Package Plants - Sicesgroup.com

advertisement
CUSTOMER
END USER
LOCATION
COUNTRY
SIIRTEC NIGI S.P.A.
ITALY
PRIRAZLOMNOYE FIELD
DEVELOPMENT PROJECT
SEVMORNEFTEGAZ
RUSSIA
NIOC/PETROLEUM
ENGINEERING &
DEVELOPMENT CO.
PETROIRAN DEVELOPMENT
COMPANY
(PEDCO)
SIRRY ISLAND GAS
COMPRESSION FACILITIES
IRAN
DESCRIPTION
YEAR
JOB N°
2005
A513
2004
A027
DESIGN AND FABRICATION OF GLYCOL REGENERATION PACKAGE
- GLYCOL REGENERATION UNIT ITEM 380-XX-302
- GLYCOL CONTACTOR ITEM 310-VE-301 with Sulzer Internal
- GLYCOL COALESCER ITEM 310-CQ-302 with Sulzer Internal
THE MAIN PROCESS OPERATING CONDITIONS FOR THIS PACKAGE ARE:
GLYCOL CONTACTOR -TREATING DESIGN CAPACITY: 211.788 KG./HR
(162 MMSCFD) AT 38 BAR. G
- WATER CONTENT NOT EXCEED 50 ppm wt AT DESIGN CAPACITY
GLYCOL REGENERATION
-LEAN GLYCOL CIRCULATION FLOW RATE: 13000 KG/h
-LEAN GLYCOL CONCENTRATION: 99.7% (WITH STRIPPING GAS)
2003
A504
DESIGN AND FABRICATION OF GLYCOL REGENERATION PACKAGE
(N.2 TRAINS) - SKID MOUNTED. THE MAIN PROCESS OPERATING
CONDITIONS FOR THESE PACKAGES ARE:
GLYCOL
CONTACTORS -TREATING CAPACITY: 489 MMSCFD
-WATER DEW POINT OF TREATED GAS: -2°C @ 79 BAR. A
GLYCOL REGENERATION
-LEAN GLYCOL CIRCULATION FLOW RATE: 12650 KG/h
-LEAN GLYCOL CONCENTRATION: 98.7% (WITHOUT STRIPPING GAS)
-FLEXIBILITY IN GAS FLOW RATE: 55%
2002
A503
N. 8 SEPARATORS SKIDS - ASME U STAMP, FOR OIL SEPARATION PLANT,
COMPLETE WITH PASSIVE FIRE PROTECTION.
DESIGN AND FABRICATION OF SLUG CATCHER PACKAGE,
COMPOSED BY:
- NO. 8 SLOPED FINGERS OD 48", THK 31 MM., LENGTH 344 MT/EACH
- NO. 1 MANIFOLD OD 48", THK 52 MM.
- NO. 2 MANIFOLDS OD 48", THK 31/ 50 MM.
- NO. 1 MANIFOLD OD 32", THK 36 MM.
- NO. 1 GAS/LIQUID INLET OD 30"
- NO. 1 VAPOUR OUTLET OD 24"
- NO. 1 EQUALIZATION LINE OD 10"
MATERIAL: API 5L-X65N (NACE MR 0175)
SAIPEM BOUYGUES
OFFSHORE
SONATRACH - BHP BILLITON AGIP
AGIP GAS BV
SICES GROUP ITALY
AGIP GAS BV
LIBYAN BRANCH
ROD INTEGRATED
DEVELOPMENT
WESTERN LIBYA GAS
PROJECT
NC 41 CENTRAL B OFFSHORE PLATFORM
ALGERIA
LIBYA
REFERENCE LIST: TURN KEY PACKAGE PLANTS
Page 1
CUSTOMER
BURULLUS GAS COMPANY
END USER
BURULLUS GAS CO.
SCARAB SAFFRON PROJECT
LOCATION
WEST DELTA DEEP
MARINE CONCESSION
COUNTRY
EGYPT
BURULLUS GAS COMPANY
BURULLUS GAS COMPANY
WEST DELTA DEEP
MARINE CONCESSION
EGYPT
KARACHAGANAK
PETROLEUM
OPERATING BV
AGIP - BG
TEXACO LUKOIL
AKSAI
REPUBLIC OF
KAZAKHSTAN
PETROBEL
PETROBEL
PORT FOUAD, SOUTH
WEST 2 PROJ
EGYPT
SICES GROUP ITALY
DESCRIPTION
YEAR
JOB N°
2001
01A523
DESIGN AND FABRICATION OF "MEG RECOVERY UNITS".THE UNIT IS
DESIGNED TO OPERATE WITH WATER-GLYCOL MIXTURE. FEED RATE FROM
13.619 KG./h TO 2.182 KG/h. A CORRESPONDING GLYCOL CONCENTRATION
FROM 26.5% BY W/W TO 83%.
