Selection of Projects Completed Poveda Learning Center Projects: Theme playground Stainless and Brass letterings. Complete Supply, Fabrication, & installation of Top Mounted Railing @ POVEDA GYMNASIUM. Far Eastern University Projects: Stainless gutter @ FEU-Fern building (June 2007) Supply , Fabrication and installation of Playground @ FEU-FERN. Fitweld Philippines Projects: Fabrication of Stainless Door with Handle for Nestle Philippines Project. Britanny Corp. Projects: Main Canopy (structural frame, SuS skylight & tempered glass, aluminum composite panel) @ VIERRA BLDG. TOWER 1 @ LAKEFRONT, SUCAT MUNTINLUPA CITY. Selection of Projects Completed Don Pin Construction Corporation Projects: Stainless Steel Wall Cladding, Stainless Steel Table Cladding, Stainless Steel Frames, Stainless Steel Column Cladding & other Stainless Steel Works for VARIOUS SMART TELECENTERS i.e. SMARTPODIUM BRANCH, SM MEGAMALL SMART-SM SHOEMART LAS PINAS, ETC. Stainless Steel Frameless Glass Door Handles, Stainless Steel Top & Bottom Frames for Frameless Glass Door. Stair railings and aluminum panel column cladding @ WYETH PHILIPPINES Stainless Steel railings @ FULLY BOOKED, GREENHILLS. Steel Table Fence @ EXL CALL CENTER, MALL OF ASIA PASAY CITY D.M. Consunji, Inc Projects: Steel Safety Signage and barricades for MAYNILAD PROJECT. Steel Safety Signage and barricades for LRT LINE 1 NORTH EXTENSION PROJECT. Aluace Corporation Projects: Stainless Portal Cladding & Stainless Door Frame @ SM ONE E-COM CENTER SM BAY, PASAY CITY. Supply, Fabrication, & Installation of Stainless Elevator Architrave & Wall Cladding from Ground floor to 20th floor @ ALPHALAND MAKATI CITY. Selection of Projects Completed Immaculate Conception Academy Projects: Stainless Steel Railings – School Gate 1, HS Building (May 2000) Stainless Steel Railings – School Gate 2, Student’s Dining Room (Nov. 2002). Stainless Steel Railings @ Dona Juanita Bldg. Stainless Steel Railings @ Gokongwei Bldg. Stainless Steel Railings @ Kinder & Prep. Bldg. (June 2003) Stainless Steel railings @ Student Activity Center Bldg. Stainless Steel Railing @ Faculty. Stainless Steel Table w/ Sink J.E. MANALO & CO., INC Projects: Steel Trench Gratings/ Steel Sump Gratings for PHILIPPINE PORTS AUTHORITY @ Zamboanga Port. HG-III Construction Project: Steel Trench Gratings/ Steel Sump Grating for PHILIPPINE PORTS AUTHORITY @ General Santos Port. Marra Builders Projects: Serrated Steel Gratings for PHILIPPINE PORTS AUTHORITY@ Cagayan de Oro sewage treatment. Serrated Steel Gratings for PHILIPPINE PORTS AUTHORITY @ Surigao sewage treatment. Selection of Projects Completed Artform Builders Inc. Project: Supply, Fabrication, & Installation of Stainless Elevator Wall Cladding from Ground floor- 28th floor @SEIBU TOWER FORT BONIFACIO, TAGUIG CITY. R.S. Developer Co. Project: Complete Supply, Fabrication, & Installation of Stainless Elevator Architrave Cladding, Seismic Gap Cover @ SMART. Poveda Learning Center Project: Complete Supply, Fabrication, & Installation of Stainless Railings @ SEGOVIA-ADMIN BLDG & WALKWAY. Brittany Corporation (Vista Land Group) Projects: Main Canopy (structural frame, SuS skylight & tempered glass, aluminum composite panel) @ VIERRA BLDG. TOWER 1 @ LAKEFRONT, SUCAT MUNTINLUPA CITY. Selection of Projects Completed Megaworld Corporation Project(s): Construction of Helipad with Stairs @ MARRIOT NEWPORT HOTEL. Steel Wire mesh Door & Partition @ MARRIOT NEWPORT HOTEL. Construction of Scenic Elevator Structural Beams @ MC KINLEY COMMERCIAL CENTER @ FORT BONIFACIO, TAGUIG CITY. Stainless Steel Bollard (Stuncheon Posts) and Escalator Cladding for Eastwood City, Libis Q.C. SuS Grab Bar at Chinese International School @ McKinley (Fort Bonifacio Taguig) . Stainless Steel Balcony Railings with tempered glass for 38/F to 40/F & Roof deck @ BELLAGIO 2 Fort Bonifacio, Taguig Metro Manila. Stainless Steel Escalator Cladding