42
3.599
3.42
3.795
3.41
1.894
3.41
80.210
3.41
3.599
3.41
1.607
3.41
1.963
3.41
5.594
3.41
6.743
3.41
3.664
3.40
5.398
3.40
0.543
3.40
1.897
3.40
1.897
3.40
3.599
3.40
8.534
3.40
33.722
3.40
18.999
3.40
5.398
3.40
1.799
3.39
3.926
3.39
1.897
3.39
3.926
3.39
3.599
3.39
3.801
3.39
2.075
3.39
1.799
3.39
0.408
3.39
53.980
3.39
NPV
60.03
18.06
19.86
69.47
40.63
12.03
10.92
18.10
5.46
6.56
20.80
11.53
12.01
12.61
6.29
286.02
11.94
5.25
6.53
18.65
23.10
12.25
17.93
5.33
6.33
6.33
11.95
28.99
111.91
65.23
17.84
5.96
13.18
6.31
13.18
11.43
12.72
69.29
5.87
4.44
178.40
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Noakhali
R142
Dhaka
Jamalpur
N4
Chittagong Rangamati
R161
Chittagong Rangamati
R161
Khulna
Kushtia
R710
Khulna
Jhenaidah
R745
Dhaka
Sherpur
R460
Chittagong Chittagong
R160
Comilla
Laxmipur
R143
Comilla
Brahmanbaria N2
Khulna
Kushtia
R710
Comilla
Comilla
R140
Comilla
Brahmanbaria R220
Khulna
Satkhira
R765
Khulna
Chuadanga
R747
Khulna
Chuadanga
R747
Comilla
Noakhali
R142
Khulna
Chuadanga
R747
Khulna
Kushtia
N704
Barisal
Pirojpur
R870
Khulna
Kushtia
R710
Comilla
Chandpur
R140
Rangpur
Lalmonirhat
N509
Dhaka
Mymensingh R314
Chittagong Khagrachari
R160
Chittagong Khagrachari
R160
Khulna
Jessore
R765
Khulna
Chuadanga
R747
Khulna
Satkhira
R765
Chittagong Chittagong
R151
Comilla
Chandpur
R140
Comilla
Noakhali
R142
Rajshahi
Pabna
R601
Dhaka
Gazipur
R301
Rajshahi
Naogaon
R547
Comilla
Brahmanbaria R220
Dhaka
Gazipur
R301
Khulna
Jessore
R755
Comilla
Chandpur
R140
Barisal
Barisal
R870
Comilla
Noakhali
R140
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Begamganj-Ramganj Road
Joydebpur-Jamalpur Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Ahaladipur-Kushtia Road
Kushtia -Jhenaidah Road
Jamalpur-Sherpur-Bangaon Road
Hathazari-Khagrachhari Road
Maijdi-Chandraganj Road
Dhaka-Sylhet-Jaflong Road
Ahaladipur-Kushtia Road
Comilla-Begumganj Road
Sarail-Habiganj Road
Khulna-Satkhira Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Begamganj-Ramganj Road
Kushtia -Chuadanga Road
Jhenaidah-Dasuria Road
Barisal-Pirojpur Road
Ahaladipur-Kushtia Road
Comilla-Begumganj Road
Barabari-Burimary Road
Gafargaon-Mawna Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Khulna-Satkhira Road
Kushtia -Chuadanga Road
Khulna-Satkhira Road
Baraiyerhat-Fatikchhari Road
Comilla-Begumganj Road
Begamganj-Ramganj Road
Pabna-Natakhola Ferry Ghat Road
Tongi-Pachdona Road
Naogaon-Badalgachhi-Rohonpur
Sarail-Habiganj Road
Tongi-Pachdona Road
Jessore -Chuknagar Road
Comilla-Begumganj Road
Barisal-Pirojpur Road
Comilla-Begumganj Road
Chainage
Km 027.55-027.95
Km 137.61-140.61
Km 018.30-018.40
Km 018.30-018.40
Km 052.85-052.95
Km 103.76-103.86
Km 001.20-001.80
Km 023.20-023.40
Km 018.00-018.80
Km 078.34-078.44
Km 048.55-048.75
Km 026.09-026.19
Km 018.68-019.00
Km 033.79-033.89
Km 030.64-030.74
Km 032.94-033.04
Km 002.10-002.30
Km 032.54-032.64
Km 045.18-045.38
Km 044.05-047.37
Km 058.55-058.75
Km 077.70-078.10
Km 050.84-053.34
Km 004.00-004.50
Km 081.62-081.72
Km 083.12-083.22
Km 010.40-010.50
Km 019.50-019.60
Km 017.30-017.40
Km 004.70-005.50
Km 051.30-051.60
Km 001.50-001.70
Km 038.97-039.67
Km 009.30-009.40
Km 064.23-064.33
Km 004.70-004.90
Km 025.93-026.03
Km 011.60-011.80
Km 062.30-063.30
Km 004.50-004.70
Km 136.47-136.97
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
3.00
9061 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.60
4422 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
5722 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 12330 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.32
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
9769 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
3.32
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional DBST @ Traff 4000-6000
S
2.50
9061 National Rehab 180mm @ IRI 9-12
S
0.50
1346 Regional Overlay 50mm @ IRI 7-9
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
1484 Regional DBST @ Traff 100-2000
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
9769 Regional Full Recon 150mm @ IRI 12
S
0.70
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
1661 Regional DBST 25mm @ 25% Crk
S
0.20
4488 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.00
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.50 10112 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:61 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.395
3.38
46.471
3.38
1.996
3.38
1.996
3.38
1.799
3.38
1.799
3.38
1.722
3.38
3.664
3.38
2.240
3.38
2.920
3.37
3.599
3.37
1.471
3.37
1.092
3.37
1.799
3.37
1.963
3.37
1.963
3.37
3.599
3.37
1.963
3.37
9.343
3.37
45.941
3.37
3.599
3.36
0.593
3.36
40.187
3.36
0.992
3.36
0.829
3.36
0.829
3.35
1.349
3.35
1.963
3.35
1.799
3.35
0.751
3.35
5.692
3.34
3.599
3.34
5.961
3.34
1.832
3.34
0.089
3.34
0.409
3.34
1.897
3.34
3.599
3.34
18.648
3.34
3.599
3.34
9.815
3.33
NPV
18.56
150.57
6.62
6.62
5.97
5.97
6.62
12.13
7.92
9.71
11.90
5.02
3.31
5.92
6.45
6.45
11.67
6.45
30.70
153.13
11.86
19.78
129.69
4.21
2.69
2.69
4.60
6.42
5.89
8.70
18.52
11.58
19.28
5.92
0.76
1.45
6.16
11.77
60.21
11.68
31.64
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Comilla
Chittagong
Dhaka
Dhaka
Dhaka
Dhaka
Khulna
Chittagong
Rajshahi
Sylhet
Dhaka
Chittagong
Khulna
Chittagong
Comilla
Chittagong
Chittagong
Comilla
Khulna
Chittagong
Dhaka
Khulna
Dhaka
Rajshahi
Khulna
Khulna
Chittagong
Rajshahi
Chittagong
Dhaka
Rajshahi
Rangpur
Barisal
Comilla
Dhaka
Gopalganj
Chittagong
Dhaka
Chittagong
Khulna
Division
Gazipur
Noakhali
Chittagong
Gazipur
Gazipur
Tangail
Gazipur
Magura
Chittagong
Rajshahi
Sylhet
Gazipur
Chittagong
Jhenaidah
Cox's Bazar
Noakhali
Chittagong
Chittagong
Comilla
Jessore
Chittagong
Narayanganj
Magura
Narsingdi
Pabna
Jhenaidah
Jessore
Khagrachari
Naogaon
Cox's Bazar
Sherpur
Naogaon
Lalmonirhat
Jhalokati
Noakhali
Narayanganj
Sariatpur
Rangamati
Narayanganj
Rangamati
Khulna
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R311
R142
R163
R315
R313
N4
R313
N7
N106
R685
N209
R315
N106
R745
R170
R140
R163
N1
R140
R755
N106
R114
N7
R114
R601
R748
R765
R160
R549
R170
R371
R549
N509
R870
R141
N1
R860
R161
R114
R161
R760
Road Name
Chainage
Joydebpur -Ordinance Factory
Km 000.30-000.90
Begamganj-Ramganj Road
Km 002.30-002.70
Chittagong -Chandragona Road
Km 029.20-029.80
Mawna-Nabinagar Road
Km 034.60-034.80
Mawna-Monohardi Road
Km 032.87-033.07
Joydebpur-Jamalpur Road
Km 117.51-119.51
Mawna-Monohardi Road
Km 000.90-001.70
Dauladia-Mongla Road
Km 089.71-090.11
Chittagong-Rangamati Road
Km 000.20-000.60
Rajshahi -Chowmasia Road
Km 030.12-030.32
Sylhet Twn By-Pass Road
Km 000.20-001.41
Mawna-Nabinagar Road
Km 033.70-034.40
Chittagong-Rangamati Road
Km 002.60-003.20
Kushtia -Jhenaidah Road
Km 110.66-110.86
Patiya-Chokoria Road
Km 063.20-063.30
Comilla-Begumganj Road
Km 137.37-137.67
Chittagong -Chandragona Road
Km 011.60-011.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 226.78-227.08
Comilla-Begumganj Road
Km 013.96-014.16
Jessore -Chuknagar Road
Km 012.50-012.70
Chittagong-Rangamati Road
Km 001.90-002.10
Nayapur-Raipura Road
Km 005.80-006.50
Dauladia-Mongla Road
Km 102.12-103.62
Nayapur-Raipura Road
Km 025.75-026.00
Pabna-Natakhola Ferry Ghat Road
Km 030.74-033.74
Chuadanga-Kaliganj Road
Km 052.30-052.50
Khulna-Satkhira Road
Km 011.60-011.80
Hathazari-Khagrachhari Road
Km 035.10-037.10
Badalgachhi-Joypurhat Road
Km 003.40-003.60
Patiya-Chokoria Road
Km 069.80-069.90
Sherpur-Nakla-Mymensingh
Km 055.16-055.36
Badalgachhi-Joypurhat Road
Km 005.10-005.80
Barabari-Burimary Road
Km 071.55-077.88
Barisal-Pirojpur Road
Km 039.87-041.77
Lalmai-Sonaimuri Road
Km 035.62-035.72
Dhaka -Comilla -Chittagong-Teknaf RoKm 005.40-005.60
Mostafapur-Chandpur Road
Km 019.18-019.88
Rangamati -Bandarban Road
Km 003.10-003.20
Nayapur-Raipura Road
Km 006.50-006.90
Rangamati -Bandarban Road
Km 020.00-020.30
Khulna-Satkhira Road
Km 009.70-010.30
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.60
2929 Regional Overlay 50mm @ IRI 5-7
S
0.40
9769 Regional Rehab 150mm @ IRI 9-12
S
0.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
2048 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
2.00
3779 National Overlay 50mm @ IRI 4-9
S
0.80
3019 Regional Rehab 135mm @ IRI 9-12
S
0.40
7850 National Full Recon 180mm @ IRI 12
S
0.40 13468 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.21
4434 National Overlay 50mm @ IRI 5-9
S
0.70
2048 Regional DBST 25mm @ 25% Crk
S
0.60 13468 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 10112 Regional Rehab 150mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20 13468 National Full Recon 195mm @ IRI 12
S
0.70
4082 Regional Overlay 60mm @ IRI 7-9
S
1.50
7850 National Full Recon 180mm @ IRI 12
S
0.25
3019 Regional DBST 25mm @ 25% Crk
S
3.00
1096 Regional Overlay 50mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
2.00
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
1779 Regional DBST @ Traff 100-2000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3786 Regional Rehab 135mm @ IRI 9-12
S
0.70
1779 Regional DBST @ Traff 100-2000
S
6.33
9061 National Rehab 180mm @ IRI 9-12
S
1.90
2223 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
R
0.20
8665 National Full Recon 180mm @ IRI 12
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
2326 Regional DBST 25mm @ 25% Crk
S
0.40
4082 Regional Overlay 50mm @ IRI 5-7
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.60
3206 Regional DBST @ Traff 2000-4000
Appendix-A: Page:62 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.190
3.33
5.395
3.33
10.796
3.33
0.153
3.33
3.599
3.33
5.773
3.33
6.739
3.32
10.927
3.32
12.457
3.32
3.599
3.31
3.170
3.31
0.536
3.31
18.685
3.31
3.599
3.31
1.894
3.31
5.811
3.31
5.398
3.31
9.926
3.31
3.664
3.31
2.697
3.31
6.228
3.31
1.655
3.30
40.976
3.30
0.243
3.30
5.794
3.30
3.599
3.30
3.599
3.30
31.145
3.29
0.181
3.29
1.894
3.29
2.762
3.29
0.633
3.29
101.819
3.29
16.005
3.28
1.897
3.28
5.987
3.28
12.595
3.28
0.086
3.28
0.793
3.27
3.531
3.27
0.889
3.27
NPV
4.38
17.58
35.08
1.40
11.68
21.71
22.45
35.46
40.34
11.69
9.45
4.73
60.45
11.69
6.10
19.50
17.44
32.15
11.89
8.97
20.11
5.98
132.21
2.28
24.14
11.64
11.59
99.43
1.44
6.06
9.15
6.54
321.20
49.42
6.12
19.25
40.28
0.56
2.34
11.49
11.91
Appendix-A
Annual Needs Report
2012-2013
Zone
Rajshahi
Dhaka
Khulna
Barisal
Khulna
Khulna
Chittagong
Chittagong
Chittagong
Chittagong
Rangpur
Gopalganj
Comilla
Khulna
Khulna
Khulna
Khulna
Comilla
Chittagong
Chittagong
Khulna
Khulna
Comilla
Khulna
Dhaka
Chittagong
Khulna
Sylhet
Rajshahi
Khulna
Dhaka
Dhaka
Dhaka
Chittagong
Rangpur
Chittagong
Comilla
Khulna
Comilla
Comilla
Dhaka
Division
Naogaon
Tangail
Satkhira
Pirojpur
Jessore
Satkhira
Chittagong
Chittagong
Chittagong
Chittagong
Dinajpur
Sariatpur
Comilla
Satkhira
Jessore
Jhenaidah
Chuadanga
Chandpur
Cox's Bazar
Chittagong
Meherpur
Jessore
Chandpur
Jessore
Mymensingh
Chittagong
Jessore
Sylhet
Nawabganj
Kushtia
Narsingdi
Narsingdi
Gazipur
Khagrachari
Dinajpur
Chittagong
Comilla
Jhenaidah
Chandpur
Comilla
Gazipur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R549
N4
R760
R870
R755
R765
R163
R163
R163
R163
R585
R860
R140
R760
N7
R748
R747
R140
R172
R163
R745
N706
R140
N706
R314
N1
R765
R250
R547
N704
R114
R114
R310
R160
R585
N106
R141
R748
R140
R141
R313
Road Name
Chainage
Badalgachhi-Joypurhat Road
Km 010.30-010.85
Joydebpur-Jamalpur Road
Km 109.66-110.26
Khulna-Satkhira Road
Km 040.76-040.86
Barisal-Pirojpur Road
Km 054.07-054.67
Jessore -Chuknagar Road
Km 012.10-012.50
Khulna-Satkhira Road
Km 040.79-041.09
Chittagong -Chandragona Road
Km 016.90-017.50
Chittagong -Chandragona Road
Km 030.70-031.00
Chittagong -Chandragona Road
Km 013.00-013.10
Chittagong -Chandragona Road
Km 016.40-016.50
Gobindagnj-Fulbari-Dinajpur Road
Km 084.66-084.76
Mostafapur-Chandpur Road
Km 017.88-018.98
Comilla-Begumganj Road
Km 021.19-021.29
Khulna-Satkhira Road
Km 042.16-042.26
Dauladia-Mongla Road
Km 153.96-154.36
Chuadanga-Kaliganj Road
Km 064.20-064.50
Kushtia -Chuadanga Road
Km 024.60-024.80
Comilla-Begumganj Road
Km 075.90-076.60
Chokoria-Baderkhali Road
Km 014.70-014.80
Chittagong -Chandragona Road
Km 013.80-013.90
Kushtia -Jhenaidah Road
Km 070.58-070.88
Jessore -Benapole Road
Km 025.30-025.40
Comilla-Begumganj Road
Km 042.47-042.67
Jessore -Benapole Road
Km 024.70-024.80
Gafargaon-Mawna Road
Km 030.15-037.00
Dhaka -Comilla -Chittagong-Teknaf RoKm 209.28-209.38
Khulna-Satkhira Road
Km 010.90-011.20
Sylhet-Jakiganj Road
Km 021.75-021.85
Naogaon-Badalgachhi-Rohonpur
Km 082.62-082.82
Jhenaidah-Dasuria Road
Km 061.68-066.66
Nayapur-Raipura Road
Km 026.00-026.10
Nayapur-Raipura Road
Km 026.20-026.30
Joydebpur-Itakhola Road
Km 005.50-005.70
Hathazari-Khagrachhari Road
Km 081.42-081.52
Gobindagnj-Fulbari-Dinajpur Road
Km 081.00-081.60
Chittagong-Rangamati Road
Km 001.20-001.40
Lalmai-Sonaimuri Road
Km 018.80-019.00
Chuadanga-Kaliganj Road
Km 056.90-057.10
Comilla-Begumganj Road
Km 068.90-069.10
Lalmai-Sonaimuri Road
Km 014.50-014.70
Mawna-Monohardi Road
Km 004.90-006.35
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.55
1779 Regional Overlay 50mm @ IRI 7-9
S
0.60
3779 National Rehab 140mm @ IRI 9-12
S
0.10
4116 Regional Full Recon 150mm @ IRI 12
S
0.60
3803 Regional Overlay 50mm @ IRI 5-7
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.60
7612 Regional DBST 25mm @ 25% Crk
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7612 Regional Full Recon 150mm @ IRI 12
S
0.10
2707 Regional DBST 25mm @ 25% Crk
S
1.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4116 Regional Full Recon 150mm @ IRI 12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7314 National Full Recon 180mm @ IRI 12
S
0.20
8774 Regional Full Recon 150mm @ IRI 12
S
0.10
7314 National Full Recon 180mm @ IRI 12
S
6.85
1346 Regional Overlay 50mm @ IRI 7-9
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3019 Regional DBST 25mm @ 25% Crk
S
4.97
5419 National DBST @ Traff 4000-6000
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
6578 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.60
2707 Regional Overlay 50mm @ IRI 5-7
S
0.20 13468 National Full Recon 195mm @ IRI 12
S
0.20
5257 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.45
3019 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:63 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.053
3.27
7.761
3.27
1.963
3.27
1.722
3.27
7.197
3.26
5.398
3.26
0.815
3.26
5.398
3.25
1.799
3.25
1.799
3.25
0.136
3.25
19.793
3.25
2.094
3.25
1.963
3.25
7.484
3.25
5.692
3.24
3.926
3.24
13.740
3.24
1.963
3.24
1.799
3.24
5.398
3.23
2.619
3.23
3.599
3.23
2.619
3.23
12.866
3.23
4.048
3.23
5.398
3.23
1.799
3.23
0.183
3.23
9.472
3.22
1.158
3.22
1.158
3.22
3.049
3.22
0.829
3.22
1.722
3.22
6.228
3.21
3.795
3.21
3.795
3.21
3.926
3.21
3.795
3.21
14.684
3.21
NPV
4.10
25.15
6.07
6.45
23.03
17.20
8.65
17.14
5.71
5.48
1.09
62.79
6.64
6.03
22.95
18.05
12.42
44.05
6.19
5.69
17.11
8.21
11.19
8.21
50.86
12.76
17.00
5.68
1.31
307.59
3.59
3.59
8.95
2.58
7.30
19.52
11.94
11.91
12.28
11.94
45.67
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Chittagong
R163
Khulna
Jessore
N708
Khulna
Kushtia
R710
Dhaka
Munshiganj
R812
Rajshahi
Naogaon
R547
Rangpur
Lalmonirhat
N509
Khulna
Jhenaidah
R745
Gopalganj Faridpur
N804
Comilla
Comilla
R140
Chittagong Chittagong
R151
Chittagong Cox's Bazar
R170
Chittagong Cox's Bazar
R170
Rangpur
Kurigram
N506
Khulna
Jhenaidah
R745
Khulna
Chuadanga
R747
Khulna
Jhenaidah
R748
Khulna
Jhenaidah
R748
Comilla
Comilla
R140
Khulna
Khulna
R760
Gopalganj Sariatpur
R861
Rangpur
Lalmonirhat
N509
Khulna
Jhenaidah
R748
Comilla
Noakhali
R141
Comilla
Comilla
R141
Khulna
Magura
N7
Comilla
Noakhali
R142
Khulna
Jessore
R755
Dhaka
Narayanganj R114
Comilla
Comilla
R141
Khulna
Jhenaidah
R748
Khulna
Jessore
N706
Sylhet
Moulavi Bazar R282
Chittagong Chittagong
N106
Dhaka
Narayanganj R114
Khulna
Kushtia
R710
Chittagong Rangamati
R161
Rangpur
Thakurgaon
N5
Khulna
Satkhira
R765
Gopalganj Sariatpur
R861
Chittagong Chittagong
N106
Comilla
Noakhali
R141
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chittagong -Chandragona Road
Jessore Town Old Section
Ahaladipur-Kushtia Road
Fatullah -Mawa Road
Naogaon-Badalgachhi-Rohonpur
Barabari-Burimary Road
Kushtia -Jhenaidah Road
Bhanga-Faridpur Road
Comilla-Begumganj Road
Baraiyerhat-Fatikchhari Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Rangpur-Barobari-Kurigram Road
Kushtia -Jhenaidah Road
Kushtia -Chuadanga Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Comilla-Begumganj Road
Khulna-Satkhira Road
Monohar -Shariatpur Road
Barabari-Burimary Road
Chuadanga-Kaliganj Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Dauladia-Mongla Road
Begamganj-Ramganj Road
Jessore -Chuknagar Road
Nayapur-Raipura Road
Lalmai-Sonaimuri Road
Chuadanga-Kaliganj Road
Jessore -Benapole Road
Juri-Lathidila Road
Chittagong-Rangamati Road
Nayapur-Raipura Road
Ahaladipur-Kushtia Road
Rangamati -Bandarban Road
Dhaka -Utholi-Banglabandh Road
Khulna-Satkhira Road
Monohar -Shariatpur Road
Chittagong-Rangamati Road
Lalmai-Sonaimuri Road
Chainage
Km 000.50-000.70
Km 001.80-001.87
Km 051.95-052.15
Km 011.32-011.52
Km 042.09-043.99
Km 100.97-101.57
Km 114.66-115.06
Km 031.50-032.05
Km 021.39-021.49
Km 022.50-023.20
Km 064.20-064.40
Km 065.10-065.30
Km 042.70-042.90
Km 101.26-101.96
Km 025.34-025.64
Km 065.30-065.80
Km 049.50-049.60
Km 023.69-023.79
Km 003.40-004.30
Km 006.37-006.40
Km 056.65-059.45
Km 064.70-064.80
Km 032.22-032.52
Km 023.02-023.22
Km 076.61-076.81
Km 007.50-008.10
Km 001.20-001.30
Km 004.60-005.40
Km 017.80-018.00
Km 045.00-045.10
Km 024.10-024.40
Km 000.00-003.00
Km 001.40-001.60
Km 004.00-004.60
Km 053.75-053.95
Km 018.80-019.37
Km 411.77-416.07
Km 022.50-022.60
Km 004.50-005.00
Km 003.20-003.70
Km 033.32-034.52
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.07 11451 National Full Recon 195mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
1.90
1661 Regional DBST @ Traff 100-2000
S
0.60
2269 National Overlay 50mm @ IRI 5-9
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.55 11451 National Rehab 195mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
1301 Regional Overlay 50mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
2992 National DBST @ Traff 2000-4000
S
0.70
5303 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.90
4887 Regional Full Recon 150mm @ IRI 12
S
0.03
3750 Regional Full Recon 135mm @ IRI 12
S
2.80
9061 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
5257 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.60
9769 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
4082 Regional DBST @ Traff 4000-6000
S
0.20
5257 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
7314 National Full Recon 180mm @ IRI 12
S
3.00
4388 Regional Overlay 60mm @ IRI 7-9
S
0.20 13468 National Rehab 195mm @ IRI 9-12
S
0.60
4082 Regional Overlay 60mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.57
4887 Regional Full Recon 150mm @ IRI 12
S
4.30
3083 National Overlay 50mm @ IRI 4-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
4885 Regional Rehab 150mm @ IRI 9-12
S
0.50 13468 National Full Recon 195mm @ IRI 12
S
1.20
4887 Regional Rehab 150mm @ IRI 9-12
Appendix-A: Page:64 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.468
3.20
3.363
3.20
3.599
3.20
3.599
3.20
1.816
3.20
1.722
3.20
7.197
3.20
17.681
3.20
2.120
3.20
1.388
3.20
3.788
3.20
3.788
3.20
0.272
3.19
12.595
3.19
5.889
3.19
9.471
3.19
2.028
3.19
2.126
3.19
19.079
3.19
0.506
3.19
45.010
3.18
1.897
3.18
6.340
3.18
3.795
3.18
9.109
3.17
8.092
3.17
1.799
3.17
0.751
3.17
3.860
3.17
2.028
3.16
7.858
3.16
8.103
3.16
4.917
3.16
1.419
3.15
3.599
3.15
11.375
3.15
13.466
3.14
1.799
3.14
6.461
3.14
15.571
3.14
17.302
3.14
NPV
10.84
10.49
11.29
11.33
19.08
7.99
22.57
56.35
6.61
5.61
11.78
11.78
3.43
38.28
18.36
29.55
6.34
6.61
59.57
1.52
137.61
5.90
19.61
11.82
28.20
25.11
5.59
8.11
11.98
6.29
24.14
26.59
15.50
4.64
11.12
35.13
55.56
5.52
19.88
47.80
55.36
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Bandarban
R161
Khulna
Satkhira
R765
Khulna
Jhenaidah
N703
Dhaka
Gazipur
R313
Rajshahi
Nawabganj
R547
Dhaka
Munshiganj
R820
Chittagong Chittagong
N1
Rangpur
Bogra
N502
Khulna
Satkhira
R765
Rajshahi
Natore
N602
Comilla
Brahmanbaria R120
Chittagong Chittagong
N106
Khulna
Chuadanga
R747
Dhaka
Gazipur
R313
Khulna
Jessore
R765
Dhaka
Munshiganj
R812
Chittagong Chittagong
N1
Rajshahi
Natore
N502
Khulna
Jhenaidah
R745
Dhaka
Tangail
N4
Comilla
Chandpur
R140
Dhaka
Narayanganj R114
Dhaka
Tangail
N4
Chittagong Chittagong
R151
Chittagong Bandarban
R161
Rajshahi
Natore
N502
Chittagong Cox's Bazar
R172
Rajshahi
Nawabganj
R547
Khulna
Kushtia
R710
Khulna
Jessore
R765
Rangpur
Bogra
N514
Comilla
Comilla
R140
Comilla
Comilla
R141
Comilla
Comilla
R144
Chittagong Chittagong
R151
Rangpur
Dinajpur
R585
Dhaka
Munshiganj
R820
Dhaka
Narsingdi
R212
Rajshahi
Natore
N502
Khulna
Chuadanga
R745
Chittagong Cox's Bazar
R170
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Rangamati -Bandarban Road
Km 055.14-055.64
Khulna-Satkhira Road
Km 039.99-040.69
Jhenaidah Town Old Section
Km 000.10-001.90
Mawna-Monohardi Road
Km 004.20-004.80
Naogaon-Badalgachhi-Rohonpur
Km 097.07-097.47
Zinzira-Srinagar Road
Km 040.18-040.28
Dhaka -Comilla -Chittagong-Teknaf RoKm 230.26-230.36
Bogra -Natore Road
Km 028.86-030.86
Khulna-Satkhira Road
Km 030.39-030.89
Natore Town old Section
Km 001.09-002.59
Akhaura Town By-Pass
Km 000.00-002.50
Chittagong-Rangamati Road
Km 001.60-001.70
Kushtia -Chuadanga Road
Km 023.80-024.20
Mawna-Monohardi Road
Km 008.57-008.87
Khulna-Satkhira Road
Km 012.70-012.90
Fatullah -Mawa Road
Km 010.22-010.42
Dhaka -Comilla -Chittagong-Teknaf RoKm 204.98-205.18
Bogra -Natore Road
Km 052.66-053.16
Kushtia -Jhenaidah Road
Km 104.36-104.46
Joydebpur-Jamalpur Road
Km 090.79-091.09
Comilla-Begumganj Road
Km 046.90-047.00
Nayapur-Raipura Road
Km 005.40-005.80
Joydebpur-Jamalpur Road
Km 091.49-091.59
Baraiyerhat-Fatikchhari Road
Km 014.00-014.20
Rangamati -Bandarban Road
Km 057.94-058.04
Bogra -Natore Road
Km 045.26-045.96
Chokoria-Baderkhali Road
Km 011.90-012.00
Naogaon-Badalgachhi-Rohonpur
Km 082.82-083.12
Ahaladipur-Kushtia Road
Km 054.25-054.45
Khulna-Satkhira Road
Km 001.10-001.50
Bogra (Banani)-Matidali Road
Km 008.40-008.67
Comilla-Begumganj Road
Km 018.89-018.99
Lalmai-Sonaimuri Road
Km 024.22-024.42
Laksam Old Section
Km 003.00-003.80
Baraiyerhat-Fatikchhari Road
Km 005.70-008.40
Gobindagnj-Fulbari-Dinajpur Road
Km 076.30-079.30
Zinzira-Srinagar Road
Km 042.58-045.71
Akdaria -Agarpur Road
Km 000.20-001.30
Bogra -Natore Road
Km 053.36-054.16
Kushtia -Jhenaidah Road
Km 076.18-076.48
Patiya-Chokoria Road
Km 067.10-067.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.50
3019 Regional Rehab 135mm @ IRI 9-12
S
0.70
4887 Regional Rehab 150mm @ IRI 9-12
S
1.80
4905 National Rehab 150mm @ IRI 9-12
S
0.60
3019 Regional Rehab 135mm @ IRI 9-12
S
0.40
3019 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.00
9061 National Rehab 180mm @ IRI 9-12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
1.50
7237 National Overlay 50mm @ IRI 5-7
S
2.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 13468 National Full Recon 195mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
3571 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.50
6500 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30 11451 National Full Recon 195mm @ IRI 12
S
0.10
8774 Regional Full Recon 150mm @ IRI 12
S
0.40
4082 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.20
1484 Regional DBST @ Traff 100-2000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
9061 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
3019 Regional Rehab 135mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
L
0.27
9159 National DBST @ Traff >6000
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
5257 Regional Full Recon 150mm @ IRI 12
S
0.80
2057 Regional Overlay 50mm @ IRI 7-9
S
2.70
1484 Regional Overlay 50mm @ IRI 7-9
S
3.00
2707 Regional Overlay 50mm @ IRI 7-9
S
3.13
4887 Regional Rehab 150mm @ IRI 9-12
S
1.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
6500 National Full Recon 180mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:65 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
4.143
3.14
9.441
3.14
24.276
3.14
4.695
3.14
0.366
3.14
1.832
3.14
4.107
3.13
34.313
3.13
8.997
3.13
6.561
3.13
44.983
3.13
3.114
3.13
7.852
3.13
0.222
3.13
3.599
3.13
3.599
3.13
6.392
3.12
8.037
3.12
1.799
3.12
12.846
3.12
2.715
3.12
0.793
3.12
4.282
3.11
0.188
3.11
2.225
3.11
11.252
3.11
1.963
3.11
2.555
3.11
3.599
3.10
7.197
3.10
0.934
3.10
2.094
3.09
3.795
3.09
3.132
3.09
5.989
3.09
8.612
3.09
42.994
3.09
19.793
3.09
16.465
3.08
5.634
3.08
5.683
3.07
NPV
12.30
30.13
74.12
14.77
2.42
5.61
12.57
103.28
27.52
24.46
137.43
9.51
23.96
1.57
10.98
11.06
19.91
23.72
5.50
38.96
8.36
2.80
12.96
1.60
6.78
33.56
5.93
7.60
10.95
21.79
9.10
6.32
11.51
16.12
23.39
35.75
134.95
60.04
47.57
16.83
16.99
Appendix-A
Annual Needs Report
2012-2013
Zone
Rangpur
Chittagong
Rangpur
Chittagong
Chittagong
Chittagong
Khulna
Dhaka
Dhaka
Chittagong
Chittagong
Barisal
Comilla
Gopalganj
Chittagong
Rajshahi
Khulna
Khulna
Sylhet
Chittagong
Khulna
Sylhet
Comilla
Sylhet
Rajshahi
Chittagong
Rajshahi
Comilla
Khulna
Khulna
Rajshahi
Khulna
Barisal
Khulna
Dhaka
Rangpur
Chittagong
Chittagong
Khulna
Khulna
Rangpur
Division
Rangpur
Chittagong
Nilphamari
Chittagong
Rangamati
Rangamati
Magura
Munshiganj
Gazipur
Cox's Bazar
Cox's Bazar
Barisal
Chandpur
Rajbari
Chittagong
Naogaon
Satkhira
Satkhira
Sylhet
Cox's Bazar
Chuadanga
Habiganj
Comilla
Sylhet
Nawabganj
Chittagong
Naogaon
Comilla
Jessore
Satkhira
Pabna
Jessore
Barisal
Jessore
Tangail
Rangpur
Rangamati
Chittagong
Kushtia
Kushtia
Kurigram
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N506
R163
N518
R163
R162
R161
N7
R812
N3
R170
R180
R870
R140
R710
R151
R547
R760
R765
R250
R170
R745
R220
R140
R281
R547
R152
R547
R141
R755
R760
R604
R755
R870
R755
N4
N506
R162
N106
R710
R710
N506
Road Name
Rangpur-Barobari-Kurigram Road
Chittagong -Chandragona Road
Sayedpur Town Old Section
Chittagong -Chandragona Road
Rangamati -Khagrachhari Road
Rangamati -Bandarban Road
Dauladia-Mongla Road
Fatullah -Mawa Road
Dhaka -Mymensingh Road
Patiya-Chokoria Road
Laharpur-Laboni More Road
Barisal-Pirojpur Road
Comilla-Begumganj Road
Ahaladipur-Kushtia Road
Baraiyerhat-Fatikchhari Road
Naogaon-Badalgachhi-Rohonpur
Khulna-Satkhira Road
Khulna-Satkhira Road
Sylhet-Jakiganj Road
Patiya-Chokoria Road
Kushtia -Jhenaidah Road
Sarail-Habiganj Road
Comilla-Begumganj Road
Rajnagar-Charkhai Road
Naogaon-Badalgachhi-Rohonpur
Heako-Ramgarh Road
Naogaon-Badalgachhi-Rohonpur
Lalmai-Sonaimuri Road
Jessore -Chuknagar Road
Khulna-Satkhira Road
Tebunia-Hamkuria Road
Jessore -Chuknagar Road
Barisal-Pirojpur Road
Jessore -Chuknagar Road
Joydebpur-Jamalpur Road
Rangpur-Barobari-Kurigram Road
Rangamati -Khagrachhari Road
Chittagong-Rangamati Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Rangpur-Barobari-Kurigram Road
Chainage
Km 020.35-021.00
Km 031.30-032.10
Km 001.00-004.00
Km 017.50-017.60
Km 022.40-022.50
Km 018.80-020.00
Km 087.21-087.61
Km 011.52-011.92
Km 015.40-015.60
Km 071.00-071.10
Km 002.90-003.00
Km 003.60-003.80
Km 072.10-072.30
Km 010.81-013.11
Km 014.20-016.90
Km 034.89-038.09
Km 037.20-037.30
Km 029.69-029.89
Km 040.43-062.15
Km 065.80-066.10
Km 096.66-097.26
Km 023.18-023.48
Km 025.09-025.29
Km 058.52-061.59
Km 099.07-099.27
Km 014.00-014.20
Km 060.23-063.23
Km 027.62-028.12
Km 027.33-027.53
Km 044.76-045.46
Km 013.40-018.50
Km 003.80-003.90
Km 000.10-000.40
Km 003.20-003.30
Km 110.76-113.86
Km 019.85-020.25
Km 006.30-006.40
Km 000.60-001.20
Km 067.95-068.05
Km 068.15-068.25
Km 045.30-046.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.65
7068 National Full Recon 180mm @ IRI 12
S
0.80
4887 Regional Full Recon 150mm @ IRI 12
S
3.00
4662 National Overlay 50mm @ IRI 5-9
S
0.10
7612 Regional Full Recon 150mm @ IRI 12
S
0.10
818 Regional DBST @ Traff 100-2000
S
1.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
7850 National Full Recon 180mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
R
0.20
8665 National Rehab 180mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
2.30
4048 Regional DBST 25mm @ 25% Crk
S
2.70
1484 Regional DBST @ Traff 100-2000
S
3.20
1661 Regional Overlay 50mm @ IRI 7-9
S
0.10
4116 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
21.72
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.60
5536 Regional Full Recon 150mm @ IRI 12
S
0.30
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
3.07
4682 Regional Overlay 60mm @ IRI 7-9
S
0.20
3019 Regional Rehab 135mm @ IRI 9-12
S
0.20
1398 Regional DBST @ Traff 100-2000
S
3.00
1661 Regional Overlay 50mm @ IRI 7-9
S
0.50
5257 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
5.10
3778 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
3.10
3779 National Rehab 140mm @ IRI 9-12
S
0.40
7068 National Full Recon 180mm @ IRI 12
S
0.10
818 Regional Overlay 50mm @ IRI 7-9
S
0.60 13468 National Rehab 195mm @ IRI 9-12
S
0.10
4484 Regional Full Recon 150mm @ IRI 12
S
0.10
4484 Regional Full Recon 150mm @ IRI 12
S
0.70
2992 National DBST @ Traff 2000-4000
Appendix-A: Page:66 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
13.357
3.07
38.78
14.395
3.07
43.17
9.599
3.07
38.68
1.799
3.06
5.17
0.086
3.06
0.95
23.947
3.06
71.73
10.927
3.05
32.51
5.395
3.05
16.42
4.314
3.04
13.30
1.894
3.04
5.60
1.799
3.04
5.29
3.599
3.03
10.62
3.926
3.03
11.77
3.511
3.03
26.68
2.534
3.03
25.82
6.531
3.03
26.79
1.471
3.02
4.35
2.697
3.02
8.29
388.717
3.01 1163.53
5.683
3.01
16.65
10.796
3.01
30.47
1.027
3.01
3.11
3.926
3.01
11.54
10.505
3.01
36.56
1.703
3.01
4.91
0.198
3.01
2.05
5.637
3.00
21.38
9.324
3.00
27.01
3.599
3.00
10.59
13.740
3.00
40.39
15.972
3.00
59.02
1.799
3.00
5.29
6.949
3.00
20.26
1.799
3.00
5.28
40.097
2.99 118.99
8.233
2.99
23.29
0.183
2.99
0.65
14.752
2.98
43.82
1.799
2.98
5.10
1.799
2.98
5.10
0.951
2.98
11.07
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Kushtia
R710
Khulna
Khulna
R760
Rangpur
Bogra
N510
Khulna
Chuadanga
R745
Rangpur
Bogra
N510
Gopalganj Madaripur
R860
Dhaka
Tangail
N4
Khulna
Kushtia
R710
Khulna
Meherpur
R745
Khulna
Kushtia
R710
Chittagong Chittagong
R160
Dhaka
Gazipur
N3
Chittagong Chittagong
R160
Chittagong Chittagong
R151
Rangpur
Gaibanda
R585
Dhaka
Gazipur
R313
Chittagong Rangamati
R162
Khulna
Khulna
R760
Khulna
Khulna
R760
Khulna
Kushtia
R710
Dhaka
Mymensingh R314
Dhaka
Narayanganj N1
Khulna
Chuadanga
R747
Chittagong Bandarban
R161
Chittagong Rangamati
R162
Chittagong Rangamati
R162
Rajshahi
Pabna
N705
Comilla
Brahmanbaria R220
Rajshahi
Naogaon
R549
Rangpur
Dinajpur
R585
Khulna
Jessore
N706
Chittagong Cox's Bazar
R172
Sylhet
Habiganj
N2
Rangpur
Dinajpur
R585
Khulna
Satkhira
R760
Chittagong Khagrachari
R160
Comilla
Comilla
R140
Chittagong Dohazari
R170
Chittagong Khagrachari
R160
Comilla
Brahmanbaria R220
Rangpur
Dinajpur
R585
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Ahaladipur-Kushtia Road
Km 058.15-058.55
Khulna-Satkhira Road
Km 018.90-020.00
Bogra Station Road
Km 000.00-002.78
Kushtia -Jhenaidah Road
Km 077.18-077.48
Bogra Station Road
Km 000.00-002.78
Mostafapur-Chandpur Road
Km 000.20-001.10
Joydebpur-Jamalpur Road
Km 123.71-125.61
Ahaladipur-Kushtia Road
Km 064.15-064.25
Kushtia -Jhenaidah Road
Km 068.88-069.08
Ahaladipur-Kushtia Road
Km 058.75-059.45
Hathazari-Khagrachhari Road
Km 017.60-017.70
Dhaka -Mymensingh Road
Km 017.80-018.00
Hathazari-Khagrachhari Road
Km 017.00-017.10
Baraiyerhat-Fatikchhari Road
Km 023.40-025.30
Gobindagnj-Fulbari-Dinajpur Road
Km 001.60-002.40
Mawna-Monohardi Road
Km 028.37-031.67
Rangamati -Khagrachhari Road
Km 006.90-007.00
Khulna-Satkhira Road
Km 028.60-028.70
Khulna-Satkhira Road
Km 027.80-027.90
Ahaladipur-Kushtia Road
Km 057.95-058.15
Gafargaon-Mawna Road
Km 004.50-007.50
Dhaka -Comilla -Chittagong-Teknaf RoKm 006.10-006.70
Kushtia -Chuadanga Road
Km 024.90-025.30
Rangamati -Bandarban Road
Km 056.34-056.54
Rangamati -Khagrachhari Road
Km 002.60-003.20
Rangamati -Khagrachhari Road
Km 006.70-006.90
Paksey -Iswardi-Dasuria
Km 009.40-009.46
Sarail-Habiganj Road
Km 014.68-015.18
Badalgachhi-Joypurhat Road
Km 015.05-017.00
Gobindagnj-Fulbari-Dinajpur Road
Km 074.70-074.90
Jessore -Benapole Road
Km 026.40-029.40
Chokoria-Baderkhali Road
Km 010.00-010.20
Dhaka-Sylhet-Jaflong Road
Km 148.15-148.21
Gobindagnj-Fulbari-Dinajpur Road
Km 088.06-089.76
Khulna-Satkhira Road
Km 058.46-058.75
Hathazari-Khagrachhari Road
Km 081.52-081.62
Comilla-Begumganj Road
Km 011.40-011.50
Patiya-Chokoria Road
Km 011.10-011.20
Hathazari-Khagrachhari Road
Km 042.40-042.60
Sarail-Habiganj Road
Km 018.08-018.38
Gobindagnj-Fulbari-Dinajpur Road
Km 057.72-058.12
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
1.10
4887 Regional Full Recon 150mm @ IRI 12
R
2.78 13893 National Overlay 50mm @ IRI 5
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
L
2.78 13893 National Overlay 50mm @ IRI 5
S
0.90
5672 Regional DBST 25mm @ 25% Crk
S
1.90
3779 National Rehab 140mm @ IRI 9-12
S
0.10
4484 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
5045 Regional Rehab 150mm @ IRI 9-12
L
0.20 11451 National Rehab 195mm @ IRI 9-12
S
0.10
5045 Regional Full Recon 150mm @ IRI 12
S
1.90
1301 Regional Overlay 50mm @ IRI 7-9
S
0.80
6187 Regional Rehab 150mm @ IRI 9-12
S
3.30
5572 Regional Rehab 150mm @ IRI 9-12
S
0.10
818 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
3.00
1346 Regional Overlay 50mm @ IRI 5-7
R
0.60
8665 National Full Recon 180mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
0.60
818 Regional Overlay 50mm @ IRI 7-9
S
0.20
818 Regional DBST @ Traff 100-2000
S
0.06 11451 National Rehab 195mm @ IRI 9-12
S
0.50
6240 Regional Overlay 60mm @ IRI 5.5-9
S
1.95
1779 Regional Overlay 50mm @ IRI 7-9
S
0.20
2707 Regional Overlay 50mm @ IRI 5-7
S
3.00
7314 National Full Recon 180mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.06
6671 National Full Recon 180mm @ IRI 12
S
1.70
4887 Regional Rehab 150mm @ IRI 9-12
S
0.29
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
3792 Regional Full Recon 135mm @ IRI 12
S
0.30
6240 Regional DBST @ Traff >6000
S
0.40
4331 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:67 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.395
2.97
21.592
2.97
10.577
2.97
6.016
2.97
10.577
2.97
1.223
2.96
24.575
2.96
1.799
2.96
3.599
2.96
9.441
2.96
1.373
2.96
7.136
2.95
1.832
2.95
3.768
2.95
10.789
2.94
44.506
2.94
0.183
2.93
1.963
2.92
1.963
2.92
3.599
2.92
4.885
2.91
17.962
2.91
5.885
2.91
2.139
2.90
1.096
2.90
0.173
2.89
2.287
2.89
1.711
2.89
4.517
2.89
0.574
2.89
84.646
2.88
3.926
2.88
1.824
2.88
22.927
2.88
5.791
2.88
1.069
2.88
1.897
2.88
0.951
2.87
2.923
2.87
0.408
2.87
7.197
2.87
NPV
16.03
62.95
42.19
17.64
42.12
10.59
72.10
5.07
10.44
28.09
3.98
20.79
5.11
13.59
31.19
132.84
0.64
5.62
5.62
10.29
19.09
51.14
17.28
5.66
3.78
1.84
6.58
5.59
15.96
2.11
237.06
11.01
5.14
65.72
16.34
2.94
5.31
2.63
8.22
3.97
20.06
Appendix-A
Annual Needs Report
2012-2013
Zone
Comilla
Comilla
Rajshahi
Khulna
Comilla
Rajshahi
Comilla
Rajshahi
Barisal
Chittagong
Dhaka
Rangpur
Dhaka
Comilla
Dhaka
Dhaka
Barisal
Barisal
Rangpur
Dhaka
Chittagong
Dhaka
Comilla
Dhaka
Comilla
Khulna
Chittagong
Sylhet
Rajshahi
Khulna
Chittagong
Rangpur
Khulna
Rangpur
Rajshahi
Sylhet
Sylhet
Sylhet
Gopalganj
Rangpur
Khulna
Division
Chandpur
Noakhali
Naogaon
Khulna
Chandpur
Natore
Chandpur
Pabna
Bhola
Dohazari
Mymensingh
Joypurhat
Tangail
Chandpur
Narsingdi
Narayanganj
Jhalokati
Bhola
Bogra
Narayanganj
Rangamati
Tangail
Comilla
Munshiganj
Feni
Satkhira
Khagrachari
Habiganj
Pabna
Jhenaidah
Dohazari
Thakurgaon
Kushtia
Dinajpur
Naogaon
Sylhet
Sylhet
Habiganj
Madaripur
Nilphamari
Jhenaidah
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R140
R142
R547
R760
R140
N502
R140
R604
N809
R170
R371
R545
N4
R140
R301
R202
R870
R890
R545
R202
R162
N4
R140
R820
N104
R760
R160
N2
N705
R748
R170
N5
R710
R585
R547
R250
R281
N2
R860
N518
R745
Road Name
Comilla-Begumganj Road
Begamganj-Ramganj Road
Naogaon-Badalgachhi-Rohonpur
Khulna-Satkhira Road
Comilla-Begumganj Road
Bogra -Natore Road
Comilla-Begumganj Road
Tebunia-Hamkuria Road
Barishal-Lakshmipur Road
Patiya-Chokoria Road
Sherpur-Nakla-Mymensingh
Bogra-Joypurhat Road
Joydebpur-Jamalpur Road
Comilla-Begumganj Road
Tongi-Pachdona Road
Bhulta-Rampura Road
Barisal-Pirojpur Road
Bhola -Char Manika Road
Bogra-Joypurhat Road
Bhulta-Rampura Road
Rangamati -Khagrachhari Road
Joydebpur-Jamalpur Road
Comilla-Begumganj Road
Zinzira-Srinagar Road
Feni-Noakhali Road
Khulna-Satkhira Road
Hathazari-Khagrachhari Road
Dhaka-Sylhet-Jaflong Road
Paksey -Iswardi-Dasuria
Chuadanga-Kaliganj Road
Patiya-Chokoria Road
Dhaka -Utholi-Banglabandh Road
Ahaladipur-Kushtia Road
Gobindagnj-Fulbari-Dinajpur Road
Naogaon-Badalgachhi-Rohonpur
Sylhet-Jakiganj Road
Rajnagar-Charkhai Road
Dhaka-Sylhet-Jaflong Road
Mostafapur-Chandpur Road
Sayedpur Town Old Section
Kushtia -Jhenaidah Road
Chainage
Km 065.90-066.00
Km 024.95-025.25
Km 032.69-034.89
Km 000.30-000.40
Km 046.40-046.70
Km 032.00-036.76
Km 053.00-053.40
Km 009.80-013.20
Km 024.25-024.55
Km 009.70-010.10
Km 032.40-032.60
Km 117.99-118.29
Km 097.39-098.19
Km 059.40-060.30
Km 031.13-031.33
Km 004.00-004.40
Km 005.00-008.00
Km 015.37-016.67
Km 013.90-016.00
Km 004.70-005.10
Km 008.90-009.10
Km 098.29-099.09
Km 010.60-010.70
Km 041.48-041.88
Km 001.30-001.70
Km 053.76-054.16
Km 084.12-084.22
Km 177.02-177.12
Km 004.30-004.50
Km 056.30-056.40
Km 009.10-009.50
Km 410.87-411.77
Km 068.75-068.85
Km 075.80-076.10
Km 030.29-030.99
Km 075.35-075.45
Km 067.22-068.52
Km 161.11-161.21
Km 001.40-002.70
Km 004.00-004.11
Km 115.86-116.82
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
2.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
8774 Regional Full Recon 150mm @ IRI 12
S
4.76
9061 National Full Recon 180mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
3.40
3778 Regional Overlay 50mm @ IRI 5-7
S
0.30
1488 National DBST @ Traff 100-2000
S
0.40
3516 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
3589 Regional Full Recon 135mm @ IRI 12
S
0.80
6524 National Full Recon 180mm @ IRI 12
S
0.90
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
3.00
4887 Regional Rehab 150mm @ IRI 9-12
S
1.30
4887 Regional Full Recon 150mm @ IRI 12
S
2.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
818 Regional Overlay 50mm @ IRI 7-9
S
0.80
6524 National Full Recon 180mm @ IRI 12
S
0.10
4909 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
9061 National Full Recon 180mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
6671 National Full Recon 180mm @ IRI 12
S
0.20
2897 National Full Recon 135mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
3516 Regional DBST @ Traff 2000-4000
S
0.90
3083 National Rehab 140mm @ IRI 9-12
S
0.10
4484 Regional Full Recon 150mm @ IRI 12
S
0.30
2707 Regional Overlay 50mm @ IRI 5-7
S
0.70
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.30
4682 Regional Overlay 50mm @ IRI 5-7
S
0.10
6671 National Full Recon 180mm @ IRI 12
S
1.30
5672 Regional DBST 25mm @ 25% Crk
S
0.11
4662 National DBST 25mm @ 25% Crk
S
0.96
4887 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:68 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.422
2.87
5.398
2.86
27.998
2.86
2.028
2.86
6.782
2.86
99.058
2.86
5.610
2.86
10.648
2.86
0.408
2.86
0.346
2.85
2.943
2.85
4.901
2.85
17.962
2.85
16.783
2.84
4.057
2.84
9.160
2.83
40.460
2.83
23.391
2.83
28.322
2.83
9.160
2.83
0.365
2.82
17.962
2.82
1.897
2.81
5.493
2.81
8.233
2.81
7.852
2.81
1.069
2.81
2.807
2.80
3.267
2.80
1.422
2.80
0.346
2.80
12.699
2.79
1.799
2.79
0.861
2.79
5.800
2.79
1.832
2.79
3.732
2.79
2.807
2.79
1.766
2.79
0.145
2.79
18.636
2.78
NPV
4.12
15.14
81.50
5.69
18.94
269.17
16.12
36.89
3.74
2.50
8.49
13.35
49.41
46.16
11.25
25.25
115.29
64.25
79.71
25.22
1.26
48.97
5.24
15.70
22.12
21.60
2.87
7.70
8.61
3.99
2.45
35.73
4.78
3.13
15.51
4.99
13.08
7.65
13.33
0.92
51.21
Appendix-A
Annual Needs Report
2012-2013
Zone
Chittagong
Rangpur
Khulna
Gopalganj
Barisal
Khulna
Comilla
Khulna
Khulna
Rangpur
Comilla
Khulna
Sylhet
Khulna
Khulna
Khulna
Comilla
Dhaka
Chittagong
Dhaka
Dhaka
Rajshahi
Dhaka
Rangpur
Dhaka
Chittagong
Dhaka
Khulna
Comilla
Rajshahi
Khulna
Dhaka
Khulna
Rajshahi
Khulna
Dhaka
Khulna
Chittagong
Comilla
Chittagong
Chittagong
Division
Chittagong
Lalmonirhat
Kushtia
Rajbari
Patuakhali
Jessore
Chandpur
Jhenaidah
Satkhira
Dinajpur
Noakhali
Jhenaidah
Habiganj
Meherpur
Jessore
Khulna
Comilla
Mymensingh
Chittagong
Gazipur
Gazipur
Naogaon
Tangail
Rangpur
Narsingdi
Chittagong
Gazipur
Meherpur
Chandpur
Rajshahi
Magura
Narayanganj
Jessore
Naogaon
Jhenaidah
Dhaka
Magura
Khagrachari
Comilla
Chittagong
Bandarban
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R163
N509
R710
R710
R881
R755
R140
R748
R760
R585
R141
R745
N2
R745
N708
R760
R141
R371
R160
R313
R313
R547
N4
N5
R114
R163
R313
R745
R140
R685
N7
R114
N706
R547
R748
R802
N702
R160
R140
R160
R161
Road Name
Chittagong -Chandragona Road
Barabari-Burimary Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Amtali-Kuakata Road
Jessore -Chuknagar Road
Comilla-Begumganj Road
Chuadanga-Kaliganj Road
Khulna-Satkhira Road
Gobindagnj-Fulbari-Dinajpur Road
Lalmai-Sonaimuri Road
Kushtia -Jhenaidah Road
Dhaka-Sylhet-Jaflong Road
Kushtia -Jhenaidah Road
Jessore Town Old Section
Khulna-Satkhira Road
Lalmai-Sonaimuri Road
Sherpur-Nakla-Mymensingh
Hathazari-Khagrachhari Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Naogaon-Badalgachhi-Rohonpur
Joydebpur-Jamalpur Road
Dhaka -Utholi-Banglabandh Road
Nayapur-Raipura Road
Chittagong -Chandragona Road
Mawna-Monohardi Road
Kushtia -Jhenaidah Road
Comilla-Begumganj Road
Rajshahi -Chowmasia Road
Dauladia-Mongla Road
Nayapur-Raipura Road
Jessore -Benapole Road
Naogaon-Badalgachhi-Rohonpur
Chuadanga-Kaliganj Road
Bishwa -Kayetpara Road
Jessore -Magura Road
Hathazari-Khagrachhari Road
Comilla-Begumganj Road
Hathazari-Khagrachhari Road
Rangamati -Bandarban Road
Chainage
Km 018.00-018.20
Km 087.68-089.47
Km 060.55-061.35
Km 029.51-029.71
Km 011.90-012.00
Km 026.80-026.90
Km 067.40-068.50
Km 055.60-055.70
Km 036.70-037.20
Km 100.86-102.66
Km 034.82-035.22
Km 110.46-110.56
Km 149.41-149.61
Km 064.38-064.48
Km 002.10-002.70
Km 013.70-013.80
Km 023.22-024.22
Km 022.90-023.00
Km 023.50-023.90
Km 035.47-035.57
Km 033.37-033.47
Km 025.19-026.69
Km 120.51-120.61
Km 288.38-291.38
Km 026.30-026.60
Km 000.70-004.00
Km 035.07-035.37
Km 062.68-062.78
Km 036.79-036.99
Km 029.52-029.82
Km 101.21-102.02
Km 006.90-007.60
Km 032.90-036.63
Km 064.33-064.83
Km 053.00-053.20
Km 000.00-004.24
Km 026.79-028.29
Km 080.22-080.32
Km 001.50-002.90
Km 017.10-017.60
Km 055.64-056.14
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
7612 Regional Full Recon 150mm @ IRI 12
S
1.79
9061 National Full Recon 180mm @ IRI 12
S
0.80
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.09
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.50
4116 Regional DBST 25mm @ 25% Crk
S
1.80
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
6671 National Full Recon 180mm @ IRI 12
S
0.10
4283 Regional Full Recon 150mm @ IRI 12
L
0.60
3249 National Overlay 50mm @ IRI 5-9
S
0.10
3206 Regional Full Recon 135mm @ IRI 12
S
1.00
5257 Regional Rehab 150mm @ IRI 9-12
S
0.10
4540 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.50
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
3779 National Full Recon 140mm @ IRI 12
S
3.00
4405 National Rehab 150mm @ IRI 9-12
S
0.30
3019 Regional DBST 25mm @ 25% Crk
S
3.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4283 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.81
7850 National Rehab 180mm @ IRI 9-12
S
0.70
4082 Regional DBST @ Traff 4000-6000
S
3.73
7314 National Full Recon 180mm @ IRI 12
S
0.50
1661 Regional DBST @ Traff 100-2000
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
4.24
3875 Regional Overlay 50mm @ IRI 7-9
S
1.50
3649 National Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
1.40
3942 Regional DBST 25mm @ 25% Crk
S
0.50
5045 Regional DBST 25mm @ 25% Crk
S
0.50
3019 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:69 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.599
2.78
36.779
2.78
14.395
2.78
3.386
2.78
1.099
2.78
1.799
2.77
21.474
2.77
1.422
2.76
0.741
2.76
24.276
2.76
5.797
2.76
1.799
2.75
5.613
2.75
1.799
2.75
2.349
2.75
1.782
2.75
14.222
2.75
1.963
2.75
7.328
2.75
1.799
2.74
1.799
2.74
12.428
2.74
1.744
2.74
52.965
2.74
0.289
2.74
42.887
2.73
5.398
2.73
1.799
2.73
3.664
2.73
4.046
2.73
17.282
2.72
0.657
2.72
106.335
2.72
0.600
2.72
3.599
2.72
11.181
2.72
32.525
2.71
1.069
2.71
2.351
2.71
0.692
2.71
5.347
2.71
NPV
9.38
97.07
39.19
9.00
2.95
4.89
58.06
3.93
5.16
66.56
16.27
4.86
15.11
4.63
9.15
4.69
39.30
5.19
19.73
4.82
4.82
32.62
4.56
152.17
1.68
119.16
14.39
4.60
9.82
11.11
46.98
5.85
280.77
5.49
9.59
36.11
87.76
2.77
18.63
6.52
13.19
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Gazipur
R313
Chittagong Khagrachari
R160
Comilla
Chandpur
R140
Khulna
Jessore
N706
Dhaka
Mymensingh R314
Khulna
Satkhira
R760
Comilla
Comilla
R140
Comilla
Comilla
R140
Chittagong Chittagong
R160
Chittagong Bandarban
R161
Barisal
Jhalokati
R870
Barisal
Bhola
R890
Chittagong Rangamati
R162
Gopalganj Gopalganj
R850
Gopalganj Madaripur
R860
Chittagong Rangamati
R162
Khulna
Chuadanga
R745
Khulna
Magura
R720
Rajshahi
Nawabganj
R547
Khulna
Satkhira
R760
Dhaka
Gazipur
R310
Chittagong Chittagong
R160
Barisal
Jhalokati
R870
Gopalganj Rajbari
R710
Dhaka
Gazipur
N3
Rajshahi
Naogaon
R549
Khulna
Chuadanga
R747
Comilla
Brahmanbaria R220
Rajshahi
Naogaon
R547
Rajshahi
Natore
N602
Chittagong Rangamati
N106
Chittagong Rangamati
R162
Khulna
Magura
N7
Dhaka
Narayanganj R114
Dhaka
Manikganj
R315
Rangpur
Dinajpur
R585
Rangpur
Rangpur
N506
Gopalganj Rajbari
R710
Dhaka
Mymensingh R314
Gopalganj Gopalganj
N806
Chittagong Chittagong
R163
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Mawna-Monohardi Road
Hathazari-Khagrachhari Road
Comilla-Begumganj Road
Jessore -Benapole Road
Gafargaon-Mawna Road
Khulna-Satkhira Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Hathazari-Khagrachhari Road
Rangamati -Bandarban Road
Barisal-Pirojpur Road
Bhola -Char Manika Road
Rangamati -Khagrachhari Road
Tekerhat-Mollahhat Road
Mostafapur-Chandpur Road
Rangamati -Khagrachhari Road
Kushtia -Jhenaidah Road
Magura-Narail Road
Naogaon-Badalgachhi-Rohonpur
Khulna-Satkhira Road
Joydebpur-Itakhola Road
Hathazari-Khagrachhari Road
Barisal-Pirojpur Road
Ahaladipur-Kushtia Road
Dhaka -Mymensingh Road
Badalgachhi-Joypurhat Road
Kushtia -Chuadanga Road
Sarail-Habiganj Road
Naogaon-Badalgachhi-Rohonpur
Natore Town old Section
Chittagong-Rangamati Road
Rangamati -Khagrachhari Road
Dauladia-Mongla Road
Nayapur-Raipura Road
Mawna-Nabinagar Road
Gobindagnj-Fulbari-Dinajpur Road
Rangpur-Barobari-Kurigram Road
Ahaladipur-Kushtia Road
Gafargaon-Mawna Road
Bhatiapara-Kalna Road
Chittagong -Chandragona Road
Chainage
Km 022.17-022.37
Km 055.82-055.92
Km 052.40-052.70
Km 030.10-030.20
Km 001.10-003.40
Km 055.36-055.56
Km 013.66-013.86
Km 014.26-014.76
Km 019.50-019.90
Km 056.14-056.34
Km 033.47-035.37
Km 016.67-027.37
Km 017.90-018.00
Km 010.10-010.20
Km 007.10-007.50
Km 021.10-021.50
Km 073.98-075.08
Km 025.40-025.50
Km 099.27-099.87
Km 058.16-058.26
Km 003.80-004.20
Km 020.30-020.40
Km 013.75-017.25
Km 029.71-029.91
Km 014.30-014.70
Km 011.85-012.35
Km 031.94-032.34
Km 017.68-018.08
Km 038.49-038.69
Km 003.59-004.89
Km 059.62-060.32
Km 012.20-012.50
Km 092.21-092.31
Km 000.00-003.20
Km 043.30-044.00
Km 087.16-087.96
Km 020.25-020.35
Km 031.81-032.01
Km 015.60-017.10
Km 002.70-002.80
Km 004.00-007.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
5572 Regional Full Recon 150mm @ IRI 12
S
0.10
3362 Regional Full Recon 135mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
7314 National Full Recon 180mm @ IRI 12
S
2.30
1346 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
5045 Regional Rehab 150mm @ IRI 9-12
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
1.90
2223 Regional DBST 25mm @ 25% Crk
S
10.70
1785 Regional Overlay 50mm @ IRI 7-9
S
0.10
818 Regional DBST @ Traff 100-2000
S
0.10
2343 Regional Rehab 135mm @ IRI 9-12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
818 Regional Overlay 50mm @ IRI 7-9
S
1.10
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
1047 Regional Overlay 50mm @ IRI 5-7
S
0.60
3019 Regional DBST 25mm @ 25% Crk
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
6578 Regional DBST 25mm @ 25% Crk
S
0.10
5045 Regional Full Recon 150mm @ IRI 12
S
3.50
4887 Regional DBST @ Traff 4000-6000
S
0.20
3636 Regional DBST @ Traff 2000-4000
R
0.40
8665 National Rehab 180mm @ IRI 9-12
S
0.50
1779 Regional DBST @ Traff 100-2000
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.20
1661 Regional Overlay 50mm @ IRI 5-7
S
1.30
7237 National Overlay 50mm @ IRI 5-7
S
0.70
3555 National Overlay 50mm @ IRI 5-9
S
0.30
818 Regional DBST @ Traff 100-2000
S
0.10
7850 National Full Recon 180mm @ IRI 12
S
3.20
4082 Regional Overlay 60mm @ IRI 7-9
S
0.70
2048 Regional Rehab 135mm @ IRI 9-12
S
0.80
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
7068 National DBST @ Traff >6000
S
0.20
3636 Regional Full Recon 135mm @ IRI 12
S
1.50
1346 Regional Overlay 50mm @ IRI 5-7
S
0.10
2860 National Full Recon 135mm @ IRI 12
S
3.00
4887 Regional Rehab 150mm @ IRI 9-12
Appendix-A: Page:70 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.272
2.70
1.129
2.70
4.237
2.69
2.844
2.69
4.658
2.69
3.926
2.69
3.664
2.69
9.160
2.69
5.493
2.69
2.139
2.69
2.440
2.68
30.717
2.68
0.086
2.68
1.266
2.68
6.375
2.67
0.731
2.66
15.051
2.66
0.193
2.65
0.548
2.65
1.963
2.64
0.816
2.64
1.832
2.64
4.755
2.64
0.282
2.64
10.498
2.63
0.452
2.63
7.852
2.63
1.369
2.63
0.376
2.63
5.937
2.62
1.900
2.62
0.259
2.62
2.732
2.61
8.324
2.61
4.994
2.61
10.789
2.61
0.136
2.60
3.386
2.60
2.349
2.59
1.099
2.59
38.988
2.59
NPV
8.59
2.85
11.54
7.43
14.52
10.35
9.67
24.18
14.48
5.24
18.96
97.89
0.76
3.38
17.20
2.38
39.78
0.60
3.27
5.09
4.87
4.58
154.81
2.11
27.40
3.09
20.17
3.62
1.19
20.88
5.74
2.42
6.97
23.76
12.66
27.97
3.52
8.42
6.01
2.60
102.71
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Cox's Bazar
R172
Dhaka
Narayanganj R202
Dhaka
Narayanganj N1
Khulna
Jessore
R755
Gopalganj Gopalganj
N806
Rajshahi
Pabna
R604
Dhaka
Tangail
N4
Chittagong Bandarban
R161
Chittagong Dohazari
R170
Barisal
Jhalokati
R870
Comilla
Comilla
R140
Khulna
Kushtia
R710
Khulna
Jhenaidah
R748
Comilla
Comilla
R140
Comilla
Chandpur
R140
Chittagong Chittagong
N1
Chittagong Dohazari
R170
Dhaka
Munshiganj
R813
Barisal
Bhola
R890
Comilla
Chandpur
R140
Dhaka
Gazipur
R301
Rangpur
Lalmonirhat
N506
Chittagong Rangamati
R161
Rajshahi
Pabna
R603
Gopalganj Rajbari
R710
Gopalganj Rajbari
R710
Chittagong Dohazari
R170
Rajshahi
Pabna
R601
Chittagong Chittagong
R160
Chittagong Chittagong
R160
Comilla
Brahmanbaria R220
Dhaka
Gazipur
R301
Chittagong Chittagong
R152
Gopalganj Madaripur
R860
Dhaka
Gazipur
R313
Chittagong Rangamati
R161
Chittagong Dohazari
R170
Gopalganj Rajbari
R710
Barisal
Bhola
R890
Dhaka
Mymensingh R314
Comilla
Brahmanbaria R220
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Chainage
Chokoria-Baderkhali Road
Km 010.50-010.90
Bhulta-Rampura Road
Km 005.70-005.90
Dhaka -Comilla -Chittagong-Teknaf RoKm 020.88-020.98
Jessore -Chuknagar Road
Km 003.60-003.70
Bhatiapara-Kalna Road
Km 000.00-000.10
Tebunia-Hamkuria Road
Km 003.20-009.30
Joydebpur-Jamalpur Road
Km 091.29-091.39
Rangamati -Bandarban Road
Km 039.24-041.74
Patiya-Chokoria Road
Km 006.70-006.90
Barisal-Pirojpur Road
Km 043.47-044.05
Comilla-Begumganj Road
Km 011.70-012.30
Ahaladipur-Kushtia Road
Km 062.95-063.25
Chuadanga-Kaliganj Road
Km 044.50-045.00
Comilla-Begumganj Road
Km 029.19-029.49
Comilla-Begumganj Road
Km 052.20-052.40
Dhaka -Comilla -Chittagong-Teknaf RoKm 245.84-245.94
Patiya-Chokoria Road
Km 001.00-001.40
Muktarpur - Munshiganj Road
Km 000.00-000.40
Bhola -Char Manika Road
Km 007.77-008.47
Comilla-Begumganj Road
Km 041.97-042.37
Tongi-Pachdona Road
Km 008.10-008.40
Rangpur-Barobari-Kurigram Road
Km 022.85-023.12
Rangamati -Bandarban Road
Km 020.30-021.20
Pabna-Paksey (EPZ) Road
Km 001.90-004.40
Ahaladipur-Kushtia Road
Km 039.91-040.01
Ahaladipur-Kushtia Road
Km 039.31-039.41
Patiya-Chokoria Road
Km 013.50-013.60
Pabna-Natakhola Ferry Ghat Road
Km 035.97-036.17
Hathazari-Khagrachhari Road
Km 021.10-021.60
Hathazari-Khagrachhari Road
Km 019.90-020.30
Sarail-Habiganj Road
Km 000.00-000.10
Tongi-Pachdona Road
Km 007.50-008.00
Heako-Ramgarh Road
Km 010.80-011.00
Mostafapur-Chandpur Road
Km 007.70-008.30
Mawna-Monohardi Road
Km 021.07-021.97
Rangamati -Bandarban Road
Km 021.40-024.40
Patiya-Chokoria Road
Km 012.00-012.10
Ahaladipur-Kushtia Road
Km 007.20-007.40
Bhola -Char Manika Road
Km 000.00-004.00
Gafargaon-Mawna Road
Km 003.80-004.00
Sarail-Habiganj Road
Km 003.10-003.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
R
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
2860 National Full Recon 135mm @ IRI 12
S
6.10
3778 Regional Overlay 50mm @ IRI 5-7
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
2.50
3019 Regional Rehab 135mm @ IRI 9-12
S
0.20
3516 Regional Rehab 135mm @ IRI 9-12
S
0.58
2223 Regional Overlay 50mm @ IRI 7-9
S
0.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4101 Regional Rehab 150mm @ IRI 9-12
S
0.50
4887 Regional Rehab 150mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.40
3516 Regional DBST 25mm @ 25% Crk
S
0.40
3788 Regional DBST 25mm @ 25% Crk
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
8774 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.27
7068 National Rehab 180mm @ IRI 9-12
S
0.90
3019 Regional Full Recon 135mm @ IRI 12
S
2.50
3297 Regional Overlay 50mm @ IRI 5-7
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
1096 Regional Overlay 50mm @ IRI 5-7
S
0.50
5045 Regional Full Recon 150mm @ IRI 12
S
0.40
5045 Regional DBST 25mm @ 25% Crk
S
0.10
6240 Regional DBST 25mm @ 25% Crk
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
1398 Regional Overlay 50mm @ IRI 5-7
S
0.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.90
5261 Regional Full Recon 150mm @ IRI 12
S
3.00
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
6238 Regional Full Recon 150mm @ IRI 12
S
4.00
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
1346 Regional Overlay 50mm @ IRI 5-7
S
0.30
4488 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:71 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.885
2.59
4.580
2.59
5.450
2.59
1.799
2.59
1.099
2.58
19.103
2.58
4.282
2.58
20.771
2.58
1.611
2.58
1.966
2.58
14.054
2.57
4.046
2.57
7.602
2.57
7.066
2.56
3.795
2.56
4.769
2.56
0.375
2.55
0.356
2.55
12.595
2.55
7.197
2.54
5.496
2.54
4.324
2.54
9.624
2.54
7.829
2.54
1.574
2.53
1.574
2.53
1.069
2.53
0.386
2.53
9.160
2.53
0.553
2.53
0.143
2.53
9.160
2.52
0.418
2.52
11.660
2.52
13.809
2.52
32.080
2.52
1.069
2.52
3.860
2.52
53.946
2.52
0.397
2.51
0.626
2.50
NPV
15.41
11.52
13.73
4.56
2.59
58.14
10.74
50.61
4.00
6.21
35.71
10.33
19.53
17.88
9.45
11.80
1.90
1.80
31.19
17.53
13.52
10.51
22.26
23.70
3.90
3.90
2.60
1.14
21.89
4.82
0.65
22.38
1.22
28.61
33.07
73.66
2.59
9.24
136.50
1.21
1.77
Appendix-A
Annual Needs Report
2012-2013
Zone
Rajshahi
Gopalganj
Gopalganj
Chittagong
Gopalganj
Gopalganj
Gopalganj
Khulna
Chittagong
Chittagong
Chittagong
Rajshahi
Khulna
Gopalganj
Rangpur
Rangpur
Rangpur
Dhaka
Khulna
Gopalganj
Gopalganj
Khulna
Dhaka
Khulna
Barisal
Gopalganj
Chittagong
Barisal
Chittagong
Chittagong
Khulna
Chittagong
Sylhet
Khulna
Dhaka
Khulna
Comilla
Dhaka
Khulna
Rangpur
Gopalganj
Division
Pabna
Rajbari
Gopalganj
Chittagong
Rajbari
Rajbari
Rajbari
Kushtia
Rangamati
Rangamati
Dohazari
Pabna
Jhenaidah
Gopalganj
Lalmonirhat
Dinajpur
Gaibanda
Gazipur
Chuadanga
Faridpur
Rajbari
Kushtia
Munshiganj
Magura
Jhalokati
Rajbari
Chittagong
Patuakhali
Khagrachari
Rangamati
Jessore
Chittagong
Sylhet
Meherpur
Narsingdi
Khulna
Comilla
Gazipur
Jessore
Bogra
Rajbari
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R601
R710
R850
R152
R710
R710
R710
R710
R161
R161
R170
R601
R748
R850
N506
R585
R585
R314
R747
N7
R710
R710
R812
R720
R870
R710
N1
R881
R160
R162
R755
R151
R250
R745
R301
R760
R140
R311
N706
R546
R710
Road Name
Chainage
Pabna-Natakhola Ferry Ghat Road
Km 027.74-030.74
Ahaladipur-Kushtia Road
Km 035.01-035.21
Tekerhat-Mollahhat Road
Km 034.00-034.20
Heako-Ramgarh Road
Km 014.60-015.00
Ahaladipur-Kushtia Road
Km 044.85-044.95
Ahaladipur-Kushtia Road
Km 038.21-038.31
Ahaladipur-Kushtia Road
Km 038.41-038.51
Ahaladipur-Kushtia Road
Km 070.65-070.95
Rangamati -Bandarban Road
Km 018.40-018.80
Rangamati -Bandarban Road
Km 018.40-018.80
Patiya-Chokoria Road
Km 012.90-013.00
Pabna-Natakhola Ferry Ghat Road
Km 042.77-045.87
Chuadanga-Kaliganj Road
Km 051.40-051.80
Tekerhat-Mollahhat Road
Km 010.60-010.70
Rangpur-Barobari-Kurigram Road
Km 021.00-021.15
Gobindagnj-Fulbari-Dinajpur Road
Km 070.70-073.30
Gobindagnj-Fulbari-Dinajpur Road
Km 000.50-001.10
Gafargaon-Mawna Road
Km 037.00-042.16
Kushtia -Chuadanga Road
Km 036.44-036.64
Dauladia-Mongla Road
Km 061.02-061.12
Ahaladipur-Kushtia Road
Km 036.91-037.11
Ahaladipur-Kushtia Road
Km 067.15-067.65
Fatullah -Mawa Road
Km 011.92-012.82
Magura-Narail Road
Km 016.10-017.20
Barisal-Pirojpur Road
Km 035.47-037.37
Ahaladipur-Kushtia Road
Km 013.91-015.71
Dhaka -Comilla -Chittagong-Teknaf RoKm 208.98-209.08
Amtali-Kuakata Road
Km 016.90-017.00
Hathazari-Khagrachhari Road
Km 051.40-051.50
Rangamati -Khagrachhari Road
Km 008.00-008.20
Jessore -Chuknagar Road
Km 016.30-016.40
Baraiyerhat-Fatikchhari Road
Km 000.80-000.90
Sylhet-Jakiganj Road
Km 086.57-089.68
Kushtia -Jhenaidah Road
Km 069.78-070.58
Tongi-Pachdona Road
Km 030.73-031.03
Khulna-Satkhira Road
Km 001.20-001.60
Comilla-Begumganj Road
Km 026.69-026.99
Joydebpur -Ordinance Factory
Km 000.00-000.20
Jessore -Benapole Road
Km 030.40-032.10
Railgate-Shantahar Road
Km 000.40-001.10
Ahaladipur-Kushtia Road
Km 009.40-009.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
3.00
1096 Regional Overlay 50mm @ IRI 7-9
S
0.20
3636 Regional Rehab 135mm @ IRI 9-12
S
0.20
3497 Regional Rehab 135mm @ IRI 9-12
S
0.40
1398 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.30
4484 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
3.10
3019 Regional Rehab 135mm @ IRI 9-12
S
0.40
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
2343 Regional Rehab 135mm @ IRI 9-12
S
0.15
7068 National Full Recon 180mm @ IRI 12
S
2.60
2707 Regional Overlay 50mm @ IRI 5-7
S
0.60
6187 Regional Full Recon 150mm @ IRI 12
S
5.16
1346 Regional Overlay 50mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
7248 National Full Recon 180mm @ IRI 12
S
0.20
3636 Regional Rehab 135mm @ IRI 9-12
S
0.50
4484 Regional Rehab 150mm @ IRI 9-12
S
0.90
4887 Regional Full Recon 150mm @ IRI 12
S
1.10
1047 Regional Overlay 50mm @ IRI 7-9
S
1.90
2223 Regional DBST 25mm @ 25% Crk
S
1.80
3636 Regional DBST @ Traff 2000-4000
S
0.10 11451 National Full Recon 195mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
3362 Regional Full Recon 135mm @ IRI 12
S
0.20
818 Regional DBST @ Traff 100-2000
S
0.10
3292 Regional Full Recon 135mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
3.12
4887 Regional Rehab 150mm @ IRI 9-12
S
0.80
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
2929 Regional DBST 25mm @ 25% Crk
S
1.70
7314 National Full Recon 180mm @ IRI 12
S
0.70
3283 Regional Overlay 50mm @ IRI 7-9
S
0.20
6238 Regional Full Recon 150mm @ IRI 12
Appendix-A: Page:72 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.794
2.50
2.532
2.50
2.532
2.50
0.835
2.49
1.734
2.49
1.574
2.49
1.574
2.49
5.398
2.49
5.983
2.49
5.983
2.49
1.069
2.49
26.398
2.49
6.081
2.49
1.266
2.49
3.108
2.48
7.464
2.48
10.796
2.47
9.692
2.47
3.926
2.47
2.732
2.47
2.532
2.47
6.743
2.46
16.194
2.46
2.124
2.46
2.581
2.46
2.583
2.45
4.048
2.45
1.099
2.45
1.129
2.45
0.173
2.44
1.634
2.44
1.129
2.44
42.087
2.44
14.395
2.44
6.085
2.44
8.113
2.44
7.596
2.44
0.188
2.44
48.348
2.43
2.010
2.43
4.057
2.43
NPV
16.04
6.33
6.30
2.41
4.17
3.84
3.84
12.42
14.97
14.97
2.56
63.55
15.14
3.14
7.30
23.60
24.92
27.72
9.45
6.57
6.25
15.78
39.21
6.22
19.93
18.02
9.68
2.60
2.59
1.40
3.82
2.62
104.42
34.42
14.48
19.39
18.28
0.78
114.23
6.52
9.45
Appendix-A
Annual Needs Report
2012-2013
Zone
Khulna
Gopalganj
Khulna
Khulna
Sylhet
Chittagong
Chittagong
Khulna
Khulna
Chittagong
Dhaka
Khulna
Chittagong
Khulna
Comilla
Chittagong
Chittagong
Chittagong
Chittagong
Rajshahi
Gopalganj
Chittagong
Chittagong
Rajshahi
Khulna
Dhaka
Gopalganj
Khulna
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Comilla
Gopalganj
Barisal
Comilla
Khulna
Dhaka
Sylhet
Dhaka
Division
Satkhira
Rajbari
Kushtia
Jessore
Habiganj
Bandarban
Rangamati
Kushtia
Khulna
Chittagong
Narayanganj
Khulna
Khagrachari
Jessore
Chandpur
Chittagong
Cox's Bazar
Khagrachari
Khagrachari
Pabna
Rajbari
Khagrachari
Chittagong
Pabna
Satkhira
Narsingdi
Rajbari
Magura
Dohazari
Khagrachari
Chittagong
Rangamati
Rangamati
Comilla
Gopalganj
Barisal
Comilla
Kushtia
Mymensingh
Habiganj
Gazipur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R760
R710
R710
R755
R220
R161
R161
R710
R760
R152
R202
R760
R160
R755
R140
R160
R180
R160
R160
R603
R710
R160
R163
N705
R765
R301
R710
N7
R170
R160
R163
