**FINAL DRAFT** Town of Acushnet: **FINAL DRAFT** Riverfront Economic Development District Introduction: This document evaluates potential future commercial and mixed-use redevelopment and other new business development opportunities, zoning considerations and proposed infrastructure improvements for the area located southwest of the Town Center between South Main Street and the Acushnet River. It is anticipated that a new roadway combined with the establishment of appropriate zoning will provide access, encourage private investment, attract new business, expansion and redevelopment opportunities, enhance public access to riverfront and, improve traffic and circulation for a newly proposed “Riverfront Economic Development Area”. In addition development opportunities may emerge through the Kings Highway Commuter Rail Station proposed in New Bedford approximately 1 ¼ miles from the study area. The availability of potential transit or shuttle service through SERTA connections to the study area may attract additional residential and commercial development interest. Figure 1. Acushnet Riverfront EDD 1 The review and analysis was conducted as part of the technical assistance component of the South Coast Rail Land Use and Economic Development Corridor Study, 2009. The project area assessment and recommendations included in this document are based on a preliminary site analysis, collaboration with the Acushnet Town Planner, mapping, previous studies and reports and, other associated area activities. No market analysis was conducted for this study, and recommendations should be considered as long-term goals. Building the Framework Acushnet has developed several planning and economic development documents consistent with identifying the Titleist Property- Slocum Street/ South Main Street and the adjacent area as a priority development area targeted for potential redevelopment including recommendations for the establishment of additional zoning districts to allow for new commercial and industrial development, job creation, increased local benefits and the alleviation of truck traffic and congestion in the downtown through the construction of a possible bypass road. These documents include the following: → → → → Town of Acushnet Priority Development Areas and Priority Protection Areas Town of Acushnet Master Plan Acushnet Economic Development Plan and Strategy, and The Greater New Bedford Joint Economic Target Area Designation Riverfront Economic Development District: Study Area and Description The Riverfront Economic Development District study area starts at a point along the Acushnet River north of the Slocum/Wood Street Bridge and heads east to River Street at the intersection of Guilotte Street, then heads south along the rear lot lines of several parcels on River Street, then continue south crossing Slocum Street, extends east along Slocum Street to Titleist Drive, then heads south along Titleist Drive to Hope Street, then heads east along Hope Street to Rock Street, then heads south along Rock Street to a point, then heads east on a line to a point, then heads south along a line to a point, then heads east again, along a line parallel with Prouteau Street to South Main Street, then extents south along South Main Street to Lacuyers Lane, heads west on Lacuyers Lane to its end, continuing west along a line to the Acushnet River, then heads north along the banks of the Acushnet River to its intersection with the Slocum/Wood Street Bridge. Acushnet Riverfront EDD 2 Figure 2. Located within this area is the Acushnet Company’s Titleist Property, which had been home to Acushnet for about 100 years since 1910 is now closed. The main facility of Titleist’s property sits on the Acushnet River and abuts residential neighborhoods to the north and east. The residential area adjacent to the study area contains a mix of single- Acushnet Riverfront EDD 3 family homes and 2-family rentals. The neighborhood could benefit from some housing rehabilitation and street and sidewalk improvements. The remaining areas in the south are mostly vacant and underutilized rear lot areas with commercial and limited residential uses fronting South Main Street on the east. Proutteau Street residential neighborhood adjacent to study area Hope Street residential neighborhood Acushnet Riverfront EDD 4 This area represents Acushnet’s principal priority development area which is targeted for potential future business growth and redevelopment opportunities. A primary component of this redevelopment effort is construction of a proposed bypass road that will re-route truck traffic and congestion off South Main Street through a bypass road to Titleist Drive, Slocum Street and destinations in New Bedford. The installation of this roadway will have several beneficial objectives including: ● ● ● ● ● ● ● Alleviating heavy truck traffic and congestion in Acushnet’s Town Center will improve public safety, increase pedestrian access and foot traffic encouraging additional investment and new business growth; Providing transportation access for potential new light industrial, commercial, business and mixed-use development including redevelopment and infill opportunities Stimulating private investment, create new employment opportunities and generate