from Ground to 3rd floor @ EASTWOOD PARK VIEW MALL Construction of Grand Stair @ MARRIOTT NEWPORTHOTEL. Stainless Architrave Cladding @ TWO WORLD SQUARE BLDG, Mc Kinley Hill Taguig. Construction of Steel Gate & Grilles @ English Learning Center BINONDO SCHOOL & HOUSING 2. Steel Railings at 2nd floor lobby of clusters 1,2,3, & 6 @ RESIDENTIAL RESORT, NEWPORT CITY PHASE 1. Stainless Steel Railings with glass @ EASTWOOD CITY WALK. Complete Supply & Installation of Stainless Grab Bar @ 8Th UPPER MCKINLEY , Road B McKinley Hill Fort Bonifacio, Taguig City. Supply & Installation of Stainless Kick Plate & Push Plate for the Existing Metal Doors @ MARRIOTT HOTEL, NEW PORT CITY. Construction of Steel Canopy including Aluminum Cladding @ FORBESWOOD PARKLANE, FORT BONIFACIO TAGUIG CITY. Complete Works of Canopy @ WOODRIDGE CLUSER 2, MCKINLEY PARK ROAD FORT BONIFACIO, TAGUIG CITY. Supply & Installation of Grab Bar & Curtain Rod @ BINONDO SCHOOL HOUSING HOSPITAL. Selection of Projects Completed Megaworld Corporation Project(s): Installation of Elevator Door Cladding @ MARRIOTT NEWPORT HOTEL. Supply & Installation of Brass Steel Railings @ MARRIOTT NEWPORT HOTEL. Complete Supply, Fabrication & Installation of Main Stair Railings @ THE WOODRIDGE CLUSTER 2. Supply & Installation of Stainless Steel Built-In Backdrop Rigging Bars @ EASTWOOD PARK HOTEL. Supply, Delivery, Fabrication & Installation of Built-In Office & Business Center of Bldg. 2C @ Mc Kinley Garden Villa Phase 2. Supply, Delivery , Fabrication & Installation of Stainless Steel Cladding for Guest Room-2 @ 38th Floor Eastwood Park Hotel. Supply & Installation of Steel Plant Frame with Concrete Plant Box @ 8th Upper Mc Kinley Fort Bonifacio Taguig. Supply, Fabrication & Installation of Balcony & Stair Railings including Wood Handrail @ MC KINLEY GARDEN VILLA PHASE 2. Complete Construction of Trench Drain with Gratings @ MCCC COMMERCE & INDUSTRY PLAZA. Complete Supply, Fabrication & Installation of Steel Railings with Glass for Pool Area & Children’s Play Area @ BELLAGIO 3, Fort Bonifacio Taguig City. Supply & Installation of Tubular Bars on Podium Level (2/F to 4/f) at Front & Rear Elevation @ GREENBELT CHANCELLOR Makati City. Complete Supply of Labor, Materials, Tools Consumables & Technical Supervision for Additional Railing Works on Pool Deck of Bellagio 3. Supply & Installation of ACCU Ledge @ Unit 4 Exterior, Bldg A to D @ Mc Kinley Garden Villas Phase 2. Supply & Installation of Fire Exit Ladder of Bldg A to D @ Mc Kinley Garden Villas Phase 2. Supply, Fabrication & Installation of Stainless Steel Railings @ Boy Scout of the Philippines Ermita Manila. Complete Supply, Fabrication & Installation of Interior Fit-Outs Works at City Place Binondo Manila. Selection of Projects Completed Megaworld Corporation Project(s): Complete Supply & Installation of Front & Rear Trellis with 6mm Twin Wall Polycarbonate at The Bellagio Tower 2. Complete Supply & Installation of Stainless Steel Balcony Railings with 12mm thk Tempered Glass for 38th , 39th Floor & Roof Deck of Bellagio 3. Supply, Fabrication, Delivery, Installation and Finishing of Mailboxes and Information Boards at Mc Kinley Hill Garden Villas Taguig City. Complete supply and installation of Stiffener Beams including all accessories and consumables at 26/F and 27/F of Government Office Building Edsa , Quezon City. Complete supply of labor, tools, materials, consumables and technical supervision for the Installation of Stairs Railings at Sales rd. cor. Gozar st. Newport, Villamor Airbase, Pasay City. Complete supply of labor, materials, consumables, tools for the construction, fabrication, installation of and finishing of Stainless Mail Boxes at Morgan Suites Executive Residences Tower 1 McKinley Hill Fort Bonifacio, Taguig. Complete supply of labor, materials, consumables, tools for the construction, fabrication, installation of and Billboard