City of Cape Town 5 YEAR PLAN FOR CAPE TOWN Integrated Development Plan (IDP) 2007/8 – 2011/12 SUMMARY DRAFT FOR COMMENT VERSION x 2.2 15.03.07 (To Mayco) 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Table of Contents Executive Summary ................................................................................................................... 3 1 Setting the Scene.................................................................................................................. 6 2 State of the City: A brief summary .................................................................................... 10 3 The 5- YEAR IDP Strategy and Strategic Focus Areas .................................................... 19 Strategic Focus Area 1: Shared Economic Growth and Development ................................... 23 Strategic Focus Area 2: Sustainable Urban Infrastructure and Services ................................ 26 Strategic Focus Area 3: Public Transport Systems ................................................................ 30 Strategic Focus Area 4: Integrated Human Settlements......................................................... 31 Strategic Focus Area 5: Safety and Security .......................................................................... 33 Strategic Focus Area 6: Health, Social and Human Capital Development ............................ 35 Strategic Focus Area 7: Good Governance and Regulatory Reform ..................................... 36 4 Financial Strategy ............................................................................................................... 39 5 Prioritising the allocation of resources ............................................................................ 44 6 Development directions over the next 5 years................................................................. 47 7 Conclusion .......................................................................................................................... 51 Annexure A: Disaster Risk Management ............................................................................ 52 Annexure B: Human Resources Strategy ........................................................................... 53 Annexure C: Principles Informing the Spatial Framework and District Plans ................. 58 Annexure D: Partnership Strategy ....................................................................................... 61 Annexure E: Draft Corporate Scorecard for 2007 – 2012 .................................................. 63 Annexure F: Programmes towards the implementation of Objectives ............................ 69 Annexure G: Scorecard Indicator Definitions ..................................................................... 90 Statutory Plans ............................................................................... Error! Bookmark not defined. City of Cape Town Page 2 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Executive Summary On I July 2007 a new five year Integrated Development Plan (IDP) will commence for the city of Cape Town. This five-year plan (2007/08 -2011/12) informs the period of office of the current elected public representatives. At the onset of the new term of office IDP City governance and management structures find themselves confronted by a mixture of challenges and opportunities. The City’s participation in the hosting of the 2010 Soccer World Cup events is concentrating unprecedented public sector investment and stimulating new momentum amongst private sector role players. But, on the other hand, the city faces real infrastructure provision and capital funding challenges and institutional capacity problems. Cape Town has doubled in size over the past 20 years and faces rising development challenges. Urban growth in the past 20 years in Cape Town has been spatially ad hoc and result has been ineffective and unsustainable urban development. Urban sprawl, due to the location of informal settlements along the city’s periphery has placed immense strain on the city’s finances by requiring new bulk and link infrastructure extensions. The persistent and reactive focus on the extension of infrastructure has meant that preventative maintenance of existing infrastructure has suffered. The extent to which the City can meet these challenges and provide an environment for sustainable and shared economic growth depends on its ability to provide improved service delivery, foster key partnerships to implement and maintain the infrastructure of the City and build an efficient and effective City Administration. The City’s 2007/08 -2011/12 integrated development plan focuses on seven strategic focus areas. The concrete objectives for each strategic focus area have been outlined and elaborated upon. These objectives will be used to further develop key performance indicators against which performance, implementation monitoring and reporting will be done. The corporate scorecard, in Annexure E, outlines these indicators and targets. The seven focus areas are: 1. Shared economic growth and development: The City needs a strategy to attract investors, business and visitors. This includes mechanisms to facilitate easy and regular interaction between investors, business and the City, small business development and skills development. A review of Red Tape that impedes business development is one of the objectives envisaged. Also included in this focus area is to prepare for the hosting of the FIFA 2010 World Cup. City of Cape Town Page 3 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 2. Sustainable Urban Infrastructure and Services A small percentage of the city’s increasing population does not have access to basic services. Increasingly-stressed infrastructure is impairing sustainable service delivery, social development and economic growth in Cape Town. The reality is that all the infrastructure requirements cannot be met simultaneously, given the limitations of the current budget and the financing models. The City’s objectives include: reducing services backlogs; giving bulk infrastructure priority and developing an integrated approach to infrastructure, service planning and budgeting. 3. Public Transport Systems Transforming and restructuring public transport systems to ensure that investment in public transport does not only focus on transport but also the improvement in the spatial development of the City is vital. Integration of land use and transport through Integrated Transport Corridors and the building of homes close to transport corridors is needed to ensure improved access to community facilities (such as clinics and schools) and economic opportunities (including shopping areas). The need for a public transport authority is a prerequisite to integration. 4. Integrated Human Settlements The need for integrated human settlements is one of the key challenges facing the city. The main human settlement challenges include the estimated 350 000 families without adequate access to shelter. The apartheid urban landscape remains largely unchanged with new assisted housing developments generally located on the periphery, far from work opportunities, amenities and facilities. New and existing settlement areas are characterised as uni-functional “housing areas” with a lack of integration with other land uses and transportation. 5. Safety and Security The negative impact of the current level of crime in Cape Town on attracting international and national investment on the quality of life and the retention of human capital and as well as the potential risk to the 2010 Word Cup Soccer event, is without doubt one of, if not the most important, strategic challenge. The City’s focus is on integrating the efforts of all spheres of government, business and the public to work together to further strengthen and align the activities of law enforcement agencies, the criminal justice system, emergency and disaster risk management services. 6. Health, Social and Human Capital Development Cape Town as a city is a reflection of the broader South African Society, with rich and poor, skilled and unskilled living side by side. It is also characterized by vulnerable groups that find themselves on the margins of society i.e. youth, women, the disabled and those affected by extreme poverty. When social and human capital is low, the social fabric of society begins to disintegrate. In large parts of Cape Town this manifests as high incidences of drug and alcohol abuse, gang affiliation, crime against property and City of Cape Town Page 4 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 people, especially women and children. HIV/AIDS/STIs and TB are yet other challenges that are closely linked to the social and human capital capacity of citizens. The City aims to facilitate the development of a healthy and inclusive society through facilitating the provision of social facilities, like childcare and community amenities. 7. Good governance and regulatory reform The City aims to effectively execute various institutional improvements. To give effect to the IDP challenges there is a high priority need to optimise the organization. The focus, therefore, is on an intensive effort to develop and sustain a much improved City Administration as well as improving the regulatory environment to maximise the impact of public investment and service delivery on the development potential of Cape Town. City of Cape Town Page 5 1 Setting the Scene On 1 July 2007 a new five year Integrated Development Plan (IDP) will commence for the city of Cape Town. This five-year plan (2007/08 -2011/12) informs the period of office of the current elected public representatives. The IDP is the principal strategic planning instrument which guides management within the administration and informs all planning and development within the City of Cape Town (City). It also informs the City’s contribution to the work initiated through inter-governmental processes involving provincial and national government. The IDP will be refined through a programme/project prioritisation process informed by budget parameters. Its implementation relies on partnerships (See Annexure C) with external role players as well as institutional improvements within the City. Attracting international and regional investment through marketing the city is also a key element in the execution of the IDP. At the onset of the new term of office IDP City governance and management structures find themselves confronted by a mixture of challenges and opportunities. The City’s participation in the hosting of the 2010 Soccer World Cup events is concentrating unprecedented public sector investment and stimulating new momentum amongst private sector role players. But, on the other hand, the city faces real infrastructure provision and capital funding challenges and institutional capacity problems. . The City’s long term vision The vision of the political leadership elected in March 2006 for Cape Town is of: o a prosperous city in which City Government creates an enabling environment for shared growth and economic development; o a city known for its effective and equitable service delivery; and o a city that distinguishes itself as a well-governed and efficiently run administration. In order to achieve this vision, the City must: o actively contribute to the development of its environmental, human and social capital; o offer high quality services to all who live in it, do business or visit it as tourists or holiday makers; o be known for its efficiency, effectiveness and clean and caring government. The nature of strategy in the City The City needs both short term plans and long term strategies. In recent years, the City has compiled several sector plans, including an Economic and Human Development Strategy, an Integrated Waste Development Plan, a Water Services Plan, an Integrated Transport Plan and an Integrated Metropolitan 6 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Environmental Management Plan. However, it has been a shortcoming that the short term initiatives necessary to implement these plans have not always been in place. The City has also begun to turn its attention to a longer time horizon of 30 to 40 years through the Future Cape Town initiative. More work is being done on this with the aim being to develop a comprehensive long term development strategy for the City. This means that this draft of the five-year IDP will be the first of various iterations of the strategic plan for the City that will be finalised after public and other stakeholder inputs have been considered. The medium to long term spatial development considerations Future Cape Town, an initiative of the City’s Strategy and Planning Directorate, aims to initiate a widespread debate on the future spatial development of the city. It puts forward a set of ideas and propositions on the issues and choices facing the city over the next 30-40 years and provides a platform for debate around the future spatial development of Cape Town. Cape Town must be understood in its regional context. This way of thinking has formed the basis of ongoing work with the Provincial Government of the Western Cape on a development strategy for the Cape Town Functional Region. Key discussion points of regional significance arising from the Future Cape Town work include the reconsideration of the use and long term location or configuration of key pieces of economic infrastructure such as the ports, airport and major transport routes. The Future Cape Town initiative lays the basis for the preparation of the city-wide Spatial Development Framework (SDF) which will guide the long-term development of the city. The SDF will provide a broad long term spatial concept and support policy on issues such as open space, transport and land use integration, sustainable neighbourhoods, densification, urban growth path and the urban edge. In parallel with and informed by the city-wide Spatial Development Framework, District Spatial Development Plans are being prepared for the eight functional planning districts of Cape Town. These district plans are intended to review, and where appropriate, replace, the more than 500 historic, outdated and often conflicting plans and spatial frameworks that are currently still in place. The District Spatial Development Plans (SDPs) are due for completion by July 2007 with approval in terms of the Land Use Planning Act (LUPO) by the end of 2007. Upon completion both the Citywide Spatial Development Framework and the District Plans will inform the preparation / review of the IDP in 2008. City of Cape Town Page 7 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Principles* Informing the Spatial Framework and District Plans The 5 main ideas and areas of action set out for discussion in the Future Cape Town document and which will form the foundation of the Spatial Development Framework and 8 District Spatial Development Frameworks are: 1. Consolidate, protect and improve access to natural resources 2. Promote an equitable pattern of access 3. Promote sustainable and accessible economic opportunities 4. Integrate settlements 5. Create more great people places * These principles are explained in more detail in Annexure B. Alignment with Provincial and National Government Cape Town’s development plan needs to align with national and provincial initiatives to ensure optimal impact from the combined efforts of government. In this regard there are six critical elements: Accelerated and Shared Growth-South Africa (ASGI-SA), National Spatial Development Perspective (NSDP), National Strategy for Sustainable Development (NSSD), Provincial Growth and Development Strategy (PGDS), Provincial Spatial Development Framework (PSDF) and the Intergovernmental Development Agenda for Cape Town. All of these feed into and influence the 2007/8 IDP. Accelerated and Shared Growth-South Africa (ASGI-SA): The core objective of ASGI-SA, as set out in 2004, is to halve poverty and unemployment by 2014. To achieve these objectives ASGI-SA sets out a state-led investment plan that involves State Owned Enterprises (SOEs), strategic partnerships and all spheres of government. Emphasis is placed on high impact state-led projects that would serve to achieve accelerated and shared growth. National Spatial Development Perspective (NSDP):- This was endorsed by the cabinet in March 2003. At a national scale it advocates capital investment in areas of growth potential, with an emphasis on providing basic services and access to social services and human resource development in areas of need and less potential. The major metropolitan economic centres are thus identified as a focus for substantial state investment in infrastructure to support further shared growth and development. City