Proposed Residential Subdivision Stormwater Drainage Strategy Lot 5 DP1082569 Averys Lane Buchanan Buchanan Ridge Pty Ltd PO Box 3330 Merewether NSW 2291 M 0400 397 342 E admin@fisherengineers.com.au W fisherengineers.com.au Averys Lane Buchanan © Fisher Consulting Engineers Pty Limited [2013]. Copyright in the information, drawings and data recorded in this document (the information) is owned by Fisher Consulting Engineers Pty Limited. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by Fisher Consulting Engineers Pty Limited. Fisher Consulting Engineers Pty Limited makes no representation, undertakes no duty and accepts no responsibility to any third party who may choose to use or rely upon this document or the information. Issue 1 1 Description Original Issue Draft - Client Issue Only Author AJF AJF Reviewer 27.05.15 04.02.15 AJF AJF 27.05.15 04.02.15 Approved by AJF AJF 27.05.15 04.02.15 14034 Buchanan DA Stormwater Drainage Strategy r1 |i Averys Lane Buchanan Table of Contents 1. INTRODUCTION ......................................................................................................................... 1 1.1. Background ................................................................................................................... 1 1.2. Site Description ............................................................................................................. 1 1.3. Proposed Development ................................................................................................ 1 1.4. Drainage Catchment ..................................................................................................... 1 1.5. Scope of Work ............................................................................................................... 2 1.6. Available Data ................................................................................................................ 2 1.7. Previous Studies............................................................................................................ 2 1.8. Strategy Objectives / Criteria......................................................................................... 3 1.8.1. Stormwater Runoff Quantity Criteria ............................................................ 3 1.8.2. Stormwater Runoff Quality Criteria .............................................................. 3 1.8.3. Flooding Criteria .......................................................................................... 3 2. STORMWATER DRAINAGE MANAGEMENT STRATEGY .......................................................... 4 3. METHODOLOGY ........................................................................................................................ 5 3.1. Stormwater Runoff Quantity .......................................................................................... 5 3.1.1. Stormwater Flow Model ............................................................................... 5 3.1.1.1. Catchment Plan and Model Data ..................................................... 5 3.1.1.2. Rainfall Data ..................................................................................... 6 3.1.1.3. Probabilistic Rational Method .......................................................... 6 3.1.1.4. DRAINS Model Parameters .............................................................. 7 3.1.1.5. Model Subcatchment Data ............................................................... 7 3.2. Stormwater Runoff Quality ............................................................................................ 8 3.2.1. MUSIC Parameters ...................................................................................... 9 3.2.1.1. Land Use Types ............................................................................... 9 3.2.1.2. Rainfall and Evapotranspiration ....................................................... 9 3.2.1.3. Time Step ......................................................................................... 9 3.2.1.4. Hydrology ......................................................................................... 9 3.2.1.5. Event Mean Concentrations ........................................................... 10 3.3. 4. Flooding ...................................................................................................................... 11 MODEL RESULTS .................................................................................................................... 12 4.1. 4.2. Stormwater Runoff Quantity ........................................................................................ 12 4.1.1. Probabilistic Rational Method .................................................................... 12 4.1.2. DRAINS Model Results .............................................................................. 12 4.1.3. DRAINS Modelled Detention Basin Outlet Controls .................................. 17 4.1.4. Stormwater Flow Conveyance Structures ................................................. 18 Stormwater Runoff Quality .......................................................................................... 19 4.2.1. MUSIC Results – Post Development Land Use (No Treatment) ............... 19 4.2.2. MUSIC Results – Post Development Land Use (with Treatment).............. 19 4.2.2.1. Treatment Devices.......................................................................... 19 14034 Buchanan DA Stormwater Drainage Strategy r1 |ii Averys Lane Buchanan 4.2.2.2. Modelling Results ........................................................................... 20 4.3. Flooding ...................................................................................................................... 21 5. SOIL AND WATER MANAGEMENT DURING CONSTRUCTION ............................................. 22 6. SUMMARY AND CONCLUSIONS ............................................................................................ 23 7. REFERENCES .......................................................................................................................... 25 List of Figures Figure 1 Locality Plan Figure 2 Indicative Lot Layout Figure 3 Existing Catchment Plan Figure 4 Developed Catchment Plan Figure 5 Stormwater Management Plan Figure 6 Detention Basin No. 1 Layout Plan Figure 7 Detention Basin No. 2 Layout Plan Figure 8 MUSIC Node Layout List of Appendices Appendix A Indicative Lot Layout (supplied by Buchanan Ridge) Appendix B Planning Proposal, “Averys Village”, Averys Lane, Heddon Greta, 18/2006/3, 30 May 2012, Figure 4 (PPEE2/2012), Cessnock City Council Appendix C DRAINS Data Spreadsheets Appendix D PRM Calculations Appendix E DRAINS Results Spreadsheets Appendix F 100 Year ARI Hydrographs 14034 Buchanan DA Stormwater Drainage Strategy r1 |iii Averys Lane Buchanan List of Tables Table 1: Table 2: Table 3: Table 4: Table 5: Table 6: Table 7: Table 8: Table 9: Table 10: Table 11: Table 12: Table 13: Table 14: Table 15: Table 16: Table 17: Table 18: Table 19: Table 20: Table 21: Table 22: Table 23: Catchment values for probabilistic rational method calculations ................................. 6 Storage and loss parameter values adopted in the DRAINS hydrological models for Catchments North and South........................................................................................ 7 Roughness parameter values adopted in the DRAINS models .................................... 7 Impervious area percentage values adopted in the DRAINS models .......................... 7 Stormwater treatment objectives for New South Wales ................................................ 8 Monthly Average Areal PET Values ............................................................................... 9 MUSIC Rainfall-Runoff Parameters ............................................................................. 10 Adopted Land Use Baseflow and Stormflow Concentration Parameters ................... 11 Probabilistic rational method results ........................................................................... 12 Model results of ‘existing’ state for Catchment North ................................................. 13 Model results of ‘existing’ state for Catchment South ................................................ 13 Existing Peak Flowrates Comparison ......................................................................... 14 DRAINS Peak Flow Results for Catchment North ....................................................... 15 DRAINS Peak Flow Results for Catchment South ...................................................... 15 DRAINS Peak Flow Results with Detention for Catchment North ............................... 16 DRAINS Peak Flow Results with Detention for Catchment South .............................. 16 Detention Volume ........................................................................................................ 17 Summary of Basin and Outlet Structures.................................................................... 17 Flowrate and Depth over Spillway - Detention Basin No. 1 ........................................ 18 Summary of culvert parameters .................................................................................. 18 MUSIC Model Results for the Site’s Post Development Land Use (No Treatment).... 19 MUSIC Model Results for the Site’s Post Development Land Use (with Treatment) .. 20 MUSIC Model Treatment Train Effectiveness Results................................................. 20 14034 Buchanan DA Stormwater Drainage Strategy r1 |iv Averys Lane Buchanan List of Acronyms AHD Australian Height Datum ARI Average Recurrence Interval AR&R Australian Rainfall and Runoff, Institution of Engineers, Australia, 1987 ARQ Australian Runoff Quality, Engineers Australia, 2006 AWL Active Water Level BASIX Building Sustainability Index BOM Bureau of Meteorology CC Construction Certificate CCC Cessnock City Council DA Development Application DLWC Department of Land and Water Conservation FFL Finished Floor Level GPT Gross Pollutant Trap IFD Intensity Frequency Duration LGA Local Government Area PRM Probabilistic Rational Method PWL Permanent Water Level R.L Reduced Level TWL Top Water Level 14034 Buchanan DA Stormwater Drainage Strategy r1 |v Averys Lane Buchanan 1. INTRODUCTION 1.1. Background Fisher Consulting Engineers has been engaged by Buchanan Ridge Pty Ltd to formulate a Stormwater Drainage Strategy to support a proposed Development Application for a residential subdivision at Averys Lane Buchanan. The site is known as Lot 5 DP 1082569 and is situated within the Cessnock City Council Local Government Area. The stormwater drainage strategy addresses stormwater quantity and quality requirements, and flood levels for the proposed development. A locality plan is shown in Figure 1. 1.2. Site Description The site is generally bounded by Wallis Creek to the East, rural residential lots to the South, bushland to the East, and rezoned and/or DA approved residential land to the North. Lot 5 has been rezoned with both R2 and E2 zonings covering the site. Lot 5 drains typically toward the East with the site broken into two Catchments, both ultimately draining into Wallis Creek. Both Catchments contains slopes typically in the order of 2-3%. The R2 zoned portion of the site varies in level from approximately R.L 23m in its North Western corner to approximately R.L 8m along the Eastern boundary near its South Eastern corner. 1.3. Proposed Development The proposed development previously involved the rezoning of the site from rural grazing to R2 Low Density Residential and E2 Environmental Conservation. The proposal is for 175 lots over the R2 zoned portion of the site. An indicative lot layout has been prepared and is shown in Figure 2. Access to the proposed development from the South will be via Averys Lane from John Renshaw Drive. Access from the North via an extension of Averys Lane from Heddon Street and Main Road will become available following development of the residential zoned land to the North. 1.4. Drainage Catchment Wallis Creek is a major tributary of the Hunter River and flows adjacent to the Eastern boundary of the subject site. Wallis Creek flows generally in a northerly direction ultimately draining into the Hunter River at Horseshoe Bend in Maitland. The Wallis Creek floodplain lies adjacent to the Eastern boundary of the subject site, and the site drains to this floodplain prior to joining the physical creek line of Wallis Creek. 14034 Buchanan DA Stormwater Drainage Strategy r1 |1 Averys Lane Buchanan 1.5. Scope of Work This Strategy has been undertaken to provide the following information in support of the Development Application: Identification of the requirements of Cessnock City Council for the development site. Identify the impacts of the proposed residential development on existing waterways. Develop a strategy to minimise the effects of the development on downstream waterways. Provide concept sizing of the proposed stormwater management facilities in accordance with the adopted strategy. 1.6. Available Data The following available information was utilised in the preparation of this strategy: An indicative lot layout plan supplied by Buchanan Ridge. A copy of the lot layout plan is shown in Appendix A. Planning Proposal, “Averys Village”, Averys Lane, Heddon Greta, 18/2006/3, 30 May 2012, Contact: Mr Scott Christie, Strategic Land Use Planner, Cessnock City Council. An extract from the report is shown in Appendix B. Wallis, Swamp and Fishery Creeks Flood Study, dated August 2011, prepared by Worley Parsons. Averys Lane Rezoning, Flooding and Stormwater Management, October 2007, prepared by Parsons Brinckerhoff. 1.7. Previous Studies Averys Lane Rezoning, Flooding and Stormwater Management, October 2007, prepared by Parsons Brinckerhoff (PB). This report was prepared to provide preliminary flooding and stormwater management advice to support the rezoning application. Wallis, Swamp and Fishery Creeks Flood Study, dated August 2011, prepared by Worley Parsons. This study was prepared for Cessnock City Council to provide flood levels in the Wallis Creek and Swamp/Fishery Creek locations. In the study peak flood levels, for a range of ARI events, in the creeks were mapped against survey levels to provide peak flood extents within the creeks and associated flood storage areas. 