R161
R161
R140
R850
R870
R140
R710
R371
N2
R310
Road Name
Khulna-Satkhira Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Jessore -Chuknagar Road
Sarail-Habiganj Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Ahaladipur-Kushtia Road
Khulna-Satkhira Road
Heako-Ramgarh Road
Bhulta-Rampura Road
Khulna-Satkhira Road
Hathazari-Khagrachhari Road
Jessore -Chuknagar Road
Comilla-Begumganj Road
Hathazari-Khagrachhari Road
Laharpur-Laboni More Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Pabna-Paksey (EPZ) Road
Ahaladipur-Kushtia Road
Hathazari-Khagrachhari Road
Chittagong -Chandragona Road
Paksey -Iswardi-Dasuria
Khulna-Satkhira Road
Tongi-Pachdona Road
Ahaladipur-Kushtia Road
Dauladia-Mongla Road
Patiya-Chokoria Road
Hathazari-Khagrachhari Road
Chittagong -Chandragona Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Comilla-Begumganj Road
Tekerhat-Mollahhat Road
Barisal-Pirojpur Road
Comilla-Begumganj Road
Ahaladipur-Kushtia Road
Sherpur-Nakla-Mymensingh
Dhaka-Sylhet-Jaflong Road
Joydebpur-Itakhola Road
Chainage
Km 056.96-057.36
Km 030.21-031.81
Km 065.65-065.85
Km 000.40-000.60
Km 019.00-019.68
Km 041.74-055.14
Km 024.40-027.20
Km 070.15-070.45
Km 001.90-003.10
Km 011.90-012.60
Km 007.00-007.20
Km 003.10-003.40
Km 053.30-054.00
Km 022.00-022.10
Km 032.29-032.79
Km 020.40-021.10
Km 001.60-001.70
Km 081.72-083.12
Km 083.22-083.82
Km 007.70-009.50
Km 005.60-005.80
Km 078.52-078.92
Km 023.00-023.70
Km 004.60-005.20
Km 029.99-030.29
Km 029.93-030.63
Km 013.71-013.91
Km 077.31-077.51
Km 020.20-020.70
Km 080.52-081.42
Km 020.80-020.90
Km 015.90-018.20
Km 015.90-018.20
Km 016.26-017.29
Km 001.50-002.30
Km 004.80-005.00
Km 015.56-015.86
Km 066.65-066.85
Km 018.10-018.30
Km 152.91-153.11
Km 006.80-007.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
1.60
3636 Regional DBST 25mm @ 25% Crk
S
0.20
4484 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.68
6240 Regional Overlay 60mm @ IRI 5.5-9
S
13.40
3019 Regional Full Recon 135mm @ IRI 12
S
2.80
3019 Regional Full Recon 135mm @ IRI 12
S
0.30
4484 Regional Full Recon 150mm @ IRI 12
S
1.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
1398 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional DBST @ Traff 4000-6000
S
0.70
3362 Regional Rehab 135mm @ IRI 9-12
S
0.10
3292 Regional Full Recon 135mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
5045 Regional DBST 25mm @ 25% Crk
S
0.10
4993 Regional Full Recon 150mm @ IRI 12
S
1.40
3019 Regional Full Recon 135mm @ IRI 12
S
0.60
3019 Regional Full Recon 135mm @ IRI 12
S
1.80
3297 Regional Overlay 50mm @ IRI 5-7
S
0.20
6238 Regional Full Recon 150mm @ IRI 12
S
0.40
3019 Regional Full Recon 135mm @ IRI 12
S
0.70
7612 Regional DBST 25mm @ 25% Crk
S
0.60
2897 National Full Recon 135mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.20 11451 National Full Recon 195mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.90
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
7612 Regional Full Recon 150mm @ IRI 12
S
2.30
4887 Regional Full Recon 150mm @ IRI 12
S
2.30
4887 Regional Full Recon 150mm @ IRI 12
S
1.03
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
2343 Regional DBST @ Traff 2000-4000
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.20
4484 Regional Full Recon 150mm @ IRI 12
S
0.20
4540 Regional Full Recon 150mm @ IRI 12
S
0.20
6671 National Full Recon 180mm @ IRI 12
S
0.30
3723 Regional Rehab 135mm @ IRI 9-12
Appendix-A: Page:73 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
7.852
2.43
2.253
2.43
3.599
2.43
3.599
2.43
2.331
2.42
143.289
2.42
29.941
2.42
5.398
2.42
27.324
2.42
1.461
2.42
4.580
2.42
0.593
2.42
6.122
2.41
1.634
2.41
9.487
2.41
0.968
2.41
1.963
2.41
14.970
2.41
6.416
2.41
5.637
2.40
3.730
2.40
4.277
2.40
0.951
2.40
10.265
2.40
4.046
2.40
13.351
2.40
3.860
2.40
9.109
2.39
7.361
2.39
9.624
2.39
1.799
2.39
45.899
2.38
45.899
2.38
19.383
2.38
1.186
2.37
3.599
2.37
4.120
2.37
3.599
2.37
3.926
2.37
5.613
2.36
2.762
2.36
NPV
18.70
14.27
8.31
8.56
5.08
316.49
66.06
12.20
64.76
3.91
10.77
14.10
14.42
3.77
22.23
4.81
4.43
34.45
14.75
15.80
8.53
9.82
5.18
23.49
9.87
31.12
9.06
21.24
17.02
21.96
4.02
106.95
106.95
44.57
8.24
8.31
9.96
7.88
8.94
12.95
6.22
Appendix-A
Annual Needs Report
2012-2013
Road
No
Gopalganj Rajbari
R710
Comilla
Comilla
R140
Chittagong Chittagong
R163
Chittagong Bandarban
R161
Dhaka
Gazipur
R313
Khulna
Jhenaidah
R745
Khulna
Kushtia
R713
Chittagong Chittagong
R151
Barisal
Barisal
R870
Barisal
Pirojpur
R870
Khulna
Magura
R720
Sylhet
Sylhet
N209
Comilla
Comilla
R140
Khulna
Jessore
R755
Chittagong Chittagong
R160
Chittagong Chittagong
R152
Chittagong Chittagong
R163
Chittagong Cox's Bazar
R170
Dhaka
Gazipur
R310
Khulna
Meherpur
R745
Chittagong Cox's Bazar
R172
Khulna
Meherpur
R745
Sylhet
Moulavi Bazar R282
Dhaka
Tangail
N401
Dhaka
Gazipur
R315
Chittagong Cox's Bazar
R170
Dhaka
Mymensingh R314
Rangpur
Dinajpur
R585
Gopalganj Sariatpur
R861
Comilla
Comilla
R140
Gopalganj Gopalganj
R850
Rangpur
Bogra
R545
Rajshahi
Pabna
N6
Dhaka
Kishoreganj
R360
Gopalganj Faridpur
N803
Rajshahi
Pabna
R604
Sylhet
Habiganj
R220
Rajshahi
Pabna
R601
Comilla
Comilla
R140
Chittagong Chittagong
R151
Rajshahi
Naogaon
R547
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Ahaladipur-Kushtia Road
Comilla-Begumganj Road
Chittagong -Chandragona Road
Rangamati -Bandarban Road
Mawna-Monohardi Road
Kushtia -Jhenaidah Road
Charikoal -Shilahdah Link Road
Baraiyerhat-Fatikchhari Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Magura-Narail Road
Sylhet Twn By-Pass Road
Comilla-Begumganj Road
Jessore -Chuknagar Road
Hathazari-Khagrachhari Road
Heako-Ramgarh Road
Chittagong -Chandragona Road
Patiya-Chokoria Road
Joydebpur-Itakhola Road
Kushtia -Jhenaidah Road
Chokoria-Baderkhali Road
Kushtia -Jhenaidah Road
Juri-Lathidila Road
Madhupur-Mymensingh Road
Mawna-Nabinagar Road
Patiya-Chokoria Road
Gafargaon-Mawna Road
Gobindagnj-Fulbari-Dinajpur Road
Monohar -Shariatpur Road
Comilla-Begumganj Road
Tekerhat-Mollahhat Road
Bogra-Joypurhat Road
Kashinathpur-Natore-Rajshahi Road
Mymensingh -Bhairab Road
Faridpur Town Old section
Tebunia-Hamkuria Road
Sarail-Habiganj Road
Pabna-Natakhola Ferry Ghat Road
Comilla-Begumganj Road
Baraiyerhat-Fatikchhari Road
Naogaon-Badalgachhi-Rohonpur
Chainage
Km 026.71-026.81
Km 008.70-009.20
Km 019.20-019.90
Km 038.84-039.24
Km 022.77-023.27
Km 105.36-105.56
Km 001.40-001.50
Km 027.20-027.40
Km 000.00-000.10
Km 053.97-054.07
Km 013.80-015.90
Km 000.00-000.20
Km 015.06-015.56
Km 030.23-030.53
Km 025.40-026.00
Km 000.30-001.10
Km 020.40-020.50
Km 066.40-066.50
Km 002.60-003.40
Km 062.08-062.58
Km 011.70-011.80
Km 064.68-064.88
Km 003.00-006.10
Km 000.80-016.00
Km 036.20-037.90
Km 072.20-072.50
Km 017.20-018.30
Km 099.46-099.66
Km 001.70-001.80
Km 008.50-008.70
Km 018.90-019.00
Km 011.30-012.90
Km 040.35-040.45
Km 109.38-109.68
Km 000.10-000.20
Km 009.70-009.80
Km 022.38-022.98
Km 033.87-034.17
Km 010.90-011.20
Km 003.30-003.50
Km 038.99-042.09
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.50
4909 Regional Rehab 150mm @ IRI 9-12
S
0.70
7612 Regional Full Recon 150mm @ IRI 12
S
0.40
3019 Regional Full Recon 135mm @ IRI 12
S
0.50
5572 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
1416 Regional DBST @ Traff 100-2000
S
0.20
1301 Regional Overlay 50mm @ IRI 5-7
S
0.10
4887 Regional DBST @ Traff 4000-6000
S
0.10
3803 Regional Full Recon 135mm @ IRI 12
S
2.10
1047 Regional Overlay 50mm @ IRI 7-9
S
0.20
4434 National Full Recon 150mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
4887 Regional Rehab 150mm @ IRI 9-12
S
0.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
1398 Regional Overlay 50mm @ IRI 5-7
S
0.10
7612 Regional Full Recon 150mm @ IRI 12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
5531 Regional Overlay 60mm @ IRI 5.5-9
S
0.50
4283 Regional Rehab 150mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4283 Regional Full Recon 150mm @ IRI 12
S
3.10
4391 Regional DBST @ Traff 4000-6000
S
15.20
3417 National DBST 25mm @ 25% Crk
S
1.70
2048 Regional Rehab 135mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
1.10
1346 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
0.20
4909 Regional Full Recon 150mm @ IRI 12
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
1.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
6210 National Rehab 180mm @ IRI 9-12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 24928 National Full Recon 195mm @ IRI 12
S
0.10
3778 Regional Rehab 135mm @ IRI 9-12
S
0.60
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.30
1096 Regional Overlay 50mm @ IRI 5-7
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
3.10
1661 Regional Overlay 50mm @ IRI 5-7
Appendix-A: Page:74 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.693
2.36
8.582
2.36
12.595
2.36
4.289
2.36
8.179
2.35
3.599
2.35
0.091
2.35
0.397
2.35
0.249
2.35
1.634
2.34
4.001
2.34
2.944
2.34
9.160
2.34
4.046
2.34
10.207
2.34
1.841
2.33
1.799
2.33
1.894
2.33
4.854
2.33
6.743
2.33
1.963
2.33
3.599
2.33
2.910
2.32
21.175
2.32
12.129
2.32
5.683
2.31
1.722
2.31
3.599
2.31
1.799
2.31
4.580
2.31
1.699
2.31
28.789
2.30
2.134
2.30
5.398
2.29
4.924
2.29
1.381
2.29
2.054
2.28
0.579
2.28
5.692
2.28
2.257
2.28
5.825
2.27
NPV
3.82
20.36
27.81
9.22
18.66
8.29
0.48
1.04
2.40
3.58
10.86
6.35
21.05
9.51
23.19
5.45
3.93
4.30
13.79
14.86
4.44
7.83
17.57
110.19
27.35
12.80
4.44
8.03
3.89
10.29
3.75
63.83
4.79
12.07
10.58
3.10
4.71
1.52
12.61
4.89
16.61
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Chittagong
R151
Chittagong Chittagong
R152
Dhaka
Gazipur
R313
Comilla
Brahmanbaria R220
Chittagong Khagrachari
R160
Khulna
Kushtia
R713
Dhaka
Mymensingh R314
Sylhet
Habiganj
N2
Gopalganj Faridpur
N804
Comilla
Brahmanbaria R220
Chittagong Khagrachari
R160
Khulna
Magura
R720
Khulna
Satkhira
R760
Gopalganj Sariatpur
R861
Chittagong Dohazari
R170
Rajshahi
Pabna
R603
Gopalganj Madaripur
R860
Khulna
Kushtia
R710
Sylhet
Habiganj
N2
Chittagong Khagrachari
R160
Chittagong Dohazari
R170
Gopalganj Sariatpur
R861
Gopalganj Sariatpur
R861
Dhaka
Narsingdi
R301
Chittagong Cox's Bazar
R170
Khulna
Magura
R720
Khulna
Magura
R720
Gopalganj Sariatpur
R861
Khulna
Jessore
N708
Dhaka
Tangail
N4
Chittagong Chittagong
R163
Comilla
Brahmanbaria R220
Khulna
Magura
R720
Khulna
Jessore
R755
Khulna
Khulna
R760
Rajshahi
Naogaon
R547
Khulna
Jessore
R755
Rajshahi
Naogaon
R547
Rajshahi
Pabna
R604
Chittagong Bandarban
R161
Gopalganj Gopalganj
N805
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Baraiyerhat-Fatikchhari Road
Heako-Ramgarh Road
Mawna-Monohardi Road
Sarail-Habiganj Road
Hathazari-Khagrachhari Road
Charikoal -Shilahdah Link Road
Gafargaon-Mawna Road
Dhaka-Sylhet-Jaflong Road
Bhanga-Faridpur Road
Sarail-Habiganj Road
Hathazari-Khagrachhari Road
Magura-Narail Road
Khulna-Satkhira Road
Monohar -Shariatpur Road
Patiya-Chokoria Road
Pabna-Paksey (EPZ) Road
Mostafapur-Chandpur Road
Ahaladipur-Kushtia Road
Dhaka-Sylhet-Jaflong Road
Hathazari-Khagrachhari Road
Patiya-Chokoria Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Tongi-Pachdona Road
Patiya-Chokoria Road
Magura-Narail Road
Magura-Narail Road
Monohar -Shariatpur Road
Jessore Town Old Section
Joydebpur-Jamalpur Road
Chittagong -Chandragona Road
Sarail-Habiganj Road
Magura-Narail Road
Jessore -Chuknagar Road
Khulna-Satkhira Road
Naogaon-Badalgachhi-Rohonpur
Jessore -Chuknagar Road
Naogaon-Badalgachhi-Rohonpur
Tebunia-Hamkuria Road
Rangamati -Bandarban Road
Bhanga-Mollahhat Road
Chainage
Km 003.00-003.20
Km 012.80-014.00
Km 033.57-034.97
Km 004.00-004.40
Km 079.12-080.02
Km 000.00-000.10
Km 009.90-010.20
Km 160.51-160.61
Km 031.20-031.30
Km 001.00-001.50
Km 049.10-049.20
Km 010.50-010.70
Km 038.56-038.76
Km 001.40-001.50
Km 007.00-007.40
Km 010.20-012.80
Km 016.28-016.38
Km 051.45-051.75
Km 153.21-153.41
Km 039.30-039.40
Km 008.00-008.20
Km 004.00-004.10
Km 004.30-004.40
Km 026.81-029.83
Km 068.60-069.10
Km 017.50-018.50
Km 029.10-030.10
Km 003.60-003.70
Km 003.29-004.74
Km 108.56-108.66
Km 027.00-029.00
Km 004.40-004.70
Km 026.90-027.10
Km 023.10-023.20
Km 013.80-014.40
Km 019.09-019.19
Km 021.70-021.90
Km 031.99-032.69
Km 031.60-040.57
Km 035.60-038.70
Km 007.00-010.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
1.20
1398 Regional Overlay 50mm @ IRI 7-9
S
1.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
4488 Regional Overlay 60mm @ IRI 7-9
S
0.90
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
1416 Regional DBST 25mm @ 25% Crk
S
0.30
1346 Regional Overlay 50mm @ IRI 7-9
S
0.10
6671 National Full Recon 180mm @ IRI 12
S
0.10 11451 National Rehab 195mm @ IRI 9-12
S
0.50
4488 Regional Overlay 60mm @ IRI 7-9
S
0.10
3362 Regional Full Recon 135mm @ IRI 12
S
0.20
1047 Regional Overlay 50mm @ IRI 7-9
S
0.20
4116 Regional Full Recon 150mm @ IRI 12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
0.40
3516 Regional Full Recon 135mm @ IRI 12
S
2.60
3297 Regional Overlay 50mm @ IRI 5-7
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.30
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
6671 National Full Recon 180mm @ IRI 12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
3516 Regional Rehab 135mm @ IRI 9-12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
3.02
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
1.00
1047 Regional Overlay 50mm @ IRI 5-7
S
1.00
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
1.45
3249 National DBST @ Traff 2000-4000
S
0.10
3779 National Full Recon 140mm @ IRI 12
S
2.00
5390 Regional Full Recon 150mm @ IRI 12
S
0.30
4488 Regional DBST @ Traff 4000-6000
S
0.20
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
3292 Regional Full Recon 135mm @ IRI 12
S
0.60
3206 Regional DBST @ Traff 2000-4000
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
3292 Regional Full Recon 135mm @ IRI 12
S
0.70
3019 Regional Full Recon 135mm @ IRI 12
S
8.97
2942 Regional Overlay 50mm @ IRI 7-9
S
3.10
3019 Regional Full Recon 135mm @ IRI 12
S
3.90
2650 National DBST 25mm @ 25% Crk
Appendix-A: Page:75 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.257
2.27
2.505
2.27
25.191
2.26
0.996
2.26
9.624
2.26
0.091
2.26
0.825
2.26
2.807
2.25
4.610
2.25
1.245
2.24
1.129
2.24
0.574
2.24
3.926
2.24
1.799
2.24
4.158
2.23
8.142
2.23
1.188
2.22
5.398
2.22
5.613
2.22
1.099
2.21
1.611
2.21
1.799
2.21
1.799
2.21
57.285
2.21
9.471
2.20
1.931
2.20
1.931
2.19
1.799
2.19
3.109
2.19
1.744
2.19
35.987
2.19
0.296
2.18
0.386
2.18
1.634
2.18
0.889
2.18
1.084
2.18
3.267
2.18
7.485
2.17
21.499
2.17
33.149
2.17
7.032
2.17
NPV
4.88
6.77
55.65
2.25
20.77
0.35
2.55
6.18
10.33
2.90
2.37
1.74
8.32
3.77
8.70
19.21
2.56
11.74
12.17
2.32
3.44
3.73
3.73
122.97
20.24
5.12
5.10
3.69
26.59
3.64
75.89
2.18
0.99
3.41
5.79
2.24
6.80
15.43
52.85
65.68
46.30
Appendix-A
Annual Needs Report
2012-2013
Zone
Comilla
Khulna
Chittagong
Gopalganj
Chittagong
Khulna
Gopalganj
Dhaka
Dhaka
Rangpur
Chittagong
Gopalganj
Gopalganj
Rajshahi
Chittagong
Gopalganj
Dhaka
Khulna
Khulna
Dhaka
Rangpur
Chittagong
Khulna
Chittagong
Comilla
Barisal
Khulna
Dhaka
Chittagong
Dhaka
Chittagong
Gopalganj
Chittagong
Chittagong
Rajshahi
Gopalganj
Khulna
Khulna
Khulna
Gopalganj
Gopalganj
Division
Comilla
Khulna
Bandarban
Madaripur
Rangamati
Jessore
Madaripur
Gazipur
Narayanganj
Dinajpur
Rangamati
Rajbari
Rajbari
Naogaon
Chittagong
Madaripur
Gazipur
Jessore
Satkhira
Narayanganj
Dinajpur
Khagrachari
Satkhira
Rangamati
Comilla
Pirojpur
Jessore
Tangail
Cox's Bazar
Munshiganj
Chittagong
Madaripur
Bandarban
Khagrachari
Rajshahi
Faridpur
Khulna
Satkhira
Satkhira
Rajbari
Faridpur
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R144
R760
R161
R860
R161
R755
R860
R315
R202
R585
R162
N7
R710
R547
R151
R860
N3
R755
R760
N1
R585
R160
R760
R162
R140
R870
R755
N4
R172
R813
R160
R860
N108
R160
R685
N804
R760
R760
R760
R710
N803
Road Name
Chainage
Laksam Old Section
Km 003.90-004.50
Khulna-Satkhira Road
Km 016.80-017.70
Rangamati -Bandarban Road
Km 031.90-032.40
Mostafapur-Chandpur Road
Km 002.70-002.90
Rangamati -Bandarban Road
Km 027.70-031.90
Jessore -Chuknagar Road
Km 032.43-033.23
Mostafapur-Chandpur Road
Km 000.00-000.10
Mawna-Nabinagar Road
Km 032.10-032.50
Bhulta-Rampura Road
Km 003.70-003.80
Gobindagnj-Fulbari-Dinajpur Road
Km 089.86-090.26
Rangamati -Khagrachhari Road
Km 007.40-007.80
Dauladia-Mongla Road
Km 000.10-000.20
Ahaladipur-Kushtia Road
Km 025.91-026.11
Naogaon-Badalgachhi-Rohonpur
Km 049.03-049.33
Baraiyerhat-Fatikchhari Road
Km 001.50-001.60
Mostafapur-Chandpur Road
Km 000.10-000.20
Dhaka -Mymensingh Road
Km 014.30-014.70
Jessore -Chuknagar Road
Km 012.90-013.00
Khulna-Satkhira Road
Km 055.66-056.06
Dhaka -Comilla -Chittagong-Teknaf RoKm 024.47-024.48
Gobindagnj-Fulbari-Dinajpur Road
Km 102.86-103.46
Hathazari-Khagrachhari Road
Km 041.70-042.40
Khulna-Satkhira Road
Km 037.56-038.56
Rangamati -Khagrachhari Road
Km 013.70-015.90
Comilla-Begumganj Road
Km 028.89-029.09
Barisal-Pirojpur Road
Km 062.07-064.24
Jessore -Chuknagar Road
Km 016.80-017.00
Joydebpur-Jamalpur Road
Km 122.01-122.71
Chokoria-Baderkhali Road
Km 015.30-015.40
Muktarpur - Munshiganj Road
Km 002.50-004.00
Hathazari-Khagrachhari Road
Km 018.40-018.50
Mostafapur-Chandpur Road
Km 005.00-005.30
Keranirhat-Bandarban Road
Km 015.70-017.00
Hathazari-Khagrachhari Road
Km 054.00-055.80
Rajshahi -Chowmasia Road
Km 011.40-011.90
Bhanga-Faridpur Road
Km 028.90-029.30
Khulna-Satkhira Road
Km 007.80-007.90
Khulna-Satkhira Road
Km 043.26-043.36
Khulna-Satkhira Road
Km 040.46-040.56
Ahaladipur-Kushtia Road
Km 041.91-042.11
Faridpur Town Old section
Km 000.00-000.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.60
2057 Regional DBST 25mm @ 25% Crk
S
0.90
4887 Regional Full Recon 150mm @ IRI 12
S
0.50
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
5672 Regional Full Recon 150mm @ IRI 12
S
4.20
3019 Regional Rehab 135mm @ IRI 9-12
S
0.80
4887 Regional Rehab 150mm @ IRI 9-12
S
0.10
5672 Regional DBST 25mm @ 25% Crk
S
0.40
2048 Regional Rehab 135mm @ IRI 9-12
S
0.10
6255 Regional DBST @ Traff >6000
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
818 Regional Overlay 50mm @ IRI 7-9
S
0.10
7649 National Full Recon 180mm @ IRI 12
S
0.20
3636 Regional Full Recon 135mm @ IRI 12
S
0.30
1661 Regional Rehab 110mm @ IRI 9-12
S
0.10
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
5672 Regional Full Recon 150mm @ IRI 12
L
0.40
8665 National Rehab 180mm @ IRI 9-12
S
0.10
3292 Regional Full Recon 135mm @ IRI 12
S
0.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.01 11451 National Full Recon 195mm @ IRI 12
S
0.60
4887 Regional Full Recon 150mm @ IRI 12
S
0.70
3019 Regional Rehab 135mm @ IRI 9-12
S
1.00
4116 Regional DBST @ Traff 4000-6000
S
2.20
818 Regional Overlay 50mm @ IRI 7-9
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
2.18
3581 Regional Overlay 50mm @ IRI 5-7
S
0.20
3292 Regional Full Recon 135mm @ IRI 12
S
0.70
3779 National Rehab 140mm @ IRI 9-12
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
1.50
3788 Regional DBST @ Traff 2000-4000
S
0.10
5045 Regional Full Recon 150mm @ IRI 12
S
0.30
5672 Regional Full Recon 150mm @ IRI 12
S
1.30
1363 National DBST @ Traff 100-2000
S
1.80
3362 Regional Full Recon 135mm @ IRI 12
S
0.50
6330 Regional Full Recon 150mm @ IRI 12
S
0.40 11451 National Full Recon 195mm @ IRI 12
S
0.10
3206 Regional Full Recon 135mm @ IRI 12
S
0.10
4116 Regional Full Recon 150mm @ IRI 12
S
0.10
4116 Regional Full Recon 150mm @ IRI 12
S
0.20
3636 Regional Rehab 135mm @ IRI 9-12
S
0.10 24928 National DBST @ Traff >6000
Appendix-A: Page:76 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.112
2.17
17.666
2.17
5.347
2.17
3.599
2.16
34.799
2.16
10.789
2.16
0.210
2.16
4.373
2.15
0.173
2.15
7.197
2.15
0.731
2.15
3.742
2.14
3.386
2.14
2.032
2.13
1.129
2.13
1.799
2.13
12.533
2.12
1.634
2.12
7.852
2.12
0.311
2.11
11.660
2.10
6.541
2.09
1.482
2.09
4.019
2.09
4.606
2.08
4.831
2.08
3.267
2.08
9.054
2.08
1.963
2.08
1.752
2.08
1.832
2.08
5.398
2.07
1.830
2.07
20.317
2.07
8.997
2.06
23.356
2.06
1.782
2.06
1.963
2.06
1.963
2.05
2.440
2.05
0.371
2.05
NPV
6.65
37.54
10.56
7.46
70.98
23.40
1.02
9.21
1.14
14.92
1.94
7.85
6.92
4.32
2.28
3.66
26.30
3.31
16.28
0.64
23.48
13.24
9.75
9.72
9.37
10.63
6.50
18.66
3.96
9.46
3.60
10.71
13.99
39.30
17.66
47.02
3.51
3.82
3.81
5.01
2.04
Appendix-A
Annual Needs Report
2012-2013
Zone
Rangpur
Khulna
Comilla
Khulna
Chittagong
Dhaka
Chittagong
Chittagong
Gopalganj
Khulna
Khulna
Chittagong
Dhaka
Gopalganj
Khulna
Khulna
Khulna
Dhaka
Gopalganj
Dhaka
Dhaka
Khulna
Khulna
Gopalganj
Dhaka
Rajshahi
Gopalganj
Gopalganj
Khulna
Dhaka
Khulna
Chittagong
Gopalganj
Chittagong
Chittagong
Dhaka
Khulna
Khulna
Dhaka
Gopalganj
Khulna
Division
Dinajpur
Jessore
Comilla
Magura
Khagrachari
Mymensingh
Bandarban
Rangamati
Madaripur
Satkhira
Khulna
Cox's Bazar
Tangail
Rajbari
Magura
Khulna
Khulna
Tangail
Rajbari
Narayanganj
Gazipur
Satkhira
Chuadanga
Faridpur
Kishoreganj
Pabna
Rajbari
Rajbari
Magura
Narayanganj
Kushtia
Dohazari
Rajbari
Dohazari
Dohazari
Gazipur
Kushtia
Meherpur
Tangail
Sariatpur
Satkhira
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R585
R755
R140
R720
R160
R314
N108
R162
R860
R760
R760
R172
N4
R710
R720
R760
R760
N4
R710
R114
R313
R760
R745
N803
R360
R601
R710
R710
R720
R202
R713
R170
R710
R170
R170
R310
R713
R746
N4
R861
R760
Road Name
Gobindagnj-Fulbari-Dinajpur Road
Jessore -Chuknagar Road
Comilla-Begumganj Road
Magura-Narail Road
Hathazari-Khagrachhari Road
Gafargaon-Mawna Road
Keranirhat-Bandarban Road
Rangamati -Khagrachhari Road
Mostafapur-Chandpur Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Chokoria-Baderkhali Road
Joydebpur-Jamalpur Road
Ahaladipur-Kushtia Road
Magura-Narail Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Joydebpur-Jamalpur Road
Ahaladipur-Kushtia Road
Nayapur-Raipura Road
Mawna-Monohardi Road
Khulna-Satkhira Road
Kushtia -Jhenaidah Road
Faridpur Town Old section
Mymensingh -Bhairab Road
Pabna-Natakhola Ferry Ghat Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Magura-Narail Road
Bhulta-Rampura Road
Charikoal -Shilahdah Link Road
Patiya-Chokoria Road
Ahaladipur-Kushtia Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Joydebpur-Itakhola Road
Charikoal -Shilahdah Link Road
Meherpur-Mujibnagar Road
Joydebpur-Jamalpur Road
Monohar -Shariatpur Road
Khulna-Satkhira Road
Chainage
Km 091.36-092.06
Km 020.80-020.90
Km 020.29-020.49
Km 008.80-009.60
Km 041.50-041.70
Km 015.10-015.30
Km 009.50-010.30
Km 020.70-020.90
Km 006.20-006.30
Km 037.36-037.56
Km 006.70-006.80
Km 015.60-016.10
Km 110.26-110.56
Km 032.01-035.01
Km 010.20-010.40
Km 004.60-005.50
Km 009.60-009.70
Km 119.51-120.41
Km 036.01-036.21
Km 022.40-022.50
Km 002.70-003.40
Km 049.56-051.26
Km 077.78-077.98
Km 000.70-000.80
Km 045.42-046.82
Km 034.67-034.87
Km 024.71-024.81
Km 008.30-008.50
Km 025.10-025.30
Km 003.90-004.00
Km 004.90-005.41
Km 008.70-008.80
Km 024.91-025.11
Km 007.80-007.90
Km 010.10-010.20
Km 004.20-004.50
Km 000.70-000.90
Km 001.60-007.90
Km 104.99-105.09
Km 002.50-002.60
Km 034.87-035.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.10
3292 Regional Full Recon 135mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.80
1047 Regional Overlay 50mm @ IRI 7-9
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
1346 Regional Full Recon 110mm @ IRI 12
S
0.80
1363 National DBST @ Traff 100-2000
S
0.20
818 Regional Overlay 50mm @ IRI 7-9
S
0.10
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4116 Regional Full Recon 150mm @ IRI 12
S
0.10
3206 Regional Full Recon 135mm @ IRI 12
S
0.50
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
3779 National Full Recon 140mm @ IRI 12
S
3.00
3636 Regional DBST 25mm @ 25% Crk
S
0.20
1047 Regional Overlay 50mm @ IRI 7-9
S
0.90
3206 Regional Full Recon 135mm @ IRI 12
S
0.10
3206 Regional Full Recon 135mm @ IRI 12
S
0.90
3779 National Rehab 140mm @ IRI 9-12
S
0.20
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
1140 Regional DBST 25mm @ 25% Crk
S
0.70
3019 Regional Full Recon 135mm @ IRI 12
S
1.70
4887 Regional Full Recon 150mm @ IRI 12
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.10 24928 National Full Recon 195mm @ IRI 12
S
1.40
2693 Regional Rehab 135mm @ IRI 9-12
S
0.20
1096 Regional Overlay 50mm @ IRI 5-7
S
0.10
3636 Regional Full Recon 135mm @ IRI 12
S
0.20
6238 Regional Rehab 150mm @ IRI 9-12
S
0.20
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
6255 Regional DBST 25mm @ 25% Crk
S
0.51
1416 Regional Rehab 110mm @ IRI 9-12
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.20
3636 Regional Full Recon 135mm @ IRI 12
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.30
6578 Regional Full Recon 150mm @ IRI 12
S
0.20
1416 Regional DBST 25mm @ 25% Crk
S
6.30
2154 Regional Overlay 50mm @ IRI 7-9
S
0.10
3779 National Rehab 140mm @ IRI 9-12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
0.13
4116 Regional Rehab 150mm @ IRI 9-12
Appendix-A: Page:77 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
12.595
2.05
1.634
2.05
4.188
2.04
2.297
2.04
2.257
2.04
1.620
2.03
1.146
2.03
0.365
2.02
2.944
2.02
3.926
2.01
1.782
2.00
9.815
2.00
5.232
2.00
4.157
2.00
0.574
2.00
16.040
2.00
1.782
2.00
11.641
1.99
3.267
1.99
0.094
1.98
7.069
1.98
33.369
1.98
5.692
1.98
4.788
1.98
17.722
1.98
0.386
1.98
1.693
1.97
3.041
1.97
0.386
1.97
0.173
1.97
3.191
1.97
1.040
1.96
3.386
1.96
1.040
1.96
1.040
1.96
9.815
1.96
0.183
1.95
18.086
1.95
1.411
1.94
1.799
1.94
1.913
1.94
NPV
24.89
3.20
8.36
5.43
4.39
3.20
8.57
0.82
5.86
7.46
3.42
19.11
10.00
22.49
1.33
30.66
3.41
23.00
6.36
0.39
13.61
64.85
11.07
8.89
35.48
0.88
3.20
5.98
0.88
0.90
6.05
1.91
6.35
1.91
1.91
18.27
0.79
52.39
2.73
3.27
3.62
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Brahmanbaria R220
Khulna
Satkhira
R760
Gopalganj Rajbari
R710
Chittagong Dohazari
R170
Rajshahi
Pabna
N5
Rangpur
Bogra
R550
Khulna
Jessore
R755
Sylhet
Habiganj
R220
Gopalganj Sariatpur
R861
Khulna
Khulna
R760
Chittagong Chittagong
R151
Gopalganj Sariatpur
R861
Rajshahi
Natore
R548
Rangpur
Bogra
R550
Rangpur
Dinajpur
R585
Chittagong Dohazari
R170
Dhaka
Mymensingh R314
Dhaka
Gazipur
R302
Chittagong Chittagong
R151
Dhaka
Mymensingh R314
Khulna
Magura
R720
Gopalganj Gopalganj
R850
Gopalganj Gopalganj
R850
Rajshahi
Pabna
R603
Chittagong Rangamati
R161
Gopalganj Gopalganj
R850
Dhaka
Tangail
N4
Chittagong Khagrachari
R160
Chittagong Rangamati
R162
Khulna
Chuadanga
R745
Chittagong Khagrachari
R160
Khulna
Jessore
R755
Rangpur
Dinajpur
R585
Khulna
Chuadanga
R745
Chittagong Chittagong
R151
Chittagong Dohazari
R170
Dhaka
Gazipur
R313
Khulna
Chuadanga
R745
Khulna
Khulna
R760
Gopalganj Sariatpur
R861
Dhaka
Tangail
R480
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Sarail-Habiganj Road
Khulna-Satkhira Road
Ahaladipur-Kushtia Road
Patiya-Chokoria Road
Dhaka -Utholi-Banglabandh Road
Mokamtala-Joypurhat Road
Jessore -Chuknagar Road
Sarail-Habiganj Road
Monohar -Shariatpur Road
Khulna-Satkhira Road
Baraiyerhat-Fatikchhari Road
Monohar -Shariatpur Road
Naogaon-Atrai-Natore Road
Mokamtala-Joypurhat Road
Gobindagnj-Fulbari-Dinajpur Road
Patiya-Chokoria Road
Gafargaon-Mawna Road
Kaliganj Bazr Road
Baraiyerhat-Fatikchhari Road
Gafargaon-Mawna Road
Magura-Narail Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Pabna-Paksey (EPZ) Road
Rangamati -Bandarban Road
Tekerhat-Mollahhat Road
Joydebpur-Jamalpur Road
Hathazari-Khagrachhari Road
Rangamati -Khagrachhari Road
Kushtia -Jhenaidah Road
Hathazari-Khagrachhari Road
Jessore -Chuknagar Road
Gobindagnj-Fulbari-Dinajpur Road
Kushtia -Jhenaidah Road
Baraiyerhat-Fatikchhari Road
Patiya-Chokoria Road
Mawna-Monohardi Road
Kushtia -Jhenaidah Road
Khulna-Satkhira Road
Monohar -Shariatpur Road
Elanga-Bhuanpur Road
Chainage
Km 012.40-013.60
Km 043.66-044.06
Km 009.70-009.90
Km 020.90-021.10
Km 101.10-101.80
Km 005.30-005.60
Km 025.70-026.40
Km 019.98-021.18
Km 002.80-002.90
Km 020.30-021.70
Km 011.70-012.10
Km 006.20-006.37
Km 035.89-037.29
Km 009.30-009.60
Km 076.10-076.30
Km 001.40-002.40
Km 017.10-017.20
Km 001.40-001.80
Km 025.70-026.60
Km 013.30-013.40
Km 028.30-028.80
Km 021.90-022.00
Km 034.50-035.00
Km 007.60-007.70
Km 011.00-011.60
Km 021.30-021.40
Km 109.16-109.66
Km 055.92-056.42
Km 000.80-000.90
Km 079.56-079.76
Km 040.70-041.00
Km 013.30-013.50
Km 079.90-080.30
Km 079.86-081.36
Km 009.20-009.70
Km 018.74-019.70
Km 020.57-020.97
Km 078.58-079.46
Km 008.40-008.80
Km 000.00-000.10
Km 001.51-016.81
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.20
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.40
4116 Regional Full Recon 150mm @ IRI 12
S
0.20
6238 Regional Full Recon 150mm @ IRI 12
S
0.20
3019 Regional Full Recon 135mm @ IRI 12
S
0.70
1550 National Overlay 50mm @ IRI 4-9
S
0.30
3234 Regional DBST @ Traff 2000-4000
S
0.70
3292 Regional Full Recon 135mm @ IRI 12
S
1.20
6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
1.40
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
1484 Regional Rehab 110mm @ IRI 9-12
S
0.17
4885 Regional Full Recon 150mm @ IRI 12
S
1.40
3019 Regional Rehab 135mm @ IRI 9-12
S
0.30
3234 Regional Rehab 135mm @ IRI 9-12
S
0.20
2707 Regional Full Recon 135mm @ IRI 12
S
1.00
3516 Regional Rehab 135mm @ IRI 9-12
S
0.10
1346 Regional Full Recon 110mm @ IRI 12
S
0.40
3076 Regional Full Recon 135mm @ IRI 12
S
0.90
1301 Regional Overlay 50mm @ IRI 5-7
S
0.10
1346 Regional Full Recon 110mm @ IRI 12
S
0.50
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
3497 Regional Full Recon 135mm @ IRI 12
S
0.50
3497 Regional Rehab 135mm @ IRI 9-12
S
0.10
3297 Regional Rehab 135mm @ IRI 9-12
S
0.60
2326 Regional DBST 25mm @ 25% Crk
S
0.10
3497 Regional Full Recon 135mm @ IRI 12
S
0.50
3779 National Full Recon 140mm @ IRI 12
S
0.50
3362 Regional Rehab 135mm @ IRI 9-12
S
0.10
818 Regional Overlay 50mm @ IRI 5-7
S
0.20
4887 Regional Full Recon 150mm @ IRI 12
S
0.30
3019 Regional Full Recon 135mm @ IRI 12
S
0.20
3292 Regional Full Recon 135mm @ IRI 12
S
0.40
2707 Regional DBST 25mm @ 25% Crk
S
1.50
5210 Regional Full Recon 150mm @ IRI 12
S
0.50
1484 Regional Rehab 110mm @ IRI 9-12
S
0.96
3019 Regional Full Recon 135mm @ IRI 12
S
0.40
3571 Regional Full Recon 135mm @ IRI 12
S
0.88
4887 Regional Full Recon 150mm @ IRI 12
S
0.40
3206 Regional Rehab 135mm @ IRI 9-12
S
0.10
4885 Regional Full Recon 150mm @ IRI 12
S
15.30
3903 Regional DBST 25mm @ 25% Crk
Appendix-A: Page:78 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
4.107
1.93
7.852
1.93
4.057
1.93
2.079
1.91
2.667
1.91
0.408
1.91
11.436
1.91
4.107
1.90
1.822
1.90
27.481
1.90
2.859
1.90
3.041
1.90
12.889
1.89
3.798
1.89
3.267
1.89
8.654
1.88
0.810
1.88
6.654
1.88
1.785
1.87
0.810
1.87
0.966
1.87
1.634
1.87
6.329
1.86
1.381
1.86
0.519
1.86
1.634
1.86
8.721
1.85
4.373
1.85
0.183
1.85
5.692
1.84
3.297
1.84
3.267
1.84
0.543
1.84
36.755
1.83
3.574
1.82
10.019
1.82
3.564
1.82
24.904
1.81
5.524
1.80
1.865
1.78
11.334
1.78
NPV
7.15
14.35
7.48
3.83
6.06
2.28
20.85
7.85
3.23
51.13
5.51
5.40
24.47
7.14
5.90
15.72
1.49
12.12
3.91
1.48
2.08
2.92
11.74
2.45
2.15
2.90
15.42
7.89
0.38
10.31
5.80
5.76
2.52
64.17
6.62
17.59
6.10
44.36
9.90
3.12
37.59
Appendix-A
Annual Needs Report
2012-2013
Zone
Division
Khulna
Chittagong
Comilla
Dhaka
Dhaka
Gopalganj
Chittagong
Dhaka
Rangpur
Khulna
Dhaka
Comilla
Barisal
Khulna
Chittagong
Comilla
Gopalganj
Rangpur
Gopalganj
Comilla
Rangpur
Dhaka
Khulna
Chittagong
Comilla
Khulna
Gopalganj
Gopalganj
Gopalganj
Chittagong
Chittagong
Barisal
Khulna
Gopalganj
Gopalganj
Dhaka
Chittagong
Chittagong
Chittagong
Rajshahi
Chittagong
Jessore
Dohazari
Brahmanbaria
Gazipur
Tangail
Sariatpur
Rangamati
Gazipur
Bogra
Meherpur
Gazipur
Brahmanbaria
Pirojpur
Magura
Bandarban
Comilla
Rajbari
Joypurhat
Sariatpur
Brahmanbaria
Bogra
Gazipur
Khulna
Chittagong
Brahmanbaria
Jessore
Gopalganj
Gopalganj
Gopalganj
Bandarban
Chittagong
Pirojpur
Magura
Sariatpur
Rajbari
Narayanganj
Cox's Bazar
Dohazari
Dohazari
Pabna
Dohazari
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
N708
R170
R220
R311
N4
R861
R162
N3
N514
R746
R313
N2
R870
N702
N108
R140
R710
R545
R861
R220
N514
R302
R760
R151
R220
R755
R850
R850
R850
N108
R151
R870
R720
R860
R710
R202
R180
R170
R170
R601
R170
Road Name
Jessore Town Old Section
Patiya-Chokoria Road
Sarail-Habiganj Road
Joydebpur -Ordinance Factory
Joydebpur-Jamalpur Road
Monohar -Shariatpur Road
Rangamati -Khagrachhari Road
Dhaka -Mymensingh Road
Bogra (Banani)-Matidali Road
Meherpur-Mujibnagar Road
Mawna-Monohardi Road
Dhaka-Sylhet-Jaflong Road
Barisal-Pirojpur Road
Jessore -Magura Road
Keranirhat-Bandarban Road
Comilla-Begumganj Road
Ahaladipur-Kushtia Road
Bogra-Joypurhat Road
Monohar -Shariatpur Road
Sarail-Habiganj Road
Bogra (Banani)-Matidali Road
Kaliganj Bazr Road
Khulna-Satkhira Road
Baraiyerhat-Fatikchhari Road
Sarail-Habiganj Road
Jessore -Chuknagar Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Keranirhat-Bandarban Road
Baraiyerhat-Fatikchhari Road
Barisal-Pirojpur Road
Magura-Narail Road
Mostafapur-Chandpur Road
Ahaladipur-Kushtia Road
Bhulta-Rampura Road
Laharpur-Laboni More Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Pabna-Natakhola Ferry Ghat Road
Patiya-Chokoria Road
Chainage
Km 002.90-003.00
Km 003.20-003.30
Km 013.60-013.68
Km 003.10-003.50
Km 113.86-114.46
Km 006.80-006.90
Km 012.10-012.20
Km 015.40-015.60
Km 003.70-003.78
Km 011.90-012.00
Km 006.47-006.77
Km 074.18-074.24
Km 061.47-062.07
Km 021.98-025.79
Km 017.80-019.30
Km 009.20-009.50
Km 021.31-021.61
Km 116.79-117.29
Km 000.60-001.00
Km 018.58-018.68
Km 003.70-003.78
Km 000.00-000.10
Km 014.40-014.50
Km 004.20-004.50
Km 015.78-015.88
Km 014.10-014.30
Km 007.50-007.60
Km 008.80-008.90
Km 026.00-026.10
Km 011.90-014.30
Km 017.00-017.30
Km 055.07-061.47
Km 005.30-007.40
Km 016.50-017.88
Km 009.91-010.81
Km 001.70-002.90
Km 002.10-002.30
Km 006.40-006.50
Km 000.90-001.00
Km 005.60-006.50
Km 000.70-000.80
Cway Length
Road
AADT
Work Name
(km)
Side
Class
L
0.10
3249 National DBST 25mm @ 25% Crk
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.08
6240 Regional Full Recon 150mm @ IRI 12
S
0.40
2929 Regional Rehab 135mm @ IRI 9-12
S
0.60
3779 National Full Recon 140mm @ IRI 12
S
0.10
3750 Regional Full Recon 135mm @ IRI 12
S
0.10
818 Regional DBST 25mm @ 25% Crk
L
0.20
8665 National Rehab 180mm @ IRI 9-12
R
0.08 10992 National Overlay 50mm @ IRI 5
S
0.10
2154 Regional Overlay 50mm @ IRI 5-7
S
0.30
3571 Regional Full Recon 135mm @ IRI 12
S
0.06 12330 National Overlay 50mm @ IRI 4
S
0.60
3803 Regional Full Recon 135mm @ IRI 12
S
3.81
3649 National Rehab 135mm @ IRI 9-12
S
1.50
1363 National Overlay 50mm @ IRI 5-9
S
0.30
4909 Regional Rehab 150mm @ IRI 9-12
S
0.30
3636 Regional Full Recon 135mm @ IRI 12
S
0.50
2947 Regional Full Recon 135mm @ IRI 12
S
0.40
4885 Regional Rehab 150mm @ IRI 9-12
S
0.10
6240 Regional Full Recon 150mm @ IRI 12
L
0.08 14432 National Overlay 50mm @ IRI 5
S
0.10
3076 Regional DBST 25mm @ 25% Crk
S
0.10
3206 Regional Full Recon 135mm @ IRI 12
S
0.30
3019 Regional Full Recon 135mm @ IRI 12
S
0.10
6240 Regional Rehab 150mm @ IRI 9-12
S
0.20
3292 Regional Full Recon 135mm @ IRI 12
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.10
3497 Regional Full Recon 135mm @ IRI 12
S
2.40
1363 National Overlay 50mm @ IRI 5-9
S
0.30
1484 Regional DBST @ IRI>12
S
6.40
3803 Regional DBST @ Traff 2000-4000
S
2.10
1047 Regional Overlay 50mm @ IRI 7-9
S
1.38
3019 Regional Rehab 135mm @ IRI 9-12
S
0.90
6238 Regional Full Recon 150mm @ IRI 12
S
1.20
6255 Regional DBST @ IRI>12
S
0.20
4993 Regional Full Recon 150mm @ IRI 12
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
S
0.90
535 Regional Overlay 50mm @ IRI 7-9
S
0.10
3516 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:79 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.185
1.78
1.069
1.78
1.457
1.78
3.498
1.78
10.465
1.77
1.650
1.77
0.086
1.76
7.745
1.76
0.585
1.76
0.287
1.76
3.030
1.76
0.227
1.76
6.523
1.75
63.979
1.75
4.588
1.75
5.149
1.75
5.079
1.75
6.401
1.75
5.395
1.74
1.799
1.74
0.585
1.74
0.138
1.74
1.782
1.74
3.386
1.73
1.349
1.73
3.267
1.73
1.634
1.73
1.634
1.73
1.634
1.73
7.015
1.73
0.282
1.73
7.193
1.72
6.029
1.72
15.544
1.72
22.730
1.72
2.075
1.72
3.599
1.71
1.040
1.71
1.129
1.71
1.738
1.71
1.129
1.71
NPV
0.71
1.78
2.37
6.00
17.74
2.75
0.33
13.84
1.14
0.62
5.00
0.55
10.43
114.17
11.84
9.06
8.51
10.25
9.21
2.86
1.12
0.44
2.96
5.58
2.14
5.42
2.71
2.71
2.71
14.41
3.79
32.19
13.00
27.02
37.49
33.20
5.75
1.67
1.81
4.21
1.80
Appendix-A
Annual Needs Report
2012-2013
Road
No
Dhaka
Mymensingh R314
Dhaka
Tangail
N401
Rajshahi
Naogaon
R547
Dhaka
Narayanganj R202
Chittagong Dohazari
R170
Chittagong Chittagong
R163
Dhaka
Mymensingh R314
Dhaka
Gazipur
R311
Rajshahi
Pabna
N5
Rangpur
Dinajpur
R585
Chittagong Rangamati
R162
Dhaka
Gazipur
R313
Dhaka
Gazipur
R313
Rajshahi
Pabna
R601
Gopalganj Gopalganj
N806
Rajshahi
Pabna
N705
Chittagong Chittagong
R163
Chittagong Bandarban
R161
Chittagong Chittagong
R152
Rajshahi
Rajshahi
N603
Khulna
Jessore
N708
Khulna
Magura
R720
Khulna
Magura
R720
Dhaka
Gazipur
R311
Khulna
Jessore
R755
Dhaka
Gazipur
R313
Khulna
Magura
R720
Comilla
Comilla
R140
Dhaka
Mymensingh R314
Gopalganj Rajbari
R710
Chittagong Bandarban
R161
Khulna
Khulna
R760
Chittagong Rangamati
R162
Chittagong Rangamati
N106
Rajshahi
Pabna
N504
Rangpur
Joypurhat
R545
Comilla
Brahmanbaria R220
Chittagong Dohazari
R170
Dhaka
Tangail
N4
Sylhet
Habiganj
R220
Khulna
Khulna
R760
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Gafargaon-Mawna Road
Madhupur-Mymensingh Road
Naogaon-Badalgachhi-Rohonpur
Bhulta-Rampura Road
Patiya-Chokoria Road
Chittagong -Chandragona Road
Gafargaon-Mawna Road
Joydebpur -Ordinance Factory
Dhaka -Utholi-Banglabandh Road
Gobindagnj-Fulbari-Dinajpur Road
Rangamati -Khagrachhari Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Pabna-Natakhola Ferry Ghat Road
Bhatiapara-Kalna Road
Paksey -Iswardi-Dasuria
Chittagong -Chandragona Road
Rangamati -Bandarban Road
Heako-Ramgarh Road
Rajshahi Town By-Pass Road
Jessore Town Old Section
Magura-Narail Road
Magura-Narail Road
Joydebpur -Ordinance Factory
Jessore -Chuknagar Road
Mawna-Monohardi Road
Magura-Narail Road
Comilla-Begumganj Road
Gafargaon-Mawna Road
Ahaladipur-Kushtia Road
Rangamati -Bandarban Road
Khulna-Satkhira Road
Rangamati -Khagrachhari Road
Chittagong-Rangamati Road
Nagarbari -Kashinathpur Road
Bogra-Joypurhat Road
Sarail-Habiganj Road
Patiya-Chokoria Road
Joydebpur-Jamalpur Road
Sarail-Habiganj Road
Khulna-Satkhira Road
Chainage
Km 013.10-013.30
Km 000.60-000.80
Km 015.96-016.97
Km 003.10-003.70
Km 009.50-009.70
Km 022.80-023.00
Km 015.50-015.60
Km 002.20-002.60
Km 102.00-106.93
Km 073.30-074.70
Km 013.00-013.50
Km 019.37-019.77
Km 018.27-019.27
Km 037.07-038.07
Km 000.20-001.20
Km 000.00-000.10
Km 021.40-021.60
Km 033.10-033.70
Km 007.70-008.10
Km 000.10-002.30
Km 003.00-003.29
Km 000.40-000.80
Km 021.80-022.00
Km 004.10-004.40
Km 014.40-015.20
Km 006.77-007.07
Km 027.90-028.00
Km 009.80-010.00
Km 013.40-013.60
Km 029.91-030.21
Km 038.70-038.84
Km 006.90-007.10
Km 015.90-016.10
Km 062.52-064.88
Km 000.20-000.40
Km 117.49-117.79
Km 015.98-016.08
Km 003.50-003.70
Km 107.46-108.46
Km 022.28-022.38
Km 008.00-008.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
1346 Regional DBST 25mm @ 25% Crk
S
0.20
3417 National Rehab 135mm @ IRI 9-12
S
1.01
3019 Regional Full Recon 135mm @ IRI 12
S
0.60
6255 Regional DBST @ IRI>12
S
0.20
3516 Regional Full Recon 135mm @ IRI 12
S
0.20
7612 Regional Full Recon 150mm @ IRI 12
S
0.10
1346 Regional Full Recon 110mm @ IRI 12
S
0.40
2929 Regional Rehab 135mm @ IRI 9-12
S
4.93
1550 National Overlay 50mm @ IRI 4-9
S
1.40
2707 Regional Rehab 135mm @ IRI 9-12
S
0.50
818 Regional Overlay 50mm @ IRI 5-7
S
0.40
3571 Regional Full Recon 135mm @ IRI 12
S
1.00
3571 Regional Full Recon 135mm @ IRI 12
S
1.00
3019 Regional Full Recon 135mm @ IRI 12
S
1.00
2860 National Full Recon 135mm @ IRI 12
S
0.10
2897 National Full Recon 135mm @ IRI 12
S
0.20
7612 Regional Full Recon 150mm @ IRI 12
S
0.60
464 Regional Overlay 50mm @ IRI 7-9
S
0.40
1398 Regional Overlay 50mm @ IRI 7-9
S
2.20
3802 National Rehab 135mm @ IRI 9-12
R
0.29
3249 National Rehab 135mm @ IRI 9-12
S
0.40
1047 Regional Overlay 50mm @ IRI 5-7
S
0.20
1047 Regional Overlay 50mm @ IRI 5-7
S
0.30
2929 Regional Rehab 135mm @ IRI 9-12
S
0.80
3292 Regional Rehab 135mm @ IRI 9-12
S
0.30
3571 Regional DBST 25mm @ 25% Crk
S
0.10
1047 Regional Rehab 110mm @ IRI 9-12
S
0.20
4909 Regional Full Recon 150mm @ IRI 12
S
0.20
1346 Regional DBST 25mm @ 25% Crk
S
0.30
3636 Regional Full Recon 135mm @ IRI 12
S
0.14
3019 Regional DBST @ Traff 2000-4000
S
0.20
3206 Regional Full Recon 135mm @ IRI 12
S
0.20
818 Regional DBST @ IRI>12
S
2.36
3555 National Full Recon 135mm @ IRI 12
S
0.20
2162 National Overlay 50mm @ IRI 5-9
S
0.30
2947 Regional Rehab 135mm @ IRI 9-12
S
0.10
6240 Regional Rehab 150mm @ IRI 9-12
S
0.20
3516 Regional Full Recon 135mm @ IRI 12
S
1.00
3779 National Full Recon 140mm @ IRI 12
S
0.10
6240 Regional Full Recon 150mm @ IRI 12
S
0.40
3206 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:80 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.148
1.71
3.222
1.70
12.108
1.70
1.037
1.70
2.079
1.70
3.599
1.70
0.810
1.69
3.498
1.68
18.777
1.67
17.722
1.67
0.913
1.67
3.564
1.67
8.911
1.67
10.990
1.66
10.990
1.66
1.637
1.66
3.599
1.66
1.127
1.65
1.148
1.65
36.962
1.65
5.006
1.64
1.148
1.64
0.386
1.64
2.624
1.64
10.127
1.64
0.252
1.64
0.696
1.63
4.580
1.62
0.148
1.62
5.079
1.62
0.124
1.62
3.564
1.62
0.173
1.62
40.027
1.62
0.762
1.62
3.798
1.62
1.349
1.62
2.079
1.61
17.441
1.61
1.799
1.61
7.129
1.61
NPV
0.43
5.48
19.41
16.41
3.30
5.71
1.33
5.68
35.47
29.48
1.87
5.57
13.93
17.49
16.69
2.55
5.58
2.38
2.39
61.98
8.22
2.29
0.78
4.15
16.48
0.77
1.09
7.23
0.49
7.89
1.61
5.53
2.09
63.49
1.49
5.82
2.00
3.14
26.81
2.64
10.95
Appendix-A
Annual Needs Report
2012-2013
Zone
Chittagong
Rangpur
Chittagong
Khulna
Dhaka
Khulna
Rangpur
Gopalganj
Gopalganj
Barisal
Rajshahi
Gopalganj
Dhaka
Rajshahi
Rajshahi
Khulna
Chittagong
Chittagong
Rajshahi
Dhaka
Comilla
Khulna
Chittagong
Comilla
Chittagong
Khulna
Chittagong
Barisal
Dhaka
Dhaka
Chittagong
Dhaka
Chittagong
Chittagong
Gopalganj
Dhaka
Khulna
Dhaka
Chittagong
Rangpur
Rajshahi
Division
Chittagong
Joypurhat
Dohazari
Magura
Narayanganj
Khulna
Bogra
Gopalganj
Sariatpur
Pirojpur
Pabna
Madaripur
Narayanganj
Natore
Pabna
Kushtia
Rangamati
Chittagong
Pabna
Gazipur
Comilla
Khulna
Rangamati
Noakhali
Dohazari
Magura
Dohazari
Jhalokati
Narayanganj
Gazipur
Chittagong
Narayanganj
Rangamati
Rangamati
Sariatpur
Narayanganj
Jessore
Gazipur
Chittagong
Bogra
Pabna
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R163
R545
R170
R720
R114
R760
R550
R850
R861
R870
R604
R860
R114
R548
R601
R713
N106
R160
R601
R310
R140
R760
R162
R143
R171
N702
R171
R870
R114
R313
R160
R202
R161
R162
R861
R114
N708
R302
R152
N514
R601
Road Name
Chittagong -Chandragona Road
Bogra-Joypurhat Road
Patiya-Chokoria Road
Magura-Narail Road
Nayapur-Raipura Road
Khulna-Satkhira Road
Mokamtala-Joypurhat Road
Tekerhat-Mollahhat Road
Monohar -Shariatpur Road
Barisal-Pirojpur Road
Tebunia-Hamkuria Road
Mostafapur-Chandpur Road
Nayapur-Raipura Road
Naogaon-Atrai-Natore Road
Pabna-Natakhola Ferry Ghat Road
Charikoal -Shilahdah Link Road
Chittagong-Rangamati Road
Hathazari-Khagrachhari Road
Pabna-Natakhola Ferry Ghat Road
Joydebpur-Itakhola Road
Comilla-Begumganj Road
Khulna-Satkhira Road
Rangamati -Khagrachhari Road
Maijdi-Chandraganj Road
Banshkhali -Chunti Road
Jessore -Magura Road
Banshkhali -Chunti Road
Barisal-Pirojpur Road
Nayapur-Raipura Road
Mawna-Monohardi Road
Hathazari-Khagrachhari Road
Bhulta-Rampura Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Monohar -Shariatpur Road
Nayapur-Raipura Road
Jessore Town Old Section
Kaliganj Bazr Road
Heako-Ramgarh Road
Bogra (Banani)-Matidali Road
Pabna-Natakhola Ferry Ghat Road
Chainage
Km 016.60-016.90
Km 113.77-116.79
Km 006.00-006.30
Km 012.80-013.80
Km 007.60-009.35
Km 011.50-011.90
Km 011.00-011.20
Km 019.00-019.10
Km 005.20-005.80
Km 054.67-055.07
Km 019.60-031.60
Km 003.90-004.60
Km 015.50-015.80
Km 038.99-039.29
Km 008.60-009.30
Km 004.50-004.90
Km 060.32-060.62
Km 024.10-025.10
Km 012.30-012.90
Km 004.50-005.10
Km 001.40-001.50
Km 008.80-009.00
Km 000.30-000.70
Km 000.40-001.30
Km 004.40-004.80
Km 025.79-026.19
Km 003.00-003.80
Km 042.97-043.27
Km 003.70-004.00
Km 007.07-007.27
Km 000.00-000.10
Km 000.00-000.60
Km 003.20-003.40
Km 012.50-012.90
Km 001.10-001.30
Km 016.90-018.00
Km 002.90-003.00
Km 004.70-005.00
Km 010.40-010.50
Km 007.50-007.91
Km 033.84-033.87
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30
7612 Regional Full Recon 150mm @ IRI 12
S
3.02
2947 Regional DBST 25mm @ 25% Crk
S
0.30
3516 Regional Full Recon 135mm @ IRI 12
S
1.00
1047 Regional DBST @ IRI>12
S
1.75
4082 Regional DBST @ Traff 4000-6000
S
0.40
3206 Regional Full Recon 135mm @ IRI 12
S
0.20
3234 Regional Rehab 135mm @ IRI 9-12
S
0.10
3497 Regional Full Recon 135mm @ IRI 12
S
0.60
4885 Regional Rehab 150mm @ IRI 9-12
S
0.40
3803 Regional Full Recon 135mm @ IRI 12
S
12.00
2942 Regional Overlay 50mm @ IRI 5-7
S
0.70
5672 Regional Full Recon 150mm @ IRI 12
S
0.30
1140 Regional DBST @ Traff 100-2000
S
0.30
3019 Regional Full Recon 135mm @ IRI 12
S
0.70
535 Regional Overlay 50mm @ IRI 7-9
S
0.40
1416 Regional DBST @ Traff 100-2000
S
0.30
3555 National Full Recon 135mm @ IRI 12
S
1.00
3019 Regional Full Recon 135mm @ IRI 12
S
0.60
535 Regional Overlay 50mm @ IRI 7-9
S
0.60
6578 Regional DBST 25mm @ 25% Crk
S
0.10
3942 Regional Full Recon 135mm @ IRI 12
S
0.20
3206 Regional Full Recon 135mm @ IRI 12
S
0.40
818 Regional Overlay 50mm @ IRI 5-7
S
0.90
4563 Regional Overlay 50mm @ IRI 5-7
S
0.40
1514 Regional DBST @ IRI>12
S
0.40
3649 National Full Recon 135mm @ IRI 12
S
0.80
1514 Regional DBST @ IRI>12
S
0.30
2223 Regional DBST @ Traff 2000-4000
S
0.30
4082 Regional Rehab 150mm @ IRI 9-12
S
0.20
3571 Regional Full Recon 135mm @ IRI 12
S
0.10
4887 Regional DBST 25mm @ 25% Crk
S
0.60
6255 Regional DBST @ IRI>12
S
0.20
2326 Regional Full Recon 135mm @ IRI 12
S
0.40
818 Regional Overlay 50mm @ IRI 5-7
S
0.20
4885 Regional Full Recon 150mm @ IRI 12
S
1.10
1140 Regional Overlay 50mm @ IRI 7-9
R
0.10
3249 National DBST 25mm @ 25% Crk
S
0.30
3076 Regional Full Recon 135mm @ IRI 12
S
0.10
1398 Regional Overlay 50mm @ IRI 5-7
R
0.41 10964 National Overlay 50mm @ IRI 5
S
0.03
1096 Regional DBST @ IRI>12
Appendix-A: Page:81 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.398
1.60
2.764
1.59
3.119
1.59
0.815
1.59
1.638
1.59
7.129
1.59
2.532
1.58
1.568
1.58
7.062
1.58
6.535
1.58
35.388
1.57
12.595
1.56
0.282
1.56
3.564
1.56
1.352
1.55
0.366
1.55
4.634
1.55
13.664
1.55
1.159
1.54
1.208
1.54
2.020
1.53
3.564
1.53
0.731
1.53
1.898
1.53
0.375
1.53
8.673
1.53
0.751
1.53
0.408
1.52
2.795
1.52
2.020
1.51
0.173
1.51
1.037
1.50
2.079
1.50
0.731
1.50
3.599
1.50
2.182
1.50
0.185
1.50
4.990
1.49
0.287
1.49
2.967
1.49
0.026
1.49
NPV
8.09
9.75
4.65
9.67
6.76
10.84
3.99
2.37
10.90
9.65
66.52
18.87
1.41
5.38
2.50
1.38
7.02
20.22
2.01
3.92
3.04
5.22
1.27
2.95
4.40
13.17
8.80
1.75
3.92
2.86
0.49
14.52
2.91
1.28
5.05
4.27
0.71
7.24
0.52
4.78
0.29
Appendix-A
Annual Needs Report
2012-2013
Zone
Division
Khulna
Chittagong
Dhaka
Dhaka
Khulna
Dhaka
Chittagong
Comilla
Comilla
Chittagong
Dhaka
Comilla
Chittagong
Rajshahi
Rajshahi
Comilla
Chittagong
Dhaka
Rajshahi
Chittagong
Dhaka
Rajshahi
Dhaka
Rajshahi
Comilla
Comilla
Dhaka
Dhaka
Gopalganj
Chittagong
Chittagong
Gopalganj
Dhaka
Rajshahi
Dhaka
Chittagong
Dhaka
Gopalganj
Gopalganj
Dhaka
Rajshahi
Satkhira
Chittagong
Gazipur
Gazipur
Magura
Narayanganj
Rangamati
Comilla
Brahmanbaria
Rangamati
Gazipur
Chandpur
Dohazari
Pabna
Naogaon
Brahmanbaria
Chittagong
Gazipur
Pabna
Dohazari
Narayanganj
Pabna
Mymensingh
Pabna
Brahmanbaria
Brahmanbaria
Gazipur
Gazipur
Gopalganj
Chittagong
Chittagong
Gopalganj
Gazipur
Naogaon
Munshiganj
Rangamati
Gazipur
Gopalganj
Gopalganj
Gazipur
Naogaon
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R760
R164
N3
N3
R720
R114
R162
R140
R220
R162
R302
R860
R170
R601
R549
R220
R152
R311
R601
R170
R114
R603
R314
R601
R220
R220
R310
R310
R850
R152
R164
R850
R311
R547
R820
R162
R302
R850
R850
R311
R549
Road Name
Khulna-Satkhira Road
Baraichhari-Kaptai Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Magura-Narail Road
Nayapur-Raipura Road
Rangamati -Khagrachhari Road
Comilla-Begumganj Road
Sarail-Habiganj Road
Rangamati -Khagrachhari Road
Kaliganj Bazr Road
Mostafapur-Chandpur Road
Patiya-Chokoria Road
Pabna-Natakhola Ferry Ghat Road
Badalgachhi-Joypurhat Road
Sarail-Habiganj Road
Heako-Ramgarh Road
Joydebpur -Ordinance Factory
Pabna-Natakhola Ferry Ghat Road
Patiya-Chokoria Road
Nayapur-Raipura Road
Pabna-Paksey (EPZ) Road
Gafargaon-Mawna Road
Pabna-Natakhola Ferry Ghat Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Tekerhat-Mollahhat Road
Heako-Ramgarh Road
Baraichhari-Kaptai Road
Tekerhat-Mollahhat Road
Joydebpur -Ordinance Factory
Naogaon-Badalgachhi-Rohonpur
Zinzira-Srinagar Road
Rangamati -Khagrachhari Road
Kaliganj Bazr Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Joydebpur -Ordinance Factory
Badalgachhi-Joypurhat Road
Chainage
Km 037.30-037.36
Km 006.40-006.50
Km 012.70-012.80
Km 012.70-012.80
Km 025.50-025.90
Km 022.50-022.65
Km 003.70-005.50
Km 002.90-003.40
Km 005.00-006.00
Km 003.30-003.50
Km 003.00-003.80
Km 063.51-064.16
Km 000.10-000.30
Km 010.70-011.10
Km 007.80-010.30
Km 006.30-007.35
Km 012.60-012.80
Km 003.60-003.90
Km 006.70-008.00
Km 002.40-002.60
Km 019.40-019.70
Km 000.00-001.90
Km 013.60-013.70
Km 026.54-027.24
Km 015.88-015.98
Km 012.30-012.40
Km 003.40-003.80
Km 002.20-002.60
Km 019.10-021.30
Km 003.80-004.20
Km 007.60-007.90
Km 009.80-009.90
Km 001.30-001.40
Km 038.69-038.99
Km 022.91-026.11
Km 008.80-008.90
Km 000.10-000.30
Km 018.70-018.80
Km 003.40-003.50
Km 000.20-000.30
Km 012.35-015.05
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.05
4116 Regional DBST 25mm @ 25% Crk
S
0.10
1582 Regional DBST @ Traff 100-2000
L
0.10
8665 National Rehab 180mm @ IRI 9-12
R
0.10
8665 National Rehab 180mm @ IRI 9-12
S
0.40
1047 Regional Rehab 110mm @ IRI 9-12
S
0.15
1140 Regional DBST @ Traff 100-2000
S
1.80
818 Regional Overlay 50mm @ IRI 7-9
S
0.50
3942 Regional Rehab 135mm @ IRI 9-12
S
1.00
4488 Regional Overlay 50mm @ IRI 5-7
S
0.20
818 Regional Overlay 50mm @ IRI 5-7
S
0.80
3076 Regional Rehab 135mm @ IRI 9-12
S
0.65
1239 Regional DBST @ Traff 100-2000
S
0.20
3516 Regional Full Recon 135mm @ IRI 12
S
0.40
535 Regional Overlay 50mm @ IRI 7-9
S
2.50
1779 Regional Full Recon 110mm @ IRI 12
S
1.05
4488 Regional Overlay 50mm @ IRI 5-7
S
0.20
1398 Regional DBST @ IRI>12
S
0.30
2929 Regional Full Recon 135mm @ IRI 12
S
1.30
535 Regional Overlay 50mm @ IRI 7-9
S
0.20
3516 Regional Full Recon 135mm @ IRI 12
S
0.30
1140 Regional DBST @ Traff 100-2000
S
1.90
3297 Regional DBST 25mm @ 25% Crk
S
0.10
1346 Regional Full Recon 110mm @ IRI 12
S
0.70
1096 Regional Rehab 110mm @ IRI 9-12
S
0.10
6240 Regional Full Recon 150mm @ IRI 12
S
0.10
6240 Regional Full Recon 150mm @ IRI 12
S
0.40
5766 Regional Full Recon 150mm @ IRI 12
S
0.40
8616 Regional Full Recon 150mm @ IRI 12
S
2.20
3497 Regional DBST @ Traff 2000-4000
S
0.40
1398 Regional DBST @ Traff 100-2000
S
0.30
1582 Regional DBST @ Traff 100-2000
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.10
2929 Regional Full Recon 135mm @ IRI 12
S
0.30
1661 Regional Full Recon 110mm @ IRI 12
S
3.20
3019 Regional Rehab 135mm @ IRI 9-12
S
0.10
818 Regional DBST 25mm @ 25% Crk
S
0.20
3076 Regional Full Recon 135mm @ IRI 12
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.10
2929 Regional Full Recon 135mm @ IRI 12
S
2.70
1779 Regional Full Recon 110mm @ IRI 12
Appendix-A: Page:82 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.082
1.48
0.161
1.48
4.969
1.48
4.969
1.48
2.784
1.48
0.141
1.47
3.288
1.47
7.825
1.47
1.983
1.46
0.365
1.46
10.311
1.46
0.879
1.46
2.257
1.45
0.772
1.45
24.709
1.45
2.083
1.44
0.198
1.44
3.386
1.44
2.511
1.44
2.198
1.43
0.282
1.43
2.816
1.42
0.810
1.42
4.872
1.42
1.799
1.42
1.799
1.42
10.600
1.42
14.918
1.41
2.989
1.41
0.543
1.41
0.482
1.41
1.634
1.40
1.129
1.40
2.917
1.40
35.130
1.40
0.086
1.39
3.327
1.39
1.634
1.39
1.634
1.38
1.129
1.38
26.686
1.38
NPV
0.26
0.81
7.27
7.26
3.96
0.66
5.93
11.62
3.15
0.59
15.07
3.65
3.07
1.27
34.33
3.26
2.21
4.54
5.34
2.95
1.25
10.92
1.12
6.92
2.33
2.32
14.29
20.55
12.30
2.58
2.30
2.20
1.48
3.86
47.90
0.29
4.50
2.17
2.16
1.45
35.24
Appendix-A
Annual Needs Report
2012-2013
Zone
Dhaka
Khulna
Gopalganj
Chittagong
Khulna
Rajshahi
Dhaka
Gopalganj
Khulna
Khulna
Gopalganj
Chittagong
Rajshahi
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Rajshahi
Dhaka
Chittagong
Dhaka
Chittagong
Chittagong
Chittagong
Khulna
Rajshahi
Chittagong
Gopalganj
Chittagong
Chittagong
Gopalganj
Rajshahi
Chittagong
Chittagong
Dhaka
Chittagong
Rangpur
Chittagong
Dhaka
Rajshahi
Division
Gazipur
Magura
Gopalganj
Rangamati
Magura
Naogaon
Narayanganj
Gopalganj
Khulna
Magura
Gopalganj
Rangamati
Pabna
Rangamati
Rangamati
Rangamati
Chittagong
Dohazari
Pabna
Narayanganj
Rangamati
Kishoreganj
Bandarban
Chittagong
Cox's Bazar
Magura
Nawabganj
Rangamati
Gopalganj
Bandarban
Rangamati
Gopalganj
Pabna
Chittagong
Bandarban
Mymensingh
Rangamati
Dinajpur
Rangamati
Narsingdi
Naogaon
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R313
R720
R850
R162
R720
R547
R114
R850
R760
R720
R850
R161
R601
N106
R162
R162
R152
R170
R601
R114
R162
R211
N108
R152
R180
R720
R547
R162
R850
N108
R162
N805
R601
R152
N108
R314
R162
R585
R162
R114
R547
Road Name
Mawna-Monohardi Road
Magura-Narail Road
Tekerhat-Mollahhat Road
Rangamati -Khagrachhari Road
Magura-Narail Road
Naogaon-Badalgachhi-Rohonpur
Nayapur-Raipura Road
Tekerhat-Mollahhat Road
Khulna-Satkhira Road
Magura-Narail Road
Tekerhat-Mollahhat Road
Rangamati -Bandarban Road
Pabna-Natakhola Ferry Ghat Road
Chittagong-Rangamati Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Heako-Ramgarh Road
Patiya-Chokoria Road
Pabna-Natakhola Ferry Ghat Road
Nayapur-Raipura Road
Rangamati -Khagrachhari Road
Itakhola-Kotiadi Road
Keranirhat-Bandarban Road
Heako-Ramgarh Road
Laharpur-Laboni More Road
Magura-Narail Road
Naogaon-Badalgachhi-Rohonpur
Rangamati -Khagrachhari Road
Tekerhat-Mollahhat Road
Keranirhat-Bandarban Road
Rangamati -Khagrachhari Road
Bhanga-Mollahhat Road
Pabna-Natakhola Ferry Ghat Road
Heako-Ramgarh Road
Keranirhat-Bandarban Road
Gafargaon-Mawna Road
Rangamati -Khagrachhari Road
Gobindagnj-Fulbari-Dinajpur Road
Rangamati -Khagrachhari Road
Nayapur-Raipura Road
Naogaon-Badalgachhi-Rohonpur
Chainage
Km 017.77-018.07
Km 025.90-026.80
Km 027.70-028.10
Km 001.00-001.40
Km 027.40-027.90
Km 054.43-060.23
Km 003.20-003.70
Km 032.50-032.70
Km 010.30-010.90
Km 007.50-008.30
Km 012.30-012.40
Km 014.61-015.50
Km 036.17-037.07
Km 062.02-062.12
Km 005.90-006.00
Km 020.90-021.10
Km 011.00-011.60
Km 005.50-005.90
Km 027.44-027.74
Km 020.50-022.40
Km 007.90-008.00
Km 032.38-044.75
Km 006.30-007.30
Km 015.00-016.70
Km 000.00-000.20
Km 001.60-001.80
Km 100.07-100.66
Km 009.10-009.50
Km 002.30-002.50
Km 017.10-017.40
Km 011.20-012.00
Km 010.90-011.20
Km 023.34-026.44
Km 006.10-007.00
Km 010.30-011.50
Km 008.00-009.90
Km 007.00-007.40
Km 084.76-086.06
Km 010.20-011.10
Km 022.65-025.00
Km 045.89-049.03
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30
3571 Regional Full Recon 135mm @ IRI 12
S
0.90
1047 Regional Overlay 50mm @ IRI 5-7
S
0.40
3497 Regional Full Recon 135mm @ IRI 12
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.50
1047 Regional Overlay 50mm @ IRI 5-7
S
5.80
1661 Regional DBST @ Traff 100-2000
S
0.50
4082 Regional DBST 25mm @ 25% Crk
S
0.20
3497 Regional Full Recon 135mm @ IRI 12
S
0.60
3206 Regional Full Recon 135mm @ IRI 12
S
0.80
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
2343 Regional Full Recon 135mm @ IRI 12
S
0.89
3038 Regional Full Recon 135mm @ IRI 12
S
0.90
1096 Regional Rehab 110mm @ IRI 9-12
S
0.10
3555 National Full Recon 135mm @ IRI 12
S
0.10
818 Regional DBST 25mm @ 25% Crk
S
0.20
818 Regional DBST @ IRI>12
S
0.60
1398 Regional Rehab 110mm @ IRI 9-12
S
0.40
3516 Regional Full Recon 135mm @ IRI 12
S
0.30
1096 Regional Rehab 110mm @ IRI 9-12
S
1.90
1140 Regional Overlay 50mm @ IRI 7-9
S
0.10
818 Regional DBST @ Traff 100-2000
S
12.37
4153 Regional DBST 25mm @ 25% Crk
S
1.00
1363 National Overlay 50mm @ IRI 5-9
S
1.70
1398 Regional DBST @ Traff 100-2000
S
0.20
4993 Regional DBST 25mm @ 25% Crk
S
0.20
1047 Regional Overlay 50mm @ IRI 7-9
S
0.59
3019 Regional DBST 25mm @ 25% Crk
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.20
2343 Regional Full Recon 135mm @ IRI 12
S
0.30
1363 National Rehab 110mm @ IRI 9-12
S
0.80
818 Regional Overlay 50mm @ IRI 5-7
S
0.30
2650 National Full Recon 135mm @ IRI 12
S
3.10
1096 Regional Rehab 110mm @ IRI 9-12
S
0.90
1398 Regional Overlay 50mm @ IRI 5-7
S
1.20
1363 National Overlay 50mm @ IRI 5-9
S
1.90
1346 Regional Overlay 50mm @ IRI 5-7
S
0.40
818 Regional DBST @ IRI>12
S
1.30
2707 Regional Rehab 135mm @ IRI 9-12
S
0.90
818 Regional Overlay 50mm @ IRI 5-7
S
2.35
1140 Regional DBST @ Traff 100-2000
S
3.14
1661 Regional DBST 25mm @ 25% Crk
Appendix-A: Page:83 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.673
1.38
1.738
1.38
6.535
1.38
0.346
1.37
0.966
1.37
5.960
1.37
0.469
1.37
3.267
1.37
10.693
1.36
2.297
1.36
1.634
1.36
13.192
1.36
6.264
1.36
1.723
1.35
0.086
1.35
0.173
1.34
4.515
1.34
4.158
1.34
2.088
1.34
3.768
1.33
0.086
1.33
14.240
1.33
3.121
1.32
1.680
1.32
0.296
1.32
0.574
1.32
0.539
1.32
0.346
1.31
3.291
1.30
3.217
1.30
1.461
1.29
6.505
1.29
21.576
1.29
2.584
1.28
3.633
1.28
6.803
1.28
0.346
1.28
16.456
1.27
1.644
1.27
2.229
1.27
2.796
1.27
NPV
3.45
2.80
8.60
0.95
1.53
18.55
1.36
4.27
13.96
3.84
2.13
17.66
8.50
2.28
0.20
1.73
6.09
5.20
2.79
5.96
0.32
50.29
5.20
5.42
0.67
1.00
1.37
0.90
4.10
4.17
2.21
8.35
27.85
3.94
5.75
11.33
3.29
20.89
2.44
9.07
11.00
Appendix-A
Annual Needs Report
2012-2013
Road
No
Sylhet
Habiganj
N204
Comilla
Noakhali
R143
Chittagong Rangamati
R162
Chittagong Chittagong
R164
Gopalganj Gopalganj
R850
Khulna
Magura
R720
Chittagong Dohazari
R171
Rajshahi
Pabna
R601
Chittagong Bandarban
N108
Rajshahi
Pabna
R601
Dhaka
Mymensingh R314
Chittagong Chittagong
R152
Gopalganj Gopalganj
R850
Chittagong Rangamati
R162
Barisal
Bhola
R890
Sylhet
Habiganj
R220
Chittagong Chittagong
R152
Chittagong Chittagong
R152
Chittagong Bandarban
N108
Comilla
Laxmipur
R143
Dhaka
Gazipur
R313
Comilla
Brahmanbaria R220
Chittagong Rangamati
R162
Chittagong Rangamati
R162
Gopalganj Gopalganj
N805
Chittagong Rangamati
R162
Dhaka
Gazipur
R302
Khulna
Jhenaidah
N703
Khulna
Magura
R720
Comilla
Brahmanbaria R220
Khulna
Magura
R720
Dhaka
Gazipur
R302
Dhaka
Gazipur
R311
Khulna
Jessore
N708
Dhaka
Gazipur
R313
Dhaka
Mymensingh R314
Barisal
Bhola
R890
Chittagong Bandarban
N108
Chittagong Chittagong
R152
Chittagong Dohazari
R171
Barisal
Jhalokati
R870
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Jagadishpur-Shaistaganj
Maijdi-Chandraganj Road
Rangamati -Khagrachhari Road
Baraichhari-Kaptai Road
Tekerhat-Mollahhat Road
Magura-Narail Road
Banshkhali -Chunti Road
Pabna-Natakhola Ferry Ghat Road
Keranirhat-Bandarban Road
Pabna-Natakhola Ferry Ghat Road
Gafargaon-Mawna Road
Heako-Ramgarh Road
Tekerhat-Mollahhat Road
Rangamati -Khagrachhari Road
Bhola -Char Manika Road
Sarail-Habiganj Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Keranirhat-Bandarban Road
Maijdi-Chandraganj Road
Mawna-Monohardi Road
Sarail-Habiganj Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Bhanga-Mollahhat Road
Rangamati -Khagrachhari Road
Kaliganj Bazr Road
Jhenaidah Town Old Section
Magura-Narail Road
Sarail-Habiganj Road
Magura-Narail Road
Kaliganj Bazr Road
Joydebpur -Ordinance Factory
Jessore Town Old Section
Mawna-Monohardi Road
Gafargaon-Mawna Road
Bhola -Char Manika Road
Keranirhat-Bandarban Road
Heako-Ramgarh Road
Banshkhali -Chunti Road
Barisal-Pirojpur Road
Chainage
Km 008.70-009.30
Km 001.30-001.40
Km 018.60-019.70
Km 008.90-008.92
Km 025.70-025.90
Km 024.30-024.80
Km 005.20-005.70
Km 002.30-002.70
Km 015.00-015.70
Km 034.87-035.97
Km 000.00-000.80
Km 017.00-017.66
Km 006.20-006.60
Km 020.20-020.70
Km 072.80-073.99
Km 023.48-023.78
Km 004.20-006.00
Km 003.30-003.80
Km 000.30-000.60
Km 018.80-019.00
Km 007.47-008.57
Km 002.20-002.30
Km 001.40-002.40
Km 019.70-020.20
Km 006.60-007.00
Km 016.40-017.70
Km 005.20-005.60
Km 000.00-000.10
Km 022.00-023.40
Km 004.90-005.00
Km 023.40-023.60
Km 004.20-004.60
Km 000.90-001.10
Km 003.00-003.29
Km 008.87-017.47
Km 012.70-013.10
Km 027.37-035.77
Km 005.90-006.10
Km 001.10-001.20
Km 002.40-002.90
Km 035.37-035.47
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.60
1956 National Overlay 50mm @ IRI 5-9
S
0.10
4563 Regional Full Recon 150mm @ IRI 12
S
1.10
818 Regional DBST @ IRI>12
S
0.02
1582 Regional Overlay 50mm @ IRI 5-7
S
0.20
3497 Regional Full Recon 135mm @ IRI 12
S
0.50
1047 Regional Overlay 50mm @ IRI 5-7
S
0.50
1514 Regional Rehab 110mm @ IRI 9-12
S
0.40
535 Regional Overlay 50mm @ IRI 7-9
S
0.70
1363 National Overlay 50mm @ IRI 5-9
S
1.10
1096 Regional Rehab 110mm @ IRI 9-12
S
0.80
1346 Regional DBST 25mm @ 25% Crk
S
0.66
1398 Regional DBST 25mm @ 25% Crk
S
0.40
2343 Regional Full Recon 135mm @ IRI 12
S
0.50
818 Regional Rehab 110mm @ IRI 9-12
S
1.20
1779 Regional DBST 25mm @ 25% Crk
