PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 1 Process &Process Group Develop Project Charter PG: Initiating KA: Project Integration Management Input 1. Project Statement of Work 2. Business Case Output Tools & Techniques 1. Project Charter 1. Expert judgment 3. Contract 4. Enterprise Environmental Factors 5. Organizational Process Assets 2 Identify Stakeholders 1. Project Charter PG: Initiating 2. Procurement Documents KA: Project Communications Management 3. Enterprise Environmental Factors 1. Stakeholder Register 2. Stakeholder Management Strategy 1. Expert judgment 1. Project Management Plan 1. Expert judgment 2. Stakeholder analysis 4. Organizational Process Assets 3 Develop Project Management Plan PG: Planning KA: Project Integration Management 1. Project Charter 2. Outputs from Planning Processes 3. Enterprise Environmental Factors 4. Organizational Process Assets 1|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 4 Process &Process Group Collect Requirements PG: Planning Input 1. Project Charter 2. Stakeholder Register KA: Project Scope Management Output Tools & Techniques 1. Requirements Documentation 2. Requirements Management Plan 3. Requirements Traceability Matrix 1. Interviews 2. Focus groups 3. Facilitated Workshops 4. Group Creativity Techniques 5. Group Decision Making Techniques 6. Questionnaires & Surveys 7. Observations 8. Prototypes 5 Define Scope 1. Project Charter 1. Project Scope Statement 1. Expert judgment PG: Planning 2. Requirements Documentation 2. Project Document Updates 2. Product Analysis KA: Project Scope Management 3. Organizational Process Assets 3. Facilitated Workshops 4. Alternatives Identification 2|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 6 7 Process &Process Group Input Output Tools & Techniques Create WBS 1. Project Scope Statement 1. WBS PG: Planning 2. Requirements Documentation 2. WBS Dictionary KA: Project Scope Management 3. Organizational Process Assets 3. Scope Baseline 4. Project Document Updates Define Activities 1. Scope Baseline 1. Activity List 1. Rolling Wave Planning PG: Planning 2. Enterprise Environmental Factors 2. Activity Attributes 2. Decomposition KA: Project Time Management 3. Organizational Process Assets 3. Milestone List 3. Templates 4. Expert Judgment 1. Project Schedule Network Diagram 2. Project Document Updates 1.Precedence Diagramming Method (PDM) 8 Sequence Activities 1. Decomposition 1. Activity List PG: Planning 2. Activity Attributes KA: Project Time Management 3. Milestone List 4. Project Scope Statement 2. Dependency Determination 3. Applying Leads & Lags 4. Schedule Network Templates 5. Organizational Process Assets 3|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 9 Process &Process Group Input Estimate Activity Resources 1. Activity List PG: Planning 2. Activity Attributes KA: Project Time Management 3. Resource Calendars Output Tools & Techniques 1. Activity Resource Requirements 1. Expert Judgment 2. Resource Breakdown Structure 3. Project Document Updates 4. Enterprise Environmental Factors 3. Published Estimating Data 4. Bottom-up Estimating 5. Project Management Software 5. Organizational Process Assets 10 2. Alternatives Analysis 1. Activity List 1. Activity Durations Estimate 1. Expert Judgment PG: Planning 2. Activity Attributes 2. Project Document Updates 2. Analogous Estimating KA: Project Time Management 3. Activity Resource Requirements 3. Parametric Estimating 4. Resource Calendars 5. Project Scope Statement 4. Three-Point Estimates 5. Reserve Analysis Estimate Activity Durations 6. Enterprise Environmental Factors 7. Organizational Process Assets 4|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 11 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Develop Schedule PG: Planning KA: Project Time Management Output Tools & Techniques 1. Activity List 2. Activity Attributes 3. Project Schedule Network Diagram 1. Project Schedule 2. Schedule Baseline 1. Schedule Network Analysis 2. Critical Path Method 3. Schedule Data 3. Critical Chain Method 4. Activity Resource Requirements 4. Project Document Updates 4. Resource Leveling 5. Resource Calendars 5. What-If Scenario Analysis 6. Activity Duration Estimates 6. Applying Leads & Lags 7. Project Scope Statement 7. Schedule Compression 8. Enterprise Environmental Factors 8. Scheduling Tool 9. Organizational Process Assets 12 Estimate Costs 1. Scope Baseline 1. Activity Cost Estimates 1. Expert Judgment PG: Planning 2. Project Schedule 2. Basis of Estimates 2. Analogous Estimating KA: Project Cost Management 3. Human Resource Plan 3. Project Document Updates 3. Parametric Estimating 4. Risk Register 4. Three-Point Estimates 5. Enterprise Environmental Factors 5. Reserve Analysis 6. Organizational Process Assets 6. Bottom-up Estimating 7. Cost of Quality (COQ) 8. Project Management Estimating