of Cape Town Page 8 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 The Provincial Growth and Development Strategy (PGDS):- The PGDS takes the name ‘iKapa Elihlumayo’ and has a mandate from stakeholders in the Province to define shared growth and integrated development targets and objectives for 2014. The initiative focuses on strengthening growth sectors, resource management and implementation strategies. The key pillars of the proposed development path are: growth, equity, empowerment and environmental integrity. The Provincial Spatial Development Framework (PSDF): This aims to address urbanisation pressures on natural resources and economic and social divisions within the cities and towns of the province and provides a policy context for urban development and environmental resource protection. The Intergovernmental Development Agenda for Cape Town: An Intergovernmental Development Task Team was established in January 2006 to draft an Agenda for Action. Three critical outcomes (each with targets to be achieved by 2014) were identified:: Shared Prosperity - 6% average GGP growth per annum to 2014, 50% reduction in unemployment and poverty. An Inclusive and Equitable Society - 50% improvement in the Access Index (incorporating proximity to service centres, public transport, education, health and recreation facilities and the upgrading of informal settlements), 50% improvement in the Integration Index (which includes settlement and economic activity patterns, black economic empowerment and gender) and 50% increase in the Skills Index (which incorporates pre-school, school and post-school learning performances) An Ecologically Sustainable future - No increase in the per capita ecological and per capita carbon footprint. Positioning the City in the global, national and provincial arena Cape Town plays a bigger role within the South and Southern African context. It is an important contributor to the national economy and, together with the Gauteng Global City Region and Ethekweni, anchors the SADEC regional economy. For Cape Town to strategically position itself nationally and internationally, and meet the needs of all its citizens, it needs to address its development challenges in a coherent way (including planning for the sustainable utilisation and protection of its Global Common Goods, including climate/air quality, biodiversity and water) and recognise it has a larger responsibility to fulfil as a globally relevant city in the growth and development of the African continent. City of Cape Town Page 9 5 Year Plan (IDP) for Cape Town 2 Provisional Draft to Mayco 15 March 2007 State of the City: A brief summary Introduction Cape Town faces rising development challenges. During the past decade poverty and unemployment have almost doubled, the housing backlog has more than doubled, drug-related crime has tripled, HIV prevalence has increased tenfold and public transport has deteriorated. This is despite significant economic growth (4% annual increase in GGP), improvements in the provision of basic services (water, waste, electricity) and rising tourist numbers. Cape Town has almost doubled in size during the past 20 years. In this time movement patterns have changed dramatically. The transport infrastructure network has become outdated and the major road and rail routes still focus primarily on historic destinations such as the central city. The structure and form of the city generates enormous amounts of movement at great economic, social and environmental cost to the public purse. Traffic congestion is increasing, public transport is inefficient and not available to all parts of the city and it is difficult to change between modes of transport. The location of the urban poor on marginal land far from places of economic opportunity and facilities (e.g. clinics and hospitals) reinforces the cost of transport for the poorest of the poor. Inadequate shelter, overcrowding and indiscriminate development are growing problems in many parts of the city. In stark contrast, some areas are very well off, rich in both nature and opportunities, and continue to benefit from sustained investment. The gap in opportunity that exists between wealthier areas and poorer ones continues to widen. It is recognised that it is important to conserve the character of Cape Town through its unique and globally important biodiversity and its cultural, historical and heritage diversity. This brings a greater a commitment to more sustainable resource use. Improved efficiencies in resource use (especially amongst the middle and high income communities) can bring financial savings in service provision and allow local government to focus more attention on poverty. Economic conditions Cape Town generates approximately 82% of the Gross Geographic Product of the Western Cape. From 1994 to 2004 Cape Town contributed 15.9% of South Africa’s GDP. In 2005 Cape Town’s contribution declined to 11.1%. Cape Town has a relatively diverse economy with approximately 93% of Cape Town businesses being small, contributing 50% of total output and 40% of total formal employment. However, in line with international trends the city is shifting towards the services sector with the largest areas of City of Cape Town Page 10 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 growth identified in finance, business services, trade, catering, accommodation, tourism and transport and communication. Manufacturing, which accounts for 19.4% of employment, is in decline. The relatively strong Rand has had negative impacts on the global competitiveness of the city’s traditional major economic sectors, such as clothing and textiles. A healthy and growing economy is a prerequisite for attaining and achieving the objectives of a more sustainable Cape Town. Despite growth, the challenges of jobless growth, high unemployment (13% in 1997, almost 23% in 2004, and 20,7% in 2005) and a mismatch between available skills and those that are needed by the economy pose an on-going challenge. Comparison of level of unemployment and GGP growth in Cape Town 35 140.0 30 % unempoyment 82.3 82.4 86.1 90.3 20 15 15 112.5 120.0 100.0 19.7 18 10 94.5 108.0 23.8 23.4 20.7 19.8 80.0 60.0 16.5 13.3 40.0 5 20.0 0 0.0 1997 1998 1999 2000 2001 2002 2003 GGP (R billions) 25 98.4 102.3 2004 2005 Source:- Strategic Development Information & GIS using Quantec and STATSSA Labour Force Survey data There is a pressing need to create productive employment opportunities. For the city to achieve growth, it must become globally competitive. City government can improve the business environment by gathering and sharing information with local businesses, reducing the cost of doing business and enhancing safety and security, especially in areas that want to attract development. Spatial planning needs to take account of economic forces and trends in the city and provide an appropriate basis for future infrastructure investment, extension of services and land availability. City of Cape Town Page 11 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Infrastructure and Services Urban growth in the past 20 years in Cape Town has been spatially ad hoc, which has forced reactive and uncoordinated public investment in infrastructure. The result is ineffective and unsustainable urban development. Urban sprawl, due to the location of informal settlements along the city’s periphery has placed immense strain on the city’s finances by requiring new bulk and link infrastructure extensions. This settlement pattern has also caused a loss of biodiversity. Investment into public infrastructure such as public transport and bulk services systems has lagged behind advances made in the extension of basic services and housing. The replacement, rehabilitation and preventative maintenance of existing infrastructure has suffered as a result of the persistent focus on the (often reactive) extension of infrastructure at the cost of maintenance. City of Cape Town 1996 2001 2004 2005 651 972 759 765 845 000 2 563 095 2 893 251 3 239 768 % of households out without weekly refuse removal 10.2% 5.8% Number of households without weekly refuse removal 65 882 45 031 % of households without piped water on site 10.2% 15.6% Number of households without piped water on site 66 133 121 258 % of households without flush toilet 10.4% 12.5% Number of households without flush toilet 67 785 96 799 % of households without electricity supply 12.8% 11.2% Number of households without electricity supply 82 928 87 024 Demography Number of Households Population Refuse Removal 2.0% 3.6% 30 420 Water Supply 6.0% 7.4% 62 530 Toilet Facilities 9.7% 9.9% 83 655 Electricity Supply 3.0% 4.7% 39 715 Source: Strategic Development Information & GIS using STATSSA Census and General Household Survey data There is an urgent need to raise investment levels into city infrastructure for remedial work, upgrading and replacement of aging municipal services infrastructure. Healthcare and social facilities, particularly for the aged and the youth, are insufficient to meet needs. This is compounded by funding problems emanating from unresolved intergovernmental arrangements. City of Cape Town Page 12 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Environmental conditions The city’s environment is one of the strongest assets that drives tourism and attracts skilled workers to Cape Town. However, growing consumption and pollution are threatening the rich, yet highly vulnerable biodiversity of this region. Water use per capita decreased sharply in 2001 due to water restrictions, illustrating a useful demand management system for a water scarce city such as Cape Town. Daily per capita usage of 200 litres is now high. Coastal water quality samples across the city reflected a significant decline between 2003 where 16% of the sample points experienced an exceeding the 80th percentile water quality guideline, and 2004/2005 where 24% of sites exceeded the guideline. Quantities of waste being disposed per capita are increasing at an alarming rate demonstrating a 60% increase since 1999. This may be indicative of excessively high consumption patterns as well as the impact of increased tourism and increased waste loads from outside the City. A lot must still be done to implement alternatives to locating new and ever larger landfill sites, including retention of waste at source. There are a range of threats to the environment, some of which could be addressed more directly by the City and its residents. Growing consumption and resulting waste disposal mean that the city requires more services and sites for disposal. Growing pollution is affecting the quality of air and water in the City with a direct impact on residents’ health and well-being. Urban sprawl is a further threat to Cape Town’s unique biodiversity. This is especially true in the low income, high density areas of the Cape Flats, home to Cape Town’s most threatened ecosystems. Global warming appears to be impacting on the region’s ecology resulting in the reduction of water resources, agricultural land and increasing storm and flood damage. Bold and far-reaching measures are needed to mitigate the impact of environmental resource scarcity and to position the economy and society on a more sustainable footing. Housing and shelter conditions Housing backlogs and associated infrastructure backlogs are due to net immigration into the City. New infrastructure is needed to accommodate economic, urban and population growth. There is tremendous strain on the current infrastructure resulting from rapid growth in the urban centre (most acutely felt in services such water, waste waster, electricity, roads and storm water). City of Cape Town Page 13 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Key indicators show that fundamental changes to the development path of the city are being constrained by a number of trends which are reinforcing social spatial segregation and inequalities in the city. The number of people living in informal settlements is growing (23 000 families in 1993 to 115 000 families in 2005), overcrowding is increasing and household size is declining. These contribute to an increasing housing backlog (an increase from 150 000 in 1998 to approximately 300 000 in 2006). Housing backlog compared to housing delivery 350000 350000 300000 300000 265000 265000 250000 245000 245000 221000 200000 150000 200000 150000 150000 100000 100000 50000 housing delivery Housing backlog (no. of dwelling units) 245000 240000 250000 300000 50000 4110 9729 1808 3469 0 0 1998 1999 2000 20012002 2003 2004 2005 2006 2007 2008 2009 2010 Source: Strategic Development Information & GIS using Housing Department data The financial implications of addressing these and future housing and infrastructure demands are high and will need significant additional capital investment. It is imperative that the City explores new and innovative funding mechanisms to meet its infrastructure investment challenges. A key challenge will be to balance the financial costs of addressing backlogs against the opportunity cost of upgrading ageing existing infrastructure that supports services to the established parts of the city. Safety and Security conditions To become globally competitive and attract private sector investment, the city must provide a safe business environment, which in turn requires an improvement in the social conditions of the poor and unemployed. Levels of crime in some categories, like murder, have improved over the past few years bur are far from normalised. The incidence of murders is still extremely high with a total of 1856 murders in 2005/6, representing an annual murder rate of 57 per 100 000 population - an average of five murders every day. City of Cape Town Page 14 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Of special concern is that fact that reported drug-related crime has almost tripled in the past five years. Property related crime (especially residential burglaries) has also increased over the same period, possibly reflecting a connection between drugs and property crime. Incidence of reported crime in Cape Town (murder rate and drug related crime rate) Murder rate per 100 000 100 86 80 77 60 55 60 57 40 20 0 2001/2002 2002/2003 2003/2004 2004/2005 2005/2006 Source: Strategic Development Information & GIS using SAPS data Drug related crim e per 100 000 700 616 600 482 500 400 314 300 241 232 2001/2002 2002/2003 200 100 0 2003/2004 2004/2005 2005/2006 Source: Strategic Development Information & GIS using SAPS data City of Cape Town Page 15 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Health, Social and Human conditions Decades of distorted development in the city has manifested in highly skewed distribution of income and wealth. In Cape Town there is a trend towards rising poverty (from 25% in 1996 to 38% of households living below or marginally above the household poverty line in 2005). 38% 40% 35% 32% 30% 25% 25% 20% 15% 10% 5% 0% 1996 2001 2005 Source: Strategic Development Information & GIS using STATSSA Census and General Household Survey data Arising out the poor socio-economic and physical environment there has been a rise in incidence of HIV prevalence. This is evidenced in an increasing HIV prevalence among women visiting public health clinics (from 1,2% in 1994 to 15% in 2005). 