S
0.30
6240 Regional Rehab 150mm @ IRI 9-12
S
1.80
1398 Regional Overlay 50mm @ IRI 7-9
S
0.50
1398 Regional Overlay 50mm @ IRI 7-9
S
0.30
1363 National Overlay 50mm @ IRI 5-9
S
0.20
5722 Regional Full Recon 150mm @ IRI 12
S
1.10
3571 Regional Full Recon 135mm @ IRI 12
S
0.10
4488 Regional Full Recon 150mm @ IRI 12
S
1.00
818 Regional Rehab 110mm @ IRI 9-12
S
0.50
818 Regional DBST 25mm @ 25% Crk
S
0.40
2650 National Rehab 135mm @ IRI 9-12
S
1.30
818 Regional Rehab 110mm @ IRI 9-12
S
0.40
3076 Regional Full Recon 135mm @ IRI 12
S
0.10
4905 National DBST 25mm @ 25% Crk
S
1.40
1047 Regional DBST @ IRI>12
S
0.10
4488 Regional Full Recon 150mm @ IRI 12
S
0.20
1047 Regional Overlay 50mm @ IRI 5-7
S
0.40
3076 Regional Full Recon 135mm @ IRI 12
S
0.20
2929 Regional Full Recon 135mm @ IRI 12
L
0.29
3249 National Rehab 135mm @ IRI 9-12
S
8.60
3571 Regional Full Recon 135mm @ IRI 12
S
0.40
1346 Regional Full Recon 110mm @ IRI 12
S
8.40
1785 Regional DBST 25mm @ 25% Crk
S
0.20
1363 National DBST @ IRI>12
S
0.10
1398 Regional Full Recon 110mm @ IRI 12
S
0.50
1514 Regional DBST @ IRI>12
S
0.10
2223 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:84 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.816
1.26
1.243
1.26
0.951
1.26
0.054
1.26
3.267
1.25
1.368
1.25
3.574
1.25
0.772
1.24
2.083
1.24
7.656
1.23
0.771
1.23
0.654
1.23
6.535
1.23
3.292
1.22
1.623
1.21
4.046
1.21
5.167
1.21
1.435
1.20
0.971
1.20
2.944
1.19
10.554
1.19
1.309
1.19
6.584
1.19
0.432
1.19
6.720
1.19
8.559
1.18
6.654
1.18
0.186
1.18
1.328
1.18
1.243
1.18
0.574
1.17
6.654
1.16
2.257
1.16
5.006
1.14
76.635
1.14
3.241
1.14
11.411
1.14
0.298
1.14
0.945
1.14
0.469
1.12
1.634
1.12
NPV
2.58
1.45
8.93
0.08
3.92
2.06
4.44
1.06
3.16
9.46
2.04
1.68
7.66
3.88
4.19
4.49
8.09
2.19
1.47
3.21
11.80
1.43
7.55
0.95
8.07
9.74
7.62
0.45
11.65
1.34
0.78
7.47
2.43
5.71
82.17
3.61
26.32
2.61
1.02
4.05
1.73
Appendix-A
Annual Needs Report
2012-2013
Road
No
Comilla
Brahmanbaria R220
Chittagong Chittagong
R164
Dhaka
Mymensingh R314
Dhaka
Gazipur
R302
Chittagong Rangamati
R161
Khulna
Narail
R720
Rajshahi
Naogaon
R547
Sylhet
Habiganj
R220
Chittagong Chittagong
R151
Khulna
Meherpur
R746
Khulna
Magura
R720
Chittagong Dohazari
R171
Chittagong Bandarban
N108
Dhaka
Tangail
N401
Dhaka
Narsingdi
R212
Khulna
Bagerhat
R772
Sylhet
Habiganj
R220
Khulna
Bagerhat
R772
Dhaka
Narsingdi
R114
Chittagong Chittagong
R151
Chittagong Dohazari
R171
Dhaka
Narsingdi
R212
Chittagong Chittagong
R151
Dhaka
Manikganj
N503
Dhaka
Manikganj
N503
Dhaka
Narayanganj R114
Chittagong Chittagong
R152
Khulna
Meherpur
R746
Dhaka
Gazipur
R302
Chittagong Rangamati
R162
Comilla
Laxmipur
R143
Sylhet
Habiganj
R220
Dhaka
Narayanganj R114
Barisal
Bhola
R890
Chittagong Rangamati
R161
Chittagong Rangamati
R162
Dhaka
Gazipur
R302
Chittagong Chittagong
R151
Chittagong Chittagong
R152
Chittagong Rangamati
R162
Barisal
Jhalokati
R870
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Sarail-Habiganj Road
Baraichhari-Kaptai Road
Gafargaon-Mawna Road
Kaliganj Bazr Road
Rangamati -Bandarban Road
Magura-Narail Road
Naogaon-Badalgachhi-Rohonpur
Sarail-Habiganj Road
Baraiyerhat-Fatikchhari Road
Meherpur-Mujibnagar Road
Magura-Narail Road
Banshkhali -Chunti Road
Keranirhat-Bandarban Road
Madhupur-Mymensingh Road
Akdaria -Agarpur Road
Bagerhat Town Section
Sarail-Habiganj Road
Bagerhat Town Section
Nayapur-Raipura Road
Baraiyerhat-Fatikchhari Road
Banshkhali -Chunti Road
Akdaria -Agarpur Road
Baraiyerhat-Fatikchhari Road
Utholi-Aricha Road
Utholi-Aricha Road
Nayapur-Raipura Road
Heako-Ramgarh Road
Meherpur-Mujibnagar Road
Kaliganj Bazr Road
Rangamati -Khagrachhari Road
Maijdi-Chandraganj Road
Sarail-Habiganj Road
Nayapur-Raipura Road
Bhola -Char Manika Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Kaliganj Bazr Road
Baraiyerhat-Fatikchhari Road
Heako-Ramgarh Road
Rangamati -Khagrachhari Road
Barisal-Pirojpur Road
Chainage
Km 015.18-015.78
Km 008.60-008.80
Km 012.30-012.70
Km 005.70-005.90
Km 001.20-002.80
Km 040.60-040.90
Km 064.83-065.33
Km 019.68-019.98
Km 021.80-022.50
Km 000.00-000.10
Km 012.20-012.40
Km 009.30-010.00
Km 007.50-009.50
Km 000.00-000.60
Km 014.82-015.61
Km 000.60-000.63
Km 021.18-022.18
Km 000.00-000.20
Km 025.00-025.75
Km 013.80-014.00
Km 007.40-007.50
Km 012.12-013.02
Km 012.30-012.40
Km 001.58-003.25
Km 001.58-003.25
Km 019.70-020.50
Km 002.20-002.70
Km 009.10-011.80
Km 006.20-006.40
Km 017.70-017.90
Km 013.80-014.00
Km 022.98-023.18
Km 015.80-016.90
Km 052.07-072.66
Km 000.30-000.90
Km 009.70-010.10
Km 000.30-001.40
Km 017.50-017.60
Km 002.70-002.80
Km 008.20-008.70
Km 037.37-038.07
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.60
6240 Regional DBST @ IRI>12
S
0.20
1582 Regional Overlay 50mm @ IRI 5-7
S
0.40
1346 Regional DBST 25mm @ 25% Crk
S
0.20
3076 Regional Full Recon 135mm @ IRI 12
S
1.60
2326 Regional DBST @ IRI>12
S
0.30
1047 Regional Overlay 50mm @ IRI 5-7
S
0.50
1661 Regional DBST 25mm @ 25% Crk
S
0.30
6240 Regional DBST @ IRI>12
S
0.70
1301 Regional Rehab 110mm @ IRI 9-12
S
0.10
2154 Regional DBST 25mm @ 25% Crk
S
0.20
1047 Regional DBST @ IRI>12
S
0.70
1514 Regional DBST @ IRI>12
S
2.00
1363 National DBST @ Traff 100-2000
S
0.60
3417 National DBST 25mm @ 25% Crk
S
0.79
1469 Regional Overlay 50mm @ IRI 7-9
S
0.03
5300 Regional Full Recon 150mm @ IRI 12
S
1.00
6240 Regional DBST @ IRI>12
S
0.20
5300 Regional Full Recon 150mm @ IRI 12
S
0.75
1140 Regional DBST 25mm @ 25% Crk
S
0.20
1484 Regional DBST @ IRI>12
S
0.10
1514 Regional Full Recon 110mm @ IRI 12
S
0.90
1469 Regional Overlay 50mm @ IRI 7-9
S
0.10
1484 Regional Full Recon 110mm @ IRI 12
L
1.67
2015 National DBST 25mm @ 25% Crk
R
1.67
2015 National DBST 25mm @ 25% Crk
S
0.80
1140 Regional Overlay 50mm @ IRI 7-9
S
0.50
1398 Regional Rehab 110mm @ IRI 9-12
S
2.70
2154 Regional Overlay 50mm @ IRI 5-7
S
0.20
3076 Regional Full Recon 135mm @ IRI 12
S
0.20
818 Regional DBST 25mm @ 25% Crk
S
0.20
4563 Regional Full Recon 150mm @ IRI 12
S
0.20
6240 Regional Full Recon 150mm @ IRI 12
S
1.10
1140 Regional Overlay 50mm @ IRI 7-9
S
20.59
1779 Regional DBST 25mm @ 25% Crk
S
0.60
2326 Regional Rehab 135mm @ IRI 9-12
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
1.10
3076 Regional DBST 25mm @ 25% Crk
S
0.10
1484 Regional Full Recon 110mm @ IRI 12
S
0.10
1398 Regional DBST 25mm @ 25% Crk
S
0.50
818 Regional DBST 25mm @ 25% Crk
S
0.70
2223 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:85 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.815
1.12
0.679
1.12
0.296
1.12
3.327
1.11
1.383
1.11
0.861
1.11
0.457
1.11
0.408
1.10
5.004
1.10
0.141
1.08
0.163
1.08
0.657
1.08
2.796
1.07
1.037
1.07
2.268
1.07
0.716
1.06
1.359
1.06
4.776
1.06
0.721
1.06
0.188
1.05
1.026
1.05
2.584
1.05
1.026
1.05
2.366
1.04
2.366
1.04
1.587
1.03
5.173
1.03
7.751
1.03
3.327
1.03
0.173
1.02
2.421
1.00
3.599
1.00
2.182
1.00
27.977
1.00
4.944
1.00
0.346
0.99
1.560
0.99
1.026
0.99
0.136
0.99
0.432
0.98
9.377
0.97
NPV
8.28
0.90
0.62
3.60
13.40
1.10
0.86
4.07
5.54
0.27
1.31
5.44
8.84
1.95
2.88
0.71
13.08
4.75
1.29
1.54
1.02
3.15
1.04
7.70
7.70
1.98
5.31
9.68
3.33
0.35
2.23
3.29
2.64
57.17
4.63
0.80
2.88
0.98
0.24
1.09
8.52
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Khagrachari
R162
Chittagong Bandarban
N108
Khulna
Magura
R720
Khulna
Magura
R720
Rajshahi
Pabna
N5
Chittagong Chittagong
R151
Chittagong Khagrachari
R162
Chittagong Rangamati
R162
Gopalganj Gopalganj
R850
Dhaka
Narayanganj R114
Barisal
Bhola
R890
Dhaka
Narsingdi
R212
Rajshahi
Pabna
N504
Chittagong Bandarban
N108
Chittagong Chittagong
R151
Barisal
Jhalokati
R870
Khulna
Narail
R720
Comilla
Comilla
R140
Chittagong Rangamati
R162
Rajshahi
Pabna
R601
Rajshahi
Pabna
N505
Rajshahi
Pabna
R602
Chittagong Rangamati
R162
Chittagong Rangamati
R162
Chittagong Chittagong
R152
Chittagong Chittagong
R152
Comilla
Noakhali
R143
Rajshahi
Pabna
R601
Rajshahi
Pabna
N504
Dhaka
Gazipur
R310
Gopalganj Gopalganj
R850
Comilla
Laxmipur
R143
Rajshahi
Naogaon
R547
Rajshahi
Pabna
R601
Gopalganj Rajbari
R712
Comilla
Brahmanbaria R220
Comilla
Noakhali
R143
Dhaka
Mymensingh R314
Khulna
Narail
R720
Chittagong Khagrachari
R162
Comilla
Comilla
R140
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Rangamati -Khagrachhari Road
Keranirhat-Bandarban Road
Magura-Narail Road
Magura-Narail Road
Dhaka -Utholi-Banglabandh Road
Baraiyerhat-Fatikchhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Tekerhat-Mollahhat Road
Nayapur-Raipura Road
Bhola -Char Manika Road
Akdaria -Agarpur Road
Nagarbari -Kashinathpur Road
Keranirhat-Bandarban Road
Baraiyerhat-Fatikchhari Road
Barisal-Pirojpur Road
Magura-Narail Road
Comilla-Begumganj Road
Rangamati -Khagrachhari Road
Pabna-Natakhola Ferry Ghat Road
Baderhat-Kazirhat Road
Nazirganj -Ferry Ghat Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Maijdi-Chandraganj Road
Pabna-Natakhola Ferry Ghat Road
Nagarbari -Kashinathpur Road
Joydebpur-Itakhola Road
Tekerhat-Mollahhat Road
Maijdi-Chandraganj Road
Naogaon-Badalgachhi-Rohonpur
Pabna-Natakhola Ferry Ghat Road
Tottipur -Machpara Link Road
Sarail-Habiganj Road
Maijdi-Chandraganj Road
Gafargaon-Mawna Road
Magura-Narail Road
Rangamati -Khagrachhari Road
Comilla-Begumganj Road
Chainage
Km 060.26-060.66
Km 000.60-000.90
Km 001.80-002.40
Km 025.30-025.40
Km 101.80-102.00
Km 011.00-011.10
Km 060.66-062.66
Km 006.40-006.50
Km 000.00-000.50
Km 018.00-019.40
Km 072.66-072.80
Km 009.00-009.42
Km 000.40-000.50
Km 014.30-015.00
Km 019.20-021.70
Km 033.37-033.47
Km 038.50-038.70
Km 000.30-000.40
Km 018.00-018.60
Km 000.40-000.60
Km 000.00-002.63
Km 000.60-000.80
Km 022.00-022.40
Km 016.10-016.40
Km 011.80-011.90
Km 010.50-010.80
Km 004.30-004.50
Km 008.00-008.60
Km 004.60-004.70
Km 007.40-010.29
Km 013.00-013.40
Km 017.80-018.00
Km 052.83-053.13
Km 017.24-020.24
Km 000.00-002.22
Km 013.78-014.08
Km 001.40-004.30
Km 013.70-015.10
Km 039.30-039.40
Km 056.66-059.76
Km 000.40-001.23
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.40
237 Regional Overlay 50mm @ IRI 7-9
S
0.30
1363 National Rehab 110mm @ IRI 9-12
S
0.60
1047 Regional Overlay 50mm @ IRI 5-7
S
0.10
1047 Regional DBST @ IRI>12
S
0.20
1550 National Rehab 120mm @ IRI 9-12
S
0.10
1484 Regional Full Recon 110mm @ IRI 12
S
2.01
237 Regional DBST @ Traff 100-2000
S
0.10
818 Regional DBST @ IRI>12
S
0.50
2343 Regional Full Recon 135mm @ IRI 12
S
1.40
1140 Regional Overlay 50mm @ IRI 5-7
R
0.14
1779 Regional DBST 25mm @ 25% Crk
S
0.42
1469 Regional DBST @ Traff 100-2000
S
0.10
2162 National Rehab 135mm @ IRI 9-12
S
0.70
1363 National Rehab 110mm @ IRI 9-12
S
2.50
1378 Regional DBST @ IRI>12
S
0.10
2223 Regional Full Recon 135mm @ IRI 12
S
0.20
1047 Regional DBST 25mm @ 25% Crk
S
0.10
2080 Regional DBST @ IRI>12
S
0.60
818 Regional DBST 25mm @ 25% Crk
S
0.20
535 Regional Overlay 50mm @ IRI 7-9
S
2.63
1472 National Overlay 50mm @ IRI 5-9
S
0.20
1178 Regional Full Recon 110mm @ IRI 12
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.30
818 Regional DBST 25mm @ 25% Crk
S
0.10
1398 Regional Full Recon 110mm @ IRI 12
S
0.30
1398 Regional DBST @ IRI>12
S
0.20
4563 Regional Full Recon 150mm @ IRI 12
S
0.60
535 Regional Overlay 50mm @ IRI 5-7
S
0.10
2162 National Rehab 135mm @ IRI 9-12
S
2.89
6578 Regional DBST 25mm @ 25% Crk
S
0.40
2343 Regional Full Recon 135mm @ IRI 12
S
0.20
4563 Regional Full Recon 150mm @ IRI 12
S
0.30
1661 Regional Rehab 110mm @ IRI 9-12
S
3.00
882 Regional Overlay 50mm @ IRI 5-7
S
2.22
1160 Regional Full Recon 110mm @ IRI 12
S
0.30
6240 Regional Full Recon 150mm @ IRI 12
S
2.90
4563 Regional DBST 25mm @ 25% Crk
S
1.40
1346 Regional DBST 25mm @ 25% Crk
S
0.10
1047 Regional DBST 25mm @ 25% Crk
S
3.10
237 Regional DBST @ Traff 100-2000
S
0.83
2080 Regional DBST @ Traff 2000-4000
Appendix-A: Page:86 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.772
0.97
3.471
0.97
1.722
0.96
0.091
0.96
2.893
0.96
1.026
0.96
1.833
0.96
0.086
0.95
10.693
0.95
2.777
0.95
0.183
0.94
0.568
0.94
1.680
0.94
7.492
0.92
2.347
0.92
1.634
0.92
0.272
0.92
0.168
0.92
0.519
0.92
0.595
0.92
10.378
0.91
1.944
0.91
0.346
0.91
0.259
0.90
1.080
0.90
0.346
0.90
2.486
0.90
1.159
0.90
1.765
0.88
3.828
0.88
6.535
0.88
2.670
0.87
3.104
0.87
6.483
0.87
22.002
0.87
5.398
0.87
2.758
0.86
1.037
0.86
0.136
0.85
2.871
0.84
1.404
0.83
NPV
0.98
3.36
1.96
0.66
2.82
0.95
6.09
0.61
9.65
3.12
0.33
1.64
1.55
6.92
16.83
1.42
0.50
1.41
0.81
0.65
10.92
1.68
0.66
0.44
0.94
2.33
2.07
1.26
1.52
5.47
5.52
2.13
2.72
6.79
18.10
4.27
4.71
1.69
0.26
8.06
3.40
Appendix-A
Annual Needs Report
2012-2013
Zone
Division
Khulna
Comilla
Dhaka
Dhaka
Dhaka
Khulna
Chittagong
Chittagong
Chittagong
Khulna
Chittagong
Chittagong
Dhaka
Chittagong
Chittagong
Rajshahi
Chittagong
Rajshahi
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Comilla
Khulna
Chittagong
Chittagong
Chittagong
Chittagong
Chittagong
Comilla
Dhaka
Chittagong
Chittagong
Rajshahi
Comilla
Chittagong
Chittagong
Chittagong
Chittagong
Narail
Brahmanbaria
Narsingdi
Mymensingh
Narayanganj
Kushtia
Chittagong
Rangamati
Rangamati
Kushtia
Chittagong
Dohazari
Narsingdi
Rangamati
Chittagong
Pabna
Chittagong
Pabna
Rangamati
Rangamati
Bandarban
Rangamati
Rangamati
Chittagong
Brahmanbaria
Kushtia
Rangamati
Rangamati
Rangamati
Rangamati
Chittagong
Brahmanbaria
Mymensingh
Rangamati
Rangamati
Naogaon
Brahmanbaria
Chittagong
Rangamati
Chittagong
Rangamati
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road
No
R720
R220
R212
R314
R114
R713
R151
R161
R162
R713
R164
R171
R212
R161
R164
R601
R152
R601
R162
R162
R161
R162
R162
R151
R220
R713
R161
R162
R162
R162
R164
R220
R314
R162
R162
R547
R220
R151
R162
R164
R162
Road Name
Magura-Narail Road
Sarail-Habiganj Road
Akdaria -Agarpur Road
Gafargaon-Mawna Road
Nayapur-Raipura Road
Charikoal -Shilahdah Link Road
Baraiyerhat-Fatikchhari Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Charikoal -Shilahdah Link Road
Baraichhari-Kaptai Road
Banshkhali -Chunti Road
Akdaria -Agarpur Road
Rangamati -Bandarban Road
Baraichhari-Kaptai Road
Pabna-Natakhola Ferry Ghat Road
Heako-Ramgarh Road
Pabna-Natakhola Ferry Ghat Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Baraiyerhat-Fatikchhari Road
Sarail-Habiganj Road
Charikoal -Shilahdah Link Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Baraichhari-Kaptai Road
Sarail-Habiganj Road
Gafargaon-Mawna Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Naogaon-Badalgachhi-Rohonpur
Sarail-Habiganj Road
Baraiyerhat-Fatikchhari Road
Rangamati -Khagrachhari Road
Baraichhari-Kaptai Road
Rangamati -Khagrachhari Road
Chainage
Km 041.00-041.30
Km 000.10-000.40
Km 009.42-012.12
Km 000.80-001.10
Km 009.35-015.50
Km 000.90-001.40
Km 018.20-019.10
Km 011.60-015.50
Km 008.70-008.80
Km 000.10-000.70
Km 000.00-001.10
Km 008.60-008.80
Km 013.02-014.82
Km 010.70-011.00
Km 006.10-006.40
Km 009.30-010.70
Km 002.90-003.10
Km 012.90-016.94
Km 010.10-010.20
Km 011.10-011.20
Km 033.70-035.60
Km 000.70-000.80
Km 000.90-001.00
Km 017.80-018.00
Km 014.18-014.68
Km 001.50-004.50
Km 007.70-010.70
Km 007.80-007.90
Km 013.50-013.70
Km 012.00-012.10
Km 001.30-001.70
Km 006.00-006.30
Km 019.60-030.15
Km 003.20-003.30
Km 012.90-013.00
Km 053.93-054.43
Km 017.08-017.68
Km 005.60-005.70
Km 009.50-009.70
Km 005.90-006.10
Km 003.50-003.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.30
1047 Regional Overlay 50mm @ IRI 5-7
S
0.30
6240 Regional Full Recon 150mm @ IRI 12
S
2.70
1469 Regional DBST @ Traff 100-2000
S
0.30
1346 Regional Full Recon 110mm @ IRI 12
S
6.16
1140 Regional Overlay 50mm @ IRI 5-7
S
0.50
1416 Regional Full Recon 110mm @ IRI 12
S
0.90
1484 Regional Full Recon 110mm @ IRI 12
S
3.90
2489 Regional Full Recon 135mm @ IRI 12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.60
1416 Regional Full Recon 110mm @ IRI 12
S
1.10
1582 Regional DBST 25mm @ 25% Crk
S
0.20
1514 Regional Full Recon 110mm @ IRI 12
S
1.80
1469 Regional DBST @ Traff 100-2000
S
0.30
2326 Regional Full Recon 135mm @ IRI 12
S
0.30
1582 Regional DBST 25mm @ 25% Crk
S
1.40
535 Regional Overlay 50mm @ IRI 5-7
S
0.20
1398 Regional DBST 25mm @ 25% Crk
S
4.04
535 Regional Overlay 50mm @ IRI 5-7
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
1.90
464 Regional Rehab 110mm @ IRI 9-12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.20
1484 Regional Full Recon 110mm @ IRI 12
S
0.50
6240 Regional Full Recon 150mm @ IRI 12
S
3.00
1416 Regional Full Recon 110mm @ IRI 12
S
3.00
2326 Regional DBST @ IRI>12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.20
818 Regional Full Recon 110mm @ IRI 12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.40
1582 Regional DBST @ Traff 100-2000
S
0.30
4488 Regional DBST @ IRI>12
S
10.55
1346 Regional DBST 25mm @ 25% Crk
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.10
818 Regional Full Recon 110mm @ IRI 12
S
0.50
1661 Regional Rehab 110mm @ IRI 9-12
S
0.60
6240 Regional Full Recon 150mm @ IRI 12
S
0.10
1484 Regional Full Recon 110mm @ IRI 12
S
0.20
818 Regional Full Recon 110mm @ IRI 12
S
0.20
1582 Regional DBST @ IRI>12
S
0.20
818 Regional Full Recon 110mm @ IRI 12
Appendix-A: Page:87 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.861
0.83
5.692
0.83
3.648
0.82
3.160
0.82
12.208
0.81
4.996
0.81
9.236
0.81
44.484
0.81
0.945
0.80
5.995
0.80
1.766
0.80
2.052
0.80
2.445
0.79
3.119
0.79
0.482
0.79
2.704
0.79
0.272
0.79
7.798
0.79
0.945
0.77
0.945
0.77
12.867
0.77
0.945
0.77
0.945
0.77
2.052
0.76
8.997
0.76
29.975
0.76
2.594
0.75
0.945
0.75
1.890
0.74
0.945
0.74
0.642
0.73
0.282
0.73
14.753
0.73
0.945
0.73
0.945
0.73
5.615
0.73
10.796
0.73
1.026
0.72
1.890
0.72
0.321
0.72
1.890
0.72
NPV
0.84
4.41
9.67
2.52
11.60
3.84
7.22
33.79
0.72
4.54
3.24
1.55
6.29
2.31
0.87
2.38
0.58
6.76
0.69
0.69
9.54
0.69
0.68
1.51
6.23
21.44
17.09
0.67
1.32
0.66
1.21
1.87
20.11
0.65
0.65
4.12
7.15
0.72
1.29
1.73
1.29
Appendix-A
Annual Needs Report
2012-2013
Road
No
Chittagong Rangamati
R162
Chittagong Rangamati
R162
Dhaka
Narayanganj R202
Chittagong Chittagong
R152
Dhaka
Narayanganj R202
Comilla
Brahmanbaria R220
Chittagong Chittagong
R164
Khulna
Narail
R720
Khulna
Jessore
N708
Chittagong Chittagong
R151
Rajshahi
Naogaon
R547
Dhaka
Narayanganj R202
Khulna
Narail
R720
Chittagong Rangamati
R162
Chittagong Rangamati
R162
Rajshahi
Pabna
R601
Khulna
Magura
R720
Chittagong Bandarban
R161
Chittagong Chittagong
R152
Chittagong Dohazari
R170
Khulna
Magura
R720
Sylhet
Habiganj
R220
Chittagong Chittagong
R152
Khulna
Magura
R720
Chittagong Rangamati
R162
Chittagong Chittagong
R164
Chittagong Rangamati
R161
Khulna
Jessore
N708
Khulna
Narail
R720
Chittagong Chittagong
R151
Khulna
Magura
R720
Khulna
Meherpur
R746
Khulna
Magura
R720
Comilla
Brahmanbaria R220
Khulna
Magura
R720
Comilla
Comilla
R140
Khulna
Magura
R720
Khulna
Magura
R720
Comilla
Brahmanbaria R220
Chittagong Rangamati
R162
Chittagong Rangamati
R161
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Bhulta-Rampura Road
Heako-Ramgarh Road
Bhulta-Rampura Road
Sarail-Habiganj Road
Baraichhari-Kaptai Road
Magura-Narail Road
Jessore Town Old Section
Baraiyerhat-Fatikchhari Road
Naogaon-Badalgachhi-Rohonpur
Bhulta-Rampura Road
Magura-Narail Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Pabna-Natakhola Ferry Ghat Road
Magura-Narail Road
Rangamati -Bandarban Road
Heako-Ramgarh Road
Patiya-Chokoria Road
Magura-Narail Road
Sarail-Habiganj Road
Heako-Ramgarh Road
Magura-Narail Road
Rangamati -Khagrachhari Road
Baraichhari-Kaptai Road
Rangamati -Bandarban Road
Jessore Town Old Section
Magura-Narail Road
Baraiyerhat-Fatikchhari Road
Magura-Narail Road
Meherpur-Mujibnagar Road
Magura-Narail Road
Sarail-Habiganj Road
Magura-Narail Road
Comilla-Begumganj Road
Magura-Narail Road
Magura-Narail Road
Sarail-Habiganj Road
Rangamati -Khagrachhari Road
Rangamati -Bandarban Road
Chainage
Km 002.40-002.60
Km 021.50-022.00
Km 003.80-003.90
Km 002.80-002.90
Km 001.30-001.50
Km 016.08-016.78
Km 002.90-003.20
Km 043.40-043.60
Km 002.70-002.90
Km 008.40-009.00
Km 053.13-053.93
Km 000.90-001.00
Km 036.60-037.40
Km 006.00-006.30
Km 000.10-000.30
Km 026.44-026.54
Km 002.40-002.80
Km 032.40-033.10
Km 016.70-017.00
Km 041.56-054.71
Km 018.50-018.60
Km 025.68-026.40
Km 007.00-007.70
Km 010.70-011.10
Km 005.50-005.90
Km 006.50-007.60
Km 003.50-004.10
Km 002.70-002.90
Km 037.40-037.70
Km 027.40-030.40
Km 008.50-008.80
Km 000.90-001.60
Km 009.60-010.20
Km 010.50-012.30
Km 028.10-028.30
Km 000.00-000.10
Km 032.50-033.00
Km 015.90-016.10
Km 007.40-010.50
Km 006.50-006.70
Km 004.40-007.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.20
818 Regional Full Recon 110mm @ IRI 12
S
0.50
818 Regional Full Recon 110mm @ IRI 12
S
0.10
6255 Regional Full Recon 150mm @ IRI 12
S
0.10
1398 Regional DBST @ IRI>12
S
0.20
6255 Regional Full Recon 150mm @ IRI 12
S
0.70
6240 Regional Full Recon 150mm @ IRI 12
S
0.30
1582 Regional Rehab 110mm @ IRI 9-12
S
0.20
1047 Regional DBST 25mm @ 25% Crk
L
0.20
3249 National Full Recon 135mm @ IRI 12
S
0.60
1484 Regional Full Recon 110mm @ IRI 12
S
0.80
1661 Regional DBST 25mm @ 25% Crk
S
0.10
6255 Regional Full Recon 150mm @ IRI 12
S
0.80
1047 Regional DBST @ IRI>12
S
0.30
818 Regional Full Recon 110mm @ IRI 12
S
0.20
818 Regional Full Recon 110mm @ IRI 12
S
0.10
1096 Regional DBST @ IRI>12
S
0.40
1047 Regional Rehab 110mm @ IRI 9-12
S
0.70
464 Regional DBST @ IRI>12
S
0.30
1398 Regional Full Recon 110mm @ IRI 12
S
13.15
715 Regional Overlay 50mm @ IRI 7-9
S
0.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.72
6240 Regional Rehab 150mm @ IRI 9-12
S
0.70
1398 Regional DBST @ IRI>12
S
0.40
1047 Regional Rehab 110mm @ IRI 9-12
S
0.40
818 Regional Full Recon 110mm @ IRI 12
S
1.10
1582 Regional DBST 25mm @ 25% Crk
S
0.60
2326 Regional Full Recon 135mm @ IRI 12
R
0.20
3249 National Full Recon 135mm @ IRI 12
S
0.30
1047 Regional DBST 25mm @ 25% Crk
S
3.00
1301 Regional Rehab 110mm @ IRI 9-12
S
0.30
1047 Regional Rehab 110mm @ IRI 9-12
S
0.70
2154 Regional Overlay 50mm @ IRI 5-7
S
0.60
1047 Regional Rehab 110mm @ IRI 9-12
S
1.80
6240 Regional Full Recon 150mm @ IRI 12
S
0.20
1047 Regional Full Recon 110mm @ IRI 12
S
0.10
2080 Regional DBST 25mm @ 25% Crk
S
0.50
1047 Regional Rehab 110mm @ IRI 9-12
S
0.20
1047 Regional Full Recon 110mm @ IRI 12
S
3.10
6240 Regional Rehab 150mm @ IRI 9-12
S
0.20
818 Regional DBST 25mm @ 25% Crk
S
3.30
2326 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:88 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.890
0.72
4.726
0.72
2.290
0.72
0.136
0.72
4.580
0.72
12.595
0.71
3.668
0.71
0.272
0.71
4.455
0.71
6.157
0.71
1.328
0.71
2.290
0.71
1.087
0.71
2.836
0.71
1.890
0.70
0.091
0.70
4.138
0.70
0.622
0.70
3.241
0.70
31.637
0.70
0.999
0.70
9.697
0.70
0.951
0.69
4.138
0.68
3.781
0.66
1.766
0.66
6.238
0.66
4.455
0.66
0.408
0.66
21.444
0.64
3.104
0.64
3.749
0.64
6.208
0.64
32.388
0.64
1.998
0.64
0.173
0.63
5.173
0.62
1.998
0.62
41.808
0.61
0.173
0.61
34.307
0.61
NPV
1.29
3.21
1.54
0.75
3.07
8.21
2.60
0.47
3.13
4.21
1.89
1.52
5.74
1.89
1.26
0.48
2.81
3.25
2.17
24.95
0.66
6.18
5.08
2.70
2.37
3.00
3.85
2.90
0.57
13.93
1.93
3.13
3.84
18.92
1.20
0.24
3.11
1.17
23.50
0.22
19.56
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Jessore
N711
Khulna
Magura
R720
Chittagong Cox's Bazar
R172
Khulna
Magura
R720
Khulna
Narail
R720
Barisal
Barisal
N809
Rajshahi
Pabna
N504
Khulna
Magura
R720
Comilla
Noakhali
R143
Comilla
Comilla
R140
Comilla
Comilla
R144
Comilla
Brahmanbaria R220
Chittagong Chittagong
R151
Comilla
Comilla
R140
Khulna
Magura
R720
Khulna
Magura
R720
Khulna
Narail
R720
Sylhet
Habiganj
N204
Chittagong Rangamati
R162
Rajshahi
Natore
R548
Khulna
Meherpur
R746
Chittagong Bandarban
N108
Chittagong Chittagong
R151
Chittagong Chittagong
R151
Chittagong Bandarban
N108
Rangpur
Lalmonirhat
N509
Chittagong Cox's Bazar
R170
Rajshahi
Pabna
N504
Khulna
Magura
R720
Khulna
Meherpur
R746
Comilla
Brahmanbaria R220
Chittagong Chittagong
R152
Chittagong Chittagong
R152
Rangpur
Lalmonirhat
N509
Barisal
Bhola
R890
Chittagong Chittagong
R164
Comilla
Brahmanbaria R220
Rangpur
Lalmonirhat
N509
Chittagong Chittagong
R152
Chittagong Chittagong
R164
Chittagong Chittagong
R164
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Benapole Town Old Section
Magura-Narail Road
Chokoria-Baderkhali Road
Magura-Narail Road
Magura-Narail Road
Barishal-Lakshmipur Road
Nagarbari -Kashinathpur Road
Magura-Narail Road
Maijdi-Chandraganj Road
Comilla-Begumganj Road
Laksam Old Section
Sarail-Habiganj Road
Baraiyerhat-Fatikchhari Road
Comilla-Begumganj Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Jagadishpur-Shaistaganj
Rangamati -Khagrachhari Road
Naogaon-Atrai-Natore Road
Meherpur-Mujibnagar Road
Keranirhat-Bandarban Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Keranirhat-Bandarban Road
Barabari-Burimary Road
Patiya-Chokoria Road
Nagarbari -Kashinathpur Road
Magura-Narail Road
Meherpur-Mujibnagar Road
Sarail-Habiganj Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Barabari-Burimary Road
Bhola -Char Manika Road
Baraichhari-Kaptai Road
Sarail-Habiganj Road
Barabari-Burimary Road
Heako-Ramgarh Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Chainage
Km 000.00-001.28
Km 026.80-026.90
Km 007.70-008.00
Km 024.80-025.10
Km 033.00-036.60
Km 005.25-006.25
Km 000.00-000.20
Km 027.10-027.40
Km 000.10-000.40
Km 000.20-000.30
Km 000.00-003.00
Km 001.50-002.10
Km 023.20-023.40
Km 000.10-000.20
Km 023.60-023.90
Km 005.10-005.30
Km 040.90-041.00
Km 014.40-014.50
Km 022.50-039.66
Km 040.17-055.36
Km 009.00-009.10
Km 007.30-007.50
Km 026.60-027.20
Km 025.30-025.70
Km 000.10-000.30
Km 093.37-096.57
Km 062.14-062.20
Km 000.90-001.40
Km 030.10-032.20
Km 011.80-011.90
Km 000.50-001.00
Km 006.00-006.10
Km 008.10-010.40
Km 101.57-102.47
Km 072.66-072.80
Km 010.12-010.17
Km 003.40-004.00
Km 096.57-100.97
Km 000.10-000.30
Km 008.92-009.02
Km 001.70-001.80
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.28
4485 National Full Recon 150mm @ IRI 12
S
0.10
1047 Regional DBST @ IRI>12
S
0.30
570 Regional Overlay 50mm @ IRI 7-9
S
0.30
1047 Regional Full Recon 110mm @ IRI 12
S
3.60
1047 Regional Rehab 110mm @ IRI 9-12
S
1.00
1488 National Full Recon 110mm @ IRI 12
S
0.20
2162 National Full Recon 135mm @ IRI 12
S
0.30
1047 Regional DBST @ IRI>12
S
0.30
4563 Regional Full Recon 150mm @ IRI 12
S
0.10
2080 Regional DBST 25mm @ 25% Crk
S
3.00
2057 Regional Rehab 135mm @ IRI 9-12
S
0.60
4488 Regional DBST @ IRI>12
S
0.20
1301 Regional Full Recon 110mm @ IRI 12
S
0.10
2080 Regional Full Recon 135mm @ IRI 12
S
0.30
1047 Regional DBST @ IRI>12
S
0.20
1047 Regional DBST @ IRI>12
S
0.10
1047 Regional DBST @ IRI>12
S
0.10
1956 National Full Recon 110mm @ IRI 12
S
17.16
543 Regional DBST 25mm @ 25% Crk
S
15.19
1939 Regional DBST 25mm @ 25% Crk
S
0.10
2154 Regional DBST @ IRI>12
S
0.20
1363 National Full Recon 110mm @ IRI 12
S
0.60
1301 Regional DBST @ IRI>12
S
0.40
1301 Regional Full Recon 110mm @ IRI 12
S
0.20
1363 National Full Recon 110mm @ IRI 12
S
3.20
2269 National Rehab 135mm @ IRI 9-12
S
0.06
715 Regional DBST @ Traff 100-2000
S
0.50
2162 National DBST @ IRI>12
S
2.10
1047 Regional DBST @ IRI>12
S
0.10
2154 Regional Full Recon 135mm @ IRI 12
S
0.50
4488 Regional Full Recon 150mm @ IRI 12
S
0.10
1398 Regional Full Recon 110mm @ IRI 12
S
2.30
1398 Regional Rehab 110mm @ IRI 9-12
S
0.90
2269 National Rehab 135mm @ IRI 9-12
L
0.14
1779 Regional DBST 25mm @ 25% Crk
S
0.05
1582 Regional Full Recon 110mm @ IRI 12
S
0.60
4488 Regional Full Recon 150mm @ IRI 12
S
4.40
2269 National Rehab 135mm @ IRI 9-12
S
0.20
1398 Regional Full Recon 110mm @ IRI 12
S
0.10
1582 Regional Full Recon 110mm @ IRI 12
S
0.10
1582 Regional Full Recon 110mm @ IRI 12
Appendix-A: Page:89 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
37.688
0.61
0.091
0.61
0.940
0.61
2.998
0.60
37.246
0.60
14.853
0.59
4.349
0.58
0.274
0.58
4.397
0.58
0.168
0.57
51.784
0.56
0.593
0.55
2.052
0.55
2.050
0.54
0.408
0.53
0.272
0.52
0.136
0.52
1.566
0.52
14.835
0.52
13.510
0.51
0.136
0.51
3.025
0.49
0.563
0.48
4.105
0.48
3.462
0.48
40.507
0.47
0.086
0.46
0.902
0.46
2.469
0.45
1.634
0.45
6.543
0.44
1.485
0.43
23.796
0.43
11.393
0.42
0.283
0.41
0.860
0.41
7.852
0.41
55.697
0.40
2.836
0.40
1.755
0.40
1.755
0.40
NPV
22.32
0.42
0.66
1.69
21.36
8.32
2.37
1.18
2.34
0.21
29.20
2.95
1.08
1.06
1.61
1.06
0.53
0.79
16.49
12.93
0.61
1.39
2.10
1.88
1.55
19.00
0.12
3.73
8.28
0.69
2.66
0.61
10.12
4.80
0.23
0.34
2.92
22.43
1.10
0.67
0.67
Appendix-A
Annual Needs Report
2012-2013
Road
No
Khulna
Meherpur
R746
Chittagong Chittagong
R164
Chittagong Chittagong
R164
Comilla
Comilla
R144
Khulna
Meherpur
R746
Chittagong Chittagong
R152
Chittagong Chittagong
R164
Comilla
Brahmanbaria R220
Chittagong Chittagong
R164
Khulna
Magura
R720
Chittagong Khagrachari
R162
Rajshahi
Pabna
N504
Khulna
Magura
R720
Khulna
Magura
R720
Khulna
Narail
R720
Khulna
Magura
R720
Khulna
Narail
R720
Rajshahi
Pabna
R601
Khulna
Narail
R720
Khulna
Magura
R720
Khulna
Narail
R720
Khulna
Narail
R720
Khulna
Magura
R720
Khulna
Magura
R720
Khulna
Meherpur
R746
Chittagong Khagrachari
R162
Khulna
Magura
R720
Khulna
Khulna
N710
Chittagong Dohazari
R170
Chittagong Dohazari
R170
Chittagong Cox's Bazar
R172
Chittagong Cox's Bazar
R172
Chittagong Cox's Bazar
R172
Chittagong Cox's Bazar
R172
Chittagong Cox's Bazar
R170
Chittagong Cox's Bazar
R172
Khulna
Meherpur
R746
Chittagong Rangamati
R161
Zone
Division
1st Year Capital Works of National and Regional Roads (Excluding Ongoing )
(Sorted by NPV/Cost)
Road Name
Meherpur-Mujibnagar Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Laksam Old Section
Meherpur-Mujibnagar Road
Heako-Ramgarh Road
Baraichhari-Kaptai Road
Sarail-Habiganj Road
Baraichhari-Kaptai Road
Magura-Narail Road
Rangamati -Khagrachhari Road
Nagarbari -Kashinathpur Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Pabna-Natakhola Ferry Ghat Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Meherpur-Mujibnagar Road
Rangamati -Khagrachhari Road
Magura-Narail Road
Khulna Town Old Section
Patiya-Chokoria Road
Patiya-Chokoria Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Patiya-Chokoria Road
Chokoria-Baderkhali Road
Meherpur-Mujibnagar Road
Rangamati -Bandarban Road
Chainage
Km 000.70-000.80
Km 001.10-001.30
Km 005.60-005.70
Km 003.80-003.90
Km 012.00-012.40
Km 003.10-003.30
Km 008.30-008.60
Km 002.40-003.10
Km 008.80-008.90
Km 010.40-010.50
Km 059.76-060.26
Km 002.30-002.40
Km 008.30-008.40
Km 032.30-032.40
Km 038.70-039.30
Km 000.80-001.00
Km 043.60-046.60
Km 016.94-017.24
Km 041.30-043.40
Km 011.20-011.30
Km 037.70-038.50
Km 039.40-040.60
Km 024.10-024.30
Km 007.40-007.50
Km 000.80-000.90
Km 039.66-056.66
Km 000.10-000.40
Km 000.00-000.02
Km 055.42-061.80
Km 062.00-062.14
Km 000.30-000.40
Km 000.60-000.70
Km 000.10-000.20
Km 004.00-004.30
Km 062.30-062.40
Km 006.30-006.60
Km 000.10-000.70
Km 031.90-031.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.10
2154 Regional DBST 25mm @ 25% Crk
S
0.20
1582 Regional Full Recon 110mm @ IRI 12
S
0.10
1582 Regional Full Recon 110mm @ IRI 12
S
0.10
2057 Regional Full Recon 135mm @ IRI 12
S
0.40
2154 Regional DBST @ IRI>12
S
0.20
1398 Regional Full Recon 110mm @ IRI 12
S
0.30
1582 Regional Full Recon 110mm @ IRI 12
S
0.70
4488 Regional Full Recon 150mm @ IRI 12
S
0.10
1582 Regional Full Recon 110mm @ IRI 12
S
0.10
1047 Regional DBST @ IRI>12
S
0.50
237 Regional DBST @ IRI>12
S
0.10
2162 National Full Recon 135mm @ IRI 12
S
0.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.60
1047 Regional Full Recon 110mm @ IRI 12
S
0.20
1047 Regional Full Recon 110mm @ IRI 12
S
3.00
1047 Regional Full Recon 110mm @ IRI 12
S
0.30
535 Regional DBST @ IRI>12
S
2.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.80
1047 Regional Full Recon 110mm @ IRI 12
S
1.20
1047 Regional Full Recon 110mm @ IRI 12
S
0.20
1047 Regional Full Recon 110mm @ IRI 12
S
0.10
1047 Regional Full Recon 110mm @ IRI 12
S
0.10
2154 Regional DBST @ Traff 2000-4000
S
17.00
237 Regional DBST @ IRI>12
S
0.30
1047 Regional Full Recon 110mm @ IRI 12
S
0.02 17790 National DBST @ Traff >6000
S
6.39
715 Regional DBST @ IRI>12
S
0.14
715 Regional DBST @ IRI>12
S
0.10
570 Regional DBST @ IRI>12
S
0.10
570 Regional DBST @ IRI>12
S
0.10
570 Regional DBST @ IRI>12
S
0.30
570 Regional DBST @ IRI>12
S
0.10
715 Regional DBST @ IRI>12
S
0.30
570 Regional DBST @ IRI>12
S
0.60
2154 Regional Full Recon 135mm @ IRI 12
S
0.00
3019 Regional Full Recon 135mm @ IRI 12
Appendix-A: Page:90 of 90
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
0.270
0.39
3.511
0.39
1.755
0.39
2.228
0.38
0.543
0.38
2.971
0.36
5.266
0.36
9.160
0.34
1.755
0.33
0.136
0.32
0.457
0.30
3.208
0.29
1.485
0.29
1.485
0.28
8.912
0.27
2.971
0.27
44.558
0.27
0.274
0.27
31.191
0.27
1.485
0.26
11.882
0.25
17.823
0.25
2.971
0.24
1.485
0.24
0.346
0.23
15.281
0.22
4.456
0.22
0.104
0.20
9.131
0.20
0.200
0.20
0.148
0.20
0.148
0.20
0.148
0.17
0.445
0.12
0.143
0.07
0.445
0.07
18.178
0.03
0.000
0.00
NPV
0.23
1.31
0.65
0.82
1.80
1.04
1.83
2.88
0.56
0.32
0.92
0.86
0.40
0.40
2.28
0.76
11.31
0.55
7.86
0.36
2.85
4.15
0.68
0.34
0.00
20.81
0.92
0.04
11.50
0.25
0.18
0.18
0.00
0.34
0.06
0.19
0.59
0.56
Appendix-B
1st Year Unconstrained Periodic Works for National
and Regional Roads. (Excluding ongoing projects)
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Cway Length
AADT
Side
(km)
Road
Class
Work Name
Year
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
Barisal Zone
Barisal Division
N8
N8
N8
N8
N8
N8
N8
N8
N809
N809
N809
R870
R870
R870
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Km 148.55-149.25
Km 149.25-157.50
Km 169.50-171.00
Km 169.50-171.00
Km 140.65-143.85
Km 143.85-147.05
Km 147.05-148.25
Km 148.45-148.55
Km 002.50-002.85
Km 001.30-001.80
Km 000.00-000.10
Km 000.00-000.10
Km 003.80-004.50
Km 004.70-004.80
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.70
8.25
1.50
1.50
3.20
3.20
1.20
0.10
0.35
0.50
0.10
0.10
0.70
0.10
11451
9061
9061
9061
11451
11451
11451
11451
11451
9061
11451
4887
4887
4887
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
DBST @ Traff >6000
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
DBST @ Traff >6000
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 5-9
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.262
29.218
5.134
5.134
19.228
19.228
7.211
0.601
0.503
1.789
0.823
0.249
2.010
0.342
92.732
10.51
9.78
8.89
8.89
10.38
8.75
10.12
12.10
10.93
10.16
10.33
2.35
11.75
7.90
67.63
434.91
70.52
70.52
281.79
247.65
107.46
10.26
22.83
26.64
13.11
2.40
35.64
3.85
Km 025.15-025.19
Km 029.39-030.29
Km 024.25-024.55
Km 030.39-030.69
Km 030.79-040.88
Km 004.00-007.20
Km 072.66-072.80
Km 072.66-072.80
Km 027.37-035.77
Km 052.07-072.66
Km 072.80-073.99
Km 016.67-027.37
Km 007.20-007.77
Km 008.47-015.37
Km 035.77-047.57
S
S
S
S
S
S
L
R
S
S
S
S
S
S
S
0.04
0.90
0.30
0.30
10.09
3.20
0.14
0.14
8.40
20.59
1.20
10.70
0.57
6.90
11.80
9061
9061
1488
9061
9061
4887
1779
1779
1785
1779
1779
1785
4887
4887
4887
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff 100-2000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.050
1.223
0.408
0.408
28.971
4.347
0.283
0.183
11.411
27.977
1.623
30.717
1.951
23.618
40.390
5.36
6.31
2.86
7.43
9.15
5.12
0.41
0.94
1.14
1.00
1.21
2.68
8.01
6.15
6.48
2.99
31.71
3.74
12.95
468.80
97.91
0.23
0.33
26.32
57.17
4.19
97.89
23.24
228.85
417.21
Sub-total Barisal Division
Bhola Division
N809
N809
N809
N809
N809
R890
R890
R890
R890
R890
R890
R890
R890
R890
R890
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Appendix-B: Page: 1 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R890
Road Name
Bhola -Char Manika Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road
Cway Length
AADT
Work Name
Class
Side
(km)
Km 073.99-097.50
S
23.50 4887 Regional Overlay 60mm @ IRI 7-9
Fin Cost
NPV /
(Mill Taka) Cost
2013
78.982
6.26
252.542
Km 042.87-042.97
Km 042.97-043.27
Km 043.27-043.47
Km 008.00-008.70
Km 013.75-017.25
Km 033.47-035.37
Km 035.47-037.37
Km 017.55-018.05
Km 023.25-023.55
Km 031.77-033.37
Km 041.77-042.87
Km 038.07-039.87
Km 043.47-044.05
Km 008.90-009.30
Km 023.75-025.47
Km 025.57-026.87
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10
0.30
0.20
0.70
3.50
1.90
1.90
0.50
0.30
1.60
1.10
1.80
0.58
0.40
1.72
1.30
2223
2223
2223
4887
4887
2223
2223
4887
4887
2223
2223
2223
2223
4887
4887
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.136
0.408
0.272
0.951
4.755
2.440
2.581
1.435
0.861
4.593
2.584
3.730
1.966
1.369
5.891
4.450
38.421
4.16
1.52
3.81
9.52
2.64
2.68
2.46
7.82
8.22
3.50
6.66
5.65
2.58
4.01
8.56
7.82
2.09
1.75
3.40
33.09
154.81
18.96
19.93
20.40
12.87
24.38
21.06
25.82
6.21
18.76
82.82
56.23
Km 180.42-187.22
Km 187.82-189.12
Km 187.22-187.82
Km 000.00-011.90
Km 017.00-018.29
Km 031.42-032.72
Km 032.82-040.70
S
S
S
S
S
S
S
6.80
1.30
0.60
11.90
1.29
1.30
7.87
9061
9061
9061
3019
3019
3019
3019
National
National
National
Regional
Regional
Regional
Regional
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 60mm @ IRI 7-9
DBST @ Traff 2000-4000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
19.521
3.732
2.054
11.111
3.497
2.511
15.203
57.627
8.70
13.06
13.50
3.61
4.71
5.17
5.33
207.95
77.73
40.25
154.04
27.47
21.32
135.15
Km 055.07-061.47
S
6.40
3803 Regional DBST @ Traff 2000-4000
2013
7.193
1.72
32.19
Chainage
Sub-total Bhola Division
Year
NPV
779.21
Jhalokati Division
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Sub-total Jhalokati Division
Patuakhali Division
N8
N8
N8
R881
R881
R881
R881
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Amtali-Kuakata Road
Amtali-Kuakata Road
Amtali-Kuakata Road
Amtali-Kuakata Road
Sub-total Patuakhali Division
Pirojpur Division
R870
Barisal-Pirojpur Road
Appendix-B: Page: 2 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R870
R870
R870
R870
Road Name
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 053.37-053.97
Km 054.07-054.67
Km 062.07-064.24
Km 052.17-052.47
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.60 3892 Regional DBST 25mm @ 25% Crk
S
0.60 3803 Regional Overlay 50mm @ IRI 5-7
S
2.18 3581 Regional Overlay 50mm @ IRI 5-7
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
Sub-total Pirojpur Division
Total Barisal Zone
Fin Cost
NPV /
(Mill Taka) Cost
0.815
8.87
1.722
3.27
4.831
2.08
1.027
6.48
15.588
NPV
24.07
6.45
10.63
10.37
456.912
Chittagong Zone
Bandarban Division
N108
N108
N108
N108
N108
N108
N108
N108
N108
N108
R161
R161
R161
R161
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Km 005.90-006.10
Km 007.50-009.50
Km 009.50-010.30
Km 015.70-017.00
Km 000.30-000.60
Km 006.30-007.30
Km 010.30-011.50
Km 011.90-014.30
Km 015.00-015.70
Km 017.80-019.30
Km 032.40-033.10
Km 038.70-038.84
Km 058.04-061.17
Km 033.10-033.70
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.20
2.00
0.80
1.30
0.30
1.00
1.20
2.40
0.70
1.50
0.70
0.14
3.14
0.60
1363
1363
1363
1363
1363
1363
1363
1363
1363
1363
464
3019
4887
464
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
DBST @ IRI>12
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
DBST @ IRI>12
DBST @ Traff 2000-4000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.298
2.796
1.146
1.830
0.971
3.121
3.633
7.015
2.083
4.588
0.622
0.124
5.464
1.127
34.820
1.14
1.07
2.03
2.07
1.20
1.32
1.28
1.73
1.24
1.75
0.70
1.62
3.64
1.65
2.61
8.84
8.57
13.99
1.47
5.20
5.75
14.41
3.16
11.84
3.25
1.61
84.86
2.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 216.08-216.68
Dhaka-Comilla-Chittagong-Teknaf RoadKm 217.88-218.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.78-219.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 225.28-225.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.86-228.96
Dhaka-Comilla-Chittagong-Teknaf RoadKm 225.98-226.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.76-228.86
Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.96-229.26
S
S
S
S
S
S
S
S
0.60
0.30
0.20
0.30
0.10
0.10
0.10
0.30
11451
11451
11451
11451
11451
9061
11451
11451
National
National
National
National
National
National
National
National
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
2013
2013
2013
2013
2013
2013
2013
2013
0.948
0.526
0.351
0.771
0.210
0.128
0.444
1.331
11.71
11.50
8.58
14.64
17.45
8.80
10.46
8.49
51.73
29.68
10.36
51.60
16.76
3.76
7.92
19.28
Sub-total Bandarban Division
Chittagong Division
N1
N1
N1
N1
N1
N1
N1
N1
Appendix-B: Page: 3 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Dhaka-Comilla-Chittagong-Teknaf RoadKm 170.18-170.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 170.48-171.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 171.18-171.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 171.78-171.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 173.18-174.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 174.38-174.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 174.58-175.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 176.58-176.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 176.98-179.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 179.58-182.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 182.98-183.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 190.28-193.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 195.28-195.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 199.68-200.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 200.48-200.68
Dhaka-Comilla-Chittagong-Teknaf RoadKm 200.78-201.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 203.58-204.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 205.18-205.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 206.08-208.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 209.08-209.28
Dhaka-Comilla-Chittagong-Teknaf RoadKm 209.38-210.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 210.48-211.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 211.38-213.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 214.68-215.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 216.78-217.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 218.18-218.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 218.48-218.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.08-219.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.48-219.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 220.48-222.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 224.18-225.28
Dhaka-Comilla-Chittagong-Teknaf RoadKm 226.38-226.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 227.08-227.46
Dhaka-Comilla-Chittagong-Teknaf RoadKm 227.56-227.76
Dhaka-Comilla-Chittagong-Teknaf RoadKm 233.46-241.30
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.80 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
2.50 11451 National Overlay 80mm @ IRI 4-9
S
3.30 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
3.60 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
1.40 11451 National Overlay 80mm @ IRI 4-9
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
2.90 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
2.50 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.38 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
7.83 11451 National Overlay 80mm @ IRI 4-9
Appendix-B: Page: 4 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.235
8.35
3.704 11.14
1.852 13.44
1.235 12.19
7.507 12.00
1.251 18.32
5.005 13.72
1.901 12.89
16.195 12.22
20.915 10.12
0.630 13.37
19.261 10.67
1.457 10.66
3.457 15.82
1.103 15.72
1.654 12.43
11.985
8.29
5.136 10.53
24.825
8.78
1.712
9.78
4.391
9.09
3.688 11.27
9.482 10.88
6.918
9.90
1.753 10.46
1.753 14.78
0.584 11.72
2.338 15.24
1.753 20.41
19.981 13.45
8.357 10.67
2.799 14.52
2.680 11.56
1.399 11.88
92.211
6.08
NPV
15.18
58.21
33.78
21.24
122.17
31.10
84.77
34.58
279.27
342.32
14.62
305.66
22.11
69.08
21.90
29.28
140.19
73.38
307.75
20.68
49.25
47.02
145.64
100.89
28.28
36.30
9.59
43.59
43.78
331.83
110.09
50.17
38.24
20.53
760.68
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
R151
R151
R151
R151
R151
R151
R151
R151
R151
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Dhaka-Comilla-Chittagong-Teknaf RoadKm 241.30-243.04
Dhaka-Comilla-Chittagong-Teknaf RoadKm 243.14-243.34
Dhaka-Comilla-Chittagong-Teknaf RoadKm 243.44-244.04
Dhaka-Comilla-Chittagong-Teknaf RoadKm 244.34-244.44
Dhaka-Comilla-Chittagong-Teknaf RoadKm 244.54-244.84
Dhaka-Comilla-Chittagong-Teknaf RoadKm 245.34-245.84
Dhaka-Comilla-Chittagong-Teknaf RoadKm 245.94-246.17
Chittagong-Rangamati Road
Km 004.20-004.30
Chittagong-Rangamati Road
Km 005.90-006.10
Chittagong-Rangamati Road
Km 013.10-013.50
Chittagong-Rangamati Road
Km 013.70-014.00
Chittagong-Rangamati Road
Km 000.00-000.20
Chittagong-Rangamati Road
Km 002.10-002.60
Chittagong-Rangamati Road
Km 003.90-004.10
Chittagong-Rangamati Road
Km 005.30-005.60
Chittagong-Rangamati Road
Km 012.90-013.00
Chittagong-Rangamati Road
Km 014.10-014.60
Chittagong-Rangamati Road
Km 014.90-015.20
Chittagong-Rangamati Road
Km 015.30-016.10
Chittagong-Rangamati Road
Km 016.30-017.20
Chittagong-Rangamati Road
Km 017.30-018.60
Chittagong-Rangamati Road
Km 019.30-021.20
Chittagong-Rangamati Road
Km 021.80-022.20
Chittagong-Rangamati Road
Km 022.60-023.00
Chittagong-Rangamati Road
Km 023.60-027.80
Chittagong-Rangamati Road
Km 027.80-030.00
Baraiyerhat-Fatikchhari Road
Km 013.80-014.00
Baraiyerhat-Fatikchhari Road
Km 017.00-017.30
Baraiyerhat-Fatikchhari Road
Km 019.20-021.70
Baraiyerhat-Fatikchhari Road
Km 026.60-027.20
Baraiyerhat-Fatikchhari Road
Km 004.70-005.50
Baraiyerhat-Fatikchhari Road
Km 014.00-014.20
Baraiyerhat-Fatikchhari Road
Km 014.20-016.90
Baraiyerhat-Fatikchhari Road
Km 003.20-003.30
Baraiyerhat-Fatikchhari Road
Km 004.60-004.70
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.75 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.23 11451 National Overlay 80mm @ IRI 4-9
S
0.10 13468 National DBST @ Traff >6000
S
0.20 13468 National DBST @ Traff >6000
S
0.40 11451 National Overlay 50mm @ IRI 5
S
0.30 11451 National Overlay 50mm @ IRI 5
S
0.20 13468 National Overlay 80mm @ IRI 5-9
S
0.50 13468 National Overlay 80mm @ IRI 5-9
S
0.20 13468 National Overlay 80mm @ IRI 5-9
S
0.30 13468 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.50 11451 National Overlay 80mm @ IRI 5-9
S
0.30 11451 National Overlay 80mm @ IRI 5-9
S
0.80 11451 National Overlay 80mm @ IRI 5-9
S
0.90 11451 National Overlay 80mm @ IRI 5-9
S
1.30 11451 National Overlay 80mm @ IRI 5-9
S
1.90 11451 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National Overlay 80mm @ IRI 5-9
S
0.40 11451 National Overlay 80mm @ IRI 5-9
S
4.20 11451 National Overlay 80mm @ IRI 5-9
S
2.20 11451 National Overlay 80mm @ IRI 5-9
S
0.20 1484 Regional DBST @ IRI>12
S
0.30 1484 Regional DBST @ IRI>12
S
2.50 1378 Regional DBST @ IRI>12
S
0.60 1301 Regional DBST @ IRI>12
S
0.80 1484 Regional DBST @ Traff 100-2000
S
0.20 1484 Regional DBST @ Traff 100-2000
S
2.70 1484 Regional DBST @ Traff 100-2000
S
0.10 3019 Regional DBST @ Traff 2000-4000
S
0.10 1484 Regional DBST 25mm @ 25% Crk
Appendix-B: Page: 5 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
9.980
8.77
1.185 10.16
3.556
8.83
0.658 10.25
1.975
9.50
3.992
8.23
2.289
3.97
0.198
6.83
0.278 10.40
1.211 18.97
0.908 19.62
1.317
8.61
3.292
8.09
1.317
9.26
1.432 11.65
0.477 20.44
2.387 16.55
1.432 17.28
3.997 19.92
5.037 17.71
7.276 13.22
9.071 16.81
1.910 24.14
1.910 26.05
20.570 19.66
10.503 16.49
0.188
1.05
0.282
1.73
2.347
0.92
0.563
0.48
0.751
3.35
0.188
3.11
2.534
3.03
0.094
7.31
0.094
3.62
NPV
133.04
17.73
46.22
10.40
28.92
50.65
11.11
6.88
13.86
31.17
24.18
14.00
37.58
17.96
24.57
10.58
42.84
26.84
88.08
104.57
112.70
165.27
52.14
56.27
447.43
206.03
1.54
3.79
16.83
2.10
8.70
1.60
25.82
1.96
0.77
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
R152
Road Name
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 000.00-000.80
Km 001.60-003.00
Km 003.50-004.20
Km 012.40-013.80
Km 025.70-026.60
Km 027.20-027.40
Km 000.90-001.50
Km 004.50-004.60
Km 005.70-008.40
Km 009.00-009.20
Km 009.70-011.00
Km 017.60-017.80
Km 018.00-018.20
Km 019.10-019.20
Km 021.70-021.80
Km 022.50-023.20
Km 023.40-025.30
Km 002.80-002.90
Km 007.00-007.70
Km 010.50-010.80
Km 012.60-012.80
Km 003.80-004.20
Km 014.00-014.20
Km 015.00-016.70
Km 002.70-002.80
Km 002.90-003.10
Km 017.00-017.66
Km 000.30-001.10
Km 006.10-007.00
Km 010.40-010.50
Km 010.80-011.00
Km 011.90-012.60
Km 001.20-002.20
Km 003.30-003.80
Km 004.20-006.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.80 3019 Regional Overlay 50mm @ IRI 5-7
S
1.40 3019 Regional Overlay 50mm @ IRI 5-7
S
0.70 3019 Regional Overlay 50mm @ IRI 5-7
S
1.40 1484 Regional Overlay 50mm @ IRI 5-7
S
0.90 1301 Regional Overlay 50mm @ IRI 5-7
S
0.20 1301 Regional Overlay 50mm @ IRI 5-7
S
0.60 3019 Regional Overlay 50mm @ IRI 7-9
S
0.10 3019 Regional Overlay 50mm @ IRI 7-9
S
2.70 1484 Regional Overlay 50mm @ IRI 7-9
S
0.20 1484 Regional Overlay 50mm @ IRI 7-9
S
1.30 1484 Regional Overlay 50mm @ IRI 7-9
S
0.20 1484 Regional Overlay 50mm @ IRI 7-9
S
0.20 1484 Regional Overlay 50mm @ IRI 7-9
S
0.10 1484 Regional Overlay 50mm @ IRI 7-9
S
0.10 1301 Regional Overlay 50mm @ IRI 7-9
S
0.70 1301 Regional Overlay 50mm @ IRI 7-9
S
1.90 1301 Regional Overlay 50mm @ IRI 7-9
S
0.10 1398 Regional DBST @ IRI>12
S
0.70 1398 Regional DBST @ IRI>12
S
0.30 1398 Regional DBST @ IRI>12
S
0.20 1398 Regional DBST @ IRI>12
S
0.40 1398 Regional DBST @ Traff 100-2000
S
0.20 1398 Regional DBST @ Traff 100-2000
S
1.70 1398 Regional DBST @ Traff 100-2000
S
0.10 1398 Regional DBST 25mm @ 25% Crk
S
0.20 1398 Regional DBST 25mm @ 25% Crk
S
0.66 1398 Regional DBST 25mm @ 25% Crk
S
0.80 1398 Regional Overlay 50mm @ IRI 5-7
S
0.90 1398 Regional Overlay 50mm @ IRI 5-7
S
0.10 1398 Regional Overlay 50mm @ IRI 5-7
S
0.20 1398 Regional Overlay 50mm @ IRI 5-7
S
0.70 1398 Regional Overlay 50mm @ IRI 5-7
S
1.00 1398 Regional Overlay 50mm @ IRI 7-9
S
0.50 1398 Regional Overlay 50mm @ IRI 7-9
S
1.80 1398 Regional Overlay 50mm @ IRI 7-9
Appendix-B: Page: 6 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.587
6.60
2.777
6.30
1.388
8.30
2.777
4.04
1.785
1.87
0.397
2.35
1.190
7.47
0.198 10.42
5.989
3.09
0.397
4.65
2.578
4.41
0.397
5.34
0.397
5.04
0.198
5.19
0.198
4.28
1.388
3.20
3.768
2.95
0.136
0.72
0.951
0.69
0.346
0.90
0.198
1.44
0.543
1.41
0.198
3.01
1.680
1.32
0.136
0.99
0.272
0.79
0.654
1.23
1.841
2.33
2.584
1.28
0.287
1.49
0.418
2.52
1.461
2.42
1.926
4.09
1.435
1.20
5.167
1.21
NPV
12.45
20.27
15.07
13.72
3.91
1.04
12.53
3.16
23.39
2.33
13.92
3.12
2.45
1.19
0.96
5.61
13.59
0.75
5.08
2.33
2.21
2.58
2.05
5.42
0.24
0.58
1.68
5.45
3.94
0.52
1.22
3.91
9.96
2.19
8.09
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R152
R152
R152
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
Road Name
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 007.70-008.10
Km 012.80-014.00
Km 014.60-015.00
Km 025.10-025.40
Km 000.00-000.10
Km 017.10-017.60
Km 019.90-020.30
Km 020.40-021.10
Km 021.60-023.20
Km 017.70-018.40
Km 018.50-019.50
Km 023.40-023.50
Km 023.90-024.10
Km 026.00-029.00
Km 021.80-022.50
Km 023.70-024.40
Km 000.00-000.10
Km 011.90-013.00
Km 032.10-033.27
Km 007.20-007.30
Km 013.90-016.40
Km 016.50-016.60
Km 016.90-017.50
Km 020.50-020.80
Km 023.00-023.70
Km 024.40-024.50
Km 031.00-031.10
Km 013.10-013.40
Km 013.60-013.80
Km 031.20-031.30
Km 017.60-018.00
Km 018.20-019.20
Km 019.90-020.40
Km 020.90-021.40
Km 021.60-021.80
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.40 1398 Regional Overlay 50mm @ IRI 7-9
S
1.20 1398 Regional Overlay 50mm @ IRI 7-9
S
0.40 1398 Regional Overlay 50mm @ IRI 7-9
S
0.30 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.50 5045 Regional DBST 25mm @ 25% Crk
S
0.40 5045 Regional DBST 25mm @ 25% Crk
S
0.70 5045 Regional DBST 25mm @ 25% Crk
S
1.60 4406 Regional DBST 25mm @ 25% Crk
S
0.70 5045 Regional Overlay 60mm @ IRI 5.5-9
S
1.00 5045 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
3.00 4887 Regional Overlay 60mm @ IRI 7-9
S
0.70 7612 Regional DBST @ Traff >6000
S
0.70 7612 Regional DBST @ Traff >6000
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
1.10 4887 Regional DBST @ Traff 4000-6000
S
1.17 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
2.50 5687 Regional DBST 25mm @ 25% Crk
S
0.10 7612 Regional DBST 25mm @ 25% Crk
S
0.60 7612 Regional DBST 25mm @ 25% Crk
S
0.30 7612 Regional DBST 25mm @ 25% Crk
S
0.70 7612 Regional DBST 25mm @ 25% Crk
S
0.10 7612 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 7612 Regional Overlay 60mm @ IRI 5.5-9
S
1.00 7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 7612 Regional Overlay 60mm @ IRI 5.5-9
Appendix-B: Page: 7 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.148
1.65
2.505
2.27
0.835
2.49
0.385 13.02
0.173
1.51
0.692
2.71
0.553
2.53
0.968
2.41
2.213
5.11
2.440
3.68
3.485
4.69
0.349 12.36
0.551 11.92
9.709 12.14
0.951
6.91
0.951
6.69
0.131
5.88
1.494
8.86
1.589
5.57
0.131
5.26
3.396
4.41
0.136
4.92
0.815
3.26
0.408
3.39
0.951
2.40
0.136
6.09
0.136
5.87
0.861 11.85
0.574 10.18
0.287
7.81
1.369
6.02
3.423
5.27
1.711
5.90
1.711
5.51
0.685
7.89
NPV
2.39
6.77
2.41
18.78
0.49
6.52
4.82
4.81
39.60
10.31
19.27
5.89
9.27
144.29
24.02
23.25
3.33
47.34
39.74
2.85
49.36
1.45
8.65
4.44
5.18
1.94
3.44
13.14
8.17
4.00
8.77
19.18
10.95
10.22
5.97
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R164
R164
R164
R164
R164
R164
R164
R164
R164
Road Name
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 022.50-022.80
Km 024.50-024.90
Km 024.90-027.00
Km 000.30-000.50
Km 007.00-007.10
Km 007.40-008.30
Km 008.60-009.40
Km 009.70-009.90
Km 010.40-010.70
Km 010.90-011.60
Km 029.00-029.20
Km 029.80-030.10
Km 030.40-030.50
Km 030.60-030.70
Km 005.90-006.10
Km 001.30-001.70
Km 006.40-006.50
Km 007.60-007.90
Km 000.00-001.10
Km 006.10-006.40
Km 006.50-007.60
Km 008.60-008.80
Km 008.90-008.92
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.30 7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 7612 Regional Overlay 60mm @ IRI 5.5-9
S
2.10 7612 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.70 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 1582 Regional DBST @ IRI>12
S
0.40 1582 Regional DBST @ Traff 100-2000
S
0.10 1582 Regional DBST @ Traff 100-2000
S
0.30 1582 Regional DBST @ Traff 100-2000
S
1.10 1582 Regional DBST 25mm @ 25% Crk
S
0.30 1582 Regional DBST 25mm @ 25% Crk
S
1.10 1582 Regional DBST 25mm @ 25% Crk
S
0.20 1582 Regional Overlay 50mm @ IRI 5-7
S
0.02 1582 Regional Overlay 50mm @ IRI 5-7
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Chittagong Division
Fin Cost
NPV /
(Mill Taka) Cost
1.027
7.08
1.369
6.86
7.188
5.36
0.660
6.87
0.330
8.61
2.969
6.80
2.669
6.60
0.685
7.89
1.027
7.97
2.396
6.57
0.685
8.79
1.027
8.05
0.342
9.56
0.342
9.58
0.321
0.72
0.642
0.73
0.161
1.48
0.482
1.41
1.766
0.80
0.482
0.79
1.766
0.66
0.679
1.12
0.054
1.26
526.577
NPV
8.04
11.17
42.59
7.06
4.53
31.81
27.73
8.61
13.24
24.78
9.87
13.37
5.37
5.39
1.73
1.21
0.81
2.30
3.24
0.87
3.00
0.90
0.08
Cox's Bazar Division
N110
N110
N110
N110
R170
R170
R170
R170
R170
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Km 005.00-005.20
Km 005.40-005.50
Km 006.00-006.20
Km 006.50-007.70
Km 062.30-062.40
Km 062.14-062.20
Km 063.10-063.20
Km 064.00-064.20
Km 065.30-065.80
S
S
S
S
S
S
S
S
S
0.20
0.10
0.20
1.20
0.10
0.06
0.10
0.20
0.50
11451
11451
11451
11451
715
715
4887
4887
4887
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 8 of 61
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ IRI>12
DBST @ Traff 100-2000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.136
0.568
1.136
7.072
0.143
0.086
0.302
0.604
1.511
10.58
12.45
14.15
9.70
0.07
0.46
16.80
15.96
15.42
15.19
9.98
20.31
93.04
0.06
0.12
6.33
12.41
29.02
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R170
R170
R170
R170
R170
R172
R172
R172
R172
R172
R172
R172
R172
R172
R180
R180
Road Name
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Laharpur-Laboni More Road
Laharpur-Laboni More Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 069.90-071.00
Km 064.40-065.10
Km 067.40-068.60
Km 069.20-069.40
Km 071.70-072.20
Km 000.10-000.20
Km 000.30-000.40
Km 000.60-000.70
Km 004.00-004.30
Km 006.30-006.60
Km 011.80-011.90
Km 014.80-015.30
Km 007.70-008.00
Km 016.10-017.83
Km 000.20-000.30
Km 000.00-000.20
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.70 4887 Regional Overlay 60mm @ IRI 7-9
S
1.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10
570 Regional DBST @ IRI>12
S
0.10
570 Regional DBST @ IRI>12
S
0.10
570 Regional DBST @ IRI>12
S
0.30
570 Regional DBST @ IRI>12
S
0.30
570 Regional DBST @ IRI>12
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.50 4887 Regional Overlay 50mm @ IRI 5-7
S
0.30
570 Regional Overlay 50mm @ IRI 7-9
S
1.73 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4993 Regional DBST @ Traff 4000-6000
S
0.20 4993 Regional DBST 25mm @ 25% Crk
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Cox's Bazar Division
Fin Cost
NPV /
(Mill Taka) Cost
3.324 13.06
2.522 16.70
4.324 13.38
0.721 15.99
1.802 14.83
0.148
0.17
0.148
0.20
0.148
0.20
0.445
0.12
0.445
0.07
0.313 11.92
1.566 11.59
0.940
0.61
6.460
6.28
0.148
4.71
0.296
1.32
36.308
NPV
55.89
50.11
67.02
14.11
31.79
0.00
0.18
0.18
0.34
0.19
5.68
27.72
0.66
62.10
2.43
0.67
Dohazari Division
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
Dhaka-Comilla-Chittagong-Teknaf RoadKm 301.08-302.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 246.94-247.14
Dhaka-Comilla-Chittagong-Teknaf RoadKm 251.94-254.84
Dhaka-Comilla-Chittagong-Teknaf RoadKm 254.94-255.14
Dhaka-Comilla-Chittagong-Teknaf RoadKm 255.44-255.54
Dhaka-Comilla-Chittagong-Teknaf RoadKm 275.58-276.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 276.88-277.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 278.48-278.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 281.18-283.58
Dhaka-Comilla-Chittagong-Teknaf RoadKm 283.78-284.28
Dhaka-Comilla-Chittagong-Teknaf RoadKm 284.58-285.68
Dhaka-Comilla-Chittagong-Teknaf RoadKm 291.08-292.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 292.28-294.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 298.78-300.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 300.68-300.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 302.58-302.98
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.10
0.20
2.90
0.20
0.10
1.00
0.20
0.30
2.40
0.50
1.10
1.10
2.60
1.70
0.20
0.40
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 9 of 61
DBST @ Traff >6000
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.956
2.017
15.826
1.103
0.551
4.782
0.955
1.432
12.129
2.881
6.175
5.885
13.740
9.459
1.185
2.371
8.64
3.95
12.13
11.67
9.84
10.52
10.79
14.39
10.31
13.37
11.59
10.85
10.03
19.58
9.42
10.57
89.29
9.47
270.95
18.18
8.16
71.64
15.48
32.45
176.50
53.95
97.93
94.97
205.01
226.76
16.45
36.89
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R171
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.08-303.38
Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.48-303.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.98-304.18
Dhaka-Comilla-Chittagong-Teknaf RoadKm 304.68-304.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 305.08-305.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 309.18-309.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 309.98-310.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 311.28-312.98
Dhaka-Comilla-Chittagong-Teknaf RoadKm 313.38-314.48
Dhaka-Comilla-Chittagong-Teknaf RoadKm 314.58-315.17
Patiya-Chokoria Road
Km 055.42-061.80
Patiya-Chokoria Road
Km 062.00-062.14
Patiya-Chokoria Road
Km 009.10-009.50
Patiya-Chokoria Road
Km 009.70-010.10
Patiya-Chokoria Road
Km 019.70-020.20
Patiya-Chokoria Road
Km 001.00-001.40
Patiya-Chokoria Road
Km 008.80-008.90
Patiya-Chokoria Road
Km 012.10-012.20
Patiya-Chokoria Road
Km 000.30-000.70
Patiya-Chokoria Road
Km 000.80-000.90
Patiya-Chokoria Road
Km 003.30-003.50
Patiya-Chokoria Road
Km 007.90-008.00
Patiya-Chokoria Road
Km 010.20-011.10
Patiya-Chokoria Road
Km 011.20-012.00
Patiya-Chokoria Road
Km 012.50-012.90
Patiya-Chokoria Road
Km 002.60-003.20
Patiya-Chokoria Road
Km 003.70-005.50
Patiya-Chokoria Road
Km 006.30-006.40
Patiya-Chokoria Road
Km 006.90-007.00
Patiya-Chokoria Road
Km 007.40-007.80
Patiya-Chokoria Road
Km 008.90-009.10
Patiya-Chokoria Road
Km 013.00-013.50
Patiya-Chokoria Road
Km 041.56-054.71
Patiya-Chokoria Road
Km 020.70-020.90
Banshkhali -Chunti Road
Km 002.40-002.90
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.59 11451 National Overlay 80mm @ IRI 4-9
S
6.39
715 Regional DBST @ IRI>12
S
0.14
715 Regional DBST @ IRI>12
S
0.40 3516 Regional DBST @ Traff 2000-4000
S
0.40 3516 Regional DBST @ Traff 2000-4000
S
0.50 4887 Regional DBST @ Traff 4000-6000
S
0.40 3516 Regional DBST 25mm @ 25% Crk
S
0.10 3516 Regional DBST 25mm @ 25% Crk
S
0.10 3019 Regional DBST 25mm @ 25% Crk
S
0.40 3516 Regional Overlay 50mm @ IRI 5-7
S
0.10 3516 Regional Overlay 50mm @ IRI 5-7
S
0.20 3516 Regional Overlay 50mm @ IRI 5-7
S
0.10 3516 Regional Overlay 50mm @ IRI 5-7
S
0.90 3181 Regional Overlay 50mm @ IRI 5-7
S
0.80 3019 Regional Overlay 50mm @ IRI 5-7
S
0.40 3019 Regional Overlay 50mm @ IRI 5-7
S
0.60 3516 Regional Overlay 50mm @ IRI 7-9
S
1.80 3516 Regional Overlay 50mm @ IRI 7-9
S
0.10 3516 Regional Overlay 50mm @ IRI 7-9
S
0.10 3516 Regional Overlay 50mm @ IRI 7-9
S
