GH Phipps Construction Co.
5995 Greenwood Plaza Blvd. Suite 100
Greenwood Village CO 80111-4710
Subject: Elevator Hoist Beam
Project: Metro CareRing-Hunger Relief Center
Address: 1100 E 18th St
Denver CO 80203 Denver County
Phone: Fax:
To:
Joel Hermann
Barker Rinker Seacat & Architecture
From: GH Phipps Construction Co.
Brady McQuinn
Contact: Co-Author:
Reference:
Drawing:
Spec Section:
Discipline: All
Detail:
Page:
Request For Information
RFI-13J2024-0023
Printed On: 07/28/2014
Page 1 of 1
Date:
Job:
Required:
Est.Cost Impact: $
Est. Days Impact:
07/28/2014
13J2024
08/04/2014
Co-Author RFI Number:
Request
REF: S103 and Elevator Submittal (Otis)
On drawing S103 the elevator W 8x24 hoist beam is shown running North and South. The elevator submittal shows the elevator hoist beam running East and West. After speaking with Tim Thompson (Otis Elevator) it was confirmed that the hoist beam must run East and West to set the elevator side rails. Please provide new hoist beam size and any additional supporting details/embeds.
Suggestion
Answer Accept Suggestion
JVA Response:
Changing beam size is not necessary, a W8x24 will still work. The connections at bearing ends remain the same. Coordinate new dimensions with steel fabricator and/or Otis and also with the now perpendicular 10K1 (not 8K1) joist at roof.
Steve Carpenter - JVA, Inc. 07/28/14
Answered By:
Signed:
Date:
Distribution:
Subcontractors/Suppliers - Please respond back to GH Phipps Construction Co. within 7 calendar days from date of receipt regarding any cost or schedule impacts that are a result of this RFI.
pm3010
7'-10" min. rough opening at upper floor. 7'-0" clear opening.
7'-10" min. rough opening at lower floor. 7'-0" clear opening.
OK. No change to shaft dims. Otis concurs.
-BRS
-
Reference RFI #8 for sump pit.
-BRS
Sump pit 24"x24", centered in elevator pit.
Does the plate have to be continuous?
Does there need to be a plate if the walls are reinforced CMU?
Does the plate have to recessed into the wall?
Otis' answer is: No tube steel needed.
No plate is needed, but
CMU cells at sides of elevator to be grouted solid to accommodate attachments.
GHP: Please issue an RFI for these the new door and a change in the opening size for the elevator door itself.
Access door to be Type H, Hollow metal frame, 45 minute rated, with hardware group 9. Group 9 has been updated at the right:
Elevator door to be 3'-6" clear in lieu of 3'-0" as shown on drawings 4 & 8 on A501.
-BRS
HW 9
DOOR 202,
3 HINGE BB5000 450 652 BO
1 CLOSER 8616 AF86 FC 689(mount onDO
pull side)
1 STOREROOM LOCK C848D LRC 626 DO
1 STOP 1270WV 630 TR
1 KICKPLATE K0050 10x34 630 TR
1 SMOKE SEAL 5050B 17’ NG
Is a hatch better or a door?
Otis' answer is: It must be a door.