2001 2004 HIV Prevalence (%) by Health District 35 2002 2005 2003 32.5 30.2 30 29.1 25 20 17.7 16.2 15 12.8 15.2 15 15.7 12.4 11.5 10 7.3 5.1 5 South Africa (Total) Cape Town (Total) Tygerberg West Tygerberg East South Peninsula Oostenberg Nyanga Mitchells Plain Khayelitsha Helderberg Central Blaauwberg Athlone 0 Source:- City Health City of Cape Town Page 16 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Governance and management Increased importance placed on cities internationally as centres of economic, social and governance activity calls for new, innovative and decentralized types of governance. Modern forms of governance are characterized by better intra-municipal coordination, improved intergovernmental cooperation, additional levels of governance, i.e. a sub-council system, more meaningful civil society participation and greater autonomy for various parts of the metropolitan city. The challenges facing Cape Town cut across the responsibilities of all spheres of government and civil society. Through adopting the Inter Governmental Relations Policy and approving the intergovernmental 12 point plan the City of Cape Town acknowledges the need for closer intergovernmental cooperation and alignment. The City aims to improve its own governance by putting in place effective zoning systems, efficient EIA processes and reducing red tape for businesses and city residents. Public Needs The City of Cape Town executed a public engagement process during October and November 2006. Eight public workshops were held as part of a national imbizo and sixty seven ward and sub-council workshops were held where members of the public could vote for priorities in their community. Six thousand nine hundred and eighty six people (6 986) attended these meetings. Participants were also given an opportunity to submit project proposals to be considered for funding from local (Ward) budgets or as part of the City-wide corporate capital budget. Information obtained from the participants in the public workshops as well as through e-based inputs and written inputs showed that housing and job creation were the most important priorities. City of Cape Town Page 17 5 Year Plan (IDP) for Cape Town 30 Provisional Draft to Mayco 15 March 2007 26 25 20 17 15 10 5 12 11 6 8 10 5 2 3 an sin Cl e Ba sic Se rv ic es g/ S a Cl ni in ta ic t io s n an d H ea lt h Ho us in Jo g b Ro Cr ad ea tio & pa n ve Sa m fe en ty ts & Se So cu cia rit y lF ac ilit ie St s re et Li gh ts Tr an sp or t 0 Source:- IDP Office Summary. January 2007 City of Cape Town Page 18 5 Year Plan (IDP) for Cape Town 3 Provisional Draft to Mayco 15 March 2007 The 5- YEAR IDP Strategy and Strategic Focus Areas The following figure illustrates the City’s IDP Strategy. Of primary importance is the shared growth and development strategic focus area. It aims to achieve the national target of a 6-8% growth in the Gross Geographical Product of Cape Town and human capital development. This will be done by strengthening the pillars of urban efficiency, which means getting all the required infrastructure and resources in place, as well as improving institutional effectiveness. Human development will be achieved through improvements in the material status of individual residents, households and the city’s population as a whole. Goals: A prosperous city Effective and equitable service delivery A well governed and efficiently run administration 5 YEAR PLAN FOR THE CITY • Shared economic growth and • development •Sustainable Urban Infrastructure and Urban Efficiency Services •Public Transport Systems •Integrated Human Settlements •Safety and Security •Health, Social and Human Capital Institutional Effectiveness Development •Good Governance and Regulatory reform Figure 1.1 Strategic Framework Taking the city’s challenges, its vision statement and other strategic considerations into account, the City has opted for 7 strategic focus areas that form the framework of the five year plan for the City. These strategic focus areas function as internal strategic levers to facilitate shared growth and development and enable urban efficiency and institutional effectiveness. In order to ensure that the City achieves the implementation of its strategic intent, key objectives were identified for each of the seven strategic focus areas. These objectives form the platform to cascade strategy and the allocation of City resources downwards into the organisation. (Refer to Annexure E for a summary of the strategic focus areas and aligned objectives) City of Cape Town Page 19 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 These objectives will be used to further develop Key Performance Indicators against which City performance, implementation monitoring and reporting will be done. To ensure the operational implementation of the key objectives for the City, programmes have been identified that will form the basis for projects that will be implemented at operational level. These programmes will be monitored at departmental and directorate level. A summary of the planned programmes is presented in Annexure E. A table of the focus areas and the core objectives to which they give rise appears below. Strategic Focus Area 1:Shared Economic Growth and Development A strategy to attract investors, business and visitors and to grow and retain existing businesses is vital. This can be done by the creation of a strong enabling environment for business. This includes mechanisms to facilitate easy and regular interaction between investors, business and the City. Small business enterprise support with a specific emphasis on the development of the 2nd economy and skills development are other key focus areas. Investment in transport and other infrastructure, including information communications technology are important enablers of economic growth and poverty reduction. The City also recognises the need to protect and manage its natural resource heritage. The delivery focus will be on unlocking economic development, job and business opportunities within the Cape Town area through the City’s Economic and Human Development Strategy. Strategic Focus Area 2:Sustainable Urban Infrastructure and Services A small percentage of the city’s increasing population does not have access to basic services. Increasingly-stressed infrastructure is impairing sustainable service delivery, social development and economic growth in Cape Town. City of Cape Town Core objectives Objectives:- 1A Creating an enabling environment for the economy to grow 1.1 Develop new and strengthen existing partnerships to meet the City’s strategic objectives in investment and tourism. 1.2 Develop and implement LED initiatives. 1.3 Strengthen the City’s tourism capability and events management calendar 365 days a year. 1.4 Develop and grow SMME opportunities through 2010, supply chain management and other partnerships. Strengthen linkages between the first and second economies to encourage SMME development. 1.5 Direct investment into strategic infrastructure where economic benefits are demonstrated. 1.6 Proactively support the formal business environment. 1.7 Develop skills to support the growing sectoral economy and to provide access to opportunities. Prioritise skills development based on the needs of the local economy, to support continued economic growth and access to opportunities. 1.8 Develop policy to encourage economic growth, job creation and broader participation. 1.9 Support the expansion and development of established businesses to strengthen the city’s economic base and competitiveness. 1.10 Support an enabling environment for the development of opportunities. 1.11 Prepare for hosting of the FIFA 2010 World Cup in the City of Cape Town in accordance with FIFA’s requirements and the City’s developmental objectives 1B Preparations for Hosting of the FIFA 2010 World Cup in the City of Cape Town in accordance with FIFA’s requirements and the City’s developmental objectives Core objectives 2A Universal access to basic service Objectives:2.1 Reduce backlogs in line with national objectives for basic services. 2.2 Large or bulk infrastructure programmes that are essential must receive priority. 2.3 Develop an integrated programme” approach to infrastructure and service planning and budgeting. 2.4 Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants. Page 20 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 The reality is that all the infrastructure requirements cannot be met simultaneously, given the limitations of the current budget and the financing models. Ecologically sustainable forms of infrastructure should also be taken into consideration. Reduced resource flows and lower levels of pollutants would also contribute to improved living environments. An approach based on demand management to relieve pressure on infrastructure development, resource impacts and capital expenditure is urgently needed. 2B Conservation of natural resources Strategic Focus Area 3:- Public Transport Systems Core objectives Objectives:- 3A Improve public transport system and services 3.1 Improve public transport services and secure new investment in infrastructure 3.2 Promote use of public transport. Creation of a unified road-based public transport system utilising the optimum mode for a particular route/corridor. Promote use of public transport to access all facilities and services and reduce the need to use private cars. 3.3 To reduce demand for travel and to create conditions for all day public transport services. 3.4 Integration of Land Use and Transport 3.5 Ensure that freight moves efficiently and safely within the City 3.6 Develop and implement a transport asset management plan for the City. Core objectives Objectives:- 4A Improve and develop Integrated Human Settlements 4.1 Transform dormitory suburbs into areas which support a greater mix of land uses, offer a range of amenities and are socially mixed facilities 4.2 Put in place policy and spatial planning frameworks that will facilitate the development of integrated human settlements. 4.3 Development and implementation of a incremental housing programme 4.4 Development of new housing opportunities 4.5 Increase rental stock through social housing partnerships. 4.6 Redress land ownership inequities by providing Housing based on Restitution claim settlements. 4.7 Facilitate gap housing programmes through partnerships with Banks and private sector developers. Transforming and restructuring public transport systems to ensure that investment in public transport does not only focus on transport but also the improvement in the spatial development of the City. Integration of land use and transport through Integrated Transport Corridors and the building of homes close to transport corridors is needed to ensure improved access to community facilities (such as clinics and schools) and economic opportunities (including shopping areas). The need for a public transport authority is a prerequisite to integration. Strategic Focus Area 4:Integrated Human Settlements The need for integrated human settlements is one of the key challenges facing the city. Te main human settlement challenges include the estimated 350 000 families without adequate access to shelter. The apartheid urban landscape remains largely unchanged with new assisted housing developments generally located on the periphery, far from work opportunities, amenities and facilities. New and existing settlement areas are characterised as unifunctional “housing areas” with a City of Cape Town 2C Effective management of City’s Infrastructure and Resources 4B Delivery of housing opportunities 2.5 Reduce impact of flooding on community livelihoods and regional economies 2.6 Conserving biodiversity and improving quality living environments through greening, education and access 2.7 Safeguard human health, protect natural aquatic environments, and improve and maintain recreational water quality. Page 21 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco lack of integration with other land uses and transportation. Strategic Focus Area 5:- Safety and Security The negative impact of the current level of crime in Cape Town on attracting international and national investment on the quality of life and the retention of human capital and as well as the potential risk to the 2010 Word Cup Soccer event, is without doubt one of, if not the most important, strategic challenge. The focus is on integrating the efforts of all spheres of government, business and the public to work together to further strengthen and align the activities of law enforcement agencies, the criminal justice system, emergency and disaster risk management services. Strategic Focus Area 6: Health, Social and Human Capital Development Cape Town as a city is a reflection of the broader South African Society, with a dichotomy of rich and poor, skilled and unskilled, wellness and pathology. It is also characterized by vulnerable groups that find themselves on the margins of soceity i.e. youth, women, the disabled and those affected by extreme poverty. When social and human capital is low, the social fabric of society begins to disintegrate. In large parts of Cape Town this manifests as high incidences of drug and alcohol abuse, gang affiliation, crime against property and people, especially women and children. HIV/AIDS/STIs and TB are yet other challenges that are closely linked to the social and human capital capacity of citizens. Strategic Focus Area 7. Good governance and regulatory reform To effectively execute various institutional improvements and to City of Cape Town 15 March 2007 4.8 Develop and maintain zoned public open spaces, cemeteries, resorts and beaches Core objectives Objectives:- 5A Foster a safe and secure environment 5.1 Community and youth development programmes directed at reducing crime and lawlessness. 5.2 The improvement of urban design to reduce crime and emergencies; 5.3 The on-going expansion of the CCTV network covering key economic and transport locations as well as crime hot spot areas. 5.4 Improve law enforcement (traffic policing, licencing services and general law enforcement) through more visible actions; 5.5 Development of disaster risk assessment and development of pro-active disaster prevention and response plans. 5.6 Fast, efficient and equitable emergency response to safeguard life, property, the environment and livelihoods. Core objectives Objectives:6.1 Facilitate the provision of childcare facilities and services to promote holistic childhood development 6.2 Use of Community Amenities and Facilities to implement programmes that impact on antisocial behaviour (eg Drugs and Crime) 6.3 Implementation of programmes to address the plight of Street People 6.4 Provision of effective environmental health services including Air Quality Management and Pollution Control programmes (Including noise pollution). 6.5 Provision of effective primary health care services in close collaboration with Provincial Health Services with a special emphasis on maternal and child health care and HIV/AIDS/STI and TB control. 6A Facilitating the development of a healthy and socially inclusive society Core objectives Objectives:- 7A Ensuring enhanced service delivery with efficient institutional arrangements 7.1 Optimising the development of our Organisation staff structure, strategies, policies and promote skills development. 7.2 Enhance service delivery through exploring Page 22 5 Year Plan (IDP) for Cape Town give effect to the IDP challenges there is a high priority need to optimise the organization. The focus, therefore, is on an intensive effort to develop and sustain a much improved City Administration as well as improving the Regulatory Environment to maximise the impact of public investment and service delivery on the development potential of Cape Town. Provisional Draft to Mayco 7B Management of key financial areas such as income control, cashflow, indigent support, alternative income opportunities, asset management and risk management 7C Establish effective community engagement channels 15 March 2007 alternative service delivery mechanisms. 7.3 Strategically utilise information technology, validated data bases and systems to support the transformation of public services to provide better and more efficient government and reporting structures. 7.4 Improve the service culture and workplace ethics by accomplishing sound financial governance; improved accountability and transparency. 7.5 Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. 7.6 Improve the regulatory environment through conducting policy and by-law review (Bureaucratic red tape). 