0.40 3516 Regional Overlay 50mm @ IRI 7-9
S
0.20 3516 Regional Overlay 50mm @ IRI 7-9
S
0.50 3019 Regional Overlay 50mm @ IRI 7-9
S
13.15
715 Regional Overlay 50mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 1514 Regional DBST @ IRI>12
Appendix-B: Page: 10 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.753 16.60
2.305 14.35
1.152 16.49
1.152 16.33
3.860 16.78
3.872 12.65
5.482
9.57
9.235 10.76
5.976 16.23
3.222 16.32
9.131
0.20
0.200
0.20
0.346
2.80
0.346
2.85
0.498 10.63
0.375
2.55
0.086
5.46
0.089
6.44
0.793
3.83
0.198
6.91
0.365
5.86
0.183
8.39
1.588
6.61
1.378
7.90
0.737
7.65
1.159
3.77
3.288
3.68
0.183
8.02
0.183
8.17
0.731
5.58
0.365
6.43
0.940
8.39
31.637
0.70
0.518 19.69
0.469
1.12
NPV
37.17
46.29
24.27
26.35
81.83
72.85
78.04
140.25
126.80
68.71
11.50
0.25
2.45
2.50
17.77
1.90
1.04
1.61
3.13
1.41
2.24
1.70
12.85
13.33
6.70
5.52
13.70
1.85
1.83
5.33
3.07
10.31
24.95
12.48
4.05
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R171
R171
R171
R171
Road Name
Banshkhali -Chunti Road
Banshkhali -Chunti Road
Banshkhali -Chunti Road
Banshkhali -Chunti Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 003.00-003.80
Km 004.40-004.80
Km 009.30-010.00
Km 002.90-003.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.80 1514 Regional DBST @ IRI>12
S
0.40 1514 Regional DBST @ IRI>12
S
0.70 1514 Regional DBST @ IRI>12
S
0.10 1514 Regional Overlay 50mm @ IRI 5-7
Year
2013
2013
2013
2013
Sub-total Dohazari Division
Fin Cost
NPV /
(Mill Taka) Cost
0.751
1.53
0.375
1.53
0.657
1.08
0.198
5.31
178.226
NPV
8.80
4.40
5.44
1.14
Khagrachari Division
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R162
R162
R162
R162
R162
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Km 078.32-078.52
Km 080.32-080.52
Km 055.80-055.82
Km 042.60-042.70
Km 035.00-035.10
Km 037.10-039.30
Km 041.00-041.50
Km 046.70-049.10
Km 049.20-050.00
Km 051.20-051.40
Km 051.50-051.60
Km 080.02-080.22
Km 083.82-084.12
Km 040.10-040.70
Km 039.66-056.66
Km 059.76-060.26
Km 056.66-059.76
Km 060.66-062.66
Km 060.26-060.66
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.20
0.20
0.02
0.10
0.10
2.20
0.50
2.40
0.80
0.20
0.10
0.20
0.30
0.60
17.00
0.50
3.10
2.01
0.40
3019
3019
3362
3362
3019
3019
3019
3362
3362
3362
3362
3019
3019
4887
237
237
237
237
237
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
DBST @ IRI>12
DBST @ IRI>12
DBST @ Traff 100-2000
DBST @ Traff 100-2000
Overlay 50mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.178
0.178
0.018
0.198
0.198
4.421
0.986
4.760
1.587
0.397
0.198
0.376
0.564
1.811
15.281
0.457
2.871
1.833
0.772
37.085
5.99
3.67
12.65
11.96
9.26
5.85
6.07
7.59
7.49
7.23
10.80
4.46
4.59
11.53
0.22
0.30
0.84
0.96
0.97
3.13
2.36
0.65
2.82
2.81
35.06
8.12
48.99
15.53
3.51
2.55
2.75
4.32
24.19
20.81
0.92
8.06
6.09
0.98
Km 059.12-059.62
Km 056.12-059.12
Km 059.62-060.32
Km 062.12-062.52
Km 001.20-002.80
S
S
S
S
S
0.50
3.00
0.70
0.40
1.60
3555
3555
3555
3555
2326
National
National
National
National
Regional
DBST @ Traff 2000-4000
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
DBST @ IRI>12
2013
2013
2013
2013
2013
0.642
8.142
1.900
1.211
1.383
4.46
4.07
2.62
3.59
1.11
9.90
43.27
5.74
6.70
13.40
Sub-total Khagrachari Division
Rangamati Division
N106
N106
N106
N106
R161
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Rangamati -Bandarban Road
Appendix-B: Page: 11 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
Road Name
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 007.70-010.70
Km 002.90-003.10
Km 018.20-018.30
Km 018.20-018.30
Km 002.80-002.90
Km 003.10-003.20
Km 011.00-011.60
Km 004.10-004.40
Km 015.50-015.90
Km 027.20-027.70
Km 015.50-015.90
Km 003.40-003.50
Km 021.20-021.40
Km 006.40-006.50
Km 007.00-007.40
Km 015.90-016.10
Km 018.60-019.70
Km 020.90-021.10
Km 006.70-006.90
Km 007.90-008.00
Km 008.00-008.20
Km 012.20-012.50
Km 017.90-018.00
Km 022.40-022.50
Km 001.00-001.40
Km 005.90-006.00
Km 006.50-006.70
Km 008.20-008.70
Km 008.80-008.90
Km 009.10-009.50
Km 009.70-010.10
Km 012.10-012.20
Km 016.10-016.40
Km 017.70-017.90
Km 018.00-018.60
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
3.00 2326 Regional DBST @ IRI>12
S
0.20 2326 Regional DBST @ Traff 2000-4000
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
0.10 2326 Regional DBST 25mm @ 25% Crk
S
0.10 2326 Regional DBST 25mm @ 25% Crk
S
0.60 2326 Regional DBST 25mm @ 25% Crk
S
0.30 2326 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.50 3019 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 2326 Regional Overlay 50mm @ IRI 7-9
S
0.20 3019 Regional Overlay 50mm @ IRI 7-9
S
0.10
818 Regional DBST @ IRI>12
S
0.40
818 Regional DBST @ IRI>12
S
0.20
818 Regional DBST @ IRI>12
S
1.10
818 Regional DBST @ IRI>12
S
0.20
818 Regional DBST @ IRI>12
S
0.20
818 Regional DBST @ Traff 100-2000
S
0.10
818 Regional DBST @ Traff 100-2000
S
0.20
818 Regional DBST @ Traff 100-2000
S
0.30
818 Regional DBST @ Traff 100-2000
S
0.10
818 Regional DBST @ Traff 100-2000
S
0.10
818 Regional DBST @ Traff 100-2000
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.10
818 Regional DBST 25mm @ 25% Crk
S
0.20
818 Regional DBST 25mm @ 25% Crk
S
0.50
818 Regional DBST 25mm @ 25% Crk
S
0.10
818 Regional DBST 25mm @ 25% Crk
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
0.10
818 Regional DBST 25mm @ 25% Crk
S
0.30
818 Regional DBST 25mm @ 25% Crk
S
0.20
818 Regional DBST 25mm @ 25% Crk
S
0.60
818 Regional DBST 25mm @ 25% Crk
Appendix-B: Page: 12 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
2.594
0.75
0.173
3.56
0.151
4.58
0.151
4.58
0.086
3.50
0.086
3.28
0.519
1.86
0.548
3.74
1.274
8.83
0.940
5.41
1.274
8.83
0.183
6.35
0.376
4.28
0.086
0.95
0.346
1.28
0.173
1.62
0.951
1.26
0.173
1.34
0.173
2.89
0.086
1.33
0.173
2.44
0.259
2.62
0.086
2.68
0.086
3.06
0.346
1.37
0.086
1.35
0.173
0.61
0.432
0.98
0.086
1.39
0.346
1.31
0.346
0.99
0.086
1.76
0.259
0.90
0.173
1.02
0.519
0.92
NPV
17.09
2.02
2.88
2.88
0.56
0.56
2.15
2.32
17.10
8.11
17.10
1.42
2.69
0.61
3.29
2.09
8.93
1.73
1.84
0.32
1.40
2.42
0.76
0.95
0.95
0.20
0.22
1.09
0.29
0.90
0.80
0.33
0.44
0.35
0.81
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
Road Name
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 019.70-020.20
Km 022.00-022.40
Km 022.50-039.66
Km 000.30-000.70
Km 000.80-000.90
Km 003.30-003.50
Km 006.90-007.00
Km 010.20-011.10
Km 011.20-012.00
Km 012.50-012.90
Km 013.00-013.50
Km 002.60-003.20
Km 003.70-005.50
Km 006.30-006.40
Km 007.40-007.80
Km 008.90-009.10
Km 013.70-015.90
Km 020.70-020.90
Km 021.10-021.50
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.50
818 Regional DBST 25mm @ 25% Crk
S
0.40
818 Regional DBST 25mm @ 25% Crk
S
17.16
543 Regional DBST 25mm @ 25% Crk
S
0.40
818 Regional Overlay 50mm @ IRI 5-7
S
0.10
818 Regional Overlay 50mm @ IRI 5-7
S
0.20
818 Regional Overlay 50mm @ IRI 5-7
S
0.10
818 Regional Overlay 50mm @ IRI 5-7
S
0.90
818 Regional Overlay 50mm @ IRI 5-7
S
0.80
818 Regional Overlay 50mm @ IRI 5-7
S
0.40
818 Regional Overlay 50mm @ IRI 5-7
S
0.50
818 Regional Overlay 50mm @ IRI 5-7
S
0.60
818 Regional Overlay 50mm @ IRI 7-9
S
1.80
818 Regional Overlay 50mm @ IRI 7-9
S
0.10
818 Regional Overlay 50mm @ IRI 7-9
S
0.40
818 Regional Overlay 50mm @ IRI 7-9
S
0.20
818 Regional Overlay 50mm @ IRI 7-9
S
2.20
818 Regional Overlay 50mm @ IRI 7-9
S
0.20
818 Regional Overlay 50mm @ IRI 7-9
S
0.40
818 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Rangamati Division
Total Chittagong Zone
Fin Cost
NPV /
(Mill Taka) Cost
0.432
1.19
0.346
0.91
14.835
0.52
0.731
1.53
0.183
1.85
0.365
1.46
0.183
2.93
1.644
1.27
1.461
1.29
0.731
1.50
0.913
1.67
1.096
2.90
3.288
1.47
0.183
2.99
0.731
2.15
0.365
2.82
4.019
2.09
0.365
2.02
0.731
2.66
59.680
NPV
0.95
0.66
16.49
1.27
0.38
0.59
0.64
2.44
2.21
1.28
1.87
3.78
5.93
0.65
1.94
1.26
9.72
0.82
2.38
872.696
Comilla Zone
Brahmanbaria Division
N102
N102
N102
N102
N102
N2
N2
N2
N2
N2
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Km 080.06-082.33
Km 077.06-077.16
Km 053.40-053.50
Km 072.19-072.34
Km 072.44-072.66
Km 074.24-074.54
Km 074.18-074.24
Km 074.84-075.24
Km 075.44-076.94
Km 077.44-078.34
S
S
S
S
S
S
S
S
S
S
2.27
0.10
0.10
0.15
0.22
0.30
0.06
0.40
1.50
0.90
15273
15273
9061
11451
11451
12330
12330
12330
12330
12330
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 13 of 61
DBST @ Traff >6000
Overlay 50mm @ IRI 5
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ Traff >6000
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.348
0.313
0.336
0.714
1.081
0.556
0.227
1.566
5.872
3.523
7.84
8.50
10.04
18.39
16.73
13.24
1.76
7.58
9.43
10.68
106.62
5.16
5.01
20.94
28.48
33.65
0.55
15.67
82.57
64.23
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N2
N2
N2
N2
N2
N2
N2
N2
N2
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
Road Name
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 078.44-079.54
Km 079.74-082.44
Km 084.64-085.24
Km 074.54-074.74
Km 077.14-077.24
Km 082.64-084.14
Km 084.34-084.54
Km 085.44-087.74
Km 087.94-092.14
Km 001.50-002.10
Km 006.00-006.30
Km 015.18-015.78
Km 007.35-007.40
Km 018.08-018.38
Km 004.40-004.70
Km 000.00-000.10
Km 013.68-013.78
Km 000.40-000.50
Km 002.10-002.20
Km 002.30-002.40
Km 003.10-003.40
Km 004.70-004.90
Km 005.00-006.00
Km 006.30-007.35
Km 012.40-013.60
Km 014.08-014.18
Km 014.68-015.18
Km 016.78-017.08
Km 017.68-018.08
Km 018.38-018.58
Km 018.68-019.00
Km 001.00-001.50
Km 004.00-004.40
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.10 12330 National Overlay 50mm @ IRI 4
S
2.70 12330 National Overlay 50mm @ IRI 4
S
0.60 12330 National Overlay 50mm @ IRI 4
S
0.20 12330 National Overlay 80mm @ IRI 4-9
S
0.10 12330 National Overlay 80mm @ IRI 4-9
S
1.50 12330 National Overlay 80mm @ IRI 4-9
S
0.20 12330 National Overlay 80mm @ IRI 4-9
S
2.30 11451 National Overlay 80mm @ IRI 4-9
S
4.20 11451 National Overlay 80mm @ IRI 4-9
S
0.60 4488 Regional DBST @ IRI>12
S
0.30 4488 Regional DBST @ IRI>12
S
0.60 6240 Regional DBST @ IRI>12
S
0.05 6240 Regional DBST @ Traff >6000
S
0.30 6240 Regional DBST @ Traff >6000
S
0.30 4488 Regional DBST @ Traff 4000-6000
S
0.10 6240 Regional DBST 25mm @ 25% Crk
S
0.10 6240 Regional DBST 25mm @ 25% Crk
S
0.10 4488 Regional Overlay 50mm @ IRI 5-7
S
0.10 4488 Regional Overlay 50mm @ IRI 5-7
S
0.10 4488 Regional Overlay 50mm @ IRI 5-7
S
0.30 4488 Regional Overlay 50mm @ IRI 5-7
S
0.20 4488 Regional Overlay 50mm @ IRI 5-7
S
1.00 4488 Regional Overlay 50mm @ IRI 5-7
S
1.05 4488 Regional Overlay 50mm @ IRI 5-7
S
1.20 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.32 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 4488 Regional Overlay 60mm @ IRI 7-9
S
0.40 4488 Regional Overlay 60mm @ IRI 7-9
Sub-total Brahmanbaria Division
Appendix-B: Page: 14 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
4.306 12.25
10.569
8.99
2.349 13.08
1.235
6.80
0.617 17.19
9.260 12.20
1.235 13.00
14.199 10.27
25.928 13.05
0.593
0.55
0.282
0.73
0.815
1.12
0.068
8.60
0.408
2.87
0.296
2.18
0.143
2.53
0.136
4.66
0.209
5.62
0.209
5.65
0.209
5.81
0.626
2.50
0.409
3.34
1.983
1.46
2.083
1.44
4.107
1.93
0.342
6.78
1.711
2.89
1.027
3.50
1.369
2.63
0.685
4.21
1.092
3.37
1.245
2.24
0.996
2.26
108.276
NPV
90.01
162.11
58.74
10.18
14.40
182.65
21.77
205.88
477.72
2.95
1.87
8.28
1.28
3.97
2.18
0.65
1.03
1.30
1.28
1.29
1.77
1.45
3.15
3.26
7.15
2.09
5.59
3.24
3.62
2.60
3.31
2.90
2.25
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Cway Length
AADT
Side
(km)
Road
Class
Work Name
Year
Fin Cost
(Mill Taka)
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.143
2.075
0.148
1.186
0.296
2.418
1.862
0.287
0.716
0.593
0.285
0.148
0.148
2.297
2.183
1.211
0.298
0.595
2.384
5.961
2.167
2.422
2.725
0.940
0.313
2.192
5.629
1.394
1.394
1.083
1.083
2.113
0.342
1.472
NPV /
Cost
NPV
Chandpur Division
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Km 040.47-040.57
Km 078.20-079.60
Km 081.00-081.10
Km 083.72-084.52
Km 084.72-084.92
Km 030.61-032.29
Km 032.79-034.09
Km 064.10-064.30
Km 064.50-065.00
Km 077.70-078.10
Km 052.80-053.00
Km 071.40-071.50
Km 079.70-079.80
Km 035.09-035.89
Km 036.19-036.79
Km 051.80-052.20
Km 053.40-053.50
Km 055.30-055.50
Km 058.60-059.40
Km 060.30-062.30
Km 063.30-064.00
Km 065.10-065.90
Km 066.00-066.90
Km 067.10-067.40
Km 068.50-068.60
Km 069.10-069.80
Km 036.99-038.49
Km 038.59-038.99
Km 039.09-039.49
Km 039.59-039.89
Km 039.99-040.29
Km 041.37-041.97
Km 042.37-042.47
Km 042.67-043.10
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10
1.40
0.10
0.80
0.20
1.68
1.30
0.20
0.50
0.40
0.20
0.10
0.10
0.80
0.60
0.40
0.10
0.20
0.80
2.00
0.70
0.80
0.90
0.30
0.10
0.70
1.50
0.40
0.40
0.30
0.30
0.60
0.10
0.43
8774
7103
10297
10297
10297
4887
4887
4887
4887
4887
4887
4887
10297
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
8423
8774
8774
8774
8774
8774
8774
8774
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 15 of 61
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
6.67
3.39
8.21
5.29
7.49
9.26
6.41
7.75
7.27
3.36
7.31
5.85
7.78
6.91
5.16
9.00
9.39
6.39
6.22
6.72
7.95
8.12
6.59
5.71
6.65
6.15
7.25
11.77
9.96
8.84
9.15
8.50
13.11
8.51
4.09
69.29
5.75
26.15
9.96
78.03
47.82
8.12
19.02
19.78
7.15
3.78
5.45
27.42
20.30
17.01
4.74
6.67
26.02
69.25
29.38
33.53
32.77
9.28
3.65
23.66
58.67
22.44
19.17
15.07
15.81
28.29
5.67
16.37
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R860
R860
R860
R860
R860
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 043.20-045.70
Km 045.90-046.00
Km 046.10-046.40
Km 046.70-046.90
Km 047.00-047.70
Km 080.30-080.70
Km 081.40-081.90
Km 082.00-082.10
Km 082.20-082.50
Km 034.29-034.89
Km 049.60-049.70
Km 049.90-050.40
Km 050.80-051.30
Km 051.60-051.70
Km 053.60-053.80
Km 054.00-054.10
Km 054.20-055.10
Km 055.70-056.70
Km 057.00-058.40
Km 068.80-068.90
Km 070.00-071.20
Km 072.30-072.40
Km 073.10-073.20
Km 073.30-074.50
Km 074.90-075.90
Km 076.90-077.50
Km 063.51-064.16
Km 071.26-071.46
Km 064.86-064.96
Km 069.36-069.76
Km 070.56-070.66
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
2.50 8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.70 8774 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 10297 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
S
1.00 4887 Regional Overlay 60mm @ IRI 7-9
S
1.40 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
1.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
1.20 4887 Regional Overlay 60mm @ IRI 7-9
S
1.00 4887 Regional Overlay 60mm @ IRI 7-9
S
0.60 4887 Regional Overlay 60mm @ IRI 7-9
S
0.65 1239 Regional DBST @ Traff 100-2000
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.40 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Chandpur Division
Fin Cost
NPV /
(Mill Taka) Cost
8.775
8.79
0.355 10.15
1.064 12.46
1.033
7.64
3.232
7.92
1.494
9.52
1.867
7.83
0.436
7.54
1.143
7.12
2.054
6.45
0.355
9.16
1.774
8.06
1.795
6.65
0.361
9.68
0.709
7.81
0.355
8.94
3.193
6.76
3.547
8.03
5.080
6.47
0.373
7.63
4.600
7.47
0.373
9.01
0.373
8.82
4.481
8.37
3.734
7.61
2.240
7.65
0.879
1.46
0.574
8.11
0.342
9.39
1.369
8.39
0.342
9.81
108.805
NPV
115.96
5.35
16.76
11.26
36.49
24.19
23.04
5.24
12.22
20.15
5.25
23.12
20.01
5.23
8.84
5.13
34.40
46.06
55.07
4.55
55.54
5.52
5.41
61.54
45.93
27.73
3.65
8.64
5.37
19.19
5.52
Comilla Division
R140
Comilla-Begumganj Road
Km 000.30-000.40
S
0.10
2080 Regional DBST @ IRI>12
Appendix-B: Page: 16 of 61
2013
0.168
0.92
1.41
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R141
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Lalmai-Sonaimuri Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 000.40-001.23
Km 010.70-010.90
Km 011.50-011.70
Km 026.99-028.89
Km 029.09-029.19
Km 000.00-000.10
Km 000.20-000.30
Km 001.50-002.90
Km 011.20-011.40
Km 012.30-013.36
Km 016.06-016.26
Km 017.29-017.39
Km 017.49-018.89
Km 026.19-026.49
Km 001.23-001.40
Km 003.40-004.35
Km 007.80-008.50
Km 014.16-014.26
Km 014.76-014.96
Km 018.99-020.29
Km 020.49-021.19
Km 021.29-021.39
Km 021.49-023.69
Km 023.79-024.89
Km 025.29-026.09
Km 026.59-026.69
Km 029.49-030.61
Km 004.35-004.78
Km 004.78-007.80
Km 009.50-009.80
Km 010.00-010.60
Km 013.46-013.66
Km 013.86-013.96
Km 024.99-025.09
Km 000.40-001.20
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.83 2080 Regional DBST @ Traff 2000-4000
S
0.20 4909 Regional DBST @ Traff 4000-6000
S
0.20 4887 Regional DBST @ Traff 4000-6000
S
1.90 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
0.10 2080 Regional DBST 25mm @ 25% Crk
S
0.10 2080 Regional DBST 25mm @ 25% Crk
S
1.40 3942 Regional DBST 25mm @ 25% Crk
S
0.20 4887 Regional DBST 25mm @ 25% Crk
S
1.06 4887 Regional DBST 25mm @ 25% Crk
S
0.20 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
1.40 4887 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional DBST 25mm @ 25% Crk
S
0.17 3942 Regional Overlay 50mm @ IRI 5-7
S
0.95 3942 Regional Overlay 50mm @ IRI 5-7
S
0.70 4909 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
1.30 4887 Regional Overlay 50mm @ IRI 5-7
S
0.70 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
2.20 4887 Regional Overlay 50mm @ IRI 5-7
S
1.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.80 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
1.12 4887 Regional Overlay 50mm @ IRI 5-7
S
0.42 4887 Regional Overlay 60mm @ IRI 7-9
S
3.03 4909 Regional Overlay 60mm @ IRI 7-9
S
0.30 4909 Regional Overlay 60mm @ IRI 7-9
S
0.60 4909 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional DBST @ Traff 4000-6000
Appendix-B: Page: 17 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.404
0.83
0.287
9.75
0.287
9.35
3.318
3.85
0.178
5.03
0.173
0.63
0.168
0.57
2.351
2.71
0.287
8.59
1.534
7.00
0.277
8.71
0.138
8.15
1.950
6.25
0.445
5.48
0.603
3.97
3.379
4.70
2.558
4.83
0.292
9.29
0.585
9.55
4.343
9.24
2.305
9.32
0.334
6.49
7.464
5.57
3.485
6.63
2.505
6.30
0.313
7.46
3.688
7.35
1.869
6.43
13.517
4.57
1.307
7.86
2.166
8.96
0.697
7.43
0.349 10.80
0.373
6.93
1.146
5.76
NPV
3.40
9.20
8.48
52.78
3.66
0.24
0.21
18.63
8.27
39.26
7.63
3.88
48.50
8.55
3.42
26.77
21.67
4.63
9.52
64.62
34.63
3.74
68.13
39.96
25.88
4.04
43.68
19.43
91.22
14.10
28.51
7.70
5.42
4.13
30.83
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R144
R144
Road Name
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Laksam Old Section
Laksam Old Section
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 000.00-000.10
Km 022.10-022.12
Km 014.20-014.50
Km 014.70-017.80
Km 018.00-018.80
Km 019.00-020.60
Km 020.70-022.00
Km 022.22-023.02
Km 024.42-024.52
Km 024.62-027.62
Km 028.12-030.22
Km 001.50-004.30
Km 004.40-006.80
Km 007.00-007.10
Km 007.60-013.80
Km 014.00-014.10
Km 030.62-031.52
Km 003.90-004.50
Km 003.00-003.80
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.02 5257 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional Overlay 50mm @ IRI 5-7
S
3.10 5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.80 5257 Regional Overlay 60mm @ IRI 5.5-9
S
1.60 5257 Regional Overlay 60mm @ IRI 5.5-9
S
1.30 5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.80 5257 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 5257 Regional Overlay 60mm @ IRI 5.5-9
S
3.00 5257 Regional Overlay 60mm @ IRI 5.5-9
S
2.10 5257 Regional Overlay 60mm @ IRI 5.5-9
S
2.80 4887 Regional Overlay 60mm @ IRI 7-9
S
2.40 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
6.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
S
0.60 2057 Regional DBST 25mm @ 25% Crk
S
0.80 2057 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Comilla Division
Fin Cost
NPV /
(Mill Taka) Cost
0.143
9.53
0.034
6.59
0.907
6.37
11.267
5.87
2.888
7.99
5.865
5.74
4.814
5.16
2.888
5.79
0.361
7.51
10.791
6.11
7.554
6.39
10.473
8.36
8.514
8.51
0.358
9.42
22.379
8.28
0.355
8.62
3.305
7.45
1.112
2.17
3.132
3.09
163.380
NPV
4.22
0.89
10.14
100.58
37.87
53.61
39.59
25.43
4.32
100.23
70.13
143.72
117.15
5.64
299.78
4.94
39.81
6.65
16.12
Feni Division
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Km 001.70-002.20
Km 017.10-017.20
Km 017.30-019.50
Km 002.50-002.60
Km 016.90-017.00
Km 000.40-000.70
Km 002.80-005.10
Km 005.30-005.90
Km 007.40-008.50
Km 008.60-009.20
Km 009.30-009.80
Km 010.00-010.30
Km 010.40-010.60
S
S
S
S
S
S
S
S
S
S
S
S
S
0.50
0.10
2.20
0.10
0.10
0.30
2.30
0.60
1.10
0.60
0.50
0.30
0.20
11732
9193
9193
12376
9193
11451
11225
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 18 of 61
DBST @ Traff >6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5
Overlay 50mm @ IRI 5-7
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.334
0.143
3.152
0.303
0.303
1.383
10.980
2.864
5.315
2.766
2.305
1.383
0.922
9.15
6.53
5.57
25.99
8.09
20.86
17.18
12.28
11.13
16.39
14.72
13.86
16.01
55.80
3.89
78.39
11.59
4.74
32.62
218.59
44.46
74.74
59.25
42.87
23.48
18.08
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N104
Road Name
Feni-Noakhali Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road
Cway Length
AADT
Work Name
Class
Side
(km)
Km 011.40-011.50
S
0.10 11451 National Overlay 80mm @ IRI 5-9
Fin Cost
NPV /
(Mill Taka) Cost
2013
0.461 22.11
33.613
Km 014.00-014.10
Km 015.50-015.52
Km 018.00-018.80
S
S
S
0.10
0.02
0.80
2013
2013
2013
0.090
0.067
2.240
2.398
3.82
20.15
3.38
0.89
1.40
7.92
Km 033.20-033.50
Km 048.49-048.79
Km 035.74-036.50
Km 036.80-036.90
Km 037.10-038.00
Km 041.40-041.58
Km 032.40-032.90
Km 034.20-035.30
Km 035.50-035.74
Km 038.00-038.20
Km 038.20-038.60
Km 038.70-039.40
Km 039.90-040.00
Km 041.78-041.88
Km 042.28-042.68
Km 042.68-042.98
Km 044.38-044.78
Km 044.78-045.48
Km 045.58-045.99
Km 046.19-046.29
Km 046.69-048.09
Km 048.79-049.17
Km 131.57-132.67
Km 133.57-134.87
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.30
0.30
0.76
0.10
0.90
0.18
0.50
1.10
0.24
0.20
0.40
0.70
0.10
0.10
0.40
0.30
0.40
0.70
0.41
0.10
1.40
0.38
1.10
1.30
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.608
0.548
3.229
0.292
2.631
0.539
2.901
7.425
1.620
0.924
1.910
3.509
0.477
0.461
2.120
1.852
4.260
4.488
2.072
0.510
7.594
2.352
1.630
1.927
9.82
11.43
6.07
10.75
10.13
12.78
8.53
12.09
12.52
18.20
8.40
12.75
16.68
16.77
13.39
10.22
10.22
12.36
18.37
14.02
14.55
15.97
5.94
6.14
24.94
28.67
27.63
3.74
32.65
9.34
34.66
110.81
25.04
17.90
16.31
47.62
8.63
8.38
33.78
26.70
53.74
68.48
44.11
9.04
139.65
46.38
40.03
48.91
Chainage
Sub-total Feni Division
Year
NPV
12.12
Laxmipur Division
R143
R143
R143
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
4563 Regional DBST @ Traff 4000-6000
5722 Regional Overlay 60mm @ IRI 5.5-9
5722 Regional Overlay 60mm @ IRI 5.5-9
Sub-total Laxmipur Division
Noakhali Division
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
R140
R140
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Comilla-Begumganj Road
Comilla-Begumganj Road
13490
11451
10253
10253
10253
10253
13564
11451
11451
10253
10253
10253
10253
10253
10253
11451
11451
11451
11451
11451
11451
11451
10112
10112
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Appendix-B: Page: 19 of 61
DBST @ Traff >6000
DBST @ Traff >6000
Overlay 50mm @ IRI 5
Overlay 50mm @ IRI 5
Overlay 50mm @ IRI 5
Overlay 50mm @ IRI 5
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ Traff >6000
DBST @ Traff >6000
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R140
R140
R140
R141
R141
R141
R141
R141
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R143
R143
R143
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 132.97-133.17
Km 135.17-135.67
Km 136.97-137.37
Km 031.82-032.22
Km 035.72-037.97
Km 035.32-035.62
Km 032.52-033.12
Km 034.62-034.72
Km 028.25-028.99
Km 000.00-000.30
Km 026.35-027.25
Km 000.50-001.50
Km 001.70-002.10
Km 002.90-003.90
Km 004.00-004.10
Km 004.40-007.50
Km 008.20-008.60
Km 008.70-010.60
Km 021.85-022.45
Km 022.55-022.95
Km 023.05-024.95
Km 000.00-000.10
Km 001.40-004.30
Km 000.40-001.30
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.20 10112 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 10112 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 10112 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 4887 Regional DBST @ Traff 4000-6000
S
2.24 4887 Regional DBST @ Traff 4000-6000
S
0.30 4887 Regional DBST 25mm @ 25% Crk
S
0.60 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.75 4887 Regional DBST @ Traff 4000-6000
S
0.30 9769 Regional DBST 25mm @ 25% Crk
S
0.90 4887 Regional DBST 25mm @ 25% Crk
S
1.00 9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 9769 Regional Overlay 60mm @ IRI 5.5-9
S
1.00 9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 9769 Regional Overlay 60mm @ IRI 5.5-9
S
3.10 9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 9769 Regional Overlay 60mm @ IRI 5.5-9
S
1.90 9769 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 7837 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 7837 Regional Overlay 60mm @ IRI 5.5-9
S
1.90 5770 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 4563 Regional DBST 25mm @ 25% Crk
S
2.90 4563 Regional DBST 25mm @ 25% Crk
S
0.90 4563 Regional Overlay 50mm @ IRI 5-7
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Noakhali Division
Total Comilla Zone
Fin Cost
NPV /
(Mill Taka) Cost
0.747
8.03
1.867
8.07
1.494
7.46
0.569
6.15
3.354
5.22
0.430
4.59
2.166
8.09
0.367
6.64
1.015
5.69
0.408
5.81
1.223
6.99
3.423
7.49
1.369
7.85
3.423
7.81
0.342
9.27
10.611
7.67
1.369
8.15
6.503
7.69
2.054
6.07
1.369
7.07
6.503
8.23
0.096
4.43
2.758
0.86
1.898
1.53
111.237
NPV
9.45
22.65
16.95
15.72
75.66
8.23
28.33
4.09
25.89
8.14
31.22
39.95
16.73
42.09
5.13
133.60
15.75
73.06
18.20
12.23
67.62
0.73
4.71
2.95
527.708
Dhaka Zone
Dhaka Division
N105
N105
N3
N3
N302
Madanpur-Joydevpur
Madanpur-Joydevpur
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Tongi-Ashulia-Zerabo-EPZ Road
Km 018.00-027.84
Km 027.84-028.00
Km 009.10-010.00
Km 009.10-010.00
Km 000.00-006.50
S
S
L
R
S
9.84
0.16
0.90
0.90
6.50
11312
12144
11451
11451
21914
National
National
National
National
National
Appendix-B: Page: 20 of 61
DBST @ Traff >6000
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 5-9
2013
2013
2013
2013
2013
17.750
0.937
12.594
12.594
53.556
11.29 916.57
10.82
12.52
7.09 110.21
7.07 109.90
21.80 1441.83
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N302
N302
N5
N501
N501
N501
N501
N501
N501
R112
R504
R801
R802
R803
R812
Road Name
Tongi-Ashulia-Zerabo-EPZ Road
Tongi-Ashulia-Zerabo-EPZ Road
Dhaka -Utholi-Banglabandh Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Narayanganj -Rampura Road
Hemayetpur-Manikganj Road
Jurain-Chasara Road
Bishwa -Kayetpara Road
Jurain-Abdullahpur Road
Fatullah -Mawa Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 006.50-017.44
Km 017.44-017.55
Km 017.70-017.81
Km 012.40-013.98
Km 009.10-010.50
Km 010.90-011.10
Km 011.10-012.40
Km 001.70-002.00
Km 005.10-008.30
Km 000.00-017.50
Km 003.20-004.00
Km 000.00-010.00
Km 000.00-004.24
Km 000.00-026.31
Km 000.00-008.83
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
10.94 15146 National Overlay 80mm @ IRI 5-9
S
0.11 18611 National Overlay 80mm @ IRI 5-9
R
0.11 9061 National Overlay 50mm @ IRI 4-7
S
1.58 9061 National DBST @ Traff >6000
S
1.40 9061 National Overlay 60mm @ IRI 7-9
S
0.20 9061 National Overlay 60mm @ IRI 7-9
S
1.30 9061 National Overlay 60mm @ IRI 7-9
S
0.30 10311 National Overlay 80mm @ IRI 5-9
S
3.20 10311 National Overlay 80mm @ IRI 5-9
S
17.50 3019 Regional Overlay 50mm @ IRI 7-9
S
0.80 4187 Regional Overlay 60mm @ IRI 7-9
S
10.00 4887 Regional Overlay 60mm @ IRI 7-9
S
4.24 3875 Regional Overlay 50mm @ IRI 7-9
S
26.31 4887 Regional Overlay 60mm @ IRI 7-9
S
8.83 13225 Regional DBST @ Traff >6000
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Dhaka Division
Fin Cost
NPV /
NPV
(Mill Taka) Cost
86.522 13.55 1447.53
0.816 19.37
19.53
0.290 12.25
4.34
1.884 10.17
71.54
4.182 11.16
68.43
0.597 10.59
9.39
3.883
9.88
57.62
1.185
9.85
10.51
12.643
6.86
78.10
29.229
5.38 254.48
2.803
4.81
20.99
46.676
5.31 356.74
11.181
2.72
36.11
114.616
6.18 1104.93
11.930 11.17 604.91
425.869
Gazipur Division
N105
N105
N105
N105
N105
N105
N105
N105
N3
N3
N3
N3
N3
N3
N3
N3
N3
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Madanpur-Joydevpur
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Km 028.84-029.14
Km 032.24-036.94
Km 028.00-028.84
Km 029.14-029.44
Km 029.44-030.24
Km 030.24-032.24
Km 036.94-040.14
Km 043.14-048.66
Km 022.30-023.20
Km 022.30-023.20
Km 036.75-039.78
Km 010.00-012.70
Km 012.80-014.30
Km 014.70-014.80
Km 015.30-015.40
Km 015.60-017.80
Km 010.00-012.70
S
S
S
S
S
S
S
S
L
R
S
L
L
L
L
L
R
0.30
4.70
0.84
0.30
0.80
2.00
3.20
5.52
0.90
0.90
3.03
2.70
1.50
0.10
0.10
2.20
2.70
11451
11451
10730
11451
11451
11451
11451
11451
11451
11451
11451
8665
8665
8665
8665
8665
8665
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 21 of 61
DBST @ Traff >6000
Overlay 50mm @ IRI 5
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.541
17.908
5.071
1.803
4.807
12.018
19.228
33.144
2.445
3.779
8.460
23.958
11.486
0.391
0.391
17.982
23.958
15.40
14.46
11.30
8.90
18.91
14.37
12.11
9.89
6.31
5.04
13.97
4.76
5.49
8.46
10.65
4.44
4.26
38.09
386.17
70.75
19.82
112.25
213.28
315.98
444.88
76.12
94.09
540.48
194.60
120.51
6.85
7.97
152.65
174.28
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N4
N4
N4
N4
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
Road Name
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 012.80-014.30
Km 014.70-014.80
Km 015.30-015.40
Km 014.80-015.30
Km 014.80-015.30
Km 019.60-022.30
Km 023.20-023.98
Km 048.65-049.03
Km 019.60-022.30
Km 023.20-023.98
Km 048.65-049.03
Km 033.55-036.75
Km 039.78-044.65
Km 045.35-047.05
Km 048.15-048.58
Km 049.03-055.40
Km 055.40-055.80
Km 055.80-058.00
Km 000.00-017.27
Km 017.27-019.47
Km 019.67-021.37
Km 021.47-026.75
Km 000.01-000.06
Km 001.50-001.70
Km 000.01-000.06
Km 000.00-000.01
Km 000.06-000.71
Km 004.90-005.40
Km 005.60-005.90
Km 008.00-008.10
Km 026.03-026.43
Km 001.30-001.40
Km 001.90-002.50
Km 002.60-002.70
Km 002.80-004.10
Road
Cway Length
AADT
Work Name
Class
Side
(km)
R
1.50 8665 National Overlay 50mm @ IRI 4-7
R
0.10 8665 National Overlay 50mm @ IRI 4-7
R
0.10 8665 National Overlay 50mm @ IRI 4-7
L
0.50 8665 National Overlay 60mm @ IRI 7-9
R
0.50 8665 National Overlay 60mm @ IRI 7-9
L
2.70 11451 National Overlay 80mm @ IRI 4-9
L
0.78 11451 National Overlay 80mm @ IRI 4-9
L
0.38 11451 National Overlay 80mm @ IRI 4-9
R
2.70 11451 National Overlay 80mm @ IRI 4-9
R
0.78 11451 National Overlay 80mm @ IRI 4-9
R
0.38 11451 National Overlay 80mm @ IRI 4-9
S
3.20 11451 National Overlay 80mm @ IRI 4-9
S
4.87 11451 National Overlay 80mm @ IRI 4-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
0.43 11451 National Overlay 80mm @ IRI 4-9
S
6.37 11451 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
2.20 11451 National Overlay 80mm @ IRI 4-9
S
17.27 15927 National Overlay 80mm @ IRI 4-9
S
2.20 16227 National Overlay 80mm @ IRI 4-9
S
1.70 16574 National Overlay 80mm @ IRI 4-9
S
5.28 19452 National Overlay 80mm @ IRI 4-9
R
0.05 30316 Regional DBST @ Traff >6000
S
0.20 21334 Regional DBST @ Traff >6000
L
0.05 30316 Regional DBST 25mm @ 25% Crk
S
0.01 30316 Regional DBST 25mm @ 25% Crk
S
0.64 30316 Regional DBST 25mm @ 25% Crk
S
0.50 21334 Regional DBST 25mm @ 25% Crk
S
0.30 21334 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 21334 Regional Overlay 60mm @ IRI 5.5-9
S
1.30 21334 Regional Overlay 60mm @ IRI 5.5-9
Appendix-B: Page: 22 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
NPV
(Mill Taka) Cost
10.217
6.28 122.59
0.391
7.36
5.97
0.391 13.36
10.00
2.334
9.17
37.41
2.334
7.24
31.22
22.758
9.16 336.89
7.090
9.10
87.50
2.195 12.89
34.33
24.891
5.98 219.09
10.957
6.11
82.66
2.195 12.89
34.33
25.839 12.20 427.71
36.270
9.61 430.25
10.215 13.73 190.22
2.590
8.39
26.84
43.309
7.98 426.70
2.469 12.75
38.89
13.581
6.35 105.46
114.575 11.22 1743.44
17.239 15.44 410.38
10.915 12.64 203.11
33.074 18.46 828.26
0.142 21.26
9.93
0.346 16.98
18.33
0.124 27.65
10.78
0.041
8.87
1.61
1.928 21.98 137.15
0.692 27.90
67.67
0.415 28.79
42.73
0.138
7.39
3.19
1.211 11.47
19.38
0.436 27.67
13.63
2.106 33.50
81.76
0.349 40.02
17.62
4.531 38.79 215.19
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R301
R301
R301
R301
R301
R301
R302
R302
R302
R302
R302
R302
R302
R302
R302
R303
R303
R303
R303
R310
R310
R310
R310
R310
R310
R310
R310
R310
R310
R311
R311
R311
R311
R311
R311
Road Name
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Tongi By-Pass Road
Tongi By-Pass Road
Tongi By-Pass Road
Tongi By-Pass Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 004.20-004.70
Km 006.30-006.50
Km 006.60-006.80
Km 006.90-007.50
Km 008.40-009.30
Km 024.70-025.93
Km 004.60-004.70
Km 005.90-006.20
Km 000.00-000.10
Km 000.30-001.40
Km 006.40-007.04
Km 005.00-005.20
Km 001.80-003.00
Km 003.80-004.20
Km 005.60-005.70
Km 000.00-000.10
Km 000.90-001.40
Km 000.20-000.30
Km 000.60-000.70
Km 000.00-000.10
Km 000.20-001.70
Km 003.80-004.20
Km 004.50-005.10
Km 007.40-010.29
Km 001.90-002.20
Km 002.60-003.40
Km 005.20-005.50
Km 010.48-011.36
Km 011.50-034.73
Km 000.00-000.20
Km 001.40-001.50
Km 000.30-000.90
Km 001.10-001.30
Km 002.00-002.20
Km 003.90-004.10
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.50 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 21334 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 8310 Regional Overlay 60mm @ IRI 5.5-9
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
S
1.23 4285 Regional Overlay 60mm @ IRI 7-9
S
0.10 3076 Regional DBST @ Traff 2000-4000
S
0.30 3076 Regional DBST @ Traff 2000-4000
S
0.10 3076 Regional DBST 25mm @ 25% Crk
S
1.10 3076 Regional DBST 25mm @ 25% Crk
S
0.64 3076 Regional DBST 25mm @ 25% Crk
S
0.20 3076 Regional Overlay 50mm @ IRI 5-7
S
1.20 3076 Regional Overlay 50mm @ IRI 7-9
S
0.40 3076 Regional Overlay 50mm @ IRI 7-9
S
0.10 3076 Regional Overlay 50mm @ IRI 7-9
S
0.10 10199 Regional DBST 25mm @ 25% Crk
S
0.50 10199 Regional DBST 25mm @ 25% Crk
S
0.10 10199 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 10199 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 17870 Regional DBST @ Traff >6000
S
1.50 17870 Regional DBST @ Traff >6000
S
0.40 6578 Regional DBST 25mm @ 25% Crk
S
0.60 6578 Regional DBST 25mm @ 25% Crk
S
2.89 6578 Regional DBST 25mm @ 25% Crk
S
0.30 17870 Regional Overlay 60mm @ IRI 5.5-9
S
0.80 5531 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 6578 Regional Overlay 60mm @ IRI 5.5-9
S
0.88 6578 Regional Overlay 60mm @ IRI 5.5-9
S
23.23 6578 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 2929 Regional DBST 25mm @ 25% Crk
S
0.10 2929 Regional DBST 25mm @ 25% Crk
S
0.60 2929 Regional Overlay 50mm @ IRI 5-7
S
0.20 2929 Regional Overlay 50mm @ IRI 5-7
S
0.20 2929 Regional Overlay 50mm @ IRI 5-7
S
0.20 2929 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 23 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.743 31.24
0.697 38.12
0.792 33.73
2.102 22.09
3.282 12.29
4.436 11.08
0.138
6.60
0.415
5.15
0.138
1.74
1.560
0.99
0.885
4.90
0.585
6.82
3.508
4.07
1.169
6.96
0.292
6.66
0.136 12.40
0.677 13.78
0.342 12.66
0.342 20.20
0.287
8.76
4.261 15.98
0.816
2.64
1.208
1.54
3.828
0.88
2.128 20.25
4.854
2.33
0.896 11.00
2.886 11.28
79.668
8.96
0.188
2.44
0.094
4.14
1.190
3.33
0.397
4.77
0.397
4.78
0.397
4.85
NPV
66.66
31.61
33.74
55.26
51.28
67.63
3.24
6.21
0.44
2.88
15.50
5.84
17.77
13.54
3.26
5.22
30.09
6.33
9.04
8.78
263.76
4.87
3.92
5.47
56.96
13.79
10.68
36.81
789.45
0.78
0.71
4.38
2.09
1.95
1.96
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R311
R311
R311
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R314
R315
R315
R315
R315
R315
R315
R315
R315
R315
R505
Road Name
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Gafargaon-Mawna Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Nabinagar-Kaliakoir Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 001.50-002.00
Km 002.60-003.10
Km 003.50-003.60
Km 008.57-008.87
Km 019.77-020.57
Km 021.97-022.17
Km 006.35-006.47
Km 006.77-007.07
Km 018.07-018.27
Km 020.97-021.07
Km 025.17-025.27
Km 033.07-033.37
Km 033.47-033.57
Km 034.97-035.07
Km 000.00-000.90
Km 019.27-019.37
Km 001.70-002.70
Km 003.40-004.20
Km 004.80-004.90
Km 007.27-007.47
Km 017.47-017.77
Km 023.27-023.87
Km 031.67-032.87
Km 035.37-035.47
Km 037.00-042.16
Km 031.00-031.50
Km 034.40-034.60
Km 034.60-034.80
Km 034.80-036.10
Km 033.70-034.40
Km 036.10-036.20
Km 032.50-033.60
Km 037.90-039.40
Km 000.00-030.60
Km 014.00-015.83
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.50 2929 Regional Overlay 50mm @ IRI 7-9
S
0.50 2929 Regional Overlay 50mm @ IRI 7-9
S
0.10 2929 Regional Overlay 50mm @ IRI 7-9
S
0.30 3571 Regional DBST @ Traff 2000-4000
S
0.80 3571 Regional DBST @ Traff 2000-4000
S
0.20 5572 Regional DBST @ Traff 4000-6000
S
0.11 3019 Regional DBST 25mm @ 25% Crk
S
0.30 3571 Regional DBST 25mm @ 25% Crk
S
0.20 3571 Regional DBST 25mm @ 25% Crk
S
0.10 3571 Regional DBST 25mm @ 25% Crk
S
0.10 5572 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.90 3019 Regional Overlay 50mm @ IRI 5-7
S
0.10 3571 Regional Overlay 50mm @ IRI 5-7
S
1.00 3019 Regional Overlay 50mm @ IRI 7-9
S
0.80 3019 Regional Overlay 50mm @ IRI 7-9
S
0.10 3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 3571 Regional Overlay 50mm @ IRI 7-9
S
0.30 3571 Regional Overlay 50mm @ IRI 7-9
S
0.60 5572 Regional Overlay 60mm @ IRI 5.5-9
S
1.20 4741 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
5.16 1346 Regional Overlay 50mm @ IRI 7-9
S
0.50 2048 Regional DBST @ Traff 2000-4000
S
0.20 2048 Regional DBST @ Traff 2000-4000
S
0.20 2048 Regional DBST @ Traff 2000-4000
S
1.30 2048 Regional DBST @ Traff 2000-4000
S
0.70 2048 Regional DBST 25mm @ 25% Crk
S
0.10 2048 Regional DBST 25mm @ 25% Crk
S
1.10 2048 Regional Overlay 50mm @ IRI 5-7
S
1.50 2048 Regional Overlay 50mm @ IRI 5-7
S
30.60 3372 Regional Overlay 50mm @ IRI 7-9
S
1.83 17384 Regional DBST @ Traff >6000
Appendix-B: Page: 24 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
0.992
4.05
0.992
4.01
0.198
6.94
0.222
3.13
0.594
3.95
0.247
8.10
0.094
5.78
0.252
1.64
0.148
4.81
0.074
4.06
0.124
4.99
0.408
5.60
0.136
5.82
0.136
5.99
1.785
8.33
0.157
5.44
1.775
7.97
1.420
6.09
0.177
9.44
0.355
5.19
0.470
7.02
1.867 15.31
4.107
6.54
0.342 12.71
9.692
2.47
0.420
6.27
0.153
9.41
0.153
3.33
0.995
8.75
0.536
3.31
0.077
6.29
1.780
7.29
2.427
4.13
60.053
7.28
3.381 19.30
NPV
5.26
5.39
1.56
1.57
7.33
5.77
1.50
0.77
2.21
0.96
1.05
6.86
1.53
1.63
20.35
1.34
19.18
10.59
1.99
2.50
4.82
36.11
42.86
5.04
27.72
8.65
5.13
1.40
31.03
4.73
0.90
15.04
10.34
662.49
229.48
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Cway Length
AADT
Side
(km)
Road
Class
Work Name
Year
Sub-total Gazipur Division
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
819.128
Jamalpur Division
N4
N4
N4
N4
N4
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Km 130.81-137.61
Km 127.15-127.61
Km 127.61-130.71
Km 143.01-143.41
Km 144.11-146.30
S
S
S
S
S
Km 071.71-071.94
Km 072.04-074.18
Km 032.38-044.75
Km 017.79-022.31
Km 108.89-109.38
Km 109.68-116.10
Km 095.98-102.68
Km 102.68-108.89
Km 095.58-095.98
Km 003.00-003.10
S
S
S
S
S
S
S
S
S
S
Km 051.03-057.46
Km 057.46-065.56
Km 001.58-003.25
Km 001.58-003.25
Km 039.40-043.30
Km 044.00-044.70
Km 044.80-045.00
Km 000.00-009.10
Km 000.00-001.20
Km 003.90-005.00
S
S
L
R
S
S
S
S
S
S
6.80 9061
0.46 3779
3.10 9061
0.40 9061
2.19 11451
National
National
National
National
National
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
18.918
1.309
10.611
1.319
12.757
44.914
14.27
4.73
8.36
9.16
13.12
436.54
7.58
147.09
18.67
270.52
0.23 11451 National Overlay 80mm @ IRI 4-9
2.14 10258 National Overlay 80mm @ IRI 4-9
12.37 4153 Regional DBST 25mm @ 25% Crk
4.52 3019 Regional Overlay 50mm @ IRI 7-9
0.48 4887 Regional DBST @ Traff 4000-6000
6.42 4887 Regional DBST 25mm @ 25% Crk
6.70 4887 Regional Overlay 50mm @ IRI 5-7
6.22 4887 Regional Overlay 50mm @ IRI 5-7
0.40 4887 Regional Overlay 60mm @ IRI 7-9
0.09 3019 Regional DBST @ Traff 2000-4000
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.408
13.223
14.240
8.489
0.658
9.008
21.997
19.986
1.369
0.023
90.402
9.50
5.12
1.33
5.78
10.35
7.16
7.04
8.10
13.32
11.50
19.69
80.51
50.29
61.99
25.47
221.66
213.65
244.30
23.04
1.07
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
23.981
45.909
2.366
2.366
6.310
1.133
0.324
43.154
3.382
1.975
9.18
10.67
1.04
1.04
5.04
3.93
6.27
10.97
12.64
7.68
420.88
578.22
7.70
7.70
28.61
5.12
2.25
754.09
57.00
19.17
Sub-total Jamalpur Division
Kishoreganj Division
N2
N2
R211
R212
R360
R360
R360
R360
R360
R364
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Itakhola-Kotiadi Road
Akdaria -Agarpur Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Battoli - Kishoreganj Road
Sub-total Kishoreganj Division
Manikganj Division
N5
N5
N503
N503
R315
R315
R315
R505
R506
R506
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Utholi-Aricha Road
Utholi-Aricha Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Nabinagar-Kaliakoir Road
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
6.43 7636 National Overlay 50mm @ IRI 4-7
8.10 11451 National Overlay 80mm @ IRI 4-9
1.67 2015 National DBST 25mm @ 25% Crk
1.67 2015 National DBST 25mm @ 25% Crk
3.90 2048 Regional Overlay 50mm @ IRI 5-7
0.70 2048 Regional Overlay 50mm @ IRI 5-7
0.20 2048 Regional Overlay 50mm @ IRI 5-7
9.10 13534 Regional Overlay 60mm @ IRI 5.5-9
1.20 4887 Regional Overlay 50mm @ IRI 5-7
1.10 3019 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 25 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R506
R506
R506
R506
R506
Road Name
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 001.70-003.10
Km 010.30-010.70
Km 001.20-001.70
Km 003.10-003.90
Km 005.00-005.20
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.40 3019 Regional Overlay 50mm @ IRI 7-9
S
0.40 3019 Regional Overlay 50mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
Sub-total Manikganj Division
Fin Cost
NPV /
(Mill Taka) Cost
3.011
6.51
0.724
8.87
1.612 15.03
2.639
9.57
0.672 10.11
139.559
NPV
24.75
8.40
29.66
36.90
9.92
Munshiganj Division
N8
N8
N8
N8
N8
N8
N8
N8
R812
R812
R812
R813
R813
R813
R813
R820
R820
R820
R820
R820
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Fatullah -Mawa Road
Fatullah -Mawa Road
Fatullah -Mawa Road
Muktarpur - Munshiganj Road
Muktarpur - Munshiganj Road
Muktarpur - Munshiganj Road
Muktarpur - Munshiganj Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Km 003.60-004.10
Km 012.50-012.70
Km 013.80-014.10
Km 014.20-014.60
Km 010.70-011.00
Km 012.70-013.80
Km 019.10-019.90
Km 033.10-034.93
Km 008.83-010.22
Km 012.82-018.82
Km 010.42-011.32
Km 000.40-001.60
Km 002.00-002.50
Km 002.50-004.00
Km 000.00-000.40
Km 016.73-022.91
Km 041.88-042.58
Km 029.21-040.18
Km 010.47-016.73
Km 040.28-041.48
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Km 059.20-059.30
Km 069.10-071.10
Km 074.30-074.50
S
S
S
0.50
0.20
0.30
0.40
0.30
1.10
0.80
1.83
1.39
6.00
0.90
1.20
0.50
1.50
0.40
6.18
0.70
10.97
6.26
1.20
11451
11451
11451
11451
11451
11451
11451
11451
13225
8882
4887
3788
3788
3788
3788
4579
4887
4887
5393
4887
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 7-9
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST 25mm @ 25% Crk
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.050
0.371
0.556
0.741
1.852
6.791
4.939
11.297
4.798
21.023
3.081
1.067
0.445
1.752
0.356
7.744
0.968
30.756
21.994
4.182
125.761
15.29
11.49
11.69
14.32
12.91
6.36
12.55
9.49
15.01
10.27
7.04
5.30
5.39
2.08
2.55
10.04
9.64
14.42
5.41
7.49
73.41
18.89
28.83
47.10
29.26
50.01
76.56
157.85
120.25
354.36
34.59
20.15
8.54
9.46
1.80
258.77
36.40
591.37
145.40
47.10
2013
2013
2013
0.185
4.910
0.371
12.60
6.69
13.86
9.63
173.59
22.64
Sub-total Munshiganj Division
Mymensingh Division
N3
N3
N3
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
0.10 11451 National DBST @ Traff >6000
2.00 11451 National DBST @ Traff >6000
0.20 11451 National DBST @ Traff >6000
Appendix-B: Page: 26 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N309
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
Road Name
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Mymensingh Town By-Pass Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 088.80-090.00
Km 108.48-109.00
Km 108.48-109.00
Km 058.00-059.20
Km 059.30-064.80
Km 064.90-067.50
Km 067.90-069.10
Km 071.10-072.20
Km 072.20-073.10
Km 073.10-073.60
Km 073.60-073.80
Km 073.80-074.30
Km 074.50-074.60
Km 074.60-077.20
Km 077.20-085.70
Km 085.70-088.80
Km 090.00-094.00
Km 094.00-097.20
Km 097.20-106.60
Km 005.16-007.40
Km 010.60-010.80
Km 012.10-012.30
Km 000.00-000.80
Km 012.30-012.70
Km 013.10-013.30
Km 013.40-013.60
Km 013.70-015.10
Km 019.60-030.15
Km 001.10-003.40
Km 003.80-004.00
Km 004.50-007.50
Km 008.00-009.90
Km 010.20-010.60
Km 010.80-011.50
Km 015.60-017.10
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.20 11451 National DBST @ Traff >6000
L
0.52 11451 National Overlay 80mm @ IRI 4-9
R
0.52 11451 National Overlay 80mm @ IRI 4-9
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
5.50 11451 National Overlay 80mm @ IRI 4-9
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
1.20 11451 National Overlay 80mm @ IRI 4-9
S
1.10 11451 National Overlay 80mm @ IRI 4-9
S
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
2.60 11451 National Overlay 80mm @ IRI 4-9
S
8.50 11451 National Overlay 80mm @ IRI 4-9
S
3.10 11451 National Overlay 80mm @ IRI 4-9
S
4.00 11451 National Overlay 80mm @ IRI 4-9
S
3.20 11451 National Overlay 80mm @ IRI 4-9
S
9.40 11451 National Overlay 80mm @ IRI 4-9
S
2.24 11451 National Overlay 80mm @ IRI 5-9
S
0.20 1346 Regional DBST @ Traff 100-2000
S
0.20 1346 Regional DBST @ Traff 100-2000
S
0.80 1346 Regional DBST 25mm @ 25% Crk
S
0.40 1346 Regional DBST 25mm @ 25% Crk
S
0.20 1346 Regional DBST 25mm @ 25% Crk
S
0.20 1346 Regional DBST 25mm @ 25% Crk
S
1.40 1346 Regional DBST 25mm @ 25% Crk
S
10.55 1346 Regional DBST 25mm @ 25% Crk
S
2.30 1346 Regional Overlay 50mm @ IRI 5-7
S
0.20 1346 Regional Overlay 50mm @ IRI 5-7
S
3.00 1346 Regional Overlay 50mm @ IRI 5-7
S
1.90 1346 Regional Overlay 50mm @ IRI 5-7
S
0.40 1346 Regional Overlay 50mm @ IRI 5-7
S
0.70 1346 Regional Overlay 50mm @ IRI 5-7
S
1.50 1346 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 27 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
2.223 12.14
3.210 11.84
3.210 11.84
7.408
6.53
34.497
7.47
16.051
9.30
7.408 13.63
6.791
8.86
5.556
9.80
3.087
6.36
1.235 13.02
3.087
6.80
0.617
6.52
16.051 17.04
52.474
7.98
19.138 13.94
26.241
9.93
19.749
8.76
58.572
8.60
17.724
9.11
0.148
5.23
0.148
4.32
0.771
1.23
0.296
1.12
0.148
1.71
0.148
1.62
1.037
0.86
14.753
0.73
4.658
2.69
0.397
2.51
4.885
2.91
6.803
1.28
0.626
3.89
1.096
4.45
2.349
2.59
NPV
133.22
46.94
46.94
52.44
318.18
184.31
124.65
88.61
65.62
24.23
19.36
24.76
4.97
337.77
516.84
361.89
415.75
254.78
621.79
197.79
2.61
2.15
2.04
0.62
0.43
0.49
1.69
20.11
14.52
1.21
19.09
11.33
3.27
5.97
6.01
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R314
R371
R371
R371
R371
R371
R371
Road Name
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 017.20-018.30
Km 018.70-019.60
Km 003.40-003.80
Km 004.00-004.50
Km 007.50-008.00
Km 009.90-010.20
Km 011.50-011.90
Km 011.90-012.10
Km 015.30-015.50
Km 018.30-018.70
Km 030.15-037.00
Km 030.00-030.40
Km 030.40-031.00
Km 034.70-034.77
Km 000.00-018.10
Km 031.00-032.40
Km 032.60-034.70
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.10 1346 Regional Overlay 50mm @ IRI 5-7
S
0.90 1346 Regional Overlay 50mm @ IRI 5-7
S
0.40 1346 Regional Overlay 50mm @ IRI 7-9
S
0.50 1346 Regional Overlay 50mm @ IRI 7-9
S
0.50 1346 Regional Overlay 50mm @ IRI 7-9
S
0.30 1346 Regional Overlay 50mm @ IRI 7-9
S
0.40 1346 Regional Overlay 50mm @ IRI 7-9
S
0.20 1346 Regional Overlay 50mm @ IRI 7-9
S
0.20 1346 Regional Overlay 50mm @ IRI 7-9
S
0.40 1346 Regional Overlay 50mm @ IRI 7-9
S
6.85 1346 Regional Overlay 50mm @ IRI 7-9
S
0.40 4887 Regional DBST @ Traff 4000-6000
S
0.60 4887 Regional DBST @ Traff 4000-6000
S
0.07 4887 Regional DBST @ Traff 4000-6000
S
18.10 4540 Regional DBST 25mm @ 25% Crk
S
1.40 4887 Regional Overlay 50mm @ IRI 5-7
S
2.10 4887 Regional Overlay 50mm @ IRI 5-7
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Mymensingh Division
Fin Cost
NPV /
(Mill Taka) Cost
1.722
2.31
1.550
3.43
0.793
3.88
0.992
3.36
0.783
4.49
0.825
2.26
0.626
5.02
0.313
5.33
0.313
4.28
0.626
4.81
12.866
3.23
0.593
3.73
0.889
5.04
0.104 10.64
26.869
5.00
4.384
4.50
6.577
4.84
408.884
NPV
4.44
5.77
3.77
4.21
4.44
2.55
4.63
2.04
1.70
4.25
50.86
6.32
15.06
4.31
386.80
24.04
44.17
Narayanganj Division
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.30-009.40
Dhaka-Comilla-Chittagong-Teknaf RoadKm 000.00-000.70
Dhaka-Comilla-Chittagong-Teknaf RoadKm 020.98-021.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 005.60-006.10
Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.40-012.40
Dhaka-Comilla-Chittagong-Teknaf RoadKm 003.70-005.40
Dhaka-Comilla-Chittagong-Teknaf RoadKm 006.70-009.00
Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.20-009.30
Dhaka-Comilla-Chittagong-Teknaf RoadKm 026.08-034.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 035.18-035.68
Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.20-009.30
Dhaka-Comilla-Chittagong-Teknaf RoadKm 012.60-016.50
Dhaka-Comilla-Chittagong-Teknaf RoadKm 018.58-018.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 020.78-020.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 025.08-025.88
L
R
R
R
R
R
R
L
L
L
R
R
R
R
R
0.10
0.70
0.80
0.50
3.00
1.70
2.30
0.10
8.80
0.50
0.10
3.90
0.20
0.10
0.80
11451
11451
11451
8665
11451
8665
8665
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 28 of 61
DBST @ Traff >6000
DBST @ Traff >6000
DBST @ Traff >6000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.183
1.527
1.940
0.988
12.120
6.513
9.448
0.609
55.340
3.046
0.609
27.062
1.235
1.152
4.873
17.34
6.08
5.97
9.25
14.48
10.26
11.82
7.45
8.19
12.44
8.23
7.52
13.90
6.48
9.19
14.49
47.31
61.14
35.98
316.39
127.74
201.32
5.60
667.51
51.40
6.19
299.57
29.80
11.51
63.22
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N105
N105
N105
N105
N105
N2
N2
N2
R111
R113
R113
R113
R113
R113
R113
R113
R114
R114
R114
R114
R114
R114
R114
R114
R114
R114
R114
R114
R114
R114
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Dhaka-Comilla-Chittagong-Teknaf RoadKm 026.08-034.88
Dhaka-Comilla-Chittagong-Teknaf RoadKm 035.18-036.08
Dhaka-Comilla-Chittagong-Teknaf RoadKm 036.28-037.78
Dhaka-Comilla-Chittagong-Teknaf RoadKm 037.88-039.13
Dhaka-Comilla-Chittagong-Teknaf RoadKm 024.48-025.07
Madanpur-Joydevpur
Km 000.00-006.50
Madanpur-Joydevpur
Km 006.60-014.34
Madanpur-Joydevpur
Km 014.34-017.54
Madanpur-Joydevpur
Km 006.50-006.60
Madanpur-Joydevpur
Km 017.54-018.00
Dhaka-Sylhet-Jaflong Road
Km 000.00-000.13
Dhaka-Sylhet-Jaflong Road
Km 000.00-000.13
Dhaka-Sylhet-Jaflong Road
Km 000.13-017.00
Signboard -Narayanganj Road
Km 000.00-003.20
Madanpur-Sayedpur Road
Km 002.30-005.40
Madanpur-Sayedpur Road
Km 011.10-011.20
Madanpur-Sayedpur Road
Km 005.40-011.10
Madanpur-Sayedpur Road
Km 011.20-011.88
Madanpur-Sayedpur Road
Km 000.00-001.30
Madanpur-Sayedpur Road
Km 001.80-002.00
Madanpur-Sayedpur Road
Km 001.30-001.80
Nayapur-Raipura Road
Km 015.50-015.80
Nayapur-Raipura Road
Km 019.40-019.70
Nayapur-Raipura Road
Km 022.50-022.65
Nayapur-Raipura Road
Km 004.60-005.40
Nayapur-Raipura Road
Km 006.90-007.60
Nayapur-Raipura Road
Km 007.60-009.35
Nayapur-Raipura Road
Km 003.20-003.70
Nayapur-Raipura Road
Km 022.40-022.50
Nayapur-Raipura Road
Km 005.40-005.80
Nayapur-Raipura Road
Km 006.50-006.90
Nayapur-Raipura Road
Km 009.35-015.50
Nayapur-Raipura Road
Km 018.00-019.40
Nayapur-Raipura Road
Km 015.80-016.90
Nayapur-Raipura Road
Km 016.90-018.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
R
8.80 11451 National Overlay 80mm @ IRI 4-9
R
0.90 11451 National Overlay 80mm @ IRI 4-9
R
1.50 11451 National Overlay 80mm @ IRI 4-9
R
1.25 11451 National Overlay 80mm @ IRI 4-9
S
0.59 11451 National Overlay 80mm @ IRI 4-9
S
6.50 9061 National DBST @ Traff >6000
S
7.74 11451 National Overlay 50mm @ IRI 5
S
3.20 11451 National Overlay 50mm @ IRI 5
S
0.10 9061 National Overlay 50mm @ IRI 5-7
S
0.46 11451 National Overlay 80mm @ IRI 5-9
L
0.13 21762 National Overlay 50mm @ IRI 4
R
0.13 21762 National Overlay 50mm @ IRI 4
S
16.88 18233 National Overlay 50mm @ IRI 4
S
3.20 15970 Regional DBST 25mm @ 25% Crk
S
3.10 4887 Regional DBST @ Traff 4000-6000
S
0.10 5419 Regional DBST @ Traff 4000-6000
S
5.70 5074 Regional DBST 25mm @ 25% Crk
S
0.68 5419 Regional DBST 25mm @ 25% Crk
S
1.30 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 1140 Regional DBST @ Traff 100-2000
S
0.30 1140 Regional DBST @ Traff 100-2000
S
0.15 1140 Regional DBST @ Traff 100-2000
S
0.80 4082 Regional DBST @ Traff 4000-6000
S
0.70 4082 Regional DBST @ Traff 4000-6000
S
1.75 4082 Regional DBST @ Traff 4000-6000
S
0.50 4082 Regional DBST 25mm @ 25% Crk
S
0.10 1140 Regional DBST 25mm @ 25% Crk
S
0.40 4082 Regional Overlay 50mm @ IRI 5-7
S
0.40 4082 Regional Overlay 50mm @ IRI 5-7
S
6.16 1140 Regional Overlay 50mm @ IRI 5-7
S
1.40 1140 Regional Overlay 50mm @ IRI 5-7
S
1.10 1140 Regional Overlay 50mm @ IRI 7-9
S
1.10 1140 Regional Overlay 50mm @ IRI 7-9
Appendix-B: Page: 29 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
54.471 12.52
5.452 15.06
9.013 18.25
7.511 15.70
6.503
8.83
6.583
9.49
27.890 14.20
12.193
8.14
0.214 21.52
2.740
8.87
0.391 14.44
0.391 14.44
102.612
6.11
6.023 10.22
4.043 12.23
0.138
8.57
6.800
5.71
0.804
3.60
3.976
9.79
0.585 10.86
1.743 14.34
0.282
1.56
0.282
1.43
0.141
1.47
0.751
3.17
0.657
2.72
1.638
1.59
0.469
1.37
0.094
1.98
0.793
3.12
0.793
3.27
12.208
0.81
2.777
0.95
2.182
1.00
2.182
1.50
NPV
925.03
101.36
203.11
145.57
70.92
270.14
676.13
147.97
6.02
30.02
8.33
8.33
910.82
228.52
176.86
4.33
131.52
6.90
55.20
9.26
31.58
1.41
1.25
0.66
8.11
5.85
6.76
1.36
0.39
2.80
2.34
11.60
3.12
2.64
4.27
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R114
R114
R114
R114
R114
R201
R202
R202
R202
R202
R202
R202
R202
R202
R202
R202
R202
R202
R202
Road Name
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Tarabo-Demraghat Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 019.70-020.50
Km 020.50-022.40
Km 000.00-003.20
Km 004.00-004.60
Km 005.80-006.50
Km 000.00-002.12
Km 000.00-000.60
Km 001.70-002.90
Km 003.10-003.70
Km 002.90-003.10
Km 003.70-003.80
Km 003.90-004.00
Km 007.20-009.10
Km 004.40-004.70
Km 000.60-000.90
Km 001.00-001.30
Km 001.50-001.70
Km 005.10-005.70
Km 005.90-007.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.80 1140 Regional Overlay 50mm @ IRI 7-9
S
1.90 1140 Regional Overlay 50mm @ IRI 7-9
S
3.20 4082 Regional Overlay 60mm @ IRI 7-9
S
0.60 4082 Regional Overlay 60mm @ IRI 7-9
S
0.70 4082 Regional Overlay 60mm @ IRI 7-9
S
2.12 19185 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 6255 Regional DBST @ IRI>12
S
1.20 6255 Regional DBST @ IRI>12
S
0.60 6255 Regional DBST @ IRI>12
S
0.20 6255 Regional DBST @ Traff >6000
S
0.10 6255 Regional DBST @ Traff >6000
S
0.10 6255 Regional DBST 25mm @ 25% Crk
S
1.90 4887 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 6255 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 4887 Regional Overlay 60mm @ IRI 7-9
S
1.10 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Narayanganj Division
Fin Cost
NPV /
(Mill Taka) Cost
1.587
1.03
3.768
1.33
8.324
2.61
1.419
3.15
1.655
3.30
8.720 19.18
1.037
1.50
2.075
1.72
1.037
1.70
0.346
3.97
0.173
2.15
0.173
1.97
1.821
6.56
1.096
5.43
1.307
3.42
1.307
3.68
0.871
4.42
2.614
5.02
4.792
4.92
456.090
NPV
1.98
5.96
23.76
4.64
5.98
270.49
14.52
33.20
16.41
5.31
1.14
0.90
44.71
10.86
5.46
6.13
4.89
20.89
37.56
Narsingdi Division
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Km 033.58-033.65
Km 063.97-064.11
Km 041.54-041.64
Km 033.58-033.65
Km 041.54-041.64
Km 063.97-064.11
Km 017.70-027.40
Km 033.65-041.54
Km 041.64-042.60
Km 042.82-051.75
Km 027.49-027.65
Km 029.89-030.12
Km 051.75-051.89
L
L
L
R
R
R
S
S
S
S
L
L
L
0.06
0.14
0.10
0.06
0.10
0.14
9.70
7.89
0.96
8.93
0.15
0.22
0.14
9032
8884
16426
16426
16426
11669
17148
16426
16426
13453
9061
9061
8987
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 30 of 61
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.071
0.177
0.369
0.217
0.343
0.545
37.960
30.875
3.762
34.946
0.431
0.617
0.402
12.33
2.91
9.81
6.26
13.66
8.43
22.30
9.26
17.82
9.00
16.41
16.12
18.25 1249.48
16.87 939.24
11.10
71.27
14.01 882.80
11.70
7.26
16.73
16.69
10.83
5.95
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
R114
R114
R114
R114
R114
R114
R114
R210
R212
R212
R212
R212
R212
R212
R212
R212
R212
R212
R301
R301
R301
R301
R310
Road Name
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Shahepratap-Narsingdi Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Akdaria -Agarpur Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Joydebpur-Itakhola Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 054.55-054.91
Km 029.89-030.12
Km 051.75-051.89
Km 052.76-052.87
Km 054.55-054.91
Km 052.76-052.87
Km 058.95-059.00
Km 027.49-027.65
Km 058.95-059.00
Km 027.65-029.85
Km 030.12-033.47
Km 054.91-058.95
Km 022.65-025.00
Km 026.60-028.99
Km 025.00-025.75
Km 025.75-026.00
Km 026.10-026.20
Km 026.30-026.60
Km 028.99-054.78
Km 000.00-004.73
Km 009.00-009.42
Km 009.42-012.12
Km 013.02-014.82
Km 001.30-008.00
Km 008.00-008.80
Km 000.00-000.20
Km 012.12-013.02
Km 014.82-015.61
Km 015.61-017.79
Km 008.80-009.00
Km 031.03-031.13
Km 031.33-032.86
Km 030.63-030.73
Km 029.83-029.93
Km 034.73-043.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
L
0.36 8983 National Overlay 50mm @ IRI 4-7
R
0.22 9061 National Overlay 50mm @ IRI 4-7
R
0.14 8987 National Overlay 50mm @ IRI 4-7
R
0.11 8987 National Overlay 50mm @ IRI 4-7
R
0.36 8983 National Overlay 50mm @ IRI 4-7
L
0.11 12877 National Overlay 80mm @ IRI 4-9
L
0.05 11451 National Overlay 80mm @ IRI 4-9
R
0.15 11451 National Overlay 80mm @ IRI 4-9
R
0.05 11451 National Overlay 80mm @ IRI 4-9
S
2.21 11451 National Overlay 80mm @ IRI 4-9
S
3.36 15267 National Overlay 80mm @ IRI 4-9
S
4.04 11451 National Overlay 80mm @ IRI 4-9
S
2.35 1140 Regional DBST @ Traff 100-2000
S
2.39 3019 Regional DBST @ Traff 2000-4000
S
0.75 1140 Regional DBST 25mm @ 25% Crk
S
0.25 3019 Regional DBST 25mm @ 25% Crk
S
0.10 3019 Regional DBST 25mm @ 25% Crk
S
0.30 3019 Regional DBST 25mm @ 25% Crk
S
25.79 3806 Regional Overlay 50mm @ IRI 7-9
S
4.73 8494 Regional DBST 25mm @ 25% Crk
S
0.42 1469 Regional DBST @ Traff 100-2000
S
2.70 1469 Regional DBST @ Traff 100-2000
S
1.80 1469 Regional DBST @ Traff 100-2000
S
6.70 4887 Regional DBST @ Traff 4000-6000
S
0.80 4887 Regional DBST @ Traff 4000-6000
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.90 1469 Regional Overlay 50mm @ IRI 7-9
S
0.79 1469 Regional Overlay 50mm @ IRI 7-9
S
2.18 3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
1.53 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
8.27 4887 Regional Overlay 60mm @ IRI 7-9
Appendix-B: Page: 31 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
0.942 14.02
0.524 19.46
0.402 10.83
0.319 12.56
0.942 14.02
0.685 15.69
0.257 20.51
0.945 14.37
0.257 20.51
13.637 13.51
20.730 14.97
24.953 10.01
2.229
1.27
2.317
6.16
0.721
1.06
0.243
3.30
0.096
4.60
0.289
2.74
50.746 10.44
8.031
6.95
0.568
0.94
3.648
0.82
2.445
0.79
8.970
6.23
1.055
9.02
0.574
8.85
2.584
1.05
2.268
1.07
4.100
6.44
0.685 10.88
0.153
6.00
2.340
5.48
0.324
8.09
0.361 10.82
28.307
6.86
NPV
21.68
16.48
5.95
5.76
21.68
13.28
6.45
16.76
6.45
250.00
437.96
352.55
9.07
49.34
1.29
2.28
1.28
1.68
733.91
204.47
1.64
9.67
6.29
214.62
32.25
7.75
3.15
2.88
32.31
8.42
2.86
36.92
3.75
4.92
286.03
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Cway Length
AADT
Side
(km)
Road
Class
Work Name
Year
Sub-total Narsingdi Division
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
298.359
Sherpur Division
R371
R371
R371
R460
R460
R460
R460
R460
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Jamalpur-Sherpur-Bangaon Road
Jamalpur-Sherpur-Bangaon Road
Jamalpur-Sherpur-Bangaon Road
Jamalpur-Sherpur-Bangaon Road
Jamalpur-Sherpur-Bangaon Road
Km 035.20-035.60
Km 055.36-058.36
Km 034.77-035.20
Km 006.71-015.60
Km 001.20-001.80
Km 002.50-006.71
Km 000.70-001.20
Km 001.80-002.50
S
S
S
S
S
S
S
S
0.40
3.00
0.43
8.89
0.60
4.21
0.50
0.70
4887
3786
4887
4887
4422
4422
4422
4422
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 7-9
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
1.253
9.395
1.606
13.456
1.722
12.358
1.711
2.396
43.897
6.55
5.22
9.74
4.57
3.38
8.06
6.38
4.82
10.67
67.64
20.62
263.43
6.62
132.86
12.08
12.92
Km 039.89-039.99
Km 026.75-036.49
Km 091.76-097.39
Km 098.19-098.29
Km 099.09-100.59
Km 100.89-102.59
Km 102.79-103.49
Km 103.59-104.99
Km 105.09-107.46
Km 108.46-108.56
Km 108.66-109.16
Km 110.56-110.76
Km 114.46-117.51
Km 117.51-119.51
Km 120.41-120.51
Km 120.61-121.61
Km 121.61-121.91
Km 121.91-122.01
Km 122.71-123.01
Km 123.01-123.31
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10 11451 National DBST @ Traff >6000
9.74 11451 National Overlay 50mm @ IRI 4
5.63 6524 National Overlay 50mm @ IRI 4-7
0.10 6524 National Overlay 50mm @ IRI 4-7
1.50 6524 National Overlay 50mm @ IRI 4-7
1.70 6524 National Overlay 50mm @ IRI 4-7
0.70 6524 National Overlay 50mm @ IRI 4-7
