ANALYST’S BRIEFING : No.4/2014 November 28, 2014 1 This presentation was made from the analysis of reliable information in order to assist investment community to better understand the company's financial status and operation. It also supports the "Good Corporate Governance Project" of the Securities and Exchange Commission (SEC). However, the information within this presentation has been derived from the existing factors in the present time. Therefore, the forward-looking information on this presentation may not occur in the future if the aforementioned factors or situations are changed. Investors are, nevertheless, required to use their own discretion regarding the use of information contained in this presentation for any purpose. For further information, please contact Investor Relations Section of the Electricity Generating Public Company Limited (EGCO) at Tel: (662) 998-5145-8 or Email: ir@egco.com 2 Highlights Q3/2014 Financial Results EGCO Group’s Overview ► Highlights ► Q3/2014 Financial Results ► EGCO Group’s Overview 3 Highlights Q3/2014 Financial Results ► EGCO Group’s Overview Highlights ♦ Under Construction Projects ♦ Under Development Projects ♦ Activities & Achievements 4 Highlights Q3/2014 Financial Results EGCO Group’s Overview Under Construction : 4 projects Philippines Laos XPCL Xayaburi, Laos PDR SCOD: October 2019 (35.43%) KEGCO (KN4) Nakhon Si Thammarat SCOD: June 2016 (37.90%) Thailand BRWF GIDEC Songkhla New South Wales, Australia Australia SCOD: December 2014 SCOD: February 2015 (almost complete) (93.52%) 5 Highlights Q3/2014 Financial Results ► EGCO Group’s Overview Highlights ♦ Under Construction Projects ♦ Under Development Projects ♦ Activities & Achievements 6 Highlights Q3/2014 Financial Results EGCO Group’s Overview Philippines Under Development : 4 projects Laos TP Cogen Thailand Ban Pong, Ratchaburi SCOD: February 2017 CWF Sub Yai, Chaiyaphum SK Cogen SCOD: December 2016 Ban Pong, Ratchaburi TJ Cogen SCOD: February 2017 Klong Luang, Pathum Thani Australia SCOD: June 2017 7 Highlights Q3/2014 Financial Results EGCO Group’s Overview Chaiyaphum Wind Farm (CWF) Project Description Type: Wind Power Plant Location: Subyai, Chaiyaphum Shareholders: EGCO 90%, PVI Group 10% SCOD: December 2016 Contracted Capacity with EGAT : 90 MW (SPP Non-Firm) Adder: 3.50 baht/unit for 10 years Project Progress BOI application was approved in July 2014. A public consultation was held in June 2014 at Subyai District Office. EPC and O&M contracts are expected to be signed in December 2014. Financing Documents are expected to be signed in December 2014. Subyai CWF 8 Highlights Q3/2014 Financial Results EGCO Group’s Overview TP Cogeneration Project (TP Cogen) & SK Cogeneration Project (SK Cogen) Project Description Type: Cogeneration Power Plant Location: Ban Pong, Ratchaburi Province Shareholder: EGCO 100% SCOD: February 2017 Installed Capacity: 125 MW each Contracted Capacity with EGAT: 90 MW each Contracted Capacity with IU: 23 MW and 40 T/hr of steam (TP Cogen) TP Cogen & SK Cogen Contracted Capacity with IU: 17 MW and 60 T/hr of steam (SK Cogen) 9 Highlights Q3/2014 Financial Results EGCO Group’s Overview TP Cogeneration Project (TP Cogen) & SK Cogeneration Project (SK Cogen) (Con’t) Project Progress PPA & SPA with