7.7 Establishment of representative Ward Participatory Mechanisms 7.8 Improvement of community satisfaction Unpacking the 5 Year IDP Strategic Focus areas into strategic responses, objectives and programmes for budgeting and operational implementation Visionary Framework Realities and Challenges 7 Strategic Focus Areas Prioritisation Strategic Choices Objectives Programmes KPI’s Projects City Scorecard Directorate Scorecards Departmental Targets Funding Regime Budgets Scorecards The IDP Strategic Focus Areas Strategic Focus Area 1: Shared Economic Growth and Development Poverty and unemployment reduction, balanced growth targets, capital inflows (foreign and local) and good corporate governance are the foundation on which contemporary economic plans find longer shelf life. The Western Cape, as a province, is the third largest contributor to South Africa’s GDP (Gross Domestic Product). An estimated 76% of the provincial GGP is attributable to the Cape Town. The City works against a backdrop of sizeable economic challenges, including high levels of inequity and poverty, City of Cape Town Page 23 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 relatively low levels of economic growth, a mismatch of skills supply and demand and low levels of industry competitiveness in relation to global players. The City, in partnership with the province and others, attempts to meet these challenges by facilitating activities that support economic growth and poverty reduction in Cape Town. Economic development is achieved when there is an improvement in the material status of individual residents, households and the city population as a whole. This is a central goal and the City’s Economic and Human Development Strategy provides further guidance on the key priorities to develop and broaden participation in the formal economy, grow the formal and informal economies of the poor and ensure integration of the first and second economies. A number of actions and interventions are needed to ensure the city’s economic and development goals are achieved. The priorities include: * supporting the developed economy through a focus on primary growth and new growth sectors; * ensuring that the Cape Town brand is managed and marketed to attract investors, business and visitors; and * active investment promotion to grow and retain existing investments and businesses. The creation of an enabling environment for the economy to grow and be shared is critical. To support the developed economy, mechanisms to facilitate the easy and regular interaction between investors, business and the City are important. The City will actively pursue establishing one entry point for investors and businesses which provides comprehensive development facilitation services. It plans to hold regular business briefings with senior City representatives and to simplify, within is ambit, regulatory and administrative processes. It is widely accepted that successful Small Medium and Micro Enterprises (SMME) decrease the burden on the state. One successful SME, on average, provides an income for more than one household. If an average household is unemployed, the burden on the state increases dramatically. Social security, safety, health and community development are just a few of the areas on which unemployment impacts. Therefore, the City of Cape Town will prioritise the facilitation of SMMEs through programmes such as the Red Door project and complement it with other initiatives such as developing relations with key cities across South Africa and the rest of the world. Prioritising skills requirements in the different sectors in order to unlock economic growth is another important focus. Creating an adaptable environment where people possess an ability that can be applied to different environments is a desired outcome. Perceptions of one career for life should be challenged and the focus should be on developing skills to match sector needs, fostering entrepreneurship, City of Cape Town Page 24 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 employment readiness and life skills training. Specific sectors and skills that need attention include artisan training and information technology skills. Public transport and investment in other strategic infrastructure follows as the next logical priority. An integrated transport system that provides people and goods with mobility will be a strategic lever in enhancing our competitive capabilities. The provision of basic services and investment and leveraging of infrastructure is core to ensuring sustained economic development. High telecommunications costs and the lack of low-cost internet access make it extremely difficult for citizens to access opportunities and connect with the rest of the world. This is a major obstacle in the way of developing economic growth and connecting people with each other and the rest of the world. Free or low-cost internet supported by the development of a metropolitan wide area network which is wireless enabled for example, will support economic growth in the city and region. A sustainable environment is essential for economic growth. The City of Cape Town believes in balancing the need of the market economy with that of the environment. Managing the city’s natural resource and built heritage is vital as it is the basis for much of the city and region’s competitiveness and will support a sustainable future. IDP response: Resource allocation: The City will identify services that will have the maximum impact on economic growth and will prioritise the allocation of resources towards those services and Council functions. The marketing of focused investment proposals: The delivery focus will be on unlocking economic development, job and business opportunities within the Cape Town area by means of focussed strategic interventions. Municipal entities/Strategic partnerships: In order to achieve economic growth targets, the City will attract high value partners, attract investment and will support strategic partners that contribute towards the achievement of enhanced economic growth and development in the City. The City will engage more proactively with investors to enable private sector investment to support broader city goals (E.g. Inner City partnership, Urban Development Zones). Investment in Infrastructure that enables economic growth: Investment in transport and other infrastructure, including information communications technology is considered to be important enablers of economic growth and poverty reduction. The City will ensure the provision of basic services and access to social services and human resource development in areas of need. Small business and economic participation: The City will support the needs of small business, broaden economic participation, promote entrepreneurship and build and foster networks to sustain economic development initiatives at community level. Protection of natural resources: The City will create an environment that is conducive for growth and development while at the same time protecting the environment to ensure sustainability. Creating an enabling environment: The City will actively engage stakeholders to encourage a cheaper telecommunication platform within the City Of Cape Town and will implement measures to cut red tape in order to promote investment growth. The City will work towards the alignment of skills development, training and educational systems of the City and business City of Cape Town Page 25 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Objectives:(See Annexure E for details of programmes to achieve objectives) Core Objective 1A – Creating an enabling environment for the economy to grow. 1.1 Develop new and strengthen existing partnerships to meet the City’s strategic objectives in particular investment and tourism. 1.2 Develop and implement LED initiatives. 1.3 Strengthen the City’s tourism capability and events management calendar 365 days a year. 1.4 Develop and grow SMME opportunities through 2010, supply chain management and other partnerships. Strengthen linkages between the first and second economies to encourage SMME development. 1.5 Direct investment into strategic infrastructure where economic benefits will be demonstrated. 1.6 Proactively support the formal business environment 1.7 Develop skills to support the growing sectoral economy and access to opportunities. Prioritise skills development based on the needs of the local economy, to support continued economic growth and access to opportunities. 1.8 Develop policy to encourage economic growth, job creation and broader participation. 1.9 Support the expansion and development of established businesses to strengthen the city’s economic base and competitiveness. 1.10 Support an enabling environment for the development of opportunities. Core objective 1B – Preparations for hosting of the FIFA 2010 World Cup 1.11 To prepare the city for the hosting of the FIFA 2010 World Cup events in accordance with FIFA’s requirements and the City’s developmental objectives Strategic Focus Area 2: Sustainable Urban Infrastructure and Services The city aims to ensure that all facets of development occur in a meaningful and sustainable manner. The current unsustainable growth patterns threaten the City’s primary economic asset – its diverse and rich natural resource base. Urban infrastructure and related services that are developed in a sustainable way enable social and economic development and reduce the environmental impact of physical development. Infrastructure and services encompass the availability of water, sanitation, electricity, roads, stormwater and waste management. The unplanned growth of informal settlements is adding to the city’s service delivery backlogs. Inadequate resourcing and staffing impedes the City of Cape Town’s ability to meet the growing service City of Cape Town Page 26 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 delivery needs. An integrated planning, budgeting and development approach is needed to improve infrastructure and services and to attempt to find the necessary balance in sustainable resource use. Increasingly-stressed and failing infrastructure is impairing sustainable service delivery, social development and economic growth in Cape Town. Backlogs are defined as including: basic service backlogs; backlogs arising from the need to rehabilitate or upgrade failing infrastructure or to replace redundant, but essential bulk infrastructure and equipment; and infrastructure required for planned or unplanned growth and development needs. An approach based on demand management to relieve pressure on infrastructure development, resource impacts and capital expenditure is urgently needed. The reality is that all infrastructure requirements cannot be met simultaneously, given the limitations of the current budget and budget method to implement these and other service requirements. To create alignment and balance and reduce the growing dependency on currently available funds, some key strategic objectives should be identified to avoid service interruptions in the future and to ensure that the City meets minimum service requirements. In addition, there are special medium-term requirements due to the City’s commitment to host the 2010 World Cup that increases funding needs. Each service’s summary of strategic issues gives an indication of planning and execution requirements. Environmental Resource Management The natural environment of Cape Town is threatened by unsustainable development and consumption of resources. Current integrated environmental education, capacity building, outreach and advocacy programmes are important social change instruments towards promoting environmentally responsible decisions, actions and preserving our globally recognised rare and endangered ecosystems. The implementation of energy and resource efficient practices and technologies facilitates improved environmental performance, in line with international best practice. Water Services and Waste Water Treatment (Sanitation) Services Cape Town’s and the immediate region’s sustainable water supply are being threatened by a combination of growth and development, uncontained demand and unrealistically low tariffs. On completion, the Berg River supply dam will only satisfy demand until 2014, which requires alternate strategies. Many key bulk infrastructure upgrade or development projects cannot be prioritised due to budget limitations and have severe service implications for both potable water supply and waste water treatment/sanitation services in the near future. Water demand management must reduce water City of Cape Town Page 27 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 consumption in view of the possible impacts of climate change, population growth and a pattern of increasing consumption. Solid Waste Management Bulk waste management infrastructure, specialised equipment investment needs and growing waste volumes are directly linked to population growth, industrial development and increases in tourism. A new multipurpose, replacement landfill and a system of transfer stations must be established as the existing landfills are filling up and will not be able to cope with increasing waste volumes during the next five years. The rehabilitation of disused, full landfills and dumps in the city is long overdue and is a compliance issue in terms of the MFMA and operating permit conditions. The existing waste collection vehicle fleet has an average life of eight years and is not reliable enough to sustain effective and efficient service delivery. Due to growth, services need to be optimised and expanded but balanced by the introduction of waste minimisation partnerships. Waste minimisation, linked to the future enablement of recycling through partnerships with various key industries and other stakeholders, has true sustainable economic potential. Electricity Services Electricity service availability and access backlogs stem from the electrification programme of informal settlements and low-cost housing programmes. Bulk infrastructure backlogs relate to the ageing Medium Voltage infrastructure (switchgear), or to new growth in certain areas. The City’s Electricity Dept services approximately 75% of the city’s customers, with areas in the north and the south being serviced by Eskom. However, approximately half the poor households are serviced by Eskom. This requires cooperation between the Electricity Dept and Eskom for the electrification programmes. The City will continue to engage with Eskom, Provincial and National Government on energy matters to support the city and regions economic growth. An energy and climate change strategy, including energy demand management and investment in green energy will be key to sustainable growth and to prevent costly interruptions to the economy in Cape Town. Roads and Stormwater The city's road infrastructure network (including bridges and other road side furniture) requires a very large capital input to reconstruct and rehabilitate existing inadequacies that influence and impact both on living an travel conditions and on the cost of doing business. Growth and development needs are also increasing, influencing budget decisions. Previous development has impeded spatial connectivity within the city, which in turn limits access to economic opportunities. Transport and public transport in particular, is one of the critical success factors for the 2010 World Cup. Regional linkages by road (and other transport modes) to surrounding areas and towns also needs attention to improve economic and tourism growth. However, vital road City of Cape Town Page 28 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 infrastructure links and reconstruction projects cannot be programmed due to severe staff shortages and budget restrictions. Catchment, Stormwater and River Management involves both flood risk management and the protection of receiving waters (rivers, sea, etc) from pollution conveyed by the stormwater drainage system in a manner that ensures public health and safety as well as enhancement of both the built and natural environments. Formal risk reduction and mitigation programs focussing on vulnerable communities are being prioritised given the adverse socio-economic impacts of flooding. Although the City’s recreational waters are generally considered safe for contact recreation, an integrated approach to the management of urban water is required to arrest deteriorating water quality in certain watercourses. IDP response: Targeted support to the indigent: The City will move away from the blanket provision of basic free) services to all its residents to a system of targeted support to the indigent. Equitable Service Delivery: The City will strive to enable access to equitable basic services. Public (National, Province, local, SOEs, Public & Municipal entities) Infrastructure Led Growth: The City will embark on a consistent long term development path by using public infrastructure investment as a platform and catalyst. Containment, densification and infill: The geographic growth of the City will be restricted to the existing footprint and densification and the development of vacant and underutilized land will be encouraged. Sustainable urban infrastructure: The City will provide leadership and develop implementation plans for projects that will limit demand growth on water, electricity, waste and the demand on travel and transport resources and offer opportunities for alternative forms of energy and recycling. The City will consolidate, protect and improve access to natural resources. Objectives:(See Annexure E for details of programmes to achieve objectives) Core Objective 2A – Universal access to basic services 2.1 Reduce backlogs in line with national objectives for basic services. 2.2 Large or bulk infrastructure programmes that are essential must receive priority. Core Objective 2B – Conservation of natural resources 2.3 Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants. 2.4 Consere biodiversity and improve quality living environments through greening, education and access 2.5 Reduce impact of flooding on community livelihoods and regional economies Core Objective 2C – Effective management of the City’s infrastructure and resources 2.6 Develop an “integrated programme” approach to infrastructure and service planning and budgeting. 