1.40 5901 National Overlay 50mm @ IRI 4-9
2.37 3779 National Overlay 50mm @ IRI 4-9
0.10 3779 National Overlay 50mm @ IRI 4-9
0.50 3779 National Overlay 50mm @ IRI 4-9
0.20 3779 National Overlay 50mm @ IRI 4-9
3.05 3779 National Overlay 50mm @ IRI 4-9
2.00 3779 National Overlay 50mm @ IRI 4-9
0.10 3779 National Overlay 50mm @ IRI 4-9
1.00 3779 National Overlay 50mm @ IRI 4-9
0.30 3779 National Overlay 50mm @ IRI 4-9
0.10 3779 National Overlay 50mm @ IRI 4-9
0.30 3779 National Overlay 50mm @ IRI 4-9
0.30 3779 National Overlay 50mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.185
38.164
17.870
0.313
4.478
4.969
2.046
5.013
6.828
0.287
1.435
0.574
10.230
5.773
0.287
2.871
0.861
0.287
0.861
0.861
15.56
10.85
6.45
11.82
13.04
10.63
9.60
6.54
4.69
6.54
6.19
5.79
7.08
3.33
7.31
6.32
4.93
5.55
4.59
7.20
13.19
706.77
162.66
5.80
101.40
93.78
35.73
59.59
46.41
2.84
14.00
4.96
117.11
21.71
3.44
29.79
7.21
2.92
6.18
9.89
Sub-total Sherpur Division
Tangail Division
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Appendix-B: Page: 32 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N401
N401
N403
R480
R506
R506
Road Name
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Madhupur-Mymensingh Road
Madhupur-Mymensingh Road
Mirzapur Town old Section
Elanga-Bhuanpur Road
Aricha -Daulatpur-Tangail Road
Aricha -Daulatpur-Tangail Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 125.61-127.15
Km 039.99-040.99
Km 040.99-041.19
Km 057.92-059.72
Km 059.82-068.65
Km 072.85-073.15
Km 074.35-075.15
Km 075.45-078.55
Km 078.55-078.75
Km 079.85-080.25
Km 080.25-080.55
Km 082.75-084.35
Km 084.35-084.95
Km 084.95-085.25
Km 085.25-086.25
Km 086.25-086.35
Km 086.35-087.64
Km 087.64-090.79
Km 091.09-091.29
Km 000.00-000.60
Km 000.80-016.00
Km 000.00-004.00
Km 001.51-016.81
Km 036.71-038.41
Km 038.41-047.81
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.54 3779 National Overlay 50mm @ IRI 4-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
8.82 13569 National Overlay 80mm @ IRI 4-9
S
0.30 15112 National Overlay 80mm @ IRI 4-9
S
0.80 15112 National Overlay 80mm @ IRI 4-9
S
3.10 15112 National Overlay 80mm @ IRI 4-9
S
0.20 15112 National Overlay 80mm @ IRI 4-9
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
1.60 11451 National Overlay 80mm @ IRI 4-9
S
0.60 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
1.00 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
1.29 11451 National Overlay 80mm @ IRI 4-9
S
3.15 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
0.60 3417 National DBST 25mm @ 25% Crk
S
15.20 3417 National DBST 25mm @ 25% Crk
S
4.00 11451 National DBST @ Traff >6000
S
15.30 3903 Regional DBST 25mm @ 25% Crk
S
1.70 2847 Regional Overlay 50mm @ IRI 7-9
S
9.40 3019 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Tangail Division
Total Dhaka Zone
Fin Cost
NPV /
(Mill Taka) Cost
4.432
4.64
6.173
8.46
1.235 17.59
11.646 11.58
54.480 10.32
1.408 16.49
3.753 21.31
18.704 18.13
1.235 19.36
2.469 14.36
1.852 16.63
9.746
9.61
3.655 13.87
1.827 15.15
6.091 16.41
0.609 14.72
7.876 15.52
19.077 14.05
1.811
8.36
1.037
1.07
21.175
2.32
7.212 13.07
11.334
1.78
3.549
5.65
19.625
4.43
326.206
NPV
32.62
64.48
26.82
182.95
866.32
32.76
104.56
418.59
33.74
48.10
41.78
137.90
71.55
37.55
141.05
12.17
165.84
350.49
18.69
1.95
110.19
431.12
37.59
26.23
140.52
3179.070
Gopalganj Zone
Faridpur Division
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Km 055.72-060.12
Km 060.12-060.22
Km 049.70-052.57
Km 036.30-041.00
S
S
S
S
4.40 7248
0.10 7248
2.87 5397
4.70 11451
National
National
National
National
Appendix-B: Page: 33 of 61
DBST @ Traff >6000
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
7.934
0.381
10.920
28.241
6.69
12.79
8.49
8.93
239.10
8.78
178.33
371.24
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N7
N803
N803
N803
N803
N803
N803
N803
N803
N804
Road Name
Dauladia-Mongla Road
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Bhanga-Faridpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 041.20-041.50
Km 000.00-000.10
Km 002.30-002.60
Km 006.20-006.72
Km 000.80-001.50
Km 002.10-002.20
Km 003.10-004.60
Km 000.20-000.70
Km 005.40-005.50
Km 030.20-030.80
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
0.10 24928 National DBST @ Traff >6000
S
0.30 24928 National DBST @ Traff >6000
S
0.52 9061 National DBST @ Traff >6000
S
0.70 24928 National Overlay 50mm @ IRI 5
S
0.10 24928 National Overlay 50mm @ IRI 5
S
1.50 11315 National Overlay 50mm @ IRI 5
S
0.50 24928 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.60 11451 National Overlay 50mm @ IRI 5
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Faridpur Division
Fin Cost
NPV /
(Mill Taka) Cost
1.803
9.40
0.371
2.05
0.630 14.64
0.706 12.98
4.151
6.49
0.444
9.99
4.549 10.46
5.062
6.55
0.510 14.72
2.286
9.63
67.987
NPV
23.91
2.04
41.58
30.11
36.49
6.52
70.06
39.14
9.82
42.09
Gopalganj Division
N805
N805
N805
N806
N806
R850
R850
R850
R850
R850
R850
R850
R850
R850
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhatiapara-Kalna Road
Bhatiapara-Kalna Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Km 000.90-004.00
Km 007.00-010.90
Km 004.10-004.90
Km 001.20-002.70
Km 002.80-003.00
Km 001.50-002.30
Km 019.10-021.30
Km 031.40-031.80
Km 018.80-018.90
Km 001.20-001.50
Km 005.40-005.60
Km 008.90-009.80
Km 025.90-026.00
Km 033.00-033.70
S
S
S
S
S
S
S
S
S
S
S
S
S
S
3.10 11451 National DBST @ Traff >6000
3.90 2650 National DBST 25mm @ 25% Crk
0.80 11451 National Overlay 50mm @ IRI 5
1.50 2860 National Overlay 50mm @ IRI 5-9
0.20 2860 National Overlay 50mm @ IRI 5-9
0.80 2343 Regional DBST @ Traff 2000-4000
2.20 3497 Regional DBST @ Traff 2000-4000
0.40 3497 Regional DBST @ Traff 2000-4000
0.10 2343 Regional Overlay 50mm @ IRI 5-7
0.30 2343 Regional Overlay 50mm @ IRI 7-9
0.20 2343 Regional Overlay 50mm @ IRI 7-9
0.90 2343 Regional Overlay 50mm @ IRI 7-9
0.10 3497 Regional Overlay 50mm @ IRI 7-9
0.70 3497 Regional Overlay 50mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
5.590
7.032
3.048
2.897
0.386
1.186
2.989
0.543
0.287
0.940
0.574
2.584
0.287
2.010
30.352
10.28
2.17
12.25
3.86
4.40
2.37
1.41
5.81
3.62
5.52
6.53
3.95
8.58
7.03
262.89
46.30
67.34
18.37
2.79
8.24
12.30
11.45
1.34
8.37
5.11
16.93
3.41
23.13
Km 001.10-001.40
Km 000.00-000.10
Km 000.20-001.10
Km 001.40-002.70
S
S
S
S
0.30
0.10
0.90
1.30
2013
2013
2013
2013
0.408
0.210
1.223
1.766
6.37
2.16
2.96
2.79
8.67
1.02
10.59
13.33
Sub-total Gopalganj Division
Madaripur Division
R860
R860
R860
R860
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
5672
5672
5672
5672
Regional
Regional
Regional
Regional
Appendix-B: Page: 34 of 61
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R860
R860
R860
R860
R860
R860
Road Name
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 016.38-016.48
Km 007.50-007.70
Km 002.90-003.90
Km 004.60-005.00
Km 005.30-006.20
Km 006.30-007.10
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 3019 Regional DBST 25mm @ 25% Crk
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
1.00 5672 Regional Overlay 60mm @ IRI 5.5-9
S
0.40 5672 Regional Overlay 60mm @ IRI 5.5-9
S
0.90 5179 Regional Overlay 60mm @ IRI 5.5-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
Sub-total Madaripur Division
Fin Cost
NPV /
(Mill Taka) Cost
0.099
5.81
0.709
7.41
3.423
7.53
1.369
7.51
3.848
4.28
3.968
4.77
17.022
NPV
1.89
8.96
33.69
12.99
25.48
28.46
Rajbari Division
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Km 000.40-000.60
Km 013.91-015.71
Km 016.81-021.31
Km 026.11-026.71
Km 029.71-029.91
Km 013.11-013.41
Km 043.01-044.71
Km 009.90-009.91
Km 010.81-013.11
Km 013.41-013.71
Km 016.11-016.51
Km 026.81-029.51
Km 030.21-031.81
Km 032.01-035.01
Km 039.41-039.91
Km 024.61-024.71
Km 038.31-038.41
Km 015.71-016.11
Km 016.51-016.81
Km 003.90-005.60
Km 007.40-008.30
Km 009.60-009.70
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.20
1.80
4.50
0.60
0.20
0.30
1.70
0.01
2.30
0.30
0.40
2.70
1.60
3.00
0.50
0.10
0.10
0.40
0.30
1.70
0.90
0.10
6238
3636
3636
3636
3636
4887
4887
6238
4048
4887
3636
3636
3636
3636
3636
3636
3636
3636
3636
6238
6238
6238
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Sub-total Rajbari Division
Sariatpur Division
Appendix-B: Page: 35 of 61
DBST @ Traff >6000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.282
2.583
6.336
0.845
0.282
0.437
2.225
0.021
3.511
0.437
0.563
3.801
2.253
4.157
0.655
0.298
0.277
1.190
0.893
6.030
3.310
0.386
40.771
7.59
2.45
6.29
7.12
2.64
9.82
8.17
10.56
3.03
4.37
4.06
4.98
2.43
2.00
6.79
9.29
12.58
7.80
8.04
10.35
10.99
7.19
8.00
18.02
133.82
21.34
2.11
16.61
68.02
0.83
26.68
5.48
7.25
60.50
14.27
22.49
13.63
3.86
4.34
15.35
12.00
83.27
44.56
3.94
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R860
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
Road Name
Mostafapur-Chandpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 019.88-020.18
Km 006.40-006.80
Km 001.90-002.10
Km 002.90-003.00
Km 003.00-003.40
Km 004.40-004.50
Km 003.40-003.60
Km 000.10-000.60
Km 001.00-001.10
Km 001.30-001.40
Km 001.50-001.70
Km 001.80-001.90
Km 005.00-005.20
Km 005.80-006.20
Km 002.10-002.50
Km 002.60-002.80
Km 003.70-004.00
Km 004.10-004.30
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.40 3750 Regional DBST @ Traff 2000-4000
S
0.20 4885 Regional DBST @ Traff 4000-6000
S
0.10 4885 Regional DBST @ Traff 4000-6000
S
0.40 4885 Regional DBST @ Traff 4000-6000
S
0.10 4885 Regional DBST @ Traff 4000-6000
S
0.20 4885 Regional DBST 25mm @ 25% Crk
S
0.50 4885 Regional Overlay 50mm @ IRI 5-7
S
0.10 4885 Regional Overlay 50mm @ IRI 5-7
S
0.10 4885 Regional Overlay 50mm @ IRI 5-7
S
0.20 4885 Regional Overlay 50mm @ IRI 5-7
S
0.10 4885 Regional Overlay 50mm @ IRI 5-7
S
0.20 4885 Regional Overlay 50mm @ IRI 5-7
S
0.40 4885 Regional Overlay 50mm @ IRI 5-7
S
0.40 4885 Regional Overlay 60mm @ IRI 7-9
S
0.20 4885 Regional Overlay 60mm @ IRI 7-9
S
0.30 4885 Regional Overlay 60mm @ IRI 7-9
S
0.20 4885 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Sariatpur Division
Total Gopalganj Zone
Fin Cost
NPV /
(Mill Taka) Cost
1.027
7.34
0.543
3.40
0.272
5.93
0.141
4.15
0.543
7.75
0.136
4.83
0.272
6.24
1.435
8.98
0.287 11.22
0.287 11.45
0.574
6.61
0.287 10.98
0.501
7.21
1.127
6.16
1.369
7.64
0.685
9.71
1.027
9.55
0.685
5.89
11.198
NPV
12.02
5.33
6.03
1.43
15.76
1.68
4.97
17.20
4.30
4.38
5.73
4.20
5.46
10.48
12.82
8.14
12.01
5.46
167.329
Khulna Zone
Bagerhat Division
R771
Rupsha-Bagerhat Road
Km 031.08-031.18
S
0.10
3019 Regional Overlay 50mm @ IRI 7-9
2013
0.186
0.186
7.87
2.28
Km 077.48-077.78
Km 077.98-078.58
Km 079.46-079.56
Km 079.76-079.86
Km 081.86-081.96
Km 093.86-095.16
Km 084.56-085.56
S
S
S
S
S
S
S
0.30
0.60
0.10
0.10
0.10
1.30
1.00
4887
4887
4887
4887
5536
5536
5536
2013
2013
2013
2013
2013
2013
2013
0.645
1.289
0.215
0.215
0.136
1.606
1.359
6.48
5.68
5.88
6.47
9.12
11.11
10.59
16.01
29.31
4.44
4.89
3.52
53.12
51.44
Sub-total Bagerhat Division
Chuadanga Division
R745
R745
R745
R745
R745
R745
R745
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 36 of 61
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R747
R747
R747
R747
R747
R747
R747
R747
R747
Road Name
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 092.86-093.66
Km 095.46-096.46
Km 096.56-096.66
Km 071.02-071.98
Km 081.36-081.76
Km 082.76-083.66
Km 083.86-084.06
Km 084.36-084.46
Km 085.66-088.06
Km 088.56-090.26
Km 090.36-091.76
Km 091.96-092.46
Km 097.26-097.30
Km 071.98-073.98
Km 075.08-075.38
Km 075.58-076.18
Km 076.48-077.18
Km 025.64-030.64
Km 033.04-033.44
Km 033.54-033.94
Km 034.04-034.44
Km 034.54-035.94
Km 036.14-036.44
Km 041.94-044.77
Km 025.30-025.34
Km 041.04-041.84
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.80 5536 Regional DBST 25mm @ 25% Crk
S
1.00 5536 Regional DBST 25mm @ 25% Crk
S
0.10 5536 Regional DBST 25mm @ 25% Crk
S
0.96 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.90 5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 5536 Regional Overlay 60mm @ IRI 5.5-9
S
2.40 5536 Regional Overlay 60mm @ IRI 5.5-9
S
1.70 5536 Regional Overlay 60mm @ IRI 5.5-9
S
1.40 5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.50 5536 Regional Overlay 60mm @ IRI 5.5-9
S
0.04 5536 Regional Overlay 60mm @ IRI 5.5-9
S
2.00 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.60 4887 Regional Overlay 60mm @ IRI 7-9
S
0.70 4887 Regional Overlay 60mm @ IRI 7-9
S
5.00 4887 Regional DBST @ Traff 4000-6000
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
1.40 4887 Regional Overlay 50mm @ IRI 5-7
S
0.30 4887 Regional Overlay 50mm @ IRI 5-7
S
2.83 4887 Regional Overlay 50mm @ IRI 5-7
S
0.04 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Chuadanga Division
Fin Cost
NPV /
(Mill Taka) Cost
0.988 11.53
1.235 13.18
0.125 14.47
2.897
8.77
1.369 13.23
3.081
9.12
0.685
9.96
0.342
8.47
8.215 13.81
5.290 15.59
4.356 15.79
1.556 17.36
0.147 25.68
8.613
7.37
1.027
6.40
2.801
4.82
2.396
9.74
7.361
8.17
1.253
7.23
1.253
9.07
1.253
9.07
4.384
8.96
0.940
6.52
8.875
8.43
0.146
9.39
2.987
6.06
79.037
NPV
39.24
56.05
6.24
41.14
20.99
38.42
9.32
4.31
131.44
98.14
81.83
31.30
4.50
91.36
9.87
22.37
29.48
202.14
15.66
20.65
20.66
70.07
10.04
121.18
1.95
26.06
Jessore Division
N7
N7
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Km 154.36-154.46
Km 150.32-150.72
Km 150.82-153.06
Km 153.66-153.96
Km 187.49-188.19
Km 188.29-188.77
S
S
S
S
S
S
0.10
0.40
2.24
0.30
0.70
0.48
9061
9061
9061
9061
7406
7406
National
National
National
National
National
National
Appendix-B: Page: 37 of 61
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
2013
2013
2013
2013
2013
2013
0.124
1.044
5.846
0.783
2.415
1.665
11.36
15.35
12.91
14.71
8.27
6.74
4.47
25.55
114.77
18.37
37.32
22.81
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N706
N706
N706
N706
N706
N706
N706
N707
N707
N707
N707
N707
N707
N708
N708
N708
N708
N708
N708
N708
R755
R755
R755
Road Name
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 138.86-139.32
Km 139.82-140.92
Km 141.02-141.42
Km 141.52-141.92
Km 142.12-142.82
Km 143.12-143.22
Km 143.42-143.52
Km 143.72-143.82
Km 144.02-144.72
Km 153.46-153.56
Km 145.42-145.52
Km 148.62-148.72
Km 030.20-030.40
Km 023.20-024.10
Km 024.40-024.70
Km 029.40-030.10
Km 032.10-032.90
Km 036.63-037.91
Km 036.63-037.91
Km 004.60-004.70
Km 001.40-001.50
Km 001.60-003.40
Km 003.50-004.30
Km 005.70-005.90
Km 006.10-006.76
Km 003.29-004.74
Km 002.90-003.00
Km 002.90-003.00
Km 002.10-002.70
Km 002.10-002.70
Km 000.00-000.20
Km 001.40-001.60
Km 012.80-012.90
Km 013.00-013.30
Km 014.30-014.40
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.46 5636 National Overlay 50mm @ IRI 4-9
S
1.10 5636 National Overlay 50mm @ IRI 4-9
S
0.40 5636 National Overlay 50mm @ IRI 4-9
S
0.40 5636 National Overlay 50mm @ IRI 4-9
S
0.70 5636 National Overlay 50mm @ IRI 4-9
S
0.10 5636 National Overlay 50mm @ IRI 4-9
S
0.10 5636 National Overlay 50mm @ IRI 4-9
S
0.10 5636 National Overlay 50mm @ IRI 4-9
S
0.70 5636 National Overlay 50mm @ IRI 4-9
S
0.10 9061 National Overlay 60mm @ IRI 7-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.20 7314 National DBST @ Traff >6000
S
0.90 7314 National Overlay 50mm @ IRI 5-7
S
0.30 7314 National Overlay 60mm @ IRI 7-9
S
0.70 7314 National Overlay 60mm @ IRI 7-9
S
0.80 7314 National Overlay 60mm @ IRI 7-9
L
1.28 11451 National Overlay 80mm @ IRI 5-9
R
1.28 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National DBST @ Traff >6000
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
1.80 11451 National Overlay 80mm @ IRI 5-9
S
0.80 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.66 11451 National Overlay 80mm @ IRI 5-9
S
1.45 3249 National DBST @ Traff 2000-4000
L
0.10 3249 National DBST 25mm @ 25% Crk
R
0.10 3249 National DBST 25mm @ 25% Crk
L
0.60 3249 National Overlay 50mm @ IRI 5-9
R
0.60 3249 National Overlay 50mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.20 11451 National Overlay 80mm @ IRI 5-9
S
0.10 3292 Regional DBST @ Traff 2000-4000
S
0.30 3292 Regional DBST @ Traff 2000-4000
S
0.10 3292 Regional DBST @ Traff 2000-4000
Appendix-B: Page: 38 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.372
7.41
3.858
6.23
1.409
6.07
1.378
6.43
2.031
6.93
0.287
7.77
0.287
7.83
0.324
7.06
2.214
6.63
0.311 17.37
0.477 17.26
0.551 17.80
0.375
4.32
3.288 11.75
1.307
8.57
3.311
7.48
3.784
5.56
7.877 14.44
7.877 14.46
0.165
9.71
0.510 17.91
11.157 15.40
4.412 11.54
1.103 13.70
3.656 12.67
3.109
2.19
0.185
1.78
0.185
1.50
2.349
2.75
2.349
3.42
1.202 14.31
1.202
9.37
0.136
9.51
0.408
5.26
0.136
8.67
NPV
21.65
51.66
18.24
17.99
26.95
4.08
4.15
4.27
28.87
7.93
13.32
15.87
7.51
65.95
19.62
43.27
34.35
175.28
175.58
7.70
14.78
264.75
75.02
22.48
68.25
26.59
0.71
0.71
9.15
11.53
25.33
15.27
4.41
6.44
4.02
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R765
R765
R765
R765
R765
R765
Road Name
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 017.00-018.70
Km 020.90-021.00
Km 021.00-021.30
Km 021.30-021.70
Km 021.90-022.00
Km 023.20-025.70
Km 001.30-003.20
Km 027.53-028.13
Km 028.23-030.13
Km 030.83-032.33
Km 033.33-034.13
Km 034.23-037.83
Km 000.00-000.40
Km 000.60-001.20
Km 003.90-005.40
Km 016.40-016.80
Km 018.80-020.80
Km 022.10-023.10
Km 026.40-026.50
Km 003.70-003.80
Km 015.20-016.30
Km 026.90-027.33
Km 037.83-038.11
Km 013.50-014.10
Km 003.30-003.60
Km 006.40-007.20
Km 007.30-011.60
Km 011.80-012.10
Km 030.63-030.73
Km 010.70-010.90
Km 010.50-010.60
Km 013.80-016.00
Km 001.50-007.30
Km 007.50-010.40
Km 011.20-011.60
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.70 3292 Regional DBST @ Traff 2000-4000
S
0.10 3292 Regional DBST @ Traff 2000-4000
S
0.30 3292 Regional DBST @ Traff 2000-4000
S
0.40 3292 Regional DBST @ Traff 2000-4000
S
0.10 3292 Regional DBST @ Traff 2000-4000
S
2.50 3292 Regional DBST @ Traff 2000-4000
S
1.90 4887 Regional DBST @ Traff 4000-6000
S
0.60 4887 Regional DBST @ Traff 4000-6000
S
1.90 4887 Regional DBST @ Traff 4000-6000
S
1.50 4887 Regional DBST @ Traff 4000-6000
S
0.80 4887 Regional DBST @ Traff 4000-6000
S
3.60 4887 Regional DBST @ Traff 4000-6000
S
0.40 4887 Regional DBST 25mm @ 25% Crk
S
0.60 4887 Regional DBST 25mm @ 25% Crk
S
1.50 4887 Regional DBST 25mm @ 25% Crk
S
0.40 3292 Regional DBST 25mm @ 25% Crk
S
2.00 3292 Regional DBST 25mm @ 25% Crk
S
1.00 3292 Regional DBST 25mm @ 25% Crk
S
0.10 3292 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
1.10 3292 Regional Overlay 50mm @ IRI 5-7
S
0.43 4887 Regional Overlay 50mm @ IRI 5-7
S
0.28 4887 Regional Overlay 50mm @ IRI 5-7
S
0.60 3292 Regional Overlay 50mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
S
4.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
2.20 4887 Regional DBST 25mm @ 25% Crk
S
5.80 4887 Regional Overlay 50mm @ IRI 5-7
S
2.90 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 39 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
2.309
6.04
0.136
5.39
0.408
7.74
0.543
6.15
0.136
8.03
3.396
4.15
2.581
6.60
0.815
9.15
2.581
7.11
2.038
7.10
1.087
7.36
4.891
9.06
0.543
8.47
0.815
6.94
2.038
4.99
0.543
8.04
2.717
5.11
1.359
5.95
0.136
4.28
0.287
8.69
3.158
7.63
1.223 10.14
0.804
8.74
1.722
8.44
1.027 10.31
2.738
7.94
14.718
7.98
1.027
6.73
0.342
8.08
0.272
8.25
0.136
8.54
2.989
7.46
16.650
6.03
8.325
6.32
1.148
8.35
NPV
45.43
2.14
12.58
10.88
3.27
41.51
49.11
25.07
67.05
54.11
29.22
148.88
16.83
16.31
22.23
13.41
49.11
26.56
1.20
3.40
37.89
18.91
11.24
22.64
12.27
36.99
195.99
10.89
4.11
8.39
3.99
83.41
176.16
92.39
15.53
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R765
R765
R765
R765
Road Name
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 012.90-013.20
Km 013.30-013.70
Km 000.00-001.10
Km 011.80-012.70
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.30 4887 Regional Overlay 50mm @ IRI 5-7
S
0.40 4887 Regional Overlay 50mm @ IRI 5-7
S
1.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
Sub-total Jessore Division
Fin Cost
NPV /
(Mill Taka) Cost
0.861
7.19
1.148
6.88
3.765
8.03
3.081
7.24
180.954
NPV
10.55
13.48
51.43
33.51
Jhenaidah Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N703
N703
N704
N704
N704
N704
N704
N704
R745
R745
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jhenaidah Town Old Section
Jhenaidah Town Old Section
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Km 135.92-136.62
Km 108.22-110.32
Km 110.72-112.62
Km 112.72-114.12
Km 114.42-114.82
Km 115.02-116.12
Km 116.22-116.82
Km 118.02-119.62
Km 119.82-121.22
Km 121.32-122.92
Km 125.72-129.42
Km 130.22-135.52
Km 136.92-138.86
Km 116.92-117.22
Km 117.32-117.72
Km 104.82-105.32
Km 107.22-108.12
Km 122.92-125.72
Km 000.00-000.10
Km 003.40-003.47
Km 001.20-002.60
Km 008.00-012.90
Km 000.00-000.10
Km 007.20-007.50
Km 007.70-007.90
Km 013.20-020.80
Km 107.36-110.46
Km 101.96-103.76
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.70
2.10
1.90
1.40
0.40
1.10
0.60
1.60
1.40
1.60
3.70
5.30
1.94
0.30
0.40
0.50
0.90
2.80
0.10
0.07
1.40
4.90
0.10
0.30
0.20
7.60
3.10
1.80
5636
6605
6605
6605
6605
6605
6605
6605
6605
6605
5636
5636
5636
6605
6605
11451
11451
11451
4905
11451
11451
11451
9061
11451
11451
11451
4887
4887
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Appendix-B: Page: 40 of 61
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
DBST 25mm @ 25% Crk
Overlay 80mm @ IRI 5-9
DBST @ Traff >6000
DBST @ Traff >6000
DBST 25mm @ 25% Crk
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.003
7.125
5.911
4.019
1.148
3.290
1.989
5.328
4.626
6.013
12.263
17.013
5.879
1.214
1.618
3.004
4.815
16.825
0.186
0.336
2.524
8.859
0.136
1.803
1.350
49.608
4.211
5.167
4.45
6.97
9.88
7.28
7.21
10.22
7.27
5.84
6.49
7.60
5.51
7.28
4.37
7.61
7.35
13.56
12.53
10.34
1.18
16.68
8.68
9.98
9.40
7.82
9.17
8.24
7.32
8.85
46.52
92.76
106.21
54.65
15.47
61.13
27.01
63.27
56.06
90.73
137.29
266.25
125.37
15.82
22.00
66.86
96.20
281.40
0.45
7.08
108.14
404.32
4.38
19.88
16.80
554.31
112.66
74.01
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R745
R745
R745
R745
R745
R745
R745
R748
R748
R748
R748
R748
R748
R748
R748
R748
R748
R748
R748
Road Name
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 110.56-110.66
Km 112.56-114.26
Km 114.36-114.46
Km 099.66-101.26
Km 110.86-112.46
Km 114.56-114.66
Km 115.06-115.86
Km 049.60-051.40
Km 051.80-052.30
Km 057.10-058.70
Km 058.80-064.20
Km 064.50-064.70
Km 056.40-056.90
Km 053.40-055.60
Km 055.70-056.30
Km 049.30-049.50
Km 052.50-053.00
Km 053.20-053.30
Km 065.10-065.30
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
1.70 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
1.60 5536 Regional Overlay 60mm @ IRI 5.5-9
S
1.60 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.80 4887 Regional Overlay 60mm @ IRI 7-9
S
1.80 4887 Regional DBST @ Traff 4000-6000
S
0.50 4887 Regional DBST @ Traff 4000-6000
S
1.60 4887 Regional DBST @ Traff 4000-6000
S
5.40 4887 Regional DBST @ Traff 4000-6000
S
0.20 4887 Regional DBST @ Traff 4000-6000
S
0.50 4887 Regional DBST 25mm @ 25% Crk
S
2.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.60 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Jhenaidah Division
Fin Cost
NPV /
(Mill Taka) Cost
0.287
7.60
4.880
6.05
0.287
8.23
5.477 13.88
5.477
6.93
0.342
7.31
2.738
6.01
2.757
6.46
0.764
8.88
2.292
7.10
7.736
7.14
0.287
8.62
0.716
9.08
6.384
8.86
1.816 10.11
0.772
8.26
1.711
7.26
0.342
8.30
0.722
9.22
223.050
NPV
3.58
47.79
4.08
88.10
56.45
3.76
24.74
67.12
25.60
59.49
201.76
9.03
23.78
91.52
29.58
9.45
19.34
4.23
9.96
Khulna Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Km 220.86-221.86
Km 223.66-224.46
Km 188.77-189.49
Km 191.39-191.89
Km 221.96-223.06
Km 223.26-223.56
Km 211.26-212.92
Km 211.26-212.92
Km 192.19-202.22
Km 204.28-206.23
Km 215.46-215.54
Km 204.28-206.23
Km 215.46-215.54
S
S
S
S
S
S
L
R
S
L
L
R
R
1.00
0.80
0.72
0.50
1.10
0.30
1.66
1.66
10.03
1.95
0.08
1.95
0.08
9474
9684
7406
7406
9684
9684
9061
9061
7406
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 41 of 61
DBST @ Traff >6000
DBST @ Traff >6000
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.729
1.383
2.532
1.683
4.019
1.096
5.699
5.699
41.501
10.760
0.650
12.847
0.650
6.40
6.47
7.09
8.87
10.07
10.71
9.01
9.01
9.41
14.74
6.82
12.42
6.82
56.06
45.33
36.47
31.80
77.39
22.45
79.33
79.33
754.83
252.88
6.53
258.09
6.53
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N7
N7
N7
N7
N7
N7
N709
N709
N709
N709
N709
N710
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
Road Name
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna Town Old Section
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 202.22-204.28
Km 206.23-211.26
Km 212.92-213.88
Km 215.54-216.05
Km 217.26-217.56
Km 217.66-219.36
Km 017.00-018.00
Km 017.00-018.00
Km 013.90-016.10
Km 016.20-016.30
Km 016.40-017.00
Km 000.00-000.02
Km 005.50-006.70
Km 009.70-010.30
Km 013.80-014.40
Km 000.00-000.30
Km 000.50-000.70
Km 003.10-003.40
Km 021.70-027.80
Km 000.40-000.50
Km 000.70-001.20
Km 001.60-001.90
Km 004.30-004.60
Km 007.10-007.80
Km 011.90-013.70
Km 030.60-033.60
Km 006.80-006.90
Km 007.90-008.00
Km 009.00-009.60
Km 010.90-011.50
Km 016.57-016.80
Km 017.70-018.90
Km 020.00-020.30
Km 028.70-029.00
Km 029.10-030.50
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
2.06 11451 National Overlay 80mm @ IRI 4-9
S
5.03 11451 National Overlay 80mm @ IRI 4-9
S
0.95 11451 National Overlay 80mm @ IRI 4-9
S
0.51 11451 National Overlay 80mm @ IRI 4-9
S
0.30 11451 National Overlay 80mm @ IRI 4-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
L
1.00 11451 National DBST @ Traff >6000
R
1.00 11451 National DBST @ Traff >6000
S
2.20 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.02 17790 National DBST @ Traff >6000
S
1.20 3206 Regional DBST @ Traff 2000-4000
S
0.60 3206 Regional DBST @ Traff 2000-4000
S
0.60 3206 Regional DBST @ Traff 2000-4000
S
0.30 4887 Regional DBST @ Traff 4000-6000
S
0.20 4887 Regional DBST @ Traff 4000-6000
S
0.30 4887 Regional DBST @ Traff 4000-6000
S
6.10 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.50 4887 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional DBST 25mm @ 25% Crk
S
0.30 4887 Regional DBST 25mm @ 25% Crk
S
0.70 3206 Regional Overlay 50mm @ IRI 5-7
S
1.80 3206 Regional Overlay 50mm @ IRI 5-7
S
3.00 3937 Regional Overlay 50mm @ IRI 5-7
S
0.10 3206 Regional Overlay 50mm @ IRI 7-9
S
0.10 3206 Regional Overlay 50mm @ IRI 7-9
S
0.60 3206 Regional Overlay 50mm @ IRI 7-9
S
0.60 3206 Regional Overlay 50mm @ IRI 7-9
S
0.23 4887 Regional Overlay 60mm @ IRI 7-9
S
1.20 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
0.30 4887 Regional Overlay 60mm @ IRI 7-9
S
1.40 4887 Regional Overlay 60mm @ IRI 7-9
Appendix-B: Page: 42 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
12.783
8.57
34.923 11.25
8.332
6.88
5.258
5.58
1.780
8.92
9.795 11.79
1.507 10.68
1.507 10.68
13.219 11.16
0.601 12.93
3.605 11.47
0.104
0.20
1.778
3.45
0.889
3.27
0.889
2.18
0.459
6.18
0.306 10.00
0.593
2.42
9.055
5.40
0.153
5.17
0.766
5.28
0.459
4.46
0.445
6.36
2.192
3.65
5.637
3.83
9.395
5.15
0.313
3.93
0.313
3.91
1.879
5.43
1.879
5.27
0.855 11.79
4.481
5.98
1.120
7.84
1.120
7.72
5.228
8.40
NPV
154.60
635.40
80.85
41.37
24.47
184.21
77.03
77.03
208.29
11.44
58.38
0.04
23.75
11.91
5.79
13.22
12.16
14.10
152.22
1.93
14.67
5.58
13.16
13.48
28.67
83.57
2.20
2.15
17.40
16.88
12.41
40.73
14.00
15.61
72.09
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R760
Road Name
Khulna-Satkhira Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road
Cway Length
AADT
Work Name
Class
Side
(km)
Km 033.60-034.87
S
1.27 4116 Regional Overlay 60mm @ IRI 7-9
Fin Cost
NPV /
(Mill Taka) Cost
2013
4.742
5.19
238.613
Km 061.68-066.66
Km 023.50-024.10
Km 040.40-040.80
Km 045.38-045.48
Km 048.75-051.45
Km 053.95-054.25
Km 052.65-052.85
Km 052.95-053.75
Km 054.45-056.05
Km 052.15-052.55
Km 059.95-060.55
Km 061.35-062.95
Km 066.85-067.15
Km 067.65-067.95
Km 070.45-070.65
Km 045.00-048.25
Km 048.35-048.55
Km 051.75-051.95
Km 056.25-057.95
Km 001.40-001.50
Km 004.50-004.90
Km 000.00-000.10
Km 000.70-000.90
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
4.97 5419 National DBST @ Traff 4000-6000
0.60 11451 National Overlay 80mm @ IRI 5-9
0.40 11451 National Overlay 80mm @ IRI 5-9
0.10 11451 National Overlay 80mm @ IRI 5-9
2.70 4887 Regional DBST @ Traff 4000-6000
0.30 4887 Regional DBST @ Traff 4000-6000
0.20 4887 Regional DBST 25mm @ 25% Crk
0.80 4887 Regional DBST 25mm @ 25% Crk
1.60 4887 Regional DBST 25mm @ 25% Crk
0.40 4887 Regional Overlay 50mm @ IRI 5-7
0.60 4887 Regional Overlay 50mm @ IRI 5-7
1.60 4887 Regional Overlay 50mm @ IRI 5-7
0.30 4484 Regional Overlay 50mm @ IRI 5-7
0.30 4484 Regional Overlay 50mm @ IRI 5-7
0.20 4484 Regional Overlay 50mm @ IRI 5-7
3.25 4887 Regional Overlay 60mm @ IRI 7-9
0.20 4887 Regional Overlay 60mm @ IRI 7-9
0.20 4887 Regional Overlay 60mm @ IRI 7-9
1.70 4887 Regional Overlay 60mm @ IRI 7-9
0.10 1416 Regional DBST @ Traff 100-2000
0.40 1416 Regional DBST @ Traff 100-2000
0.10 1416 Regional DBST 25mm @ 25% Crk
0.20 1416 Regional DBST 25mm @ 25% Crk
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
9.472
3.605
2.404
0.988
3.668
0.408
0.272
1.087
2.174
1.148
1.722
4.593
0.861
0.861
0.574
11.111
0.685
0.685
5.819
0.091
0.366
0.091
0.183
52.867
3.22
9.87
13.52
8.72
7.16
10.29
10.60
9.53
9.48
8.40
7.80
7.72
10.43
11.03
9.86
6.94
6.80
10.10
6.14
2.35
1.55
2.26
1.95
307.59
48.29
47.87
12.69
95.95
15.33
9.47
37.05
67.79
14.71
21.74
57.39
11.19
14.35
7.05
114.63
7.08
9.76
54.30
0.48
1.38
0.35
0.79
Km 065.02-069.02
Km 078.21-082.91
Km 083.21-085.51
Km 085.61-087.21
S
S
S
S
4.00
4.70
2.30
1.60
2013
2013
2013
2013
16.682
18.791
8.764
6.096
10.16
9.29
12.45
11.59
305.70
297.82
196.76
127.45
Chainage
Sub-total Khulna Division
Year
NPV
37.54
Kushtia Division
N704
N704
N704
N704
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R713
R713
R713
R713
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Sub-total Kushtia Division
Magura Division
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
7248
7850
7850
7850
National
National
National
National
Appendix-B: Page: 43 of 61
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N702
N702
N702
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
Road Name
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 087.61-089.51
Km 089.61-089.71
Km 090.11-092.21
Km 092.31-097.51
Km 097.61-097.91
Km 098.01-100.31
Km 102.02-102.12
Km 100.71-101.21
Km 069.42-070.32
Km 075.31-075.41
Km 076.11-076.61
Km 076.81-077.31
Km 077.51-078.21
Km 026.19-026.79
Km 028.29-029.49
Km 035.89-038.59
Km 005.10-005.30
Km 010.40-010.50
Km 012.20-012.40
Km 012.80-013.80
Km 022.00-023.40
Km 023.60-023.90
Km 025.30-025.40
Km 026.80-026.90
Km 027.10-027.40
Km 030.10-032.20
Km 000.40-000.80
Km 001.80-002.40
Km 007.50-008.30
Km 017.50-018.50
Km 021.80-022.00
Km 023.40-023.60
Km 024.30-024.80
Km 025.10-025.30
Km 025.40-025.50
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
1.90 7850 National Overlay 50mm @ IRI 4-7
S
0.10 7850 National Overlay 50mm @ IRI 4-7
S
2.10 7850 National Overlay 50mm @ IRI 4-7
S
5.20 7850 National Overlay 50mm @ IRI 4-7
S
0.30 7850 National Overlay 50mm @ IRI 4-7
S
2.30 7850 National Overlay 50mm @ IRI 4-7
S
0.10 7850 National Overlay 50mm @ IRI 4-7
S
0.50 7850 National Overlay 60mm @ IRI 7-9
S
0.90 11451 National Overlay 80mm @ IRI 4-9
S
0.10 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.50 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
0.60 3649 National Overlay 50mm @ IRI 5-9
S
1.20 3649 National Overlay 50mm @ IRI 5-9
S
2.70 11451 National Overlay 80mm @ IRI 5-9
S
0.20 1047 Regional DBST @ IRI>12
S
0.10 1047 Regional DBST @ IRI>12
S
0.20 1047 Regional DBST @ IRI>12
S
1.00 1047 Regional DBST @ IRI>12
S
1.40 1047 Regional DBST @ IRI>12
S
0.30 1047 Regional DBST @ IRI>12
S
0.10 1047 Regional DBST @ IRI>12
S
0.10 1047 Regional DBST @ IRI>12
S
0.30 1047 Regional DBST @ IRI>12
S
2.10 1047 Regional DBST @ IRI>12
S
0.40 1047 Regional Overlay 50mm @ IRI 5-7
S
0.60 1047 Regional Overlay 50mm @ IRI 5-7
S
0.80 1047 Regional Overlay 50mm @ IRI 5-7
S
1.00 1047 Regional Overlay 50mm @ IRI 5-7
S
0.20 1047 Regional Overlay 50mm @ IRI 5-7
S
0.20 1047 Regional Overlay 50mm @ IRI 5-7
S
0.50 1047 Regional Overlay 50mm @ IRI 5-7
S
0.20 1047 Regional Overlay 50mm @ IRI 5-7
S
0.10 1047 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 44 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
7.378
9.84
0.381 12.68
8.319 12.03
19.813 10.11
1.143 12.38
8.764
9.91
0.381
9.80
2.272
7.34
5.408
9.97
0.766 10.78
4.009
8.24
4.815
6.93
6.741
5.50
2.286
8.89
4.572
6.45
16.224 12.11
0.272
0.52
0.136
0.32
0.163
1.08
0.815
1.59
1.328
1.18
0.408
0.53
0.091
0.96
0.091
0.61
0.274
0.58
2.469
0.45
1.148
1.64
1.722
0.96
2.297
1.36
1.931
2.20
0.386
1.64
0.574
1.17
1.368
1.25
0.386
1.97
0.193
2.65
NPV
138.78
9.24
191.26
382.99
27.05
166.05
7.14
29.15
79.39
13.34
44.81
45.24
52.34
33.64
45.73
256.84
1.06
0.32
1.31
9.67
11.65
1.61
0.66
0.42
1.18
8.28
2.29
1.96
3.84
5.12
0.78
0.78
2.06
0.88
0.60
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
Road Name
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 025.90-026.80
Km 026.90-027.10
Km 027.40-027.90
Km 028.30-028.80
Km 029.10-030.10
Km 001.60-001.80
Km 005.30-007.40
Km 008.80-009.60
Km 010.20-010.40
Km 010.50-010.70
Km 012.40-012.80
Km 013.80-015.90
Km 016.10-017.20
Km 028.80-029.10
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.90 1047 Regional Overlay 50mm @ IRI 5-7
S
0.20 1047 Regional Overlay 50mm @ IRI 5-7
S
0.50 1047 Regional Overlay 50mm @ IRI 5-7
S
0.50 1047 Regional Overlay 50mm @ IRI 5-7
S
1.00 1047 Regional Overlay 50mm @ IRI 5-7
S
0.20 1047 Regional Overlay 50mm @ IRI 7-9
S
2.10 1047 Regional Overlay 50mm @ IRI 7-9
S
0.80 1047 Regional Overlay 50mm @ IRI 7-9
S
0.20 1047 Regional Overlay 50mm @ IRI 7-9
S
0.20 1047 Regional Overlay 50mm @ IRI 7-9
S
0.40 1047 Regional Overlay 50mm @ IRI 7-9
S
2.10 1047 Regional Overlay 50mm @ IRI 7-9
S
1.10 1047 Regional Overlay 50mm @ IRI 7-9
S
0.30 1047 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Magura Division
Fin Cost
NPV /
(Mill Taka) Cost
1.738
1.38
0.386
2.18
0.966
1.37
0.966
1.87
1.931
2.19
0.574
1.32
6.029
1.72
2.297
2.04
0.574
2.00
0.574
2.24
0.689
3.47
4.001
2.34
2.124
2.46
0.579
3.56
183.085
NPV
2.80
0.99
1.53
2.08
5.10
1.00
13.00
5.43
1.33
1.74
2.70
10.86
6.22
2.53
Meherpur Division
R745
R745
R745
R745
R745
R745
R746
R746
R746
R746
R746
R746
R746
R746
R746
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Km 064.48-064.68
Km 064.98-065.08
Km 054.18-062.08
Km 062.78-064.38
Km 069.08-069.68
Km 070.88-071.02
Km 009.00-009.10
Km 012.00-012.40
Km 000.80-000.90
Km 000.00-000.10
Km 000.70-000.80
Km 000.90-001.60
Km 009.10-011.80
Km 011.90-012.00
Km 001.60-007.90
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.20
0.10
7.90
1.60
0.60
0.14
0.10
0.40
0.10
0.10
0.10
0.70
2.70
0.10
6.30
4283
4283
4283
4283
4887
4887
2154
2154
2154
2154
2154
2154
2154
2154
2154
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Sub-total Meherpur Division
Appendix-B: Page: 45 of 61
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
DBST @ IRI>12
DBST @ IRI>12
DBST @ Traff 2000-4000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.272
0.136
22.679
4.593
1.722
0.396
0.136
0.543
0.346
0.141
0.270
3.749
7.751
0.287
18.086
61.106
7.22
10.24
9.02
11.38
8.82
10.11
0.51
0.38
0.23
1.08
0.39
0.64
1.03
1.76
1.95
6.30
4.98
272.67
69.70
23.41
6.48
0.61
1.80
0.00
0.27
0.23
3.13
9.68
0.62
52.39
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
Road Name
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Cway Length
AADT
Side
(km)
Road
Class
Work Name
Year
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
Narail Division
R720
R720
R720
R720
R720
R720
R720
R720
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Km 036.60-037.40
Km 040.90-041.00
Km 037.40-037.70
Km 038.50-038.70
Km 039.30-039.40
Km 043.40-043.60
Km 040.60-040.90
Km 041.00-041.30
S
S
S
S
S
S
S
S
0.80
0.10
0.30
0.20
0.10
0.20
0.30
0.30
1047
1047
1047
1047
1047
1047
1047
1047
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ IRI>12
DBST @ IRI>12
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
2013
2013
2013
2013
2013
2013
2013
2013
1.087
0.136
0.408
0.272
0.136
0.272
0.861
0.861
4.032
0.71
0.52
0.66
0.92
0.85
0.71
1.11
0.83
5.74
0.53
0.57
0.50
0.26
0.47
1.10
0.84
Km 000.00-000.10
Km 005.30-005.40
Km 006.10-007.20
Km 007.30-009.50
Km 003.60-004.00
Km 004.20-004.40
Km 004.80-005.00
Km 036.30-036.70
Km 037.56-038.56
Km 048.56-049.56
Km 051.26-053.76
Km 036.70-037.20
Km 037.30-037.36
Km 056.06-056.96
Km 057.36-058.16
Km 058.26-058.46
Km 040.56-040.76
Km 054.16-055.36
Km 055.56-055.66
Km 018.80-019.50
Km 019.60-021.70
Km 022.90-023.30
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10
0.10
1.10
2.20
0.40
0.20
0.20
0.40
1.00
1.00
2.50
0.50
0.05
0.90
0.80
0.20
0.20
1.20
0.10
0.70
2.10
0.40
9061
9061
9061
9061
9061
9061
9061
4116
4116
4887
4887
4116
4116
4887
4887
4887
4116
4887
4887
4887
4887
4887
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
DBST @ Traff >6000
DBST @ Traff >6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 7-9
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.136
0.136
3.158
6.316
1.369
0.685
0.685
0.593
1.482
1.482
3.705
0.741
0.082
1.334
1.186
0.296
0.626
3.758
0.373
0.951
2.853
0.543
7.96
11.15
11.32
12.46
17.44
17.99
16.94
6.61
2.09
10.73
10.01
2.76
1.48
6.17
6.17
5.25
4.60
8.01
11.23
6.65
6.15
5.69
4.73
4.15
57.02
125.49
31.74
16.37
16.01
14.51
9.75
60.37
140.75
5.16
0.26
27.84
26.92
3.67
3.45
44.15
5.40
29.04
78.72
12.78
Sub-total Narail Division
Satkhira Division
N715
N715
N715
N715
N715
N715
N715
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R765
R765
R765
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Appendix-B: Page: 46 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
Road Name
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 026.49-029.39
Km 030.89-030.99
Km 031.09-032.39
Km 032.39-032.59
Km 029.89-029.99
Km 030.29-030.39
Km 032.59-033.79
Km 033.89-036.89
Km 040.69-040.79
Km 041.29-043.00
Km 021.90-022.50
Km 022.60-022.80
Km 025.09-025.19
Km 029.49-029.69
Km 023.40-024.40
Km 024.69-024.79
Km 024.89-024.99
Km 025.29-025.79
Km 026.19-026.29
Km 036.89-039.99
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
2.90 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST @ Traff 4000-6000
S
1.30 4887 Regional DBST @ Traff 4000-6000
S
0.20 4887 Regional DBST @ Traff 4000-6000
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
1.20 4887 Regional DBST 25mm @ 25% Crk
S
3.00 4887 Regional DBST 25mm @ 25% Crk
S
0.10 4887 Regional DBST 25mm @ 25% Crk
S
1.72 4887 Regional DBST 25mm @ 25% Crk
S
0.60 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
0.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 4887 Regional Overlay 50mm @ IRI 5-7
S
1.00 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
0.50 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
3.10 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Satkhira Division
Total Khulna Zone
Fin Cost
NPV /
(Mill Taka) Cost
3.940
5.94
0.136
8.68
1.766
7.63
0.272
6.30
0.136 10.90
0.136
7.44
1.630
7.26
4.076
8.86
0.136
7.71
2.330
6.66
1.722
5.93
0.574
7.68
0.287
8.65
0.574 14.55
3.423
6.97
0.342
9.43
0.342
9.60
1.711
8.29
0.342
9.42
10.611
6.52
66.975
NPV
104.94
4.42
50.42
7.21
5.30
3.20
43.23
131.92
3.40
50.35
17.64
7.23
4.51
11.14
38.06
5.22
5.39
23.29
5.21
108.89
1089.903
Rajshahi Zone
Naogaon Division
R547
R547
R547
R547
R547
R547
R547
R547
R547
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Km 038.09-038.49
Km 042.09-043.99
Km 044.39-044.49
Km 044.89-044.99
Km 049.43-050.63
Km 054.43-060.23
Km 063.23-064.23
Km 064.33-064.83
Km 014.87-015.96
S
S
S
S
S
S
S
S
S
0.40
1.90
0.10
0.10
1.20
5.80
1.00
0.50
1.09
1661
1661
1661
1661
1661
1661
1661
1661
3109
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 47 of 61
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 100-2000
DBST @ Traff 2000-4000
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.356
1.816
0.089
0.089
1.067
5.960
0.889
0.600
1.449
3.73
3.20
4.97
4.79
3.72
1.37
3.65
2.72
4.36
4.59
19.08
1.45
1.37
13.36
18.55
11.21
5.49
22.68
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R549
R549
R549
R549
R549
R549
R549
R549
R549
R549
Road Name
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 016.97-017.17
Km 045.89-049.03
Km 053.13-053.93
Km 064.23-064.33
Km 064.83-065.33
Km 017.27-019.09
Km 019.19-020.09
Km 021.89-022.29
Km 022.49-023.49
Km 038.49-038.69
Km 038.99-042.09
Km 004.47-014.87
Km 020.09-021.89
Km 022.29-022.49
Km 023.49-023.79
Km 026.69-027.39
Km 028.49-030.29
Km 030.99-031.99
Km 034.89-038.09
Km 060.23-063.23
Km 003.40-003.60
Km 003.60-004.90
Km 005.10-005.80
Km 010.85-011.85
Km 011.85-012.35
Km 000.30-003.40
Km 004.90-005.10
Km 005.80-007.80
Km 010.30-010.85
Km 015.05-017.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.20 3019 Regional DBST 25mm @ 25% Crk
S
3.14 1661 Regional DBST 25mm @ 25% Crk
S
0.80 1661 Regional DBST 25mm @ 25% Crk
S
0.10 1661 Regional DBST 25mm @ 25% Crk
S
0.50 1661 Regional DBST 25mm @ 25% Crk
S
1.81 3019 Regional Overlay 50mm @ IRI 5-7
S
0.90 3019 Regional Overlay 50mm @ IRI 5-7
S
0.40 3019 Regional Overlay 50mm @ IRI 5-7
S
1.00 4887 Regional Overlay 50mm @ IRI 5-7
S
0.20 1661 Regional Overlay 50mm @ IRI 5-7
S
3.10 1661 Regional Overlay 50mm @ IRI 5-7
S
10.40 3109 Regional Overlay 50mm @ IRI 7-9
S
1.80 3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 3019 Regional Overlay 50mm @ IRI 7-9
S
0.30 3019 Regional Overlay 50mm @ IRI 7-9
S
0.70 3019 Regional Overlay 50mm @ IRI 7-9
S
1.80 3019 Regional Overlay 50mm @ IRI 7-9
S
1.00 3019 Regional Overlay 50mm @ IRI 7-9
S
3.20 1661 Regional Overlay 50mm @ IRI 7-9
S
3.00 1661 Regional Overlay 50mm @ IRI 7-9
S
0.20 1779 Regional DBST @ Traff 100-2000
S
1.30 1779 Regional DBST @ Traff 100-2000
S
0.70 1779 Regional DBST @ Traff 100-2000
S
1.00 1779 Regional DBST @ Traff 100-2000
S
0.50 1779 Regional DBST @ Traff 100-2000
S
3.10 1779 Regional Overlay 50mm @ IRI 7-9
S
0.20 1779 Regional Overlay 50mm @ IRI 7-9
S
2.00 1779 Regional Overlay 50mm @ IRI 7-9
S
0.55 1779 Regional Overlay 50mm @ IRI 7-9
S
1.95 1779 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Naogaon Division
Fin Cost
NPV /
(Mill Taka) Cost
0.180
5.06
2.796
1.27
1.328
0.71
0.089
3.34
0.457
1.11
3.456
6.60
1.715
7.48
0.762
6.43
2.030 15.51
0.376
2.63
5.825
2.27
29.313
5.18
3.429
8.09
0.381
9.27
0.564
7.42
1.315
6.23
3.720
4.59
1.879
7.96
6.531
3.03
5.637
3.00
0.181
3.29
1.175
3.56
0.633
3.29
0.904
3.62
0.452
2.63
5.922
3.82
0.382
3.89
3.821
3.76
1.053
3.27
4.517
2.89
103.136
NPV
2.56
11.00
1.89
0.76
0.86
26.44
16.21
5.31
39.22
1.19
16.61
226.70
36.25
4.98
5.46
12.76
26.88
23.29
26.79
21.38
1.44
14.10
6.54
11.02
3.09
30.63
1.64
18.17
4.10
15.96
Natore Division
N502
N502
Bogra -Natore Road
Bogra -Natore Road
Km 045.96-046.66
Km 046.66-047.16
S
S
0.70
0.50
9061 National DBST @ Traff >6000
9061 National DBST @ Traff >6000
Appendix-B: Page: 48 of 61
2013
2013
0.951
0.679
6.06
8.83
14.97
18.87
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N502
N502
N502
N502
N502
N502
N502
N6
N6
N6
N6
N6
N6
N6
N6
N602
N602
N602
N602
N602
R548
R548
R548
R548
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Natore Town old Section
Natore Town old Section
Natore Town old Section
Natore Town old Section
Natore Town old Section
Naogaon-Atrai-Natore Road
Naogaon-Atrai-Natore Road
Naogaon-Atrai-Natore Road
Naogaon-Atrai-Natore Road
Chainage
Km 047.16-048.06
Km 053.16-053.36
Km 056.76-062.81
Km 041.86-043.36
Km 051.56-052.66
Km 055.96-056.16
Km 044.26-045.26
Km 090.02-100.52
Km 068.12-078.52
Km 083.92-090.02
Km 100.52-102.22
Km 102.22-102.42
Km 102.42-103.92
Km 104.02-112.12
Km 112.12-113.60
Km 002.59-002.89
Km 001.09-002.59
Km 003.59-004.89
Km 003.19-003.59
Km 004.89-005.41
Km 029.58-035.89
Km 040.17-055.36
Km 037.29-038.99
Km 039.29-040.17
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.90 9061 National DBST @ Traff >6000
S
0.20 6500 National DBST @ Traff >6000
S
6.05 9061 National DBST @ Traff >6000
S
1.50 9061 National Overlay 50mm @ IRI 5-7
S
1.10 6500 National Overlay 50mm @ IRI 5-7
S
0.20 6500 National Overlay 50mm @ IRI 5-7
S
1.00 9061 National Overlay 60mm @ IRI 7-9
S
10.50 7507 National Overlay 50mm @ IRI 4-7
S
10.39 11451 National Overlay 80mm @ IRI 4-9
S
6.10 11451 National Overlay 80mm @ IRI 4-9
S
1.70 11451 National Overlay 80mm @ IRI 4-9
S
0.20 11451 National Overlay 80mm @ IRI 4-9
S
1.50 11451 National Overlay 80mm @ IRI 4-9
S
8.10 11451 National Overlay 80mm @ IRI 4-9
S
1.48 11451 National Overlay 80mm @ IRI 4-9
S
0.30 7237 National DBST @ Traff >6000
S
1.50 7237 National Overlay 50mm @ IRI 5-7
S
1.30 7237 National Overlay 50mm @ IRI 5-7
S
0.40 7237 National Overlay 60mm @ IRI 7-9
S
0.52 11451 National Overlay 80mm @ IRI 5-9
S
6.31 3019 Regional DBST @ Traff 2000-4000
S
15.19 1939 Regional DBST 25mm @ 25% Crk
S
1.70 3019 Regional Overlay 50mm @ IRI 7-9
S
0.88 1939 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Natore Division
Fin Cost
NPV /
(Mill Taka) Cost
1.223
5.81
0.272
9.80
8.731 11.79
4.306 11.56
3.158
8.07
0.574
8.15
3.510 16.72
40.007 11.31
62.449 10.31
36.654 10.85
10.215 14.34
1.202 17.21
9.013 14.89
48.671 10.47
8.911 14.79
0.630
3.95
6.561
3.13
5.937
2.62
2.116
4.19
3.249
9.60
6.236
7.20
13.510
0.51
3.549
7.73
1.835
5.41
284.149
NPV
18.46
9.94
311.70
78.43
41.22
7.96
70.73
864.81
873.07
561.28
198.74
28.06
182.02
690.94
162.73
9.20
24.46
20.88
11.38
42.29
159.87
12.93
41.89
12.97
Nawabganj Division
R547
R547
R547
R547
R547
R547
R547
R547
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Km 081.42-082.62
Km 097.47-098.37
Km 082.62-082.82
Km 083.12-083.32
Km 096.07-096.17
Km 097.07-097.47
Km 098.37-098.47
Km 099.27-099.87
S
S
S
S
S
S
S
S
1.20
0.90
0.20
0.20
0.10
0.40
0.10
0.60
3019
3019
3019
3019
3019
3019
3019
3019
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 49 of 61
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
2013
2013
2013
2013
2013
2013
2013
2013
1.097
0.823
0.183
0.183
0.091
0.366
0.091
0.548
5.63
4.86
3.23
3.48
4.08
3.14
4.25
2.65
20.29
12.57
1.31
1.35
0.76
2.42
0.74
3.27
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Chainage
Km 100.07-100.66
Km 081.12-081.42
Km 083.37-084.87
Km 087.07-089.57
Km 089.77-091.67
Km 098.57-099.07
Km 084.87-087.07
Km 091.87-094.57
Km 094.57-096.07
Km 096.17-097.07
Km 099.87-100.07
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.59 3019 Regional DBST 25mm @ 25% Crk
S
0.30 3019 Regional Overlay 50mm @ IRI 5-7
S
1.50 3019 Regional Overlay 50mm @ IRI 5-7
S
2.50 3019 Regional Overlay 50mm @ IRI 5-7
S
1.90 3019 Regional Overlay 50mm @ IRI 5-7
S
0.50 3019 Regional Overlay 50mm @ IRI 5-7
S
2.20 3019 Regional Overlay 50mm @ IRI 7-9
S
2.70 3019 Regional Overlay 50mm @ IRI 7-9
S
1.50 3019 Regional Overlay 50mm @ IRI 7-9
S
0.90 3019 Regional Overlay 50mm @ IRI 7-9
S
0.20 3019 Regional Overlay 50mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Nawabganj Division
Fin Cost
NPV /
(Mill Taka) Cost
0.539
1.32
0.579
6.13
2.897
4.68
4.828
4.73
3.669
7.76
0.966
4.61
4.249
6.01
5.214
7.44
2.897
6.23
1.790
4.82
0.386
6.53
31.396
NPV
1.37
4.02
14.71
25.81
35.99
4.59
32.24
50.71
24.47
10.26
3.09
Pabna Division
N5
N5
N504
N504
N505
N6
N6
N6
N6
N6
N6
N6
N604
N604
N604
N704
N705
N705
N705
N705
R601
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Nagarbari -Kashinathpur Road
Nagarbari -Kashinathpur Road
Baderhat-Kazirhat Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Pabna Town Old Section
Pabna Town Old Section
Pabna Town Old Section
Jhenaidah-Dasuria Road
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Pabna-Natakhola Ferry Ghat Road
Km 101.10-101.80
Km 102.00-106.93
Km 000.90-001.40
Km 000.20-000.40
Km 000.00-002.63
Km 044.05-044.15
Km 025.27-040.35
Km 041.85-044.05
Km 044.15-046.20
Km 041.68-041.85
Km 046.20-048.55
Km 048.65-051.25
Km 001.90-003.40
Km 000.00-001.90
Km 003.40-007.57
Km 070.40-081.39
Km 004.50-004.60
Km 005.70-006.60
Km 008.30-009.20
Km 009.30-009.40
Km 016.94-017.24
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.70
4.93
0.50
0.20
2.63
0.10
15.08
2.20
2.05
0.17
2.35
2.60
1.50
1.90
4.17
10.99
0.10
0.90
0.90
0.10
0.30
1550
1550
2162
2162
1472
7153
6210
7153
7153
11451
11451
11451
7342
11451
11451
6607
2897
11451
11451
11451
535
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Appendix-B: Page: 50 of 61
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
DBST @ IRI>12
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
DBST @ Traff >6000
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 50mm @ IRI 4-7
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 50mm @ IRI 5-7
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 60mm @ IRI 7-9
Overlay 50mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ IRI>12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.667
18.777
0.902
0.762
10.378
0.180
57.447
8.383
7.822
1.034
14.103
15.623
7.853
12.699
28.791
50.530
0.287
5.334
5.334
0.593
0.274
1.91
1.67
0.46
1.62
0.91
8.46
6.60
6.08
5.16
13.41
14.82
11.11
4.04
11.92
13.43
7.57
4.18
10.99
10.03
11.95
0.27
6.06
35.47
3.73
1.49
10.92
7.25
534.56
71.07
54.70
22.41
258.10
245.01
44.23
186.98
477.28
692.19
1.49
79.50
72.54
9.61
0.55
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R601
R603
R603
R603
R603
R603
R603
R603
R603
R604
R604
R604
Road Name
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Pabna-Paksey (EPZ) Road
Tebunia-Hamkuria Road
Tebunia-Hamkuria Road
Tebunia-Hamkuria Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 026.44-026.54
Km 033.84-033.87
Km 008.00-008.60
Km 009.30-010.70
Km 012.90-016.94
Km 017.24-020.24
Km 033.87-034.17
Km 034.67-034.87
Km 035.97-036.17
Km 045.87-047.07
Km 000.40-000.60
Km 002.30-002.70
Km 005.60-006.50
Km 006.70-008.00
Km 008.60-009.30
Km 010.70-011.10
Km 012.30-012.90
Km 020.24-023.34
Km 027.24-027.44
Km 027.74-030.74
Km 030.74-033.74
Km 038.07-038.97
Km 039.67-042.77
Km 047.07-047.87
Km 000.00-001.90
Km 001.90-004.40
Km 007.70-009.50
Km 010.20-012.80
Km 004.40-007.60
Km 009.50-010.20
Km 012.80-015.20
Km 021.81-025.78
Km 003.20-009.30
Km 009.80-013.20
Km 013.40-018.50
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 1096 Regional DBST @ IRI>12
S
0.03 1096 Regional DBST @ IRI>12
S
0.60
535 Regional Overlay 50mm @ IRI 5-7
S
1.40
535 Regional Overlay 50mm @ IRI 5-7
S
4.04
535 Regional Overlay 50mm @ IRI 5-7
S
3.00
882 Regional Overlay 50mm @ IRI 5-7
S
0.30 1096 Regional Overlay 50mm @ IRI 5-7
S
0.20 1096 Regional Overlay 50mm @ IRI 5-7
S
0.20 1096 Regional Overlay 50mm @ IRI 5-7
S
1.20 3019 Regional Overlay 50mm @ IRI 5-7
S
0.20
535 Regional Overlay 50mm @ IRI 7-9
S
0.40
535 Regional Overlay 50mm @ IRI 7-9
S
0.90
535 Regional Overlay 50mm @ IRI 7-9
S
1.30
535 Regional Overlay 50mm @ IRI 7-9
S
0.70
535 Regional Overlay 50mm @ IRI 7-9
S
0.40
535 Regional Overlay 50mm @ IRI 7-9
S
0.60
535 Regional Overlay 50mm @ IRI 7-9
S
3.10 1096 Regional Overlay 50mm @ IRI 7-9
S
0.20 1096 Regional Overlay 50mm @ IRI 7-9
S
3.00 1096 Regional Overlay 50mm @ IRI 7-9
S
3.00 1096 Regional Overlay 50mm @ IRI 7-9
S
0.90 3019 Regional Overlay 50mm @ IRI 7-9
S
3.10 3019 Regional Overlay 50mm @ IRI 7-9
S
0.80 3019 Regional Overlay 50mm @ IRI 7-9
S
1.90 3297 Regional DBST 25mm @ 25% Crk
S
2.50 3297 Regional Overlay 50mm @ IRI 5-7
S
1.80 3297 Regional Overlay 50mm @ IRI 5-7
S
2.60 3297 Regional Overlay 50mm @ IRI 5-7
S
3.20 3297 Regional Overlay 50mm @ IRI 7-9
S
0.70 3297 Regional Overlay 50mm @ IRI 7-9
S
2.40 3297 Regional Overlay 50mm @ IRI 7-9
S
3.96 3019 Regional Overlay 50mm @ IRI 7-9
S
6.10 3778 Regional Overlay 50mm @ IRI 5-7
S
3.40 3778 Regional Overlay 50mm @ IRI 5-7
S
5.10 3778 Regional Overlay 50mm @ IRI 5-7
Appendix-B: Page: 51 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
0.091
0.70
0.026
1.49
1.159
0.90
2.704
0.79
7.798
0.79
6.483
0.87
0.579
2.28
0.386
1.98
0.386
2.53
2.317
9.29
0.595
0.92
0.772
1.24
1.738
1.71
2.511
1.44
1.352
1.55
0.772
1.45
1.159
1.54
5.987
3.67
0.386
3.94
5.794
2.50
5.794
3.30
1.738
8.64
5.987
8.03
1.545
7.52
2.816
1.42
7.829
2.54
5.637
2.40
8.142
2.23
10.021
3.62
2.192
3.71
7.516
3.58
8.915
5.01
19.103
2.58
10.648
2.86
15.972
3.00
NPV
0.48
0.29
1.26
2.38
6.76
6.79
1.52
0.88
1.14
27.21
0.65
1.06
4.21
5.34
2.50
1.27
2.01
26.16
1.76
16.04
24.14
19.63
60.74
18.09
10.92
23.70
15.80
19.21
42.59
10.47
34.66
56.42
58.14
36.89
59.02
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R604
R604
R604
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Tebunia-Hamkuria Road
Tebunia-Hamkuria Road
Tebunia-Hamkuria Road
Road
Cway Length
AADT
Work Name
Class
Side
(km)
Km 019.60-031.60
S
12.00 2942 Regional Overlay 50mm @ IRI 5-7
Km 013.20-013.40
S
0.20 3778 Regional Overlay 50mm @ IRI 7-9
Km 031.60-040.57
S
8.97 2942 Regional Overlay 50mm @ IRI 7-9
Fin Cost
NPV /
(Mill Taka) Cost
2013
35.388
1.57
2013
0.626
5.17
2013
21.499
2.17
464.136
Km 118.02-124.57
Km 124.57-124.98
Km 144.98-145.73
Km 144.98-145.73
Km 113.60-117.22
Km 117.22-118.02
Km 142.55-144.98
Km 145.73-149.67
Km 000.00-000.10
Km 002.30-003.90
Km 003.90-004.60
Km 004.60-006.30
Km 006.30-006.90
Km 006.90-009.30
Km 009.30-017.20
Km 017.60-020.83
Km 010.00-011.20
Km 026.00-028.30
Km 022.20-026.00
Km 029.82-030.12
Km 007.00-010.00
Km 012.40-012.50
Km 015.80-019.00
Km 028.70-029.00
Km 030.32-032.34
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Sub-total Pabna Division
Year
NPV
66.52
4.48
52.85
Rajshahi Division
N6
N6
N6
N6
N6
N6
N6
N6
N603
N603
N603
N603
N603
N603
N603
N603
R685
R685
R685
R685
R685
R685
R685
R685
R685
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
S
S
L
R
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
6.55
0.41
0.75
0.75
3.62
0.80
2.43
3.94
0.10
1.60
0.70
1.70
0.60
2.40
7.90
3.23
1.20
2.30
3.80
0.30
3.00
0.10
3.20
0.30
2.02
7109
7109
11451
11451
11451
11451
11451
11451
3802
3802
3802
3802
3802
3802
11451
11451
6330
4887
4887
4887
6330
6330
6330
4887
4887
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Sub-total Rajshahi Division
Sirajganj Division
Appendix-B: Page: 52 of 61
Overlay 50mm @ IRI 4-7
Overlay 60mm @ IRI 7-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
DBST @ Traff >6000
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
25.516
2.582
6.198
6.198
21.734
4.807
14.601
23.657
0.180
6.096
2.667
6.477
2.286
9.145
47.469
19.408
1.630
3.227
10.909
0.861
11.557
0.342
10.953
1.027
6.921
246.449
6.45
5.88
9.21
9.21
12.94
12.54
16.18
13.40
5.22
7.54
6.46
6.91
5.98
7.65
10.54
10.89
10.49
8.10
12.91
7.12
7.14
8.63
10.14
10.16
6.42
326.38
26.68
70.51
70.51
381.62
92.94
291.72
391.28
2.82
73.57
30.07
71.67
23.58
111.97
705.84
298.22
61.18
101.06
187.77
10.59
104.01
3.01
136.06
13.64
70.02
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N405
N5
N5
N5
N5
N5
N5
R451
R451
R451
R451
R451
R451
R451
R451
R451
R451
R451
Road Name
Elenga-Hatikamrul Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Nalka-Sirajganj Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 036.25-040.81
Km 134.51-137.51
Km 137.51-143.61
Km 143.61-146.71
Km 122.31-129.61
Km 129.61-132.71
Km 132.71-134.51
Km 006.90-009.50
Km 000.00-001.30
Km 002.70-003.40
Km 009.50-009.70
Km 012.25-013.27
Km 012.25-013.27
Km 001.30-002.70
Km 003.40-005.90
Km 005.90-006.90
Km 009.70-010.80
Km 013.27-014.74
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
4.56 11451 National DBST @ Traff >6000
S
3.00 6306 National Overlay 50mm @ IRI 4-7
S
6.10 6306 National Overlay 50mm @ IRI 4-7
S
3.10 6306 National Overlay 50mm @ IRI 4-7
S
7.30 5355 National Overlay 50mm @ IRI 4-9
S
3.10 11451 National Overlay 80mm @ IRI 4-9
S
1.80 11451 National Overlay 80mm @ IRI 4-9
S
2.60 4965 Regional DBST @ Traff 4000-6000
S
1.30 4965 Regional Overlay 50mm @ IRI 5-7
S
0.70 4965 Regional Overlay 50mm @ IRI 5-7
S
0.20 4965 Regional Overlay 50mm @ IRI 5-7
L
1.02 4887 Regional Overlay 60mm @ IRI 7-9
R
1.02 4887 Regional Overlay 60mm @ IRI 7-9
S
1.40 4965 Regional Overlay 60mm @ IRI 7-9
S
2.50 4965 Regional Overlay 60mm @ IRI 7-9
S
1.00 4965 Regional Overlay 60mm @ IRI 7-9
S
1.10 4965 Regional Overlay 60mm @ IRI 7-9
S
1.47 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Sirajganj Division
Total Rajshahi Zone
Fin Cost
NPV /
(Mill Taka) Cost
8.222
7.40
11.431
4.42
23.242
6.03
11.812
4.64
27.815
3.76
18.627
8.15
10.816
7.44
3.532
6.50
3.732
4.72
2.010
5.69
0.574
6.18
3.161 14.39
4.742
8.10
4.792
5.73
8.557
6.31
3.423
7.08
3.765
6.20
5.032 14.68
155.285
NPV
191.15
81.11
197.52
87.99
151.21
187.49
99.30
82.17
21.94
14.24
4.29
55.71
53.01
32.65
66.12
28.82
27.04
90.44
1284.551
Rangpur Zone
Bogra Division
N5
N5
N5
N5
N502
N502
N502
N502
N502
N502
N502
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Km 161.37-164.12
Km 164.12-174.36
Km 174.36-201.28
Km 201.28-245.52
Km 003.60-004.50
Km 008.10-008.80
Km 009.10-010.20
Km 017.10-019.90
Km 028.26-028.36
Km 028.66-028.86
Km 002.40-003.60
S
S
S
S
S
S
S
S
S
S
S
2.75
10.23
26.93
44.23
0.90
0.70
1.10
2.80
0.10
0.20
1.20
11451
10530
20036
13193
5705
5705
5705
5705
9061
9061
5705
National
National
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 53 of 61
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
16.536
62.667
161.798
269.791
1.223
0.951
1.494
3.845
0.287
0.574
3.445
13.73 367.01
17.56 1492.52
13.12 3272.90
8.54 3250.65
7.20
34.26
9.94
34.14
6.60
36.44
9.07 125.95
9.29
4.45
8.68
8.32
6.85
29.79
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N502
N502
N502
N502
N502
N502
N502
N502
N502
N510
N510
N514
N514
N514
N514
N514
N515
N515
N515
N515
N515
N515
N515
N515
R545
R545
R546
R550
R550
R550
R550
R550
R550
R550
R550
Road Name
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra Station Road
Bogra Station Road
Bogra (Banani)-Matidali Road
Bogra (Banani)-Matidali Road
Bogra (Banani)-Matidali Road
Bogra (Banani)-Matidali Road
Bogra (Banani)-Matidali Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Railgate-Shantahar Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 004.50-004.90
Km 007.50-008.10
Km 010.60-010.80
Km 012.30-013.10
Km 013.30-015.10
Km 016.90-017.10
Km 019.90-026.16
Km 027.06-027.46
Km 030.86-032.00
Km 000.00-002.78
Km 000.00-002.78
Km 007.50-007.91
Km 008.40-008.67
Km 003.70-003.78
Km 003.70-003.78
Km 007.50-007.91
Km 000.00-000.10
Km 000.50-003.70
Km 003.70-006.70
Km 006.70-010.40
Km 010.70-013.30
Km 013.30-013.90
Km 013.90-014.00
Km 014.30-016.00
Km 000.70-007.30
Km 012.90-013.90
Km 000.40-001.10
Km 005.30-005.60
Km 005.80-007.70
Km 008.50-009.30
Km 009.60-011.00
Km 005.60-005.80
Km 007.70-008.50
Km 011.20-014.20
Km 014.20-016.00
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.40 5705 National Overlay 50mm @ IRI 5-9
S
0.60 5705 National Overlay 50mm @ IRI 5-9
S
0.20 5705 National Overlay 50mm @ IRI 5-9
S
0.80 5705 National Overlay 50mm @ IRI 5-9
S
1.80 5705 National Overlay 50mm @ IRI 5-9
S
0.20 5705 National Overlay 50mm @ IRI 5-9
S
6.26 9061 National Overlay 60mm @ IRI 7-9
S
0.40 9061 National Overlay 60mm @ IRI 7-9
S
1.14 9061 National Overlay 60mm @ IRI 7-9
L
2.78 13893 National Overlay 50mm @ IRI 5
R
2.78 13893 National Overlay 50mm @ IRI 5
L
0.41 9159 National DBST @ Traff >6000
L
0.27 9159 National DBST @ Traff >6000
L
0.08 14432 National Overlay 50mm @ IRI 5
R
0.08 10992 National Overlay 50mm @ IRI 5
R
0.41 10964 National Overlay 50mm @ IRI 5
S
0.10 11451 National Overlay 50mm @ IRI 5
S
3.20 11451 National Overlay 80mm @ IRI 5-9
S
3.00 11451 National Overlay 80mm @ IRI 5-9
S
3.70 11451 National Overlay 80mm @ IRI 5-9
S
2.60 11451 National Overlay 80mm @ IRI 5-9
S
0.60 11451 National Overlay 80mm @ IRI 5-9
S
0.10 11451 National Overlay 80mm @ IRI 5-9
S
1.70 11451 National Overlay 80mm @ IRI 5-9
S
6.60 7933 Regional DBST @ Traff >6000
S
1.00 4887 Regional DBST @ Traff 4000-6000
S
0.70 3283 Regional Overlay 50mm @ IRI 7-9
S
0.30 3234 Regional DBST @ Traff 2000-4000
S
1.90 3234 Regional Overlay 50mm @ IRI 5-7
S
0.80 3234 Regional Overlay 50mm @ IRI 5-7
S
1.40 3234 Regional Overlay 50mm @ IRI 5-7
S
0.20 3234 Regional Overlay 50mm @ IRI 7-9
S
0.80 3234 Regional Overlay 50mm @ IRI 7-9
S
3.00 3234 Regional Overlay 50mm @ IRI 7-9
S
1.80 3234 Regional Overlay 50mm @ IRI 7-9
Appendix-B: Page: 54 of 61
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
1.148
6.80
1.722
8.01
0.574
8.05
2.297
7.01
5.167
5.50
0.574
9.51
21.859
9.31
1.369
9.51
3.899 14.64
10.577
2.97
10.577
2.97
1.404
4.02
0.934
3.10
0.585
1.74
0.585
1.76
2.967
1.49
0.381
7.57
19.228 15.48
18.026 13.85
22.232 16.38
15.623 14.33
3.605 13.79
0.601 15.60
10.215 15.84
8.901 15.39
1.359
6.03
2.010
2.43
0.408
1.91
5.454
3.52
2.297
4.35
4.019
8.17
0.574
7.42
2.297
6.21
8.612
7.36
5.167
5.99
NPV
9.28
20.30
7.37
20.34
38.55
7.14
295.31
20.13
75.86
42.12
42.19
23.59
9.10
1.12
1.14
4.78
5.86
364.54
305.74
446.09
274.21
60.92
10.60
198.25
442.23
31.47
6.52
2.28
23.24
12.55
45.96
5.68
18.36
84.47
38.58
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R550
R550
R550
Road Name
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Road
Cway Length
AADT
Work Name
Class
Side
(km)
Km 000.00-002.40
S
2.40 4887 Regional Overlay 60mm @ IRI 7-9
Km 002.40-002.60
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
Km 002.60-005.30
S
2.70 4887 Regional Overlay 60mm @ IRI 7-9
Fin Cost
NPV /
(Mill Taka) Cost
2013