Siam Kraft were signed on October 16, 2014. EPC contract was signed on November 1, 2014. Financing Documents are expected to be signed in March 2015. TP Cogen & SK Cogen 10 Highlights Q3/2014 Financial Results EGCO Group’s Overview TJ Cogeneration Project (TJ Cogen) Project Description Type: Cogeneration Power Plant Location: Klong Luang, Pathum Thani Province Shareholder: EGCO 100% SCOD: June 2017 Installed Capacity: 110 MW Contracted Capacity with EGAT: 90 MW Contracted Capacity with IU: 16 MW TJ Cogen and 10 T/hr of steam 11 Highlights Q3/2014 Financial Results EGCO Group’s Overview TJ Cogeneration Project (TJ Cogen) (Con’t) Project Progress PPA with Teijin was signed on October 9, 2014. EPC selection is expected to be concluded and signed in January 2015. TJ Cogen 12 Highlights Q3/2014 Financial Results ► EGCO Group’s Overview Highlights ♦ Under Construction Projects ♦ Under Development Projects ♦ Activities & Achievements 13 Highlights Q3/2014 Financial Results EGCO Group’s Overview Achievement for acquisition of shares in MPPCL Laos Achievement for acquisition of shares in SEG Philippines Thailand MPPCL Zambales, The Philippines Acquisition date: July 15, 2014 Indonesia SEG West Java, Indonesia Acquisition date: July 30, 2014 Australia 14 Highlights Q3/2014 Financial Results EGCO Group’s Overview Masinloc Power Partners Company Limited (MPPCL) Achievement : Achievement for signing of Share Purchase Agreement to acquire the shares in MPPCL was on June 25, 2014. Acquisition transaction was completed on July 15, 2014 and Shareholders’ Agreement was signed on the same date. Achievement 15 Highlights Q3/2014 Financial Results EGCO Group’s Overview Masinloc Power Partners Company Limited (MPPCL) Power Plant Description Type: Coal Fired Power Plant After Technology: Subcritical Pulverized Coal Installed Capacity: 2x315 MW Contracted Capacity: 589 MW Location: Zambales Province, Luzon, the Philippines Shareholder: EGCO 40.95%, AES 51% and IFC 8.05% COD: Unit 1 - June 1998 / Unit 2 – December 1998 O&M: MPPCL employees History MPPCL was originally developed and owned by NPC, the Philippines state power utility. In 2008, AES acquired MPPCL through privatization auction. Upon takeover, AES executed on rehabilitation plan during 2008-2010. 16 Highlights Q3/2014 Financial Results EGCO Group’s Overview Star Energy Geothermal Pte Ltd. (SEG) Achievement : Acquisition transaction was completed on July 30, 2014 and Shareholders’ Agreement was signed on October 30, 2014. Achievement 17 Highlights Q3/2014 Financial Results EGCO Group’s Overview Star Energy Geothermal Pte Ltd (SEG) Power Plant Description Type: Geothermal Power Plant Location: 40km South of Bandung, West Java, Indonesia Shareholder: EGCO 20%, Star Energy 60%, DGA 20% COD: Unit 1 – June 2000 / Unit 2 – March 2009 Installed Capacity: Unit 1 – 110 MW/ Unit 2 – 117 MW Contracted Capacity with PLN : SEG has the right to develop the geothermal project up to 400 MW under Energy Sale Contract. Energy Sale Contract: 30 years from COD of each unit (extendable) 18 Highlights Q3/2014 Financial Results EGCO Group’s Overview Baht/Share Second Payment Interim Payment 7.00 6.00 6.00 3.25 3.25 6.00 5.25 5.25 5.25 5.00 5.00 4.75 4.00 4.00 2.75 2.75 2.75 2.50 2.50 2.50 2.50 2008 2009 2010 