2.7 To safeguard human health, protect natural aquatic environments, and improve and maintain recreational water quality. City of Cape Town Page 29 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Strategic Focus Area 3: Public Transport Systems The focus is to create maximum opportunity through transport, for all residents and visitors to enjoy the full social, economic and environmental opportunities that Cape Town has to offer. This means transforming and restructuring the public transport system for the benefit of existing users and in order to attract new users. Key to this is to move away from the historic commuter system, where services are designed only for peak periods, to a public transport system with greater route permanence outside the peak periods and over week-ends and public holidays. The extended services should also cater for the needs of tourists and shift workers. The enforcement of existing public transport priority lanes and the introduction of new priority lanes on strategic segments of the public transport route network are seen as a priority to aid the movement of public transport vehicles to the various employment areas. The needs of special categories of people should also be catered for in mainstream public transport services. There is also a need to integrate land use and transport and to properly align planning processes and policies. Integrated transport corridors should be planned. Increased residential densities will provide the necessary thresholds to ensure a supportive environment for public transport. Decentralised and local economic development and appropriate development around public transport interchanges are needed to reduce the dependency on motorised travel and to create conditions for lower cost non-motorised transport and universal access. A prerequisite to an effective public transport system is sustained enforcement, management of interchanges and transport assets and a regulatory environment to improve the operation, image and attractiveness of public transport. Integration with human settlement development and related infrastructure are also critical success factors. The focus on public transport systems requires an integrated capital investment approach with the planning of roads as the road based public transport systems - bus and taxi - operate on the public road network. Currently, the responsibility for managing public transport services is extremely fragmented and the need for a metropolitan transport authority is seen as a prerequisite to achieve an integrated public transport system. Although there is a need to improve the public transport system for the FIFA 2010 World Cup, the ultimate objective is create a public transport legacy that will serve Cape Town beyond the event. City of Cape Town Page 30 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 IDP response: Mobility: The City will move away from the historic commuter system, where services are designed only for peak periods, to a public transport system with greater route permanance outside the peak periods and over week-ends and public holidays. Transport Interchanges: Transport interchanges will be prioritized as hubs of economic development where socially inclusive communities can develop. Transport as enabler of growth: The City will embark on a programme of large scale investment in public transport infrastructure in support of 2010 linked economic growth and development infrastructure. Priority lanes: The City will enforce existing public transport priority lanes and introduce new priority lanes on strategic segments of the public transport route network. Freight: The City will promote the reduction of road based freight traffic by facilitating a shift to rail based freight transporting and to leverage and support rail rolling stock upgrade and improved efficiencies in rail operations. Promoting Public Transport: The City will improve transport services through multimodal integration, the application of Intelligent Transport Systems and by securing new investment in infrastructure. Objectives:(See Annexure E for details of programmes to achieve objectives) Core objective 3A – Improve public transport system and services 3.1 Improve public transport services and secure new investment in infrastructure 3.2 Promote use of public transport. Creation of a unified road-based public transport system utilising the optimum mode for a particular route/corridor. Promote use of public transport to access all facilities and services and reduce the need to use private cars. 3.3 To reduce demand for travel and to create conditions for all day public transport services. 3.4 Integration of Land Use and Transport 3.5 Ensure that freight moves efficiently and safely within the City 3.6 Develop and implement a transport asset management plan for the City. Strategic Focus Area 4: Integrated Human Settlements Integrated Human Settlements are a major driver of demand for services and hence have an impact that affects most of the other strategic focus areas. For example, the major portion of the road infrastructure backlog is related to the delivery of housing units. Housing and the need for truly integrated human settlements remains one of the key challenges facing the city. The focus is therefore on accelerated housing provision, ensuring land utilization is well planned, managed and monitored and on creating living environments that have adequate access to economic opportunities, educational, recreational and cultural activities, health, welfare and police services, are planned and implemented on sustainable development principles and with due recognition of the need for energy, water and waste efficiencies and offer a mix of housing and tenure options. Coordinated strategic planning and budgeting across directorates is essential housing delivery and improve the development of sustainable human settlements. City of Cape Town Page 31 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 The key challenges facing the city with regard to the development of integrated human settlements include: Urban sprawl and the current urban form, especially in the middle and upper income areas of the city, as they do not support the development of a viable public transport system or make effective and efficient use of existing infrastructure Reinforcement of socio-economic and racial settlement patterns established under apartheid and the poor functioning of the housing market in low-income areas Incorporating sustainable development principles within integrated human settlement development An estimated 300 000 families are without adequate access to formal housing. With the high unemployment rate, the situation is likely to worsen in future. To address this backlog effectively, the City needs to deliver approximately 20 000 housing opportunities per annum for the next 10 years. Two factors currently make it difficult for the City to meet this target. Firstly, available financial resources will only deliver approximately 7 500 housing opportunities per annum. Secondly, the lack of sufficient technical, planning, financial and social facilitation capacity have resulted in the present delivery rate being approximately 4 500 housing opportunities per annum New subsidized housing developments are still generally located on the periphery, far from work opportunities, amenities and facilities The management and financial challenges associated with the administration of some 43 000 rental units The threat land invasions pose to the City’s plans for orderly and accelerated housing delivery. IDP response: Housing plan: A medium to long term plan for housing will be developed with the key focus on land acquisition which aligns with the City’s spatial development framework. Access to land for housing: The City will shift the focus away from the provision of houses to incremental, serviced sitse, self-help, integrated development projects and will focus on the facilitation of gap housing and implementation of social housing. The City will identify areas of economic and settlement growth which do not threaten agricultural land, cultural landscapes and/or natural areas that merit protection and make effective and efficient use of existing infrastructure. Land restitution: The City will start with the implementation of its social and land restitution housing programme with identified external partners, such as the implementation and facilitation of GAP housing with banking partners and the private sector. Housing authority: The City will establish itself as a level 1 accredited housing authority. Informal Settlements: The City will investigate how best to implement in-situ informal settlement upgrades as a mechanism of increasing access to housing. A zero tolerance approach will be taken in respect of land invasions. Spatial Integration: The City will transform dormitory suburbs into areas which support a greater mix of land uses, offer a range of amenities and are socially mixed by formulating urban renewal plans supported by public investment in strategic areas and public/ private partnerships. Social Housing: The City will improve rent collection, effective and efficient maintenance of units and dealing with problems related to unlawful occupations and social problems involving shebeens and gangsterism. City of Cape Town Page 32 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Objectives:(See Annexure E for details of programmes to achieve objectives) Core Objective 4A – Improve and develop integrated human settlements 4.1 Transform dormitory suburbs into areas which support a greater mix of land uses, offer a range of amenities and are socially mixed facilities 4.2 Put in place policy and spatial planning frameworks that will facilitate the development of integrated human settlements. 4.3 Development and implementation of a incremental housing programme Core Objective 4B – Delivery of housing opportunities 4.4 Development of new housing opportunities 4.5 Increase rental stock through social housing partnerships. 4.6 Redress land ownership inequities by providing Housing based on Restitution claim settlements. 4.7 Facilitate gap housing programmes through partnerships with Banks and private sector developers. 4.8 Develop and maintain zoned public open spaces, cemeteries, resorts and beaches Strategic Focus Area 5: Safety and Security The focus is on integrating the efforts of all spheres of government, business and the public to work together to further strengthen and align the activities of law enforcement agencies, the criminal justice system, emergency and disaster risk management services to reduce the current levels of crime and vulnerability and to improve safety and security. Improved safety and security is an important foundation for accelerated and shared growth. The negative impact of the current level of crime in Cape Town on attracting international and national investment and tourism; on the quality of life of our citizens and visitors, businesses, on the retention of human capital and the potential risk on the 2010 Word Cup Soccer event, is without doubt one of, if not the most important, strategic challenge facing this City. If Government wants to win public and investor confidence, it needs to implement a more disciplined approach to addressing this strategic imperative. However, it is not only crime that is the only safety threat to the City. Current levels of vulnerability to fire, flooding and other natural or human-induced hazards, and the impact of these hazards on communities, and the environment are negatively impacting on development and growth, and in some cases inhibiting or destroying hard-won advances. There is a clear need for an efficient emergency response but also focused action on eliminating or reducing disaster and human risk and vulnerability through all means available. City of Cape Town Page 33 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 In the context of the City’s Administration, a more proactive rather than a reactive approach will be followed. The City will contribute to accelerated and shared growth by significantly improving its performance in respect of traffic policing, by-law enforcement, crime prevention, emergency response to natural and human-induced hazards, eliminating and reducing disaster risk, and softening the impact of major incidents and disasters. An integral part of these initiatives is to work more closely with other public institutions, business and the public. This strategic area is a focus of National Government, the Intergovernmental Developmental Agenda for Cape Town and the 2010 World Cup Soccer Event. It is also directly linked to the shared growth and development, integrated human settlements, and health, social and human capital development strategic focus areas. IDP response: Internal Management Efficiency: Functional departments will focus on their constitutional mandate and required outcomes in order to facilitate a safer City. Stakeholder Collaboration: The City will focus on integrating the efforts of all spheres of government, business and the public to work together to further strengthen and align the activities of law enforcement agencies, the criminal justice system, municipal courts, emergency and disaster risk management services to reduce the current levels of crime and vulnerability to improve safety, security and resilience in all areas as an important foundation. Disaster Risk Prevention: The City will contribute to accelerated and shared growth by significantly improving its performance in respect of traffic policing, by-law enforcement, crime prevention and emergency response to natural and human-induced hazards. Disaster risk will be reduced and eliminated where possible by softening the impact of major incidents and disasters. (Refer to Annexure C for more details). Social Crime Prevention: The City will focus on social crime prevention programmes directed at reducing crime, high incidences of drug and alcohol abuse, gang affiliation, crime against property and people, especially women and children. Urban design: The City will focus on improvement of urban design that reduces crime and emergencies. Protection and crime prevention: The City will implement a fast, efficient and equitable emergency response to safeguard life, property, the environment and livelihoods. Police Plan: A police plan will be drafted to focus on bylaw and traffic enforcement as key priorities, with a high focus on land invasion control and drug dealing properties. Targets will be set for driver’s licence testing stations – a maximum wait time for a booking will be set. Objectives:(See Annexure E for details of programmes to achieve objectives) Core objective 5A – Foster a safe and secure environment 5.1 Community and youth development programmes directed at reducing crime and lawlessness 5.2 The improvement of urban design to reduce crime and emergencies; 5.3 The on-going expansion of the CCTV network covering key economic and transport locations as well as crime hot spot areas. 5.4 Improve law enforcement (traffic policing, licencing services and general law enforcement) through more visible actions; City of Cape Town Page 34 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 5.5 Development of disaster risk assessment and development of pro-active disaster prevention and response plans. 