local tax benefits Encouraging revitalization of the Town Center and the South Main Street Corridor Enabling additional public riverfront and open space access Improving pedestrian linkages between the riverfront, development area, residential neighborhood and destinations in the town center Proximity to the proposed Kings Highway Commuter Rail Station could provided additional development opportunities through new transits connection or expanded shuttle service Titleist property, Slocum Street Acushnet Riverfront EDD 5 The area contains five (5) major parcels and several smaller parcels representing approximately 43 acres, (see Table I: Parcels below) most of which are vacant and underutilized. A large portion of the area about 16.0 acres is anchored by the Titleist Ball Plant #1, which is located along the Acushnet River on Slocum Street at Titleist Drive adjacent to a residential neighborhood and within proximity to the town center. The Titleist site viewing west from the east property consists of a single 12.0 acre parcel and several smaller parcels. The larger parcel contains a vacant, 287,000 square foot manufacturing complex. A significant portion of this site (8.0 acres +/-) is vacant along with the remaining 4.0 acres which consists of paved parking lots. The facility closed in 2004 and is currently for sale. Some Table I: Parcels Town of Acushnet Acushnet Economic Development District Map Lot 25 24 25 25 25 25 31 107 34A 34 Owner Acushnet Company Cameron Realty Trust E. Hammond N&T Realty J. Robichaud Acushnet Riverfront EDD Value $ (land & bld) Street Address Acreage 4 Slocum Street 12.0 2,868,700 12.0 2.0 7.0 (17.7)6.0 39.0 1,359,800 251,200 166,800 259,386 4,905,886 107 S Main Street 97 S. Main Street S. Main Street 89 S. Main Street 6 of this land is located in the floodplain and has wetland constraints. It should be noted that the Titleist site is in Phase III remediation and has limited activity and use limitations (AUL). In addition, there are three (3) parcels that offer frontage with existing commercial uses on South Main Street and extend in the rear to the Acushnet River, these parcels total about 20 acres and are primarily vacant. A fourth parcel has access off South Main Street to a rear 7.0 acre parcel used as a mining operation. Figure 3. Study Area Parcel Map Vision Statement: The Town of Acushnet envisions the establishment of a new zoning district targeted towards economic development. This new economic development district will initially have two (2) central components serving as the catalyst for redevelopment in this riverfront area. The first component is the proposed construction of an estimated 2,000 +/- linear foot bypass road between South Main Street and the Acushnet River which is anticipated to enable both new business development as well as commercial and mixed-use redevelopment opportunities for approximately 24.7 available acres containing several new buildable parcels. It is recommended that the proposed layout be re-aligned to eliminate the hazardous curve off of South Main Street. About two thirds of the Titleist property (parking lot and undeveloped area to the south) are included in this section of the target area. Acushnet Riverfront EDD 7 The second major component is the redevelopment of the Titleist complex including the 278,000 square foot Ball Plant facility and vacant parking lots which are estimated at about 4 acres. Figure 4. Proposed Bypass Road and New Development Parcels Collectively these working components are expected to attract private sector investment through the development of new industries, expansion, redevelopment and infill opportunities providing job creation and increased tax revenues. Additional benefits include reduction of heavy truck in the Town Center, which will encourage revitalization along the South Main Street and in the Town Center by providing greater public safety to pedestrians and business patrons while improving the overall image of the area and, opportunities to secure additional public access on the Acushnet River enhancing the existing Acushnet Riverview Park with increased green connections including potential boating options, bike paths, walking trails and open space areas. Opportunities may also exists at the Head of the River Historic District located on Main Street in Acushnet to connect with New Bedford plans for bike paths from Reliable Truss south to the downtown (See Figure 5: Acushnet Open Space Map below for walking and bike paths connections). Acushnet Riverfront EDD 8 Figure 5. Acushnet Riverfront EDD 9 Acushnet: Riverview Park from the north viewing south This redevelopment area will integrate pedestrian friendly linkages to the adjacent residential areas, riverfront open space, downtown destinations and associated transit connections to create an area with a “sense of place”. These linkages will connect over the Slocum /Wood Street Bridge to destinations in the Riverside Avenue neighborhood of New Bedford (See New Bedford’s Upper Harbor Redevelopment Plan for review). Environmental Constraints: Environmental constraints in the proposed Riverfront Economic Development District are limited to the 500 and 100 year floodplains and some wetland areas. Acushnet’s Floodplain Protection Bylaw does