14034 Buchanan DA Stormwater Drainage Strategy r1 |2 Averys Lane Buchanan 1.8. Strategy Objectives / Criteria 1.8.1. Stormwater Runoff Quantity Criteria The proposed development site has two distinct catchments which discharge toward the East to the flood storage plain associated with Wallis Creek. Stormwater flow management criteria include: The adoption of a major / minor flow approach to the design of the local stormwater flow management system. Conveyance of major flows through the site in a safe manner. Limiting the post development discharge rates from the subject site to predevelopment discharge rates. 1.8.2. Stormwater Runoff Quality Criteria Stormwater runoff from the development should be treated prior to discharge, consistent with normal practice for new developments, and with consideration to opportunities for integration with existing site features and topography. The methodology for Stormwater Runoff Quality typically involves selection of stormwater quality treatment devices based on identified opportunities for stormwater quality management referencing the development site and catchment conditions, and normal best practice. Stormwater quality management for the subject site could comprise a treatment train of structures consisting of: water harvesting for reducing runoff volumes (rainwater tanks) gross pollutant traps (GPTs) stormwater quality control ponds 1.8.3. Flooding Criteria Lots should have sufficient buildable area for a dwelling to be located at or above the flood planning level, which is the 1 in 100 year ARI flood level plus 500mm freeboard for residential development. In 2012 Cessnock City Council prepared a report titled Planning Proposal, “Averys Village”, Averys Lane, Heddon Greta, 18/2006/3, 30 May 2012, Contact: Mr Scott Christie, Strategic Land Use Planner. The report was prepared for the Agenda of the Planning Panel Meeting of the Cessnock City Council. Within this report Figure 4 (PPEE2/2012) shows the flood levels within the Wallis Creek catchment, which is an extract from the Wallis, Swamp and Fishery Creek Flood Study (2011). A flood level of R.L 10.30m AHD is shown adjacent to the north east corner of the subject site. This flood level of R.L 10.30m AHD continues through the flood storage plain for a distance of greater than 3.0km, and hence is considered that the majority of the flood plain storage area has a flood level of R.L10.30m AHD, including the subject site. Accordingly this strategy has adopted the Council’s 1 in 100 year flood level of R.L 10.30m AHD. 14034 Buchanan DA Stormwater Drainage Strategy r1 |3 Averys Lane Buchanan 2. STORMWATER DRAINAGE MANAGEMENT STRATEGY The proposed stormwater drainage strategy involves: Roof areas on lots will outlet to rainwater tanks within each lot for re-use, which are likely to be a requirement by BASIX (Building Sustainability Index) regulations. Tanks will overflow via a piped connection to the IAD or street drainage system. Capture of stormwater from lot and road reserve areas by a conventional pit and pipe drainage network located in the street or in interallotment drainage easements where required. Conveyance of captured stormwater within the drainage pipe network to gross pollutant traps (GPT’s) for primary treatment prior to discharge into the proposed detention basin and/or stormwater quality control pond. Discharge from the catchments outlets will be conveyed over land within existing watercourses to the Wallis Creek flood storage plain. The proposed detention basins and/or stormwater quality control ponds will be located within drainage reserves and dedicated to Council consistent with other developments within the Cessnock LGA. Figure 5 shows the Stormwater Management Plan and depicts the above management strategy. Details of the proposed local drainage system will be determined at the time of Construction Certificate application, to Council’s standard requirements. 14034 Buchanan DA Stormwater Drainage Strategy r1 |4 Averys Lane Buchanan 3. METHODOLOGY 3.1. Stormwater Runoff Quantity Existing and post-development flowrates are estimated using hydrological computer modelling software in order to demonstrate the magnitude of the local catchment flowrates. The post-development discharge is compared to the pre-developed discharge, and if higher, detention is usually warranted in accordance with Council’s standard requirements. 3.1.1. Stormwater Flow Model A stormwater flow model was prepared for the purpose of estimating existing and postdevelopment flowrates to demonstrate the magnitude of the local catchment flowrates. 3.1.1.1. Catchment Plan and Model Data Surface runoff flowrates from the site were modelled in two differing scenarios using the DRAINS – Urban Drainage Model, firstly in the existing state and secondly as a developed catchment. The RAFTS module was used within the DRAINS software package for both scenarios. For the existing state the development site was divided into two catchments, Catchment North and Catchment South. Figure 3 shows the location of the existing state catchment boundaries, including the external catchment where required. DRAINS model data is included in Appendix C. For the developed state the development site was divided into two catchments, Catchment North and Catchment South, however the catchments were modified to reflect the developed catchment, including redirection of Catchment North upstream undeveloped flows around the development site into Catchment South. Figure 4 shows the location of the developed state catchment boundaries, including the external catchment. DRAINS model data is included in Appendix C. The methodology for stormwater quantity comprised quantitative analysis of available data to estimate existing and future flow behaviour from the development site. The analysis involved examination of surface hydrology to assess runoff characteristics from the site and sizing of stormwater mitigation devices to negate the impact of site development on existing flowrates. This involved the following steps: Estimation of existing peak stormwater flowrates at the downstream drainage outlets of the site using the DRAINS drainage software package. Flowrates from the DRAINS software were compared with flowrate estimates obtained using the Probabilistic Rational Method (Australian Rainfall and Runoff, Institution of Engineers, Australia, 1987), which is normal practice in rural catchments where long term flow data is not available for model calibration. Compare PRM and DRAINS flowrates to PB report’s PRM and existing state flowrates. 14034 Buchanan DA Stormwater Drainage Strategy r1 |5 Averys Lane Buchanan Revise the existing scenario in the DRAINS drainage model to include the additional impervious areas that will arise due to development of the site. This resulted in the developed DRAINS drainage model. The critical storm was then selected for each ARI, based on the peak discharge from the site. The hydrographs of these ‘critical’ storms were plotted to determine the approximate volume of storage required. Identification of potential locations for on-site stormwater detention structures to reduce post-development discharge flowrates. 3.1.1.2. Rainfall Data Rainfall for a range of design events from 1 year ARI to 100 year ARI, and storm durations from 5 minutes to 12.0 hours for each, were modelled in order to identify the critical storm duration (producing the highest peak flowrate) for each ARI from the site. The required rainfall Intensity Frequency Duration (IFD) rainfall data was obtained from the tables supplied in Australian Rainfall and Runoff, and the BOM website, and is reproduced below. Latitude = 32.800 S Longitude = 151.500 E Skewness = 0.05 2-year ARI, 1 hour intensity = 30.21 mm/hr 12 hour intensity = 6.38 mm/hr 72 hour intensity = 1.97 mm/hr 1 hour intensity = 58.51 mm/hr 12 hour intensity = 13.57 mm/hr 72 hour intensity = 4.02 mm/hr 50-year ARI, 3.1.1.3. Probabilistic Rational Method Probabilistic rational method flow calculations were undertaken for existing Catchment North and South, including their external catchments, using the procedure outlined in Australian Rainfall and Runoff to calibrate DRAINS stormwater modelling in the existing state. Table 1 summarises the adopted values for catchment areas and fraction impervious for the existing Catchments North and South, used in the probabilistic rational method flow calculations. Full PRM calculations are shown in Appendix D. Table 1: Catchment values for probabilistic rational method calculations Catchment Catchment Area Fraction Impervious North 16.113 ha 0.0 South 71.800 ha 0.0 14034 Buchanan DA Stormwater Drainage Strategy r1 |6 Averys Lane Buchanan 3.1.1.4. DRAINS Model Parameters Table 2 summarises the catchment storage and loss parameter values adopted in the DRAINS models for Catchments A, B and C. The parameter values are adopted by calibrating the exiting scenario DRAINS model results with the calculated values from probabilistic rational method calculations. Table 2: Storage and loss parameter values adopted in the DRAINS hydrological models for Catchments North and South Parameter Catchments North and South value Storage Multiplier, Bx 1.2 Pervious Area Initial Loss (mm) 10.0 Pervious Area Continuing Loss (mm) 2.5 Impervious Area Initial Loss (mm) 1.5 Impervious Area Continuing Loss (mm) 0.0 3.1.1.5. Model Subcatchment Data Full DRAINS model subcatchment data is provided in Appendix B. Subcatchment Manning’s n roughness values used in the DRAINS models are summarised in Table 3. Table 3: Roughness parameter values adopted in the DRAINS models Model - surface type Mannings ‘n’ value Existing model - pervious areas 0.06 Developed models - pervious / impervious areas 0.06 / 0.015 Subcatchment impervious area percentage values used in the DRAINS models are summarised in Table 4. Table 4: Impervious area percentage values adopted in the DRAINS models Model - type Impervious Area Percentage Existing model – natural 0% – existing external catchment 0% Developed models – natural 0% – existing external catchment 0% – developed lots with half road reserve 65% – half road reserve 85% 14034 Buchanan DA Stormwater Drainage Strategy r1 |7 Averys Lane Buchanan 3.2. Stormwater Runoff Quality The methodology for Stormwater Runoff Quality typically involves selection of stormwater quality treatment devices based on identified opportunities for stormwater quality management referencing the development site and catchment conditions, and normal best practice. The performance of the stormwater management plan was undertaken using the MUSIC stormwater water quality model. MUSIC is a continuous simulation water quality model. The pollutants considered in the water quality modelling were total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN) which are typical components of urbanised stormwater runoff. MUSIC input parameters include: Rainfall and potential evapotranspiration data Catchment area and percentage impervious Hydrologic parameters Statistical pollutant generation parameters MUSIC outputs include: Average annual pollutant export loads Treatment train effectiveness, expressed in terms of pollutant reduction. Input parameters used for modelling were derived from BOM Climate Data, parameter values in the MUSIC User Manual (version 6.1) and the publication Using MUSIC in Sydney’s Drinking Water Catchment, A Sydney Catchment Authority Standard (Published by Sydney Catchment Authority, Penrith, December 2012). The treatment criteria published in Australian Runoff Quality, Table 1.2 (Engineers Australia, 2006) were adopted for this study, and are summarised in Table 5. Table 5: Stormwater treatment objectives for New South Wales Pollutant Stormwater treatment objective Total Suspended Solids (TSS) 80% retention of average annual load Total Phosphorus (TP) 45% retention of average annual load Total Nitrogen (TN) 45% retention of average annual load 14034 Buchanan DA Stormwater Drainage Strategy r1 |8 Averys Lane Buchanan 3.2.1. MUSIC Parameters 3.2.1.1. Land Use Types Surface runoff from the undeveloped areas of the catchments will drain naturally to the existing watercourses. The developed land use was modelled as separate lot, road and roof surface types. The pollutant generation characteristics of the surface types are shown in Table 8 below. 3.2.1.2. Rainfall and Evapotranspiration The rainfall data used for the modelling was from Pokolbin (Somerset) weather station (061238). The rainfall data used in the analysis spanned from 1967 to 1976. The average annual rainfall during this period was 777mm Monthly average areal potential evapotranspiration (PET) values were obtained from mapping on the BOM website. Evapotranspiration values are given in Table 6. The estimated total annual areal PET is 1472mm. Table 6: Monthly Average Areal PET Values Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec PET (mm/month) 195 150 120 105 90 75 75 75 105 135 165 180 3.2.1.3. Time Step The model was run with a time step of 6 minutes. This time step was considered appropriate in relation to model reliability, output sensitivity, computational speed and file size. 3.2.1.4. Hydrology MUSIC hydrology parameters used are summarised below in Table 7. 14034 Buchanan DA Stormwater Drainage Strategy r1 |9 Averys Lane Buchanan Table 7: MUSIC Rainfall-Runoff Parameters Parameter Site Land Use Roofs Roads Lots Land Use Area (ha) 5.40 5.338 5.90 Impervious Area Percentage 100 85 0 Rainfall Threshold (mm/day) 1 1 1 Soil Storage Capacity (mm) 200 200 200 Initial Storage (% of Capacity) 30 30 30 Field Capacity (mm) 170 170 170 Infiltration Capacity Coefficient – a 200 200 200 Infiltration Capacity Exponent – b 1 1 1 Initial Depth (mm) 10 10 10 Daily Recharge Rate (%) 25 25 25 Daily Baseflow Rate (%) 5 5 5 Daily Deep Seepage Rate (%) 0 0 0 Impervious Area Properties Pervious Area Properties Groundwater Properties The nominated roof land use area above is based on 180 lots, being the initial lot count prior to the reduction to 175 lots due to land take by Detention Basin No. 1, with each lot having an impervious roof area of 300m2. 3.2.1.5. Event Mean Concentrations The MUSIC model requires pollutant generation parameters for baseflow and stormflow conditions. Baseflow is derived from the groundwater store, which is recharged from the pervious soil store. Stormflow is generally generated from the impervious area, and under some conditions the pervious area as well. The pollutant parameters for the adopted land use types were determined from the Using MUSIC in Sydney’s Drinking Water Catchment, A Sydney Catchment Authority Standard (Published by Sydney Catchment Authority, Penrith, December 2012), and are provided in Table 8. 