5.6 Fast, efficient and equitable emergency response to safeguard life, property, the environment and livelihoods. Strategic Focus Area 6: Health, Social and Human Capital Development Cape Town is a reflection of the broader South African society, with rich and poor, skilled and unskilled living side by side. It is also characterized by vulnerable groups that find themselves on the margins of mainstream i.e. youth, women, the disabled and those affected by extreme poverty. Health, social and human capital development is about investment in people, be it at an individual or community level. While human capital refers to an individual’s skills, knowledge and ability to pursue livelihood strategies, social capital is concerned with the connections and interactions amongst individuals, their networks and social resources. When social and human capital is low, the social fabric of society begins to disintegrate. In large parts of Cape Town this manifests as high incidences of drug and alcohol abuse, gang affiliation, crime against property and people, especially women and children. HIV/AIDS, Sexually Transmitted Infections (STIs) and Tuberculosis (TB) are other significant challenges that are closely linked to the social and human capital capacity of citizens. An investment in health, social and human capital is a critical cornerstone of transforming service delivery to attain sustainability, active community engagement and good governance. Health, social and human capital development cannot be attained by a singular department or governmental or nongovernmental entity, but has to be incorporated into all developmental and service delivery strategies and delivery arms of government, be it housing, transport, education, human resources, etc. A healthy city made up of healthy individuals and communities is an essential ingredient to maximising social and human capital development and economic opportunities. All spheres of government are tasked with pursuing this agenda of health, social and human capital development as per the Constitutional mandate of Council. Collaborative efforts are therefore essential, with the City of Cape Town pursuant of a developmental and enabling role within this agenda. This it can achieve through the delivery of integrated multi stakeholder (both public and private, governmental and non-governmental) strategies. City of Cape Town Page 35 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 IDP response: Clustering of Community Facilities: The City will embark on a programme to cluster local community facilities in order to achieve economies of scale. Promoting citizenship: The city will focus on creating dignity and taking pride in being part of the city through its public engagement programme. Effective health care: The City will facilitate the delivery of health care that is designed to ensure that primary health care is delivered at a local level. The most marginalised communities in every settlement must benefit from social and human capital development. Multi-stakeholder strategies: The City will pursue: o Maximising social cohesion and minimising social exclusion; o Provision and maintenance of community facilities as hubs to provide activities for youth development; o Enabling vulnerable groups (youth, women and disabled) to enter the mainstream o Support to the Aged / Pensioners; o Development of safety nets towards the eradication of extreme poverty; o Skills and capacity development to enable individuals, groups and communities to actively engage and benefit from any developmental intervention; o Creative utilisation of community facilities like libraries, community halls and sport facilities; o Provision of effective primary health care services in close collaboration with Provincial Health Services; o An effective HIV/AIDS/STI and TB control programme; o Provision of effective environmental health services including Air Quality Management and Air and Water Pollution Control programmes. Objectives:(See Annexure E for details of programmes to achieve objectives) Core Objective 6A – Facilitating the development of a healthy and socially inclusive society 6.1 Facilitate the provision of childcare facilities and services to promote holistic childhood development 6.2 Use of Community Amenities and Facilities to implement programmes that impact on anti-social behaviour (eg Drugs and Crime) 6.3 Implementation of programmes to address the plight of Street People 6.4 Provision of effective environmental health services including Air Quality Management and Pollution Control programmes (Including noise pollution). 6.5 Provision of effective primary health care services in close collaboration with Provincial Health Services with a special emphasis on maternal and child health care and HIV/AIDS/STI and TB control. Strategic Focus Area 7: Good Governance and Regulatory Reform There is a short term, high priority need to stabilize the organisation and execute various institutional improvements to give effect to the IDP. The focus, therefore, is on an intensive effort to develop and sustain a better public administration as well as improving the regulatory environment to maximise the impact of public investment and service delivery on the development potential of Cape Town. City of Cape Town Page 36 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 The current level of performance of the City, mainly due to a lack of capacity, cumbersome red tape processes, a silo approach to the developmental challenges facing Cape Town and the absence of a high performance service delivery culture have a significant negative impact on public performance. The City will continue to align with and strengthen intergovernmental (including with state-owned enterprises) strategies, processes and programmes, including budgets, in order to maximise resources and support delivery and positively impact on efficiencies and sustainability. A key focus will be on the preparation of a development strategy for the functional region. In the context of the City’s Administration, the focus is not only on regulatory reform but also to develop and sustain a high performance Administration to deliver efficient and reliable municipal services required for achieving the strategic objectives of the City. This will be supplemented by a measurable action plan to improve the overall governance of the City’s Administration to enhance public confidence as well as improving the regulatory environment to maximise the impact of public investment and service delivery on the development potential of Cape Town. The City will also contribute to human capital development through staff skills development, the continuation of its external bursary scheme and learnership programmes. IDP response: Improved Efficiency: The City will implement measures to become more efficient and effective as an organisation by getting the right people at the right places in the organisation. Intergovernmental relationships: The City will strive towards the fostering of good intergovernmental relationships with other spheres of government by clarifying roles and responsibilities between province and national as well as specific cooperation with the private sector, NGOs, donor agencies and other role players. Institutional Integration: The City will continue to implement processes to align the City’s operating budget and its strategic priorities. Ward Participatory Mechanisms will be established to assist in the improvement of the efficiency of Sub-Councils. Revenue Generation: The City will maximise tighter debt management programmes and progressive tariff policies. Utilities must implement tariffs that ensure the economic viability of these services. Revenue generated from land and property holdings will also be optimized. Financial sustainability: The City will intensify its efforts to ensure an improvement in the management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. Organisational Efficiency: - Human resource strategies will be designed to enable the placement of the right people in the right positions and rightsizing the organisation in order to produce value. An integrated management information system will be implemented and a corporate support model will be developed to enhance operational integration. Customer Care: The City will be marketed nationally as well as internationally to attract investment as well as promoting its image as a tourism destination in collaboration with all key stakeholders. This will be supported by an enterprise-wide citizen / customer care strategy and staff development to enhance operating efficiency, relationships and citizen / customer satisfaction. City of Cape Town Page 37 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 IDP response: Human Resource Strategy: The City will ensure that it has correct human resources that are skilled and can be developed, retained and or re-skilled for 2010 and beyond .Information Technology: The City will strategically utilise information technology to drive the transformation of public services to provide better and more efficient government. Good governance: The City will improve its service culture and workplace ethics by accomplishing sound financial governance, improved accountability and transparency in awarding of tenders, established key procedures and processes and to minimise fraud and corruption. Regulatory environment: The City will improve the regulatory environment for development to maximize the impact of public investment and service delivery on the development potential of Cape Town and minimize any constraints that government activity places on shared growth and development. Non- constitutional functions: The City will shift its focus to its Constitutional Competencies (core business). The performance of non- constitutional functions will be pursued via intergovernmental discussions with the view to resolve future funding and rendering of these services. Objectives:(See Annexure E for details of programmes to achieve objectives) Core objective 7A – Ensuring enhanced service delivery with efficient institutional arrangements 7.1 Optimise the development of our organisational staff structure, strategies and policies and promote skills development. 7.2 Enhance service delivery through exploring alternative service delivery mechanisms. 7.3 Strategically utilise information technology, validated data bases and systems to support the transformation of public services and to provide better and more efficient government and reporting structures. Core Objective 7B – Management of key financial areas such as income control, cash-flow, indigent support, alternative income opportunities, asset management and risk management. 7.4 Improve the service culture and workplace ethics by accomplishing sound financial governance, improved accountability and transparency. 7.5 Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. 7.6 Improve the regulatory environment through conducting policy and by-law review (Bureaucratic red tape). Core Objective 7C – Establish effective community engagement channels 7.7 Establishment of representative ward participatory mechanisms 7.8 Improvement of community satisfaction City of Cape Town Page 38 5 Year Plan (IDP) for Cape Town 4 Provisional Draft to Mayco 15 March 2007 Financial Strategy The City has been steadily improving its financial position as is reflected by its strong cash flow, healthy reserve provisions and favourable credit ratings. However, several challenges and infrastructural problems persist which require ongoing vigilance. The City’s main sources of operating revenue are rates (20% of total operating income) and service charges (40% of total operating income). Employee costs make up a significant proportion (30.3%) of the City’s total expenditure. Bulk services payments account for a further 20% of the operating budget. Spending on repairs and maintenance is less than desirable at 5.3% on average, while water, sanitation and electricity feature prominently in both the capital and operational expenditure of the City. The City’s financial performance can be gleaned from some quantitative and non-quantitative indicators. Cape Town is one of two South African cities to have received an unqualified audit from the Auditor General over two consecutive financial years. Whilst service debtors remain a growing concern, adequate doubtful debt provisions have been made. The high levels of debt indicate significant levels of poverty and inability of many consumers to pay for services, rather than inefficiencies in collection. The City aims to improve performance against all financial indicators to ensure sustainability and maintain its strong credit rating. Several other issues pose challenges for the City’s financial sustainability. The establishment of RED 1 as a public entity will have implications for the City’s financial management as electricity currently contributes some 20% of total operating revenue. Shifting this to RED 1 will have cash flow implications. In addition, electricity contributes to the rates account on the basis of approximately 10% of revenue turnover and this income needs to be secured under the new electricity distribution arrangements. The abolishment of RSC levies from June 2006, which contributed just over 9% to the City’s own revenue, has been replaced in the short term by direct funding from national government. In the longer term a permanent source of revenue will be required to replace this. Framing the challenge The City of Cape Town makes a substantial contribution towards the GDP of South Africa and the Western Cape and as such it is vital that the City is managed in a financially sustainable manner. The challenge is to maintain a balance between social and economic investment and ensure that “basic services” remain sustainable. It is also important for the local economy as a whole that the planning and financial processes between the three spheres of government are integrated and aligned so that the necessary synergies can be City of Cape Town Page 39 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 realised in terms of all future spending and investments. It is only through an alignment of effort and resources that the desired impact at a local level can be achieved. The key challenges that will need to be the focus of City resources include: Rising levels of unemployment and the need to create substantial opportunities for job creation; In-migration of people from other areas of South Africa, but also outward migration of scare skills; Social and economic development along major corridors such as the N2 and Klipfontein; Preparing the City and its facilities for the 2010 Soccer World Cup; Infrastructure backlogs that are inhibiting economic growth. While external factors certainly influence the finances of the City, these are not the only constraints the City has to consider in its developmental role. Continual assessment of the needs of communities must also determine the developmental and spending priorities within the short to medium term. While national government is providing targeted funding for infrastructure development and basic service delivery to poor households, these initiatives are limited, considering the scope of community needs and developmental pressures facing major cities. The City has proposed strategic and priority programmes in its IDP, which will have to be funded through rates and service charges. This has to be done in such a way as to be affordable to the community and also that the local economy is not over-burdened by changes in tariff structures which have an upward pressure on inflation. Strategic response to the challenge The City has undertaken a range of measures to ensure that the finances of the City remain sustainable into the future. These are targeted towards the City achieving long-term financial viability and sustainability. The strategies being pursued are: Reducing salary costs to acceptable levels, taking into account the City’s new operating model and transferring savings to improve the maintenance of assets; Reducing the cost of servicing long-term debt with innovative methods of borrowing and capital financing; Reducing the dependency on cross-subsidisation from tariff-based services to within acceptable norms; Maintaining rate and tariff adjustments within national norms and guidelines, ensuring the national and local economy are not undermined; Making adequate provision for free basic services for the poor, to ensure that there is no further marginalisation of poorer communities or individuals through the entrenchment of the indigent policy; City of Cape Town Page 40 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Preparing realistic income budgets with adequate provision for non-recovery to ensure the expenditure reflected for each year can be fully covered by cash receipts; Ensuring that adequate cash reserves are maintained to cover legislated funds and provisions. Some of the interventions in place, though not fully integrated, include: the consolidation of all legacy billing systems and implementation of a uniform rates and service structure for the City as a whole; the working of a single/integrated financial system (SAP), providing regular and timely reports to all stakeholders; constantly seeking out opportunities for external funding to supplement the City’s budget and reducing reliance on the City’s own funds for capital development; and regularly reviewing financial strategies and benchmarking against other organisations. Medium-term budget projections – MTIEF In accordance with the City’s financial plan, the MTIEF has been reviewed to determine the income envelope and affordability level for the 2007/08, 2008/09 and 2009/10 financial years, noting that these outer years are indicative at this stage. These projections were based on: Anticipated CPIX of 5.1% for outer years; Expected growth in the City’s economic and income base, generally in the range of 2% - 4%; Projected staff costs; Realistic target income collection rates for municipal services; Growth in repairs and maintenance expenditure; Affordable and sustainable rates and tariffs; and Capital expenditure programmes and their impact on revenue