8.215
7.20
2013
0.685
8.49
2013
9.242 11.98
737.999
Km 066.60-068.30
Km 081.60-083.00
Km 083.00-083.60
Km 083.60-084.66
Km 086.06-087.16
Km 065.42-066.60
Km 090.26-091.36
Km 095.06-095.26
Km 096.36-097.96
Km 079.90-080.30
Km 084.66-084.76
Km 102.66-102.86
Km 054.02-057.72
Km 058.12-059.12
Km 069.80-070.40
Km 070.70-073.30
Km 074.70-074.90
Km 075.80-076.10
Km 081.00-081.60
Km 089.76-089.86
Km 092.06-095.06
Km 095.26-096.36
Km 097.96-098.76
Km 099.66-100.86
Km 103.66-105.94
Km 068.30-069.80
Km 070.40-070.70
Km 074.90-075.80
Km 076.30-079.30
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Sub-total Bogra Division
Year
NPV
84.23
8.57
128.34
Dinajpur Division
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.70
1.40
0.60
1.06
1.10
1.18
1.10
0.20
1.60
0.40
0.10
0.20
3.70
1.00
0.60
2.60
0.20
0.30
0.60
0.10
3.00
1.10
0.80
1.20
2.29
1.50
0.30
0.90
3.00
2707
2707
2707
2707
2707
4887
4887
4887
4887
2707
2707
4887
4331
4331
2707
2707
2707
2707
2707
4887
4887
4887
4887
4887
4887
2707
2707
2707
2707
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-B: Page: 55 of 61
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
Overlay 50mm @ IRI 7-9
2.309
1.902
0.815
1.437
1.494
1.607
1.494
0.272
2.174
0.543
0.136
0.274
10.622
2.871
1.722
7.464
0.574
0.861
1.722
0.287
8.612
3.158
2.297
3.445
6.813
4.306
0.861
2.584
8.612
4.33
5.34
4.48
5.23
4.26
8.07
12.04
12.57
13.27
1.84
3.25
8.79
5.58
4.26
3.80
2.48
2.89
2.79
3.22
12.52
10.20
9.90
11.14
10.81
5.92
4.78
4.98
3.89
3.09
29.03
36.61
13.06
27.12
22.52
47.41
67.32
12.48
107.92
2.52
1.09
8.79
77.73
15.90
8.91
23.60
2.11
3.13
7.30
5.48
113.06
40.23
32.92
47.93
65.28
30.80
6.38
12.30
35.75
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R585
R585
R585
R585
R585
R585
R585
R586
Road Name
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Fulbari Bus Stand-Dinajpur Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 079.30-079.90
Km 080.30-081.00
Km 053.54-054.02
Km 059.42-062.42
Km 062.42-065.42
Km 098.76-099.46
Km 103.46-103.56
Km 000.00-003.27
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.60 2707 Regional Overlay 50mm @ IRI 7-9
S
0.70 2707 Regional Overlay 50mm @ IRI 7-9
S
0.48 4331 Regional Overlay 60mm @ IRI 7-9
S
3.00 4331 Regional Overlay 60mm @ IRI 7-9
S
3.00 4331 Regional Overlay 60mm @ IRI 7-9
S
0.70 4887 Regional Overlay 60mm @ IRI 7-9
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
3.27 6695 Regional DBST 25mm @ 25% Crk
Year
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Dinajpur Division
Fin Cost
NPV /
(Mill Taka) Cost
1.722
4.07
2.010
4.08
1.629
7.59
10.269
6.71
10.272
8.13
2.396 13.89
0.342
7.60
4.735
4.00
114.644
NPV
9.29
10.86
15.40
101.45
111.39
40.74
4.10
58.31
Gaibanda Division
N5
R555
R555
R555
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
Dhaka -Utholi-Banglabandh Road
Palashbari-Gaibandah Road
Palashbari-Gaibandah Road
Palashbari-Gaibandah Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Km 278.06-279.50
Km 017.80-021.02
Km 003.50-007.00
Km 014.40-017.80
Km 002.40-003.90
Km 003.90-005.10
Km 005.10-028.15
Km 028.15-040.65
Km 040.65-043.92
Km 043.92-047.02
Km 050.12-051.72
Km 000.00-000.50
Km 001.10-001.60
Km 047.02-050.12
Km 052.72-053.02
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.44
3.22
3.50
3.40
1.50
1.20
23.05
12.50
3.27
3.10
1.60
0.50
0.50
3.10
0.30
4731
4887
2956
2956
6187
6027
4887
4887
4887
4887
4887
6187
6187
4887
4331
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Overlay 50mm @ IRI 4-9
DBST @ Traff 4000-6000
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
DBST @ Traff >6000
DBST @ Traff >6000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 5.5-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
5.397
4.374
10.048
9.760
2.038
1.630
31.312
35.884
9.379
8.899
4.593
1.711
1.711
10.611
1.027
138.375
9.57
8.16
3.76
3.81
5.64
9.37
7.29
10.61
9.17
13.00
10.65
5.67
6.26
14.37
9.59
80.64
119.87
51.43
52.08
44.10
57.19
712.97
507.86
120.32
148.84
62.98
14.59
16.88
186.72
11.72
Km 117.79-117.99
Km 120.09-120.78
Km 113.77-116.79
Km 117.29-117.49
Km 118.29-118.39
S
S
S
S
S
0.20
0.69
3.02
0.20
0.10
2947
4887
2947
2947
4887
Regional
Regional
Regional
Regional
Regional
DBST @ Traff 2000-4000
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
DBST 25mm @ 25% Crk
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
0.272
0.932
2.764
0.272
0.342
5.01
5.87
1.59
4.48
9.44
3.99
24.56
9.75
2.91
5.49
Sub-total Gaibanda Division
Joypurhat Division
R545
R545
R545
R545
R545
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Appendix-B: Page: 56 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
R545
R550
R550
R550
Road Name
Bogra-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 119.79-119.89
Km 016.00-024.12
Km 025.02-028.12
Km 024.12-025.02
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 4887 Regional Overlay 60mm @ IRI 7-9
S
8.12 3234 Regional Overlay 50mm @ IRI 5-7
S
3.10 4887 Regional Overlay 50mm @ IRI 5-7
S
0.90 4887 Regional Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
Sub-total Joypurhat Division
Fin Cost
NPV /
(Mill Taka) Cost
0.342
5.17
23.316
5.33
8.899 12.83
3.081 13.91
40.219
NPV
5.38
169.36
146.98
52.47
Kurigram Division
N506
N506
N506
N506
N506
N506
N506
N506
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Km 042.70-042.90
Km 045.30-046.00
Km 036.00-041.80
Km 041.80-042.00
Km 042.00-042.70
Km 042.90-045.30
Km 046.00-047.20
Km 047.20-050.04
S
S
S
S
S
S
S
S
0.20 2992
0.70 2992
5.80 2992
0.20 2992
0.70 2992
2.40 2992
1.20 2992
2.83 11451
National
National
National
National
National
National
National
National
DBST @ Traff 2000-4000
DBST @ Traff 2000-4000
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-9
Overlay 80mm @ IRI 5-9
2013
2013
2013
2013
2013
2013
2013
2013
0.272
0.951
16.659
0.574
2.010
6.890
3.508
15.600
46.463
3.19
2.98
3.77
3.91
5.28
5.81
5.48
13.40
3.43
11.07
104.85
3.75
16.69
66.51
30.56
310.79
Km 022.65-022.85
Km 027.35-033.00
Km 033.00-036.00
Km 021.15-022.55
Km 059.45-059.55
Km 061.35-062.45
Km 062.75-062.95
Km 070.45-071.55
Km 100.97-101.57
Km 047.44-048.24
Km 048.24-048.94
Km 049.94-050.84
Km 053.34-056.25
Km 056.35-056.65
Km 059.55-061.35
Km 062.95-066.05
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.20
5.65
3.00
1.40
0.10
1.10
0.20
1.10
0.60
0.80
0.70
0.90
2.90
0.30
1.80
3.10
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-9
Overlay 60mm @ IRI 7-9
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-7
Overlay 50mm @ IRI 5-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
Overlay 60mm @ IRI 7-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.574
16.225
8.604
4.792
0.287
3.158
0.574
3.158
1.722
2.738
2.396
3.081
9.940
1.027
6.161
10.611
6.98
8.67
5.23
5.82
16.38
15.96
17.95
13.61
3.20
14.66
16.17
18.21
8.65
9.00
12.41
9.66
6.96
224.36
59.40
43.80
6.76
74.25
13.02
63.90
7.99
53.37
53.07
69.66
126.10
13.56
105.51
148.82
Sub-total Kurigram Division
Lalmonirhat Division
N506
N506
N506
N506
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
7068
9061
2992
7068
9061
9061
9061
9061
2269
9061
9061
9061
9061
9061
9061
9061
Appendix-B: Page: 57 of 61
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N509
N509
N509
N509
Road Name
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 066.05-069.25
Km 069.25-070.45
Km 089.47-091.77
Km 092.77-092.97
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
3.20 9061 National Overlay 60mm @ IRI 7-9
S
1.20 9061 National Overlay 60mm @ IRI 7-9
S
2.30 9061 National Overlay 60mm @ IRI 7-9
S
0.20 9061 National Overlay 60mm @ IRI 7-9
Year
2013
2013
2013
2013
Sub-total Lalmonirhat Division
Fin Cost
NPV /
(Mill Taka) Cost
10.953
9.51
4.107 13.12
7.873
8.80
0.685
9.50
98.666
NPV
145.03
77.53
102.72
9.64
Nilphamari Division
N518
N518
N518
R570
Sayedpur Town Old Section
Sayedpur Town Old Section
Sayedpur Town Old Section
Sayedpur-Nilphamari Road
Km 000.20-001.00
Km 004.00-004.11
Km 001.00-004.00
Km 009.40-012.50
S
S
S
S
0.80
0.11
3.00
3.10
4662
4662
4662
3900
National
National
National
Regional
DBST @ Traff 4000-6000
DBST 25mm @ 25% Crk
Overlay 50mm @ IRI 5-9
Overlay 50mm @ IRI 5-7
2013
2013
2013
2013
1.284
0.145
9.599
8.899
19.928
3.97
2.79
3.07
8.56
19.92
0.92
38.68
98.01
Km 439.41-443.44
Km 443.44-443.84
Km 443.84-446.84
Km 447.14-447.44
Km 447.44-447.64
Km 447.64-458.76
Km 458.76-468.26
Km 468.26-475.34
S
S
S
S
S
S
S
S
4.03
0.40
3.00
0.30
0.20
11.12
9.50
7.08
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
19.903
1.975
14.890
1.482
0.988
54.924
46.918
33.174
174.253
9.90
13.60
9.23
11.87
13.14
11.12
11.46
9.80
293.06
39.96
204.27
25.05
19.29
961.75
758.96
483.46
Km 306.06-323.96
Km 279.50-285.98
Km 291.38-294.48
Km 294.48-306.06
Km 323.96-358.07
Km 003.10-019.25
Km 020.25-020.35
Km 000.00-003.00
Km 019.45-019.85
S
S
S
S
S
S
S
S
S
17.90 8871 National Overlay 50mm @ IRI 4-7
6.48 4731 National Overlay 50mm @ IRI 4-9
3.10 4405 National Overlay 50mm @ IRI 4-9
11.58 4405 National Overlay 50mm @ IRI 4-9
34.11 11451 National Overlay 80mm @ IRI 4-9
16.15 7068 National DBST @ Traff >6000
0.10 7068 National DBST @ Traff >6000
3.00 9061 National Overlay 50mm @ IRI 5-7
0.40 7068 National Overlay 50mm @ IRI 5-7
2013
2013
2013
2013
2013
2013
2013
2013
2013
67.078
24.337
11.650
44.017
207.193
21.941
0.136
8.612
1.148
Sub-total Nilphamari Division
Panchgarh Division
N5
N5
N5
N5
N5
N5
N5
N5
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Sub-total Panchgarh Division
Rangpur Division
N5
N5
N5
N5
N5
N506
N506
N506
N506
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Appendix-B: Page: 58 of 61
9.50 1217.54
6.37 287.60
5.70 128.26
9.17 630.36
9.12 2668.13
7.33 612.52
2.60
3.52
9.07 124.61
8.78
15.55
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N506
N506
N517
N517
Road Name
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur Town Old Section
Rangpur Town Old Section
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 003.00-003.10
Km 019.25-019.45
Km 000.00-002.50
Km 002.50-002.60
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.10 9061 National Overlay 60mm @ IRI 7-9
S
0.20 7068 National Overlay 60mm @ IRI 7-9
S
2.50 9126 National DBST @ Traff >6000
S
0.10 9111 National DBST @ Traff >6000
Year
2013
2013
2013
2013
Sub-total Rangpur Division
Fin Cost
NPV /
(Mill Taka) Cost
0.342 10.01
0.685
7.26
4.051
5.80
0.180
5.58
391.371
NPV
5.08
7.68
102.08
4.44
Thakurgaon Division
N5
N5
N5
N5
N5
N5
N5
N5
N5
N5
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Km 405.20-408.20
Km 408.20-410.87
Km 411.77-416.07
Km 416.07-422.27
Km 422.27-434.54
Km 400.60-402.00
Km 403.60-403.80
Km 404.10-404.30
Km 405.10-405.20
Km 434.54-439.41
S
S
S
S
S
S
S
S
S
S
3.00
2.66
4.30
6.20
12.27
1.40
0.20
0.20
0.10
4.87
3083
3083
3083
3083
3083
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 50mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Thakurgaon Division
Total Rangpur Zone
9.395
8.340
13.466
19.417
42.083
6.914
0.988
0.988
0.494
24.267
126.351
7.39
5.53
3.14
7.37
6.42
10.90
12.26
11.59
17.22
20.36
110.79
64.69
55.56
242.13
381.18
112.06
18.20
16.17
10.75
587.78
1888.270
Sylhet Zone
Habiganj Division
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Km 153.11-153.21
Km 140.75-141.07
Km 145.65-148.15
Km 181.52-185.62
Km 115.94-131.24
Km 133.25-138.15
Km 148.21-149.41
Km 153.41-153.51
Km 185.62-187.02
Km 187.13-187.33
Km 187.43-188.53
Km 188.63-190.50
S
S
S
S
S
S
S
S
S
S
S
S
0.10 6671 National DBST @ Traff >6000
0.32 9332 National DBST 25mm @ 25% Crk
2.50 6671 National DBST 25mm @ 25% Crk
4.10 11451 National Overlay 50mm @ IRI 4
15.30 9332 National Overlay 50mm @ IRI 4-7
4.90 9332 National Overlay 50mm @ IRI 4-7
1.20 6671 National Overlay 50mm @ IRI 4-7
0.10 6671 National Overlay 50mm @ IRI 4-7
1.40 8158 National Overlay 50mm @ IRI 4-7
0.20 8158 National Overlay 50mm @ IRI 4-7
1.10 8158 National Overlay 50mm @ IRI 4-7
1.87 8158 National Overlay 50mm @ IRI 4-7
Appendix-B: Page: 59 of 61
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.185
0.593
4.631
16.042
59.894
19.174
4.698
0.391
5.480
0.783
4.306
7.313
5.22
3.30
10.63
26.34
5.73
73.00
14.82 454.52
10.80 1104.10
8.06 230.47
6.38
54.28
5.68
4.03
12.21 120.62
9.68
14.49
10.88
89.59
13.04 182.21
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N2
N204
R220
R220
R220
R220
R220
R220
R220
Road Name
Dhaka-Sylhet-Jaflong Road
Jagadishpur-Shaistaganj
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 141.07-145.55
Km 008.70-009.30
Km 019.68-019.98
Km 021.18-022.18
Km 019.00-019.68
Km 019.98-021.18
Km 022.18-022.28
Km 022.38-022.98
Km 023.18-023.48
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
4.48 11451 National Overlay 80mm @ IRI 4-9
S
0.60 1956 National Overlay 50mm @ IRI 5-9
S
0.30 6240 Regional DBST @ IRI>12
S
1.00 6240 Regional DBST @ IRI>12
S
0.68 6240 Regional Overlay 60mm @ IRI 5.5-9
S
1.20 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.10 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 6240 Regional Overlay 60mm @ IRI 5.5-9
S
0.30 6240 Regional Overlay 60mm @ IRI 5.5-9
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Habiganj Division
Fin Cost
NPV /
(Mill Taka) Cost
27.657
7.96
1.816
1.26
0.408
1.10
1.359
1.06
2.331
2.42
4.107
1.90
0.342
6.89
2.054
2.28
1.027
3.01
164.591
NPV
324.17
2.58
4.07
13.08
5.08
7.85
2.12
4.71
3.11
Moulavi Bazar Division
N208
N208
R282
R282
R282
R282
Moulvibazar-Sylhet Road
Moulvibazar-Sylhet Road
Juri-Lathidila Road
Juri-Lathidila Road
Juri-Lathidila Road
Juri-Lathidila Road
Km 013.40-030.60
Km 000.00-013.40
Km 003.00-006.10
Km 000.00-003.00
Km 006.10-009.10
Km 015.40-015.99
S
S
S
S
S
S
17.20 7159 National Overlay 50mm @ IRI 5-7
13.40 12587 National Overlay 80mm @ IRI 5-9
3.10 4391 Regional DBST @ Traff 4000-6000
3.00 4388 Regional Overlay 60mm @ IRI 7-9
3.00 4391 Regional Overlay 60mm @ IRI 7-9
0.58 4391 Regional Overlay 60mm @ IRI 7-9
Km 072.36-073.29
S
0.93
Km 275.49-275.89
Km 265.99-266.99
Km 273.59-274.49
Km 190.50-190.80
Km 192.73-198.03
Km 271.19-271.89
Km 274.69-275.39
Km 276.19-276.99
Km 277.19-278.79
S
S
S
S
S
S
S
S
S
0.40
1.00
0.90
0.30
5.30
0.70
0.70
0.80
1.60
2013
2013
2013
2013
2013
2013
53.868
67.828
2.910
8.103
7.095
1.274
141.078
5.09
4.85
2.32
3.16
4.67
5.59
317.42
296.14
17.57
26.59
37.04
8.14
2013
1.746
1.746
8.84
24.03
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.741
3.915
3.523
1.174
32.719
4.321
4.321
4.939
9.877
7.93
9.01
10.51
11.95
9.03
8.98
10.47
11.38
9.32
26.88
52.59
63.20
26.82
471.23
47.91
55.85
82.80
135.50
Sub-total Moulavi Bazar Division
Sunamganj Division
R370
Mymensingh -Sunamganj Road
3019 Regional Overlay 50mm @ IRI 7-9
Sub-total Sunamganj Division
Sylhet Division
N2
N2
N2
N2
N2
N2
N2
N2
N2
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
11451
11451
11451
8158
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
Appendix-B: Page: 60 of 61
DBST @ Traff >6000
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4
Overlay 50mm @ IRI 4-7
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Overlay 80mm @ IRI 4-9
Appendix-B
Annual Needs Report
2012 - 2013
Road
No
N2
N2
N2
N2
N206
N209
N210
N210
N210
N210
N210
N210
N210
R250
R250
R250
R250
R250
R250
R250
R250
R250
R250
R250
R250
R250
R281
R281
R281
R281
R281
Road Name
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Keean Bridge-Nayarpool Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Rajnagar-Charkhai Road
Rajnagar-Charkhai Road
Rajnagar-Charkhai Road
Rajnagar-Charkhai Road
Rajnagar-Charkhai Road
Million Taka
1st Year Periodic Works of National and Regional Roads
(Excluding Ongoing)
Chainage
Km 278.89-279.29
Km 279.39-280.09
Km 282.46-284.66
Km 284.76-286.26
Km 000.70-000.97
Km 000.20-001.41
Km 000.10-002.50
Km 002.60-005.30
Km 005.70-006.40
Km 006.60-006.90
Km 007.20-009.40
Km 009.50-010.60
Km 010.70-010.99
Km 010.20-010.70
Km 017.10-020.65
Km 024.15-031.05
Km 021.85-023.95
Km 031.05-040.43
Km 075.45-086.57
Km 000.00-003.30
Km 003.30-010.20
Km 010.70-013.50
Km 013.50-014.10
Km 014.10-017.10
Km 023.95-024.15
Km 062.25-075.35
Km 067.22-068.52
Km 071.52-082.76
Km 058.52-061.59
Km 061.59-067.22
Km 068.52-071.52
Road
Cway Length
AADT
Work Name
Class
Side
(km)
S
0.40 11451 National Overlay 80mm @ IRI 4-9
S
0.70 11451 National Overlay 80mm @ IRI 4-9
S
2.20 11451 National Overlay 80mm @ IRI 4-9
S
1.50 11451 National Overlay 80mm @ IRI 4-9
S
0.26 14220 National DBST @ Traff >6000
S
1.21 4434 National Overlay 50mm @ IRI 5-9
S
2.40 11451 National DBST @ Traff >6000
S
2.70 11451 National DBST @ Traff >6000
S
0.70 11451 National DBST @ Traff >6000
S
0.30 11451 National DBST @ Traff >6000
S
2.20 11451 National DBST @ Traff >6000
S
1.10 11451 National DBST @ Traff >6000
S
0.29 11451 National DBST @ Traff >6000
S
0.50 7545 Regional DBST @ Traff >6000
S
3.55 4887 Regional DBST @ Traff 4000-6000
S
6.90 4887 Regional DBST @ Traff 4000-6000
S
2.10 4887 Regional DBST 25mm @ 25% Crk
S
9.38 3155 Regional Overlay 50mm @ IRI 7-9
S
11.12 3019 Regional Overlay 50mm @ IRI 7-9
S
3.30 7545 Regional Overlay 60mm @ IRI 5.5-9
S
6.90 7545 Regional Overlay 60mm @ IRI 5.5-9
S
2.80 7545 Regional Overlay 60mm @ IRI 5.5-9
S
0.60 7545 Regional Overlay 60mm @ IRI 5.5-9
S
3.00 7088 Regional Overlay 60mm @ IRI 5.5-9
S
0.20 4887 Regional Overlay 60mm @ IRI 7-9
S
13.10 4887 Regional Overlay 60mm @ IRI 7-9
S
1.30 4682 Regional Overlay 50mm @ IRI 5-7
S
11.24 4887 Regional Overlay 50mm @ IRI 5-7
S
3.07 4682 Regional Overlay 60mm @ IRI 7-9
S
5.63 4682 Regional Overlay 60mm @ IRI 7-9
S
3.00 4887 Regional Overlay 60mm @ IRI 7-9
Sub-total Sylhet Division
Total Sylhet Zone
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
NPV /
(Mill Taka) Cost
2.469 13.59
4.321 11.91
13.581 10.22
9.260 14.42
0.687
3.73
3.170
3.31
4.327
9.55
4.868 11.88
1.262 12.42
0.541
7.90
3.967
7.28
1.983
8.54
0.523
6.62
0.865
6.55
5.510 10.53
9.374
9.80
2.853
6.59
26.280
5.01
22.402
8.11
14.458
6.13
28.771
8.02
12.198
7.26
2.614
7.11
13.069
8.00
0.685 14.81
44.106
6.71
3.732
2.79
31.261 10.29
10.505
3.01
19.320
4.52
10.269
5.90
374.762
682.176
Total Bangladesh
10,148.62
Appendix-B: Page: 61 of 61
NPV
41.45
63.53
195.86
181.19
10.42
9.45
158.16
241.67
65.53
16.36
90.78
53.26
10.88
22.57
220.34
328.69
69.06
172.21
246.40
109.54
294.56
125.82
28.37
140.61
12.81
421.37
13.08
414.17
36.56
101.15
91.05
Appendix-C
1st Year Unconstrained Rehabilitation Works for
National and Regional Highways sorted by Zone and
Division. (Excluding ongoing projects)
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
Barisal Zone
Barisal Division
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N8
N809
N809
N809
N809
N809
N809
N809
N809
N809
N809
N809
N809
R870
R870
R870
R870
R870
R870
R870
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Km 171.00-174.20
Km 174.20-177.30
Km 168.42-169.00
Km 171.00-173.80
Km 120.65-123.75
Km 123.75-126.85
Km 132.05-132.15
Km 132.35-132.45
Km 138.85-139.05
Km 139.05-140.45
Km 140.45-140.65
Km 160.80-169.00
Km 157.50-160.80
Km 126.85-132.05
Km 132.15-132.35
Km 132.45-138.85
Km 148.25-148.45
Km 005.25-006.25
Km 001.80-002.00
Km 002.10-002.50
Km 002.85-003.75
Km 003.75-003.85
Km 003.85-003.95
Km 003.95-005.05
Km 005.05-005.25
Km 000.10-000.40
Km 000.70-001.30
Km 002.00-002.10
Km 000.40-000.70
Km 000.10-000.40
Km 000.50-000.60
Km 003.60-003.80
Km 004.50-004.70
Km 004.80-005.00
Km 000.40-000.50
Km 000.60-003.60
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
3.2
3.1
0.58
2.8
3.1
3.1
0.1
0.1
0.2
1.4
0.2
8.2
3.3
5.2
0.2
6.4
0.2
1
0.2
0.4
0.9
0.1
0.1
1.1
0.2
0.3
0.6
0.1
0.3
0.3
0.1
0.2
0.2
0.2
0.1
3
9061
9061
9061
9061
11451
11451
11451
11451
11451
11451
11451
11451
9061
11451
11451
11451
11451
1488
9061
9061
9061
9061
9061
9061
9061
11451
11451
9061
11451
4887
4887
4887
4887
4887
4887
4887
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Sub-total Barisal Division
Appendix-C: Page: 1 of 49
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 110mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
65.861
63.844
11.937
57.567
73.128
73.973
2.413
2.413
4.648
39.783
5.683
199.182
53.047
99.084
3.811
121.752
4.487
14.853
4.116
8.233
18.523
2.058
2.058
22.640
4.116
10.791
16.980
1.607
5.993
6.949
1.799
3.599
3.599
3.599
1.417
40.827
1056.372
3.82 239.65
3.61 219.54
3.82
43.46
3.82 209.83
7.01 489.55
7.24 511.11
7.77
17.78
7.77
17.78
7.51
33.31
5.31 208.68
5.61
31.54
7.10 1359.27
4.84 246.18
8.23 813.26
7.88
29.95
8.29 1006.60
3.70
16.80
0.59
8.32
3.92
15.38
3.47
27.28
3.68
65.02
3.79
7.45
4.24
8.32
3.46
74.80
3.94
15.49
3.71
39.42
5.05
84.84
3.95
6.12
6.90
40.05
3.00
20.26
3.92
6.86
3.03
10.62
3.34
11.68
2.37
8.31
4.31
6.14
3.74 153.66
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
Bhola Division
N809
N809
N809
N809
N809
N809
N809
N809
N809
N809
N809
R890
R890
R890
R890
R890
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Barishal-Lakshmipur Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Bhola -Char Manika Road
Km 024.55-025.05
Km 025.05-025.15
Km 025.19-025.29
Km 025.79-026.19
Km 026.19-026.39
Km 026.39-026.49
Km 028.19-029.39
Km 030.29-030.39
Km 030.69-030.79
Km 025.29-025.79
Km 026.49-028.19
Km 007.77-008.47
Km 015.37-016.67
Km 000.00-004.00
Km 047.57-051.17
Km 051.17-052.07
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.5
0.1
0.1
0.4
0.2
0.1
1.2
0.1
0.1
0.5
1.7
0.7
1.3
4
3.6
0.9
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
4887
4887
4887
4887
4887
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
10.291
2.058
2.058
8.233
4.116
2.058
24.698
2.058
2.058
8.037
27.327
12.595
23.391
53.946
48.552
12.138
243.615
3.78
4.38
4.38
3.94
3.95
4.38
3.77
4.07
4.28
4.48
4.50
2.55
2.83
2.52
4.06
3.75
37.10
8.59
8.59
30.92
15.51
8.59
88.82
8.00
8.41
34.68
118.50
31.19
64.25
136.50
198.32
45.75
Km 033.37-033.47
Km 035.37-035.47
Km 037.37-038.07
Km 008.70-008.90
Km 009.30-009.40
Km 010.20-010.30
Km 010.65-010.75
Km 011.95-012.25
Km 013.15-013.25
Km 013.55-013.75
Km 017.25-017.55
Km 023.15-023.25
Km 023.55-023.75
Km 025.47-025.57
Km 026.87-027.07
Km 039.87-041.77
Km 005.00-008.00
Km 009.40-010.20
Km 010.30-010.65
Km 010.75-011.95
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.1
0.1
0.7
0.2
0.1
0.1
0.1
0.3
0.1
0.2
0.3
0.1
0.2
0.1
0.2
1.9
3
0.8
0.34
1.2
2223
2223
2223
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
2223
4887
4887
4887
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.634
1.634
9.377
3.599
1.799
1.799
1.799
5.398
1.799
3.599
5.398
1.799
3.599
1.799
3.599
16.005
40.460
10.789
4.653
16.184
0.92
1.12
0.97
3.41
3.92
3.92
3.92
3.57
3.92
3.66
3.47
3.88
3.61
3.86
3.66
3.28
2.83
3.96
3.68
4.05
1.42
1.73
8.52
11.94
6.86
6.86
6.86
18.77
6.86
12.81
18.20
6.79
12.63
6.76
12.81
49.42
115.29
43.01
17.21
65.87
Sub-total Bhola Division
Jhalokati Division
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Appendix-C: Page: 2 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
Road Name
No
R870
Barisal-Pirojpur Road
R870
Barisal-Pirojpur Road
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Million Taka
Km 012.25-013.15
Km 013.25-013.55
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.9 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
NPV /
Fin Cost
(Mill Taka) Cost
2013
12.138
3.95
2013
4.046
4.10
152.905
Km 177.30-180.42
Km 189.62-202.09
Km 011.90-012.00
Km 016.90-017.00
Km 032.72-032.82
S
S
S
S
S
3.12
12.48
0.1
0.1
0.1
9061
9061
3019
3019
3019
National
National
Regional
Regional
Regional
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
64.112
200.535
1.099
1.099
0.852
267.696
3.63
4.17
2.78
2.45
3.55
221.82
801.59
2.95
2.60
3.03
Km 053.97-054.07
Km 054.67-055.07
Km 061.47-062.07
Km 047.37-048.37
Km 049.57-049.77
Km 049.97-050.17
Km 051.87-052.17
Km 044.05-047.37
Km 048.37-049.57
Km 049.77-049.97
Km 050.17-051.87
S
S
S
S
S
S
S
S
S
S
S
0.1
0.4
0.6
1
0.2
0.2
0.3
3.32
1.2
0.2
1.7
3803
3803
3803
4887
4887
4887
4887
4887
4887
4887
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.634
6.535
6.523
17.993
3.599
3.599
5.398
45.941
16.184
2.697
22.927
133.029
2.34
1.58
1.75
3.43
3.66
3.66
3.40
3.37
3.91
4.19
3.83
3.58
9.65
10.43
60.03
12.81
12.82
17.84
153.13
63.71
11.36
88.27
0.48
0.49
0.97
0.92
1.30
2.17
2.17
2.36
2.42
2.71
1.55
1.39
3.36
6.92
4.17
10.56
65.68
9.22
316.49
13.19
Chainage
Sub-total Jhalokati Division
Year
NPV
48.28
16.70
Patuakhali Division
N8
N8
R881
R881
R881
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Amtali-Kuakata Road
Amtali-Kuakata Road
Amtali-Kuakata Road
Sub-total Patuakhali Division
Pirojpur Division
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
R870
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Barisal-Pirojpur Road
Sub-total Pirojpur Division
Total Barisal Zone
1853.619
Chittagong Zone
Bandarban Division
N108
N108
N108
N108
N108
R161
R161
R161
R161
R161
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Keranirhat-Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Km 000.10-000.30
Km 007.30-007.50
Km 000.60-000.90
Km 014.30-015.00
Km 017.10-017.40
Km 031.90-032.40
Km 035.60-038.70
Km 038.84-039.24
Km 041.74-055.14
Km 055.64-056.14
S
S
S
S
S
S
S
S
S
S
0.2
0.2
0.3
0.7
0.3
0.5
3.1
0.4
13.4
0.5
1363
1363
1363
1363
1363
3019
3019
3019
3019
3019
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 3 of 49
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.462
3.025
3.471
7.492
3.217
5.347
33.149
4.289
143.289
5.347
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R161
R161
R161
R161
R161
R161
R161
R161
R161
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Chainage
Km 056.14-056.34
Km 056.34-056.54
Km 056.64-057.74
Km 057.94-058.04
Km 033.70-035.60
Km 039.24-041.74
Km 055.14-055.64
Km 056.54-056.64
Km 057.74-057.94
Million Taka
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 3019 Regional Full Recon 135mm @ IRI 12
S
0.2 3019 Regional Full Recon 135mm @ IRI 12
S
1.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
1.9
464 Regional Rehab 110mm @ IRI 9-12
S
2.5 3019 Regional Rehab 135mm @ IRI 9-12
S
0.5 3019 Regional Rehab 135mm @ IRI 9-12
S
0.1 3019 Regional Rehab 135mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Year
Sub-total Bandarban Division
NPV /
Fin Cost
(Mill Taka) Cost
2.139
2.69
2.139
2.90
21.808
3.49
2.225
3.11
12.867
0.77
20.771
2.58
4.143
3.14
0.829
3.55
3.335
3.69
282.340
NPV
5.24
5.66
75.06
6.78
9.54
50.61
12.30
2.78
12.37
Chittagong Division
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
Dhaka-Comilla-Chittagong-Teknaf Roa Km 225.78-225.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 170.17-170.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 170.38-170.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.08-171.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.48-171.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 175.38-175.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 176.88-176.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 179.48-179.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 182.88-182.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 183.08-183.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.08-185.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.98-186.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 186.28-187.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.58-187.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.68-187.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.88-188.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 188.88-189.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.08-189.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.28-189.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 190.18-190.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 193.88-194.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.28-194.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.88-195.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 195.58-195.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 196.48-196.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 197.28-197.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 198.08-198.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 199.58-199.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 200.38-200.48
0.2
0.01
0.1
0.1
0.3
0.2
0.1
0.1
0.1
0.1
0.2
0.3
1.3
0.1
0.2
0.3
0.2
0.2
0.4
0.1
0.4
0.2
0.4
0.3
0.1
0.1
0.1
0.1
0.1
9061
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 4 of 49
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
3.892
0.263
2.920
2.920
8.759
5.917
2.997
2.958
2.978
2.978
5.956
8.887
38.460
2.958
5.917
8.875
5.917
5.917
11.834
2.958
9.047
4.827
9.187
6.890
2.297
2.336
2.336
2.336
2.402
3.92
5.78
5.00
5.26
5.30
3.43
4.90
4.99
5.76
5.76
5.76
5.79
5.28
5.80
5.25
5.80
5.61
4.77
5.35
5.61
7.35
7.38
6.68
6.86
7.52
7.41
7.18
6.98
6.20
14.40
1.49
14.29
15.05
45.50
19.86
14.39
14.47
16.80
16.80
33.59
50.39
198.69
16.80
30.40
50.39
32.51
27.64
61.99
16.26
62.72
33.99
58.18
44.86
16.40
16.53
16.01
15.57
14.22
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Dhaka-Comilla-Chittagong-Teknaf Roa Km 201.08-201.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 202.08-202.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 202.38-203.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 203.48-203.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 205.78-206.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 208.98-209.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 209.28-209.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 210.08-210.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 210.38-210.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 211.18-211.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.18-213.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.28-213.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.78-213.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.88-214.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.18-214.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.38-214.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.58-214.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 215.78-216.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 216.68-216.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.08-217.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.78-217.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 222.98-223.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.78-227.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 227.46-227.56
Dhaka-Comilla-Chittagong-Teknaf Roa Km 227.76-227.86
Dhaka-Comilla-Chittagong-Teknaf Roa Km 228.46-228.76
Dhaka-Comilla-Chittagong-Teknaf Roa Km 230.26-230.36
Dhaka-Comilla-Chittagong-Teknaf Roa Km 243.04-243.14
Dhaka-Comilla-Chittagong-Teknaf Roa Km 243.34-243.44
Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.04-244.34
Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.44-244.54
Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.84-245.34
Dhaka-Comilla-Chittagong-Teknaf Roa Km 245.84-245.94
Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.08-226.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.98-173.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 175.98-176.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 183.18-185.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.28-185.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 188.18-188.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.68-190.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.48-194.88
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
1.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.5 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.5 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 9061 National Rehab 180mm @ IRI 9-12
S
1.2 11451 National Rehab 195mm @ IRI 9-12
S
0.6 11451 National Rehab 195mm @ IRI 9-12
S
1.9 11451 National Rehab 195mm @ IRI 9-12
S
0.7 11451 National Rehab 195mm @ IRI 9-12
S
0.7 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.4 11451 National Rehab 195mm @ IRI 9-12
Appendix-C: Page: 5 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.608
7.06
8.642
5.92
42.563
3.73
4.048
3.66
12.145
3.43
4.048
2.45
4.048
3.23
2.491
6.33
2.491
6.38
4.983
4.88
2.491
7.59
12.457
7.02
2.491
7.59
7.474
6.80
4.983
7.27
4.983
6.64
3.410
5.01
7.474
6.73
2.725
6.23
2.764
5.99
2.764
5.17
5.333
5.53
9.926
3.31
3.309
4.44
3.309
4.41
9.926
3.44
4.107
3.13
2.803
5.74
2.803
5.84
8.724
5.51
3.114
5.07
15.571
4.58
4.769
2.56
1.868
4.93
27.918
4.81
14.051
4.03
44.671
6.68
16.458
6.86
16.350
6.58
11.679
5.79
7.290
7.40
NPV
17.73
50.06
155.47
14.48
40.63
9.68
12.76
15.04
15.18
23.20
18.05
83.52
18.05
48.50
34.59
31.60
16.74
48.02
16.57
16.21
14.00
28.80
32.15
14.38
14.30
33.43
12.57
15.75
16.04
47.06
15.46
69.80
11.80
9.04
134.38
56.68
298.70
112.95
107.67
67.65
52.27
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Dhaka-Comilla-Chittagong-Teknaf Roa Km 195.88-196.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 196.58-197.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 197.38-198.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 198.18-199.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 200.68-200.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 201.18-202.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 204.98-205.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.18-217.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 218.58-219.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 219.98-220.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 223.68-224.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.28-226.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 229.26-229.76
Chittagong-Rangamati Road
Km 000.20-000.60
Chittagong-Rangamati Road
Km 001.20-001.40
Chittagong-Rangamati Road
Km 001.60-001.70
Chittagong-Rangamati Road
Km 001.90-002.10
Chittagong-Rangamati Road
Km 002.60-003.20
Chittagong-Rangamati Road
Km 003.20-003.70
Chittagong-Rangamati Road
Km 003.70-003.90
Chittagong-Rangamati Road
Km 004.10-004.20
Chittagong-Rangamati Road
Km 004.30-004.60
Chittagong-Rangamati Road
Km 004.70-005.00
Chittagong-Rangamati Road
Km 005.10-005.30
Chittagong-Rangamati Road
Km 013.50-013.70
Chittagong-Rangamati Road
Km 014.00-014.10
Chittagong-Rangamati Road
Km 014.60-014.90
Chittagong-Rangamati Road
Km 015.20-015.30
Chittagong-Rangamati Road
Km 016.10-016.30
Chittagong-Rangamati Road
Km 017.20-017.30
Chittagong-Rangamati Road
Km 018.60-019.30
Chittagong-Rangamati Road
Km 021.20-021.60
Chittagong-Rangamati Road
Km 021.70-021.80
Chittagong-Rangamati Road
Km 022.20-022.30
Chittagong-Rangamati Road
Km 022.50-022.60
Chittagong-Rangamati Road
Km 023.00-023.20
Chittagong-Rangamati Road
Km 023.40-023.60
Chittagong-Rangamati Road
Km 000.60-001.20
Chittagong-Rangamati Road
Km 001.40-001.60
Chittagong-Rangamati Road
Km 004.60-004.70
Chittagong-Rangamati Road
Km 005.00-005.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.6 11451 National Rehab 195mm @ IRI 9-12
S
0.7 11451 National Rehab 195mm @ IRI 9-12
S
0.7 11451 National Rehab 195mm @ IRI 9-12
S
1.4 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.9 11451 National Rehab 195mm @ IRI 9-12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
0.6 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.4 13468 National Full Recon 195mm @ IRI 12
S
0.2 13468 National Full Recon 195mm @ IRI 12
S
0.1 13468 National Full Recon 195mm @ IRI 12
S
0.2 13468 National Full Recon 195mm @ IRI 12
S
0.6 13468 National Full Recon 195mm @ IRI 12
S
0.5 13468 National Full Recon 195mm @ IRI 12
S
0.2 13468 National Full Recon 195mm @ IRI 12
S
0.1 13468 National Full Recon 195mm @ IRI 12
S
0.3 13468 National Full Recon 195mm @ IRI 12
S
0.3 13468 National Full Recon 195mm @ IRI 12
S
0.2 13468 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.7 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.6 13468 National Rehab 195mm @ IRI 9-12
S
0.2 13468 National Rehab 195mm @ IRI 9-12
S
0.1 13468 National Rehab 195mm @ IRI 9-12
S
0.1 13468 National Rehab 195mm @ IRI 9-12
Appendix-C: Page: 6 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
10.880
5.35
12.800
6.21
12.908
5.74
25.816
5.11
2.059
5.25
19.694
6.74
6.392
3.12
13.092
4.96
10.910
9.00
10.910
8.42
10.526
9.16
2.612
4.63
15.674
5.23
12.457
3.32
6.228
3.21
3.114
3.13
6.228
3.31
18.685
3.31
15.571
3.14
6.228
3.42
3.114
3.48
9.343
3.48
9.191
3.49
4.516
5.12
4.516
6.56
2.258
6.24
6.773
5.08
2.258
6.92
5.294
4.52
2.647
4.52
17.821
8.52
9.031
5.14
2.258
5.62
2.258
7.20
2.258
7.20
4.516
4.96
4.516
6.52
14.752
2.98
4.917
3.16
2.459
3.46
1.783
5.70
NPV
55.99
76.98
71.85
127.88
10.59
132.74
19.91
64.90
98.22
91.93
96.08
12.10
82.02
40.34
19.52
9.51
20.11
60.45
47.80
20.80
10.60
31.77
31.34
21.81
27.82
13.22
32.29
14.67
23.48
11.73
144.86
43.60
11.90
15.25
15.25
21.02
27.64
43.82
15.50
8.48
9.70
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N106
N106
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R151
R152
R152
R152
R152
R152
R152
R152
R152
R152
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R163
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Baraiyerhat-Fatikchhari Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Heako-Ramgarh Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Chittagong -Chandragona Road
Chainage
Km 005.60-005.90
Km 013.00-013.10
Km 005.60-005.70
Km 008.40-009.00
Km 011.00-011.10
Km 012.30-012.40
Km 017.50-017.60
Km 017.80-018.00
Km 018.20-019.10
Km 023.20-023.40
Km 025.30-025.70
Km 000.80-000.90
Km 001.50-001.60
Km 003.00-003.20
Km 003.30-003.50
Km 004.20-004.50
Km 009.20-009.70
Km 011.70-012.10
Km 021.80-022.50
Km 027.40-030.40
Km 000.10-000.30
Km 001.10-001.20
Km 003.10-003.30
Km 006.00-006.10
Km 011.80-011.90
Km 016.70-017.00
Km 002.20-002.70
Km 008.10-010.40
Km 011.00-011.60
Km 024.10-025.10
Km 017.00-017.10
Km 018.40-018.50
Km 020.30-020.40
Km 021.10-021.60
Km 023.20-023.40
Km 023.50-023.90
Km 025.40-026.00
Km 029.00-031.40
Km 017.60-017.70
Km 019.50-019.90
Km 000.10-000.30
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.3 13468 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 1484 Regional Full Recon 110mm @ IRI 12
S
0.6 1484 Regional Full Recon 110mm @ IRI 12
S
0.1 1484 Regional Full Recon 110mm @ IRI 12
S
0.1 1484 Regional Full Recon 110mm @ IRI 12
S
0.1 1484 Regional Full Recon 110mm @ IRI 12
S
0.2 1484 Regional Full Recon 110mm @ IRI 12
S
0.9 1484 Regional Full Recon 110mm @ IRI 12
S
0.2 1301 Regional Full Recon 110mm @ IRI 12
S
0.4 1301 Regional Full Recon 110mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.2 3019 Regional Full Recon 135mm @ IRI 12
S
0.2 3019 Regional Full Recon 135mm @ IRI 12
S
0.3 3019 Regional Full Recon 135mm @ IRI 12
S
0.5 1484 Regional Rehab 110mm @ IRI 9-12
S
0.4 1484 Regional Rehab 110mm @ IRI 9-12
S
0.7 1301 Regional Rehab 110mm @ IRI 9-12
S
3 1301 Regional Rehab 110mm @ IRI 9-12
S
0.2 1398 Regional Full Recon 110mm @ IRI 12
S
0.1 1398 Regional Full Recon 110mm @ IRI 12
S
0.2 1398 Regional Full Recon 110mm @ IRI 12
S
0.1 1398 Regional Full Recon 110mm @ IRI 12
S
0.1 1398 Regional Full Recon 110mm @ IRI 12
S
0.3 1398 Regional Full Recon 110mm @ IRI 12
S
0.5 1398 Regional Rehab 110mm @ IRI 9-12
S
2.3 1398 Regional Rehab 110mm @ IRI 9-12
S
0.6 1398 Regional Rehab 110mm @ IRI 9-12
S
1 3019 Regional Full Recon 135mm @ IRI 12
S
0.1 5045 Regional Full Recon 150mm @ IRI 12
S
0.1 5045 Regional Full Recon 150mm @ IRI 12
S
0.1 5045 Regional Full Recon 150mm @ IRI 12
S
0.5 5045 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.6 4887 Regional Full Recon 150mm @ IRI 12
S
2.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 5045 Regional Rehab 150mm @ IRI 9-12
S
0.4 5045 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 7 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.348
5.79
1.783 10.25
1.026
0.72
6.157
0.71
1.026
0.96
1.026
1.05
1.026
0.99
2.052
0.76
9.236
0.81
2.052
0.55
4.105
0.48
1.129
2.44
1.129
2.13
2.257
2.27
2.257
2.28
3.386
1.73
3.574
1.82
2.859
1.90
5.004
1.10
21.444
0.64
2.836
0.40
0.945
1.14
2.971
0.36
1.485
0.43
1.080
0.90
3.241
0.70
5.173
1.03
23.796
0.43
4.515
1.34
13.664
1.55
1.832
2.95
1.832
2.08
1.832
2.64
9.160
2.53
3.664
3.38
7.328
2.75
10.207
2.34
40.828
4.57
1.373
2.96
5.493
2.69
3.468
3.49
NPV
29.57
17.34
0.72
4.21
0.95
1.04
0.98
1.51
7.22
1.08
1.88
2.62
2.28
4.88
4.89
5.58
6.62
5.51
5.54
13.93
1.10
1.02
1.04
0.61
0.94
2.17
5.31
10.12
6.09
20.22
5.11
3.60
4.58
21.89
12.13
19.73
23.19
181.67
3.98
14.48
11.82
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R163
R164
R164
R164
R164
R164
R164
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Chittagong -Chandragona Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Baraichhari-Kaptai Road
Chainage
Km 000.50-000.70
Km 007.10-007.20
Km 007.30-007.40
Km 008.30-008.40
Km 008.50-008.60
Km 009.40-009.50
Km 009.60-009.70
Km 009.90-010.00
Km 010.10-010.40
Km 010.70-010.90
Km 011.60-011.90
Km 013.00-013.10
Km 013.80-013.90
Km 016.40-016.50
Km 016.60-016.90
Km 017.50-017.60
Km 018.00-018.20
Km 019.20-019.90
Km 020.40-020.50
Km 020.80-020.90
Km 021.40-021.60
Km 022.80-023.00
Km 027.00-029.00
Km 029.20-029.80
Km 030.10-030.40
Km 030.50-030.60
Km 030.70-031.00
Km 031.10-031.20
Km 031.30-032.10
Km 000.70-004.00
Km 004.00-007.00
Km 008.40-008.50
Km 009.50-009.60
Km 010.00-010.10
Km 013.40-013.60
Km 001.10-001.30
Km 001.70-001.80
Km 005.60-005.70
Km 008.30-008.60
Km 008.80-008.90
Km 008.92-009.02
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 7612 Regional Full Recon 150mm @ IRI 12
S
0.3 7612 Regional Full Recon 150mm @ IRI 12
S
0.1 7612 Regional Full Recon 150mm @ IRI 12
S
0.2 7612 Regional Full Recon 150mm @ IRI 12
S
0.7 7612 Regional Full Recon 150mm @ IRI 12
S
0.1 7612 Regional Full Recon 150mm @ IRI 12
S
0.1 7612 Regional Full Recon 150mm @ IRI 12
S
0.2 7612 Regional Full Recon 150mm @ IRI 12
S
0.2 7612 Regional Full Recon 150mm @ IRI 12
S
2 5390 Regional Full Recon 150mm @ IRI 12
S
0.6 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.8 4887 Regional Full Recon 150mm @ IRI 12
S
3.3 4887 Regional Rehab 150mm @ IRI 9-12
S
3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 1582 Regional Full Recon 110mm @ IRI 12
S
0.1 1582 Regional Full Recon 110mm @ IRI 12
S
0.1 1582 Regional Full Recon 110mm @ IRI 12
S
0.3 1582 Regional Full Recon 110mm @ IRI 12
S
0.1 1582 Regional Full Recon 110mm @ IRI 12
S
0.1 1582 Regional Full Recon 110mm @ IRI 12
Appendix-C: Page: 8 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
3.468
3.20
1.734
3.79
1.734
3.79
1.734
3.75
1.734
3.81
1.799
3.77
1.799
3.73
1.799
3.72
5.398
3.43
3.599
3.43
5.398
3.31
1.799
3.25
1.799
3.24
1.799
3.25
5.398
1.60
1.799
3.06
3.599
2.78
12.595
2.36
1.799
2.33
1.799
2.39
3.599
1.66
3.599
1.70
35.987
2.19
10.796
3.33
5.398
3.40
1.799
3.83
5.398
3.25
1.799
3.66
14.395
3.07
42.887
2.73
38.988
2.59
1.300
4.14
1.349
3.69
1.349
3.87
2.697
4.52
3.511
0.39
1.755
0.40
1.755
0.39
5.266
0.36
1.755
0.33
1.755
0.40
NPV
10.84
6.41
6.42
6.35
6.45
6.62
6.54
6.54
18.06
12.03
17.44
5.71
5.69
5.48
8.09
5.17
9.38
27.81
3.93
4.02
5.58
5.71
75.89
35.08
17.93
6.73
17.14
6.44
43.17
119.16
102.71
5.47
5.06
5.30
12.40
1.31
0.67
0.65
1.83
0.56
0.67
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
Road Name
No
R164
Baraichhari-Kaptai Road
R164
Baraichhari-Kaptai Road
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Million Taka
Km 010.12-010.17
Km 002.90-003.20
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.05 1582 Regional Full Recon 110mm @ IRI 12
S
0.3 1582 Regional Rehab 110mm @ IRI 9-12
NPV /
Fin Cost
(Mill Taka) Cost
2013
0.860
0.41
2013
3.668
0.71
1350.085
Km 005.20-005.40
Km 005.50-005.60
Km 005.80-006.00
Km 006.20-006.50
Km 007.70-008.00
Km 005.60-005.80
Km 063.20-063.30
Km 063.90-064.00
Km 064.20-064.40
Km 065.10-065.30
Km 065.80-066.10
Km 066.40-066.50
Km 067.10-067.40
Km 068.60-069.10
Km 069.80-069.90
Km 071.00-071.10
Km 072.20-072.50
Km 071.50-071.70
Km 010.00-010.20
Km 011.70-011.80
Km 011.90-012.00
Km 014.70-014.80
Km 015.30-015.40
Km 015.60-016.10
Km 010.50-010.90
Km 001.60-001.70
Km 002.10-002.30
Km 002.90-003.00
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.2
0.1
0.2
0.3
0.3
0.2
0.1
0.1
0.2
0.2
0.3
0.1
0.3
0.5
0.1
0.1
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.5
0.4
0.1
0.2
0.1
11451
11451
11451
11451
11451
11451
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4993
4993
4887
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
5.372
2.686
5.372
8.058
9.693
4.241
1.894
1.894
3.788
3.788
5.683
1.894
5.683
9.471
1.894
1.894
5.683
2.840
3.926
1.963
1.963
1.963
1.963
9.815
5.885
1.963
3.599
1.799
116.666
5.70
6.46
5.90
5.58
5.00
5.17
3.31
3.41
3.20
3.20
3.01
2.33
3.07
2.20
3.29
3.04
2.31
3.43
2.88
2.33
3.11
3.24
2.08
2.00
2.59
2.41
1.71
3.04
30.09
17.06
31.17
44.23
47.90
22.06
6.10
6.29
11.78
11.78
16.65
4.30
16.99
20.24
6.06
5.60
12.80
9.86
11.01
4.44
5.93
6.19
3.96
19.11
15.41
4.43
5.75
5.29
Dhaka-Comilla-Chittagong-Teknaf Roa Km 254.84-254.94
Dhaka-Comilla-Chittagong-Teknaf Roa Km 255.14-255.44
Dhaka-Comilla-Chittagong-Teknaf Roa Km 255.54-255.64
Dhaka-Comilla-Chittagong-Teknaf Roa Km 275.38-275.58
S
S
S
S
0.1
0.3
0.1
0.2
11451
11451
11451
11451
National
National
National
National
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
2013
2013
2013
2013
2.608
7.824
2.608
5.403
6.00
5.51
6.86
6.05
15.25
42.02
17.43
31.84
Chainage
Sub-total Chittagong Division
Year
NPV
0.34
2.60
Cox's Bazar Division
N110
N110
N110
N110
N110
N110
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R172
R172
R172
R172
R172
R172
R172
R180
R180
R180
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Link Road-Cox's Bazar Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Chokoria-Baderkhali Road
Laharpur-Laboni More Road
Laharpur-Laboni More Road
Laharpur-Laboni More Road
Sub-total Cox's Bazar Division
Dohazari Division
N1
N1
N1
N1
Appendix-C: Page: 9 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
R170
R170
R170
R170
R170
R170
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Dhaka-Comilla-Chittagong-Teknaf Roa Km 276.58-276.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 277.08-278.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.38-278.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.78-279.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.08-279.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.18-279.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.28-280.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.78-281.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 283.58-283.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 284.28-284.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 292.18-292.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 294.88-295.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 300.48-300.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 300.88-301.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 302.18-302.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 302.98-303.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 303.38-303.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.18-304.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.58-304.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.88-305.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 305.78-305.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 308.98-309.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 309.88-309.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 310.98-311.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 312.98-313.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 314.48-314.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 246.74-246.94
Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.18-278.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.28-280.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.38-280.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 290.58-291.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 295.18-298.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 303.88-303.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.38-304.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 305.98-308.98
Patiya-Chokoria Road
Km 000.10-000.30
Patiya-Chokoria Road
Km 000.70-000.80
Patiya-Chokoria Road
Km 000.90-001.00
Patiya-Chokoria Road
Km 002.40-002.60
Patiya-Chokoria Road
Km 003.20-003.30
Patiya-Chokoria Road
Km 003.50-003.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
1.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
1 11451 National Rehab 195mm @ IRI 9-12
S
0.4 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
3.6 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
3 11451 National Rehab 195mm @ IRI 9-12
S
0.2 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.2 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.2 3516 Regional Full Recon 135mm @ IRI 12
Appendix-C: Page: 10 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
6.773
7.41
24.835
6.47
2.258
8.00
6.773
7.64
2.258
7.29
2.258
8.09
2.336
7.90
9.343
7.45
5.450
4.82
8.175
5.73
2.491
7.34
7.824
6.46
5.606
5.13
5.606
5.73
11.211
5.37
2.803
4.23
2.725
5.95
5.450
5.71
2.725
5.95
5.286
6.10
5.216
6.15
5.216
6.50
2.628
6.71
7.708
6.00
10.277
4.48
2.569
6.63
7.530
4.49
3.565
7.64
18.010
7.83
7.376
8.40
10.296
6.76
70.367
4.43
2.151
4.84
4.303
4.27
61.774
6.35
2.257
1.45
1.129
1.71
1.129
1.71
2.198
1.43
1.069
1.78
2.079
1.61
NPV
47.64
152.32
17.13
49.12
15.62
17.32
17.51
66.03
25.63
45.73
17.45
49.26
28.15
31.43
59.00
11.60
15.82
30.39
15.82
31.43
31.23
33.05
17.17
44.14
43.90
16.26
33.36
26.18
136.59
59.56
69.15
302.41
10.38
18.32
389.64
3.07
1.80
1.81
2.95
1.78
3.14
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R170
R171
R171
R171
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Patiya-Chokoria Road
Banshkhali -Chunti Road
Banshkhali -Chunti Road
Banshkhali -Chunti Road
Million Taka
Km 005.50-005.90
Km 006.00-006.30
Km 006.40-006.50
Km 007.00-007.40
Km 007.80-007.90
Km 008.70-008.80
Km 009.50-009.70
Km 010.10-010.20
Km 011.10-011.20
Km 012.00-012.10
Km 012.90-013.00
Km 013.50-013.60
Km 018.74-019.70
Km 020.90-021.10
Km 020.20-020.70
Km 001.40-002.40
Km 006.70-006.90
Km 008.00-008.20
Km 012.20-012.50
Km 007.40-007.50
Km 008.60-008.80
Km 005.20-005.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.4 3516 Regional Full Recon 135mm @ IRI 12
S
0.3 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.4 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.2 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3516 Regional Full Recon 135mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.1 3019 Regional Full Recon 135mm @ IRI 12
S
0.96 3019 Regional Full Recon 135mm @ IRI 12
S
0.2 3019 Regional Full Recon 135mm @ IRI 12
S
0.5 4887 Regional Full Recon 150mm @ IRI 12
S
1 3516 Regional Rehab 135mm @ IRI 9-12
S
0.2 3516 Regional Rehab 135mm @ IRI 9-12
S
0.2 3516 Regional Rehab 135mm @ IRI 9-12
S
0.3 3019 Regional Rehab 135mm @ IRI 9-12
S
0.1 1514 Regional Full Recon 110mm @ IRI 12
S
0.2 1514 Regional Full Recon 110mm @ IRI 12
S
0.5 1514 Regional Rehab 110mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 039.30-039.40
Km 040.70-041.00
Km 041.50-041.70
Km 042.40-042.60
Km 049.10-049.20
Km 051.40-051.50
Km 054.00-055.80
Km 055.82-055.92
Km 078.52-078.92
Km 079.12-080.02
Km 080.22-080.32
Km 080.52-081.42
Km 081.52-081.62
Km 081.72-083.12
Km 083.22-083.82
Km 084.12-084.22
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Dohazari Division
NPV /
Fin Cost
(Mill Taka) Cost
4.158
1.34
3.119
1.59
1.040
1.71
4.158
2.23
1.040
1.96
1.040
1.96
2.079
1.70
1.040
1.96
0.951
2.87
1.069
2.52
1.069
2.49
1.069
2.53
10.019
1.82
2.079
1.91
7.361
2.39
8.654
1.88
1.611
2.58
1.611
2.21
2.348
4.06
1.026
1.05
2.052
0.80
3.574
1.25
431.640
NPV
5.20
4.65
1.67
8.70
1.91
1.91
3.30
1.91
2.63
2.59
2.56
2.60
17.59
3.83
17.02
15.72
4.00
3.44
9.46
1.02
1.55
4.44
Khagrachari Division
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
0.1
0.3
0.2
0.2
0.1
0.1
1.8
0.1
0.4
0.9
0.1
0.9
0.1
1.4
0.6
0.1
3019
3019
3019
3792
3362
3362
3362
3362
3019
3019
3019
3019
3019
3019
3019
3019
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 11 of 49
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
1.099
3.297
2.257
2.923
1.129
1.129
20.317
1.129
4.277
9.624
1.069
9.624
1.069
14.970
6.416
1.069
2.21
1.84
2.04
2.87
2.24
2.45
2.07
2.70
2.40
2.26
2.71
2.39
2.88
2.41
2.41
2.81
2.32
5.80
4.39
8.22
2.37
2.59
39.30
2.85
9.82
20.77
2.77
21.96
2.94
34.45
14.75
2.87
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
R160
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Hathazari-Khagrachhari Road
Million Taka
Km 035.10-037.10
Km 031.40-035.00
Km 041.70-042.40
Km 042.70-046.70
Km 050.00-051.20
Km 051.60-053.30
Km 053.30-054.00
Km 055.92-056.42
Km 081.42-081.52
Km 081.62-081.72
Km 083.12-083.22
Km 039.50-040.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
2 4887 Regional Full Recon 150mm @ IRI 12
S
3.6 3019 Regional Rehab 135mm @ IRI 9-12
S
0.7 3019 Regional Rehab 135mm @ IRI 9-12
S
4 3362 Regional Rehab 135mm @ IRI 9-12
S
1.2 3362 Regional Rehab 135mm @ IRI 9-12
S
1.7 3362 Regional Rehab 135mm @ IRI 9-12
S
0.7 3362 Regional Rehab 135mm @ IRI 9-12
S
0.5 3362 Regional Rehab 135mm @ IRI 9-12
S
0.1 3019 Regional Rehab 135mm @ IRI 9-12
S
0.1 3019 Regional Rehab 135mm @ IRI 9-12
S
0.1 3019 Regional Rehab 135mm @ IRI 9-12
S
0.6 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 060.32-060.62
Km 062.02-062.12
Km 062.52-064.88
Km 033.00-033.30
Km 033.30-033.60
Km 047.36-048.36
Km 048.36-048.66
Km 048.66-049.26
Km 049.26-049.36
Km 049.36-049.96
Km 049.96-050.46
Km 050.46-050.66
Km 050.66-051.06
Km 051.06-051.76
Km 051.76-051.86
Km 052.16-052.26
Km 052.26-053.26
Km 053.26-053.36
Km 053.36-053.46
Km 053.46-053.56
Km 053.56-054.46
Km 054.46-054.56
Km 054.56-054.72
Km 054.72-054.82
Km 054.82-055.42
Km 055.42-055.82
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Khagrachari Division
NPV /
Fin Cost
(Mill Taka) Cost
31.145
3.29
33.722
3.40
6.541
2.09
34.983
3.80
10.495
3.62
14.868
3.44
6.122
2.41
4.373
1.85
0.829
3.22
0.829
3.36
0.829
3.35
6.444
4.50
232.577
NPV
99.43
111.91
13.24
129.69
37.05
49.93
14.42
7.89
2.58
2.69
2.69
28.40
Rangamati Division
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
0.3
0.1
2.36
0.3
0.3
1
0.3
0.6
0.1
0.6
0.5
0.2
0.4
0.7
0.1
0.1
1
0.1
0.1
0.1
0.9
0.1
0.17
0.1
0.6
0.4
3555
3555
3555
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 12 of 49
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
4.634
1.723
40.027
5.950
5.950
20.132
5.838
11.675
1.946
11.675
9.729
3.892
7.784
13.621
1.946
1.946
19.459
1.946
1.946
1.946
17.513
1.946
3.211
1.946
11.675
7.784
1.55
1.35
1.62
4.06
4.16
3.45
4.24
4.09
4.70
3.85
4.15
4.06
4.18
3.66
4.63
4.63
3.84
4.63
4.52
4.62
3.88
4.58
4.22
4.58
3.82
4.07
7.02
2.28
63.49
23.06
23.61
66.07
23.62
45.58
8.72
42.88
38.52
15.06
31.04
47.51
8.59
8.59
71.29
8.59
8.39
8.58
64.86
8.51
12.94
8.51
42.59
30.23
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
N106
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R161
R162
R162
R162
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Chittagong-Rangamati Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Bandarban Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Chainage
Km 055.82-056.12
Km 033.60-039.50
Km 039.50-039.60
Km 039.60-040.00
Km 040.00-040.30
Km 041.20-041.30
Km 041.60-041.90
Km 043.30-043.50
Km 043.50-046.40
Km 046.40-046.96
Km 046.96-047.16
Km 047.16-047.36
Km 051.86-052.16
Km 030.00-033.00
Km 040.30-041.20
Km 041.30-041.60
Km 041.90-043.30
Km 003.20-003.40
Km 003.50-004.10
Km 004.40-007.70
Km 010.70-011.00
Km 011.60-015.50
Km 020.30-021.20
Km 021.40-024.40
Km 024.40-027.20
Km 014.61-015.50
Km 031.90-031.90
Km 015.90-018.20
Km 018.30-018.40
Km 018.80-020.00
Km 015.90-018.20
Km 018.30-018.40
Km 018.80-019.37
Km 000.30-000.90
Km 027.70-031.90
Km 018.40-018.80
Km 020.00-020.30
Km 018.40-018.80
Km 000.10-000.30
Km 000.70-000.80
Km 000.90-001.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.3 9061 National Full Recon 180mm @ IRI 12
S
5.9 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
2.9 11451 National Full Recon 195mm @ IRI 12
S
0.56 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 9061 National Rehab 180mm @ IRI 9-12
S
3 11451 National Rehab 195mm @ IRI 9-12
S
0.9 11451 National Rehab 195mm @ IRI 9-12
S
0.3 11451 National Rehab 195mm @ IRI 9-12
S
1.4 11451 National Rehab 195mm @ IRI 9-12
S
0.2 2326 Regional Full Recon 135mm @ IRI 12
S
0.6 2326 Regional Full Recon 135mm @ IRI 12
S
3.3 2326 Regional Full Recon 135mm @ IRI 12
S
0.3 2326 Regional Full Recon 135mm @ IRI 12
S
3.9 2489 Regional Full Recon 135mm @ IRI 12
S
0.9 3019 Regional Full Recon 135mm @ IRI 12
S
3 3019 Regional Full Recon 135mm @ IRI 12
S
2.8 3019 Regional Full Recon 135mm @ IRI 12
S
0.89 3038 Regional Full Recon 135mm @ IRI 12
S
0 3019 Regional Full Recon 135mm @ IRI 12
S
2.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
1.2 4887 Regional Full Recon 150mm @ IRI 12
S
2.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.57 4887 Regional Full Recon 150mm @ IRI 12
S
0.6 2326 Regional Rehab 135mm @ IRI 9-12
S
4.2 3019 Regional Rehab 135mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
Appendix-C: Page: 13 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.838
3.91
129.763
7.55
2.413
7.78
9.654
7.05
7.240
6.44
2.180
8.38
6.540
7.87
4.360
7.99
63.218
6.88
12.099
7.30
4.360
6.58
4.360
7.64
4.559
3.99
52.000
4.94
16.568
7.90
5.163
8.71
24.095
8.78
2.079
1.50
6.238
0.66
34.307
0.61
3.119
0.79
44.484
0.81
9.624
2.54
32.080
2.52
29.941
2.42
13.192
1.36
0.000
0.00
45.899
2.38
1.996
3.38
23.947
3.06
45.899
2.38
1.996
3.38
11.375
3.15
4.944
1.00
34.799
2.16
5.983
2.49
3.531
3.27
5.983
2.49
1.890
0.70
0.945
0.77
0.945
0.77
NPV
21.80
919.92
17.81
64.58
44.24
17.24
48.54
32.85
410.41
83.32
27.05
31.42
17.56
245.33
126.79
42.96
201.99
2.91
3.85
19.56
2.31
33.79
22.26
73.66
66.06
17.66
0.56
106.95
6.62
71.73
106.95
6.62
35.13
4.63
70.98
14.97
11.49
14.97
1.26
0.69
0.68
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
R162
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Rangamati -Khagrachhari Road
Chainage
Km 002.40-002.60
Km 003.20-003.30
Km 003.50-003.70
Km 005.50-005.90
Km 006.00-006.30
Km 007.80-007.90
Km 008.70-008.80
Km 009.50-009.70
Km 010.10-010.20
Km 011.10-011.20
Km 012.00-012.10
Km 012.90-013.00
Km 013.50-013.70
Km 021.50-022.00
Km 001.40-002.40
Km 016.40-017.70
Km 020.20-020.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.2
818 Regional Full Recon 110mm @ IRI 12
S
0.4
818 Regional Full Recon 110mm @ IRI 12
S
0.3
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.2
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.1
818 Regional Full Recon 110mm @ IRI 12
S
0.2
818 Regional Full Recon 110mm @ IRI 12
S
0.5
818 Regional Full Recon 110mm @ IRI 12
S
1
818 Regional Rehab 110mm @ IRI 9-12
S
1.3
818 Regional Rehab 110mm @ IRI 9-12
S
0.5
818 Regional Rehab 110mm @ IRI 9-12
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Rangamati Division
Total Chittagong Zone
NPV /
Fin Cost
(Mill Taka) Cost
1.890
0.72
0.945
0.73
1.890
0.72
3.781
0.66
2.836
0.71
0.945
0.75
0.945
0.80
1.890
0.72
0.945
0.77
0.945
0.77
0.945
0.74
0.945
0.73
1.890
0.74
4.726
0.72
6.584
1.19
8.559
1.18
3.292
1.22
981.399
NPV
1.29
0.65
1.29
2.37
1.89
0.67
0.72
1.29
0.69
0.69
0.66
0.65
1.32
3.21
7.55
9.74
3.88
3394.706
Comilla Zone
Brahmanbaria Division
N102
N102
N102
N102
N102
N102
N102
N102
N102
N102
N102
N102
N102
N102
N2
N2
N2
N2
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Comilla-Brahmanbaria Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Km 053.50-055.10
Km 055.10-055.21
Km 055.21-057.41
Km 071.79-072.19
Km 072.34-072.44
Km 072.66-072.76
Km 072.86-074.36
Km 074.46-075.96
Km 077.16-079.06
Km 079.16-080.06
Km 071.59-071.79
Km 072.76-072.86
Km 074.36-074.46
Km 079.06-079.16
Km 074.74-074.84
Km 076.94-077.14
Km 078.34-078.44
Km 079.54-079.74
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.6
0.11
2.2
0.4
0.1
0.1
1.5
1.5
1.9
0.9
0.2
0.1
0.1
0.1
0.1
0.2
0.1
0.2
11451
11451
11451
11451
11451
11451
11451
11451
15273
15273
11451
11451
11451
15273
12330
12330
12330
12330
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 14 of 49
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
35.564
2.354
48.301
9.187
2.297
2.336
34.159
34.859
44.155
20.670
3.627
1.844
1.783
1.813
2.920
5.839
2.920
5.839
6.84
7.37
7.05
7.52
7.99
7.89
7.44
7.33
4.41
3.88
8.07
8.68
9.38
4.00
5.18
4.58
3.37
4.76
228.32
16.37
321.40
65.55
17.41
17.58
240.98
243.80
183.86
75.58
28.13
15.51
15.87
6.92
14.91
26.39
9.71
27.39
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N2
N2
N2
N2
N2
N2
N2
N2
R120
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
R220
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Akhaura Town By-Pass
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Million Taka
Km 082.44-082.64
Km 084.14-084.34
Km 084.54-084.64
Km 085.24-085.44
Km 087.74-087.94
Km 092.14-092.44
Km 075.24-075.44
Km 077.24-077.44
Km 000.00-002.50
Km 000.10-000.40
Km 000.50-001.00
Km 002.20-002.30
Km 002.40-003.10
Km 003.40-004.00
Km 004.90-005.00