Software 9. Vendor Bid Analysis 5|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 13 Process &Process Group Input Output Tools & Techniques 1. Activity Cost Estimates 1. Cost Performance Baseline 1. Cost Aggregation PG: Planning 2. Basis of Estimates 2. Project Funding Requirements 2. Reserve Analysis KA: Project Cost Management 3. Scope Baseline 3. Project Document Updates 3. Expert Judgment Determine Budget 4. Project Schedule 4.Historical Relationships 5. Funding Limit Reconciliation 5. Resource Calendars 6. Contracts 7. Organizational Process Assets 14 Plan Quality PG: Planning 1. Scope Baseline 2. Stakeholder Register 1. Quality Management Plan 2. Quality Metrics 1. Cost-Benefit Analysis 2. Cost of Quality KA: Project Quality Management 3. Cost Performance Baseline 4. Schedule Baseline 5. Risk Register 3. Quality Checklists 4. Process Improvement Plan 5. Project Document Updates 3. Control Charts 4. Benchmarking 5. Design of Experiments 6. Enterprise Environmental Factors 6. Statistical Sampling 7. Organizational Process Assets 7. Flowcharting 8. Proprietary Quality Management Methodologies 9. Additional Quality Planning Tools 6|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 15 16 17 Process &Process Group Input Output Tools & Techniques 1. Organizational Charts & Position Descriptions Develop Human Resource Plan 1. Activity Resource Requirements PG: Planning 2. Enterprise Environmental Factors 2. Networking KA: Human Management 3. Organizational Process Assets 3.Organizational Theory Plan Communications 1. Stakeholder Register PG: Planning 2. Stakeholder Management Strategy KA: Project Communications Management 3. Enterprise Environmental Factors 3. Communication Models 4. Organizational Process Assets 4. Communication Methods Plan Risk Management PG: Planning 1. Project Scope statement 2. Cost Management Plan KA: Project Risk Management 3. Schedule Management Plan 4. Communications Management Plan 1. Human Resource Plan 1. Communications Management Plan 1. Communication Requirements Analysis 2. Project Document Updates 2. Communication Technology 1. Risk Management Plan 1.Planning Meeting & Analysis 5. Enterprise Environmental Factors 6. Organizational Process Assets 7|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 18 Process &Process Group Input Output 1. Risk Register Tools & Techniques Identify Risks 1. Risk Management Plan 1. Documentation Reviews PG: Planning 2. Activity Cost Estimates 2. Information Gathering Techniques KA: Project Risk Management 3. Activity Duration Estimates 3. Checklist Analysis 4. Scope Baseline 4. Assumptions Analysis 5. Stakeholder Register 6. Cost Management Plan 7. Schedule Management Plan 8. Quality Management Plan 9. Project Documents 10. Enterprise Environmental Factors 5. Diagramming Techniques 6. SWOT Analysis 7. Expert Judgment 11. Organizational Process Assets 19 Perform Qualitative Risk Analysis 1. Risk Register PG: Planning 2. Risk Management Plan KA: Project Risk Management 3. Project Scope Statement 1. Risk Register Updates 4. Organizational Process Assets 1. Risk Probability & Impact Assessment 2. Probability & Impact Matrix 3. Risk Data Quality Assessment 4. Risk Urgency Assessment 5. Risk Categorization 6. Expert Judgment 8|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 20 Process &Process Group Input Perform Quantitative Risk Analysis 1. Risk Register PG: Planning 2. Risk Management Plan KA: Project Risk Management 3. Cost Management Plan 4. Schedule Management Plan Output Tools & Techniques 1. Data Gathering & Representation Techniques 1. Risk Register Updates 2. Quantitative Risk Analysis & Modeling Techniques 3. Expert Judgment 5. Organizational Process Assets 21 Plan Risk Responses PG: Planning KA: Project Risk Management 1. Risk Register 2. Risk Management Plan 1. Risk Register Updates 1. Strategies for Negative Risks or Threats 2. Risk-related Contract Decisions 3. Project Management Plan Updates 2. Strategies for Positive Risks or Opportunities 3. Contingent Response Strategies 4. Project Document Updates 4. Expert Judgment 9|Page th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 22 Process &Process Group Input Plan Procurements 1. Scope Baseline PG: Planning 2. Requirements Documentation Output 1. Procurement Management Plan 2. Procurement Statements of Work KA: Project Procurement Management 3. Teaming Agreements 3. Make-or-Buy Decisions 4. Risk Register 4. Procurement Documents 5. Risk-related Contract Decisions 5. Source Selection Criteria 6. Activity Resource Requirements 7. Project Schedule 8. Activity Cost Estimates 9. Cost Performance Baseline 6. Change Requests Tools & Techniques 1. Make-or-Buy Analysis 3. Contract Types 2. Expert Judgment 10. Enterprise Environmental Factors 11. Organizational Process Assets 23 Direct & Manage Project Executions 1. Project