Capital budget The outcome of the above scenario indicates that the City can realistically afford and sustain a capital spend of R881m (2007/08), R824m (2008/09) and R824m (2009/10). The outcomes of the capital budget projections can therefore be summarised as follows: - City of Cape Town Page 41 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco High Level Capital Budget Summary Funding Sources 15 March 2007 2007/08 2008/09 2009/10 Indicative Indicative Indicative Budget Budget Budget Rm Rm External Financing Fund (EFF) 881 824 824 Capital Replacement Reserve (CRR) 411 336 336 Capital Grants and Donations (CGD) 822 494 494 Revenue 0 0 0 Revenue – Insurance 7 0 0 2 121 1 654 1 654 TOTAL The funds from grants and subsidies represent confirmed allocations and are subject to adjustment once the final allocations from National and Provincial Government is gazetted. Operating Budget - Revenue The Operating Budget is projected to grow overall in line with inflation over the MTIEF period. These increases ensure that the rates and tariff charges for the “basket of services” offered by the City remains affordable, depending on individual consumption patterns. The City’s major sources of revenue are depicted below. High Level Operating Budget Summary – INCOME Funding Sources 2007/08 2008/09 2009/10 Indicative Indicative Indicative Budget Budget Budget Rm Rm Rm Rates 2 837 3 010 3 194 User Charges 5 695 6 175 6 732 Rent 236 248 261 Interest Earned 371 387 422 Fines 176 185 195 Other Income 339 351 362 Grants and Subsidies 2 726 2 622 2 730 Internal Billing 2 412 2 534 2 748 143 142 136 14 935 15 654 16 780 Accumulated surplus TOTAL City of Cape Town Page 42 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Operating Budget - Expenditure The following expenditure allocations are proposed in the MTIEF; High Level Operating Budget Summary - EXPENDITURE Expenditure Category 2007/08 2008/09 2009/10 Indicative Indicative Indicative Budget Budget Budget Rm Rm Rm Salaries, Wages and Allowances 3 665 3 924 4 192 General Expenses & Other 3 779 4 006 4 244 234 246 259 Bulk purchases 2 185 2 402 2 655 Financing Costs 1 273 1 517 1 645 82 87 92 Repairs and Maintenance 621 665 712 Appropriations 542 122 74 2 554 2 685 2 907 14 935 15 654 16 780 Indigent Relief Insurance Claims Activity Based Costs and Internal Billings TOTAL Conclusion The financial strategies proposed in the IDP should ensure that the City’s finances remain sustainable into the future. The challenge is for the organisation to ensure that budgeted income is collected and that expenditure is managed within the financial framework so that the objectives in the IDP can be achieved and strategic projects implemented. City of Cape Town Page 43 5 Year Plan (IDP) for Cape Town 5 Provisional Draft to Mayco 15 March 2007 Prioritising the allocation of resources Fundamental to the focussed application of resources is a prioritisation model that enables line departments to direct operating and capital budgets as well as human and other resources in such a manner so as to deliver on its strategic objectives. The prioritization of capital projects for the 2007/08 financial year and those informing the outer years of the MTREF cycle in Cape Town do not start from a zero-base. The current schedule of capital projects that contains Cape Town’s capital programme consists of a mixture of roll-over committed projects, grant funded projects, counter commitments, funding roll-over funding commitments and operational expenditure requirements. The key challenge with the current schedule is to allow some reprioritisation without disrupting the momentum in delivering the capital programme. However, even through there is limited discretion within the current capital programme some reprioritisation is advisable. The need for reprioritisation stems from the following lingering concerns: o Analysis suggests that the structure of the existing capital budget is problematic. Replacement and refurbishment requirements are under-funded, leading to increased levels of infrastructure deterioration while large scale projects such as 2010 and previously, the N2 Gateway, create distortions by crowding out discretionary funding; o The discretionary scope on the capital budget is extremely limited. The schedule of new projects for the outer years of the MTIEF, 2008-2010 needs to be firmed up. It is important to populate the projects schedule for the outer years from the start utilizing a consistent prioritization structure so as to achieve the right structural shifts within the capital budget. This is done with the view to:o Informing strategic direction:- It is critically important for Cape Town to deepen its term-of-office strategic agenda and locate this within a longer term strategic framework; o Finalising project schedules: Before new projects can be listed for prioritization the capital budget schedules has to be finalized. Current budget schedules have to be measured in terms of the prioritisation framework; o Determining available capital: In order to determine available discretionary capital the following have to be certified: Committed projects with confirmed funding; Grant funded projects with gazetted/confirmed (in writing) funding; Verification of the correct funding source to each project, as the prioritization will focus predominantly on municipal own funding sources; Confirmed counter funding commitments; and City of Cape Town Page 44 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Assessment of spending capability and project readiness within the 2007/08 financial year to spend the allocated amount. o Service Menu Prioritization: It is fairly common practice to conduct a weighted multi-criteria project prioritization process in local government. Such processes are however unwieldy and often generate distortions in the budget insofar they allow projects in different categories to compete inappropriately. The shifting of resources is therefore conducted in terms of the functions and services the City provides (Service Menu) rather than individual project prioritisation. The Service Menu Resource Allocation Matrix A simplified matrix is used that allows the shifting of resources towards the constitutionally mandated functions and services of the City in such a manner that the return on its investment in resources will lead to: an optimal return in terms of shared and sustainable growth, aimed at achieving the 6 to 8% GGP growth targets for the City; institutional stability; enabling the City to provide basic and enhanced services effectively and efficiently; redressing backlogs in a focussed and structured manner, enabling the City to leverage maximum business activity (commercial and industrial) that will support shared growth a reduction of poverty and inequality and a better life for all. Methodology outline The allocation of resources to the different services and functions provided in the City will be categorised in terms of nine prioritisation categories. The dominant feature of this model is to focus the resources of the City in such a manner that economic growth and development is achieved that benefit the all the people of the City: City of Cape Town Page 45 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 0 + ++ C1 B1 A1 - 0 + C2 B2 A2 C3 - 0 B3 A3 C. Discretionary (Non-Constitutional) B. Support Services A. Basics re Constitutional Obligations 1. Strong impact on economic growth 2. Support economic growth 3. Neutral to economic growth Figure z: - The Service Menu Resource Allocation Matrix (RAM) In terms of this matrix model, resource allocation will be predominantly directed towards constitutionally mandated functions that have a strong impact on economic growth (See Block A1) and shifted away from discretionary functions that do not contribute to shared economic growth and development. A schedule of services as categorised in terms of the Service Menu Resource Allocation Matrix (RAM) is attached as an Annexure to this document. City of Cape Town Page 46 5 Year Plan (IDP) for Cape Town 6 Provisional Draft to Mayco 15 March 2007 Development directions over the next 5 years Spatial alignment of public and private investment The role of the state should be to create the framework for market development while simultaneously protecting its assets (eg the environment and infrastructure). The alignment of the City’s investments with those of other stakeholders such as state-owned enterprises and the private sector will be emphasized in the development of strategy, in order to meet short and medium term targets, especially in the light of hosting the 2010 Soccer World Cup where very specific objectives have to be met. An analysis has been undertaken of the capital budgets and project priorities of the various sectors that impact on the spatial organisation and operation of Cape Town. This reveals that, in the short to medium term, the vast majority of public funds will have to be focussed on maintaining existing infrastructure and dealing with basic infrastructure backlogs. Major bulk infrastructure provision decisions which either unlock or prevent urban expansion will therefore shape the spatial development of the city over the next five years. Generally speaking, the City’s spatial development strategy will be containment, densification and infill. The City will seek to limit the spatial expansion (foot print) of the city and make more effective use of existing infrastructure capacity. It is therefore strongly advocated that new developments are located on vacant and underutilized residential, industrial and commercial land where: Infrastructure capacity exists for all/most services for example: central Cape Town; the southern and northern suburbs, the Blue Downs/ Eerste River area and the Montague Gardens; Killarney Gardens; Atlantis; Black Heath; and Saxenburg industrial areas; Existing infrastructure capacity is to be maintained and upgraded eg. parts of the southern suburbs and Strand/ Somerset West and Atlantis; and Investment is already contractually committed to cater for new demand eg. Blaauwberg East. 2010 FIFA World Cup Key to the 5 year plan of the City is its preparation for its role in hosting the 2010 Soccer World Cup events. The 2010 FIFA World Cup is becoming a major catalyst for development in South Africa and the City of Cape Town intends to capitalize on this opportunity. The City’s participation in the hosting of the 2010 Soccer World Cup events is concentrating unprecedented public sector/ state owned enterprise investment in infrastructure such as the airport and transport system (R 1,6 million) and this appears to be stimulating new momentum amongst private sector role players. Some of the private sector spin offs include investment into the V&A Waterfront and six new approved hotels that are to be constructed. City of Cape Town Page 47 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco International media exposure will be obtained. 15 March 2007 Images that reflect the history, natural beauty and vibrant culture of Cape Town will be beamed out to the world. A development framework and investment opportunities plan are being prepared to guide development in the central business node. Economic development opportunities The challenge will be to spread the opportunities created by the World Cup as widely as possible and promote economic development in other parts of the city, particularly in areas lacking economic and employment opportunities and in the highly accessible economic backbone area. To facilitate investment decisions, the Department of Economic and Human Development (EHD) will identify areas of opportunity with existing infrastructure and where infrastructure needs to be upgraded. It will also prepare a proactive development vision for the City and commercial nodes that align with the Regional Industrial Development Strategy (RIDS). At the same time the further development of existing and planned decentralized nodes such as the Hartland, Somerset West, Blue Downs, Khayelitsha, Mitchell’s Plain, Athlone, Blue Route and Parklands/Table View needs to be encouraged. In addition, development opportunities in Eerste River and around Faure (location of the planned Film Studio) should be explored. In Cape Town there are two Urban Development Zones. The one includes parts of the Cape Town CBD, East City, Salt River, Woodstock, Observatory, and Maitland up to the Railway Bridge, Mowbray, Athlone and Gatesville. Woodstock is undergoing the most rapid growth in this zone and the maintenance and upgrading of infrastructure is a priority for this area. The other Urban Development Zone is in the vicinity of Bellville CBD. It is also experiencing growth and office accommodation is being converted to residential development. The Urban Development Zone tax incentive is generally directed at the stimulation of capital investment in buildings, especially in declining or stagnating urban areas (demarcated and promulgated UDZs), with the objective of urban regeneration and business district revitalisation including economic development and the creation of opportunity for the urban poor. The tax incentives in the UDZs need to be actively marketed to promote further growth in the demarcated zones and cross linkages to the Neighbourhood Development Partnerships should be encouraged. With regard to industrial areas, Phillipi and Athlone Industria have been identified as possible mixed use areas for commercial and related development. While the development of the vacant industrial land adjacent to the R300 and south of Stikland Hospital is to be encouraged. The feasibility of developing the Culemborg - Ysterplaat axis along the N1 for logistical and mixed use development is to be explored in collaboration with the Departments of Public Works and the Public Investment Corporation. And, in the City of Cape Town Page 48 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 medium term, the feasibility of providing direct access between Phillipi Industria and the N2 and improving linkages between Capricorn Park at Muizenberg and the Airport and Airport Industria. To reduce traffic congestion and lengthy commuting, employment generating activities also need to be encouraged in the Helderberg and Fish Hoek Valley, up the West Coast and in Atlantis Land use intensification together with mixed use and commercial development needs to be encouraged along the routes that are prioritised for public transport investment and at the public transport interchanges. Especially those earmarked for upgrading. Public transport investment has been prioritised in the central quadrant spanning central Cape Town Bellville, Phllippi and Wynberg. Commercial development opportunities are emerging along the Klipfontein and Wetton/ Lansdowne Corridors especially at the intersection of Vanguard and Landsdowne Road and in Landsdowne Industria. The under-construction Symphony Way will improve movement between the metropolitan south-east and Bellville and create new development opportunities along its length. The upgrading of the Bellville, Khayelitsha and Mitchell’s Plain transport interchanges and Cape Town station will also create opportunities for investors. Finally, mixed use development, including residential development, linking Khayelitsha and Mitchell’s Plain to the False Bay coastline at Monwabisi and Mnandi should be explored and optimal use should be made of the City’s resort infrastructure. New tourism development opportunities are also likely to emerge with the development of the False Bay Coastal Park and the Blaauwberg Conservation Area. Residential densification Both the Provincial Spatial Development Framework (PSDF) and Future Cape Town initiative set a gross base density of 25 units/ ha as the target for the sustainable development of the city. A more comprehensive densification strategy linked to existing infrastructure capacity is in the process of being prepared together with the locational criteria and parameters for higher-density development across the city. Mechanisms and measures to support broader scale and localised higher densities are to be identified and implemented. Urban renewal The City remains committed to uplifting living conditions in the Mitchell’s Plain and Khayelitsha areas. A broad set of interventions that range from dealing with safety and security issues to housing delivery, commercial development, and the development of public places, a magistrate’s court and a hospital will all contribute to this. City of Cape Town Page 49 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 The feasibility of developing the decommissioned Athlone Power Station is being investigated with a view to it becoming a cultural and social facility of metropolitan significance. More localized