Valuation of work Complete Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston, BC prepared for Carevest Capital Inc. 710-1055 West Georgia Street Vancouver, BC V6E 3R5 Attention: Mr. Jeevan Khunkhun, MBA Vice President, Lending & Chaplin West Ventures #1603 - 100 West Pender Street Vancouver, BC V6B 1R8 Attention: Mr. Michael Chaplin October 10, 2007 CONTENTS OF THIS REPORT Cover Letter Appendix 1 - Photographs Appendix 2 - Stantec Consulting Ltd. Report June 20, 2007 1519 Eighth Avenue, New Westminster, British Columbia, Canada V3M 2S5 Tel: (604) 522-4332 Fax: (604) 522-4302 E-mail: info@costex.ca Web page: www.costex.ca October 10, 2007 Our File: 24030 Carevest Capital Inc. 710-1055 West Georgia Street Vancouver, BC V6E 3R5 Attention: Mr. Jeevan Khunkhun, MBA Vice President, Lending Chaplin West Ventures #1603 - 100 West Pender Street Vancouver, BC V6B 1R8 Attention: Mr. Michael Chaplin Dear Sirs: Re: Valuation of Site Improvement Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston , B.C. Lot1, District 525, Kootenay District Plan 68799 Engagement We were asked by Mr. Michael Chaplin to review documents relating to the above project and to prepare a valuation of the improvements currently exiting on the project site according to the documents and our experience. Methodology In arriving at the opinions expressed herein the writer examined all of the documents listed and referenced herein. We have measured the building areas from the drawings listed herein and analysed the project budget using these measured quantities and the budget provided. All measurement has been done in accordance with the Method of Measurement of Construction Works, 7th edition and Elemental Cost Analysis and Measurement of Buildings by Area and Volume, 3rd edition both published by the Canadian Institute of Quantity 1519 Eighth Avene, New Westminster, British Columbia, Canada V3M 2S5 Tel: (604) 522-4332 Fax: (604) 522-4302 Email: info@costex.ca Web page: www.costex.ca October 10, 2007 Our File: 24030 Re: Valuation of Site Improvement Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston , B.C. Lot1, District 525, Kootenay District Plan 68799 Surveyors. The writer also conducted a site inspection of the property on July 31, 2007. Photographs taken at that time are included herein at Appendix 1. Performance of Review All documentation review and analysis was performed by Evan B. Stregger PQS(F), AScT, C.Arb., CSC, the person responsible for the analysis and opinions expressed herein. Project Description The proposed project consists of 84 apartment units in a 3 storey wood frame building constructed over a concrete parking garage and amenity area. Approximately 1/3 of the main floor is slab on grade, the balance being over the concrete parking garage and amenity area. Detailed project areas are as follows: square footage Units 1 Level 1 Parking 2 Level 1 Amenity 16,100 3 Main Floor 28,100 23 4 Second Floor 27,900 26 5 Third Floor 27,800 26 6 Fourth Floor 9,900 9 Gross Floor Area 9,300 119,100 Page -2- 84 October 10, 2007 Our File: 24030 Re: Valuation of Site Improvement Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston , B.C. Lot1, District 525, Kootenay District Plan 68799 Referenced Documents Drawings/Specifications • Architectural drawings prepared by Thorkelsson Fry Architectural Associates • Structural Drawings prepared by MSS Engineering Ltd. • Mechanical Drawings prepared by Nova Engineering Ltd. • Electrical Drawings prepared by Emco Engineering Ltd. • Site Survey prepared by Griffiths Surveys, R Griffiths Land Surveying Inc. Reports • Project Inspection report prepared by Stantec Consulting Ltd. Dated June 20, 2007 Work in Place As of July 31, 2007 the following work was observed to be in place; a. All concrete footings b. Concrete walls and columns c. All precast concrete slab sections, grouted in to place but not filled or topped. d. Exterior waterproofing of concrete walls and backfill of same. e. Interior backfill for slab on grade f. Underground plumbing rough-in g. Hydraulic elevator sleeves h. Sanitary sewer connection and manhole Status of the Project The concrete parking structure and amenity area is in place with no serous deficiencies as described in the report by Stantec (attached). Value of work in Place Based on Stantec’s report, the photographs and our experience we have calculated that the work currently in place, after allowances for anticipated remedial work to be $2,439,000. This value does not include land value. Page -3- October 10, 2007 Our File: 24030 Re: Valuation of Site Improvement Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston , B.C. Lot1, District 525, Kootenay District Plan 68799 The above value can be summarized as follows: PROJECT SUMMARY SOFT COST HARD COST $ 96,000 $ 2,343,000 TOTAL VALUE COMPLETE$ 2,439,000 HARD COST 1000 GENERAL REQUIREMENTS $ 31,000 General site overhead to complete works to date 2000EARTHWORK $ 350,000 Excavation, backfill & perimeter drainage; main sanitary sewer for lot in front of complex, storm sewer main. 3000CONCRETE $ 1,588,000 All footings and walls below grade, supply and installation of precast slab panels, reinforcing steel. 4000MASONRY $ 0 none 5000METALS $ 10,000 embedded metals for setting of precast 7000THERMAL & MOISTURE PROTECTION $ 10,000 Waterproofing of below grade walls 14000CONVEYING SYSTEMS $ 26,000 Drilling of piston shaft for 2 elevators. 