not have any restrictions that would impact the proposed strategy. Although, the Titleist property, specifically the Ball Plant has activity and use limitations. (A site assessment should be available at the Town Hall for review). Existing and Proposed Zoning: Acushnet has limited zoning with only three (3) zoning districts having been established including a Residence A (RA), Business Village (BV) and Business Commercial (BC). The largest district is the RA covering more than 95% of Acushnet’s land area. The BV District covers land extending to 300 feet rear lot lines along several of Acushnet’s major roadways including Main Street, North Main Street and South Main Street. The B/C District contains a 21 acre area land with frontage on the southwest corner of Middle Road and Nye’s Lane. Relative to the study area and other adjacent areas there are several zoning revisions currently being considered. The 43 acre study area, referred to as the “Riverfront Economic Development District” containing land from the Titleist property south along the Acushnet River and including rear lot parcels fronting South Main Street are identified for proposed changes from RA and BV to BC. There is also a new industrial district proposed which, contains the P.J. Keating mining operation, a 272 acre area located on the east side of South Main Street potentially Acushnet Riverfront EDD 10 changing from RA and BV to Light Manufacturing and Warehousing (LMW) and Mining (M). In addition there is some expansion of the BV and a newly established Village Residential District (VR) proposed. Figure 6. Figure 6A. Land Use: The current land use within the study area consist of a combination of industrial, commercial, forest, non-forested wetland, salt-water wetland, multi-family residential, cropland, medium density residential, salt-water sandy beaches, water, pasture and powerline/utility. Most of the land is considered industrial (31.7%), forest (26.2%) and commercial (15.5%). Acushnet Riverfront EDD 11 Figure 7. Concept Map: The Concept Map portrays several primary components, which establishes a basis for a comprehensive community and economic development strategy for the area. The primary components include: Proposed Riverfront Economic Development District (REDD); Proposed bypass road; New development parcels; Existing opportunities for redevelopment Riverfront access and open space, expansion of Riverview Park linkages to historic district; Acushnet Riverfront EDD 12 Pedestrian linkages between riverfront, redevelopment area, residential neighborhood and town center/South Main Street; Neighborhood housing rehabilitation and street/sidewalk reconstruction, and Downtown revitalization Development Strategies: SRPEDD has identified a series of development strategies which Acushnet may wish to consider as it moves forward with this plan and development initiative. The development strategies are as follows: ● Initiate meetings and engage area residents, businesses, property owners and other to build support and gain consensus; ● Develop and establish a new commercial/business zoning district (proposed as the Riverfront Economic Development District); ● Obtain support and approval from the Board of Selectmen; ● Initiate meetings with key property owners for land acquisition and construction of proposed new bypass road; ● Emphasize potential redevelopment and new development lots created by proposed bypass road; ● Re-engage Titleist and potential new owners on the Town’s vision for the area; ● Highlight advantages of expanded redevelopment potential and improved access to the property and adjacent areas; ● Explore the possibility with Titleist to include in any P&S agreement a provision that the new property owners, if feasible will work with the Town of Acushnet to develop the proposed bypass road; ● Develop preliminary plans for design, engineering and cost of proposed bypass road including land acquisition; ● Initiate meetings with town center businesses and others especially those on South Main Street on the impact of the proposed bypass for town revitalization; ● Provide additional infrastructure improvements to and from destinations in the target area (riverfront, redevelopment area, residential neighborhood and town center) including creation of walkable, pedestrian friendly linkages, streetscapes, lighting, way-finding signage and riverfront access for open space and walking and bike trials; ● Pursue grant funding opportunities leveraged with private sector investment and job creation benefits; ● Encourage and support existing business expansion and new business development consistent with the redevelopment vision for the area; ● Work with potential new Titleist property owners on acquisition of riverfront property (parking lot) on north side of Slocum Road for potential expansion of Riverview park and potential greenway connection to Head of the River Historic District located on Main Street; ● Compile an inventory of vacant and underutilized properties including residential, commercial and business for redevelopment, infill or conversion potential. Special emphasis should be given to the town center and South Main Street areas; Acushnet Riverfront EDD 13 ● ● ● ● Initiate a dialogue with New Bedford officials (New