Km 010.50-012.30
Km 012.30-012.40
Km 013.60-013.68
Km 013.78-014.08
Km 014.18-014.68
Km 015.88-015.98
Km 016.08-016.78
Km 017.08-017.68
Km 018.58-018.68
Km 007.40-010.50
Km 015.78-015.88
Km 015.98-016.08
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 12330 National Full Recon 195mm @ IRI 12
S
0.2 12330 National Full Recon 195mm @ IRI 12
S
0.1 12330 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 12330 National Rehab 195mm @ IRI 9-12
S
0.2 12330 National Rehab 195mm @ IRI 9-12
S
2.5 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 6240 Regional Full Recon 150mm @ IRI 12
S
0.5 4488 Regional Full Recon 150mm @ IRI 12
S
0.1 4488 Regional Full Recon 150mm @ IRI 12
S
0.7 4488 Regional Full Recon 150mm @ IRI 12
S
0.6 4488 Regional Full Recon 150mm @ IRI 12
S
0.1 4488 Regional Full Recon 150mm @ IRI 12
S
1.8 6240 Regional Full Recon 150mm @ IRI 12
S
0.1 6240 Regional Full Recon 150mm @ IRI 12
S
0.08 6240 Regional Full Recon 150mm @ IRI 12
S
0.3 6240 Regional Full Recon 150mm @ IRI 12
S
0.5 6240 Regional Full Recon 150mm @ IRI 12
S
0.1 6240 Regional Full Recon 150mm @ IRI 12
S
0.7 6240 Regional Full Recon 150mm @ IRI 12
S
0.6 6240 Regional Full Recon 150mm @ IRI 12
S
0.1 6240 Regional Full Recon 150mm @ IRI 12
S
3.1 6240 Regional Rehab 150mm @ IRI 9-12
S
0.1 6240 Regional Rehab 150mm @ IRI 9-12
S
0.1 6240 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 032.29-032.79
Km 034.09-034.29
Km 034.89-035.09
Km 035.89-036.19
Km 036.79-036.99
Km 038.49-038.59
Km 038.99-039.09
Km 039.49-039.59
Km 039.89-039.99
Km 040.29-040.47
Km 040.57-041.37
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Brahmanbaria Division
NPV /
Fin Cost
(Mill Taka) Cost
5.839
5.44
5.839
4.47
2.920
5.01
5.839
5.23
5.839
5.11
8.759
4.14
4.610
6.49
4.610
4.22
44.983
3.13
5.692
0.83
6.543
0.44
1.309
1.19
9.160
0.34
7.852
0.41
1.243
1.18
32.388
0.64
1.799
1.42
1.457
1.78
5.398
0.87
8.997
0.76
1.799
1.42
12.595
0.71
10.796
0.73
1.799
1.74
41.808
0.61
1.349
1.73
1.349
1.62
503.036
NPV
31.31
25.70
14.42
30.19
29.21
35.52
30.19
19.61
137.43
4.41
2.66
1.43
2.88
2.92
1.34
18.92
2.32
2.37
4.27
6.23
2.33
8.21
7.15
2.86
23.50
2.14
2.00
Chandpur Division
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
0.5
0.2
0.2
0.3
0.2
0.1
0.1
0.1
0.1
0.18
0.8
4887
4887
4887
4887
4887
8774
8774
8774
8774
8774
8774
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 15 of 49
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
9.487
3.703
3.599
5.457
3.664
1.832
1.832
1.871
1.897
3.453
17.090
2.41
3.61
3.46
3.56
2.73
5.00
4.38
4.78
5.01
4.85
4.30
22.23
12.93
12.14
19.09
9.82
8.90
7.80
8.71
9.28
16.35
71.74
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Chainage
Km 041.97-042.37
Km 042.47-042.67
Km 043.10-043.20
Km 045.70-045.90
Km 046.00-046.10
Km 046.40-046.70
Km 046.90-047.00
Km 047.70-047.90
Km 049.20-049.60
Km 049.70-049.90
Km 050.40-050.80
Km 051.30-051.60
Km 051.70-051.80
Km 052.20-052.40
Km 052.70-052.80
Km 053.50-053.60
Km 053.80-054.00
Km 054.10-054.20
Km 055.10-055.30
Km 055.50-055.70
Km 056.70-057.00
Km 058.40-058.60
Km 059.40-060.30
Km 062.30-063.30
Km 064.00-064.10
Km 064.30-064.50
Km 065.00-065.10
Km 066.90-067.10
Km 067.40-068.50
Km 068.90-069.10
Km 069.80-070.00
Km 071.20-071.40
Km 072.10-072.30
Km 072.40-072.50
Km 072.90-073.10
Km 073.20-073.30
Km 074.50-074.90
Km 075.90-076.60
Km 076.70-076.90
Km 077.50-077.70
Km 078.10-078.20
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.4 8774 Regional Full Recon 150mm @ IRI 12
S
0.2 8774 Regional Full Recon 150mm @ IRI 12
S
0.1 8774 Regional Full Recon 150mm @ IRI 12
S
0.2 8774 Regional Full Recon 150mm @ IRI 12
S
0.1 8774 Regional Full Recon 150mm @ IRI 12
S
0.3 8774 Regional Full Recon 150mm @ IRI 12
S
0.1 8774 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.9 4887 Regional Full Recon 150mm @ IRI 12
S
1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
1.09 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.7 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 16 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
7.197
2.54
3.599
3.23
1.799
4.04
3.690
3.69
1.865
4.70
6.782
2.86
2.715
3.12
3.926
3.53
7.459
3.67
3.730
3.71
7.459
3.61
5.692
3.34
1.897
3.43
3.795
2.56
1.865
3.86
1.865
4.00
3.730
3.70
1.865
4.00
3.730
3.73
3.730
3.69
5.624
3.58
3.867
3.48
16.783
2.84
18.648
3.34
1.897
3.67
3.795
3.41
1.897
3.64
3.919
3.44
21.474
2.77
3.926
3.21
3.926
3.49
3.926
3.48
3.926
3.03
1.963
3.66
3.926
3.45
1.963
3.63
7.852
3.45
13.740
3.24
3.926
3.39
3.926
3.39
1.963
3.66
NPV
17.53
11.19
7.01
13.25
8.52
18.94
8.36
13.51
26.48
13.40
26.07
18.52
6.33
9.45
6.96
7.21
13.36
7.22
13.48
13.33
19.48
13.11
46.16
60.21
6.78
12.61
6.72
13.16
58.06
12.28
13.38
13.51
11.77
7.11
13.40
7.05
26.85
44.05
13.18
13.18
7.11
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R860
R860
R860
R860
R860
R860
R860
R860
R860
R860
R860
R860
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Million Taka
Km 079.60-079.70
Km 079.80-080.30
Km 080.70-081.00
Km 081.10-081.40
Km 081.90-082.00
Km 082.10-082.20
Km 082.50-082.60
Km 083.42-083.72
Km 084.52-084.72
Km 085.52-085.61
Km 047.90-049.20
Km 052.40-052.70
Km 053.00-053.40
Km 065.90-066.00
Km 068.60-068.80
Km 071.50-071.70
Km 071.70-072.10
Km 072.50-072.90
Km 076.60-076.70
Km 082.60-083.42
Km 084.92-085.12
Km 085.12-085.52
Km 064.16-064.86
Km 064.96-065.16
Km 069.16-069.36
Km 069.76-070.06
Km 070.26-070.56
Km 070.66-070.76
Km 070.96-071.26
Km 071.46-074.46
Km 074.46-074.80
Km 069.06-069.16
Km 070.06-070.26
Km 070.76-070.96
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 10297 Regional Full Recon 150mm @ IRI 12
S
0.5 10297 Regional Full Recon 150mm @ IRI 12
S
0.3 10297 Regional Full Recon 150mm @ IRI 12
S
0.3 10297 Regional Full Recon 150mm @ IRI 12
S
0.1 10297 Regional Full Recon 150mm @ IRI 12
S
0.1 10297 Regional Full Recon 150mm @ IRI 12
S
0.1 10297 Regional Full Recon 150mm @ IRI 12
S
0.3 10297 Regional Full Recon 150mm @ IRI 12
S
0.2 10297 Regional Full Recon 150mm @ IRI 12
S
0.09 10297 Regional Full Recon 150mm @ IRI 12
S
1.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.82 10297 Regional Rehab 150mm @ IRI 9-12
S
0.2 10297 Regional Rehab 150mm @ IRI 9-12
S
0.4 10297 Regional Rehab 150mm @ IRI 9-12
S
0.7 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
3 4887 Regional Full Recon 150mm @ IRI 12
S
0.34 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 000.10-000.20
Km 001.40-001.50
Km 008.50-008.70
Km 009.80-010.00
S
S
S
S
2013
2013
2013
2013
Chainage
Year
Sub-total Chandpur Division
NPV /
Fin Cost
(Mill Taka) Cost
1.963
4.83
9.815
4.31
5.889
4.31
5.889
3.81
2.038
4.58
2.290
3.85
1.963
4.55
5.889
4.15
3.926
4.52
1.865
4.82
18.999
3.40
4.237
2.69
5.610
2.86
1.422
2.87
2.943
3.50
2.943
4.25
5.885
3.63
5.885
3.46
1.471
3.50
12.020
3.88
2.943
5.32
5.885
4.95
12.595
3.44
3.599
3.42
3.599
3.62
5.398
3.54
5.398
3.54
1.799
3.88
5.398
3.54
53.980
3.39
6.172
3.48
1.349
4.31
2.697
3.86
2.697
3.88
481.589
NPV
9.22
41.17
24.68
21.85
9.04
8.60
8.69
23.78
17.26
8.75
65.23
11.54
16.12
4.12
10.42
12.73
21.75
20.75
5.25
47.14
15.83
29.47
42.30
12.01
12.73
18.64
18.65
6.81
18.64
178.40
20.97
5.91
10.59
10.65
Comilla Division
R140
R140
R140
R140
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
0.1
0.1
0.2
0.2
2080
3942
4909
4909
Regional
Regional
Regional
Regional
Appendix-C: Page: 17 of 49
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
2.050
2.020
4.580
4.580
0.54
1.53
2.31
1.62
1.06
3.04
10.29
7.23
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R140
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Chainage
Km 010.60-010.70
Km 010.90-011.20
Km 011.40-011.50
Km 011.70-012.30
Km 013.36-013.46
Km 013.66-013.86
Km 013.96-014.16
Km 014.26-014.76
Km 014.96-015.06
Km 015.06-015.56
Km 015.86-016.06
Km 016.26-017.29
Km 017.39-017.49
Km 018.89-018.99
Km 020.29-020.49
Km 021.19-021.29
Km 021.39-021.49
Km 023.69-023.79
Km 024.89-024.99
Km 025.09-025.29
Km 026.49-026.59
Km 026.69-026.99
Km 028.89-029.09
Km 029.19-029.49
Km 002.90-003.40
Km 008.70-009.20
Km 009.20-009.50
Km 015.56-015.86
Km 026.09-026.19
Km 000.10-000.40
Km 001.20-001.50
Km 004.30-004.40
Km 007.10-007.30
Km 007.50-007.60
Km 013.80-014.00
Km 014.10-014.20
Km 014.50-014.70
Km 017.80-018.00
Km 018.80-019.00
Km 020.60-020.70
Km 022.00-022.10
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 4909 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.6 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
1.03 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 3942 Regional Rehab 135mm @ IRI 9-12
S
0.5 4909 Regional Rehab 150mm @ IRI 9-12
S
0.3 4909 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 5257 Regional Full Recon 150mm @ IRI 12
S
0.2 5257 Regional Full Recon 150mm @ IRI 12
S
0.1 5257 Regional Full Recon 150mm @ IRI 12
S
0.1 5257 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 18 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.897
2.81
5.692
2.28
1.897
2.88
14.054
2.57
1.832
3.89
3.664
2.69
3.664
3.31
9.160
2.69
1.832
3.83
9.160
2.34
3.664
3.40
19.383
2.38
1.832
3.86
2.094
3.09
4.188
2.04
2.094
3.25
2.120
3.20
2.126
3.19
1.963
3.54
3.926
3.01
1.963
3.54
7.596
2.44
4.606
2.08
7.066
2.56
7.825
1.47
8.582
2.36
5.149
1.75
4.120
2.37
1.471
3.37
5.692
3.63
5.594
3.41
1.865
4.46
3.795
3.91
1.897
4.35
3.756
3.65
1.878
3.96
3.795
3.21
3.860
3.17
3.795
3.21
1.897
3.45
1.897
3.40
NPV
5.24
12.61
5.31
35.71
6.99
9.67
11.89
24.18
6.89
21.05
12.25
44.57
6.95
6.32
8.36
6.64
6.61
6.61
6.78
11.54
6.79
18.28
9.37
17.88
11.62
20.36
9.06
9.96
5.02
20.30
18.65
7.95
14.19
7.88
13.44
7.30
11.94
11.98
11.94
6.42
6.33
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R141
R144
R144
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Laksam Old Section
Laksam Old Section
Chainage
Km 022.12-022.22
Km 023.02-023.22
Km 024.22-024.42
Km 024.52-024.62
Km 027.62-028.12
Km 030.22-030.32
Km 030.52-030.62
Km 031.52-031.72
Km 006.80-007.00
Km 007.30-007.50
Km 023.22-024.22
Km 030.32-030.52
Km 003.80-003.90
Km 000.00-003.00
Million Taka
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 5257 Regional Full Recon 150mm @ IRI 12
S
0.2 5257 Regional Full Recon 150mm @ IRI 12
S
0.2 5257 Regional Full Recon 150mm @ IRI 12
S
0.1 5257 Regional Full Recon 150mm @ IRI 12
S
0.5 5257 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
1 5257 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 2057 Regional Full Recon 135mm @ IRI 12
S
3 2057 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Year
Sub-total Comilla Division
NPV /
Fin Cost
(Mill Taka) Cost
1.897
3.40
3.795
3.18
3.795
3.09
1.897
3.39
9.324
3.00
1.963
3.65
1.930
3.73
3.783
3.46
2.795
4.76
2.844
4.52
14.222
2.75
2.898
3.55
2.228
0.38
51.784
0.56
302.733
NPV
6.33
11.82
11.51
6.31
27.01
7.04
7.08
12.85
12.88
12.43
39.30
10.48
0.82
29.20
Feni Division
N1
N1
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
Dhaka-Comilla-Chittagong-Teknaf Roa Km 169.21-169.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 169.88-170.17
Feni-Noakhali Road
Km 001.30-001.70
Feni-Noakhali Road
Km 017.00-017.10
Feni-Noakhali Road
Km 017.20-017.30
Feni-Noakhali Road
Km 000.20-000.40
Feni-Noakhali Road
Km 002.20-002.50
Feni-Noakhali Road
Km 002.60-002.80
Feni-Noakhali Road
Km 005.10-005.30
Feni-Noakhali Road
Km 005.90-006.00
Feni-Noakhali Road
Km 006.00-006.10
Feni-Noakhali Road
Km 006.10-006.20
Feni-Noakhali Road
Km 006.60-006.70
Feni-Noakhali Road
Km 007.30-007.40
Feni-Noakhali Road
Km 008.50-008.60
Feni-Noakhali Road
Km 009.20-009.30
Feni-Noakhali Road
Km 009.80-010.00
Feni-Noakhali Road
Km 010.30-010.40
Feni-Noakhali Road
Km 010.60-010.70
Feni-Noakhali Road
Km 011.20-011.40
Feni-Noakhali Road
Km 011.50-011.70
Feni-Noakhali Road
Km 011.70-012.00
Feni-Noakhali Road
Km 012.00-012.40
Feni-Noakhali Road
Km 012.70-012.90
0.17
0.29
0.4
0.1
0.1
0.2
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.2
0.2
0.3
0.4
0.2
11451
11451
9061
9193
9193
11451
12376
12376
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 19 of 49
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
4.934
8.496
8.233
2.170
2.170
4.360
6.773
4.516
4.516
2.258
2.258
2.258
2.258
2.258
2.180
2.180
4.360
2.180
2.180
4.360
4.360
6.633
8.875
4.438
4.56
5.48
2.81
4.65
4.73
7.06
4.50
6.37
7.41
7.94
7.08
7.94
7.94
7.94
8.03
7.89
7.42
7.89
7.89
7.50
5.75
7.19
7.74
7.93
22.03
45.63
22.12
9.59
9.76
29.04
28.94
27.30
31.41
16.83
15.00
16.83
16.83
16.83
16.52
16.23
30.50
16.23
16.23
30.87
23.66
44.79
64.51
33.05
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Million Taka
Km 014.60-014.70
Km 014.80-015.00
Km 016.70-016.90
Km 000.70-000.90
Km 006.20-006.60
Km 006.70-007.30
Km 010.70-011.20
Km 012.40-012.70
Km 012.90-014.60
Km 014.70-014.80
Km 015.00-016.70
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
0.4 11451 National Rehab 195mm @ IRI 9-12
S
0.6 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.3 11451 National Rehab 195mm @ IRI 9-12
S
1.7 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
1.7 11451 National Rehab 195mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 013.80-014.00
Km 017.80-018.00
Km 018.80-019.00
S
S
S
0.2
0.2
0.2
2013
2013
2013
2.421
2.670
2.944
8.035
1.00
0.87
1.19
2.23
2.13
3.21
Km 032.90-033.20
Km 033.50-034.20
Km 035.30-035.50
Km 036.50-036.80
Km 038.60-038.70
Km 039.80-039.90
Km 040.00-040.20
Km 041.58-041.78
Km 041.88-042.28
Km 042.98-043.08
Km 043.68-044.08
Km 045.48-045.58
Km 045.99-046.19
Km 046.29-046.69
Km 048.09-048.49
Km 036.90-037.10
Km 039.40-039.60
Km 040.30-041.00
Km 041.20-041.40
Km 043.08-043.68
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.3
0.7
0.2
0.3
0.1
0.1
0.2
0.2
0.4
0.1
0.4
0.1
0.2
0.4
0.4
0.2
0.2
0.7
0.2
0.6
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
9.576
22.344
6.384
6.540
2.258
2.258
4.516
4.360
8.720
2.920
15.431
2.413
4.827
9.654
11.507
3.442
3.565
12.478
3.565
14.217
3.57
4.20
4.80
4.35
4.57
4.81
3.63
4.07
3.45
5.54
3.54
7.00
6.56
5.76
4.52
5.61
6.54
5.77
4.91
5.24
33.77
92.71
30.27
26.70
9.73
10.25
15.45
16.67
28.24
15.98
53.52
16.02
30.05
52.76
51.44
18.32
22.28
68.72
16.71
75.36
Chainage
Year
Sub-total Feni Division
NPV /
Fin Cost
(Mill Taka) Cost
2.367
7.86
4.827
7.18
4.516
7.84
3.442
7.76
7.130
7.70
10.695
7.53
8.605
6.53
5.255
8.42
29.780
8.22
1.921
8.43
30.460
7.60
208.200
NPV
17.75
32.89
33.23
25.52
52.09
76.39
53.69
41.99
232.33
15.69
220.99
Laxmipur Division
R143
R143
R143
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
4563 Regional Full Recon 150mm @ IRI 12
4563 Regional Full Recon 150mm @ IRI 12
5722 Regional Full Recon 150mm @ IRI 12
Sub-total Laxmipur Division
Noakhali Division
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
N104
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
Feni-Noakhali Road
13564
11451
11451
10253
10253
10253
10253
10253
10253
11451
11451
11451
11451
11451
11451
10253
10253
10253
10253
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 20 of 49
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R140
R140
R140
R140
R140
R140
R140
R141
R141
R141
R141
R141
R141
R141
R141
R141
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R142
R143
R143
R143
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Comilla-Begumganj Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Lalmai-Sonaimuri Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Begamganj-Ramganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Maijdi-Chandraganj Road
Chainage
Km 131.27-131.57
Km 132.67-132.97
Km 133.17-133.57
Km 135.67-136.17
Km 136.47-136.97
Km 134.87-135.17
Km 137.37-137.67
Km 032.22-032.52
Km 033.12-033.32
Km 034.52-034.62
Km 034.72-034.82
Km 035.22-035.32
Km 035.62-035.72
Km 031.72-031.82
Km 033.32-034.52
Km 034.82-035.22
Km 000.30-000.50
Km 001.50-001.70
Km 002.10-002.30
Km 002.70-002.90
Km 003.90-004.00
Km 004.10-004.20
Km 004.20-004.30
Km 004.30-004.40
Km 008.10-008.20
Km 008.60-008.70
Km 022.45-022.55
Km 022.95-023.05
Km 024.95-025.25
Km 026.25-026.35
Km 027.25-027.55
Km 027.95-028.25
Km 028.99-029.00
Km 002.30-002.70
Km 007.50-008.10
Km 027.55-027.95
Km 000.10-000.40
Km 001.30-001.40
Km 004.30-004.50
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.3 10112 Regional Full Recon 150mm @ IRI 12
S
0.3 10112 Regional Full Recon 150mm @ IRI 12
S
0.4 10112 Regional Full Recon 150mm @ IRI 12
S
0.5 10112 Regional Full Recon 150mm @ IRI 12
S
0.5 10112 Regional Full Recon 150mm @ IRI 12
S
0.3 10112 Regional Rehab 150mm @ IRI 9-12
S
0.3 10112 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
1.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 9769 Regional Full Recon 150mm @ IRI 12
S
0.2 9769 Regional Full Recon 150mm @ IRI 12
S
0.2 9769 Regional Full Recon 150mm @ IRI 12
S
0.2 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 9769 Regional Full Recon 150mm @ IRI 12
S
0.1 7837 Regional Full Recon 150mm @ IRI 12
S
0.1 7837 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.01 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 9769 Regional Rehab 150mm @ IRI 9-12
S
0.6 9769 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4563 Regional Full Recon 150mm @ IRI 12
S
0.1 4563 Regional Full Recon 150mm @ IRI 12
S
0.2 4563 Regional Full Recon 150mm @ IRI 12
Sub-total Noakhali Division
Appendix-C: Page: 21 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
5.889
4.19
5.889
4.19
7.852
3.74
9.815
4.01
9.815
3.33
4.414
4.27
5.811
3.31
6.340
3.18
3.730
3.65
1.930
3.69
1.930
3.68
1.897
3.83
1.897
3.28
1.494
3.95
17.302
3.14
5.797
2.76
3.599
3.54
3.599
3.34
3.599
3.37
3.599
3.46
1.799
3.89
1.799
3.89
1.799
3.62
1.799
3.89
1.799
3.72
1.799
3.76
1.799
3.39
1.799
3.49
5.398
2.86
1.799
3.51
5.398
3.42
5.398
3.45
0.108 11.74
5.395
3.33
8.092
3.17
5.395
3.38
4.397
0.58
1.243
1.26
2.486
0.90
316.672
NPV
23.88
23.90
28.40
38.08
31.64
18.94
19.50
19.61
13.31
6.99
6.98
7.13
6.12
6.02
55.36
16.27
12.15
11.58
11.67
11.99
6.74
6.74
6.27
6.74
6.45
6.52
5.87
6.06
15.14
6.19
18.10
18.22
1.24
17.58
25.11
18.56
2.34
1.45
2.07
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Total Comilla Zone
Fin Cost
(Mill Taka)
NPV /
Cost
NPV
1820.265
Dhaka Zone
Dhaka Division
N5
N5
N501
N501
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Mirpur Bridge-Dhour Road
Mirpur Bridge-Dhour Road
Km 000.30-000.40
Km 004.50-004.60
Km 008.30-009.10
Km 010.50-010.90
L
L
S
S
0.1
0.1
0.8
0.4
9159
9159
9855
9061
National
National
National
National
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
2013
2013
2013
2013
2.807
2.807
11.223
5.612
22.448
4.45
4.00
5.08
3.80
12.37
11.10
53.92
20.51
Km 040.14-043.14
Km 018.00-019.40
Km 019.40-019.60
Km 012.70-012.80
Km 014.30-014.70
Km 015.40-015.60
Km 012.70-012.80
Km 014.30-014.70
Km 015.40-015.60
Km 017.80-018.00
Km 047.05-047.25
Km 047.95-048.15
Km 019.47-019.67
Km 021.37-021.47
Km 000.80-000.86
Km 000.86-000.90
Km 001.10-001.30
Km 001.40-001.50
Km 001.70-001.90
Km 002.50-002.60
Km 002.70-002.80
Km 004.10-004.20
Km 004.70-004.90
Km 005.40-005.60
Km 005.90-006.30
Km 006.50-006.60
Km 006.80-006.90
Km 007.50-008.00
Km 008.10-008.40
S
L
L
L
L
L
R
R
R
L
S
S
S
S
R
S
S
S
S
S
S
S
S
S
S
S
S
S
S
3
1.4
0.2
0.1
0.4
0.2
0.1
0.4
0.2
0.2
0.2
0.2
0.2
0.1
0.06
0.04
0.2
0.1
0.2
0.1
0.1
0.1
0.2
0.2
0.4
0.1
0.1
0.5
0.3
11451
11451
11451
8665
8665
8665
8665
8665
8665
11451
11451
11451
16227
19452
21334
21334
21334
21334
21334
21334
21334
21334
21334
21334
21334
21334
21334
4887
4887
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
85.250
47.032
7.785
4.969
12.533
7.745
4.969
10.498
4.314
7.136
4.487
4.487
4.610
2.305
1.119
0.985
4.580
2.290
4.155
1.832
1.832
1.832
3.664
3.664
7.328
1.832
2.290
9.160
5.496
4.96
4.82
3.88
1.48
2.12
1.76
1.48
2.63
3.04
2.95
5.07
5.23
7.49
8.61
8.20
6.88
6.07
6.79
6.37
8.89
9.78
9.98
9.27
8.74
8.88
9.68
6.47
2.52
2.54
418.40
222.09
29.36
7.27
26.30
13.84
7.26
27.40
13.30
20.79
22.75
23.49
34.95
20.10
8.97
6.63
27.20
15.21
25.89
15.93
17.53
17.88
33.21
31.30
63.66
17.35
14.50
22.38
13.52
Sub-total Dhaka Division
Gazipur Division
N105
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N3
N4
N4
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
R301
Madanpur-Joydevpur
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Appendix-C: Page: 22 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R301
R301
R301
R301
R302
R302
R302
R302
R302
R302
R302
R302
R303
R303
R303
R310
R310
R310
R310
R310
R310
R310
R310
R310
R311
R311
R311
R311
R311
R311
R311
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Kaliganj Bazr Road
Tongi By-Pass Road
Tongi By-Pass Road
Tongi By-Pass Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur-Itakhola Road
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Joydebpur -Ordinance Factory
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Chainage
Km 009.30-009.40
Km 025.93-026.03
Km 000.80-000.86
Km 026.43-026.81
Km 000.10-000.30
Km 001.40-001.80
Km 004.20-004.60
Km 004.70-005.00
Km 005.20-005.60
Km 005.70-005.90
Km 006.20-006.40
Km 003.00-003.80
Km 000.10-000.20
Km 000.30-000.60
Km 000.70-000.90
Km 000.10-000.20
Km 001.70-001.90
Km 002.20-002.60
Km 003.40-003.80
Km 004.20-004.50
Km 005.10-005.20
Km 005.50-005.70
Km 007.20-007.40
Km 006.80-007.10
Km 000.20-000.30
Km 000.90-001.10
Km 001.30-001.40
Km 003.60-003.90
Km 002.20-002.60
Km 003.10-003.50
Km 004.10-004.40
Km 002.70-003.40
Km 004.90-006.35
Km 006.47-006.77
Km 007.07-007.27
Km 007.47-008.57
Km 008.87-017.47
Km 017.77-018.07
Km 018.27-019.27
Km 019.37-019.77
Km 020.57-020.97
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
L
0.06 9143 Regional Rehab 150mm @ IRI 9-12
S
0.38 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 3076 Regional Full Recon 135mm @ IRI 12
S
0.4 3076 Regional Full Recon 135mm @ IRI 12
S
0.4 3076 Regional Full Recon 135mm @ IRI 12
S
0.3 3076 Regional Full Recon 135mm @ IRI 12
S
0.4 3076 Regional Full Recon 135mm @ IRI 12
S
0.2 3076 Regional Full Recon 135mm @ IRI 12
S
0.2 3076 Regional Full Recon 135mm @ IRI 12
S
0.8 3076 Regional Rehab 135mm @ IRI 9-12
S
0.1 10199 Regional Full Recon 150mm @ IRI 12
S
0.3 10199 Regional Full Recon 150mm @ IRI 12
S
0.2 10199 Regional Full Recon 150mm @ IRI 12
S
0.1 17870 Regional Full Recon 150mm @ IRI 12
S
0.2 17870 Regional Full Recon 150mm @ IRI 12
S
0.4 8616 Regional Full Recon 150mm @ IRI 12
S
0.4 5766 Regional Full Recon 150mm @ IRI 12
S
0.3 6578 Regional Full Recon 150mm @ IRI 12
S
0.1 6578 Regional Full Recon 150mm @ IRI 12
S
0.2 6578 Regional Full Recon 150mm @ IRI 12
S
0.2 6578 Regional Full Recon 150mm @ IRI 12
S
0.3 3723 Regional Rehab 135mm @ IRI 9-12
S
0.1 2929 Regional Full Recon 135mm @ IRI 12
S
0.2 2929 Regional Full Recon 135mm @ IRI 12
S
0.1 2929 Regional Full Recon 135mm @ IRI 12
S
0.3 2929 Regional Full Recon 135mm @ IRI 12
S
0.4 2929 Regional Rehab 135mm @ IRI 9-12
S
0.4 2929 Regional Rehab 135mm @ IRI 9-12
S
0.3 2929 Regional Rehab 135mm @ IRI 9-12
S
0.7 3019 Regional Full Recon 135mm @ IRI 12
S
1.45 3019 Regional Full Recon 135mm @ IRI 12
S
0.3 3571 Regional Full Recon 135mm @ IRI 12
S
0.2 3571 Regional Full Recon 135mm @ IRI 12
S
1.1 3571 Regional Full Recon 135mm @ IRI 12
S
8.6 3571 Regional Full Recon 135mm @ IRI 12
S
0.3 3571 Regional Full Recon 135mm @ IRI 12
S
1 3571 Regional Full Recon 135mm @ IRI 12
S
0.4 3571 Regional Full Recon 135mm @ IRI 12
S
0.4 3571 Regional Full Recon 135mm @ IRI 12
Appendix-C: Page: 23 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
1.832
3.34
1.897
3.34
0.769
8.38
5.419
3.86
3.327
1.39
6.654
1.88
6.654
1.16
4.990
1.49
6.654
1.18
3.327
1.11
3.327
1.03
10.311
1.46
1.799
5.49
5.398
5.00
3.599
4.65
3.795
4.11
7.459
4.20
14.918
1.41
10.600
1.42
9.815
1.96
1.570
3.52
3.049
3.22
3.272
4.28
2.762
2.36
1.129
1.38
2.257
1.16
1.129
1.40
3.386
1.44
3.498
1.68
3.498
1.78
2.624
1.64
7.069
1.98
14.684
3.21
3.030
1.76
2.020
1.51
10.554
1.19
76.635
1.14
2.673
1.38
8.911
1.67
3.564
1.67
3.564
1.82
NPV
5.92
6.16
6.31
21.12
4.50
12.12
7.47
7.24
7.62
3.60
3.33
15.07
9.65
26.37
16.35
15.62
31.40
20.55
14.29
18.27
5.04
8.95
12.75
6.22
1.45
2.43
1.48
4.54
5.68
6.00
4.15
13.61
45.67
5.00
2.86
11.80
82.17
3.45
13.93
5.57
6.10
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R313
R315
R315
R315
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Monohardi Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Million Taka
Km 021.07-021.97
Km 022.17-022.37
Km 022.77-023.27
Km 023.87-025.17
Km 025.27-028.37
Km 032.87-033.07
Km 033.37-033.47
Km 033.57-034.97
Km 035.07-035.37
Km 035.47-035.57
Km 035.67-035.87
Km 000.90-001.70
Km 004.20-004.80
Km 022.37-022.77
Km 028.37-031.67
Km 033.60-033.70
Km 032.10-032.50
Km 036.20-037.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.9 5261 Regional Full Recon 150mm @ IRI 12
S
0.2 5572 Regional Full Recon 150mm @ IRI 12
S
0.5 5572 Regional Full Recon 150mm @ IRI 12
S
1.3 5572 Regional Full Recon 150mm @ IRI 12
S
3.1 5572 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
1.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.8 3019 Regional Rehab 135mm @ IRI 9-12
S
0.6 3019 Regional Rehab 135mm @ IRI 9-12
S
0.4 5572 Regional Rehab 150mm @ IRI 9-12
S
3.3 5572 Regional Rehab 150mm @ IRI 9-12
S
0.1 2048 Regional Full Recon 135mm @ IRI 12
S
0.4 2048 Regional Rehab 135mm @ IRI 9-12
S
1.7 2048 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 130.71-130.81
Km 140.61-140.91
Km 143.41-143.51
Km 143.51-143.61
Km 143.61-144.11
Km 137.61-140.61
Km 140.91-143.01
S
S
S
S
S
S
S
0.1
0.3
0.1
0.1
0.5
3
2.1
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2.058
5.950
1.983
1.983
10.291
46.471
32.530
101.267
4.55
4.14
4.70
4.37
3.93
3.38
4.30
8.90
23.43
8.86
8.23
38.47
150.57
134.03
Km 071.94-072.04
Km 011.20-011.30
Km 109.38-109.68
Km 045.42-046.82
Km 000.00-003.00
S
S
S
S
S
0.1 11451 National Full Recon 195mm @ IRI 12
0.1 4887 Regional Full Recon 150mm @ IRI 12
0.3 4887 Regional Full Recon 150mm @ IRI 12
1.4 2693 Regional Rehab 135mm @ IRI 9-12
3 3019 Regional Full Recon 135mm @ IRI 12
2013
2013
2013
2013
2013
2.920
1.767
5.398
17.722
8.911
36.717
4.58
4.03
2.29
1.98
8.54
13.21
6.94
12.07
35.48
73.81
Km 043.30-044.00
S
0.7
2013
4.994
2.61
12.66
Chainage
Year
Sub-total Gazipur Division
NPV /
Fin Cost
(Mill Taka) Cost
13.809
2.52
3.272
2.70
8.179
2.35
21.265
4.87
54.562
3.78
3.599
3.33
1.799
2.74
25.191
2.26
5.398
2.73
1.799
2.74
3.599
4.25
6.739
3.32
4.695
3.14
4.904
6.49
44.506
2.94
0.921
4.68
4.373
2.15
12.129
2.32
754.336
NPV
33.07
8.59
18.66
100.46
201.24
11.68
4.82
55.65
14.39
4.82
14.92
22.45
14.77
31.48
132.84
4.03
9.21
27.35
Jamalpur Division
N4
N4
N4
N4
N4
N4
N4
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
9061
9061
9061
9061
9061
9061
9061
National
National
National
National
National
National
National
Sub-total Jamalpur Division
Kishoreganj Division
N2
R360
R360
R360
R364
Dhaka-Sylhet-Jaflong Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Mymensingh -Bhairab Road
Battoli - Kishoreganj Road
Sub-total Kishoreganj Division
Manikganj Division
R315
Mawna-Nabinagar Road
2048 Regional Rehab 135mm @ IRI 9-12
Appendix-C: Page: 24 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R315
R315
R505
R505
R506
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Mawna-Nabinagar Road
Mawna-Nabinagar Road
Nabinagar-Kaliakoir Road
Nabinagar-Kaliakoir Road
Aricha -Daulatpur-Tangail Road
Million Taka
Km 044.70-044.80
Km 045.00-048.10
Km 009.10-009.40
Km 009.40-014.00
Km 006.80-006.90
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 2048 Regional Rehab 135mm @ IRI 9-12
S
3.1 2048 Regional Rehab 135mm @ IRI 9-12
S
0.3 17384 Regional Full Recon 150mm @ IRI 12
S
4.6 17384 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
Km 007.40-007.80
Km 016.50-016.70
Km 018.80-019.10
Km 019.90-020.10
Km 022.50-022.80
Km 010.22-010.42
Km 011.32-011.52
Km 011.92-012.82
Km 011.52-011.92
Km 040.18-040.28
Km 022.91-026.11
Km 026.11-029.21
Km 041.48-041.88
Km 042.58-045.71
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
13.235
5.839
8.759
5.839
8.759
3.599
3.599
16.194
5.395
1.832
35.130
40.744
5.493
42.994
197.410
4.04
4.61
4.72
4.38
5.03
3.13
3.20
2.46
3.05
3.14
1.40
3.98
2.81
3.09
52.84
26.62
40.88
25.26
43.55
11.06
11.33
39.21
16.42
5.61
47.90
164.06
15.70
134.95
Km 064.80-064.90
Km 106.60-106.70
Km 067.50-067.90
Km 000.80-001.10
Km 012.70-013.10
Km 013.30-013.40
Km 013.60-013.70
Km 015.10-015.30
Km 015.50-015.60
Km 017.10-017.20
Km 018.10-018.30
Km 022.90-023.00
Km 032.40-032.60
S
S
S
S
S
S
S
S
S
S
S
S
S
0.1 11451 National Full Recon 195mm @ IRI 12
0.1 11451 National Full Recon 195mm @ IRI 12
0.4 11451 National Rehab 195mm @ IRI 9-12
0.3 1346 Regional Full Recon 110mm @ IRI 12
0.4 1346 Regional Full Recon 110mm @ IRI 12
0.1 1346 Regional Full Recon 110mm @ IRI 12
0.1 1346 Regional Full Recon 110mm @ IRI 12
0.2 1346 Regional Full Recon 110mm @ IRI 12
0.1 1346 Regional Full Recon 110mm @ IRI 12
0.1 1346 Regional Full Recon 110mm @ IRI 12
0.2 4540 Regional Full Recon 150mm @ IRI 12
0.1 4540 Regional Full Recon 150mm @ IRI 12
0.2 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.920
2.920
9.220
3.160
3.241
0.810
0.810
1.620
0.810
0.810
3.926
1.963
2.943
35.151
6.77
3.91
7.83
0.82
1.14
1.87
1.42
2.03
1.69
1.88
2.37
2.75
2.85
19.34
11.19
72.25
2.52
3.61
1.48
1.12
3.20
1.33
1.49
8.94
5.19
8.49
Chainage
Year
Sub-total Manikganj Division
NPV /
Fin Cost
(Mill Taka) Cost
0.713
4.44
22.118
3.66
7.361
8.80
84.597
8.16
1.324
5.45
121.108
NPV
3.08
78.64
63.99
720.74
7.18
Munshiganj Division
N8
N8
N8
N8
N8
R812
R812
R812
R812
R820
R820
R820
R820
R820
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Dhaka -Patuakhali Road
Fatullah -Mawa Road
Fatullah -Mawa Road
Fatullah -Mawa Road
Fatullah -Mawa Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
Zinzira-Srinagar Road
0.4
0.2
0.3
0.2
0.3
0.2
0.2
0.9
0.4
0.1
3.2
3.1
0.4
3.13
11451
11451
11451
11451
11451
4887
4887
4887
4887
4887
3019
4887
4887
4887
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Sub-total Munshiganj Division
Mymensingh Division
N3
N3
N3
R314
R314
R314
R314
R314
R314
R314
R371
R371
R371
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Dhaka -Mymensingh Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Gafargaon-Mawna Road
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
Sub-total Mymensingh Division
Appendix-C: Page: 25 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Fin Cost
(Mill Taka)
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
5.987
17.962
5.761
8.642
4.360
2.180
2.608
7.824
20.865
2.608
5.761
6.851
2.881
5.839
17.517
2.920
2.920
5.839
20.437
11.678
20.343
5.450
2.920
2.920
2.920
2.744
5.761
5.683
2.842
0.311
1.721
1.721
24.709
2.274
6.878
15.582
2.305
53.015
6.823
60.027
NPV /
Cost
NPV
Narayanganj Division
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
N1
R111
Dhaka-Comilla-Chittagong-Teknaf Roa Km 005.40-005.60
Dhaka-Comilla-Chittagong-Teknaf Roa Km 006.10-006.70
Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.00-009.20
Dhaka-Comilla-Chittagong-Teknaf Roa Km 034.88-035.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 000.70-000.90
Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.00-001.10
Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.20-001.30
Dhaka-Comilla-Chittagong-Teknaf Roa Km 002.50-002.80
Dhaka-Comilla-Chittagong-Teknaf Roa Km 002.80-003.60
Dhaka-Comilla-Chittagong-Teknaf Roa Km 003.60-003.70
Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.00-009.20
Dhaka-Comilla-Chittagong-Teknaf Roa Km 012.40-012.60
Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.50-016.60
Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.90-017.10
Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.10-017.70
Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.70-017.80
Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.48-018.58
Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.78-018.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.98-019.68
Dhaka-Comilla-Chittagong-Teknaf Roa Km 019.68-020.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.18-020.78
Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.88-020.98
Dhaka-Comilla-Chittagong-Teknaf Roa Km 021.78-021.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.18-024.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.28-024.38
Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.38-024.47
Dhaka-Comilla-Chittagong-Teknaf Roa Km 025.88-026.08
Dhaka-Comilla-Chittagong-Teknaf Roa Km 036.08-036.28
Dhaka-Comilla-Chittagong-Teknaf Roa Km 037.78-037.88
Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.47-024.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 000.90-001.00
Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.10-001.20
Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.30-002.50
Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.30-009.40
Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.60-016.90
Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.80-018.48
Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.08-020.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 021.88-024.18
Dhaka-Comilla-Chittagong-Teknaf Roa Km 034.88-035.18
Signboard -Narayanganj Road
Km 003.20-006.60
R
R
L
L
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
S
R
R
R
R
R
R
R
R
R
S
0.2
0.6
0.2
0.3
0.2
0.1
0.1
0.3
0.8
0.1
0.2
0.2
0.1
0.2
0.6
0.1
0.1
0.2
0.7
0.4
0.6
0.1
0.1
0.1
0.1
0.09
0.2
0.2
0.1
0.01
0.1
0.1
1.2
0.1
0.3
0.68
0.1
2.3
0.3
3.4
8665
8665
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
15970
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Appendix-C: Page: 26 of 49
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
3.28
2.91
4.65
3.88
8.01
8.41
7.22
6.84
5.66
6.79
5.21
4.49
5.97
5.89
5.69
5.89
5.89
5.89
5.80
5.89
5.02
2.59
5.89
5.87
5.62
5.87
5.79
3.95
5.06
2.11
9.56
9.11
7.41
6.78
7.05
6.71
6.88
6.74
4.92
4.72
19.25
51.14
26.22
32.87
32.79
17.21
18.12
51.49
113.71
17.05
29.38
30.15
16.84
33.67
97.65
16.84
16.84
33.67
116.06
67.35
100.04
13.73
16.84
16.77
16.06
15.77
32.67
22.01
14.07
0.64
16.09
15.32
179.24
15.43
48.49
104.58
15.87
357.64
33.55
285.74
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R113
R114
R202
R202
R202
R202
R202
R202
R202
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Madanpur-Sayedpur Road
Nayapur-Raipura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Bhulta-Rampura Road
Million Taka
Km 002.00-002.30
Km 003.70-004.00
Km 000.90-001.00
Km 001.30-001.50
Km 003.80-003.90
Km 004.00-004.40
Km 004.70-005.10
Km 005.70-005.90
Km 007.00-007.20
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4082 Regional Rehab 150mm @ IRI 9-12
S
0.1 6255 Regional Full Recon 150mm @ IRI 12
S
0.2 6255 Regional Full Recon 150mm @ IRI 12
S
0.1 6255 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 017.60-017.70
Km 026.00-026.10
Km 026.20-026.30
Km 000.20-001.30
Km 026.81-029.83
Km 029.93-030.63
Km 030.73-031.03
Km 031.13-031.33
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2.305
1.158
1.158
19.793
57.285
13.351
6.085
4.057
105.192
10.36
3.22
3.22
3.09
2.21
2.40
2.44
2.84
23.81
3.59
3.59
60.04
122.97
31.12
14.48
11.25
Km 055.16-055.36
Km 035.60-035.90
S
S
0.2
0.3
2013
2013
2.762
4.414
7.176
3.29
4.80
9.15
21.49
Km 107.46-108.46
Km 108.56-108.66
Km 109.16-109.66
Km 110.26-110.56
Km 113.86-114.46
Km 120.51-120.61
Km 097.39-098.19
Km 098.29-099.09
Km 100.59-100.89
Km 102.59-102.79
Km 103.49-103.59
Km 068.65-069.05
S
S
S
S
S
S
S
S
S
S
S
S
1 3779
0.1 3779
0.5 3779
0.3 3779
0.6 3779
0.1 3779
0.8 6524
0.8 6524
0.3 6524
0.2 6524
0.1 6524
0.4 16332
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
17.441
1.744
8.721
5.232
10.465
1.744
17.962
17.962
6.287
4.191
2.096
11.678
1.61
2.19
1.85
2.00
1.77
2.74
2.85
2.82
3.46
3.85
3.86
8.13
26.81
3.64
15.42
10.00
17.74
4.56
49.41
48.97
20.55
15.25
7.65
96.20
Chainage
Year
Sub-total Narayanganj Division
NPV /
Fin Cost
(Mill Taka) Cost
4.120
5.60
2.795
1.52
2.290
0.71
4.580
0.72
2.290
0.72
9.160
2.83
9.160
2.83
4.580
2.59
4.580
2.42
431.944
NPV
23.16
3.92
1.52
3.07
1.54
25.25
25.22
11.52
10.77
Narsingdi Division
N2
R114
R114
R212
R301
R301
R301
R301
Dhaka-Sylhet-Jaflong Road
Nayapur-Raipura Road
Nayapur-Raipura Road
Akdaria -Agarpur Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
Tongi-Pachdona Road
0.1 17174 National Rehab 195mm @ IRI 9-12
0.1 3019 Regional Full Recon 135mm @ IRI 12
0.1 3019 Regional Full Recon 135mm @ IRI 12
1.1 4887 Regional Full Recon 150mm @ IRI 12
3.02 4887 Regional Full Recon 150mm @ IRI 12
0.7 4887 Regional Full Recon 150mm @ IRI 12
0.3 4887 Regional Full Recon 150mm @ IRI 12
0.2 4887 Regional Full Recon 150mm @ IRI 12
Sub-total Narsingdi Division
Sherpur Division
R371
R371
Sherpur-Nakla-Mymensingh
Sherpur-Nakla-Mymensingh
3786 Regional Rehab 135mm @ IRI 9-12
4887 Regional Rehab 150mm @ IRI 9-12
Sub-total Sherpur Division
Tangail Division
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 27 of 49
Full Recon 140mm @ IRI 12
Full Recon 140mm @ IRI 12
Full Recon 140mm @ IRI 12
Full Recon 140mm @ IRI 12
Full Recon 140mm @ IRI 12
Full Recon 140mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N4
N401
R506
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Joydebpur-Jamalpur Road
Madhupur-Mymensingh Road
Aricha -Daulatpur-Tangail Road
Chainage
Km 069.05-069.25
Km 069.25-069.75
Km 075.15-075.45
Km 081.75-082.35
Km 082.35-082.75
Km 090.79-091.09
Km 091.29-091.39
Km 091.49-091.59
Km 104.99-105.09
Km 109.66-110.26
Km 110.76-113.86
Km 119.51-120.41
Km 122.01-122.71
Km 123.71-125.61
Km 036.49-036.59
Km 057.82-057.92
Km 059.72-059.82
Km 069.75-072.65
Km 072.65-072.85
Km 073.15-073.55
Km 073.55-074.15
Km 074.15-074.35
Km 078.75-079.85
Km 080.95-081.75
Km 000.60-000.80
Km 047.81-053.28
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 16332 National Full Recon 195mm @ IRI 12
S
0.5 16332 National Full Recon 195mm @ IRI 12
S
0.3 15112 National Full Recon 195mm @ IRI 12
S
0.6 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 3779 National Rehab 140mm @ IRI 9-12
S
0.6 3779 National Rehab 140mm @ IRI 9-12
S
3.1 3779 National Rehab 140mm @ IRI 9-12
S
0.9 3779 National Rehab 140mm @ IRI 9-12
S
0.7 3779 National Rehab 140mm @ IRI 9-12
S
1.9 3779 National Rehab 140mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
2.9 15188 National Rehab 195mm @ IRI 9-12
S
0.2 15112 National Rehab 195mm @ IRI 9-12
S
0.4 15112 National Rehab 195mm @ IRI 9-12
S
0.6 15112 National Rehab 195mm @ IRI 9-12
S
0.2 15112 National Rehab 195mm @ IRI 9-12
S
1.1 11497 National Rehab 195mm @ IRI 9-12
S
0.8 11451 National Rehab 195mm @ IRI 9-12
S
0.2 3417 National Rehab 135mm @ IRI 9-12
S
5.47 4887 Regional Rehab 150mm @ IRI 9-12
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Tangail Division
Total Dhaka Zone
NPV /
Fin Cost
(Mill Taka) Cost
5.839
7.94
14.598
8.13
6.657
7.87
17.424
5.68
11.522
5.34
12.846
3.12
4.282
2.58
4.282
3.11
1.411
1.94
7.761
3.27
40.097
2.99
11.641
1.99
9.054
2.08
24.575
2.96
2.305
7.15
2.305
4.86
2.305
4.34
57.754
7.88
3.504
9.44
7.007
8.83
10.511 10.43
3.504
9.41
25.355
4.14
18.440
5.72
3.222
1.70
80.210
3.41
493.931
NPV
47.00
120.25
49.16
96.94
60.22
38.96
10.74
12.96
2.73
25.15
118.99
23.00
18.66
72.10
16.49
11.20
10.00
462.78
32.62
61.04
108.22
32.54
106.36
105.58
5.48
286.02
2306.678
Gopalganj Zone
Faridpur Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Km 044.20-044.30
Km 045.00-045.10
Km 055.42-055.72
Km 060.22-060.42
Km 061.02-061.12
Km 034.80-035.30
Km 036.20-036.30
Km 041.00-041.20
Km 041.50-041.60
S
S
S
S
S
S
S
S
S
0.1
0.1
0.3
0.2
0.1
0.5
0.1
0.2
0.1
5397
5397
7248
7248
7248
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 28 of 49
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.388
2.388
8.195
5.463
2.732
14.208
2.842
5.683
2.842
3.44
3.44
3.73
3.45
2.47
5.61
5.06
5.58
5.65
8.33
8.33
29.84
18.39
6.57
78.04
14.08
31.07
15.71
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N7
N803
N803
N803
N803
N803
N803
N803
N803
N804
N804
N804
N804
N804
N804
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Dauladia-Mongla Road
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Faridpur Town Old section
Bhanga-Faridpur Road
Bhanga-Faridpur Road
Bhanga-Faridpur Road
Bhanga-Faridpur Road
Bhanga-Faridpur Road
Bhanga-Faridpur Road
Million Taka
Km 055.30-055.40
Km 000.10-000.20
Km 000.70-000.80
Km 002.20-002.30
Km 004.60-005.40
Km 005.50-005.90
Km 006.10-006.20
Km 001.50-002.10
Km 002.60-003.10
Km 027.70-028.00
Km 028.90-029.30
Km 030.00-030.20
Km 030.80-031.10
Km 031.20-031.30
Km 031.50-032.05
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 7248 National Rehab 180mm @ IRI 9-12
S
0.1 24928 National Full Recon 195mm @ IRI 12
S
0.1 24928 National Full Recon 195mm @ IRI 12
S
0.1 24928 National Full Recon 195mm @ IRI 12
S
0.8 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.1 9061 National Rehab 180mm @ IRI 9-12
S
0.6 24928 National Rehab 195mm @ IRI 9-12
S
0.5 24928 National Rehab 195mm @ IRI 9-12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.55 11451 National Rehab 195mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 010.90-011.20
Km 000.00-000.10
Km 000.70-000.90
Km 004.00-004.10
Km 004.90-005.00
Km 006.60-007.00
Km 000.00-000.10
Km 000.20-001.20
Km 002.70-002.80
Km 000.00-000.50
Km 002.30-002.50
Km 003.40-003.50
Km 006.20-006.60
Km 007.50-007.60
Km 008.80-008.90
Km 009.80-009.90
Km 012.30-012.40
Km 013.00-013.40
Km 018.70-018.80
Km 018.90-019.00
Km 019.00-019.10
Km 021.30-021.40
Km 021.90-022.00
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Faridpur Division
NPV /
Fin Cost
(Mill Taka) Cost
2.134
3.85
4.924
2.29
4.788
1.98
3.309
3.42
18.872
6.88
9.109
5.98
1.607
3.77
18.993
6.35
11.955
7.34
8.957
5.03
23.356
2.06
5.683
5.73
8.525
5.56
4.610
2.25
17.681
3.20
191.246
NPV
8.19
10.58
8.89
10.92
123.86
51.98
5.81
115.21
86.13
44.09
47.02
31.90
46.41
10.33
56.35
Gopalganj Division
N805
N805
N805
N805
N805
N805
N806
N806
N806
R850
R850
R850
R850
R850
R850
R850
R850
R850
R850
R850
R850
R850
R850
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhanga-Mollahhat Road
Bhatiapara-Kalna Road
Bhatiapara-Kalna Road
Bhatiapara-Kalna Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
0.3
0.1
0.2
0.1
0.1
0.4
0.1
1
0.1
0.5
0.2
0.1
0.4
0.1
0.1
0.1
0.1
0.4
0.1
0.1
0.1
0.1
0.1
2650
11451
11451
11451
11451
2650
2860
2860
2860
2343
2343
2343
2343
2343
2343
2343
2343
2343
2343
2343
3497
3497
3497
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 29 of 49
Full Recon 135mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 135mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
6.505
2.842
5.683
2.842
2.842
6.720
1.099
10.990
1.099
10.693
3.291
1.634
6.535
1.634
1.634
1.634
1.634
6.535
1.634
1.699
1.568
1.634
1.634
1.29
5.67
5.66
5.65
5.66
1.19
2.58
1.66
2.59
0.95
1.30
1.38
1.23
1.73
1.73
1.40
1.36
0.88
1.39
2.31
1.58
1.86
1.87
8.35
15.94
31.81
15.89
15.90
8.07
2.59
16.69
2.60
9.65
4.10
2.16
7.66
2.71
2.71
2.20
2.13
5.52
2.17
3.75
2.37
2.90
2.92
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R850
R850
R850
R850
R850
R850
R850
R850
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Tekerhat-Mollahhat Road
Million Taka
Km 025.70-025.90
Km 026.00-026.10
Km 027.70-028.10
Km 032.50-032.70
Km 010.10-010.20
Km 010.60-010.70
Km 034.00-034.20
Km 034.50-035.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 3497 Regional Full Recon 135mm @ IRI 12
S
0.1 3497 Regional Full Recon 135mm @ IRI 12
S
0.4 3497 Regional Full Recon 135mm @ IRI 12
S
0.2 3497 Regional Full Recon 135mm @ IRI 12
S
0.1 2343 Regional Rehab 135mm @ IRI 9-12
S
0.1 2343 Regional Rehab 135mm @ IRI 9-12
S
0.2 3497 Regional Rehab 135mm @ IRI 9-12
S
0.5 3497 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
Km 045.57-045.58
Km 016.28-016.38
Km 016.48-016.50
Km 000.10-000.20
Km 002.70-002.90
Km 003.90-004.60
Km 005.00-005.30
Km 006.20-006.30
Km 007.70-008.30
Km 007.10-007.50
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.521
1.188
0.190
1.799
3.599
12.595
5.398
2.944
11.660
6.375
46.270
3.68
2.22
3.54
2.13
2.16
1.56
2.07
2.02
2.52
2.67
1.89
2.56
0.65
3.66
7.46
18.87
10.71
5.86
28.61
17.20
Km 000.10-000.20
Km 021.31-021.61
Km 024.71-024.81
Km 024.91-025.11
Km 025.91-026.11
Km 026.71-026.81
Km 029.51-029.71
Km 029.91-030.21
Km 031.81-032.01
Km 036.01-036.21
Km 038.21-038.31
Km 038.41-038.51
Km 039.31-039.41
Km 039.91-040.01
Km 005.60-005.80
Km 007.20-007.40
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.742
5.079
1.693
3.386
3.386
1.693
3.386
5.079
3.386
3.267
1.574
1.574
1.574
1.574
3.730
3.860
2.14
1.75
1.97
1.96
2.14
2.36
2.78
1.62
2.60
1.99
2.49
2.49
2.53
2.53
2.40
2.52
7.85
8.51
3.20
6.35
6.92
3.82
9.00
7.89
8.42
6.36
3.84
3.84
3.90
3.90
8.53
9.24
Chainage
Year
Sub-total Gopalganj Division
NPV /
Fin Cost
(Mill Taka) Cost
3.267
1.25
1.634
1.73
6.535
1.38
3.267
1.37
1.266
2.68
1.266
2.49
2.532
2.50
6.329
1.86
110.108
NPV
3.92
2.71
8.60
4.27
3.38
3.14
6.30
11.74
Madaripur Division
N8
R860
R860
R860
R860
R860
R860
R860
R860
R860
Dhaka -Patuakhali Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
0.01 11451 National Full Recon 195mm @ IRI 12
0.1 3019 Regional Full Recon 135mm @ IRI 12
0.02 3019 Regional Full Recon 135mm @ IRI 12
0.1 5672 Regional Full Recon 150mm @ IRI 12
0.2 5672 Regional Full Recon 150mm @ IRI 12
0.7 5672 Regional Full Recon 150mm @ IRI 12
0.3 5672 Regional Full Recon 150mm @ IRI 12
0.1 4887 Regional Full Recon 150mm @ IRI 12
0.6 4887 Regional Full Recon 150mm @ IRI 12
0.4 4887 Regional Rehab 150mm @ IRI 9-12
Sub-total Madaripur Division
Rajbari Division
N7
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
Dauladia-Mongla Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
0.1
0.3
0.1
0.2
0.2
0.1
0.2
0.3
0.2
0.2
0.1
0.1
0.1
0.1
0.2
0.2
7649
3636
3636
3636
3636
3636
3636
3636
3636
3636
3636
3636
3636
3636
6238
6238
National
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 30 of 49
Full Recon 180mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R712
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Tottipur -Machpara Link Road
Million Taka
Km 009.40-009.60
Km 009.70-009.90
Km 009.91-010.81
Km 013.71-013.91
Km 044.71-044.75
Km 044.85-044.95
Km 035.01-035.21
Km 036.91-037.11
Km 041.91-042.11
Km 008.30-008.50
Km 000.00-002.22
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 6238 Regional Full Recon 150mm @ IRI 12
S
0.2 6238 Regional Full Recon 150mm @ IRI 12
S
0.9 6238 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.03 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 3636 Regional Rehab 135mm @ IRI 9-12
S
0.2 3636 Regional Rehab 135mm @ IRI 9-12
S
0.2 3636 Regional Rehab 135mm @ IRI 9-12
S
0.2 6238 Regional Rehab 150mm @ IRI 9-12
S
2.22 1160 Regional Full Recon 110mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 017.88-018.98
Km 019.18-019.88
Km 016.50-017.88
Km 018.98-019.18
Km 006.37-006.40
Km 006.80-006.90
Km 000.00-000.10
Km 001.10-001.30
Km 001.40-001.50
Km 001.70-001.80
Km 002.50-002.60
Km 002.80-002.90
Km 003.60-003.70
Km 004.00-004.10
Km 004.30-004.40
Km 006.20-006.37
Km 000.60-001.00
Km 004.50-005.00
Km 005.20-005.80
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Rajbari Division
NPV /
Fin Cost
(Mill Taka) Cost
4.057
2.43
4.057
1.93
22.730
1.72
3.860
2.40
0.555
4.58
1.734
2.49
2.532
2.50
2.532
2.47
2.440
2.05
3.041
1.97
22.002
0.87
117.524
NPV
9.45
7.48
37.49
9.06
2.46
4.17
6.33
6.25
5.01
5.98
18.10
Sariatpur Division
R860
R860
R860
R860
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
R861
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Mostafapur-Chandpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
Monohar -Shariatpur Road
1.1
0.7
1.38
0.2
0.03
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.17
0.4
0.5
0.6
4887
4887
3019
4887
3750
3750
4885
4885
4885
4885
4885
4885
4885
4885
4885
4885
4885
4885
4885
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Sub-total Sariatpur Division
Total Gopalganj Zone
19.793
12.595
15.544
2.697
0.506
1.650
1.865
3.599
1.799
1.799
1.799
1.822
1.799
1.799
1.799
3.041
5.395
6.461
7.062
92.826
3.25
3.28
1.72
3.78
3.19
1.77
1.78
1.50
2.24
2.31
1.94
1.90
2.19
2.21
2.21
1.90
1.74
3.14
1.58
62.79
40.28
27.02
10.37
1.52
2.75
3.12
5.05
3.77
3.89
3.27
3.23
3.69
3.73
3.73
5.40
9.21
19.88
10.90
4.87
11.96
557.975
Khulna Zone
Bagerhat Division
N7
Dauladia-Mongla Road
Km 224.46-224.56
S
0.1
9684 National Full Recon 180mm @ IRI 12
Appendix-C: Page: 31 of 49
2013
2.515
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
Road Name
No
R772
Bagerhat Town Section
R772
Bagerhat Town Section
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Million Taka
Km 000.00-000.20
Km 000.60-000.63
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 5300 Regional Full Recon 150mm @ IRI 12
S
0.03 5300 Regional Full Recon 150mm @ IRI 12
NPV /
Fin Cost
(Mill Taka) Cost
2013
4.776
1.06
2013
0.716
1.06
8.008
Km 075.38-075.58
Km 076.18-076.48
Km 077.18-077.48
Km 077.78-077.98
Km 078.58-079.46
Km 079.56-079.76
Km 079.86-081.36
Km 081.96-082.06
Km 082.56-082.76
Km 083.66-083.86
Km 084.06-084.36
Km 084.46-084.56
Km 088.06-088.56
Km 090.26-090.36
Km 091.76-091.96
Km 092.46-092.86
Km 096.46-096.56
Km 096.66-097.26
Km 073.98-075.08
Km 081.76-081.86
Km 085.56-085.66
Km 093.66-093.86
Km 095.16-095.46
Km 019.50-019.60
Km 023.80-024.20
Km 024.60-024.80
Km 025.34-025.64
Km 030.64-030.74
Km 031.94-032.34
Km 032.54-032.64
Km 032.94-033.04
Km 033.44-033.54
Km 033.94-034.04
Km 034.44-034.54
Km 035.94-036.14
Km 036.44-036.64
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Sub-total Bagerhat Division
Year
NPV
4.75
0.71
Chuadanga Division
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R747
R747
R747
R747
R747
R747
R747
R747
R747
R747
R747
R747
R747
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
Kushtia -Chuadanga Road
0.2
0.3
0.3
0.2
0.88
0.2
1.5
0.1
0.2
0.2
0.3
0.1
0.5
0.1
0.2
0.4
0.1
0.6
1.1
0.1
0.1
0.2
0.3
0.1
0.4
0.2
0.3
0.1
0.4
0.1
0.1
0.1
0.1
0.1
0.2
0.2
4887
4887
4887
4887
4887
4887
5210
5536
5536
5536
5536
5536
5536
5536
5536
5536
5536
5536
4887
5536
5536
5536
5536
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Appendix-C: Page: 32 of 49
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
3.801
5.634
6.016
5.692
24.904
5.692
36.755
1.799
3.599
3.599
5.398
1.799
8.440
1.636
3.272
6.543
1.636
10.796
15.051
1.349
1.349
2.452
3.678
1.963
7.852
3.926
5.889
1.963
7.852
1.963
1.963
1.963
1.963
1.963
3.926
3.926
3.39
3.08
2.97
1.98
1.81
1.84
1.83
3.80
3.86
3.39
3.77
4.20
3.50
4.45
3.59
3.78
4.44
3.01
2.66
6.11
3.73
4.02
3.83
3.35
3.13
3.24
3.19
3.37
2.63
3.37
3.37
3.71
3.71
3.71
3.56
2.47
12.72
16.83
17.64
11.07
44.36
10.31
64.17
6.41
13.01
11.43
19.05
7.07
27.60
6.78
10.93
23.00
6.76
30.47
39.78
8.10
4.95
9.59
13.73
6.42
23.96
12.42
18.36
6.45
20.17
6.45
6.45
7.11
7.11
7.10
13.66
9.45
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
Road Name
No
R747
Kushtia -Chuadanga Road
R747
Kushtia -Chuadanga Road
R747
Kushtia -Chuadanga Road
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Million Taka
Km 037.44-037.54
Km 041.84-041.94
Km 024.90-025.30
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
NPV /
Fin Cost
(Mill Taka) Cost
2013
1.963
3.41
2013
1.963
3.42
2013
5.885
2.91
217.811
Km 139.32-139.42
Km 139.52-139.82
Km 140.92-141.02
Km 141.42-141.52
Km 141.92-142.12
Km 142.82-143.12
Km 143.22-143.42
Km 143.52-143.72
Km 143.82-144.02
Km 144.72-144.82
Km 150.22-150.32
Km 150.72-150.82
Km 153.06-153.46
Km 153.56-153.66
Km 153.96-154.36
Km 154.46-154.96
Km 188.19-188.29
Km 144.82-145.42
Km 145.52-145.82
Km 146.42-146.62
Km 148.02-148.12
Km 148.12-148.42
Km 148.42-148.62
Km 148.72-148.82
Km 139.42-139.52
Km 145.82-146.42
Km 146.62-148.02
Km 148.82-150.22
Km 024.10-024.40
Km 024.70-024.80
Km 025.30-025.40
Km 026.40-029.40
Km 030.10-030.20
Km 030.40-032.10
Km 032.90-036.63
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Sub-total Chuadanga Division
Year
NPV
6.53
6.56
17.28
Jessore Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N706
N706
N706
N706
N706
N706
N706
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
Jessore -Benapole Road
0.1
0.3
0.1
0.1
0.2
0.3
0.2
0.2
0.2
0.1
0.1
0.1
0.4
0.1
0.4
0.5
0.1
0.6
0.3
0.2
0.1
0.3
0.2
0.1
0.1
0.6
1.4
1.4
0.3
0.1
0.1
3
0.1
1.7
3.73
5636
5636
5636
5636
5636
5636
5636
5636
5636
5636
9061
9061
9061
9061
9061
9061
7406
11451
11451
11451
11451
11451
11451
11451
5636
11451
11451
11451
7314
7314
7314
7314
7314
7314
7314
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 33 of 49
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
2.100
6.478
2.388
2.159
4.318
5.398
3.599
3.775
4.057
1.835
1.871
1.871
7.484
1.871
7.484
9.355
2.507
13.176
6.773
5.216
2.608
7.824
5.216
2.608
1.618
11.451
28.828
25.213
7.858
2.619
2.619
84.646
2.844
48.348
106.335
4.21
4.04
3.56
3.96
3.70
4.47
4.60
3.69
3.80
5.23
5.20
3.98
4.14
4.79
3.25
3.54
4.57
7.68
7.68
6.79
7.07
6.54
6.61
7.07
4.28
7.94
7.37
7.69
3.16
3.23
3.23
2.88
2.69
2.43
2.72
8.84
25.85
8.43
8.45
15.80
23.43
16.09
13.91
15.39
9.34
9.19
7.03
29.26
8.47
22.95
31.32
11.33
95.03
49.05
34.89
18.17
50.45
34.01
18.17
7.18
88.06
214.19
186.48
24.14
8.21
8.21
237.06
7.43
114.23
280.77
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N706
N706
N707
N707
N707
N707
N707
N707
N707
N707
N708
N708
N708
N708
N708
N708
N708
N708
N708
N708
N708
N711
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Jessore -Benapole Road
Jessore -Benapole Road
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Jessore Town Old Section
Benapole Town Old Section
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Chainage
Km 024.80-025.30
Km 025.40-026.40
Km 000.10-001.10
Km 001.20-001.40
Km 001.50-001.60
Km 003.40-003.50
Km 004.30-004.60
Km 004.70-005.70
Km 005.90-006.10
Km 001.10-001.20
Km 002.70-002.90
Km 002.70-002.90
Km 001.90-002.10
Km 000.20-001.10
Km 001.30-001.40
Km 001.60-001.70
Km 001.80-001.87
Km 003.00-003.29
Km 003.00-003.29
Km 001.90-002.10
Km 001.10-001.30
Km 000.00-001.28
Km 012.90-013.00
Km 013.30-013.50
Km 014.10-014.30
Km 016.30-016.40
Km 016.80-017.00
Km 020.80-020.90
Km 021.70-021.90
Km 022.00-022.10
Km 023.10-023.20
Km 025.70-026.40
Km 000.40-000.60
Km 001.20-001.30
Km 003.20-003.30
Km 003.60-003.70
Km 003.80-003.90
Km 005.40-005.50
Km 006.30-006.40
Km 007.20-007.30
Km 011.60-011.80
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.5 7314 National Rehab 180mm @ IRI 9-12
S
1 7314 National Rehab 180mm @ IRI 9-12
S
1 9500 National Full Recon 180mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
L
0.2 3249 National Full Recon 135mm @ IRI 12
R
0.2 3249 National Full Recon 135mm @ IRI 12
L
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.9 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.07 11451 National Full Recon 195mm @ IRI 12
L
0.29 3249 National Rehab 135mm @ IRI 9-12
R
0.29 3249 National Rehab 135mm @ IRI 9-12
R
0.2 11451 National Rehab 195mm @ IRI 9-12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
1.28 4485 National Full Recon 150mm @ IRI 12
S
0.1 3292 Regional Full Recon 135mm @ IRI 12
S
0.2 3292 Regional Full Recon 135mm @ IRI 12
S
0.2 3292 Regional Full Recon 135mm @ IRI 12
S
0.1 3292 Regional Full Recon 135mm @ IRI 12
S
0.2 3292 Regional Full Recon 135mm @ IRI 12
S
0.1 3292 Regional Full Recon 135mm @ IRI 12
S
0.2 3292 Regional Full Recon 135mm @ IRI 12
S
0.1 3292 Regional Full Recon 135mm @ IRI 12
S
0.1 3292 Regional Full Recon 135mm @ IRI 12
S
0.7 3292 Regional Full Recon 135mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 34 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
10.230
3.56
20.459
3.43
23.238
4.37
4.827
7.42
2.413
7.74
2.608
6.64
7.824
6.00
26.081
6.14
5.216
6.65
1.905
8.52
4.455
0.71
4.455
0.66
5.839
4.43
25.575
5.81
2.842
5.65
2.931
5.05
3.363
3.20
5.006
1.14
5.006
1.64
4.610
5.97
4.487
4.38
37.688
0.61
1.634
2.12
3.267
1.84
3.267
1.73
1.634
2.44
3.267
2.08
1.634
2.05
3.267
2.18
1.634
2.41
1.634
2.18
11.436
1.91
3.599
2.43
1.799
3.17
1.799
3.00
1.799
2.59
1.799
3.00
1.799
3.82
1.799
3.82
1.799
3.82
3.599
3.34
NPV
36.06
69.47
98.27
34.21
17.84
17.02
46.15
157.53
34.11
15.73
3.13
2.90
25.58
146.79
15.88
14.63
10.49
5.71
8.22
27.88
19.89
22.32
3.31
5.76
5.42
3.82
6.50
3.20
6.80
3.77
3.41
20.85
8.56
5.59
5.28
4.56
5.29
6.74
6.74
6.74
11.77
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R755
R765
R765
R765
R765
R765
R765
R765
R765
R765
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Jessore -Chuknagar Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
Km 012.10-012.50
Km 012.70-012.80
Km 026.80-026.90
Km 027.33-027.53
Km 028.13-028.23
Km 030.13-030.23
Km 030.53-030.63
Km 030.73-030.83
Km 032.33-032.43
Km 033.23-033.33
Km 034.13-034.23
Km 014.40-015.20
Km 018.70-018.80
Km 026.50-026.80
Km 005.50-006.30
Km 012.50-012.70
Km 030.23-030.53
Km 032.43-033.23
Km 001.10-001.50
Km 007.30-007.50
Km 010.60-010.70
Km 010.90-011.20
Km 011.60-011.80
Km 012.70-012.90
Km 013.20-013.30
Km 013.70-013.80
Km 010.40-010.50
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.8 3292 Regional Rehab 135mm @ IRI 9-12
S
0.1 3292 Regional Rehab 135mm @ IRI 9-12
S
0.3 3292 Regional Rehab 135mm @ IRI 9-12
S
0.8 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.8 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 129.72-130.22
Km 135.52-135.92
Km 136.62-136.92
Km 112.62-112.72
Km 114.12-114.42
Km 114.82-115.02
Km 116.12-116.22
Km 116.82-116.92
Km 117.22-117.32
Km 117.72-118.02
Km 119.62-119.82
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Jessore Division
NPV /
Fin Cost
(Mill Taka) Cost
7.197
3.26
1.799
3.61
1.799
2.77
3.599
3.00
1.799
3.48
1.799
3.57
1.799
3.55
1.799
3.56
1.799
3.48
1.799
3.44
1.799
3.48
10.127
1.64
1.266
4.07
3.798
3.53
10.789
4.07
2.697
3.31
4.046
2.34
10.789
2.16
7.197
3.10
3.599
3.56
1.799
3.56
5.398
3.23
3.599
3.30
3.599
3.13
1.799
3.62
1.799
3.63
1.349
3.35
798.520
NPV
23.03
6.36
4.89
10.59
6.13
6.29
6.26
6.28
6.13
6.06
6.13
16.48
5.12
13.32
44.12
8.97
9.51
23.40
21.79
12.51
6.26
17.00
11.59
10.98
6.36
6.37
4.60
Jhenaidah Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
0.5
0.4
0.3
0.1
0.3
0.2
0.1
0.1
0.1
0.3
0.2
5636
5636
5636
6605
6605
6605
6605
6605
6605
6605
6605
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 35 of 49
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
10.142
7.590
5.692
2.058
6.174
4.116
2.170
2.432
2.432
7.297
4.640
4.21
4.63
4.67
4.71
4.18
4.44
4.66
3.95
3.95
3.70
4.12
42.66
35.09
26.59
9.17
24.41
17.29
9.81
9.40
9.40
26.46
18.68
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N703
N703
N703
N704
N704
N704
N704
N704
N704
N704
N704
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R745
R748
R748
R748
R748
R748
R748
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jhenaidah Town Old Section
Jhenaidah Town Old Section
Jhenaidah Town Old Section
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chainage
Km 121.22-121.32
Km 104.40-104.42
Km 104.42-104.82
Km 105.32-105.52
Km 106.82-107.02
Km 107.12-107.22
Km 108.12-108.22
Km 129.42-129.72
Km 110.32-110.72
Km 105.52-106.82
Km 107.02-107.12
Km 003.30-003.40
Km 000.10-001.90
Km 002.30-003.30
Km 000.10-000.20
Km 000.40-001.20
Km 002.60-002.80
Km 007.10-007.20
Km 007.50-007.70
Km 007.90-008.00
Km 012.90-013.20
Km 020.80-020.82
Km 099.56-099.66
Km 101.26-101.96
Km 103.76-103.86
Km 104.36-104.46
Km 105.36-105.56
Km 107.26-107.36
Km 110.46-110.56
Km 110.66-110.86
Km 112.46-112.56
Km 114.66-115.06
Km 115.86-116.82
Km 114.26-114.36
Km 114.46-114.56
Km 044.40-044.50
Km 045.00-045.10
Km 049.50-049.60
Km 052.30-052.50
Km 053.00-053.20
Km 053.30-053.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 6605 National Full Recon 180mm @ IRI 12
S
0.01 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 5636 National Rehab 150mm @ IRI 9-12
S
0.4 6605 National Rehab 180mm @ IRI 9-12
S
1.3 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
1.8 4905 National Rehab 150mm @ IRI 9-12
S
1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 9061 National Full Recon 180mm @ IRI 12
S
0.8 9061 National Full Recon 180mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.02 11451 National Full Recon 195mm @ IRI 12
S
0.1 5536 Regional Full Recon 150mm @ IRI 12
S
0.7 5303 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.96 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 5607 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 36 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.432
3.91
0.341
5.94
11.367
6.03
5.621
6.10
5.068
6.84
2.530
7.29
2.530
7.29
4.561
4.76
7.599
3.47
22.454
7.82
1.998
7.18
2.336
7.53
24.276
3.14
18.440
5.06
2.058
4.32
17.034
3.58
5.683
5.74
2.842
5.71
5.707
5.81
3.192
5.08
8.525
5.68
0.568
5.71
1.799
3.80
12.595
3.19
1.799
3.38
1.799
3.12
3.599
2.35
1.799
3.44
1.799
2.75
3.599
3.31
1.799
3.54
7.197
3.20
18.636
2.78
1.349
3.72
1.349
3.54
1.806
3.74
2.028
3.16
2.028
3.19
3.599
3.30
3.599
2.72
1.799
3.52
NPV
9.32
1.98
67.17
33.58
33.98
18.10
18.09
22.58
26.42
171.54
14.37
16.68
74.12
89.78
8.44
57.90
31.92
15.90
32.49
15.88
47.44
3.18
6.41
38.28
5.97
5.50
8.29
6.07
4.86
11.69
6.25
22.57
51.21
5.04
4.80
6.33
6.29
6.34
11.64
9.59
6.22
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R748
R748
R748
R748
R748
R748
R748
R748
R748
R748
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Chuadanga-Kaliganj Road
Million Taka
Km 056.90-057.10
Km 058.70-058.80
Km 064.20-064.50
Km 064.70-064.80
Km 065.00-065.10
Km 065.30-065.80
Km 044.50-045.00
Km 051.40-051.80
Km 055.60-055.70