Management Plan PG: Executing 2. Approved Change Requests KA: Project Integration Management 3. Enterprise Environmental Factors 4. Organizational Process Assets 1. Deliverables 2. Work Performance Information 1. Expert Judgment 2. Project Management Information System 3. Change Requests 4. Project Management Plan Updates 5. Project Document Updates 10 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 24 25 26 Process &Process Group Input Output Tools & Techniques 1. Plan Quality & Perform Quality Control Tools & Techniques 2.Quality Audits Perform Quality Assurance PG: Executing 1. Project Management Plan 2. Quality Metrics KA: Project Quality Management 3. Work Performance Information 1. Organizational Process Assets Updates 2. Change Requests 3. Project Management Plan Updates 4. Quality Control Measurements 4. Project Documents Updates Acquire Project Team 1. Project Management Plan 1. Project Staff Assignments 1. Pre-Assignment PG: Executing KA: Project Human Resource Management 2. Enterprise Environmental Factors 2. Negotiation 3. Organizational Process Assets 2. Resource Calendars 3. Project Management Plan Updates Develop Project Team 1. Project Staff Assignments 1. Team Performance Assessments 1. Interpersonal Skills 2. Project Management Plan 2. Enterprise Environmental Factors Updates 2. Training PG: Executing KA: Project Human Resource Management 3. Resource Calendars 3. Process Analysis 3. Acquisition 4. Virtual Teams 3. Team-Building Activities 4. Ground Rules 5. Co-location 6. Recognition & Rewards 11 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 27 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Output Tools & Techniques Manage Project Team 1. Project Staff Assignments 1. Enterprise Environmental Factors Updates 1. Observation & Conversation PG: Executing KA: Project Human Resource Management 2. Project Management Plan 2. Organizational Process Assets Updates 2. Project Performance Appraisals 3. Change Requests 4. Project Management Plan Updates 3. Conflict Management 3. Team Performance Assessments 4. Performance Reports 5. Organizational Process Assets 28 29 4. Issue Log 5. Interpersonal Skills 1. Organizational Process Assets Updates Distribute Information 1. Project Management Plan PG: Executing 2. Performance Reports KA: Project Communications Management 3. Organizational Process Assets Manage Stakeholder Expectations 1. Stakeholder Register 1. Organizational Process Assets Updates 1. Interpersonal Skills PG: Executing 2. Stakeholder Management Strategy 2. Change Requests 2.Communication Methods 3. Project Management Plan Updates 4. Project Document Updates 3. Management Skills KA: Project Communications Management 3. Project Management Plan 4. Issue Log 5. Change Log 6. Organizational Process Assets 1. Communication Methods 2. Information Distribution Tools 12 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 30 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Output 1. Project Management Plan 1. Selected Sellers Conduct Procurements Tools & Techniques 1. Bidder Conferences 2. Proposal Evaluation Techniques PG: Executing 2. Procurement Documents 2. Procurement Contract Award KA: Project Procurement Management 3. Source Selection Criteria 4. Qualified Seller List 3. Independent Estimate 4. Expert Judgment 5. Seller Proposals 3. Resource Calendars 4. Change Requests 5. Project Management Plan Updates 6. Project Documents 6. Project Document Updates 6. Internet Search 7. Make-or-Buy Decisions 8. Teaming Agreements 5. Advertising 7. Procurement Negotiations 9. Organizational Process Assets 31 32 Monitor & Control Project Work 1. Project Management Plan PG: Monitoring & Controlling 2. Performance Reports KA: Project Integration Management 3. Enterprise Environmental Factors 4. Organizational Process Assets Perform Integrated Change Control 1. Project Management Plan PG: Monitoring & Controlling KA: Project Integration Management 2. Work Performance Information 3. Change Requests 4. Enterprise Environmental Factors 5. Organizational Process Assets 1. Change Requests 2. Project Management Plan Updates 1. Expert Judgment 3. Project Document Updates 1. Change Requests Status Updates 2. Project Management Plan Updates 3. Project Document Updates 1. Expert Judgment 2. Change Control Meetings 13 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 33 34 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Output 1. Project Management Plan 1. Accepted Deliverables Verify Scope Tools & Techniques 1. Inspection PG: Monitoring & Controlling 2. Requirements Documentation 2. Change Requests KA: Project Scope Management 3. Requirements Traceability Matrix 4. Validated Deliverables 3. Project Document Updates Control Scope 1. Project Management Plan 1. Work Performance Measurements PG: Monitoring & Controlling 2. Work Performance Information 