Funded by HKSAR ITCITP/045/13LP Multi-dimensional (nD-)BIM Applications with RFID-Enabled RealTime Visibility and Traceability George Q Huang On behalf of “BIMPlatform” Project Team Hong Kong Housing Authority The University of Hong Kong 香 港 房 屋 委 員 會 香 港 大 學 THE HONG KONG POLYTECHNIC UNIVERSITY 香港理工大學 RFID-Enabled BIM Platform for HK Prefabrication Housing Production Duration 24 Months Start Time 15 March 2014 Budget (HKD) 7,365.020 (ITC)+2,206.259 (Sponsors) = 9,571.279 (Total) Project Coordinator Professor George Q. Huang Faculty of Engineering (IMSE), HKU Deputy Project Coordinator Professor Thomas Ng Faculty of Engineering (CE), HKU Principal Investigators Dr Wilson Lu Faculty of Architecture (REC), HKU Professor Geoffrey Shen Department of Building and Real Estate, PolyU Sponsors and Pilot Organizations HKHA-Tuen Mun Area 54 Site 2 Phases 1 & 2 Construction Industry Council (HKCIC) Hong Kong Construction Association (HKCA) The Civil Engineering and Architectural Society of Shenzhen Guangdong University of Technology (GDUT) Unicon Concrete Products (Unicon) Yau Lee Construction (Yau Lee) Huizhou Jinze International Logistics Ltd. (Jinze) Openplatform Technology Company Limited (Openplatform) Afina Data Systems Limited (Afina) Guangzhou Wanzhi Information Technology Company Ltd. (Wanzhi) Together with Hong Kong Housing Authority Field studies in prefab plants & construction sites Cast-in RFID tag Prefabrication Production Prefab warehousing RFID Truck loading Cross-border logistics Customs control Client quality control Construction Site Truck unloading and construction site Construction Physical Internet Household repairing Housing Maintenance Household maintenance BIM Scenario 1:Prefabrication Production Get Materials Get Jobs Prefab Production Execution & Control Prefab Task Management Material Requirement Production Planning and Scheduling Service Processing Operators Items Tracing Planner/Scheduler Production Execution and Monitoring Move Items Inspect Items • • • • • Lack of accurate information Low productivity Weak response to changes High wastes of construction resources Part certification Statistical Data Operator Tracing Scenario 2: Prefabrication Cross-border Logistics Get Vehicles Get Jobs Prefab Transportation Execution & Control Logistics Task Management Fleet Management Logistics Planning and Scheduling Service Load Items Operators/Drivers Loading Scheme Planners/Schedulers Transportation Execution and Monitoring Deliver Items Custom Check Statistical Data Logistics Tracking • • • • Just in Time delivery Poor information sharing Lack of dynamic control Inefficient cross-border LSCM Scenario 3: Construction On-site Assembly Get Materials Get Jobs On-site Assembly Execution & Control Assembly Task Management Material Requirement Assembly Scheduling and Execution Service Processing Operators Items Tracing On-site Manager On-site Assembly Monitoring Move Items Inspect • • • • • Limited spaces Site safety Lack of real-time locations/statuses of prefab, workers and equipment On-site Disturbances lead to project discrepancies Ineffective on-site data collection Statistical Data Operator Tracing HKHA Pioneered Uses of Building Information Modeling (BIM) Project Development Life Cycle Feasibility Studies Scheme Design Revit (BIM Modeling) 3D Max (Photo-realistic Rendering) Ecotect (Performance Analysis) Detailed Design Tender Navisworks (Collision Check) Civil 3D (CE/GE Design) Solibri (Code Checking) Construction Facility Management Navisworks (4D Simulation) Viewers (Viewing / Markup) Cost X (Material Quantities) HKHA Pioneered RFID Construction Applications HKHA Vision on Integration of BIM, GIS & HOMES Geo-spatial Database Infrastructure Geo-Spatial Convergence Building Information Project Life Cycle BIM (Building Information Modelling) Feasibility studies and Conceptual layout Design Options Project Management Scheme Design and Project Budget Detailed Design and Specification Building Design and Performance Tender Evaluation Construction of Foundation / Building Documentation Quality Control Completion, Management and Maintenance Facility Management Housing COnstruction Management Enterprise System (HOMES) Planning Programme Project Contract Site Payment Budget Cabin Sr. Executive Knowledge Management Realization HKHA’s Vision through 7 Technical Deliverables Geo-spatial Database Infrastructure Geo-Spatial Convergence BIM (Building Information Modelling) Building Information 7 RFID-Enabled BIM Platform 1 5 2 6 3 Prefab Manufacturing Traceability & Visualization Tools Crossborder logistics Data Source Service Construction Site 4 4 4 Gateway Gateway Gateway Project Management Housing Construction Management Enterprise System (HOMES) Planning Programme Project Contract Site Payment Budget Cabin Sr. Executive Knowledge Management RBIMP RBIMP DSMS DSS Stakeholders at Production Factory Stakeholders at Logistics Service Providers Stakeholders at Logistics Service Providers Stakeholders at Housing Authority Prefab Production Management Services Traceability and Visibility Tools MM System On-site Assembly Management Services Data Source Interoperability Service Platform Service Management Database (IaaS) RBIMP Infrastructure HOMES Cross-border Logistics Management Services Gateway Operating System and Management Tools Software Layer Hardware Layer BIM System Definition RBIMP Gateway Configuration Execution Smart Construction Objects Cutting & Preparing Operator Operator Truck Load De-moulding Prefab Production nD-Visibility Truck Unload Put Away On-site Receiving Cross-border Logistics (SaaS) (PaaS) RFID-enabled Building Information Modelling Platform (RBIMP) …… …… BIMCentered Systems BIMCentered Systems Key Users Overview of RBIMP Construction On-site Assembly nD BIM at Construction Site A connected and dynamic nD building information modeling (BIM) for reengineering offshore prefabrication construction processes. 3-D BIM Project Progress Gantt chart Project Cost RFID Reader Real-Life Construction Site Demo System (Prefab Production) Demo System (Cross-border Prefab Logistics) Decision Support Systems Standard and Component-Based Development of User Interfaces. Data Source Service to Integrate Islands of Decisions Centralized data source management service for heterogeneous enterprise information systems (EISs) Cloud Services for Online and Offline Decision Supports Service-Oriented Architecture (SOA) for RBIMP components and its integration More Efficient More Sustainable Safer Housing Authority Consultants Contractors Learned Societies Healthier RFIDEnabled BIM Platform Academic Institutions Market Experts Innovative Collaboration Platform with Stakeholders THANK YOU Hong Kong Housing Authority The University of Hong Kong 香 港 房 屋 委 員 會 香 港 大 學 THE HONG KONG POLYTECHNIC UNIVERSITY 香港理工大學