Km 056.30-056.40
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 4887 Regional Rehab 150mm @ IRI 9-12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 189.49-189.59
Km 190.39-190.59
Km 191.19-191.39
Km 191.89-192.19
Km 221.86-221.96
Km 223.06-223.26
Km 223.56-223.66
Km 224.46-224.46
Km 213.88-215.46
Km 213.88-215.46
Km 216.56-217.26
Km 217.56-217.66
Km 219.36-219.56
Km 220.06-220.66
Km 220.76-220.86
Km 219.56-220.06
Km 220.66-220.76
Km 000.10-000.20
Km 003.10-003.20
Km 005.00-005.10
Km 006.30-006.50
Km 013.80-013.90
Km 016.10-016.20
Km 016.30-016.40
Km 006.80-006.90
Km 004.60-005.50
Km 006.70-006.80
Km 006.90-007.10
S
S
S
S
S
S
S
S
L
R
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Jhenaidah Division
NPV /
Fin Cost
(Mill Taka) Cost
3.795
3.21
1.897
3.52
5.692
3.24
1.897
3.18
1.897
3.53
9.471
3.19
7.602
2.57
6.081
2.49
1.422
2.76
1.422
2.80
327.063
NPV
11.91
6.54
18.05
5.90
6.55
29.55
19.53
15.14
3.93
3.99
Khulna Division
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N709
N709
N709
N709
N709
N709
N709
N709
R760
R760
R760
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna City By-Pass Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
0.1
0.2
0.2
0.3
0.1
0.2
0.1
0
1.58
1.58
0.7
0.1
0.2
0.6
0.1
0.5
0.1
0.1
0.1
0.1
0.2
0.1
0.1
0.1
0.1
0.9
0.1
0.2
7406
7406
7406
7406
9684
9684
9684
9684
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
3206
3206
3206
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Appendix-C: Page: 37 of 49
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
2.507
4.790
4.790
7.409
2.619
5.239
2.619
0.105
61.544
61.544
19.892
2.725
5.450
16.349
2.725
10.757
2.151
2.842
2.842
2.842
5.683
2.842
2.842
2.842
2.244
16.040
1.782
3.564
4.49
4.73
5.00
4.68
4.60
4.48
4.17
9.54
3.91
3.91
5.78
6.14
6.40
6.30
6.53
5.96
6.69
5.80
5.07
5.75
5.54
5.91
5.92
5.92
6.55
2.00
2.00
1.62
11.14
22.33
23.61
34.29
11.77
22.92
10.66
0.98
234.81
234.81
112.51
16.34
34.05
100.66
17.39
63.87
14.35
16.30
14.24
16.16
31.15
16.61
16.64
16.64
14.88
30.66
3.42
5.53
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Million Taka
Km 007.80-007.90
Km 008.00-008.40
Km 008.80-009.00
Km 009.60-009.70
Km 010.30-010.90
Km 011.50-011.90
Km 013.70-013.80
Km 014.40-014.50
Km 000.30-000.40
Km 001.20-001.60
Km 001.90-003.10
Km 003.40-004.30
Km 016.80-017.70
Km 018.90-020.00
Km 020.30-021.70
Km 027.80-027.90
Km 028.60-028.70
Km 029.00-029.10
Km 030.50-030.60
Km 008.40-008.80
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 3206 Regional Full Recon 135mm @ IRI 12
S
0.4 3206 Regional Full Recon 135mm @ IRI 12
S
0.2 3206 Regional Full Recon 135mm @ IRI 12
S
0.1 3206 Regional Full Recon 135mm @ IRI 12
S
0.6 3206 Regional Full Recon 135mm @ IRI 12
S
0.4 3206 Regional Full Recon 135mm @ IRI 12
S
0.1 3206 Regional Full Recon 135mm @ IRI 12
S
0.1 3206 Regional Full Recon 135mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
1.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.9 4887 Regional Full Recon 150mm @ IRI 12
S
0.9 4887 Regional Full Recon 150mm @ IRI 12
S
1.1 4887 Regional Full Recon 150mm @ IRI 12
S
1.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 3206 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 020.82-021.10
Km 021.40-021.60
Km 023.40-023.50
Km 024.10-024.30
Km 024.50-024.80
Km 025.90-026.30
Km 030.40-030.50
Km 030.70-031.00
Km 034.10-034.30
Km 035.30-035.40
Km 036.60-036.90
Km 038.50-038.60
Km 038.70-038.80
Km 040.30-040.40
Km 040.80-040.90
Km 041.50-042.60
Km 042.90-043.32
Km 044.12-045.02
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Khulna Division
NPV /
Fin Cost
(Mill Taka) Cost
1.782
2.06
7.129
1.61
3.564
1.53
1.782
2.00
10.693
1.36
7.129
1.59
1.782
2.75
1.782
1.74
2.028
2.86
8.113
2.44
27.324
2.42
19.079
3.19
17.666
2.17
21.592
2.97
27.481
1.90
1.963
2.92
1.963
2.92
1.963
3.70
1.963
3.50
5.524
1.80
431.881
NPV
3.51
10.95
5.22
3.41
13.96
10.84
4.69
2.96
5.69
19.39
64.76
59.57
37.54
62.95
51.13
5.62
5.62
7.12
6.73
9.90
Kushtia Division
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
N704
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
0.28
0.2
0.1
0.2
0.3
0.4
0.1
0.3
0.2
0.1
0.3
0.1
0.1
0.1
0.1
1.1
0.42
0.9
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
11451
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Appendix-C: Page: 38 of 49
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
Full Recon 195mm @ IRI 12
7.957
5.683
2.842
5.683
8.525
11.367
2.842
8.525
5.683
2.842
8.525
2.842
2.842
2.842
2.842
31.258
11.992
35.665
5.57
5.68
5.16
5.66
5.53
5.52
4.26
4.21
5.10
5.69
5.28
5.61
5.75
6.04
6.04
6.03
5.89
4.01
43.43
31.63
14.35
31.52
46.15
61.43
11.84
35.10
28.40
15.84
44.11
15.61
15.99
16.81
16.81
184.64
69.15
139.56
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N704
N704
N704
N704
N704
N704
N704
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R710
R713
R713
R713
R713
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Jhenaidah-Dasuria Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Ahaladipur-Kushtia Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Charikoal -Shilahdah Link Road
Million Taka
Km 045.18-045.38
Km 045.48-046.48
Km 066.66-070.40
Km 040.90-041.50
Km 042.60-042.90
Km 043.32-044.12
Km 045.02-045.18
Km 048.25-048.35
Km 048.55-048.75
Km 051.45-051.75
Km 051.95-052.15
Km 052.55-052.65
Km 052.85-052.95
Km 053.75-053.95
Km 054.25-054.45
Km 056.05-056.25
Km 057.95-058.15
Km 058.55-058.75
Km 060.55-061.35
Km 064.15-064.25
Km 065.65-065.85
Km 066.65-066.85
Km 067.95-068.05
Km 068.15-068.25
Km 068.75-068.85
Km 070.15-070.45
Km 070.65-070.95
Km 058.15-058.55
Km 058.75-059.45
Km 059.45-059.95
Km 062.95-063.25
Km 067.15-067.65
Km 000.10-000.70
Km 000.90-001.40
Km 001.50-004.50
Km 004.90-005.41
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
1 11451 National Full Recon 195mm @ IRI 12
S
3.74 11451 National Full Recon 195mm @ IRI 12
S
0.6 11451 National Rehab 195mm @ IRI 9-12
S
0.3 11451 National Rehab 195mm @ IRI 9-12
S
0.8 11451 National Rehab 195mm @ IRI 9-12
S
0.16 11451 National Rehab 195mm @ IRI 9-12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.8 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4484 Regional Full Recon 150mm @ IRI 12
S
0.2 4484 Regional Full Recon 150mm @ IRI 12
S
0.2 4484 Regional Full Recon 150mm @ IRI 12
S
0.1 4484 Regional Full Recon 150mm @ IRI 12
S
0.1 4484 Regional Full Recon 150mm @ IRI 12
S
0.1 4484 Regional Full Recon 150mm @ IRI 12
S
0.3 4484 Regional Full Recon 150mm @ IRI 12
S
0.3 4484 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Rehab 150mm @ IRI 9-12
S
0.7 4887 Regional Rehab 150mm @ IRI 9-12
S
0.5 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4101 Regional Rehab 150mm @ IRI 9-12
S
0.5 4484 Regional Rehab 150mm @ IRI 9-12
S
0.6 1416 Regional Full Recon 110mm @ IRI 12
S
0.5 1416 Regional Full Recon 110mm @ IRI 12
S
3 1416 Regional Full Recon 110mm @ IRI 12
S
0.51 1416 Regional Rehab 110mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 082.91-083.21
Km 085.51-085.61
S
S
2013
2013
Chainage
Year
Sub-total Kushtia Division
NPV /
Fin Cost
(Mill Taka) Cost
9.343
3.37
37.915
4.43
108.375
5.69
13.461
6.46
6.731
6.62
23.849
4.01
5.975
3.56
1.799
3.59
3.599
3.37
5.398
2.22
3.599
3.20
1.799
3.43
1.799
3.38
3.599
3.15
3.599
3.10
3.599
3.43
3.599
2.92
3.599
3.36
14.395
2.78
1.799
2.96
3.599
2.43
3.599
2.37
1.799
2.98
1.799
2.98
1.799
2.79
5.398
2.42
5.398
2.49
5.395
2.97
9.441
2.96
6.743
3.41
4.046
2.57
6.743
2.46
5.995
0.80
4.996
0.81
29.975
0.76
3.191
1.97
518.500
NPV
30.70
164.03
604.30
86.94
44.60
95.43
21.19
6.33
11.90
11.74
11.29
6.05
5.97
11.12
10.95
12.10
10.29
11.86
39.19
5.07
8.31
7.88
5.10
5.10
4.78
12.20
12.42
16.03
28.09
23.10
10.33
15.78
4.54
3.84
21.44
6.05
Magura Division
N7
N7
Dauladia-Mongla Road
Dauladia-Mongla Road
0.3
0.1
7850 National Full Recon 180mm @ IRI 12
7850 National Full Recon 180mm @ IRI 12
Appendix-C: Page: 39 of 49
8.195
2.732
3.66
3.60
29.28
9.62
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N7
N702
N702
N702
N702
N702
N702
N702
N702
N702
N702
N702
N702
R720
R720
R720
R720
R720
R720
R720
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Dauladia-Mongla Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Jessore -Magura Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Chainage
Km 087.21-087.61
Km 089.51-089.61
Km 089.71-090.11
Km 092.21-092.31
Km 097.51-097.61
Km 097.91-098.01
Km 102.12-103.62
Km 069.32-069.42
Km 070.32-070.42
Km 071.12-071.32
Km 073.92-074.02
Km 074.02-074.62
Km 074.62-075.31
Km 075.41-076.11
Km 076.61-076.81
Km 077.31-077.51
Km 103.62-104.40
Km 100.31-100.71
Km 101.21-102.02
Km 069.02-069.32
Km 070.42-071.12
Km 071.32-073.92
Km 025.79-026.19
Km 026.79-028.29
Km 031.69-034.49
Km 035.79-035.89
Km 038.59-040.49
Km 042.79-042.99
Km 043.49-043.68
Km 021.98-025.79
Km 029.49-031.69
Km 034.49-035.79
Km 040.49-042.79
Km 042.99-043.49
Km 000.10-000.40
Km 000.80-001.00
Km 007.40-007.50
Km 008.30-008.40
Km 011.20-011.30
Km 015.90-016.10
Km 018.50-018.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.4 7850 National Full Recon 180mm @ IRI 12
S
0.1 7850 National Full Recon 180mm @ IRI 12
S
0.4 7850 National Full Recon 180mm @ IRI 12
S
0.1 7850 National Full Recon 180mm @ IRI 12
S
0.1 7850 National Full Recon 180mm @ IRI 12
S
0.1 7850 National Full Recon 180mm @ IRI 12
S
1.5 7850 National Full Recon 180mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.6 11451 National Full Recon 195mm @ IRI 12
S
0.68 11451 National Full Recon 195mm @ IRI 12
S
0.7 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.79 11451 National Full Recon 195mm @ IRI 12
S
0.4 7850 National Rehab 180mm @ IRI 9-12
S
0.81 7850 National Rehab 180mm @ IRI 9-12
S
0.3 11451 National Rehab 195mm @ IRI 9-12
S
0.7 11451 National Rehab 195mm @ IRI 9-12
S
2.6 11451 National Rehab 195mm @ IRI 9-12
S
0.4 3649 National Full Recon 135mm @ IRI 12
S
1.5 3649 National Full Recon 135mm @ IRI 12
S
2.8 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
1.9 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.19 11451 National Full Recon 195mm @ IRI 12
S
3.81 3649 National Rehab 135mm @ IRI 9-12
S
2.2 11451 National Rehab 195mm @ IRI 9-12
S
1.3 11451 National Rehab 195mm @ IRI 9-12
S
2.3 11451 National Rehab 195mm @ IRI 9-12
S
0.5 11451 National Rehab 195mm @ IRI 9-12
S
0.3 1047 Regional Full Recon 110mm @ IRI 12
S
0.2 1047 Regional Full Recon 110mm @ IRI 12
S
0.1 1047 Regional Full Recon 110mm @ IRI 12
S
0.1 1047 Regional Full Recon 110mm @ IRI 12
S
0.1 1047 Regional Full Recon 110mm @ IRI 12
S
0.2 1047 Regional Full Recon 110mm @ IRI 12
S
0.1 1047 Regional Full Recon 110mm @ IRI 12
Appendix-C: Page: 40 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
10.927
3.05
2.732
3.72
10.927
3.32
2.732
2.61
2.732
3.70
2.732
3.77
40.976
3.30
2.842
5.98
2.842
6.03
5.683
6.03
2.842
6.03
17.050
5.76
20.236
5.75
25.342
3.92
9.109
3.17
9.109
2.39
22.392
6.03
8.534
3.40
17.282
2.72
6.731
4.80
15.705
6.76
58.331
6.47
8.673
1.53
32.525
2.71
79.567
5.50
2.842
5.52
55.397
4.86
5.216
6.55
6.951
4.27
63.979
1.75
49.357
3.84
29.166
6.61
53.721
4.32
10.419
5.93
4.456
0.22
2.971
0.27
1.485
0.24
1.485
0.29
1.485
0.26
1.998
0.62
0.999
0.70
NPV
32.51
9.94
35.46
6.97
9.87
10.06
132.21
16.64
16.79
33.59
16.79
96.21
113.97
96.95
28.20
21.24
132.33
28.99
46.98
32.29
106.18
377.29
13.17
87.76
432.53
15.51
265.97
33.59
29.04
114.17
192.09
195.15
235.11
62.33
0.92
0.76
0.34
0.40
0.36
1.17
0.66
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
R720
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Million Taka
Km 024.10-024.30
Km 024.80-025.10
Km 028.10-028.30
Km 032.30-032.40
Km 002.40-002.80
Km 008.50-008.80
Km 009.60-010.20
Km 010.70-011.10
Km 025.50-025.90
Km 027.90-028.00
Km 032.50-033.00
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.2 1047 Regional Full Recon 110mm @ IRI 12
S
0.3 1047 Regional Full Recon 110mm @ IRI 12
S
0.2 1047 Regional Full Recon 110mm @ IRI 12
S
0.1 1047 Regional Full Recon 110mm @ IRI 12
S
0.4 1047 Regional Rehab 110mm @ IRI 9-12
S
0.3 1047 Regional Rehab 110mm @ IRI 9-12
S
0.6 1047 Regional Rehab 110mm @ IRI 9-12
S
0.4 1047 Regional Rehab 110mm @ IRI 9-12
S
0.4 1047 Regional Rehab 110mm @ IRI 9-12
S
0.1 1047 Regional Rehab 110mm @ IRI 9-12
S
0.5 1047 Regional Rehab 110mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Km 062.68-062.78
Km 064.38-064.48
Km 064.68-064.88
Km 068.88-069.08
Km 069.68-069.78
Km 069.78-070.58
Km 070.58-070.88
Km 062.08-062.58
Km 000.10-000.70
Km 011.80-011.90
S
S
S
S
S
S
S
S
S
S
0.1
0.1
0.2
0.2
0.1
0.8
0.3
0.5
0.6
0.1
4283
4283
4283
4887
4887
4887
4887
4283
2154
2154
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.799
1.799
3.599
3.599
1.799
14.395
5.398
6.743
18.178
1.634
58.943
2.73
2.75
2.33
2.96
3.51
2.44
3.23
2.33
0.03
0.45
4.60
4.63
7.83
10.44
6.18
34.42
17.11
14.86
0.59
0.69
Km 037.70-038.50
Km 038.70-039.30
Km 039.40-040.60
Km 041.30-043.40
Km 043.60-046.60
Km 033.00-036.60
S
S
S
S
S
S
0.8
0.6
1.2
2.1
3
3.6
1047
1047
1047
1047
1047
1047
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
Rehab 110mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
11.882
8.912
17.823
31.191
44.558
37.246
151.611
0.25
0.27
0.25
0.27
0.27
0.60
2.85
2.28
4.15
7.86
11.31
21.36
Km 000.10-000.40
Km 000.40-000.60
Km 000.60-002.30
Km 002.30-002.50
S
S
S
S
0.3
0.2
1.7
0.2
9061
9061
9061
9061
National
National
National
National
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
2013
2013
2013
2013
6.174
4.116
34.989
4.116
4.10
4.11
3.91
4.11
23.84
15.95
128.96
15.95
Chainage
Year
Sub-total Magura Division
NPV /
Fin Cost
(Mill Taka) Cost
2.971
0.24
2.998
0.60
1.998
0.64
1.485
0.28
4.138
0.70
3.104
0.64
6.208
0.64
4.138
0.68
2.784
1.48
0.696
1.63
5.173
0.62
757.098
NPV
0.68
1.69
1.20
0.40
2.81
1.93
3.84
2.70
3.96
1.09
3.11
Meherpur Division
R745
R745
R745
R745
R745
R745
R745
R745
R746
R746
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Kushtia -Jhenaidah Road
Meherpur-Mujibnagar Road
Meherpur-Mujibnagar Road
Sub-total Meherpur Division
Narail Division
R720
R720
R720
R720
R720
R720
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Magura-Narail Road
Sub-total Narail Division
Satkhira Division
N715
N715
N715
N715
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Appendix-C: Page: 41 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N715
N715
N715
N715
N715
N715
N715
N715
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R760
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
R765
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Benapole Town Old Section
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Chainage
Km 002.50-002.60
Km 002.60-003.50
Km 003.50-003.60
Km 004.40-004.80
Km 005.00-005.30
Km 005.40-006.10
Km 007.20-007.30
Km 004.00-004.20
Km 037.36-037.56
Km 038.56-038.76
Km 040.46-040.56
Km 040.76-040.86
Km 042.16-042.26
Km 043.26-043.36
Km 043.66-044.06
Km 044.76-045.46
Km 049.56-051.26
Km 053.76-054.16
Km 055.36-055.56
Km 055.66-056.06
Km 056.96-057.36
Km 058.16-058.26
Km 058.46-058.75
Km 034.87-035.00
Km 037.20-037.30
Km 017.30-017.40
Km 018.70-018.80
Km 019.50-019.60
Km 021.70-021.90
Km 022.50-022.60
Km 022.80-022.90
Km 023.30-023.40
Km 024.40-024.69
Km 024.79-024.89
Km 024.99-025.09
Km 025.19-025.29
Km 025.79-025.89
Km 026.09-026.19
Km 026.29-026.49
Km 029.39-029.49
Km 030.39-030.89
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 9061 National Full Recon 180mm @ IRI 12
S
0.9 9061 National Full Recon 180mm @ IRI 12
S
0.1 9061 National Full Recon 180mm @ IRI 12
S
0.4 9061 National Full Recon 180mm @ IRI 12
S
0.3 9061 National Full Recon 180mm @ IRI 12
S
0.7 9061 National Full Recon 180mm @ IRI 12
S
0.1 9061 National Full Recon 180mm @ IRI 12
S
0.2 9061 National Rehab 180mm @ IRI 9-12
S
0.2 4116 Regional Full Recon 150mm @ IRI 12
S
0.2 4116 Regional Full Recon 150mm @ IRI 12
S
0.1 4116 Regional Full Recon 150mm @ IRI 12
S
0.1 4116 Regional Full Recon 150mm @ IRI 12
S
0.1 4116 Regional Full Recon 150mm @ IRI 12
S
0.1 4116 Regional Full Recon 150mm @ IRI 12
S
0.4 4116 Regional Full Recon 150mm @ IRI 12
S
0.7 4887 Regional Full Recon 150mm @ IRI 12
S
1.7 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.4 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.29 4887 Regional Full Recon 150mm @ IRI 12
S
0.13 4116 Regional Rehab 150mm @ IRI 9-12
S
0.1 4116 Regional Rehab 150mm @ IRI 9-12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.28 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.5 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 42 of 49
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
(Mill Taka) Cost
2.058
4.55
18.523
3.86
2.058
4.20
8.233
3.53
6.174
3.71
14.407
3.63
2.058
3.60
3.215
3.68
3.926
2.01
3.926
2.24
1.963
2.05
1.963
3.27
1.963
3.25
1.963
2.06
7.852
1.93
13.740
3.00
33.369
1.98
7.852
2.81
3.926
2.69
7.852
2.12
7.852
2.43
1.963
2.64
5.791
2.88
1.913
1.94
1.471
3.02
1.799
3.35
1.799
3.88
1.799
3.88
3.599
3.40
1.799
3.14
1.799
3.64
1.799
3.66
5.128
3.52
1.799
3.63
1.799
3.81
1.799
3.82
1.799
3.84
1.799
3.85
3.599
3.44
1.799
3.39
8.997
3.13
NPV
8.83
67.34
8.15
27.35
21.56
49.25
6.98
11.37
7.46
8.32
3.81
6.07
6.03
3.82
14.35
40.39
64.85
21.60
10.35
16.28
18.70
5.09
16.34
3.62
4.35
5.89
6.81
6.81
11.95
5.52
6.40
6.42
17.60
6.37
6.70
6.71
6.74
6.77
12.08
5.96
27.52
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R765
R765
R765
R765
R765
R765
R765
R765
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Khulna-Satkhira Road
Chainage
Km 030.99-031.09
Km 033.79-033.89
Km 040.79-041.09
Km 041.19-041.29
Km 025.89-026.09
Km 029.69-029.89
Km 029.99-030.29
Km 039.99-040.69
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.3 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 4887 Regional Rehab 150mm @ IRI 9-12
S
0.7 4887 Regional Rehab 150mm @ IRI 9-12
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
Sub-total Satkhira Division
Total Khulna Zone
NPV /
Fin Cost
(Mill Taka) Cost
1.799
3.53
1.799
3.37
5.398
3.26
1.799
3.61
2.697
4.17
2.697
3.02
4.046
2.40
9.441
3.14
287.996
NPV
6.19
5.92
17.20
6.34
11.43
8.29
9.87
30.13
3557.432
Rajshahi Zone
Naogaon Division
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R547
R549
R549
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Badalgachhi-Joypurhat Road
Badalgachhi-Joypurhat Road
Km 038.69-038.99
Km 015.96-016.97
Km 019.09-019.19
Km 031.99-032.69
Km 049.03-049.33
Km 052.83-053.13
Km 053.93-054.43
Km 017.17-017.27
Km 025.19-026.69
Km 030.29-030.99
Km 027.39-028.49
Km 032.69-034.89
Km 007.80-010.30
Km 012.35-015.05
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.3
1.01
0.1
0.7
0.3
0.3
0.5
0.1
1.5
0.7
1.1
2.2
2.5
2.7
1661
3019
3019
3019
1661
1661
1661
3019
3019
3019
4887
4887
1779
1779
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 110mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Full Recon 110mm @ IRI 12
Full Recon 110mm @ IRI 12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.917
12.108
1.084
7.485
2.032
3.104
5.615
0.840
12.428
5.800
12.596
27.998
24.709
26.686
145.403
1.40
1.70
2.18
2.17
2.13
0.87
0.73
4.39
2.74
2.79
4.88
2.86
1.45
1.38
3.86
19.41
2.24
15.43
4.32
2.72
4.12
3.54
32.62
15.51
59.52
81.50
34.33
35.24
Km 032.00-036.76
Km 038.96-039.46
Km 041.46-041.86
Km 053.36-054.16
Km 056.46-056.76
Km 036.76-038.96
Km 039.46-041.46
Km 045.26-045.96
Km 048.06-051.56
S
S
S
S
S
S
S
S
S
4.76
0.5
0.4
0.8
0.3
2.2
2
0.7
3.5
9061
9061
9061
6500
9061
9061
9061
9061
6500
National
National
National
National
National
National
National
National
National
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
99.058
10.291
8.233
16.465
6.174
35.365
32.150
11.252
56.262
2.86
3.85
3.94
3.08
3.69
4.43
4.04
3.11
3.48
269.17
37.66
30.84
47.57
21.62
150.38
124.85
33.56
185.09
Sub-total Naogaon Division
Natore Division
N502
N502
N502
N502
N502
N502
N502
N502
N502
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Appendix-C: Page: 43 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N502
N502
N502
N502
N502
N6
R548
R548
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Kashinathpur-Natore-Rajshahi Road
Naogaon-Atrai-Natore Road
Naogaon-Atrai-Natore Road
Million Taka
Km 052.66-053.16
Km 054.16-055.66
Km 055.66-055.96
Km 056.16-056.46
Km 043.36-044.26
Km 103.92-104.02
Km 038.99-039.29
Km 035.89-037.29
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.5 6500 National Rehab 180mm @ IRI 9-12
S
1.5 6500 National Rehab 180mm @ IRI 9-12
S
0.3 6500 National Rehab 180mm @ IRI 9-12
S
0.3 9061 National Rehab 180mm @ IRI 9-12
S
0.9 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.3 3019 Regional Full Recon 135mm @ IRI 12
S
1.4 3019 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
Km 083.32-083.37
Km 082.82-083.12
Km 089.57-089.77
Km 091.67-091.87
Km 098.47-098.57
Km 099.07-099.27
S
S
S
S
S
S
0.05
0.3
0.2
0.2
0.1
0.2
3019
3019
3019
3019
3019
3019
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 135mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
0.561
2.555
1.703
1.703
0.852
1.703
9.076
4.76
3.11
4.13
3.85
4.07
3.01
2.53
7.60
6.74
6.28
3.32
4.91
Km 101.80-102.00
Km 000.00-000.20
Km 002.30-002.40
Km 000.40-000.50
Km 004.60-004.70
Km 040.35-040.45
Km 048.55-048.65
Km 000.00-000.10
Km 004.30-004.50
Km 004.60-005.20
Km 009.20-009.30
Km 005.20-005.70
Km 006.60-008.30
Km 009.40-009.46
Km 037.07-038.07
Km 023.34-026.44
Km 026.54-027.24
Km 027.44-027.74
Km 034.87-035.97
Km 036.17-037.07
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.2
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.2
0.6
0.1
0.5
1.7
0.06
1
3.1
0.7
0.3
1.1
0.9
1550
2162
2162
2162
2162
6210
11451
2897
2897
2897
11451
11451
11451
11451
3019
1096
1096
1096
1096
1096
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
Rehab 120mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Full Recon 135mm @ IRI 12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
Rehab 110mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.893
4.349
3.208
1.680
1.765
2.134
2.244
1.637
3.267
10.265
2.803
11.064
37.617
2.287
10.990
21.576
4.872
2.088
7.656
6.264
0.96
0.58
0.29
0.94
0.88
2.30
5.04
1.66
2.80
2.40
5.69
4.29
4.46
2.89
1.66
1.29
1.42
1.34
1.23
1.36
2.82
2.37
0.86
1.55
1.52
4.79
11.32
2.55
8.61
23.49
15.61
47.44
168.00
6.58
17.49
27.85
6.92
2.79
9.46
8.50
Chainage
Year
Sub-total Natore Division
NPV /
Fin Cost
(Mill Taka) Cost
8.037
3.12
24.112
3.94
4.822
4.29
4.822
4.48
19.638
4.12
2.244
4.42
3.564
1.56
12.889
1.89
355.380
NPV
23.72
89.76
19.57
20.75
81.85
9.93
5.38
24.47
Nawabganj Division
R547
R547
R547
R547
R547
R547
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Naogaon-Badalgachhi-Rohonpur
Sub-total Nawabganj Division
Pabna Division
N5
N504
N504
N504
N504
N6
N6
N705
N705
N705
N705
N705
N705
N705
R601
R601
R601
R601
R601
R601
Dhaka -Utholi-Banglabandh Road
Nagarbari -Kashinathpur Road
Nagarbari -Kashinathpur Road
Nagarbari -Kashinathpur Road
Nagarbari -Kashinathpur Road
Kashinathpur-Natore-Rajshahi Road
Kashinathpur-Natore-Rajshahi Road
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Paksey -Iswardi-Dasuria
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Appendix-C: Page: 44 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R601
R601
R602
R603
R604
R604
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Pabna-Natakhola Ferry Ghat Road
Pabna-Natakhola Ferry Ghat Road
Nazirganj -Ferry Ghat Road
Pabna-Paksey (EPZ) Road
Tebunia-Hamkuria Road
Tebunia-Hamkuria Road
Million Taka
Km 038.97-039.67
Km 042.77-045.87
Km 000.60-000.80
Km 007.60-007.70
Km 009.70-009.80
Km 019.50-019.60
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.7 3019 Regional Rehab 135mm @ IRI 9-12
S
3.1 3019 Regional Rehab 135mm @ IRI 9-12
S
0.2 1178 Regional Full Recon 110mm @ IRI 12
S
0.1 3297 Regional Rehab 135mm @ IRI 9-12
S
0.1 3778 Regional Rehab 135mm @ IRI 9-12
S
0.1 4887 Regional Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
Km 124.98-125.08
Km 017.20-017.60
Km 000.10-002.30
Km 011.40-011.90
Km 012.30-012.40
Km 012.50-012.60
Km 030.12-030.32
Km 028.30-028.40
Km 029.52-029.82
Km 122.21-122.31
Km 146.71-147.11
Km 147.11-150.51
Km 150.51-161.37
S
S
S
S
S
S
S
S
S
S
S
S
S
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Chainage
Year
Sub-total Pabna Division
NPV /
Fin Cost
(Mill Taka) Cost
5.961
3.34
26.398
2.49
1.944
0.91
1.381
1.86
1.381
2.29
1.471
3.70
179.195
NPV
19.28
63.55
1.68
2.45
3.10
5.44
Rajshahi Division
N6
N603
N603
R685
R685
R685
R685
R685
R685
N5
N5
N5
N5
Kashinathpur-Natore-Rajshahi Road
Rajshahi Town By-Pass Road
Rajshahi Town By-Pass Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Rajshahi -Chowmasia Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
0.1
0.4
2.2
0.5
0.1
0.1
0.2
0.1
0.3
0.1
0.4
3.4
10.86
7109
11451
3802
6330
6330
6330
4887
4887
4887
11451
11451
11451
11451
National
National
National
Regional
Regional
Regional
Regional
Regional
Regional
National
National
National
National
Rehab 180mm @ IRI 9-12
Full Recon 195mm @ IRI 12
Rehab 135mm @ IRI 9-12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Full Recon 195mm @ IRI 12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Sub-total Sirajganj Division
Total Rajshahi Zone
2.134
11.367
36.962
8.997
1.799
1.799
3.599
1.349
4.046
3.114
8.974
79.984
244.291
408.414
3.87
8.26
5.54
61.63
1.65
61.98
2.06
17.66
4.02
6.88
3.74
6.40
3.31
11.69
3.56
4.83
2.73
11.11
3.73
11.50
7.09
64.37
4.33 350.47
5.16 1275.70
1097.468
Rangpur Zone
Bogra Division
N502
N502
N502
N502
N502
N502
N502
N502
N515
N515
N515
R545
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra -Natore Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra 2nd Town By-Pass Road
Bogra-Joypurhat Road
Km 002.30-002.40
Km 004.90-007.50
Km 013.10-013.30
Km 015.10-016.90
Km 026.16-027.06
Km 027.46-028.26
Km 028.36-028.66
Km 028.86-030.86
Km 010.40-010.70
Km 000.10-000.50
Km 014.00-014.30
Km 000.60-000.70
S
S
S
S
S
S
S
S
S
S
S
S
0.1 5705 National Rehab 150mm @ IRI 9-12
2.6 5705 National Rehab 150mm @ IRI 9-12
0.2 5705 National Rehab 150mm @ IRI 9-12
1.8 5705 National Rehab 150mm @ IRI 9-12
0.9 9061 National Rehab 180mm @ IRI 9-12
0.8 9061 National Rehab 180mm @ IRI 9-12
0.3 9061 National Rehab 180mm @ IRI 9-12
2 9061 National Rehab 180mm @ IRI 9-12
0.3 11451 National Full Recon 195mm @ IRI 12
0.4 11451 National Rehab 195mm @ IRI 9-12
0.3 11451 National Rehab 195mm @ IRI 9-12
0.1 4887 Regional Full Recon 150mm @ IRI 12
Appendix-C: Page: 45 of 49
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
1.349
35.065
2.697
24.276
14.467
12.860
4.822
34.313
8.525
8.974
6.731
1.472
3.49
3.48
3.60
3.63
4.82
4.18
4.38
3.13
3.76
3.86
4.91
3.69
4.61
119.48
9.51
86.41
66.90
51.64
20.29
103.28
31.69
35.06
33.46
5.04
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
R545
R545
R545
R545
R550
R550
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Mokamtala-Joypurhat Road
Mokamtala-Joypurhat Road
Million Taka
Km 011.30-012.90
Km 000.30-000.50
Km 007.30-011.30
Km 013.90-016.00
Km 009.30-009.60
Km 011.00-011.20
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
1.6 4887 Regional Full Recon 150mm @ IRI 12
S
0.2 4887 Regional Rehab 150mm @ IRI 9-12
S
4 7130 Regional Rehab 150mm @ IRI 9-12
S
2.1 4887 Regional Rehab 150mm @ IRI 9-12
S
0.3 3234 Regional Rehab 135mm @ IRI 9-12
S
0.2 3234 Regional Rehab 135mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
Km 076.10-076.30
Km 057.72-058.12
Km 089.86-090.26
Km 091.36-092.06
Km 099.46-099.66
Km 102.86-103.46
Km 103.56-103.66
Km 073.30-074.70
Km 084.76-086.06
Km 059.12-059.42
Km 087.16-087.96
Km 088.06-089.76
Km 100.86-102.66
S
S
S
S
S
S
S
S
S
S
S
S
S
0.2
0.4
0.4
0.7
0.2
0.6
0.1
1.4
1.3
0.3
0.8
1.7
1.8
2707
4331
4887
4887
4887
4887
4887
2707
2707
4331
4887
4887
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.267
7.197
7.197
12.595
3.599
11.660
1.799
17.722
16.456
4.046
10.789
22.927
24.276
143.531
1.89
2.87
2.15
2.05
2.31
2.10
3.71
1.67
1.27
3.79
2.61
2.88
2.76
5.90
20.06
14.92
24.89
8.03
23.48
6.44
29.48
20.89
15.23
27.97
65.72
66.56
Km 000.50-001.10
Km 001.60-002.40
Km 051.72-052.12
Km 053.12-053.54
S
S
S
S
0.6
0.8
0.4
0.42
6187
6187
4887
4331
Regional
Regional
Regional
Regional
Full Recon 150mm @ IRI 12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
10.796
10.789
5.395
5.718
32.698
2.47
2.94
6.03
3.61
24.92
31.19
32.34
20.54
Km 116.79-117.29
Km 117.99-118.29
Km 118.39-118.69
Km 118.79-119.79
Km 119.89-120.09
Km 117.49-117.79
Km 118.69-118.79
S
S
S
S
S
S
S
0.5
0.3
0.3
1
0.2
0.3
0.1
2947
3589
4887
4887
4887
2947
4887
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Full Recon 135mm @ IRI 12
Full Recon 135mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Full Recon 150mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 150mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
6.401
4.901
5.398
17.993
3.599
3.798
1.349
1.75
2.85
3.62
3.50
3.71
1.62
4.42
10.25
13.35
18.86
60.75
12.88
5.82
5.93
Chainage
Year
Sub-total Bogra Division
NPV /
Fin Cost
(Mill Taka) Cost
28.789
2.30
2.207
3.53
53.946
5.22
28.322
2.83
3.798
1.89
2.532
1.58
275.144
NPV
63.83
7.48
276.85
79.71
7.14
3.99
Dinajpur Division
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
R585
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Sub-total Dinajpur Division
Gaibanda Division
R585
R585
R585
R585
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Gobindagnj-Fulbari-Dinajpur Road
Sub-total Gaibanda Division
Joypurhat Division
R545
R545
R545
R545
R545
R545
R545
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Bogra-Joypurhat Road
Appendix-C: Page: 46 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Sub-total Joypurhat Division
NPV /
Fin Cost
(Mill Taka) Cost
43.438
NPV
Lalmonirhat Division
N506
N506
N506
N506
N506
N506
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
N509
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Barabari-Burimary Road
Km 021.00-021.15
Km 023.95-024.35
Km 022.55-022.65
Km 022.85-023.12
Km 023.12-023.95
Km 024.35-027.35
Km 077.88-077.98
Km 077.98-078.08
Km 078.08-078.78
Km 078.78-080.78
Km 080.78-080.98
Km 080.98-083.98
Km 083.98-087.68
Km 087.68-089.47
Km 093.37-096.57
Km 096.57-100.97
Km 101.57-102.47
Km 038.74-044.84
Km 044.84-047.44
Km 049.14-049.94
Km 050.84-053.34
Km 056.25-056.35
Km 056.65-059.45
Km 062.45-062.75
Km 071.55-077.88
Km 091.77-092.77
Km 092.97-093.37
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Km 446.84-447.14
S
Km 288.38-291.38
Km 019.85-020.25
Km 020.35-021.00
S
S
S
0.15
0.4
0.1
0.27
0.83
3
0.1
0.1
0.7
2
0.2
3
3.7
1.79
3.2
4.4
0.9
6.1
2.6
0.8
2.5
0.1
2.8
0.3
6.33
1
0.4
7068
9061
7068
7068
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
2269
2269
2269
9061
9061
9061
9061
9061
9061
9061
9061
9061
9061
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
National
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Full Recon 180mm @ IRI 12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 135mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
Rehab 180mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.108
8.233
1.607
4.324
13.358
48.225
2.058
2.058
14.407
41.163
4.116
61.745
76.152
36.779
40.507
55.697
11.393
98.057
41.795
12.860
40.187
1.607
45.010
4.822
101.819
16.075
6.430
793.593
2.48
3.95
3.41
2.54
4.02
4.23
4.14
4.39
3.55
3.65
3.92
3.62
3.80
2.78
0.47
0.40
0.42
3.69
3.85
3.81
3.36
4.26
3.18
4.05
3.29
3.92
4.27
7.30
30.93
5.25
10.51
51.59
195.72
8.10
8.58
48.58
142.61
15.32
212.34
274.78
97.07
19.00
22.43
4.80
347.16
154.37
47.10
129.69
6.58
137.61
18.73
321.20
60.58
26.36
2013
5.532
5.532
5.56
29.80
2013
2013
2013
52.965
8.233
13.357
2.74
2.99
3.07
152.17
23.29
38.78
Sub-total Lalmonirhat Division
Panchgarh Division
N5
Dhaka -Utholi-Banglabandh Road
0.3 11451 National Rehab 195mm @ IRI 9-12
Sub-total Panchgarh Division
Rangpur Division
N5
N506
N506
Dhaka -Utholi-Banglabandh Road
Rangpur-Barobari-Kurigram Road
Rangpur-Barobari-Kurigram Road
3
0.4
0.65
4405 National Rehab 150mm @ IRI 9-12
7068 National Full Recon 180mm @ IRI 12
7068 National Full Recon 180mm @ IRI 12
Appendix-C: Page: 47 of 49
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Chainage
Cway Length
AADT
(km)
Side
Road
Class
Work Name
Million Taka
Year
Sub-total Rangpur Division
NPV /
Fin Cost
(Mill Taka) Cost
74.555
NPV
Thakurgaon Division
N5
N5
N5
N5
N5
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Dhaka -Utholi-Banglabandh Road
Km 410.87-411.77
Km 399.80-400.60
Km 402.00-403.60
Km 403.80-404.10
Km 404.30-405.10
S
S
S
S
S
0.9
0.8
1.6
0.3
0.8
3083
11451
11451
11451
11451
National
National
National
National
National
Rehab 140mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
Rehab 195mm @ IRI 9-12
2013
2013
2013
2013
2013
Sub-total Thakurgaon Division
Total Rangpur Zone
12.699
14.752
29.504
5.532
14.752
77.239
2.79
7.09
6.13
4.65
4.17
35.73
101.37
175.15
24.93
59.62
4.03
3.74
3.95
2.88
2.75
2.36
2.22
4.35
2.25
2.79
2.80
4.21
4.25
4.18
3.89
6.12
3.66
4.28
0.52
1.61
1.00
1.21
0.70
1.46
10.38
21.96
5.14
15.11
12.95
12.17
23.89
6.18
7.65
7.70
13.09
11.81
11.60
11.13
13.60
16.27
9.86
0.79
2.64
3.29
4.49
6.18
1445.730
Sylhet Zone
Habiganj Division
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N204
R220
R220
R220
R220
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Jagadishpur-Shaistaganj
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Sarail-Habiganj Road
Km 131.24-131.25
Km 133.15-133.25
Km 140.55-140.75
Km 148.15-148.21
Km 149.41-149.61
Km 152.91-153.11
Km 153.21-153.41
Km 153.51-153.71
Km 160.51-160.61
Km 161.11-161.21
Km 177.02-177.12
Km 187.02-187.13
Km 187.33-187.43
Km 188.53-188.63
Km 115.44-115.54
Km 138.15-138.25
Km 138.35-138.55
Km 145.55-145.65
Km 014.40-014.50
Km 022.28-022.38
Km 022.98-023.18
Km 023.48-023.78
Km 025.68-026.40
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.01 9332 National Full Recon 180mm @ IRI 12
0.1 9332 National Full Recon 180mm @ IRI 12
0.2 9332 National Full Recon 180mm @ IRI 12
0.06 6671 National Full Recon 180mm @ IRI 12
0.2 6671 National Full Recon 180mm @ IRI 12
0.2 6671 National Full Recon 180mm @ IRI 12
0.2 6671 National Full Recon 180mm @ IRI 12
0.2 6671 National Full Recon 180mm @ IRI 12
0.1 6671 National Full Recon 180mm @ IRI 12
0.1 6671 National Full Recon 180mm @ IRI 12
0.1 6671 National Full Recon 180mm @ IRI 12
0.11 8158 National Full Recon 180mm @ IRI 12
0.1 8158 National Full Recon 180mm @ IRI 12
0.1 8158 National Full Recon 180mm @ IRI 12
0.1 11451 National Full Recon 195mm @ IRI 12
0.1 9332 National Rehab 180mm @ IRI 9-12
0.2 9332 National Rehab 180mm @ IRI 9-12
0.1 11451 National Rehab 195mm @ IRI 9-12
0.1 1956 National Full Recon 110mm @ IRI 12
0.1 6240 Regional Full Recon 150mm @ IRI 12
0.2 6240 Regional Full Recon 150mm @ IRI 12
0.3 6240 Regional Rehab 150mm @ IRI 9-12
0.72 6240 Regional Rehab 150mm @ IRI 9-12
Sub-total Habiganj Division
Sylhet Division
Appendix-C: Page: 48 of 49
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.365
2.807
5.613
1.824
5.613
5.613
5.613
5.613
2.807
2.807
2.807
3.143
2.807
2.807
2.920
2.192
4.384
2.305
1.566
1.799
3.599
4.046
9.697
82.745
Appendix-C
Annual Needs Reporet
2012 - 2013
Road
No
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N2
N209
N210
N210
N210
N210
N210
N210
N210
R250
R250
R250
R250
R250
1st Year Rehabilitation Works of National and Regional Roads
(Excluding Ongoing)
Road Name
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Dhaka-Sylhet-Jaflong Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet Twn By-Pass Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Sylhet-Jakiganj Road
Chainage
Km 192.63-192.73
Km 265.69-265.99
Km 266.99-267.09
Km 268.19-268.49
Km 269.59-269.79
Km 270.99-271.19
Km 271.89-271.99
Km 274.49-274.69
Km 275.39-275.49
Km 275.89-276.19
Km 276.99-277.19
Km 278.79-278.89
Km 280.09-280.56
Km 282.26-282.46
Km 284.66-284.76
Km 238.20-238.30
Km 257.11-257.31
Km 273.49-273.59
Km 279.29-279.39
Km 286.26-286.41
Km 000.00-000.20
Km 000.00-000.10
Km 002.50-002.60
Km 005.30-005.70
Km 006.40-006.60
Km 006.90-007.20
Km 009.40-009.50
Km 010.60-010.70
Km 021.75-021.85
Km 040.43-062.15
Km 062.15-062.25
Km 075.35-075.45
Km 086.57-089.68
Cway Length
Road
AADT
Work Name
(km)
Side
Class
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.47 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.2 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.1 11451 National Rehab 195mm @ IRI 9-12
S
0.15 11451 National Rehab 195mm @ IRI 9-12
S
0.2 4434 National Full Recon 150mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.4 11451 National Full Recon 195mm @ IRI 12
S
0.2 11451 National Full Recon 195mm @ IRI 12
S
0.3 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 11451 National Full Recon 195mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
21.72 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
0.1 4887 Regional Full Recon 150mm @ IRI 12
S
3.12 4887 Regional Rehab 150mm @ IRI 9-12
Sub-total Sylhet Division
Total Sylhet Zone
Total Bangladesh
Million Taka
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
NPV /
Fin Cost
NPV
(Mill Taka) Cost
2.920
5.85
16.88
8.759
4.62
39.98
2.920
4.68
13.51
8.759
4.41
38.17
5.839
4.12
23.77
5.839
4.54
26.22
2.920
4.76
13.73
5.839
3.67
21.20
2.920
4.92
14.21
8.759
4.22
36.56
5.839
5.31
30.63
2.920
5.43
15.67
13.576
4.10
54.99
5.839
4.96
28.63
2.920
5.17
14.91
2.305
4.15
9.69
4.610
4.15
19.37
2.305
6.97
16.27
2.305
5.60
13.08
3.550
4.03
14.48
2.944
2.34
6.35
2.842
4.72
13.26
2.842
5.08
14.26
11.367
4.40
49.45
5.683
4.95
27.84
8.525
4.33
36.48
2.842
4.21
11.84
2.842
4.95
13.91
1.799
3.23
5.68
388.717
3.01 1163.53
1.799
3.81
6.72
1.832
2.79
4.99
42.087
2.44 104.42
577.760
660.505
16694.38
Appendix-C: Page: 49 of 49
Appendix-D
Zilla Road Recovery Programme by Zone and Division.
(Excluding ongoing projects)
Appendix-D
Annual Needs Report
2012-2013
Road
No
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Barisal Zone
Barguna Division
Z8814
Z8814
Barguna -Baramasua Road
Barguna -Baramasua Road
Km 000.00-002.30 S
Km 002.80-003.60 S
2.30
0.80
2146 Zilla
2146 Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
10.56
3.67
14.23
2.728
2.963
27.202
10.276
Km 015.50-015.90 S
Km 003.80-005.50 S
Km 000.00-006.29 S
0.40
1.70
6.29
2146 Zilla
2146 Zilla
1180 Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
3.37
9.62
31.46
44.45
0.681
1.453
0.238
2.243
13.287
7.025
Km 000.14-003.90 S
Km 014.50-014.75 S
Km 007.65-010.95 S
3.76
0.25
3.30
2146 Zilla
2146 Zilla
2146 Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
21.11
1.42
17.57
40.09
2.098
1.952
2.227
41.436
2.597
37.163
Km 004.44-005.24
Km 012.94-015.54
Km 013.10-013.60
Km 011.60-012.03
Km 013.60-014.00
S
S
S
S
S
0.80
2.60
0.50
0.43
0.40
643
662
2146
2146
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
4.48
15.91
4.30
2.42
2.24
29.35
0.277
0.074
1.619
2.386
1.919
1.137
1.072
6.468
5.601
4.17
Km 021.61-021.91
Km 022.21-029.00
Km 001.00-001.90
Km 017.71-019.11
Km 019.71-021.41
Km 013.60-014.20
Km 007.40-010.60
Km 010.60-013.60
Km 014.30-014.88
S
S
S
S
S
S
S
S
S
0.30
6.79
0.90
1.40
1.70
0.60
3.20
3.00
0.58
2146
2146
1204
2146
2146
3984
3984
3984
3984
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.58
58.39
5.04
7.84
9.52
5.16
17.92
16.80
3.25
1.492
0.651
0.575
2.036
2.345
0.787
1.635
1.939
1.565
3.604
35.603
2.66
15.075
21.084
3.747
27.678
30.771
4.811
Sub-total Barguna Division
Barisal Division
Z8033
Z8038
Z8048
Gariarpar-Naikati Road
Shikarpur-Uzirpur Road
Chaker-Banaripara Road
Sub-total Barisal Division
Bhola Division
Z8915
Z8915
Z8916
Bagmara-Daulatkhan Road
Bagmara-Daulatkhan Road
Guingerhat-Daulatkhan Bazar Road
Sub-total Bhola Division
Jhalokati Division
Z8047
Z8058
Z8708
Z8708
Z8708
Bakerkati-Nalchity Road
Nalchity-Pir Moazzam Hossain Road
Rajapur-Patharghata Road
Rajapur-Patharghata Road
Rajapur-Patharghata Road
Sub-total Jhalokati Division
Pirojpur Division
Z7704
Z7704
Z7704
Z7704
Z7704
Z8701
Z8701
Z8701
Z8701
Pirojpur-Gonapara Road
Pirojpur-Gonapara Road
Pirojpur-Gonapara Road
Pirojpur-Gonapara Road
Pirojpur-Gonapara Road
Charkhali-Patharghata Road
Charkhali-Patharghata Road
Charkhali-Patharghata Road
Charkhali-Patharghata Road
Appendix-D: Page:1 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z8713
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Kawkhali-Bhandaria Road
Chainage
Cway Length
Side
(km)
Km 004.70-006.49 S
1.79
AADT
Road
Class
1874 Zilla
Work Name
Rehab 75mm @ IRI 9-12
Year
2013
Fin Cost
(Mill Tk)
Sub-total Pirojpur Division
10.09
136.58
Total Barisal Zone
264.69
NPV /
Cost
NPV
0.042
0.379
Chittagong Zone
Bandarban Division
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Z1811
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Bandarban-Gundum Road
Km 019.44-022.34
Km 022.54-022.84
Km 022.94-023.44
Km 001.50-001.80
Km 002.60-002.90
Km 003.10-003.40
Km 003.60-004.10
Km 006.10-006.50
Km 007.00-007.50
Km 009.70-009.80
Km 011.20-011.60
Km 012.60-013.30
Km 013.50-013.70
Km 016.00-016.30
Km 016.50-016.70
Km 016.70-017.40
Km 018.64-019.24
Km 075.49-077.00
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
2.90
0.30
0.50
0.30
0.30
0.30
0.50
0.40
0.50
0.10
0.40
0.70
0.20
0.30
0.20
0.70
0.60
1.51
2146
2146
2146
431
431
431
431
431
431
431
431
431
431
431
431
431
2146
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
21.80
2.26
3.76
1.84
1.84
1.84
3.06
2.45
3.06
0.61
2.45
4.28
1.22
1.84
1.22
4.28
3.67
6.03
67.49
2.186
1.218
0.964
0.657
0.695
0.201
0.496
0.572
0.377
0.624
1.016
1.024
0.727
0.394
0.49
0.107
1.714
3.329
44.119
2.544
3.357
1.107
1.17
0.339
1.391
1.284
1.059
0.35
2.28
4.023
0.816
0.664
0.55
0.421
5.889
18.054
Km 000.60-000.70
Km 000.90-001.20
Km 002.10-003.70
Km 004.00-004.80
Km 005.20-005.80
Km 006.30-006.80
Km 007.00-007.30
Km 008.30-008.40
Km 009.10-009.20
S
S
S
S
S
S
S
S
S
0.10
0.30
1.60
0.80
0.60
0.50
0.30
0.10
0.10
3872
3872
3872
3832
3759
3759
3759
3759
3759
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.85
2.54
14.58
6.95
5.22
4.35
2.61
0.87
0.87
2.336
1.868
1.11
1.147
1.604
1.609
2.511
1.896
2.964
1.778
4.265
14.994
7.177
7.529
6.294
5.892
1.483
2.318
Sub-total Bandarban Division
Chittagong Division
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Appendix-D: Page:2 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1012
Z1025
Z1025
Z1084
Z1084
Z1084
Z1095
Z1095
Z1629
Z1629
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Rangunia -Raozan Road
Kumira-Sandwip Road
Kumira-Sandwip Road
Muhuriganj-Chittagong Beri Band Road
Muhuriganj-Chittagong Beri Band Road
Muhuriganj-Chittagong Beri Band Road
Sarikait-Santoshpur Road
Sarikait-Santoshpur Road
Raozan-Noapara Road
Raozan-Noapara Road
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Km 009.80-009.90
Km 011.10-011.20
Km 011.40-011.70
Km 014.50-015.20
Km 001.40-001.80
Km 005.90-006.10
Km 007.40-007.60
Km 009.30-009.60
Km 011.90-012.30
Km 000.00-001.50
Km 001.50-013.24
Km 000.50-000.70
Km 002.10-005.10
Km 008.50-008.80
Km 011.00-011.80
Km 018.06-019.78
Km 000.20-001.40
Km 012.85-014.84
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10
0.10
0.30
0.70
0.40
0.20
0.20
0.30
0.40
1.50
11.74
0.20
3.00
0.30
0.80
1.72
1.20
1.99
3759
3759
3759
3759
3872
3759
3759
3759
3759
2146
2146
1726
1726
1726
2146
2146
1891
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.87
0.87
2.61
6.06
2.20
1.13
1.13
1.70
2.26
7.35
71.82
1.68
22.49
1.61
4.53
7.89
5.87
9.74
190.65
1.781
2.963
2.513
1.422
2.596
3.409
3.701
3.394
2.56
2.273
1.838
1.189
1.343
2.248
1.933
2.545
0.672
2.62
1.393
2.318
5.896
7.754
5.376
3.627
3.938
5.417
5.447
15.787
127.105
1.915
29.079
3.249
8.269
18.077
3.693
22.972
Km 000.70-002.00
Km 002.00-005.10
Km 005.60-006.94
Km 007.20-007.60
Km 010.80-011.20
Km 011.50-011.70
Km 013.30-013.60
Km 000.70-000.80
Km 003.80-004.10
Km 005.70-006.40
Km 000.70-001.20
Km 002.10-002.70
Km 003.20-003.30
Km 003.70-004.90
Km 006.00-007.07
Km 000.70-002.10
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.30
3.10
1.34
0.40
0.40
0.20
0.30
0.10
0.30
0.70
0.50
0.60
0.10
1.20
1.07
1.40
2146
444
444
1581
1581
1581
1581
2146
2146
910
426
426
426
426
426
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
8.37
19.92
8.60
3.43
2.26
1.13
1.70
0.84
2.52
5.89
2.29
2.75
0.46
6.74
6.06
8.95
2.448
0.726
0.788
0.702
0.716
1.49
0.695
0.799
0.98
0.095
0.968
0.963
1
0.689
0.656
1.21
19.471
13.241
6.203
2.304
1.531
1.593
1.115
0.652
2.401
0.514
2.034
2.428
0.42
4.249
3.637
10.233
Sub-total Chittagong Division
Cox's Bazar Division
Z1002
Z1002
Z1002
Z1009
Z1009
Z1009
Z1009
Z1125
Z1125
Z1125
Z1133
Z1133
Z1133
Z1133
Z1133
Z1504
Baraitali-Magnamaghat Road
Baraitali-Magnamaghat Road
Baraitali-Magnamaghat Road
Ramu-Maricha Road
Ramu-Maricha Road
Ramu-Maricha Road
Ramu-Maricha Road
Ekatabazar-Magnamaghat Road
Ekatabazar-Magnamaghat Road
Ekatabazar-Magnamaghat Road
Whykhong-Shaplapur Road
Whykhong-Shaplapur Road
Whykhong-Shaplapur Road
Whykhong-Shaplapur Road
Whykhong-Shaplapur Road
Ukhia-Gundhum Road
Appendix-D: Page:3 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Sub-total Cox's Bazar Division
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
81.92
Dohazari Division
Z1018
Z1018
Z1018
Z1018
Z1018
Z1018
Z1018
Z1018
Z1036
Z1036
Z1036
Z1036
Z1036
Z1036
Z1037
Z1037
Z1040
Z1040
Z1040
Z1040
Z1040
Z1054
Z1070
Z1070
Z1070
Z1070
Z1070
Z1088
Z1088
Z1088
Z1088
Z1088
Z1088
Z1088
Z1703
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Shikalbaha-Anwara Road
Hashimpur-Borma Road
Hashimpur-Borma Road
Hashimpur-Borma Road
Hashimpur-Borma Road
Hashimpur-Borma Road
Hashimpur-Borma Road
Ghatiadanga-Monufakirhat Road
Ghatiadanga-Monufakirhat Road
Gasbaria-Anowara Road
Gasbaria-Anowara Road
Gasbaria-Anowara Road
Gasbaria-Anowara Road
Gasbaria-Anowara Road
Companiganj-Homna Road
Patiya -Anowara Road
Patiya -Anowara Road
Patiya -Anowara Road
Patiya -Anowara Road
Patiya -Anowara Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
CUFL Gate-Juidandi Road
Anwara - Tailardwip Road
Km 000.10-001.30
Km 005.50-005.80
Km 005.93-006.03
Km 006.13-006.53
Km 006.63-006.93
Km 008.43-008.93
Km 001.50-003.40
Km 004.50-005.20
Km 004.72-004.82
Km 002.02-002.12
Km 002.22-003.32
Km 005.02-005.62
Km 006.72-007.42
Km 008.12-008.62
Km 000.30-000.48
Km 001.45-001.58
Km 009.20-009.90
Km 002.30-002.60
Km 004.60-005.80
Km 006.60-007.90
Km 013.70-015.00
Km 003.20-003.30
Km 001.30-003.10
Km 003.20-004.10
Km 005.80-006.20
Km 006.30-008.60
Km 009.00-011.00
Km 000.20-000.80
Km 001.10-001.30
Km 001.80-002.00
Km 002.10-003.60
Km 004.90-005.50
Km 000.80-001.10
Km 007.70-008.10
Km 003.90-006.32
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
1.20 5395 Zilla
0.30 5395 Zilla
0.10 5395 Zilla
0.40 5395 Zilla
0.30 4270 Zilla
0.50 2146 Zilla
1.90 5395 Zilla
0.70 5395 Zilla
0.10 2146 Zilla
0.10 2146 Zilla
1.10 2146 Zilla
0.60 2146 Zilla
0.70 2146 Zilla
0.50 2146 Zilla
0.18 3527 Zilla
0.13 3527 Zilla
0.70 2146 Zilla
0.30 3418 Zilla
1.20 3418 Zilla
1.30 2287 Zilla
1.30 2146 Zilla
0.10 1006 Zilla
1.80 1363 Zilla
0.90
849 Zilla
0.40
849 Zilla
2.30
849 Zilla
2.00 2146 Zilla
0.60 17019 Zilla
0.20 17019 Zilla
0.20 8122 Zilla
1.50 8122 Zilla
0.60 2707 Zilla
0.30 17019 Zilla
0.40 2707 Zilla
2.42
892 Zilla
Appendix-D: Page:4 of 38
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
19.48
3.78
1.27
5.03
3.73
6.30
15.93
5.69
0.78
0.54
5.74
3.03
3.67
2.68
0.89
0.64
8.22
2.52
9.84
10.86
11.14
0.46
9.11
4.65
2.02
11.61
10.10
7.82
2.58
2.49
18.89
5.22
2.55
2.20
13.34
1.957
3.099
3.329
3.081
2.171
0.601
3.235
3.543
2.407
2.344
2.6
2.907
2.5
2.495
3.112
2.132
0.876
0.531
0.778
0.925
0.619
0.536
1.033
0.062
0.602
0.315
1.938
14.345
10.841
4.294
4.687
2.394
14.047
6.928
0.903
36.499
10.878
3.923
14.389
7.548
3.56
48.952
19.14
1.734
1.2
14.264
8.366
8.78
6.386
2.559
1.221
6.851
1.3
7.37
9.831
6.687
0.225
8.86
0.264
1.116
3.357
18.303
106.137
26.497
10.114
83.723
11.337
36.703
13.97
11.077
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1804
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Maizzertek-BFDC Road
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Km 000.20-000.30 S
0.10
2464 Zilla
Full Recon 75mm @ IRI>12
2013
0.99
215.75
1.103
1.005
Km 009.40-013.81
Km 008.70-008.90
Km 011.60-012.90
Km 013.20-013.40
Km 005.60-006.30
Km 009.70-011.20
Km 013.60-013.90
Km 015.60-016.40
Km 017.40-017.80
Km 026.40-026.60
Km 020.20-026.40
Km 026.70-027.40
Km 000.40-000.60
Km 000.70-001.80
Km 002.90-003.30
Km 007.30-007.80
Km 010.10-010.80
Km 014.30-014.50
Km 018.80-018.90
Km 019.10-019.20
Km 003.90-005.00
Km 009.60-010.80
Km 010.80-012.00
Km 012.10-013.60
Km 015.70-015.90
Km 017.40-018.50
Km 018.50-018.80
Km 019.50-019.80
Km 020.30-021.40
Km 022.00-023.70
Km 024.00-024.80
Km 000.70-004.00
Km 005.00-006.80
Km 010.10-013.20
4.41
0.20
1.30
0.20
0.70
1.50
0.30
0.80
0.40
0.20
6.20
0.70
0.20
1.10
0.40
0.50
0.70
0.20
0.10
0.10
1.10
1.20
1.20
1.50
0.20
1.10
0.30
0.30
1.10
1.70
0.80
3.30
1.80
3.10
491
1217
1217
1217
1217
1217
1217
1217
1217
2146
2146
2146
787
787
787
787
787
787
787
787
740
740
740
740
740
740
740
740
740
740
740
292
292
292
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
26.24
1.64
10.69
1.64
3.75
8.03
1.61
4.28
3.06
1.74
38.79
3.96
1.22
6.73
2.42
3.14
3.96
1.22
0.61
0.61
6.23
6.79
6.77
8.49
1.13
6.23
1.70
1.70
6.23
9.62
4.53
18.68
10.19
17.55
0.256
1.724
1.293
0.938
1.751
2.405
1.653
2.34
1.604
1.799
2.19
2.466
0.307
0.633
0.039
0.33
0.615
0.594
0.708
0.478
0.452
0.26
0.671
0.724
0.827
0.067
0.677
0.704
0.49
0.23
0.106
0.584
0.621
0.716
6.156
2.584
12.595
1.406
6.018
17.717
2.436
9.193
4.501
2.896
81.231
9.23
0.344
3.901
0.086
0.947
2.231
0.666
0.397
0.268
2.584
1.618
4.17
5.641
0.859
0.38
1.054
1.097
2.801
2.028
0.441
9.984
5.788
11.504
Sub-total Dohazari Division
Khagrachari Division
Z1601
Z1602
Z1602
Z1602
Z1602
Z1602
Z1602
Z1602
Z1602
Z1603
Z1603
Z1603
Z1604
Z1604
Z1604
Z1604
Z1604
Z1604
Z1604
Z1604
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1605
Z1606
Z1606
Z1606
Manikchahri-Laksmichhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Ramgarh-Mahalchhari Road
Khagrachhari-Sajek Road
Khagrachhari-Sajek Road
Khagrachhari-Sajek Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Khagrachhari-Panchhari Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Dighinala-Langadu Road
Baghaihat-Marisha Road
Baghaihat-Marisha Road
Baghaihat-Marisha Road
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Appendix-D: Page:5 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1606
Z1606
Z1608
Z1608
Z1608
Z1608
Z1608
Z1632
Z1632
Z1632
Z1632
Z1632
Z1632
Z1632
Z1632
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Baghaihat-Marisha Road
Baghaihat-Marisha Road
Matiranga-Tannakapara Road
Matiranga-Tannakapara Road
Matiranga-Tannakapara Road
Matiranga-Tannakapara Road
Matiranga-Tannakapara Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Gourangapara-Panchhari Road
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Km 018.50-018.90
Km 019.10-019.30
Km 001.60-001.70
Km 003.50-003.60
Km 004.80-005.20
Km 019.60-020.20
Km 024.60-028.10
Km 001.00-001.50
Km 002.00-002.50
Km 002.80-003.40
Km 006.50-008.30
Km 008.60-009.00
Km 009.10-009.80
Km 011.00-011.90
Km 012.30-013.70
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.40
0.20
0.10
0.10
0.40
0.60
3.50
0.50
0.50
0.60
1.80
0.40
0.70
0.90
1.40
292
292
311
311
311
311
311
849
849
849
849
849
849
849
849
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2.26
1.13
0.60
0.60
2.39
3.58
20.88
2.83
2.83
3.40
10.19
2.26
3.96
5.09
7.92
301.10
0.581
0.775
0.286
0.184
0.411
0.452
0.381
0.533
1.322
1.036
1.132
1.092
1.052
1.474
0.936
1.205
0.803
0.156
0.101
0.899
1.484
7.293
1.385
3.431
3.226
10.578
2.267
3.823
6.889
6.802
Km 008.30-008.80
Km 003.20-003.70
Km 005.10-005.50
Km 005.60-006.40
S
S
S
S
0.50
0.50
0.40
0.80
579
892
892
892
Zilla
Zilla
Zilla
Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2.83
3.52
2.45
5.34
14.13
0.272
0.474
0.734
0.389
0.706
1.53
1.667
1.925
2.917
1.604
1.501
1.746
0.72
1.623
1.019
0.423
1.149
0.488
2.683
1.255
1.46
1.214
4.177
30.392
5.204
0.923
Sub-total Khagrachari Division
Rangamati Division
Z1603
Z1613
Z1613
Z1613
Khagrachhari-Sajek Road
Ranirhat-Kawkhali Road
Ranirhat-Kawkhali Road
Ranirhat-Kawkhali Road
Sub-total Rangamati Division
Total Chittagong Zone
871.05
Comilla Zone
Brahmanbaria Division
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1201
Z1201
Z1210
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Kashba-Kuti Road
Kashba-Kuti Road
Brahmanbaria-Lalpur Road
Km 030.08-030.10
Km 030.30-030.50
Km 030.60-030.70
Km 030.90-031.00
Km 031.60-031.80
Km 032.40-032.70
Km 001.50-006.89
Km 006.89-009.34
Km 000.10-000.20
S
S
S
S
S
S
S
S
S
0.02
0.20
0.10
0.10
0.20
0.30
5.39
2.45
0.10
2146
2146
2146
2146
2146
2146
2262
1305
2984
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Appendix-D: Page:6 of 38
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.18
1.79
0.89
0.89
1.80
2.75
31.57
13.42
0.89
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1210
Z1210
Z1210
Z1210
Z1210
Z1210
Z1216
Z1216
Z1216
Z1216
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Brahmanbaria-Lalpur Road
Brahmanbaria-Lalpur Road
Brahmanbaria-Lalpur Road
Brahmanbaria-Lalpur Road
Brahmanbaria-Lalpur Road
Brahmanbaria-Lalpur Road
Sultanpur-Akhura Road
Sultanpur-Akhura Road
Sultanpur-Akhura Road
Sultanpur-Akhura Road
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Km 000.50-000.60
Km 006.10-006.20
Km 001.50-001.60
Km 002.00-002.10
Km 002.60-003.60
Km 008.60-009.20
Km 000.10-000.90
Km 001.10-001.60
Km 001.70-002.40
Km 002.40-007.25
S
S
S
S
S
S
S
S
S
S
0.10
0.10
0.10
0.10
1.00
0.60
0.80
0.50
0.70
4.85
2984
2984
2984
2984
2984
2984
2146
2146
2146
2494
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
0.89
0.82
0.58
0.58
5.35
3.21
6.58
4.11
3.75
26.71
106.78
1.149
0.54
1.057
1.121
1.053
1.104
1.782
1.673
2.439
0.477
0.923
0.4
0.578
0.612
5.3
3.334
10.893
6.39
8.801
12.042
Km 003.30-003.60
Km 003.90-004.10
Km 005.70-006.10
Km 006.40-006.90
Km 009.20-009.70
Km 012.80-013.10
Km 007.20-007.30
Km 009.70-010.20
Km 008.60-009.70
Km 009.80-010.40
Km 012.90-013.20
Km 015.80-016.40
Km 019.90-020.00
Km 020.20-020.40
Km 020.50-021.70
Km 021.80-022.80
Km 024.30-024.60
Km 002.00-002.80
Km 002.90-004.80
Km 004.80-007.80
Km 011.40-012.50
Km 013.30-014.10
Km 022.90-024.10
Km 000.10-000.30
Km 001.00-001.30
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.30
0.20
0.40
0.50
0.50
0.30
0.10
0.50
1.10
0.60
0.30
0.60
0.10
0.20
1.20
1.00
0.30
0.80
1.90
3.00
1.10
0.80
1.20
0.20
0.30
1979
1979
1979
1979
1979
1979
1979
1979
2146
2146
2146
2146
2146
2146
2146
2146
2146
1482
1482
2146
2146
2146
2146
2146
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.38
2.26
4.51
5.64
5.64
3.38
0.73
3.67
9.04
4.93
2.47
4.93
0.82
1.64
9.87
8.22
2.47
4.65
10.93
16.06
5.89
4.28
6.42
1.79
2.68
2.09
0.993
1.647
1.783
2.151
0.962
1.657
0.768
1.51
1.496
1.763
0.857
1.851
0.883
1.826
1.453
1.107
0.731
0.88
2.868
1.925
2.233
2.35
1.865
1.408
6.66
2.11
6.997
9.467
11.422
2.929
1.174
2.72
12.69
6.856
4.041
3.926
1.414
1.348
16.735
11.096
2.537
3.253
9.213
44.348
10.916
9.21
14.537
3.093
3.504
Sub-total Brahmanbaria Division
Chandpur Division
Z1050
Z1050
Z1050
Z1050
Z1050
Z1050
Z1050
Z1050
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1412
Z1824
Z1824
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Kaliapara-Kachua Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Chandpur-Ramganj Road
Doabhanga-Ramganj Road
Doabhanga-Ramganj Road
Appendix-D: Page:7 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1824
Z1824
Z1824
Z1824
Z1824
Z8699
Z8699
Z8699
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Doabhanga-Ramganj Road
Doabhanga-Ramganj Road
Doabhanga-Ramganj Road
Doabhanga-Ramganj Road
Doabhanga-Ramganj Road
Chandra-Haimchar Road
Chandra-Haimchar Road
Chandra-Haimchar Road
Chainage
Cway Length
Side
(km)
AADT
Road
Class
Work Name
Year
Fin Cost
(Mill Tk)
NPV /
Cost
NPV
Km 001.70-001.90
Km 002.70-003.40
Km 010.30-010.40
Km 010.60-010.90
Km 014.70-014.80
Km 003.10-003.50
Km 004.00-004.30
Km 004.50-004.80
S
S
S
S
S
S
S
S
0.20
0.70
0.10
0.30
0.10
0.40
0.30
0.30
2146
1224
1224
1224
1224
2622
2622
2622
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
2013
2013
2013
2013
2013
2013
2013
2013
1.16
4.07
0.58
1.74
0.58
2.22
1.70
1.70
140.07
1.724
0.097
0.14
0.492
0.123
1.252
1.186
1.247
1.917
0.362
0.074
0.786
0.065
2.603
1.885
1.981
Km 000.30-000.70
Km 001.90-002.10
Km 002.90-003.00
Km 003.70-003.90
Km 005.80-007.70
Km 013.20-013.70
Km 000.90-001.80
Km 004.00-005.00
Km 005.40-005.70
Km 007.80-008.40
Km 003.10-003.20
Km 003.30-003.50
Km 003.80-003.90
Km 004.00-004.10
Km 004.90-005.10
Km 006.40-006.50
Km 006.90-007.00
Km 007.60-007.70
Km 007.80-008.20
Km 012.53-013.00
Km 011.10-011.20
Km 015.60-015.70
Km 021.60-021.70
Km 022.30-022.50
Km 024.20-024.60
Km 027.30-027.70
Km 028.70-028.90
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.40
0.20
0.10
0.20
1.90
0.50
0.90
1.00
0.30
0.60
0.10
0.20
0.10
0.10
0.20
0.10
0.10
0.10
0.40
0.47
0.10
0.10
0.10
0.20
0.40
0.40
0.20
4698
4698
4698
4698
4698
4698
4698
4698
4698
4698
4247
4247
4247
4247
4247
4247
4247
4247
4247
2230
1360
1360
2146
2146
2146
2146
2146
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
3.57
1.79
0.89
1.79
16.96
4.46
5.23
5.81
1.74
3.49
0.92
1.83
0.92
0.92
1.79
0.89
0.89
0.89
2.33
2.76
0.89
0.89
0.89
1.79
3.57
3.57
1.79
1.256
0.862
1.027
0.881
0.708
1.224
1.536
1.519
1.616
1.527
1.627
0.659
1.628
0.845
1.359
1.679
1.679
1.68
1.479
0.426
0.803
0.823
1.646
1.623
1.426
1.43
1.466
4.139
1.421
0.846
1.452
11.088
5.044
7.555
8.3
2.649
5.006
1.381
1.118
1.381
0.717
2.247
1.388
1.388
1.389
3.248
1.055
0.654
0.669
1.376
2.714
4.769
4.783
2.452
Sub-total Chandpur Division
Comilla Division
Z1008
Z1008
Z1008
Z1008
Z1008
Z1008
Z1008
Z1008
Z1008
Z1008
Z1041
Z1041
Z1041
Z1041
Z1041
Z1041
Z1041
Z1041
Z1041
Z1041
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Chandina-Debidwar Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Comilla-Mirpur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Appendix-D: Page:8 of 38
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1042
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1046
Z1048
Z1048
Z1048
Z1048
Z1048
Z1051
Z1051
Z1053
Z1053
Z1053
Z1053
Z1053
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Eliotganj-Bancharampur Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Harishchar-Miabazar Road
Laksham -Chewara Bazar Road
Laksham -Chewara Bazar Road
Laksham -Chewara Bazar Road
Laksham -Chewara Bazar Road
Laksham -Chewara Bazar Road
Changani -Chaumohoni Road
Changani -Chaumohoni Road
Gouripur-Homna Road
Gouripur-Homna Road
Gouripur-Homna Road
Gouripur-Homna Road
Gouripur-Homna Road
Chainage
Km 029.70-029.80
Km 029.90-030.08
Km 009.20-009.70
Km 019.30-019.70
Km 020.70-021.60
Km 021.80-022.20
Km 025.20-025.40
Km 025.70-026.00
Km 026.10-026.80
Km 000.10-000.20
Km 000.30-000.40
Km 001.10-001.20
Km 001.30-001.50
Km 002.50-002.60
Km 002.90-003.00
Km 004.40-004.60
Km 005.00-005.20
Km 005.40-005.60
Km 006.40-006.60
Km 007.60-007.70
Km 008.20-008.50
Km 010.10-010.30
Km 010.60-010.80
Km 013.90-014.00
Km 000.50-001.00
Km 006.90-007.20
Km 002.60-002.70
Km 002.90-003.50
Km 003.90-004.00
Km 005.70-006.10
Km 010.00-010.10
Km 000.00-000.70
Km 003.90-004.00
Km 005.80-005.90
Km 001.30-001.50
Km 008.30-010.60
Km 010.70-014.40
Km 015.00-015.40
Cway Length
Side
(km)
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0.10
0.18
0.50
0.40
0.90
0.40
0.20
0.30
0.70
0.10
0.10
0.10
0.20
0.10
0.10
0.20
0.20
0.20
0.20
0.10
0.30
0.20
0.20
0.10
0.50
0.30
0.10
0.60
0.10
0.40
0.10
0.70
0.10
0.10
0.20
2.30
3.70
0.40
AADT
2146
2146
1360
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
2146
4132
4132
4132
4132
4132
4132
2146
4132
1903
1903
1903
1903
1903
2146
2146
2028
2028
2028
2028
2028
Road
Class
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Zilla
Appendix-D: Page:9 of 38
Work Name
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Full Recon 75mm @ IRI>12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Rehab 75mm @ IRI 9-12
Year
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
Fin Cost
(Mill Tk)
0.89
1.61
2.91
2.33
5.23
2.33
1.16
1.74
4.07
0.85
0.85
0.87
1.74
0.87
0.87
1.74
1.74
1.74
1.74
0.87
2.61
1.74
1.74
0.87
2.83
1.70
0.57
3.30
0.57
2.26
0.57
4.93
0.70
0.99
1.84
15.87
33.96
3.67
NPV /
Cost
1.762
1.631
0.657
2.329
2.364
2.423
2.132
2.32
2.38
1.708
0.8
0.836
0.774
1.994
0.79
1.692
1.873
1.669
0.868
1.608
1.119
1.218
1.218
1.599
2.26
1.528
0.722
0.489
0.64
0.353
0.767
2.112
1.995
0.752
1.025
1.619
0.478
1.137
NPV
1.473
2.455
1.753
5.178
11.827
5.386
2.37
3.869
9.258
1.366
0.627
0.673
1.247
1.605
0.636
2.723
3.014
2.687
1.358
1.258
2.625
1.906
1.905
1.251
6.076
2.335
0.368
1.453
0.326
0.719
0.391
9.621
1.298
0.698
1.83
25.143
15.777
4.06
Appendix-D
Annual Needs Report
2012-2013
Road
No
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1205
Z1219
Z1219
Z1219
Z1219
Z1219
Z1401
Z1401
Z1401
Z1401
Z1401
Z1401
Z1414
Million Taka
Zilla Roads Recovery Programme
(Excluding Ongoing Projects)
Road Name
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Dharkhar-Senarbadi Road
Nimsar-Burichaung Road
Nimsar-Burichaung Road
Nimsar-Burichaung Road
Nimsar-Burichaung Road
Nimsar-Burichaung Road
Lalmai-Barura-Jagatpur Road
Lalmai-Barura-Jagatpur Road
Lalmai-Barura-Jagatpur Road
Lalmai-Barura-Jagatpur Road
Lalmai-Barura-Jagatpur Road
Lalm