at Lucky Chinatown Mall, Binondo Manila. Supply and Installation of Bollards and Metal Works at Le Grand Project Eastwood City. Supply and Installation of Stainless Balcony Railings and ACCU Cover including installation of OFM Laminated Glass at Parkside Villas Villamor Airbase, Pasay City. Complete Architectural Works for Mailbox of Phase 3 at Parkside Villas Villamor Airbase, Pasay City Complete Supply of Labor, Materials, Consumables, Tools, Equipment, Supervision and other Facilities needed for the Fabrication, Supply, Delivery and Installation of the Parameter Railings of the Venice Canal Mall at McKinley Hill Fort Bonifacio, Taguig. Selection of Projects Completed Megaworld Corporation Project(s): Complete supply of labor, materials, consumables, tools for the construction, fabrication, installation of Steel Tubular Ribs at Venice Corporate Center Fort Bonifacio. Complete supply of labor, materials, consumables, tools for the construction, fabrication, installation Mail box at Greenhills Heights Pinaglaban St., San Juan. Complete supply of labor, materials, consumables, tools, equipments, supervision and other facilities needed for the supply, delivery, fabrication and installation of Stainless Steel Mailboxes with Aluminum Grooves at Villamor Airbase, Pasay City NEWPORT CITY. Complete Civil and Architectural Works of Transformer Vault Room 1 & 2 at at Parkside Villas Villamor Airbase, Pasay City Selection of Projects Completed Datem Incorporated Project(s): Supply, Fabrication & Installation of Structural Frame to Canopy East Tower Level 3 & 5 at One Rockwell. Supply, Fabrication & Installation of Drip Pan at East Tower Canopy of One Rockwell. Supply, Fabrication & Installation of Stainless Handrail with Tempered Glass to Drop Off at One Rockwell. Supply Fabrication & Installation of Steel Lattice @ East Tower Level 3 & 5 of One Rockwell. Supply, Fabrication & Installation of Steel Lattice @ West Towel Level 3 & 5 of One Rockwell. Supply, Fabrication & Installation of Drip Pan @ West Tower @ One Rockwell. Supply & Installation of I-Beam Support @ Ground Floor of West Tower One Rockwell. Supply & Installation of Steel Decking @ Ground Floor of West Tower One Rockwell. Supply, Fabrication & Installation of Structural Frame to Canopy West Tower Level 3 to 5 of One Rockwell. Supply & Installation of Steel Louver at West Tower One Rockwell. Supply & Installation of Fire Exit Stair Railings @ West Tower One Rockwell. Supply, & Installation of Segmented Glass Railings with Stainless Steel Top Rail at The Mind Museum, Fort Bonifacio Taguig City. Selection of Projects Completed Datem Incorporated Project(s): Supply and Installation of Ladder Rung at Unilab Corporate Center Phase 1 Project. . Supply, Fabrication & Installation of Steel Mezzanine Framing at Unilab Corporate Center Phase 1 Project. Supply, Fabrication & Installation of Guard House at Unilab Corporate Center Phase 1 Project. Supply, Fabrication & Installation of Sliding Gate at Unilab Corporate Center Phase 1 Project. Complete supply of labor materials, consumables, tools and equipment and technical supervision for the structural steel works at One Shangrila Place-Superstructure North & South Canopy. Complete supply of labor, materials, consumables, tools and equipment and technical supervision for the fabrication, delivery and installation of I-beam at Venice Corporate Center. Selection of Projects Completed Empire East Land Holdings Project(s): Supply, Installation and technical Supervision for Decorative Panels at Pioneer Woodlands. Supply, Tools, Materials and Technical Supervision for the Installation of Canopy at Pioneer Woodland Mandaluyong City. Contract Amount : Php 1,517,470.08 ROCKWELL LAND CORPORATION On-going Project (s): Complete Supply & Installation of Stainless & Glass Railings for ELS Drop-off at Edades Towers & Garden Villas Contract Amount : Php 936,700.00