2. Organizational Process Assets Updates KA: Project Scope Management 3. Requirements Documentation 1.Variance Analysis 4. Requirements Traceability Matrix 3. Change Requests 4. Project Management Plan Updates 5. Organizational Process Assets 5. Project Document Updates 14 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 35 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Control Schedule 1. Project Management Plan Output 1. Work Performance Measurements PG: Monitoring & Controlling 2. Project Schedule 2. Organizational Process Assets Updates KA: Project Time Management 3. Work Performance Information 4. Organizational Process Assets Tools & Techniques 1. Performance Reviews 3. Change Requests 4. Project Management Plan Updates 2. Variance Analysis 3. Project Management Software 4. Resource Leveling 5. Project Document Updates 5. What-If Scenario Analysis 6. Adjusting Leads & Lags 7. Schedule Compression 8. Scheduling Tool 36 Control Costs 1. Project Management Plan 1. Work Performance Measurements 2. Budget Forecasts PG: Monitoring & Controlling 2. Project Funding Requirements 3. Organizational Process Assets Updates 3. To-Complete Performance Index (TCPI) KA: Project Cost Management 3. Work Performance Information 4. Change Requests 5. Project Management Plan Updates 4. Performance Reviews 4. Organizational Process Assets 6. Project Document Updates 1. Earned Value Management 2. Forecasting 5. Variance Analysis 6. Project Management Software 15 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 37 38 Process &Process Group Input Output Tools & Techniques Perform Quality Control 1. Project Management Plan 1. Quality Control Measurements 1. Cause & Effect Diagrams PG: Monitoring & Controlling 2. Quality Metrics 2. Validated Changes 2. Control Charts KA: Project Quality Management 3. Quality Checklists 4. Work Performance Measurements 5. Approved Change Requests 3. Flowcharting 6. Deliverables 3. Validated Deliverables 4. Organizational Process Assets Updates 5. Change Requests 6. Project Management Plan Updates 7. Organizational Process Assets 7. Project Document Updates 7. Scatter Diagram 8. Statistical Sampling 9. Inspection 10. Approved Change Requests Reviews Report Performance 1. Project Management Plan 1. Variance Analysis PG: Monitoring & Controlling 2. Work Performance Information 1. Performance Reports 2. Organizational Process Assets Updates KA: Project Communications Management 3. Work Performance Measurements 4. Budget Forecasts 3. Change Requests 3.Communication Methods 4. Reporting Systems 4. Histogram 5. Pareto Chart 6. Run Chart 2. Forecasting Methods 5. Organizational Process Assets 16 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott No 39 40 PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs Process &Process Group Input Monitor & Control Risks 1. Risk Register PG: Monitoring & Controlling KA: Project Risk Management Output Tools & Techniques 1.Risk Assessment 2. Project Management Plan 1. Risk Register Updates 2. Organizational Process Assets Updates 3. Work Performance Information 3. Change Requests 3. Variance & Trend Analysis 4. Performance Reports 4. Project Management Plan Updates 4.Technical Performance Measurements 5. Project Documents Updates 5. Reserve Analysis 6. Status Meetings 2. Risk Audits 1. Procurement Documents 1. Procurement Documentation 1. Contract Change Control System PG: Monitoring & Controlling 2. Project Management Plan 2. Organizational Process Assets Updates 2.Procurement Performance Reviews KA: Project Procurement Management 3. Contract 3. Change Requests 4. Project Management Plan Updates 3.Inspections & Audits Administer Procurements 4. Performance Reports 5. Approved Change Requests 6. Work Performance Information 4. Performance Reporting 5. Payment Systems 6. Claims Administration 7. Records Management System 17 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott PMP 42 - 9: PROCESS GROUPS, KNOWLEDGE AREAS, AND IOTTs No 41 42 Process &Process Group Input Close Project or Phase 1. Project Management Plan Output 1. Final Product, Service, and Result Transition PG: Closing 2. Accepted Deliverables 2. Organizational Process Assets Updates KA: Project Integration Management 3. Organizational Process Assets Close Procurements 1. Project Management Plan PG: Closing 2. Procurement Documentation 1. Closed Procurements 2. Organizational Process Assets Updates KA: Project Procurement Management Tools & Techniques 1.Expert Judgment 1. Procurement Audits 2. Negotiated Settlements 3.Records Management System 18 | P a g e th The PMP 42-9: Process Groups, Knowledge Areas, IOTTs is a compilation of the information presented in the PMBOK 4 Edition. th st The PMBOK 4 Edition is applicable to PMP exams up to the 31 of July 2013. Key: PG – Process Groups, KA – Knowledge Area Prepared by: Meegan Scott