14034 Buchanan DA Stormwater Drainage Strategy r1 |10 Averys Lane Buchanan Table 8: Adopted Land Use Baseflow and Stormflow Concentration Parameters Total Suspended Solids (TSS) (log10 mg/L) Total Phosphorus (TP) (log10 mg/L) Mean Std. Dev Mean Std. Dev Mean Std. Dev Roof n/a n/a n/a n/a n/a n/a Road 1.20 0.17 -0.85 0.19 0.11 0.12 Lot 1.20 0.17 -0.85 0.19 0.11 0.12 Roof 1.30 0.32 -0.89 0.25 0.30 0.19 Road 2.43 0.32 -0.30 0.25 0.34 0.19 Lot 2.15 0.32 -0.60 0.25 0.30 0.19 Land Use and Flow Type Total Nitrogen (TN) (log10 mg/L) Baseflow Stormflow 3.3. Flooding Following the stormwater modelling process, and the inclusion of any required stormwater detention measures and/or stormwater flow conveyance structures, proposed lots are reviewed against localised 100 year ARI stormwater flow levels to confirm that there is sufficient buildable area for a dwelling to be located at or above the flood planning level, which is the 100 year ARI flood level plus 500mm freeboard for residential development. As stated in Section 1.8.3 this strategy has adopted the Council’s 1 in 100 year flood level of R.L 10.30m AHD, consistent with Council’s DCP 2010 Part E.14 Averys Village, Heddon Greta. 14034 Buchanan DA Stormwater Drainage Strategy r1 |11 Averys Lane Buchanan 4. MODEL RESULTS 4.1. Stormwater Runoff Quantity 4.1.1. Probabilistic Rational Method Summary of probabilistic rational method flow estimates are provided in Table 9, including a comparison of PB reports PRM flowrates. Full calculations are provided in Appendix D. Table 9: Probabilistic rational method results ARI Catchment PRM Estimate PB PRM estimate 3 (m /s) (m3/s) North 0.442 0.51 South 1.48 1.48 North 0.68 n/a South 2.28 n/a North 1.04 n/a South 3.49 n/a North 1.34 1.53 South 4.48 4.39 North 1.73 1.97 South 5.79 5.66 North 2.18 n/a South 7.30 n/a North 2.64 2.91 South 8.82 8.35 (years) 1 2 5 10 20 50 100 From Table 9 it is considered that the PRM estimate is consistent with PB’s rezoning report’s PRM estimate. 4.1.2. DRAINS Model Results The DRAINS models for Catchment North and Catchment South were run for various design storm durations to calibrate the model. The following three results summary tables are provided below: 14034 Buchanan DA Stormwater Drainage Strategy r1 |12 Averys Lane Buchanan Table 10: Catchment North model calibration. Comparison of DRAINS-predicted peak flowrates with probabilistic rational method peak flowrates for existing catchment conditions. Table 11: Catchment South model calibration. Comparison of DRAINS-predicted peak flowrates with probabilistic rational method peak flowrates for existing catchment conditions. Table 10: Model results of ‘existing’ state for Catchment North ARI Peak Flowrate Peak Flowrate (years) (Existing State – Probabilistic Rational Method) (Existing State – DRAINS) Percentage Change (m3/s) (m3/s) (m3/s) 1 0.442 0.44 0% 2 0.68 0.65 -4% 5 1.04 0.948 -9% 10 1.34 1.17 -13% 20 1.73 1.45 -16% 50 2.18 1.71 -22% 100 2.64 1.97 -25% Table 11: Model results of ‘existing’ state for Catchment South ARI Peak Flowrate Peak Flowrate (years) (Existing State – Probabilistic Rational Method) (Existing State – DRAINS) Percentage Change (m3/s) (m3/s) (m3/s) 1 1.48 1.64 +11% 2 2.28 2.46 +8% 5 3.49 3.67 +5% 10 4.48 4.38 -2% 20 5.79 5.47 -6% 50 7.30 6.58 -10% 100 8.82 7.69 -13% 14034 Buchanan DA Stormwater Drainage Strategy r1 |13 Averys Lane Buchanan The flowrate comparisons in Table 10 and Table 11 demonstrate that the DRAINS models were producing peak flowrate estimates that were similar to those estimated using probabilistic rational method calculations for 1 to 100 year ARI storm events. Table 12 below provides a comparison between the DRAINS modelled peak flowrates from Catchment North and Catchment South to the PB’s rezoning report’s modelled peak flowrates, both in the existing state. Table 12: ARI Existing Peak Flowrates Comparison Catchment (years) 1 2 5 10 20 50 100 DRAINS PB Peak Flowrate Critical Duration Peak Flowrate Critical Duration (m3/s) (hours) (m3/s) (hours) North 0.44 9 0.27 9 South 1.64 9 0.75 9 North 0.65 9 n/a South 2.46 9 n/a North 0.948 9 n/a South 3.67 9 n/a North 1.17 6 1.1 9 South 4.38 9 3.4 9 North 1.45 6 1.4 9 South 5.47 6 4.5 9 North 1.71 6 n/a South 6.58 6 n/a North 1.97 6 2.1 6 South 7.69 6 6.5 9 From Table 12 it is considered that the DRAINS modelled peak flowrates for the existing state are comparable with PB’s rezoning report’s existing state peak flowrates, taking into account the PRM estimates. This validates the effectiveness of the parameters used in the hydrological models in DRAINS. Following effective calibration of the model and determination of the existing state peak flowrates, the DRAINS models for Catchment North and Catchment South were run for various design storm durations to determine peak flowrates following development of the site. 14034 Buchanan DA Stormwater Drainage Strategy r1 |14 Averys Lane Buchanan The model-predicted flowrates for existing and developed state flowrates, with their corresponding critical storm durations, are compared and summarised in Table 13 and Table 14. Full model results are included in Appendix E for the 1, 10 and 100 year ARI events. Table 13: ARI DRAINS Peak Flow Results for Catchment North Existing State Developed State % Change (years) Peak Flowrate (m3/s) Critical Storm Duration (mins) Peak Flowrate (m3/s) Critical Storm Duration (mins) 1 0.44 540 1.05 90 +139% 2 0.65 540 1.48 90 +128% 5 0.948 540 2.12 25 +124% 10 1.17 360 2.47 25 +111% 20 1.45 360 2.94 25 +103% 50 1.71 360 3.20 25 +87% 100 1.97 360 3.62 25 +84% Table 14: ARI DRAINS Peak Flow Results for Catchment South Existing State Developed State % Change (years) Peak Flowrate (m3/s) Critical Storm Duration (mins) Peak Flowrate (m3/s) Critical Storm Duration (mins) 1 1.65 540 1.73 540 +5% 2 2.46 540 2.59 540 +5% 5 3.67 540 3.88 540 +6% 10 4.38 540 4.64 540 +6% 20 5.47 360 5.69 540 +4% 50 6.58 360 6.71 360 +2% 100 7.69 360 7.87 360 +2% Hydrographs for 100 year peak ARI events showing both existing and developed flowrates are contained in Appendix F. The model-predicted flowrates for the existing state and the developed state with detention, including their corresponding critical storm durations, are compared and summarised in Table 15 and Table 16. Full model results are included in Appendix E. 14034 Buchanan DA Stormwater Drainage Strategy r1 |15 Averys Lane Buchanan Table 15: ARI DRAINS Peak Flow Results with Detention for Catchment North Existing State (years) Developed State with Detention % Change Peak Flowrate (m3/s) Critical Storm Duration (mins) Peak Flowrate (m3/s) Critical Storm Duration (mins) 1 0.44 540 0.469 540 +6% 2 0.65 540 0.743 270 +14% 5 0.948 540 0.993 120 +5% 10 1.17 360 1.16 120 -1% 20 1.45 360 1.37 120 -6% 50 1.71 360 1.60 120 -6% 100 1.97 360 1.97 120 0% Table 16: ARI DRAINS Peak Flow Results with Detention for Catchment South Existing State (years) Developed State with Detention % Change Peak Flowrate (m3/s) Critical Storm Duration (mins) Peak Flowrate (m3/s) Critical Storm Duration (mins) 1 1.65 540 1.61 90 -2% 2 2.46 540 2.38 540 -3% 5 3.67 540 3.66 540 0% 10 4.38 540 4.39 540 0% 20 5.47 360 5.42 540 -1% 50 6.58 360 6.41 540 -3% 100 7.69 360 7.39 540 -4% The DRAINS output spreadsheets for the 1 year, 10 year and 100 year ARIs for all states are shown in Appendix E. In Catchment North the minor event peak flowrates for the developed state with detention are marginally higher than the existing state flowrates and are considered negligible. Furthermore, with the provision of rainwater tanks, as required by BASIX, the higher flowrates will be further reduced and the resulting flowrate difference would be minimal. The modelled detention volumes required for each basin are shown below in Table 17. 14034 Buchanan DA Stormwater Drainage Strategy r1 |16 Averys Lane Buchanan Table 17: Detention Volume Detention Basin Detention Volume No. (m3) 1 (Catchment North) 2009 2 (Catchment South) 5401 4.1.3. DRAINS Modelled Detention Basin Outlet Controls Outflows from Detention Basin No. 1 have been designed so that all ARI events up to and including the 20 year ARI storm event are controlled and conveyed through an outflow pipe system. The outflow pipe system will restrict the flow and water will be detained in the detention basin. For ARI’s greater than 20 years, flows are to be controlled and conveyed through the outflow pipe system and the designed spillway. Outflows from Detention Basin No. 2 have been designed so that all ARI events are controlled and conveyed through the minor flow pipe and over the proposed weir. The proposed weir is to be constructed along the downstream edge of the existing pond’s water surface. The majority of the detention is provided by the proposed extension of Averys Lane carriageway, providing a downstream embankment, with a modelled outlet control culvert to restrict peak flows. The detention basin has been modelled so that all stormwater events up to and including the 100 year ARI event do not spill across the Averys Lane road system. Table 18 shows a summary of the parameters and proposed outlet controls for each basin used in the DRAINS model. Table 18: Summary of Basin and Outlet Structures Basin Parameter Description 1 Basin Invert R.L 12.00 Top Water Level R.L 13.50 Top Of Bank R.L 14.00 Outlet Pipe Size DN600 RCP Outlet Pipe Invert Level R.L 12.00 Spillway Length 7.0m Spillway Invert Level R.L 13.40 Existing Pond Permanent Water Level R.L 8.20 Existing Pond Top of downstream Weir R.L 8.70 Detention area modelled Top Water Level R.L 9.66 Minor flow outlet pipe under Weir DN300mm RCP Minor flow outlet pipe Invert Level R.L 8.20 Outlet Control culvert under Averys Lane 2 x DN1350mm RCP Outlet Control culvert Invert Level R.L 8.00 Outlet Control culvert spillway level (min road level) R.L 10.50 2 14034 Buchanan DA Stormwater Drainage Strategy r1 |17 Averys Lane Buchanan The flowrates and maximum heights over the spillway were determined for Detention Basin No. 1 and are shown in Table 19. Table 19: Flowrate and Depth over Spillway - Detention Basin No. 1 Maximum Flow Depth over Spillway (m) v.d product (years) Peak Flowrate over Spillway (m3/s) 20 0 0 0 50 0.02 0.01 0.003 100 0.38 0.10 0.05 ARI Drawings showing the basin layouts within the proposed development are included in Figure 6 and Figure 7. 4.1.4. Stormwater Flow Conveyance Structures The proposed development requires a culvert structure, Culvert No 1, to convey overland stormwater flow from the South Western portion of Catchment South under the proposed system to proposed Detention Basin No. 2. Detention Basin No. 2 requires a culvert structure under the extension of the Averys Lane carriageway, Culvert No. 2, to act as an outlet control and to convey the controlled discharge ultimately to the Wallis Creek flood storage plain via the existing watercourse. Both culvert structures were modelled in the DRAINS developed state model to provide a sizing requirement for the conveyance of the 100 year ARI storm event without overtopping of the proposed access roads. Table 20 summarises the details of the proposed culverts. Table 20: Summary of culvert parameters Culvert No. 1 2 Parameter Description 100 year ARI Peak Flow 6.80 m3/s Piped Culvert size Twin DN1350mm RCP Culvert length 24.4m Inlet Headwall Invert Level R.L 11.00 Outlet headwall Invert Level R.L 10.88 Pipe Slope 0.5% Inlet Headwall Head Height R.L 12.61 Road Level R.L 13.00 100 year ARI Peak Flow 7.40 m3/s Piped Culvert size Twin DN1350mm RCP Culvert length 40.0m Inlet Headwall Invert Level R.L 8.00 Outlet headwall Invert Level R.L 7.80 Pipe Slope 0.5% Inlet Headwall Head Height R.L 9.65 Road Level R.L 10.50 14034 Buchanan DA Stormwater Drainage Strategy r1 |18 Averys Lane Buchanan 4.2. Stormwater Runoff Quality 4.2.1. MUSIC Results – Post Development Land Use (No Treatment) The modelled average annual pollutant loads leaving the site in its post development land use, without any treatment measures, is shown in Table 21. Pollutant load estimates are provided for total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN). Figure 8 shows the node layout used in the MUSIC modelling. Table 21: MUSIC Model Results for the Site’s Post Development Land Use (No Treatment) Land Use Average Annual Pollutant Load (kg/yr) Post Development Total Suspended Solids (TSS) Total Phosphorus (TP) Total Nitrogen (TN) 11900 24 156 Standard engineering practice is to ensure that runoff from the proposed new impervious areas of the development is treated to meet the established criteria previously documented in Table 5, and this is the basis for evaluation of the treatment train effectiveness as documented below. 4.2.2. MUSIC Results – Post Development Land Use (with Treatment) The MUSIC model results for the post development land use, with treatment measures, is documented below, enabling the evaluation of the treatment train effectiveness. 4.2.2.1. Treatment Devices Treatment devices modelled in MUSIC for the treatment of runoff from the developments impervious surface areas include: Rainwater Tanks Gross Pollutant Traps (GPTs) Existing Pond 4.2.2.1.1. Rainwater Tanks The rainwater tank node was included immediately following the roof area node, using the default rainwater tank treatment node within MUSIC. Rainwater tanks for all proposed lots within each catchment were modelled as one MUSIC treatment node. Rainwater tank treatment node data included: Stored water would be utilised by internal reuse on each lot. (SCA Table 5.3) Rainwater tank volume is 3kL per lot. Daily usage demand of 0.845kL/day per lot. (SCA Table 5.3) 14034 Buchanan DA Stormwater Drainage Strategy r1 |19 Averys Lane Buchanan 4.2.2.1.2. Gross Pollutant Traps The GPT node was included immediately upstream of the Catchment North Outlet and immediately upstream of the existing pond in Catchment South. A CDS GPT node was obtained from the CDS website and utilised in the MUSIC Modelling, which is consistent with the SCA’s generic GPT which is based on a CDS GPT. 4.2.2.1.3. Existing Pond The existing pond within Catchment South was included in the MUSIC model using the default pond treatment node within MUSIC. 