Bedford Economic Development Council-NBEDC) on what Acushnet’s vision for this area is in order to be consistent and enhance redevelopment opportunities Participate in the Chapter 43D Expedited Streamlined Permitting Program and designate the new economic development district or the Titleist property as a priority development site (PDS); Utilize New Bedford Chamber of Commerce for networking and marketing initiatives; Initiate discussions with South Eastern Regional Transit Authority (SERTA) to explore potential for expansion of the North End shuttle service from Acushnet town center to proposed King Highway commuter rail station in New Bedford or establish a new bus route. General Concerns: This preliminary redevelopment strategy attempts to provide Acushnet with valuable information, development strategies and recommended actions designed to strengthen support and build consensus for the redevelopment vision in the proposed Riverfront Economic Development District, which could provide area wide opportunities including: new private investment, business, commercial and mixed-use development, expansions, employment growth, riverfront access, open space and other. Having said this, there are several initial concerns which will ultiminately affect the feasibility of this redevelopment strategy. These concerns include the following: 1. Ability to obtain agreements securing necessary land for Bypass ROW; 2. Discussion with New Bedford officials on proposal to redirect truck traffic over the Slocum Street Bridge into the Riverside Avenue area; 3. Consensus from residential neighborhoods on the impacts from proposed strategy, and 4. Overall project cost for bypass including land acquisitions or takings. Recommended Actions: SRPEDD recommends considering a select set of actions to serve Acushnet’s vision for redevelopment in the identified area. These actions should be pursued simultaneously on a continuous basis in order to build consensus and support, position the area for new business development and other redevelopment opportunities and to obtain transportation infrastructure improvements anticipated to potentially lead to long-term redevelopment. 1. 2. 3. 4. Initiate and engage the Acushnet Board of Selectmen, other boards and/or committees to gain support and consensus on the Vision for area redevelopment; Initiate discussions with key property owners and business to determine future development plans, interest and participation; Organize and appoint a Riverfront Economic Development Task Force (or similar entity) to implement the vision of redevelopment; Work with the Planning Board to create and establish a new economic development zoning district; Acushnet Riverfront EDD 14 5. Engage Titleist and potential new property owners in discussions on proposed bypass road, potential site redevelopment plans and overall development goals for the area. Funding Options: Table II: Potential Funding Sources Category/ Program Agency Funding Cycles Funding Amount (max.) Contact Person /Telephone # Depart of Housing & Community Development (DHCD) Mass Development Ongoing $50K Mark Nardone 617-573-1400 Ongoing $50k DHCD Annual Feb 2011 $800k Jim Walsh or Larry Cameron 508-678-0533 617-573-1400 Massachusetts Department of Transportation (Mass DOT) DHCD - $15K Kristina Egan 617-973-7000 Annual $5K DHCD Rolling $25-$50K Emmy Hahn 617-573-1400 Miryam Bodadilla 617-573-1400 Mass DOT Jan & June $1.0 - $1.5ML William Palmer 617-973-8070 DHCD Rolling Basis $800K Cyrus Field 617-573-1400 Executive Office of Housing & Economic Development (EOHED) DHCD Annual $1.0 - 5.0ML Nayenday Thurman 617-788-3636 Annual $800K 617-573-1400 PDF DHCD Rolling $25-$50K Chapter 40R DHCD Ongoing Housing Development Support Program (HDSP) MassDevelopment DHCD Ongoing Project Dependant $750K Miryam Bodadilla 617-573-1400 617-573-1400 MassDevelopment Ongoing CDF II CDAG DHCD DHCD Annual Rolling Basis Planning Economic Development Fund (EDF) Mass Development Community Development Fund II (CDF II) South Coast Rail (SCR) Mass Downtown Initiative (MDI) Priority Development Fund (PDF) Infrastructure Public Works Economic Development Fund (PWED) Community Development Action Grant (CDAG) Mass Opportunity Relocation & Expansion (MORE) CDF II Mixed-use Development Project Dependant 800K $1.0 – 1.5ML 617-573-1400 Jim Walsh or Larry Cameron 508-678-05533 617-573-1400 Cyrus Field 617-573-1400 Recreation and Open Space Acushnet Riverfront EDD 15 Enhancement Projects Land & Water Conservation Funds(L&WCF) Mass Parkland Acquisition & Renovations for Communities Preservation Massachusetts Mass DOT Ongoing Varied Jim Cope 617-973-7043 Adam Reccia 508-824-1367 Melissa Cryan 617-626-1171 Executive Office of Energy and Environmental Affairs (EOEEA) Division of Conservation Services Annual 70% of project costs Annual $500K Celia Riechel 617-626-1187 Preservation Mass Ongoing Project Dependant Dorr Fox 508-245-6824 Mass Office of Business Development MOBD) Ongoing Project Dependant Buddy Rocha 508-730-1438 EOHED Ongoing Project Dependant 617-573-1400 Development Incentive Programs Economic Development Incentive Program (EDIP) Chapter 43D Expedited Streamlined Permitting Appendix Traffic Counts Business Commercial Zoning Bylaw Concept Map Acushnet Riverfront EDD 16