MIL-STD-882 (Modified) Hazard Risk Matrix Calibration Event Introduce a known event with established probability or severity to ‘calibrate’ probability estimates, i.e. risk of death due to car accident during commute to work over 25 year working life. Probability bins (over service life) IDLog A6 B5 C4 D3 Description Individual Fleet/Inventory AIAA Threshold Combinatorial probability 3 X 10 -1 Frequent Occurs regularly Continuously experienced. > 8 X 10 -2 Probable Will occur several times in the life. Occurs regularly. > 8 X 10 Occasional Remote -3 Unlikely but can reasonably expect to occur in life of item Will occur several times in the fleets life. Unlikely but possible in life of item. Unlikely but can reasonably expect to occur in life of fleet. > 8 X 10 -5 > 8 X 10 -4 3X 10- 2 3 X 10- 3 3 X 10 -4 Hazard Risk Index Matrix Severity (log) Probability log IV 1 III 2 II 3 I4 A6 (Frequent) 10(7) 6(8) 3(9) 1 (10) B5 (Probable) 14(6) 9(7) 5(8) 2(9) C4 (Occasional) 17(5) 13(6) 8(7) 4(8) D3 (Remote) 19(4) 16(5) 12(6) 7(7) E2 (Improbable) 20(3) 18(4) 15(5) 11(6) F1 (Impossible) 21(2) 21(3) 21(4) 21(5) MIL-STD-882C risk acceptance curves corrected to log scale E2 Improbable So unlikely it may not be experienced in life of item Unlikely but possible in life of fleet. > 8 X 10 -6 3 X 10 -5 F1 Impossible Virtually impossible to occur. So unlikely it may not be experienced in life of fleet > 8 X 10 -7 3 X 10 -6 Corrected MIL-STD-882C example probability definitions with log scale and AIAA/SETC threshold and combinatorial probability index, fleet numbers Will affect cumulative risk and should be used to calibrate likelihood. Severity bins Description Mission Personnel Equipment Environment I4 CATASTROPHIC Loss of mission area capability no reversionary capability Multiple deaths to single death Total loss of system, > $1M equipment damage. Long-term (5 yrs or greater) damage or requiring >$2M to correct and/or in penalties. Significant degradation of mission area capability Multiple severe injuries, to single. Greater than 2 weeks hospitalisation. >$250K to $1M equipment damage. CRITICAL 1-6 High 7-10 Medium (ALARP) 11-17 Low Medium-term (1-5 yrs) damage or requiring $500K-2M to correct and/or in penalties III2 MARGINAL Degradation of mission area Multiple Minor injuries (OH&S reportable) to single minor injury. $1K to $250K equipment damage. Short-term (<1 yr) damage or requiring $2K-$500K to correct and/or in penalties IV1 NEGLIGIBLE Minor loss of mission functionality No injury < $1K equipment damage. Minor damage, readily repaired requiring < $2K to correct and/or in penalties MIL-STD-882C example severity definitions with log scale. Risk Zone (ALARP) IDlog II3 Risk treatment 18-20 V. Low 21 Negligible Risk treatment Decision maker Intolerable risk must be reduced. --- Reduce risk until further risk reduction is grossly disproportionate. Residual risk must be quantitative or semi-quantitatively assessed and well understood. Customer or Project Sponsor Reduce risk until further risk reduction costs exceed the benefit gained. Residual risk may be more subjectively assessed. PM Broadly acceptable with periodic review.. Application of existing best practice is deemed to reduce risk to this level. Without qualitative risk assessment IPT Record only. IPT CC BY-NC