2011 2.50 3.00 3.00 September 19, 2014 2.50 3.25 2.00 2.75 2.50 2.25 1.50 2.00 1.25 1.75 1.50 1.25 1.00 2.00 1.00 1.25 1.25 2002 2003 1.50 1.50 2004 2005 2.25 2.75 2.75 2012 2013 3.00 2001 2006 2007 2014 19 Highlights Q3/2014 Financial Results EGCO Group’s Overview ► Highlights ► Q3/2014 Financial Results ► EGCO Group’s Overview 20 Highlights Q3/2014 Financial Results EGCO Group’s Overview Million Baht MD&A 3,000 -73 MB or -3% 2,500 2,223 2,150 55 53 2,000 1,500 1,000 2,168 2,097 Q3/2013 (restated) Q3/2014 500 - Power Generation Others 21 Highlights Q3/2014 Financial Results EGCO Group’s Overview Million Baht 2,665 3,000 2,500 49 302 Net Profit -452 MB or -17% 103 152 91 2,000 MD&A -73 MB or -3% 1,500 1,000 2,213 2,223 2,150 500 - -192 -500 Q3/2013 (3M) (restated) Net Profit Before FX, DT and TFRIC4&12 Q3/2014 (3M) FX Deferred Tax TFRIC4&12 22 Highlights Million Baht 3,000 2,500 Q3/2014 Financial Results EGCO Group’s Overview Construction & Development BRWF 16 BPU (TP&SK) (1) CWF (2) GIDEC (7) SBPL (10) Decrease in AP KEGCO (KN2&3) (224) BLCP (181) GPG (KK2) (121) RYPP (15) 2,223 2,150 2,150 (4) 2,000 (541) 1,890 264 1,886 208 1,682 1,500 Operating Performances QPL 113 APPC NTPC (NT2) 110 MPPCL RYPP 45 Egcom Tara GEC 43 MME KEGCO (KN2&3) 28 North Pole SEG 12 BLCP EGCO Cogen 10 GPG (KK2) Roi-Et Green 5 EGCO ESCO 5 1,000 500 5 4 (1) (11) (16) (19) (46) (79) Solar & Wind YEH (Solarco) 205 NED 18 SPP5 10 TWF 9 GPS 7 SPP2 6 SPP3 6 SPP4 3 0 Q3/2013 Q3/2014 23 Highlights Q3/2014 Financial Results EGCO Group’s Overview Million Baht 8,000 7,000 6,000 6,682 84 Net Profit +486 MB or +7% 7,168 396 325 275 4 MD&A +266 MB or 4% 5,000 4,000 3,000 6,585 6,319 2,000 1,000 - -138 -1,000 9M2013 (restated) Net Profit Before FX, DT and TFRIC4&12 9M2014 FX Deferred Tax TFRIC4&12 Highlights Q3/2014 Financial Results EGCO Group’s Overview Million Baht 9,000 8,000 7,096 7,000 6,319 6,585 6,000 5,000 4,098 4,435 4,000 3,000 2,000 1,993 1,869 1,000 - 3M 6M 2013 (restated 3M, 6M and 9M) 9M 12M 2014 25 Highlights Q3/2014 Financial Results EGCO Group’s Overview ESCO 83 MB, 1% SEG 12 MB, 0.1% Egcom Tara 105 MB, 1% MPPCL 4 MB, 0.05% RYPP 379 MB Unit: Million Baht SPP 523 MB (GEC, EGCO Cogen, Roi-Et Green) 4% BLCP 2,022 MB 6% 25% GPG (KK2) 910 MB 11% 22% NTPC (NT2) 1,162 MB Quezon 1,845 MB (QPL,QMS,PEPOI) 14% 15% Solar & Wind 1,195 MB (GPS, SPP2-5, NED, YEH (Solarco), TWF) 26 Note: Excluding EGCO Highlights Total Outstanding (Baht Equivalent) Q3/2014 Financial Results EGCO Group’s Overview Total Outstanding As of June 30, 2014 Total Outstanding As of September 30, 2014 AUD 191 M AUD 212 M USD 861 M USD 1,477 M JPY 210 M JPY 157 M THB 20,472 M THB 21,818 M THB 54,498 M THB 76,145 M 27 Highlights Q3/2014 Financial Results EGCO Group’s Overview EGCO + Subsidiaries Times (X) Unit: MB 1.4 1.18 1.2 Debt 86,392 Equity 73,316 1 0.87 0.8 0.70 0.80 Debt Equity 0.6 EGCO Unit: MB 0.4 0.23 0.21 0.18 0.17 2009 2010 0.2 0.25 0.41 0.44 0.23 Debt 44,829 Equity 55,713 0 2011 EGCO+Subsidiaries 2012 EGCO 2013 9M/2014 Debt Equity 28 Highlights Q3/2014 Financial Results Unit: Million Baht EGCO Group’s Overview 9M2014 Beginning Cash 1,800 Net Cash Receipts from Operating Activities 927 Net Cash Payments in Investing Activities Dividend Receipts from Subsidiaries JVs & Others Cash Payments for Additional Paid-up Share Capital in Subsidiary and JVs Interest Received and Other Investments (17,549) 3,983 (21,166) (366) Net Cash Receipts (Payments) in Financing Activities Loan Repayments & Receipts Interest Payments Dividend Payments Ending Cash 16,185 19,886 (412) (3,289) 1,363 Note • Dividend Receipts from QPL : 41 MUSD /PEPOI : 14 MUSD • Cash Payments from Offshore to BRWF and MPPCL : 52 and 23 MUSD, respectively. 