ADDENDUM NO. 1 TO REQUEST FOR BIDS 221/223 SW 12th Avenue Duplex Renovation Delray Beach Community Redevelopment Agency Delray Beach Community Redevelopment Agency (CRA) Project No. CRA2015-07 October 29, 2015 TO ALL RESPONDENTS AND INTERESTED PARTIES The Delray Beach Community Redevelopment Agency ("CRA") has published a Request for Bids on October 18, 2015 for the purpose of soliciting responses for the interior and exterior renovations of the duplex structure located at 221/223 SW 12 th Avenue, Delray Beach, Florida. The intent of this Addendum is to address the errors and/or clarify other aspects of the Request for Bids. Respondents submitting proposals for the above-referenced project shall take note of the following changes, additions, deletions clarifications, etc., to the Request for Bids which shall become a part of and have precedence over anything shown or described otherwise. 1. Q: “We are a licensed General Contractor, do we need to be pre-qualified with the City of Delray Beach?” (submitted by Don Stephens) A: No, the bidders do not have to be pre-qualified with the City of Delray Beach as this is a CRA project and CRA does not have a pre-qualified list of General Contractors. 2. Q: “Will there be an option for an additional site visit?” A: Yes, the site will be accessible to interested parties on Monday, November 2nd, 2015 from 1:00 P.M. to 2:00 P.M. 3. Q: “Is lead abatement required prior to construction?” A: According to the Lead Report, lead has been found in the matrix of ceramic tiles present at the bathrooms in both duplex units. Per discussion with ARS Environmental, abatement is not required prior to construction, as long as lead-containing material is not airborned. However, removal of lead-containing materials is subject to all federal, state and local requirements, and shall be performed by certified renovators, as defined by the United States Environmental Protection Agency (www.epa.gov). 4. Q: “Are we to cut floors and replace the existing sanitary with new?” (submitted by George T. Jawde) 1 Addendum No.01 A: Yes, please replace existing sanitary lines. 5. Q: “Are we to cut floors and run new water heater drain pan lines?” (submitted by George T. Jawde) A: Yes, drain pan lines need to run under the floor. 6. Q: “Item #13 in the bid list calls for (Roofing number to be entered). While plans page A-201 clearly shows that (Existing Shingles Remain).” (submitted by George T. Jawde) A: Roofing line item is for roof repair, if needed. END OF ADDENDUM No. 1 2 Addendum No.01