15000MECHANICAL $ 140,000 Underground rough-in, underground piping for Make-up air 16000ELECTRICAL $ 55,000 Electrical work embedded in concrete walls SUB-TOTAL $ 2,210,000 17000CONSTRUCTION MANAGER'S FEE 6% $ 133,000 Based on value of work in place TOTAL HARD COSTS $ 2,343,000 SOFT COST 18000 CONSULTANTS $ 96,000 Cost to prepare initial design drawings to achieve progress as shown in phonographs.. TOTAL SOFT COST $ 96,000 TOTAL PROJECT$ 2,439,000 Page -4- October 10, 2007 Our File: 24030 Re: Valuation of Site Improvement Carriage Lane, Retirement Residence, 801 Vancouver Street, Creston , B.C. Lot1, District 525, Kootenay District Plan 68799 If you have any questions or require further information please contact me at your convenience. Yours truly Costex Management Inc. per Evan B. Stregger, PQS(F), AScT, C.Arb, GSC file: project value r1.wpd encl. Page -5- Appendix 1 Page 1 of 11 Appendix 1 Page 2 of 11 Appendix 1 Page 3 of 11 Appendix 1 Page 4 of 11 Appendix 1 Page 5 of 11 Appendix 1 Page 6 of 11 Appendix 1 Page 7 of 11 Appendix 1 Page 8 of 11 Appendix 1 Page 9 of 11 Appendix 1 Page 10 of 11 Appendix 1 Page 11 of 11 Stantec Consulting Ltd. 400 - 1620 Dickson Avenue, Kelowna, BC V1Y 9Y2 June 20, 2007 File: 1121 40074 Chaplin West Ventures 1603 - 100 West Pender Vancouver, BC V6B 1R8 Attention: Michael Chaplin Dear Mr. Chaplin Reference 801 Vancouver Street, Creston, BC On June 19, 2007 Lorne Lapham, P.Eng. of Stantec Consulting Ltd. visited the Cedarbrooke site and reviewed the structural condition of the existing works. The structure presently consists of a U shaped site wrapping around a house on the north side. The site is overgrown with an average of one metre high weeds, which are slightly sparse due to growing in structural fill. The structural fill soils seemed firm and fairly well drained. There is fair amount of moisture in the soils contained within the lower level as there has not been enough hot weather to dry out the snowmelt yet. Virtually all the footings and concrete walls have been placed, except for the strip and grade wall at the dinning area. The main columns and beams supporting the upper levels are completed. The pre-cast hollow core planks have all been installed. The grouting between the pre-cast planks was started and was roughly one half complete when work was stopped on the site. Formwork had been placed for the concrete topping pour that would have completed the main concrete work on site. The form work is now badly weathered and needs to be replaced. With care, the snap ties and wedges used to hold the edge formwork could be reused. North east wing: The footings and grade walls of this area have been completed. Some walls are completely buried, while others require additional backfill. The foundation drains are placed, buried and the cleanouts are still capped. The in ground plumbing drains are placed but missing caps and may be partly disturbed. The anchor bolts for the wood frame construction are installed but a few have been damaged or bent. A partly buried sheet metal duct is still capped securely. Little work remains to get this area ready for slab-on-grade placement. South central wing: The pre-cast hollow core planks are in fairly good shape with virtually no cracking or spalling. The lower floor concrete walls, columns, and beams show no significant signs of distress. The elevator pit is full of water and debris. This is good,as it shows the pit is sealed and the debris prevents ice damage during freeze-up. There are numerous buried plumbing lines and ducts evident at the lower level, though many show some signs of disturbance. ebs c:\documents and settings\all users\a - costex project files\24000 projects\24030 carrige lane creston 801 vancouver street\srtuctural_ review_letter.doc June 20, 2007 Michael Chaplin Page 2 of 2 Reference: Reference 801 Vancouver Street, Creston, BC North west wing: The pre-cast hollow core planks are in fairly good shape with a few hairline cracks along the rib lines and no spalling. The lower floor concrete walls, columns, and beams show no significant signs of distress. The south connection of the parkade beam to the wall and dinning area beam shows some cracks due to thermal stresses from being exposed to several seasons unprotected. These cracks should not cause any significant structural concerns. There are also some small cracks below the windows in the parkade area along the west face. There are numerous buried plumbing lines visible at the lower level and some show some signs of disturbance. Conclusions: The original concrete works are still in quite good condition. The most difficult task to re-utilize this site may be removal of the weeds without damaging the concrete. If the installed plumbing could be used basically as is, then only about one months work should be required to complete the concrete works for the project with a reasonably sized crew. Recommended tasks required to reutilize the existing concrete works; • Remove weeds and other debris from site. • Remove remaining formwork placed for topping, maintaining snap-ties for reuse • Pressure wash pre-cast planks and exposed rebar to remove any loose or weak surface materials • Repair or rework any required underground services and piping • Re coat the exposed foundation damp proofing • Perform final grading for slab-on-grades • Re-form second floor concrete topping • Install missing rebar for topping and hollow core connections • Repair or replace damaged anchor bolts • Continue with normal construction to building completion. Sincerely, STANTEC CONSULTING LTD. Lorne Lapham, P.Eng. Senior Structural Engineer Tel: (250) 470-4496 Fax: (250) 860-3367 Lorne.Lapham@stantec.com