MINUTES PROJECT: UBC QMI & AMPEL DATE OF MEETING: December 20th, 8:30-10:00 PROJECT NO.: 1335 LOCATION: Fred Kaiser Room 5004 INVITED: Ron Loewen, Capital Projects Manager, Faculty of App Science (RL) Jeff Young, Professor, Physics & Astronomy, Director of AMPEL (JY) Alireza Nojeh, Professor, Electrical & Computer Engineering (AN) Warren Poole, Professor/Head, Materials Engineering (WP) Barbara Gordon, Senior Planner Facilities Planning, ID (BG) Nick Maile, UBC Properties Trust (UBC PT) Brian Wakelin, Public Architecture + Communication (PAC) Alan Maples, Maples Argo Architects (MAA) Brent Argo, Maples Argo Architects (MAA) ron.loewen@ubc.ca young@phas.ubc.ca anojeh@ece.ubc.ca warren.poole@ubc.ca bgordon1@mail.ubc.ca nmaile@ubcproperties.com brian@publicdesign.ca bargo@telus.net amaples@telus.net REGRETS: Wally Mansell, Unitech Construction Mgmt Ltd (UCM) Craig Simms, Public Architecture + Communication (PAC) John Wall, Public Architecture + Communication (PAC) Andrea Damascelli, Assoc. Professor, Physics & Astronomy (AD) Doug Bonn, Professor/Head, Physics & Astronomy (DB) Jörg Rottler, Assoc. Professor, Physics & Astronomy (JR) Meredith Edwards, Acting Director, Resources and Operations Fadi Ghorayeb, JKK Consulting Engineers Scott Ghomeshi, Integral Group (IG) Mark Van Bockhoven, JKK Consulting Engineers Stuart Hood, Integral Group (IG) Andrew Tashiro, MMM Group Limited Charlie Yao, MMM Group Limited wmansell@unitechcm.ca craig@publicdesign.ca john@publicdesign.ca damascelli@physics.ubc.ca bonn@phas.ubc.ca jrottler@physics.ubc.ca edwards@science.ubc.ca fadi@jkk.com sghomeshi@integral-group.ca mark@jkk.com shood@integral-group.ca tashiroA@mmm.ca yaoC@mmm.ca RE: Project Meeting 9 COPIES TO: Melissa Freeman, Office Admin, UBC Properties Trust (MF) Cormac Nolan, Core Group Consulting Project website mfreeman@ubcproperties.com cnolan@coregroupconsultants.c om http://quantum-matter.com User: QMI AMPEL Team Password: quantum1335 ITEM DESCRIPTION OWNER WWW.PUBLICDESIGN.CA 215–309 W CORDOVA STREET VANCOUVER BC V6B 1E5 CANADA TEL 604 738 4323 FAX 604 873 4313 EMAIL INFO@PUBLICDESIGN.CA WMW PUBLIC: ARCHITECTURE + COMMUNICATION DESIGN INC DUE BY 8.0 Previous business Lab planning: Paymen Sabati will be interviewed in early January which completes round 1 of 3 of researcher interviews. MAA to prepare a list of researchers for tracking progress on this item. MAA to host a gaming session with PM group to finalize location assignments. These assignments will then be shared with the researchers for comment. MAA will issue Room Data Sheets on 13.12.23. MAA 14.01.10 8.1 Class C cost estimate review: Class C estimate cost for QMI Addition: $16,416,332. UBC PT directs team to adjust the design to meet the $15,100,000 the construction budget. UBC PT will provide the project budget breakdown to the team. UBC PT 8.2 FFE: UBC PT clarified that FFE will be costed by a specialty consultant. UCM will coordinate the installation of the FFE (lab fit out) and related services. UBC PT 13.12.20 8.4 Chemical storage in labs: The users have been asked to provide a list of chemicals and their volumes expected to be stored in the labs on an annual basis. This will be required for building code and a gas dispersion analysis. Doug Bonn and Warren Poole will collect the information and issue to PAC. DB, WP 14.01.17 New Business 9.0 Project Manager: Nick Maile will be taking the project management role over from Craig Knight. INFO 9.1 Acid collection program: Existing AMPEL acid neutralizing tanks are currently in future magnetic facility. IG to coordinate a meeting with UBC risk management, UBC Plumbing Inspector and MAA to determine if tanks can be removed. It was also noted that EDC power feed also runs through future magnetic facility. MAA to confirm with Josh Volk if this is acceptable. IG, JV 14.01.17 9.2 Renovation Scope in AMPEL: The design team requested clarification of the AMPEL scope not listed in the program. It was agreed that the scope for the following rooms will be as noted: 111: Not in scope. 143: fix floor, new paint only 146: Not in scope. 211: In scope. 248: fix floor, new paint only 360: Not in scope 442: Not in scope 442A: Not in scope AN 14.01.17 AN will advise users of above space requesting changes not in scope. 9.3 2 Autoclave: It was agreed that no autoclave will be provided in QMI. MEETING MINUTES INFO 9.4 Security: Building wide security to be discussed at next meeting with MMM and John Molnar. PAC to invite to next meeting. PAC Schedule and Next Steps Next Project Meeting Friday, January 17 at 8:30 in Fred Kaiser Room 5004. INFO Researcher Interview Friday to be determined by MAA INFO Meeting adjourned. These minutes are deemed accurate and acceptable as issued. Please submit any errors or omissions to Craig Simms. 3 MEETING MINUTES 14.01.17