Sabbagh Award - American Society for Engineering Education

advertisement
53499-FMOI Sabbagh_07-0633-Depliant Sabbagh 06/02/13 15:24 Page1
World Federation of Engineering Organizations
C.C.C.
Fédération Mondiale des Organisations d'Ingénieurs
WFEO/FMOI
CONSOLIDATED CONTRACTORS
HASSIB J. SABBAGH
ENGINEERING CONSTRUCTION
EXCELLENCE
2013 AWARD FOR
GREEN CONSTRUCTIONS
This Award recognizes the noteworthy contributions in the field of GREEN CONSTRUCTIONS by an
engineer or team of engineers on the basis of participation in the planning, development or construction of a successful project completed in the two to five year period prior to 31 January 2013.
The Award recipient(s) shall be an engineer(s) as defined by the relative standards of the nominating
WFEO member organization.
Nominations, using the enclosed two-page nomination form and following its instructions, must be
submitted by May 31, 2013, to the Executive Director, WFEO. The WFEO Awards Committee, including
a representative of late Hassib J. Sabbagh will make its recommendation on this Award to the WFEO
Executive Council for ratification. The Award recipient(s) will be notified and, on acceptance, the news
media will be informed.
This Award will be presented in Singapore at the WFEO Gala dinner on 13 September 2013 during the
General Assembly meetings, where the award recipient would give a brief presentation on a topic related
to the basis of the nomination.
WFEO/FMOI
Maison de l’UNESCO – 1 rue Miollis
75015 Paris (France)
Tél : +33(0)1 45 68 48 46
Fax : +33(0)1 45 68 48 65
E-mail : executivedirector@wfeo.net
Web :www.wfeo.net
CONSOLIDATED CONTRACTORS
P.O. BOX 61092
Amaroussian 15110, Athens (Greece)
Tel
: +30 1 61 99 200/19
Fax : +30 1 61 99 224
Email : arichardson@ccc.gr
Web : www.ccc.gr
53499-FMOI Sabbagh_07-0633-Depliant Sabbagh 06/02/13 15:24 Page2
THE AWARD FOR ENGINEERING CONSTRUCTION EXCELLENCE
T
he purpose of this Award is to direct world attention to the role of engineering in sustainable
development. The Consolidated Contractors, under the leadership of late Hassib J. Sabbagh, gave
the World Federation of Engineering Organizations (WFEO) responsibility for organizing the
Hassib J. Sabbagh Award for Engineering Construction Excellence. This Award was instituted in 2002
by the initiative and endowment of late Hassib J. Sabbagh who devoted many years of concern and
effort in the area of engineering and construction. The Award consists of a medal, a certificate, and a
cash prize of $10,000 (USD) and presented in conjunction with the biennial General Assembly of the
WFEO. The first presentation was given during the WFEO General Assembly in Tunis, Tunisia in
October 2003.
THE CONSOLIDATED CONTRACTORS
F
rom its beginning in 1952, Consolidated Contractors Company, better known as CCC, has become
the largest engineering and construction company in the Middle East. CCC is nevertheless truly
international with active projects in countries spread over the Middle East, Africa, Caribbean and
the CIS countries with related additional investments in Europe and the United States. CCC provides
Project Management, Engineering, Procurement and Construction (EPC) Services. CCC’s services today
encompass a broad range of activities such as:
• Complete Construction of Petrochemical Plants and Refineries, Oil Loading and off-loading Terminals
and Storage Facilities, Heavy and Light Industrial Plants. CCC is a pioneer in executing Plant
Construction on a partnership basis with International Engineering Companies;
• Heavy Civil Construction of Power and Desalination Plants, Water Treatment Plants and Distribution
Systems, Sewage Treatment Plants and Collection Networks, Dams and Reservoirs, Harbours and
Docks, Airports, Bridges and Highway Interchanges, Roads and Highways;
• EPC of high Quality Buildings, Industrial Buildings, Infrastructure Works and Networks;
• EPC of Water, Oil and Gas Pipelines.
THE WORLD FEDERATION OF ENGINEERING ORGANISATIONS
O
n the 4th of March, 1968, representatives of 50 scientific and technical associations from all over
the world met under the auspices of the United Nations Educational, Scientific and Cultural
Organisation (UNESCO) in Paris to establish the World Federation of Engineering Organisations
(WFEO). WFEO’s charter as an international, non-governmental organisation is to unite multidisciplinary engineering associations throughout the world, with as essential goals:
• To provide information and leadership to the engineering profession on issues of concern to the
public or the profession;
• To serve society, and to be recognised, by national and international organisations and the public, as
a respected and valuable source of advice and guidance on the policies, interests and concerns that
relate engineering and technology to the human and natural environment;
• To make information on engineering available to the countries of the world and to facilitate communication through its member nations;
• To foster peace, socio-economic security and sustainable development among all countries of the
world, through the proper application of technology;
• To facilitate relationships between governments, business and people by contributing engineering
dimension to discussions on policies and investments.
53499-FMOI Sabbagh_07-0633-Depliant Sabbagh 06/02/13 15:24 Page3
World Federation of Engineering Organizations
Fédération Mondiale des Organisations d'Ingénieurs
CONSOLIDATED CONTRACTORS
2013
HASSIB J SABBAGH AWARD FOR ENGINEERING
CONSTRUCTION EXCELLENCE IN
GREEN CONSTRUCTIONS
Nomination Form (English only, please)
A. Background Data on the nominated engineer or team of engineers
1. Name of Firm :
.......................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
2. Major field of activity :
3. Address :
..............................................................................................................................................................................................................................................
...........................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
4. For the nominated engineer or each member of the nominated team of engineers:
Name and Surname
Year of birth
Present Position
Education
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
5. Sponsor’s Name and Address:
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
6. Sponsor’s Signature:
.......................................................................................................................................................................................................................................................................................................................................
53499-FMOI Sabbagh_07-0633-Depliant Sabbagh 06/02/13 15:24 Page4
B. Citation
Proposed citation (not more than 100 words noting specific accomplishments within the scope of
the Award Criteria)
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
C. Qualifications
1. Identification and evaluation of the accomplishments on which the nomination is based
(maximum of two double-spaced pages)
D. Supporting Letters
Letters from no more than four individuals whose names and addresses are listed
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
.......................................................................................................................................................................................................................................................................................................................................
Transmit, as attachments to one or more e-mails, this form, supplemental sheets, photographs, supporting letters and documents, all in English and in PDF format to:
executivedirector@wfeo.net
If necessary to mail, send this form, supplemental sheets, photographs, and nine copies of
supporting letters and documents, all in English to:
Executive Director WFEO/FMOI
Maison de l’UNESCO
1, rue Miollis
75015 Paris, France.
Download