4.2.2.2. Modelling Results The modelled average annual pollutant loads leaving the site in its post development land use, utilising treatment measures, is shown in Table 22. Pollutant load estimates are provided for total suspended solids (TSS), total phosphorus (TP) and total nitrogen (TN). Figure 8 shows the node layout used in the MUSIC modelling. Table 22: MUSIC Model Results for the Site’s Post Development Land Use (with Treatment) Land Use Average Annual Pollutant Load (kg/yr) Total Suspended Solids (TSS) Total Phosphorus (TP) Total Nitrogen (TN) 1850 8.01 74.4 Post Development The results above show that the pollutant export for the post development land use, for the entire site, with treatment measures is significantly lower than the post development land use with no treatment measures. The treatment train effectiveness, expressed as a percentage reduction in post development land use pollutant loads generated by the modelled sources, is summarised in Table 23. Table 23: MUSIC Model Treatment Train Effectiveness Results Pollutant Export Value Treatment Train Effectiveness Post Development Post Development with treatment measures 11900 1850 84.5% TP (kg/yr) 24 8.01 66.6% TN (kg/yr) 156 74.4 52.3% TSS (kg/yr) The treatment train effectiveness results above indicate that the pollutant reduction performance in in accordance with the requirements of the Australian Runoff Quality pollutant removal criteria. 14034 Buchanan DA Stormwater Drainage Strategy r1 |20 Averys Lane Buchanan 4.3. Flooding Following the stormwater modelling process, and the inclusion of any required stormwater detention measures and/or stormwater flow conveyance structures, proposed lots are reviewed against localised 100 year ARI stormwater flow levels to confirm that there is sufficient buildable area for a dwelling to be located at or above the flood planning level, which is the 100 year ARI flood level plus 500mm freeboard for residential development. Proposed Culvert No. 1 immediately upstream of Detention Basin No. 2 has a headwater level of R.L 12.61, and the proposed road over Culvert No. 1 has a preliminary level of R.L 13.0. It is considered a conservative approach to require proposed lots in the immediate vicinity of the culvert to have dwelling FFL’s of minimum R.L 13.11. Proposed Culvert No. 2, providing the outlet control for Detention Basin No. 2, has a headwater level of R.L 9.65, and the proposed road over Culvert No. 2 has a preliminary level of R.L 10.50. The Wallis Creek flood storage plain has a 100 year ARI flood level of R.L 10.3m AHD. Therefore all proposed lots are to have a dwelling FFL of minimum R.L 10.80m AHD. The culvert designs should be reviewed in the CC phase to ensure that the road design for the proposed roads and the culvert designs are compatible, including required blockage factors in accordance with AR&R. 14034 Buchanan DA Stormwater Drainage Strategy r1 |21 Averys Lane Buchanan 5. SOIL AND WATER CONSTRUCTION MANAGEMENT DURING Soil and water management devices to minimise land disturbance during the subdivision construction phase are to be provided in accordance with the publication Managing Urban Stormwater: Soils and Construction (Landcom, 2004). A detailed erosion and sedimentation control plan is to be undertaken during the detailed design stage of the proposed development. The erosion and sedimentation control plan should generally contain the following range of management practices for effective soil and water management during a land disturbance phase: Minimise the area of soil disturbed and exposed to erosion by phasing works so that land disturbance is confined to minimum areas. Erect barrier fencing to minimise disturbance by preventing vehicular and pedestrian access to restricted areas. Limit access for plant etc. to current construction area to limit amount of disturbed area. Conserve topsoil for site rehabilitation/revegetation when site works are complete. Installation of sediment filters, such as silt fences, straw bales, or turf strips downstream of disturbed areas. Control water flow from the top of, and through the development area. In particular, divert upslope runoff around works and limit slope length to 80 metres on disturbed lands if rainfall is expected. Where appropriate, reduce the effects of wind erosion by controlling on-site traffic movement and watering bare soil areas. Provision of shaker humps / pads near construction entry and exit locations to remove excess soil materials from vehicle tyres and underbodies. Rehabilitate disturbed lands quickly. Ensure that all erosion and sediment control measures are kept in a properly functioning condition until all site disturbance works are completed and the site is rehabilitated. 14034 Buchanan DA Stormwater Drainage Strategy r1 |22 Averys Lane Buchanan 6. SUMMARY AND CONCLUSIONS At Source Management Although a BASIX’s requirements review is not a specific requirement of this stormwater management strategy, it is anticipated that BASIX’s requirements would require all individual dwellings to provide rainwater tanks for re-use in conjunction with other BASIX’s requirements. On this basis, rainwater tanks were modelled for water quality improvement, and it is considered that the installation of rainwater tanks on each lot provides at-source stormwater management benefits. Stormwater Flow Management (stormwater runoff quantity and quality) The strategy for management of stormwater runoff from the development is depicted on Figure 5, and comprises: Rainwater tanks to collect runoff from individual allotment roofs for re-use. Capture of stormwater from lot and road reserve areas by a conventional pit and pipe drainage network located in the street or in interallotment drainage easements where required. Conveyance of captured stormwater within the drainage pipe network to gross pollutant traps (GPT’s) for primary treatment prior to discharge into the proposed detention basin (and existing pond – Catchment South). The detention basins will provide attenuation of developed stormwater flowrates to existing flowrate conditions. The existing pond will provide secondary/tertiary treatment and polishing of the stormwater runoff from Catchment South prior to discharge downstream. Discharge from the catchment outlets will be conveyed over land within the existing watercourses to the Wallis Creek flood storage plain. The proposed stormwater management measures will be located within drainage reserves and dedicated to Council consistent with other developments within the Cessnock LGA. MUSIC modelling has demonstrated that the proposed treatment devices will treat developed stormwater runoff to meet requirements outlined in ARQ, and on this basis it is considered that no further water quality controls will be required within the proposed subdivision development. Following the MUSIC modelling, the detention modelling determined that provision of the proposed Detention Basin No. 1 would require a land take in the North East corner of the site, resulting in a reduction to the proposed 175 developable lots. It is considered that the loss of these lots will have a negligible impact on the MUSIC results as the land area is replaced with a grassed basin. As illustrated by Figure 5, there is sufficient area within the developments footprint to provide stormwater drainage management measures to negate the impact of the proposed development. 14034 Buchanan DA Stormwater Drainage Strategy r1 |23 Averys Lane Buchanan Flooding This strategy has adopted the Council’s 1 in 100 year flood level of R.L 10.30m AHD, consistent with Council’s DCP 2010 Part E.14 Averys Village, Heddon Greta, for the Wallis Creek flood storage plain. From review of the Wallis Creek flood storage plain 100 year ARI flood level of R.L 10.30m AHD, it is considered that all lots have sufficient buildable area for a dwelling to be located at or above the flood planning level, which is the 100 year ARI flood level plus 500mm freeboard for residential development. Proposed Culvert No. 1 immediately upstream of Detention Basin No. 2 has a headwater level of R.L 12.61, and the proposed road over Culvert No. 1 has a preliminary level of R.L 13.0. It is considered a conservative approach to require proposed lots in the immediate vicinity of this culvert to have dwelling FFL’s of minimum R.L 13.11. The culvert designs should be reviewed in the CC phase to ensure that the road design for the proposed roads and the culvert designs are compatible, including required blockage factors in accordance with AR&R. 14034 Buchanan DA Stormwater Drainage Strategy r1 |24 Averys Lane Buchanan 7. REFERENCES Wallis, Swamp and Fishery Creeks Flood Study, dated August 2011, prepared by Worley Parsons. Averys Lane Rezoning, Flooding and Stormwater Management, October 2007, prepared by Parsons Brinckerhoff. Cessnock City Council, Engineering Requirements for Development. Cessnock City Council, DCP 2010 Part E.14 Averys Village, Heddon Greta. Australian Rainfall and Runoff, Institution of Engineers, Australia, 1987. Australian Runoff Quality, Engineers Australia, 2006. Using MUSIC in Sydney’s Drinking Water Catchment, A Sydney Catchment Authority Standard, Sydney Catchment Authority, Penrith, December 2012. The Constructed Wetlands Manual, DLWC, 1998. 14034 Buchanan DA Stormwater Drainage Strategy r1 |25 FIGURES Lot 5 DP 1082569 0 50 100 200 1:10000 Client: Buchanan Ridge Project: Stormwater Drainage Strategy Location: Averys Lane Buchanan LOCALITY PLAN FIGURE 1 Client: Buchanan Ridge Project: Stormwater Drainage Strategy Location: Averys Lane Buchanan MUSIC NODE LAYOUT FIGURE 8 Appendix A Indicative Lot Layout (supplied by Buchanan Ridge) Appendix B Planning Proposal, “Averys Village”, Averys Lane, Heddon Greta, 18/2006/3, 30 May 2012, Figure 4 (PPEE2/2012), Cessnock City Council Planning Proposal –Averys Village 29 of 42 Appendix C DRAINS Data Spreadsheets Undeveloped Catchments DRAINS Data Spreadsheet ‐ Catchment North ‐ Undeveloped Catchment PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Pressure Change Coeff. Ku Surface Elev (m) Max Pond Depth (m) Nth Nth Outlet Node Node DETENTION BASIN DETAILS Name Elev Surf. Area Not Used Outlet Type Total Area Impervious Area Avg Slope(%) Nth Pit or Node Nth PIPE DETAILS Name From To Length (m) U/S IL (m) D/S IL (m) Slope (%) Type DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) OF Nth Nth Nth Outlet SUB‐CATCHMENT DETAILS Name Base Inflow (cu.m/s) 9 8.9 16.113 0 1 K Blocking Factor x 0 0 Dia(mm) Centre RL Mannings Time lag n (mins) 2.6 0.06 Rainfall Multiplier 384.028 584.722 Bolt‐down lid id ‐236.806 ‐245.139 Part Full Shock Loss 2 3 Pit Type x y HED Crest RL Crest Length(m) Dia (mm) I.D. (mm) Rough Pipe Is No. Pipes Chg From At Chg Chg (m) Bottom Elev (m) Height of Service (m) etc etc D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) Manning n Depth (m) Roofed Weir Coeff. C Cross Section 0 Pit Family y Hydrological Model 1 Kurri Kurri RAFTS Safe Depth SafeDepth Major Storms Minor Storms (m) (m) 0.25 Grassed Depression 30m w Safe Bed DxV Slope (sq.m/sec) (%) 0.25 0.6 D/S Area Contributing % 50 id 0 8 DRAINS Data Spreadsheet ‐ Catchment South ‐ Undeveloped Catchment PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Pressure Change Coeff. Ku Surface Elev (m) Max Pond Depth (m) Sth A Sth B Sth Outlet Node Node Node DETENTION BASIN DETAILS Name Elev Surf. Area Not Used Outlet Type Total Area Impervious Area Avg Slope(%) Cat Sth A Sth B Pit or Node Sth A Sth B PIPE DETAILS Name From To Length (m) U/S IL (m) D/S IL (m) Slope (%) Type DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) OF Sth A OF Sth B Sth A Sth B Sth B Sth Outlet SUB‐CATCHMENT DETAILS Name Base Inflow (cu.m/s) 17 7 6.5 36.512 35.284 0 0 670 1 K Blocking Factor x 0 0 0 Dia(mm) Centre RL Mannings Time lag n (mins) 2.44 0.06 2.9 0.06 Rainfall Multiplier 136.111 384.028 584.722 Bolt‐down lid id ‐229.167 ‐236.806 ‐245.139 Part Full Shock Loss 1 2 3 Pit Type x y HED Crest RL Crest Length(m) Dia (mm) I.D. (mm) Rough Pipe Is No. Pipes Chg From At Chg Chg (m) Bottom Elev (m) Height of Service (m) etc etc D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) Manning n Depth (m) Roofed Weir Coeff. C Cross Section 0 0 Pit Family y Hydrological Model 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS Safe Depth SafeDepth Major Storms Minor Storms (m) (m) 0.25 Grassed Depression 30m w 0.25 Grassed Depression 30m w Safe Bed DxV Slope (sq.m/sec) (%) 0.25 0.6 0.25 0.6 D/S Area Contributing % 1.5 50 id 0 0 7 8 Developed Catchments DRAINS Data Spreadsheet ‐ Catchment North ‐ Developed Catchment PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Pressure Change Coeff. Ku Surface Elev (m) Max Pond Depth (m) Nth intern Nth Extern Nth Outlet N DummyOut Node Node Node Node DETENTION BASIN DETAILS Name Elev Surf. Area Not Used Outlet Type Total Area Impervious Area Avg Slope(%) Nth internal Nth external Pit or Node Nth intern Nth Extern PIPE DETAILS Name From To Length (m) U/S IL (m) D/S IL (m) Slope (%) Type DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) OF Nth OF Nth Extern OF Nth Outlet Nth intern Nth Extern Nth Outlet Nth Outlet Nth Outlet N DummyOut SUB‐CATCHMENT DETAILS Name Base Inflow (cu.m/s) 12 12 8.9 8.8 6.548 7.159 65 0 1 1 1 K Blocking Factor x 0 0 0 0 Dia(mm) Centre RL Mannings Time lag n (mins) 1.8 0.031 2.3 0.06 Rainfall Multiplier 384.028 436.111 584.722 731.944 Bolt‐down lid id ‐236.806 ‐134.028 ‐245.139 ‐249.306 Part Full Shock Loss 2 3164 3 3168 Pit Type x y HED Crest RL Crest Length(m) Dia (mm) I.D. (mm) Rough Pipe Is No. Pipes Chg From At Chg Chg (m) Bottom Elev (m) Height of Service (m) etc etc D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) Manning n Depth (m) Roofed Weir Coeff. C Cross Section 0 0 Pit Family y Hydrological Model 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS Safe Depth SafeDepth Major Storms Minor Storms (m) (m) Grassed Depression 30m w 0.25 0.25 Grassed Depression 30m w 0.25 Grassed Depression 30m w Safe Bed DxV Slope (sq.m/sec) (%) 0.25 0.6 0.25 0.6 0.25 0.6 D/S Area Contributing % 100 100 10 id 0 0 0 8 3166 3170 DRAINS Data Spreadsheet ‐ Catchment South ‐ Developed Catchment PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Pressure Change Coeff. Ku Sth A HW1 Sth B Outlet HW2 Sth C Outlet Sth Outlet Node Headwall Node Headwall Node Node DETENTION BASIN DETAILS Name Elev Surf. Area Not Used Outlet Type Total Area Impervious Area Avg Slope(%) Cat Sth A Cat Sth B Cat Sth C Pit or Node Sth A HW1 HW2 PIPE DETAILS Name From To Pipe Culvert 1 Pipe Culvert 2 HW1 HW2 Sth B Outlet Sth C Outlet SUB‐CATCHMENT DETAILS Name Surface Elev (m) 0.5 36.512 26.41 11.282 0 0 58 Length (m) Centre RL Mannings Time lag n (mins) 2.44 0.06 2.26 0.06 2.7 0.034 Rainfall Multiplier 24 40 D/S IL (m) 11 8 Slope (%) 10.88 7.8 Blocking Factor x 0 0 0 0 0 0 Dia(mm) U/S IL (m) Base Inflow (cu.m/s) 17 13 10.88 10.5 7.5 6.5 0.5 K Max Pond Depth (m) 0 0 0 Pit Family y 136.111 274.315 330.578 383.224 544.779 641.229 HED Crest RL Crest Length(m) I.D. (mm) Rough Pipe Is No. Pipes Chg