29 Highlights Q3/2014 Financial Results EGCO Group’s Overview ► Highlights ► Q3/2014 Financial Results ► EGCO Group’s Overview 30 Highlights Q3/2014 Financial Results ► EGCO Group’s Overview EGCO Group’s Overview ♦ EGCO Shareholders ♦ Portfolio and Corporate Strategies 31 Highlights Q3/2014 Financial Results EGCO Group’s Overview As of September 9, 2014 NDF* 50.11% EGAT 25.41% NVDR NVDR 10.43% 14.86% TEPCO 50% TEPDIA Others 49.89% 23.94% Mitsubishi 50% Foreign Investors Thai Investors 20.88% 14.91% * Nuclear Damage Liability Facilitation Fund 32 Highlights Q3/2014 Financial Results ► EGCO Group’s Overview EGCO Group’s Overview ♦ EGCO Shareholders ♦ Portfolio and Corporate Strategies 33 Highlights Q3/2014 Financial Results EGCO Group’s Overview Currently, EGCO Group’s portfolio comprises of 22 operating power plants, totaling contracted capacity 4,804.86 MWe. IPPs EGCO Shares Contracted Cap. (MW) MW Equity RYPP 100.00% 1,174.99 1,174.99 KEGCO (KN2&3) 100.00% 748.20 GPG (KK2) 50.00% BLCP 50.00% Power Plant Power Plant EGCO Shares Contracted Cap. (MW) SPPs Renewable Overseas MW Equity Renewable (Domestic) IPP 100.74 MWe 2.10% NED 33.33% 63.00 21.00 748.20 SPP2 100.00% 8.00 8.00 1,468.00 734.00 SPP3 100.00% 8.00 8.00 1,346.50 673.25 SPP4 100.00% 6.00 6.00 3,330.44 SPP5 100.00% 8.00 8.00 GPS 60.00% 26.00 15.60 TWF 90.00% 6.90 6.21 Solarco 49.00% 57.00 27.93 3,330.44 MWe 100.74 69.31% SPP EGCO Cogen 80.00% 112.18 89.74 Roi-Et Green 70.30% 8.80 6.19 GCC 50.00% 108.63 54.32 NKCC 50.00% 121.30 60.65 SCC 50.00% 114.45 57.23 NTPC (NT2) 35.00% 1,023.00 358.05 GYG 50.00% 20.20 10.10 QPL 98.00% 460.00 450.80 MPPCL 40.95% 589.00 241.20 SEG 20.00% 227.00 278.23 1,095.45 MWe 22.80% 278.23 MWe 5.79% Oversea 45.40 1,095.45 Total 4,804.86 MWe 34 Highlights Q3/2014 Financial Results EGCO Group’s Overview Currently, EGCO Group’s portfolio consists of 4 under construction projects and 4 under development projects, totaling contracted capacity 1,613.25 MWe. Under Construction Power Plant EGCO Shares Contracted Cap. (MW) MW Equity Under Construction Power Plant EGCO Shares Contracted Cap. (MW) MW Equity 407 MWe Under Development GIDEC 50.00% 6.50 3.25 CWF 90.00% 90.00 81.00 BRWF 100.00% 113.00 113.00 TP Cogen 100.00% 113.00 113.00 KEGCO (KN4) 100.00% 930.00 930.00 SK Cogen 100.00% 107.00 107.00 XPCL 12.50% 1,280.00 160.00 TJ Cogen 100.00% 106.00 106.00 1,206.25 Under Development 407.00 25.2% 1,206.25 MWe 74.8% Total 1,613.25 MWe 35 Highlights Q3/2014 Financial Results EGCO Group’s Overview Currently, EGCO Group’s other business portfolio comprises of 6 companies: Company Business Type EGCO Engineering and Service Co., Ltd. (ESCO) O&M Pearl Energy Philippines Operating Inc. (PEPOI) O&M Quezon Management Services Inc. (QMS) Management Service Eastern Water Resources Development and Management Plc. (EASTW) Water Egcom