COMPOSED BY THE FOLLOWING PACKAGES:
UNIT 100 - SEPARATION SECTION:
GLYCOL DISTILLATION COLUMN
FLASH DRUM/ VACUUM FLASH DRUM/OVHD SEPARATOR
FEED WATER HX/ FEED LEAN MEG HX
FLASH DRUM HEATER/ COLUMN REBOILER/
VACUUM FLASH DRUM HEATER
FLASH DRUM PUMP/ CENTRIFUGE CHARGE PUMP/COLUMN BOTTOM PUMP/
OVHD PUMP/ VACUUM FLASH DRUM PUMP
OVHD CONDENSER/ LP VAPOUR CONDENSER/
LEAN GLYCOL TRIM COOLER
UNIT 200 - CENTRIFUGATION SECTION:
LEAN MEG BUFFER TANK
MEG RECOVERY PUMP, CENTRIFUGE
UNIT 300 - VACUUM SYSTEM:
VACUUM UNIT FEED SEPARATOR,
VACUUM PUMP SEPARATOR, LIQUID RING COOLER
VACUUM PUMP, CONDENSATE TRANSFER PUMP
UNIT 400 - WATER TREATMENT SYSTEM:
WATER COALESCER
CARBON FILTER
2001
01A016
DESIGN AND MANUFACTURING OF N. 13 "REMOTE MANIFOLD" SKID MOUNTED
2000
054
DESIGN AND FABRICATION OF INSTRUMENT AND SERVICE GAS SYSTEM SKID MOUNTED
2000
037
DESIGN AND FABRICATION OF SLUG CATCHER PACKAGE - SKID MOUNTED,
COMPOSED BY
N. 1 COMMON INLET HORIZONTAL UPPER HEADER
N. 12 SLOPED FINGERS
N. 1 COMMON OUTLET HORIZONTAL LOWER HEADER
N. 1 BALANCE LINE RUNNING FROM THE TOP LEVEL STANDARD PIPE TO THE
GAS OUTLET
ALL PIPING SUPPORTS FOR OPERATION
REFERENCE LIST: TURN KEY PACKAGE PLANTS
Page 2
CUSTOMER
END USER
LOCATION
COUNTRY
PETROBEL
PETROBEL
EGYPT
EGYPT
EGYPT
DESCRIPTION
YEAR
JOB N°
DESIGN AND FABRICATION OF DRAIN AND BLOW DOWN SYSTEM PACKAGE,
COMPOSED OF:
N. 1 VENT K.O. DRUM SKID MOUNTED
N. 1 SUMP TANK SKID MOUNTED
2000
061023
2000
066017
PETROBEL
PETROBEL
TEMSAH GAS FIELD
EGYPT
DESIGN AND MANUFACTURING OF LOW TEMPERATURE SEPARATORS
PACKAGE, COMPOSED OF:
N. 3 LTS SEPARATOR SKIDS
N. 3 GAS/GAS HEAAT EXCHANGERS SKIDS
N. 3 GAS/LIQUID HEAT EXCHANGER SKIDS
RASHID PETROLEUM
COMPANY
RASHID PETROLEUM
COMPANY
RASHPETCO ROSETTA
FIELD
EGYPT
DESIGN AND FABRICATION OF "ONSHORE SLUG CATCHER PACKAGE"
COMPOSED BY: HEADERS, FINGERS AND SKID SERVICE
1999
900
RASHID PETROLEUM
COMPANY
RASHID PETROLEUM
COMPANY
OFFSHORE ROSETTA
PLATFORM
EGYPT
DESIGN AND FABRICATION OF "MANIFOLD SKID"
1999
889
RASHID PETROLEUM
COMPANY
RASHID PETROLEUM
COMPANY
OFFSHORE ROSETTA
PLATFORM
EGYPT
DESIGN AND FABRICATION "PIG LAUNCHER & RECEIVER TRAPS"SKID MOUNTED
1999
888
RASHID PETROLEUM
COMPANY
RASHID PETROLEUM
COMPANY
OFFSHORE ROSETTA
PLATFORM
EGYPT
DESIGN AND FABRICATION "FRESH WATER PACKAGE"SKID MOUNTED
1999
887
ENI SPA
MARINA DI RAVENNA
ENI S.P.A. - CASALBORSETTI
DIRA - MARINA DI
RAVENNA
ITALY
DESIGN AND FABRICATION OF N.2 TEG REGENERATION UNITS-200 MC/DAY COMPLETE OF REFRIGERNANT UNITSKID
MOUNTED
1999
864
SICES GROUP ITALY
REFERENCE LIST: TURN KEY PACKAGE PLANTS
Page 3
CUSTOMER
END USER
LOCATION
COUNTRY
GULF OF SUEZ PETROLEUM
COMPANY
GULF OF SUEZ PETROLEUM
COMPANY
RAS EL BARR
EGYPT
PERMEA MARITIME
PROTECTION
NORWAY
ENI S.P.A.