From At Chg Hydrological Model 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS Type Dia (mm) 0.5 Concrete, under roads, 0.5 0.5 Concrete, under roads, 0.5 1350 1350 1370 1370 0.011 NewFixed 0.011 NewFixed Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) etc etc CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) Weir Coeff. C Cross Section OF Sth A OF Culvert 1 OF Sth B OF Culvert 2 OF Sth C Sth A HW1 Sth B Outlet HW2 Sth C Outlet HW1 Sth B Outlet HW2 Sth C Outlet Sth Outlet 10.5 20 1 2653 2833 2837 1789 3 y Height of Service (m) 20 ‐229.167 ‐233.726 ‐235.735 ‐238.548 ‐243.773 ‐245.38 Part Full Shock Loss x Bottom Elev (m) 13 id Pit Type DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) 408 20 210 20 5 Bolt‐down lid Safe Depth SafeDepth Major Storms Minor Storms (m) (m) 0.25 Grassed Depression 30m w 1.7 Overflow across road low 0.05 Grassed Dummy Channel 1 1 1.7 Overflow across road low 0.05 1 Grassed Dummy Channel 1 0.25 0 1 0 1 Manning n Safe Bed DxV Slope (sq.m/sec) (%) 0.6 0.6 1 0.6 1 2 HW1 2 HW2 Depth (m) Roofed D/S Area Contributing % 1.4 1 1.37 1 20 0 0 id 0 0 0 0 0 7 2658 2845 1802 8 Developed Catchments with Detention DRAINS Data Spreadsheet ‐ Catchment North ‐ Developed Catchment with Detention PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Nth bypass Node Nth Extern Node Nth Outlet Node N DummyOut Node DETENTION BASIN DETAILS Name Nth Basin SUB‐CATCHMENT DETAILS Name Elev Surf. Area 12 13.5 14 Not Used Total Area Impervious Area Nth internal bypass Nth external Nth internal basin PIPE DETAILS Name From To Basin Pipe Nth Basin Nth Outlet 0.186 7.159 6.361 Avg Slope(%) 85 0 61 Length (m) K Max Pond Depth (m) Base Inflow (cu.m/s) Dia(mm) Blocking Factor x 0 0 0 0 Centre RL Pit Family Pit Type x 12 Slope (%) 8.9 Rainfall Multiplier 0 0 0 Type Dia (mm) 6.89 Concrete, under roads, 1% I.D. (mm) 600 Rough 600 Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) etc etc CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) Weir Coeff. C Cross Section OF Nth bypass OF Nth Extern OF Nth Basin OF Nth Outlet Nth bypass Nth Extern Nth Basin Nth Outlet Nth Outlet Nth Outlet Nth Outlet N DummyOut Safe Depth SafeDepth Major Storms Minor Storms (m) (m) Overflow across road low 0.05 Grassed Depression 30m w 0.25 1.7 Overflow across road low 0.05 Grassed Depression 30m w 0.25 0 0.25 0 0.25 No. Pipes 0.011 NewFixed Height of Service (m) 7 Part Full Shock Loss 2 3164 3 3168 HED ‐348.611 No Pipe Is Bottom Elev (m) 13.4 id Crest RL Crest Length(m) Chg From At Chg Hydrological Model 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) 1 1 25 1 Bolt‐down lid ‐236.806 ‐134.028 ‐245.139 ‐249.306 y 432.639 Mannings Time lag n (mins) 1.8 0.022 2.3 0.06 1.8 0.033 D/S IL (m) y 384.028 436.111 584.722 731.944 0.5 U/S IL (m) 45 Surface Elev (m) 12 12 8.9 8.8 Outlet Type Culvert 748 2037 2394 Pit or Node Nth bypass Nth Extern Nth Basin Pressure Change Coeff. Ku Manning n Safe Bed DxV Slope (sq.m/sec) (%) 0.6 0.6 0.6 0.6 1 Nth Basin Depth (m) Roofed D/S Area Contributing % 100 100 5 10 0 id 0 0 0 0 8 3166 4716 3170 DRAINS Data Spreadsheet ‐ Catchment South ‐ Developed Catchment with Detention PIT / NODE DETAILS Version 12 Name Type Family Size Ponding Volume (cu.m) Sth A Node HW1 Headwall Sth B Outlet Node Extg Dam Outlet Node HW2 Headwall Sth C Outlet Node Sth Outlet Node DETENTION BASIN DETAILS Name Extg Dam SUB‐CATCHMENT DETAILS Name Elev Surf. Area 8.2 9.7 Not Used Total Area Impervious Area Cat Sth A Cat Sth B Cat Sth C PIPE DETAILS Name From To Pipe Culvert 1 Pipe Basin Low Flow Pipe Culvert 2 HW1 Extg Dam HW2 Sth B Outlet Extg Dam Outle Sth C Outlet 36.512 26.41 11.282 Avg Slope(%) 0 0 58 Length (m) K Max Pond Depth (m) Base Inflow (cu.m/s) 17 13 10.88 8.1 10.5 7.5 6.5 0.5 Dia(mm) Blocking Factor x 0 0 0 0 0 0 0 Centre RL Pit Family y 136.111 274.315 330.578 427.23 480.813 544.779 641.229 Pit Type x 0.5 D/S IL (m) 11 8.2 8 Slope (%) 10.88 8.1 7.8 Rainfall Multiplier 0 0 0 Type Dia (mm) 0.5 Concrete, under roads, 0.5 1 Concrete, not under roads 0.5 Concrete, under roads, 0.5 I.D. (mm) 1350 300 1350 Rough 1370 300 1370 Chg (m) Bottom Elev (m) Height of Service (m) Chg (m) Bottom Elev (m) Height of Service (m) etc etc CHANNEL DETAILS Name From To Type Length (m) U/S IL (m) D/S IL (m) Slope (%) Base Width (m) L.B. Slope (1:?) R.B. Slope (1:?) OVERFLOW ROUTE DETAILS Name From To Length (m) Spill Level (m) Crest Length (m) Weir Coeff. C Cross Section OF Sth A OF Culvert 1 OF Sth B OF Extg Dam Spillway OF Extg Dam OF Culvert 2 OF Sth C Sth A HW1 HW1 Sth B Outlet Sth B Outlet Extg Dam Extg Dam Extg Dam Outle Extg Dam OutleHW2 HW2 Sth C Outlet Sth C Outlet Sth Outlet 8.7 4 10.5 20 Safe Depth SafeDepth Major Storms Minor Storms (m) (m) 0.25 Grassed Depression 30m w 1.7 Overflow across road low 0.05 1 Grassed Dummy Channel 1 1.7 Overflow across road low 0.05 Grassed Dummy Channel 1 1 1.7 Overflow across road low 0.05 1 Grassed Dummy Channel 1 0.25 0 1 0 1 0 1 No. Pipes 0.011 NewFixed 0.011 NewFixed 0.011 NewFixed Height of Service (m) 20 Part Full Shock Loss 1 2653 2833 19845 2837 1789 3 HED ‐237.733 No Pipe Is Bottom Elev (m) 13 id Crest RL Crest Length(m) Chg From At Chg Hydrological Model 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS 1 Kurri Kurri RAFTS DETAILS of SERVICES CROSSING PIPES Pipe Chg (m) 408 20 88 10 10 20 5 Bolt‐down lid ‐229.167 ‐233.726 ‐235.735 ‐238.85 ‐242.031 ‐243.773 ‐245.38 y 381.46 Mannings Time lag n (mins) 2.44 0.06 2.26 0.06 2.7 0.034 U/S IL (m) 24 10 40 Surface Elev (m) 0.5 Outlet Type Culvert 2881 4662 Pit or Node Sth A HW1 HW2 Pressure Change Coeff. Ku Manning n Safe Bed DxV Slope (sq.m/sec) (%) 0.6 0.6 1 0.6 1 0.6 1 2 HW1 1 Extg Dam 2 HW2 Depth (m) Roofed D/S Area Contributing % 1.4 1 2.5 1 1 1 20 0 0 0 id 0 0 0 0 0 0 0 7 2658 2845 19832 19847 1802 8 Appendix D PRM Calculations Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 CA FLOW ha m3/s Probabilistic Rational Method Hydrologic Calculations ARI C10 1 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. RAINFALL INTENSITY mm/hr Kinematic Wave Method South A 36.516 0.0% 0.62 0.248 9.1 31.1 31.1 South B 35.284 0.0% 0.62 0.248 8.8 30.7 30.7 North 16.113 0.0% 0.62 0.248 4.0 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 31.1 33.8 9.06 38.8 30.0 17.81 0.851 1.484 22.8 39.8 4.00 0.442 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 43.6 10.81 38.8 38.6 21.25 1.309 2.281 22.8 51.3 4.77 0.680 Probabilistic Rational Method Hydrologic Calculations ARI C10 2 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 0.74 0.296 10.8 31.1 31.1 South B 35.284 0.0% 0.74 0.296 10.4 30.7 30.7 North 16.113 0.0% 0.74 0.296 4.8 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 56.0 12.85 38.8 49.6 25.27 2.003 3.488 22.8 66.1 5.67 1.042 Probabilistic Rational Method Hydrologic Calculations ARI C10 5 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 0.88 0.352 12.9 31.1 31.1 South B 35.284 0.0% 0.88 0.352 12.4 30.7 30.7 North 16.113 0.0% 0.88 0.352 5.7 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 63.4 14.61 38.8 56.1 28.72 2.573 4.480 22.8 74.7 6.45 1.339 Probabilistic Rational Method Hydrologic Calculations ARI C10 10 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 1.00 0.400 14.6 31.1 31.1 South B 35.284 0.0% 1.00 0.400 14.1 30.7 30.7 North 16.113 0.0% 1.00 0.400 6.4 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 73.1 16.36 38.8 64.7 32.17 3.324 5.788 22.8 86.3 7.22 1.731 Probabilistic Rational Method Hydrologic Calculations ARI C10 20 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 1.12 0.448 16.4 31.1 31.1 South B 35.284 0.0% 1.12 0.448 15.8 30.7 30.7 North 16.113 0.0% 1.12 0.448 7.2 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 85.9 17.55 38.8 76.0 34.51 4.192 7.296 22.8 101.5 7.74 2.184 Probabilistic Rational Method Hydrologic Calculations ARI C10 50 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 1.20 0.481 17.6 31.1 31.1 South B 35.284 0.0% 1.20 0.481 17.0 30.7 30.7 North 16.113 0.0% 1.20 0.481 7.7 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Proposed Residential Subdivision - Averys Lane Buchanan Project No. 14034 Date: 9/12/14 RAINFALL INTENSITY mm/hr CA FLOW ha m3/s 31.1 95.8 19.04 38.8 84.8 37.43 5.068 8.820 22.8 113.1 8.40 2.642 Probabilistic Rational Method Hydrologic Calculations ARI C10 100 0.40 10 I1 = 43.90 mm/h Min tc 5 mins Location: Kurri Kurri Catchment Total Area ha Subcatchment Data Imperv. L S % m m/m n - Runoff Coefficient FFy C CA ha Subcatchment tc Bransby.W Regional Kinematic Min. Min. Min. tc adopt L m 690 DS Channel Data S v t m/m m/s Min. TIME OF CONC. u/s this Catchment Min. Min. Kinematic Wave Method South A 36.516 0.0% 1.30 0.521 19.0 31.1 31.1 South B 35.284 0.0% 1.30 0.521 18.4 30.7 30.7 North 16.113 0.0% 1.30 0.521 8.4 22.8 22.8 ARI FFy FFy 1 0.62 0.80 20 1.12 1.05 50 1.20 1.15 100 1.30 1.20 Rural: Urban: 2 0.74 0.85 5 0.88 0.95 10 1.00 1.00 Zone B <500m Intensities for FFY I12,50 13.70 I12,2 6.36 1.5 7.7 38.8 Appendix E DRAINS Results Spreadsheets Undeveloped Catchments DRAINS Results Spreadsheet ‐ Catchment North ‐ Undeveloped Catchment ‐ 1 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 0.44 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 16.1 pervious = 16.1 total ha) Storm Total Rainfall cu.m AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 2282.68 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 2544.78 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 2771.3 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 3335.26 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 3770.58 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 4398.85 4898.49 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 5703.6 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 6576.12 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 7300 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 8469.8 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 9397.1 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 263.06 (11.5%) 395.78 (15.6%) 507.15 (18.3%) 947.90 (28.4%) 1365.87 (36.2%) 1952.85 (44.4%) 2403.07 (49.1%) 2979.59 (52.2%) 3518.54 (53.5%) 3970.21 (54.4%) 4441.03 (52.4%) 4567.04 (48.6%) Impervious Runoff cu.m (Runoff %) ‐341.90 (0.0%) ‐443.78 (0.0%) ‐527.17 (0.0%) ‐579.50 (0.0%) ‐525.95 (0.0%) ‐377.36 (0.0%) ‐282.43 (0.0%) ‐140.42 (0.0%) ‐42.23 (0.0%) 11.85 (0.0%) 35.53 (0.0%) ‐368.23 (0.0%) Pervious Runoff cu.m (Runoff %) 604.96 (26.5%) 839.56 (33.0%) 1034.32 (37.3%) 1527.40 (45.8%) 1891.82 (50.2%) 2330.22 (53.0%) 2685.50 (54.8%) 3120.01 (54.7%) 3560.76 (54.1%) 3958.36 (54.2%) 4405.50 (52.0%) 4935.28 (52.5%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth Max Q U/S Max Q D/S 0.44 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 0.44 MaxVol CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth 4441.09 Nth Outlet 4440.16 Due to Storm 4441.09 4440.16 Max D 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 Max DxV 0.038 0.06 Max Q High Level 0 0 Max Width Max V Due to Storm 10.51 1.69 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Undeveloped Catchment ‐ 10 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 1.166 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 16.1 pervious = 16.1 total ha) Storm Total Rainfall cu.m AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 4296.8 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 4766.76 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 5236.72 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 6284.07 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 7041.25 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 8314.17 9345.54 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 10972.55 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 12834.41 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 14405.02 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 16821.17 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 18912.64 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 1763.17 (41.0%) 2116.33 (44.4%) 2459.46 (47.0%) 3548.41 (56.5%) 4387.71 (62.3%) 5690.23 (68.4%) 6692.89 (71.6%) 8094.66 (73.8%) 9569.54 (74.6%) 10751.52 (74.6%) 12105.13 (72.0%) 13480.37 (71.3%) Impervious Runoff cu.m (Runoff %) ‐819.39 (0.0%) ‐908.79 (0.0%) ‐1001.49 (0.0%) ‐892.07 (0.0%) ‐724.56 (0.0%) ‐493.71 (0.0%) ‐372.00 (0.0%) ‐208.62 (0.0%) ‐97.45 (0.0%) ‐21.07 (0.0%) 45.23 (0.0%) 55.12 (0.0%) Pervious Runoff cu.m (Runoff %) 2582.56 (60.1%) 3025.12 (63.5%) 3460.95 (66.1%) 4440.48 (70.7%) 5112.27 (72.6%) 6183.94 (74.4%) 7064.89 (75.6%) 8303.27 (75.7%) 9667.00 (75.3%) 10772.59 (74.8%) 12059.90 (71.7%) 13425.25 (71.0%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth Max Q D/S Max Q U/S 1.166 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 1.166 MaxVol CONTINUITY CHECK for AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth 10751.43 Nth Outlet 10751.45 Due to Storm 10751.43 10751.45 Max D 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 Max DxV 0.059 0.14 Max Q High Level 0 0 Max Width Max V Due to Storm 12.56 2.35 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Undeveloped Catchment ‐ 100 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 1.966 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 16.1 pervious = 16.1 total ha) Storm Total Rainfall cu.m AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 6498.91 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 7250.85 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 7895.37 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 9426.24 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 10634.58 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 12568.14 14276.52 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 16870.72 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 19939.03 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 22429.3 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 26537.31 AR&R 100 year, 12 hours storm, average 15.5 mm/h, Zone 1 29968.57 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 3722.43 (57.3%) 4339.21 (59.8%) 4856.14 (61.5%) 6522.78 (69.2%) 7850.10 (73.8%) 9847.26 (78.4%) 11520.41 (80.7%) 13907.59 (82.4%) 16587.04 (83.2%) 18623.83 (83.0%) 21640.63 (81.5%) 24073.86 (80.3%) Impervious Runoff cu.m (Runoff %) ‐1042.51 (0.0%) ‐1145.34 (0.0%) ‐1240.87 (0.0%) ‐1041.82 (0.0%) ‐835.71 (0.0%) ‐571.72 (0.0%) ‐435.75 (0.0%) ‐260.47 (0.0%) ‐138.01 (0.0%) ‐53.80 (0.0%) 23.95 (0.0%) 64.52 (0.0%) Pervious Runoff cu.m (Runoff %) 4764.93 (73.3%) 5484.55 (75.6%) 6097.00 (77.2%) 7564.60 (80.3%) 8685.81 (81.7%) 10418.99 (82.9%) 11956.16 (83.7%) 14168.06 (84.0%) 16725.05 (83.9%) 18677.63 (83.3%) 21616.67 (81.5%) 24009.34 (80.1%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth Max Q D/S Max Q U/S 1.966 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 1.966 MaxVol CONTINUITY CHECK for AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth 18623.51 Nth Outlet 18624.37 Due to Storm 18623.51 18624.37 Max D 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 Max DxV 0.075 0.21 Max Q High Level 0 0 Max Width Max V Due to Storm 14.2 2.75 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Undeveloped Catchment ‐ 1 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Cat Sth A Sth B CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 0.825 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0.86 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 71.8 pervious = 71.8 total ha) Storm Total Rainfall cu.m AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 10171.1 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 11338.98 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 12348.32 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 14861.17 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 16800.86 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 19600.31 21826.59 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 25413.99 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 29301.75 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 32527.18 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 37739.57 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 41871.43 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 880.93 (8.7%) 1357.85 (12.0%) 1760.38 (14.3%) 3415.08 (23.0%) 5138.17 (30.6%) 7780.17 (39.7%) 9889.18 (45.3%) 12612.04 (49.6%) 15082.93 (51.5%) 17138.65 (52.7%) 19328.93 (51.2%) 19939.23 (47.6%) Impervious Runoff cu.m (Runoff %) ‐1814.65 (0.0%) ‐2383.06 (0.0%) ‐2848.31 (0.0%) ‐3390.68 (0.0%) ‐3291.40 (0.0%) ‐2602.66 (0.0%) ‐2076.85 (0.0%) ‐1289.99 (0.0%) ‐783.01 (0.0%) ‐498.05 (0.0%) ‐300.51 (0.0%) ‐2051.01 (0.0%) Pervious Runoff cu.m (Runoff %) 2695.58 (26.5%) 3740.91 (33.0%) 4608.68 (37.3%) 6805.76 (45.8%) 8429.57 (50.2%) 10382.83 (53.0%) 11966.04 (54.8%) 13902.02 (54.7%) 15865.94 (54.1%) 17636.70 (54.2%) 19629.44 (52.0%) 21990.23 (52.5%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Sth A OF Sth B Max Q U/S Max Q D/S 0.825 1.64 DETENTION BASIN DETAILS Name Max WL Due to Storm Max D Safe Q 0.825 1.64 MaxVol CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 9812.62 Sth B 19354.92 Sth Outlet 19355.32 Due to Storm 9812.62 19354.91 19355.32 4.523 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 Max DxV 0.114 0.069 0.07 0.18 Max Q High Level 0 0 0 Max Width Max V Due to Storm 18.06 0.62 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 13.55 2.62 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Undeveloped Catchment ‐ 10 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Cat Sth A Sth B CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 2.26 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 2.306 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 71.8 pervious = 71.8 total ha) Storm Total Rainfall cu.m AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 19145.6 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 21239.65 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 23333.7 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 28000.44 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 31374.26 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 37046.14 41641.68 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 48891.29 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 57187.31 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 64185.62 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 74951.45 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 84270.57 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 6534.10 (34.1%) 7903.81 (37.2%) 9263.19 (39.7%) 13942.74 (49.8%) 17795.98 (56.7%) 24010.06 (64.8%) 28744.17 (69.0%) 35305.45 (72.2%) 41996.64 (73.4%) 47333.71 (73.7%) 53406.15 (71.3%) 59614.10 (70.7%) Impervious Runoff cu.m (Runoff %) ‐4973.27 (0.0%) ‐5575.47 (0.0%) ‐6158.08 (0.0%) ‐5843.14 (0.0%) ‐4983.16 (0.0%) ‐3544.35 (0.0%) ‐2735.30 (0.0%) ‐1691.73 (0.0%) ‐1077.15 (0.0%) ‐665.55 (0.0%) ‐330.40 (0.0%) ‐204.94 (0.0%) Pervious Runoff cu.m (Runoff %) 11507.37 (60.1%) 13479.27 (63.5%) 15421.27 (66.1%) 19785.88 (70.7%) 22779.14 (72.6%) 27554.41 (74.4%) 31479.47 (75.6%) 36997.18 (75.7%) 43073.79 (75.3%) 47999.26 (74.8%) 53736.55 (71.7%) 59819.04 (71.0%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Sth A OF Sth B Max Q U/S Max Q D/S 2.26 4.382 DETENTION BASIN DETAILS Name Max WL Due to Storm Max D Safe Q 2.26 4.382 MaxVol CONTINUITY CHECK for AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 27137.55 Sth B 53105.73 Sth Outlet 53108.76 Due to Storm 27137.55 53105.68 53108.76 4.523 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 Max DxV 0.179 0.109 0.15 0.38 Max Q High Level 0 0 0 Max Width Max V Due to Storm 22.74 0.84 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 17.59 3.49 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Undeveloped Catchment ‐ 100 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Cat Sth A Sth B CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 3.895 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 4.03 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Outflow Volumes for Total Catchment (0.00 impervious + 71.8 pervious = 71.8 total ha) Storm Total Rainfall cu.m AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 28957.72 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 32308.2 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 35180.04 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 42001.27 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 47385.36 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 56000.88 63613.06 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 75172.22 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 88843.96 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 99940.06 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 118244.45 AR&R 100 year, 12 hours storm, average 15.5 mm/h, Zone 1 133533.41 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 14455.19 (49.9%) 16944.98 (52.4%) 19037.78 (54.1%) 26535.83 (63.2%) 32770.65 (69.2%) 42283.32 (75.5%) 50073.63 (78.7%) 61101.17 (81.3%) 73234.47 (82.4%) 82396.05 (82.4%) 95899.10 (81.1%) 106739.46 (79.9%) Impervious Runoff cu.m (Runoff %) ‐6776.31 (0.0%) ‐7492.93 (0.0%) ‐8129.17 (0.0%) ‐7170.31 (0.0%) ‐5931.44 (0.0%) ‐4141.56 (0.0%) ‐3200.91 (0.0%) ‐2030.10 (0.0%) ‐1288.42 (0.0%) ‐829.42 (0.0%) ‐426.36 (0.0%) ‐243.35 (0.0%) Pervious Runoff cu.m (Runoff %) 21231.50 (73.3%) 24437.91 (75.6%) 27166.94 (77.2%) 33706.14 (80.3%) 38702.09 (81.7%) 46424.88 (82.9%) 53274.54 (83.7%) 63131.27 (84.0%) 74522.89 (83.9%) 83225.47 (83.3%) 96325.46 (81.5%) 106982.80 (80.1%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Sth A OF Sth B Max Q U/S Max Q D/S 3.895 7.694 DETENTION BASIN DETAILS Name Max WL Due to Storm Max D Safe Q 3.895 7.694 MaxVol CONTINUITY CHECK for AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 41846.41 Sth B 82191.43 Sth Outlet 82195.52 Due to Storm 41846.41 82190.95 82195.52 4.523 7.945 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 Max DxV 0.229 0.141 0.23 0.58 Max Q High Level 0 0 0 Max Width Max V Due to Storm 25.76 1 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 20.49 4.11 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Developed Catchments DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment ‐ 1 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth internal Nth external CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 0.999 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 0.214 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Outflow Volumes for Total Catchment (4.26 impervious + 9.45 pervious = 13.7 total ha) Storm Total Rainfall cu.m AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 1941.82 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 2164.79 2357.49 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 2837.23 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 3207.55 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 3742.01 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 4167.04 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 4851.94 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 5594.17 6209.96 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 7205.08 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 7993.92 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 767.85 (39.5%) 938.80 (43.4%) 1082.90 (45.9%) 1517.59 (53.5%) 1877.31 (58.5%) 2361.00 (63.1%) 2739.24 (65.7%) 3260.67 (67.2%) 3779.92 (67.6%) 4222.50 (68.0%) 4821.91 (66.9%) 5214.20 (65.2%) Impervious Runoff cu.m (Runoff %) 413.02 (68.5%) 446.37 (66.4%) 476.24 (65.1%) 621.71 (70.6%) 767.70 (77.1%) 994.26 (85.6%) 1164.11 (90.0%) 1430.68 (95.0%) 1691.42 (97.4%) 1900.91 (98.6%) 2238.11 (100.0%) 2319.24 (93.4%) Pervious Runoff cu.m (Runoff %) 354.83 (26.5%) 492.43 (33.0%) 606.66 (37.3%) 895.87 (45.8%) 1109.61 (50.2%) 1366.74 (53.0%) 1575.13 (54.8%) 1829.99 (54.7%) 2088.51 (54.1%) 2321.59 (54.2%) 2583.81 (52.0%) 2894.95 (52.5%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth OF Nth Extern OF Nth Outlet Max Q U/S Max Q D/S 0.999 0.214 1.053 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 0.999 0.214 1.053 MaxVol CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth intern 2827.88 Nth Extern 1994.08 Nth Outlet 4821.44 N DummyOut 4821.39 Due to Storm 2827.88 1994.08 4821.7 4821.39 Max D 7.049 7.049 10.232 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 Max DxV 0.047 0.024 0.082 0.13 0.04 0.11 Max Q High Level 0 0 0 0 Max Width Max V Due to Storm 11.39 2.8 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 8.08 1.76 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 14.84 1.3 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment ‐ 10 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth internal Nth external CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 2.316 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 0.564 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 Outflow Volumes for Total Catchment (4.26 impervious + 9.45 pervious = 13.7 total ha) Storm Total Rainfall cu.m AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 3655.2 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 4054.99 4454.77 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 5345.73 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 5989.85 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 7072.7 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 7950.06 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 9334.12 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 10917.97 12254.06 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 14309.42 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 16088.59 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 2307.51 (63.1%) 2662.48 (65.7%) 3009.86 (67.6%) 3916.42 (73.3%) 4571.95 (76.3%) 5616.78 (79.4%) 6449.17 (81.1%) 7666.91 (82.1%) 9003.66 (82.5%) 10088.60 (82.3%) 11522.98 (80.5%) 12881.21 (80.1%) Impervious Runoff cu.m (Runoff %) 792.75 (69.8%) 888.15 (70.5%) 979.88 (70.8%) 1311.93 (79.0%) 1573.45 (84.6%) 1989.70 (90.6%) 2305.48 (93.4%) 2796.84 (96.5%) 3333.63 (98.3%) 3769.97 (99.1%) 4449.29 (100.1%) 5007.33 (100.2%) Pervious Runoff cu.m (Runoff %) 1514.76 (60.1%) 1774.33 (63.5%) 2029.98 (66.1%) 2604.49 (70.7%) 2998.49 (72.6%) 3627.08 (74.4%) 4143.69 (75.6%) 4870.07 (75.7%) 5670.02 (75.3%) 6318.63 (74.8%) 7073.69 (71.7%) 7873.88 (71.0%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth OF Nth Extern OF Nth Outlet Max Q U/S Max Q D/S 2.316 0.564 2.466 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 2.316 0.564 2.466 MaxVol CONTINUITY CHECK for AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth intern 5291.24 Nth Extern 4797.15 Nth Outlet 10087.26 N DummyOut 10087.59 Due to Storm 5291.24 4797.15 10087.18 10087.59 Max D 7.049 7.049 10.232 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 Max DxV 0.069 0.037 0.122 0.25 0.09 0.2 Max Q High Level 0 0 0 0 Max Width Max V Due to Storm 13.55 3.7 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 10.33 2.33 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 18.82 1.67 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment ‐ 100 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name SUB‐CATCHMENT DETAILS Name Max HGL Max Pond HGL Max Flow (cu.m/s) Due to Storm Nth internal Nth external CHANNEL DETAILS Name Min Freeboard (m) Overflow (cu.m/s) Constraint 3.291 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 0.98 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 Outflow Volumes for Total Catchment (4.26 impervious + 9.45 pervious = 13.7 total ha) Storm Total Rainfall cu.m AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 5528.49 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 6168.15 6716.43 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 8018.71 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 9046.62 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 10691.46 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 12144.75 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 14351.57 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 16961.73 19080.15 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 22574.75 AR&R 100 year, 12 hours storm, average 15.5 mm/h, Zone 1 25493.65 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 4106.76 (74.3%) 4694.00 (76.1%) 5191.08 (77.3%) 6535.31 (81.5%) 7582.58 (83.8%) 9196.97 (86.0%) 10596.91 (87.3%) 12644.17 (88.1%) 15003.41 (88.5%) 16834.50 (88.2%) 19685.57 (87.2%) 22039.33 (86.5%) Impervious Runoff cu.m (Runoff %) 1311.97 (76.4%) 1477.11 (77.1%) 1614.97 (77.4%) 2098.43 (84.3%) 2488.03 (88.6%) 3085.87 (93.0%) 3584.20 (95.0%) 4334.41 (97.3%) 5193.66 (98.6%) 5879.26 (99.2%) 7006.90 (100.0%) 7956.61 (100.5%) Pervious Runoff cu.m (Runoff %) 2794.79 (73.3%) 3216.88 (75.6%) 3576.10 (77.2%) 4436.89 (80.3%) 5094.55 (81.7%) 6111.10 (82.9%) 7012.71 (83.7%) 8309.77 (84.0%) 9809.75 (83.9%) 10955.25 (83.3%) 12678.66 (81.5%) 14082.72 (80.1%) Max Q (cu.m/s) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) Max Q (cu.m/s) Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth OF Nth Extern OF Nth Outlet Max Q