Tara Co., Ltd. (Egcom Tara) Water Manambang Muara Enim Co., Ltd. (MME) Coal Mining 36 Highlights Q3/2014 Financial Results EGCO Group’s Overview Under Construction Projects GIDEC BRWF KEGCO (KN4) XPCL (Waste) (Wind) (Gas) (Hydro) 2014 2015 2016 2017 2018 2019 2020 TP Cogen (Gas) CWF (Wind) SK Cogen SBPL (Coal) (Gas) TJ Cogen (Gas) Under Development Projects Under Construction Projects Under Development Projects Potential Project (Waiting for ERC ’s Approval) 37 Highlights Q3/2014 Financial Results EGCO Group’s Overview Operate power plant portfolio to achieve optimum efficiency and manage projects under construction to achieve on time and within budget completion Focus on seeking opportunities to acquire operating assets to realize quick earning Focus on the opportunities in greenfield projects to boost its earning prospects in long term by utilizing existing projects to expand its investments 38 THANK YOU 39 Appendices 40 As of September 2014, Thailand’s Power Installed Capacity was 34,953.02 MW. Classified by Fuel type Classified by Producer 1.8% 6.9% 13.0% 10.1% 44.3% 15.9% 69.3% 38.7% EGAT IPP SPP IMPORT NATURAL GAS HYDRO OTHERS* EGAT : 15,482 MW SPP : 3,525 MW Natural Gas : 24,221 MW Coal : 4,556 MW IPP : 13,541 MW Import : 2,405 MW Hydro : 5,549 MW Others* : 627 MW *OTHERS = Fuel Oil, Diesel, Renewable Source: EGAT COAL 41 MW 30,000 26,598.14 MW (May 16, 2013) 26,942.10 MW (April 23, 2014) 1.3% 24,785.24 MW (September 20, 2014) 25,000 20,000 15,000 January Source: EGAT Februaary March April May June July August September October November December 42 2009 2010 2011 2012 2013 2014 Key Financial Data: FX Variance MD&A 43 Key Financial Data: Deferred Income (Expense) Tax 44 Key Financial Data: Impact of the Adoption of TFRIC 4 and TFRIC 12 Million Baht 283 300 236 200 134 154 100 40 25 10 14 7 (10) (4) (100) (14) (65) (60) (3) 9M2013 9M2014 (77) (200) (300) RYPP KEGCO Roi-Et Green BLCP GPG GYG NTPC ET 45 Key Financial Data: Financial Ratio Highlights 9M/2013* 9M/2014 Debt to Equity (Time) 0.79 1.18 Net Debt to Equity (Time) 0.80 1.03 Net Profit before FX** (Million Baht) 6,406 6,910 EPS (Baht) 12.17 12.86 9.01 11.37 129.08 137.49 Operating Cash Flow / share (Baht) BV / share (Baht) * The information is up on the financial statements as of September 30, 2013. ** FX gains/losses from Income Statements including financial cost from foreign currency loans (EGCO & Subs) and JVs 46 Key Financial Data: Segmental Operating Results, Ended September 30, 2014 47 Key Financial Data: Segmental Operating Results, Ended September 30, 2013 48 Operating Performance (IPPs) : Annual Net Generation & Electricity Sales for the Year 2009-2013 Net Generation 2,693 5,897 9,323 5,188 5,770 10,157 10,848 5,311 - 3,000 NT2 4,004 10,617 2,127 4,976 5,816 9,857 10,036 5,476 4,783 2,952 6,000 5,643 9,000 9,329 10,018 12,000 KK II 10,770 BLCP 6,361 KEGCO 8,813 RYPP GWh - 2009 2010 2011 2012 2013 27,470 2,038 2,201 1,762 2,167 7,937 8,107 17,255 29,649 18,505 7,672 2,170 2,258 6,317 2,788 2,535 - 5,000 2,319 10,000 3,722 15,000 22,655 17,868 20,000 22,750 25,000 17,706 17,909 MM Baht 30,000 22,506 Electricity Sales - 2009 2010 2011 2012 2013 EGAT is the sole offtaker for electricity produced by Rayong Power Plant and KEGCO under long term cost-plus based