HERA LACINIA (CK)
ITALY
DESCRIPTION
YEAR
JOB N°
DESIGN AND FABRICATION OF:
- PRODUCTION SEPARATOR SKID
-SEPARATOR SKID
-TEST SEPARATOR SKID
-MANIFOLD SKID
-INTERCONNECTING PIPING SKID
1998
842
DESIGN AND INSTALLATION OF MEMBRANE GAS DEHYDRATION SYSTEM SKID MOUNTED
1998
837
1998
801
PETROBEL BELAYIM
PETROLEUM COMPANY
PETROBEL BELAYM
PORT FOUAD
SOUTH EAST
EGYPT
DESIGN, FABRICATION AND INSTALLATION OF N. 1 COMPLETE WATER
INJECTION SYSTEM, COMPOSED OF:
CHEMICAL DOSING SKID
COARSE FILTER SKID
DUAL MEDIA FILTER SKID
BACK WASH PUMP SKID
VACUUM PUMP SKID
BOOSTER PUMP SKID
CARTRIDGE FINE FILTER SKID
PETROBEL BELAYIM
PETROLEUM COMPANY
PETROBEL BELAYM
PORT FOUAD
SOUTH EAST
EGYPT
DESIGN AND FABRICATION OF N. 2 INSTRUMENT AND GAS SYSTEM
PACKAGES - SKID MOUNTED
1998
789/790
EGYPT
DESIGN AND FABRICATION OF SKID MOUNTED PACKAGES:
- TEST SEPARATOR SKID
- GLYCOLE STORAGE SKID
- VENT K.O. DRUM SKID
- DRAIN TANK SKID
INTERCONNECTING PIPING SKID
1997
774
1997
773
PETROBEL BELAYIM
PETROLEUM COMPANY
PETROBEL BELAYIM
PETROLEUM COMPANY
SICES GROUP ITALY
PETROBEL BELAYIM
PETROLEUM COMPANY
PETROBEL BELAYIM
PETROLEUM COMPANY
OFFSHORE DARFEEL
PLATFORM
OFFSHORE DARFEEL
PLATFORM
EGYPT
DESIGN AND FABRICATION OF N. 1 LIVING MODULE COMPLETE OF:
- ELECTRICAL GENERATION STATION - LIVING SECTION - SWITCHBOARD &
CONTROL PANELS ROOM - EQUIPMENT
REFERENCE LIST: TURN KEY PACKAGE PLANTS
-
Page 4
CUSTOMER
END USER
LOCATION
COUNTRY
DESCRIPTION
YEAR
JOB N°
DESIGN AND FABRICATION OF GAS, OIL, WATER SEPARATOR UNITS SKID MOUNTED, COMPOSED BY:
TEST SEPARATORS V-9001
XXHP SEPARATORS V-9002
HP SEPARATOR V-9003
LP SEPARATOR V-9004
1997
741
DESIGN AND FABRICATION OF NATURAL GAS SWEETENING/MEMBRANE
SYSTEM, SKID MOUNTED, COMPLETE OF:-FEED GAS COOLER-FEED GAS
K.O.DRUM -COALESHING FILTER-PREHEATER-COOLING TOWER-COOLING
WATER COOLER-EXPANSION DRUM-CIRCULATION PUMPS
1997
737
SAIPEM S.P.A.
SHELL
SOKU FLOW STATION
NIGERIA
AGIP SPA
DISTRETTO DI ORTONA
AGIP SPA CENTRO OLIO
MONTE ALPI (PZ)
MONTE ALPI
ITALY
PETROBEL BELAYIM
PETROLEUM COMPANY
PETROBEL BELAYM
PETROLEUM COMPANY
OFFSHORE DARFEEL
PLATFORM
EGYPT
DESIGN AND FABRICATION OF GLYCOL REGENERATION UNITSKID MOUNTED
1997
710
DUKAN ARAB "D"
PROJECT
DOHA
QATAR
DESIGN AND FABRICATION OF COMPLETE "GAS RECYCLING" UNIT
COMPOSED OF N. 6 SKIDS, COMPLETE WITH PASSIVE FIRE PROTECTION
1997
666
TRECATE
ITALY
DESIGN AND FABRICATION OF N.1 DEOXYGENATION AND VACUUM
GENERATION UNIT FOR WATER INJECTION PLANTSKID MOUNTED
1997
664
QATAR GENERAL
QATAR GENERAL PETROLEUM
PETROLEUM CORPORATION
CORPORATION
AGIP S.P.A.
SICES GROUP ITALY
AGIP CENTRO OLIO
REFERENCE LIST: TURN KEY PACKAGE PLANTS
Page 5
Download