U/S Max Q D/S 3.291 0.98 3.616 DETENTION BASIN DETAILS Name Max WL Due to Storm Safe Q 3.291 0.98 3.616 MaxVol CONTINUITY CHECK for AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth intern 5412 Nth Extern 5184.86 Nth Outlet 10596.89 N DummyOut 10597.21 Due to Storm 5412 5184.86 10596.64 10597.21 Max D 7.049 7.049 10.232 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 Max DxV 0.081 0.047 0.144 0.33 0.13 0.27 Max Q High Level 0 0 0 0 Max Width Max V Due to Storm 14.78 4.11 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 11.33 2.8 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 20.67 1.87 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment ‐ 1 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 11.66 11.24 8.73 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 1.44 0 1.772 0 Overflow (cu.m/s) Constraint 1.34 0 None 1.77 0 None 0.825 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0.615 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 1.597 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 10512.23 AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 11719.28 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 12762.47 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 15359.61 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 17364.35 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 20257.69 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 22558.63 26266.36 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 30284.51 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 33618.12 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 39005.33 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 43275.77 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 1743.46 (16.6%) 2317.12 (19.8%) 2804.35 (22.0%) 4581.07 (29.8%) 6348.10 (36.6%) 9049.88 (44.7%) 11228.99 (49.8%) 14115.24 (53.7%) 16801.66 (55.5%) 19040.94 (56.6%) 21581.38 (55.3%) 22664.25 (52.4%) Impervious Runoff cu.m (Runoff %) ‐796.85 (‐86.0%) ‐1208.31 (‐116.9%) ‐1538.86 (‐136.7%) ‐1832.66 (‐135.3%) ‐1595.90 (‐104.2%) ‐734.94 (‐41.1%) ‐47.78 (‐2.4%) 1014.01 (43.8%) 1849.69 (69.3%) 2419.64 (81.6%) 3082.92 (89.6%) 1940.81 (50.9%) Pervious Runoff cu.m (Runoff %) 2540.32 (26.5%) 3525.43 (33.0%) 4343.20 (37.3%) 6413.73 (45.8%) 7944.00 (50.2%) 9784.82 (53.0%) 11276.77 (54.8%) 13101.24 (54.7%) 14951.97 (54.1%) 16621.29 (54.2%) 18498.46 (52.0%) 20723.44 (52.5%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 1.422 1.734 Max Q (cu.m/s) 2.28 2.41 Max V (m/s) 11.362 8.402 Due to Storm 11.242 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 8.201 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 0.825 0 1.422 0 1.734 DETENTION BASIN DETAILS Name Max WL Safe Q 0.825 0 1.422 0 1.734 MaxVol CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 9813.37 HW1 16866.63 Sth B Outlet 16864.4 HW2 21495.92 Sth C Outlet 21492.72 Sth Outlet 21493.39 9813.37 16864.4 16864.32 21492.72 21492.63 21493.39 Max D 4.523 0 9.401 0 8.037 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 0 0 Max DxV 0.116 0 0.201 0 0.126 0.07 0 0.19 0 0.29 Max Q High Level 0 0 0 0 0 0 Max Width Max V Due to Storm 18.24 0.6 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0 0 10.2 0.94 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0 0 10.05 2.28 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment ‐ 10 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 12.12 11.5 9.26 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 3.931 0 4.693 0 Overflow (cu.m/s) Constraint 0.88 0 None 1.24 0 None 2.26 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 1.671 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 3.797 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 19787.73 AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 21952.02 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 24116.29 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 28939.56 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 32426.53 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 38288.64 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 43038.31 50531.07 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 59105.33 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 66338.37 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 77465.27 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 87096.95 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 7933.51 (40.1%) 9416.05 (42.9%) 10888.49 (45.1%) 15669.53 (54.1%) 19564.50 (60.3%) 25906.56 (67.7%) 30783.61 (71.5%) 37626.33 (74.5%) 44691.39 (75.6%) 50363.38 (75.9%) 57083.25 (73.7%) 63776.52 (73.2%) Impervious Runoff cu.m (Runoff %) ‐2911.02 (‐166.8%) ‐3286.84 (‐169.8%) ‐3644.51 (‐171.4%) ‐2976.62 (‐116.6%) ‐1902.49 (‐66.5%) ‐60.60 (‐1.8%) 1117.58 (29.4%) 2760.05 (61.9%) 4098.47 (78.6%) 5128.21 (87.7%) 6443.31 (94.3%) 7404.10 (96.4%) Pervious Runoff cu.m (Runoff %) 10844.53 (60.1%) 12702.89 (63.5%) 14533.00 (66.1%) 18646.15 (70.7%) 21466.99 (72.6%) 25967.17 (74.4%) 29666.03 (75.6%) 34866.28 (75.7%) 40592.91 (75.3%) 45235.17 (74.8%) 50639.94 (71.7%) 56372.42 (71.0%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 3.889 4.635 Max Q (cu.m/s) 3.01 3.14 Max V (m/s) 11.619 8.685 Due to Storm 11.499 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 8.485 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 2.26 0 3.889 0 4.635 DETENTION BASIN DETAILS Name Max WL Safe Q 2.26 0 3.889 0 4.635 MaxVol CONTINUITY CHECK for AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 27139.55 HW1 46722.34 Sth B Outlet 46718.94 HW2 56971.78 Sth C Outlet 56966.8 Sth Outlet 56969.18 27139.55 46718.94 46718.79 56966.8 56966.61 56969.18 Max D 4.523 0 9.401 0 8.037 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 0 0 Max DxV 0.182 0 0.327 0 0.187 0.15 0 0.45 0 0.63 Max Q High Level 0 0 0 0 0 0 Max Width Max V Due to Storm 22.91 0.82 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 0 0 10.45 1.38 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 0 0 10.17 3.36 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment ‐ 100 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 12.61 11.74 9.66 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 6.797 0 7.936 0 Overflow (cu.m/s) Constraint 0.39 0 None 0.84 0 None 3.895 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 2.902 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 5.543 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 29928.95 AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 33391.8 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 36359.95 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 43409.96 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 48974.63 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 57879.12 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 65746.6 77693.45 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 91823.73 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 103291.98 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 122210.28 138012.03 AR&R 100 year, 12 hours storm, average 15.5 mm/h, Zone 1 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 16256.52 (54.3%) 18911.57 (56.6%) 21150.37 (58.2%) 28782.84 (66.3%) 35111.48 (71.7%) 44846.24 (77.5%) 52882.96 (80.4%) 64328.25 (82.8%) 77014.08 (83.9%) 86660.67 (83.9%) 101062.02 (82.7%) 112676.25 (81.6%) Impervious Runoff cu.m (Runoff %) ‐3752.06 (‐142.2%) ‐4118.66 (‐139.9%) ‐4451.70 (‐138.8%) ‐2981.76 (‐77.9%) ‐1361.33 (‐31.5%) 1095.68 (21.5%) 2677.69 (46.2%) 4834.02 (70.6%) 6783.37 (83.8%) 8230.21 (90.4%) 10287.77 (95.5%) 11855.20 (97.4%) Pervious Runoff cu.m (Runoff %) 20008.57 (73.3%) 23030.23 (75.6%) 25602.07 (77.2%) 31764.60 (80.3%) 36472.81 (81.7%) 43750.57 (82.9%) 50205.27 (83.7%) 59494.23 (84.0%) 70230.71 (83.9%) 78430.46 (83.3%) 90774.25 (81.5%) 100821.05 (80.1%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 6.702 7.865 Max Q (cu.m/s) 3.43 3.53 Max V (m/s) 11.863 8.969 Due to Storm 11.743 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 8.777 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 3.895 0 6.702 0 7.865 DETENTION BASIN DETAILS Name Max WL Safe Q 3.895 0 6.702 0 7.865 MaxVol CONTINUITY CHECK for AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 41846.49 HW1 72017.1 Sth B Outlet 72011.66 HW2 86461.04 Sth C Outlet 86451.55 Sth Outlet 86453.53 41846.49 72011.66 72010.98 86451.55 86450.85 86453.53 Max D 4.523 0.288 9.401 0.288 8.037 Max Q Total Max Q Low Level Storage Change (cu.m) Difference % 0 0 0 0 0 0 Max DxV 0.233 0 0.434 0 0.239 0.23 0 0.74 0 0.98 Max Q High Level 0 0 0 0 0 0 Max Width Max V Due to Storm 26.01 0.97 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 0 0 10.67 1.69 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 0 0 10.28 4.12 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Developed Catchments with Detention DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment with Detention ‐ 1 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name Max HGL Nth Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 9.06 Max Flow (cu.m/s) Nth internal bypass Nth external Nth internal basin Constraint 0.222 Max Q (cu.m/s) Total Runoff cu.m (Runoff %) 748.67 (38.6%) 919.16 (42.5%) 1062.66 (45.1%) 1496.51 (52.7%) 1855.56 (57.9%) 2337.18 (62.5%) 2713.90 (65.1%) 3231.19 (66.6%) 3745.76 (67.0%) 4184.94 (67.4%) 4776.23 (66.3%) 5163.91 (64.6%) Impervious Runoff cu.m (Runoff %) 385.69 (67.4%) 415.43 (65.1%) 442.08 (63.6%) 580.08 (69.4%) 720.49 (76.2%) 939.07 (85.2%) 1102.62 (89.8%) 1359.23 (95.1%) 1609.33 (97.6%) 1810.04 (98.9%) 2133.01 (100.5%) 2202.70 (93.5%) Pervious Runoff cu.m (Runoff %) 362.97 (26.5%) 503.73 (33.0%) 620.58 (37.3%) 916.43 (45.8%) 1135.07 (50.2%) 1398.10 (53.0%) 1611.28 (54.8%) 1871.96 (54.7%) 2136.43 (54.1%) 2374.90 (54.2%) 2643.21 (52.0%) 2961.21 (52.5%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 0.314 Max Q (cu.m/s) 4.98 12.165 Due to Storm 9.065 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth bypass OF Nth Extern OF Nth Basin OF Nth Outlet Max Q U/S Max Q D/S 0.038 0.214 0 0.469 DETENTION BASIN DETAILS Name Max WL Nth Basin Overflow (cu.m/s) 0.038 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 0.214 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0.911 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 Basin Pipe CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (4.04 impervious + 9.67 pervious = 13.7 total ha) Storm Total Rainfall cu.m 1941.68 AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 2164.63 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 2357.32 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 2837.03 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 3207.32 3741.74 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 4166.74 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 4851.58 5593.76 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 6209.5 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 7204.56 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 7993.34 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Due to Storm Safe Q 0.038 0.214 0 0.469 MaxVol 12.65 CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth bypass 91.4 Nth Extern 1994.12 Nth Basin 2690.8 Nth Outlet 4735.98 N DummyOut 4736 Max D 7.049 7.049 0 10.232 Max Q Total 634 Max Q Low Level 0.314 Storage Change (cu.m) 91.4 1994.12 2650.2 4735.38 4736 Max DxV 0.008 0.024 0 0.056 0 0 40.58 0 0 0.01 0.04 0 0.06 Max Q High Level 0.314 Difference % 0 0 0 0 0 0 Max Width Max V Due to Storm 5.04 1.75 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 8.08 1.76 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0 0 12.26 1.02 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment with Detention ‐ 10 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name Max HGL Nth Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 9.15 Max Flow (cu.m/s) Nth internal bypass Nth external Nth internal basin Constraint 0.579 Max Q (cu.m/s) Total Runoff cu.m (Runoff %) 2287.64 (62.6%) 2642.13 (65.2%) 2988.96 (67.1%) 3894.63 (72.9%) 4549.25 (76.0%) 5591.73 (79.1%) 6422.54 (80.8%) 7635.86 (81.8%) 8967.20 (82.1%) 10047.30 (82.0%) 11468.52 (80.2%) 12820.35 (79.7%) Impervious Runoff cu.m (Runoff %) 738.12 (68.5%) 827.08 (69.2%) 912.41 (69.5%) 1230.37 (78.1%) 1481.94 (84.0%) 1881.44 (90.3%) 2183.72 (93.2%) 2653.92 (96.5%) 3167.09 (98.5%) 3583.71 (99.3%) 4232.85 (100.4%) 4764.79 (100.5%) Pervious Runoff cu.m (Runoff %) 1549.52 (60.1%) 1815.05 (63.5%) 2076.55 (66.1%) 2664.27 (70.7%) 3067.31 (72.6%) 3710.29 (74.4%) 4238.82 (75.6%) 4981.94 (75.7%) 5800.11 (75.3%) 6463.59 (74.8%) 7235.67 (71.7%) 8055.56 (71.0%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 0.669 Max Q (cu.m/s) 6.15 12.246 Due to Storm 9.146 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth bypass OF Nth Extern OF Nth Basin OF Nth Outlet Max Q U/S Max Q D/S 0.071 0.564 0 1.158 DETENTION BASIN DETAILS Name Max WL Nth Basin Overflow (cu.m/s) 0.071 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 0.564 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 2.158 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 Basin Pipe CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (4.04 impervious + 9.67 pervious = 13.7 total ha) Storm Total Rainfall cu.m 3654.93 AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 4054.69 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 4454.45 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 5345.34 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 5989.41 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 7072.18 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 7949.48 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 9333.44 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 10917.17 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 12253.16 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 14308.38 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 16087.42 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Due to Storm Safe Q 0.071 0.564 0 1.158 MaxVol 13.12 CONTINUITY CHECK for AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth bypass 159.89 Nth Extern 4797.14 Nth Basin 5089.92 Nth Outlet 9998.11 N DummyOut 9999.53 Max D 7.049 7.049 0 10.232 Max Q Total 1309.4 Max Q Low Level 0.669 Storage Change (cu.m) 159.89 4797.14 5042.16 9998.54 9999.53 Max DxV 0.01 0.037 0 0.085 0 0 47.83 0 0 0.02 0.09 0 0.11 Max Q High Level 0.669 Difference % 0 0 0 0 0 0 Max Width Max V Due to Storm 5.39 2.31 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 10.33 2.33 