Power Purchase Agreements (PPAs). REGCO and KEGCO receive the capacity payment (Rayong Power Plant) or availability payment (KEGCO) for maintaining the availability of the power plants, regardless of whether the electric power will be supplied to EGAT or not. 49 Operating Performance (IPPs) : Major Maintenance Expenses for the Year 2014 Million Baht Rayong Power Plant Quarter 1 2 3 4 Actual Actual Actual Budget Spare Parts 3.06 0.24 0.00 0.00 3.30 Service Charge 15.21 6.45 7.35 7.21 36.22 18.27 6.69 7.35 7.21 39.52 Total Total KEGCO Quarter 1 2 3 4 Actual Actual Actual Budget Spare Parts 33.47 12.39 13.02 5.22 64.10 Service Charge 23.95 4.63 5.86 4.96 39.40 57.42 17.02 18.89 10.18 103.50 Total Total 50 Operating Performance (IPPs) : Major Maintenance Expenses for the Year 2013 Million Baht Rayong Power Plant Quarter 1 2 3 4 Actual Actual Actual Actual Spare Parts 10.67 2.12 5.66 0.22 18.67 Service Charge 25.74 23.12 21.44 7.80 78.10 36.41 25.24 27.10 8.02 96.77 Total Total KEGCO Quarter 1 2 3 4 Actual Actual Actual Actual Spare Parts 19.09 15.93 27.68 51.64 114.34 Service Charge 21.84 33.03 39.57 48.69 143.14 40.93 48.96 67.25 100.33 257.48 Total Total 51 Operating Performance (IPPs) : Operating Performance Equivalent Availability Factor 2013 Rayong Power Plant Plant Type 1Q13 2Q13 3Q13 4Q13 Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) CCGT #1 81.85 85.83 98.44 99.06 98.80 97.82 95.90 97.12 CCGT #2 99.63 99.66 97.60 98.47 82.25 83.44 96.74 98.00 CCGT #3 90.19 92.95 97.60 98.44 99.64 99.50 95.90 97.43 CCGT #4 99.49 100.00 98.31 99.10 97.87 97.10 96.65 96.59 2014 Rayong Power Plant Plant Type 1Q14 2Q14 3Q14 4Q14 Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) CCGT #1 95.93 100.00 97.92 99.09 99.12 100.00 99.12 CCGT #2 99.07 98.48 95.63 99.09 98.28 100.00 99.12 CCGT #3 89.47 93.33 96.54 99.00 98.89 100.00 98.28 CCGT #4 98.89 100.00 95.42 99.19 98.91 100.00 98.98 2013 KEGCO Plant Type Actual EAF (%) 1Q13 2Q13 3Q13 4Q13 Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Target EAF (%) Barge #1 - - - - - - - Actual EAF (%) - Barge #2 94.00 99.51 63.01 66.83 78.67 88.18 92.90 87.36 CCGT #3 79.87 87.31 80.53 86.88 91.66 95.10 66.22 79.50 2014 KEGCO 1Q14 2Q14 3Q14 4Q14 Plant Type Target EAF (%) Actual EAF (%) Target EAF (%) Actual EAF (%) Barge #2 91.00 82.90 91.00 CCGT #3 83.60 86.00 82.19 Barge #1 Target EAF (%) Actual EAF (%) 96.00 91.00 88.13 90.38 99.29 87.87 94.23 94.94 - Target EAF (%) Actual EAF (%) - 52 Operating Performance (IPPs) : Net Generation and Fuel Consumption Rayong Power Plant CCGT #1- 4 2013 1Q13 2Q13 2014 3Q13 4Q13 1Q14 2Q14 3Q14 Net Generation - By Natural Gas (GWh) 979 1,146 288 280 441 560 123 - 0.170 - - 0.160 - - 8,432,352 9,904,901 2,557,558 2,483,331 3,906,610 4,951,634 1,095,950 - 0.040 - - 0.040 - - - By Secondary Fuel (GWh) Fuel Consumption - By Natural Gas (MMBTU) - By Secondary Fuel (Million Litre) 2013 KEGCO Barge # 2 1Q13 2Q13 2014 3Q13 4Q13 1Q14 2Q14 3Q14 Net Generation - By Natural Gas (GWh) 142 98 130 124 115 130 124 - - - - - - - - 1,590,779 - By Secondary Fuel (GWh) Fuel Consumption - By Natural Gas (MMBTU) 1,791,289 1,286,936 1,695,172 1,590,779 1,470,853 1,659,281 - - 0.004 0.002 0.029 - - By Secondary Fuel (Million Litre) CCGT # 3 1Q13 2Q13 3Q13 4Q13 1Q14 2Q14 Net Generation - By Natural Gas (GWh) - By Secondary Fuel (GWh) 1,162 - 1,181 1,288 1,062 1,099 - - - - Fuel Consumption - By Natural Gas (MMBTU) - By Secondary Fuel (Million Litre) 3Q14 1,302 1,062 - - - - 9,404,137 9,571,503 10,481,570 8,696,415 10,493,579 10,619,075 8,696,415 0.01 0.01 - - - 0.02 - 53 GIDEC Waste Power Plant Project (GIDEC) Project Description Type: Municipal Solid Waste Plant Location: Hat Yai, Songkhla Province Shareholders: EGCO 50%, IEC Green Energy 50% Expected COD: December 2014 PPA with PEA (VSPP Program) Contracted Capacity: 6.5 MW Adder: 3.5 baht/unit for 7 years Project Progress The 1st synchronization was done and PQ test is on process with PEA. Application for Factory Operation Permit (Ror Ngor 5) is under preparation and COD is on process. 54 Boco Rock Wind Farm (BRWF) Project Description Type: Wind Power Plant (Green Field) Location: New South Wales, Australia Shareholder: EGCO 100% SCOD: February 2015 PPA: 15 years with Energy Australia Pty Ltd. Installed Capacity: 113 MW Project Progress Ending Q3/2014, the progress of work was 93.52%. Construction work is progressing well, installation of 47 WTGs was completed. 55 Khanom Power Plant Project Unit 4 (KN 4) Project Description Type: Combined Cycle Power Plant Location: Khanom, Nakhon Si Thammarat Province Shareholder: EGCO 99.99% SCOD: June 2016 PPA: 25 years with EGAT Contracted Capacity: 930 MW Project Progress Ending Q3/2014, the overall project progress was 37.90%. Overall project progress is on schedule. 56 Xayaburi Power Company Limited (XPCL) Project Description Type: Hydro Power Plant Project, Run off River Location: Xayaburi District, Laos PDR Shareholders: EGCO 12.5%, CK 30%, EDL 20%, BECL 7.5%, Natee Synergy 25%, PT Construction and Irrigation Co., Ltd. 5% SCOD: October 2019 PPA: 29 years with EGAT and EDL Contracted Capacity with EGAT: 1,220 MW Contracted Capacity with EDL: 60 MW Project Progress Ending Q3/2014, the overall project progress was 35.43% Detailed design for Powerhouse and Fish Passing Facilities is ongoing. Construction work is progressing well. 57 Star Energy Geothermal Pte Ltd (SEG) The Earth core has temperature > 5000 C. The heat is continuously produced by the earth. The heat from the underground geothermal resource is transferred to underground water and it is turned into high temperature and high pressure steam. The steam will be used for steam turbine to generate electricity. The condensate will be injected back into the geothermal reservoir to maintain the underground water. Moreover, the underground water is replenished by rainfall. 58 Star Energy Geothermal Pte Ltd (SEG) Water/steam is extracted from geothermal reservoir through Production Wells. Steam is separated from brine water by Separator. Hydrogen sulfide and other gases in the steam is taken out by Scrubber before going into the steam turbine. Steam flows directly into the Steam Turbine to generate electricity to be sold to PLN. The condensate and brine water are injected back into reservoir through Injection Wells. The steam flow will be declined over years of operation. The well maintenance or new make-up 59 well will be done to maintain the steam flow. For further information, Please contact Investor Relations at Tel. 02-998-5147-8 or E-mail: ir@egco.com 60