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 0 0 15.19 1.34 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment North ‐ Developed Catchment with Detention ‐ 100 YR ARI DRAINS results prepared 08 January, 2015 from Version 2014.12 PIT / NODE DETAILS Name Max HGL Nth Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 9.17 Max Flow (cu.m/s) Nth internal bypass Nth external Nth internal basin Constraint 1.163 Max Q (cu.m/s) Total Runoff cu.m (Runoff %) 1264.77 (50.1%) 2484.23 (64.7%) 3395.63 (70.8%) 4086.58 (73.9%) 4673.22 (75.8%) 5169.72 (77.0%) 6513.05 (81.2%) 7559.25 (83.6%) 9171.25 (85.8%) 10569.42 (87.0%) 12612.73 (87.9%) 14965.53 (88.2%) Impervious Runoff cu.m (Runoff %) 495.54 (66.6%) 799.87 (70.7%) 1043.73 (73.8%) 1227.66 (75.4%) 1382.54 (76.1%) 1511.56 (76.4%) 1974.34 (83.6%) 2347.85 (88.1%) 2919.96 (92.7%) 3395.85 (94.9%) 4111.88 (97.2%) 4930.82 (98.7%) Pervious Runoff cu.m (Runoff %) 769.23 (43.2%) 1684.36 (62.2%) 2351.90 (69.5%) 2858.93 (73.3%) 3290.68 (75.6%) 3658.16 (77.2%) 4538.71 (80.3%) 5211.40 (81.7%) 6251.29 (82.9%) 7173.57 (83.7%) 8500.85 (84.0%) 10034.71 (83.9%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 0.805 Max Q (cu.m/s) 6.45 12.272 Due to Storm 9.172 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 Max V (m/s) OVERFLOW ROUTE DETAILS Name OF Nth bypass OF Nth Extern OF Nth Basin OF Nth Outlet Max Q U/S Max Q D/S 0.114 0.98 0.375 1.968 DETENTION BASIN DETAILS Name Max WL Nth Basin Overflow (cu.m/s) 0.114 AR&R 100 year, 5 minutes storm, average 221 mm/h, Zone 1 0.98 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 3.134 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 Basin Pipe CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (4.04 impervious + 9.67 pervious = 13.7 total ha) Storm Total Rainfall cu.m 2524.19 AR&R 100 year, 5 minutes storm, average 221 mm/h, Zone 1 3837.68 AR&R 100 year, 10 minutes storm, average 168 mm/h, Zone 1 4797.1 AR&R 100 year, 15 minutes storm, average 140 mm/h, Zone 1 5528.09 AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 6167.7 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 6715.94 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 8018.13 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 9045.96 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 10690.68 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 12143.86 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 14350.53 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 16960.49 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Due to Storm Safe Q 0.114 0.98 0.375 1.968 MaxVol 13.5 CONTINUITY CHECK for AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Nth bypass 159.01 Nth Extern 5184.85 Nth Basin 5225.45 Nth Outlet 10471.81 N DummyOut 10472.16 Max D 7.049 7.049 0 10.232 Max Q Total 2009.1 Max Q Low Level 1.179 Storage Change (cu.m) 159.01 5184.85 5127.66 10471.55 10472.16 0 0 97.76 0 0 Max DxV 0.013 0.047 0.04 0.11 0.03 0.13 0.05 0.17 Max Q High Level 0.805 0.375 Difference % 0 0 0 0 0 Max Width Max V Due to Storm 5.86 2.59 AR&R 100 year, 5 minutes storm, average 221 mm/h, Zone 1 11.33 2.8 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 10.62 1.37 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 17.65 1.55 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment with Detention ‐ 1 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet Extg Dam Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 11.66 11.24 8.38 8.7 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 1.44 0 1.247 1.597 0 Overflow (cu.m/s) Constraint 1.34 0 None 1.8 0 None 0.825 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0.615 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 1.597 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Basin Low Flow Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 10512.23 AR&R 1 year, 20 minutes storm, average 42.5 mm/h, Zone 1 AR&R 1 year, 25 minutes storm, average 37.9 mm/h, Zone 1 11719.28 AR&R 1 year, 30 minutes storm, average 34.4 mm/h, Zone 1 12762.47 15359.61 AR&R 1 year, 45 minutes storm, average 27.6 mm/h, Zone 1 AR&R 1 year, 1 hour storm, average 23.4 mm/h, Zone 1 17364.35 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 20257.69 AR&R 1 year, 2 hours storm, average 15.2 mm/h, Zone 1 22558.63 AR&R 1 year, 3 hours storm, average 11.8 mm/h, Zone 1 26266.36 AR&R 1 year, 4.5 hours storm, average 9.1 mm/h, Zone 1 30284.51 AR&R 1 year, 6 hours storm, average 7.6 mm/h, Zone 1 33618.12 39005.33 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 AR&R 1 year, 12 hours storm, average 4.9 mm/h, Zone 1 43275.77 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 1743.46 (16.6%) 2317.12 (19.8%) 2804.35 (22.0%) 4581.07 (29.8%) 6348.10 (36.6%) 9049.88 (44.7%) 11228.99 (49.8%) 14115.24 (53.7%) 16801.66 (55.5%) 19040.94 (56.6%) 21581.38 (55.3%) 22664.25 (52.4%) Impervious Runoff cu.m (Runoff %) ‐796.85 (‐86.0%) ‐1208.31 (‐116.9%) ‐1538.86 (‐136.7%) ‐1832.66 (‐135.3%) ‐1595.90 (‐104.2%) ‐734.94 (‐41.1%) ‐47.78 (‐2.4%) 1014.01 (43.8%) 1849.69 (69.3%) 2419.64 (81.6%) 3082.92 (89.6%) 1940.81 (50.9%) Pervious Runoff cu.m (Runoff %) 2540.32 (26.5%) 3525.43 (33.0%) 4343.20 (37.3%) 6413.73 (45.8%) 7944.00 (50.2%) 9784.82 (53.0%) 11276.77 (54.8%) 13101.24 (54.7%) 14951.97 (54.1%) 16621.29 (54.2%) 18498.46 (52.0%) 20723.44 (52.5%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 1.422 0.151 1.605 Max Q (cu.m/s) 2.28 2.19 2.35 Max V (m/s) 11.362 8.556 8.39 Due to Storm 11.242 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 8.381 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 8.186 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Extg Dam Spillway OF Extg Dam OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 0.825 0 1.422 1.247 1.398 0 1.605 DETENTION BASIN DETAILS Name Max WL Extg Dam Safe Q 0.825 0 1.422 1.247 1.398 0 1.605 MaxVol 9.02 CONTINUITY CHECK for AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 9813.37 HW1 16866.63 Sth B Outlet 16864.14 Extg Dam 16844.82 Extg Dam Outlet 15849.82 HW2 20498.96 Sth C Outlet 20492.96 Sth Outlet 20493.94 Max D 4.523 0 9.401 0 0 0 8.037 Max Q Total 2742.1 Max Q Low Level 1.398 Storage Change (cu.m) 9813.37 16864.14 16864.06 15850.25 15849.68 20492.96 20492.65 20493.94 0 0 0 994.51 0 0 0 0 Max DxV 0.116 0 0.176 0.099 0.214 0 0.122 0.07 0 0.2 0.11 0.18 0 0.27 Max Q High Level 0.151 1.247 Difference % 0 0 0 0 0 0 0 0 Max Width Max V Due to Storm 18.24 0.6 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0 0 10.15 1.12 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 16.54 1.16 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 10.23 0.84 AR&R 1 year, 9 hours storm, average 5.8 mm/h, Zone 1 0 0 10.04 2.22 AR&R 1 year, 1.5 hours storm, average 18.2 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment with Detention ‐ 10 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet Extg Dam Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 12.12 11.5 8.39 9.21 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 3.931 0 3.633 4.393 0 Overflow (cu.m/s) Constraint 0.88 0 None 1.29 0 None 2.26 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 1.671 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 3.797 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Basin Low Flow Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 19787.73 AR&R 10 year, 20 minutes storm, average 80.0 mm/h, Zone 1 AR&R 10 year, 25 minutes storm, average 71.0 mm/h, Zone 1 21952.02 AR&R 10 year, 30 minutes storm, average 65.0 mm/h, Zone 1 24116.29 28939.56 AR&R 10 year, 45 minutes storm, average 52.0 mm/h, Zone 1 AR&R 10 year, 1 hour storm, average 43.7 mm/h, Zone 1 32426.53 AR&R 10 year, 1.5 hours storm, average 34.4 mm/h, Zone 1 38288.64 AR&R 10 year, 2 hours storm, average 29.0 mm/h, Zone 1 43038.31 50531.07 AR&R 10 year, 3 hours storm, average 22.7 mm/h, Zone 1 AR&R 10 year, 4.5 hours storm, average 17.7 mm/h, Zone 1 59105.33 AR&R 10 year, 6 hours storm, average 14.9 mm/h, Zone 1 66338.37 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 77465.27 AR&R 10 year, 12 hours storm, average 9.8 mm/h, Zone 1 87096.95 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 7933.51 (40.1%) 9416.05 (42.9%) 10888.49 (45.1%) 15669.53 (54.1%) 19564.50 (60.3%) 25906.56 (67.7%) 30783.61 (71.5%) 37626.33 (74.5%) 44691.39 (75.6%) 50363.38 (75.9%) 57083.25 (73.7%) 63776.52 (73.2%) Impervious Runoff cu.m (Runoff %) ‐2911.02 (‐166.8%) ‐3286.84 (‐169.8%) ‐3644.51 (‐171.4%) ‐2976.62 (‐116.6%) ‐1902.49 (‐66.5%) ‐60.60 (‐1.8%) 1117.58 (29.4%) 2760.05 (61.9%) 4098.47 (78.6%) 5128.21 (87.7%) 6443.31 (94.3%) 7404.10 (96.4%) Pervious Runoff cu.m (Runoff %) 10844.53 (60.1%) 12702.89 (63.5%) 14533.00 (66.1%) 18646.15 (70.7%) 21466.99 (72.6%) 25967.17 (74.4%) 29666.03 (75.6%) 34866.28 (75.7%) 40592.91 (75.3%) 45235.17 (74.8%) 50639.94 (71.7%) 56372.42 (71.0%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 3.889 0.187 4.388 Max Q (cu.m/s) 3.01 2.66 3.1 Max V (m/s) 11.619 8.656 8.664 Due to Storm 11.499 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 8.395 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 8.463 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Extg Dam Spillway OF Extg Dam OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 2.26 0 3.889 3.633 3.821 0 4.388 DETENTION BASIN DETAILS Name Max WL Extg Dam Safe Q 2.26 0 3.889 3.633 3.821 0 4.388 MaxVol 9.36 CONTINUITY CHECK for AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 27139.55 HW1 46722.34 Sth B Outlet 46718.56 Extg Dam 46700.94 Extg Dam Outlet 45526.66 HW2 55816.44 Sth C Outlet 55807.77 Sth Outlet 55809.31 Max D 4.523 0 9.401 0 0 0 8.037 Max Q Total Max Q Low Level 4088 3.82 Storage Change (cu.m) 27139.55 46718.56 46718.4 45526.95 45526.29 55807.77 55807.21 55809.31 0 0 0 1173.89 0 0 0 0 Max DxV 0.182 0 0.281 0.161 0.351 0 0.183 0.15 0 0.47 0.26 0.44 0 0.6 Max Q High Level 0.187 3.633 Difference % 0 0 0 0 0 0 0 0 Max Width Max V Due to Storm 22.91 0.82 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 0 0 10.36 1.66 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 21.65 1.59 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 10.5 1.24 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 0 0 10.17 3.29 AR&R 10 year, 9 hours storm, average 11.6 mm/h, Zone 1 DRAINS Results Spreadsheet ‐ Catchment South ‐ Developed Catchment with Detention ‐ 100 YR ARI DRAINS results prepared 15 December, 2014 from Version 2014.12 PIT / NODE DETAILS Name Max HGL HW1 Sth B Outlet Extg Dam Outlet HW2 Sth C Outlet SUB‐CATCHMENT DETAILS Name Max Pond HGL 12.61 11.74 8.39 9.65 7.5 Max Flow (cu.m/s) Cat Sth A Cat Sth B Cat Sth C 6.797 0 6.358 7.398 0 Overflow (cu.m/s) Constraint 0.39 0 None 0.85 0 None 3.895 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 2.902 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 5.543 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 Max Q (cu.m/s) Pipe Culvert 1 Pipe Basin Low Flow Pipe Culvert 2 CHANNEL DETAILS Name Min Freeboard (m) Due to Storm Outflow Volumes for Total Catchment (6.54 impervious + 67.7 pervious = 74.2 total ha) Storm Total Rainfall cu.m 29928.95 AR&R 100 year, 20 minutes storm, average 121 mm/h, Zone 1 AR&R 100 year, 25 minutes storm, average 108 mm/h, Zone 1 33391.8 AR&R 100 year, 30 minutes storm, average 98.0 mm/h, Zone 1 36359.95 43409.96 AR&R 100 year, 45 minutes storm, average 78.0 mm/h, Zone 1 AR&R 100 year, 1 hour storm, average 66.0 mm/h, Zone 1 48974.63 AR&R 100 year, 1.5 hours storm, average 52.0 mm/h, Zone 1 57879.12 AR&R 100 year, 2 hours storm, average 44.3 mm/h, Zone 1 65746.6 77693.45 AR&R 100 year, 3 hours storm, average 34.9 mm/h, Zone 1 AR&R 100 year, 4.5 hours storm, average 27.5 mm/h, Zone 1 91823.73 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 103291.98 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 122210.28 AR&R 100 year, 12 hours storm, average 15.5 mm/h, Zone 1 138012.03 PIPE DETAILS Name Version 8 Max Pond Volume (cu.m) Max Surface Flow Arriving (cu.m/s) Total Runoff cu.m (Runoff %) 16256.52 (54.3%) 18911.57 (56.6%) 21150.37 (58.2%) 28782.84 (66.3%) 35111.48 (71.7%) 44846.24 (77.5%) 52882.96 (80.4%) 64328.25 (82.8%) 77014.08 (83.9%) 86660.67 (83.9%) 101062.02 (82.7%) 112676.25 (81.6%) Impervious Runoff cu.m (Runoff %) ‐3752.06 (‐142.2%) ‐4118.66 (‐139.9%) ‐4451.70 (‐138.8%) ‐2981.76 (‐77.9%) ‐1361.33 (‐31.5%) 1095.68 (21.5%) 2677.69 (46.2%) 4834.02 (70.6%) 6783.37 (83.8%) 8230.21 (90.4%) 10287.77 (95.5%) 11855.20 (97.4%) Pervious Runoff cu.m (Runoff %) 20008.57 (73.3%) 23030.23 (75.6%) 25602.07 (77.2%) 31764.60 (80.3%) 36472.81 (81.7%) 43750.57 (82.9%) 50205.27 (83.7%) 59494.23 (84.0%) 70230.71 (83.9%) 78430.46 (83.3%) 90774.25 (81.5%) 100821.05 (80.1%) Max V (m/s) Max U/S HGL (m) Max D/S HGL (m) 6.702 0.216 7.389 Max Q (cu.m/s) 3.43 3.06 3.49 Max V (m/s) 11.863 8.746 8.925 Due to Storm 11.743 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 8.4 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 8.728 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 Due to Storm OVERFLOW ROUTE DETAILS Name OF Sth A OF Culvert 1 OF Sth B OF Extg Dam Spillway OF Extg Dam OF Culvert 2 OF Sth C Max Q U/S Max Q D/S 3.895 0 6.702 6.358 6.575 0 7.389 DETENTION BASIN DETAILS Name Max WL Extg Dam Safe Q 3.895 0 6.702 6.358 6.575 0 7.389 MaxVol 9.66 CONTINUITY CHECK for AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 Node Inflow Outflow (cu.m) (cu.m) Sth A 41846.49 HW1 72017.1 Sth B Outlet 72010.22 Extg Dam 71986.13 Extg Dam Outlet 70334.93 HW2 84840.98 Sth C Outlet 84830.07 Sth Outlet 84831.2 Max D 4.523 0.288 9.401 0 0 0.288 8.037 Max Q Total 5401 Max Q Low Level 6.574 Storage Change (cu.m) 41846.49 72010.22 72009.55 70335.36 70334.41 84830.07 84829.24 84831.2 0 0 0 1650.41 0 0 0 0 Max DxV 0.233 0 0.371 0.207 0.467 0 0.232 0.23 0 0.76 0.39 0.71 0 0.93 Max Q High Level 0.216 6.358 Difference % 0 0 0 0 0 0 0 0 Max Width Max V Due to Storm 26.01 0.97 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 0 0 10.54 2.04 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 24.42 1.9 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 10.73 1.53 AR&R 100 year, 6 hours storm, average 23.2 mm/h, Zone 1 0 0 10.26 4.02 AR&R 100 year, 9 hours storm, average 18.3 mm/h, Zone 1 Appendix F 100 Year ARI Hydrographs Catchment North 100 year ARI ‐ Peak Outflow Hydrograph 4 3.5 Discharge (m3/s) 3 2.5 Undeveloped 2 Developed 1.5 1 0.5 0 0 20 40 60 Time (mins) 80 100 Catchment South 100 year ARI ‐ Peak Outflow Hydrograph 9 8 7 Discharge (m3/s) 6 5 Undeveloped Developed 4 3 2 1 0 0 30 60 90 120 150 180 210 240 270 300 330 Time (mins) 360 390 420 450 480 510 540 570 600