public places will continue to be developed/ upgraded across the city in terms of the dignified places programme e.g. Atlantis, Table View, Khayelitsha and Grand Parade. While the identification and development of the 2010 World Cup decentralized viewing sites will result in improvements in the public environment in different parts of the city. City of Cape Town Page 50 5 Year Plan (IDP) for Cape Town 7 Provisional Draft to Mayco 15 March 2007 Conclusion In support of the IDP being effectively executed over the 5-year period, the City is committed to prioritizing its available budget, investigating alternative financing and service delivery models and improving institutional frameworks to give effect to the objectives of the seven strategic focus areas. Strategic planning is only effective with a considerable degree of fiscal autonomy. To reform the budget will need strong political will. The City is further committed to changing the current approach (which is largely driven by Finance) to a more integrated approach (involving a prioritization model) where planning with budgeting will provide efficiencies in resource application and more effective outcomes . The City’s performance management system being implemented at both organisational and individual management level, will monitor, evaluate and appraise progress in achieving the objectives and serve as the key instrument to motivate for change, if necessary. Great care has been taken in developing this plan to guide Cape Town’s development towards a shared prosperity, an inclusive and equitable society and ecological sustainability. Let us work together for a better city. Masisebenze kunye ukwenza isixeko ncono. Kom ons werk saam vir ‘n beter stad. City of Cape Town Page 51 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Annexure A: Disaster Risk Management The Disaster Risk Management Centre of the City aims to prevent or reduce the risk of disasters, mitigate the severity or consequences of disasters, prepare for emergencies, respond rapidly and effectively to disasters and to implement post-disaster recovery and rehabilitation within the City of Cape Town by, monitoring, integrating, coordinating and directing the disaster risk management activities of all role players. This is done in order to efficiently manage disaster risk in all communities of the City of Cape Town in an integrated manner in order to prevent or mitigate disasters and to soften disaster impact where prevention is impossible. The City has also introduced measures to meet the legislative requirements of the Disaster Management Act and the prescriptions of the Disaster Management Framework by combining area-focused and community-based risk assessments, disaster risk reduction and response planning that leads to integrated and sustainable development and resilient communities. The City also provides fast, efficient and equitable emergency response by appropriate services to safeguard life, property, the environment and livelihoods. It is important to note that the overall implementation of Disaster Risk Management initiatives is the shared responsibility of all employees of the City of Cape Town and relevant external role-players. The City will establish integrated institutional capacity within the administration to enable the effective implementation of disaster risk management policy and legislation and introduce an Indicative National Disaster Risk Profile by establishing and maintaining a uniform methodology to continuously assess and monitor risk by all disaster management stakeholders developed in accordance with approved frameworks Communication links and integrated disaster management plans and risk reduction programmes will include all disaster risk management role players in provincial and municipal spheres of government to ensure effective and appropriate preparedness, response, recovery and rehabilitation. A culture of risk avoidance will be promoted among stakeholders by capacitating all role-players through integrated education, training and public awareness supported by scientific research and the establishment of mechanisms for the funding of disaster risk management within the City City of Cape Town Page 52 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Annexure B: Human Resources Strategy The City’s biggest single budget item staff costs. The City’s most valuable asset, when optimally utilised, motivated and developed, is its people. However, this asset becomes a liability when not effectively utilised. The City aims, by means of a clear and simple strategy to deliver the right people at the right place, at the right time, with the right skills. This strategy needs to ensure that the City can afford its staff, thereby ensuring the correct alignment of people to organisational needs, in order to provide value added results (Improved service delivery) within budget parameters. Over the past six years, employees have faced multiple stressful and disruptive restructuring exercises, which have had a negative impact on both service delivery and staff morale. A Corporate Staffing Strategy was developed early in the 2006 financial year and was aimed at putting in place a comprehensive set of initiatives to address the instability and misalignment of resources to institutional needs and staff morale. Its completion will form the foundation of a five year IDP Human Resources Strategy. This strategy has been extended to incorporate the following additional areas: 1. Corporate Staffing Strategy The key outcomes of the current Corporate Staffing Strategy include: Stabilisation intervention:- Alignment of the current organisational structure to new political structure, amalgamation of previous administrations at all levels and completion of placement for all employees. This will be completed in the 2006/7 financial year. Parity Intervention:- Achievement of parity for all employees through the process of voluntarily moving employees to a standard set of Cost Of Services and pay structure. To be phased in over three to four year period, starting in the 2006/7 financial year and subject to the collective bargaining & TASK evaluation processes. Integrated Talent Management, Remuneration & Performance Management:- Development & implementation of integrated Talent Management, reward and performance systems, with the framework to be completed in 2006/7 financial year and implementation to be rolled out from 2008. Implementation of Corporate Wide Individual Performance Management system:- To be developed in the 2006/7 financial year, for implementation from 2008. City of Cape Town Page 53 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Creation, over time, of benchmarked, customer/community-centric organisation:- To create flexible policies and strategies which will support the creation of a flexible organisational structure. The identification and phasing in of Department level & Corporate benchmarks to manage structure & business processes, over the next five years and the management of move to single public sector. Increased investment in staff through implementation of:- A Talent Management strategy, Leadership Development, Learnership programmes and Graduate programmes Implementation of Quality Management principles and processes, to embed sound and innovative managerial practices at all levels of the organisation. Fully implement SAP HR process, moving to Management Self Service and Employee Self Service, based of SAP best practice:- Implementation of an electronic time and attendance system that is to be phased in over the next two years. The balance of the outstanding modules to be implemented over next two years, including Occupational Health and Safety and integrated Human Capital Management. Management of the change process through: Implementation of a comprehensive client survey to be conducted at the start of the 2007 financial year. The identification of areas for productivity interventions to come out of survey and be implemented over next 5 years and ongoing change support to overall staffing strategy. 2. Directorate Level Staffing Strategies The responsibility for the management of staff lies with line management. Policy formulation and professional services will be provided by Corporate Services. The funding of staff resources lies with line management and will be managed within their normal budget. The shifting of financial priorities lies with the City Manager, the City Financial Officer and the Executive Management Team. Executive Directors are held responsible to effectively manage the allocation and deployment of their resources. To this effect, each Directorate will be required to prepare an annual Staffing Strategy and Staffing Plan which encompasses the following aspects: Projection of staffing needs based on a projected service delivery menu and future strategy. Identification of critical vacancies and financial plans to enable the filling of these positions. City of Cape Town Page 54 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Identification of critical bottlenecks and underutilised resources and plan for the better utilisation of current resources. Management of staff remuneration in the context of the remuneration policy and financial plan. Development of a talent management plan, including the identification of scarce skills and retention and attraction strategies as well as staff development plans. Identification of staff learnership programmes and other training priorities. Identification of areas which require special interventions such as Business Planning Reengineering and Quality Management. The human resources strategy to meet the requirements of Service Delivery Integration Strategy. Ensure the benchmarking of staff to service provision per department. Compliance with corporate benchmarks adopted by the Mayoral Committee. 3. Human Resources Budget The management of annual budget lies with the line directorates. Any reallocation to meet growth areas will be built into the annual budget process. On an annual basis, the Executive Management Team needs to consider whether to reprioritise a percentage of the staffing budget in order to fund growth services and to reduce (Shrink) other services. This reprioritisation must be based on proper benchmarking of each Department, input on IDP priorities and Departmental attrition. Directorates will base their proposals on their Directorate level staffing strategies. 4. HR Development and Talent Management The City will prioritise staff development and talent management by: Repositioning of the Human Resources function in terms of the Employee Value Chain; Increasing investment in this area; Implementation of the Human Capital Development module on SAP, including the competency framework, talent management model, leadership development model. Conducting a baseline Skills Audit and an Annual Skills audit update at Departmental level. Establishing a skills assessment centre. Implementing a Leadership Development plan, including the rolling out of Personal Development Plans. Rolling out of comprehensive Performance Management system. Identification of scarce skills and strategy to develop, attract and retain skills. Development and implementation of graduate programme and extension of internships. City of Cape Town Page 55 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 5. Time and Attendance Plan Time and attendance has been identified as an area that requires urgent intervention. This will be done through the rolling out of an electronic time and attendance system, a process which will be championed by the Executive Management Team. This project forms part of the e-HR rollout plan of the City that will be phased in over the next two years. Within this process the following is to be prioritised: Putting in place an intervention to ensure that line management are able to take full responsibility for managing individual time and attendance. Implementing electronic leave for all employees who do not currently clock in electronically. Ensuring accurate information to monitor time and attendance. 6. HR Standing Committee on Compliance The City will establish a Human Resources Standing Committee on Compliance. This Committee will consider bi-annual reports on corporate wide compliance to the following metrics. It will constitute the key measuring tool both for the outcome of the strategy (based on the metrics) and for compliance: Absenteeism levels Time & attendance stats – including backlogs in capturing of leave & overtime Critical vacancies – funded & unfunded Identification & retention of scarce skills Average length of time to fill vacancies, including securing funding Placement of unplaced or underutilised employees Overtime expenditure, including optimisation of shift systems Training Expenditure & adherence to WPSDP Adherence to HR policies in relation to Employment Equity, Skills Development, Essential User, Medically unfit Adherence to SALGBC Agreements COS, TASK, Org Rights Occupational Health & Safety statistics Disciplinary cases & average length of time to finalise Grievances & average length of time to finalise Disputes Other risk items – Workplace HIV/Aids levels & treatment programme City of Cape Town Page 56 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco Individual Performance Management All HR related items raised by Audit Committee City of Cape Town 15 March 2007 Page 57 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Annexure C: Principles Informing the Spatial Framework and District Plans The 5 main ideas and areas of action set out for discussion in the Future Cape Town document and which will form the foundation of the SDF and 8 District SDPs are: Consolidate, protect and improve access to natural resources The starting point of Future Cape Town is that we need to consolidate and protect Cape Town’s world class assets as they have great environmental, economic and social value. They are a major part of what makes the city a unique and desirable place to live in, work in and invest in. The key strategic action areas are to: Protect valuable natural areas (geophysical features, river systems and agricultural land); Enhance ecological sustainability and protect the globally important and unique biodiversity; Improve the multi-functionality and connectivity of open spaces by consolidating and improving the Cape Town Metropolitan Open Space System (MOSS); Provide better access to both existing open space amenities and new ones; Create new city parks and multi-purpose sports complexes; Enable dignity in cultural, social and life celebrations such as initiation. Promote an equitable pattern of access The argument advocates the establishment of an equitable pattern of access so that people enjoy easy access to all parts of the City – particularly on public transport. This is an essential precondition to economic growth and efficient, sustainable development. The components of this idea include: Transforming the existing radial, CBD biased, transport system to a multi-directional network with strengthened south-north movement linkages to support urban renewal and the expansion of the city northwards and the development of critical east-west linkages; The alignment of the movement system and land use, especially along activity and development routes; The establishment of a citywide, efficient and affordable public transport system. Sustainable and accessible economic opportunities Economic and human development lies at the core of Cape Town’s vision of a transformed, integrated and prosperous city. Spatial strategies which will help contribute to this include: City of Cape Town Page 58 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Ensuring critical economic infrastructure and services (port, airport, road and rail network and water and electricity supply) are in place and that the local – international freight system is rationalised and enhances Cape Town and the region’s economic development. Reinforcing and enhancing the economic backbone to establish it as a place of commerce and living that is easily accessed from all parts of the metropolitan area; Promoting new accessible, high opportunity commercial centres, tourism development opportunities and areas of mixed use development which have the potential to introduce new economies into depressed or marginalised parts of the city and create opportunities for emerging businesses, linked to public transport changes, recreational areas and the like; Making strategic sector locations attractive for investors through appropriate investment in infrastructure, transport and development partnerships. Settlement – An integrated development path An essential component of the argument is to ensure that all new development areas are truly ‘integrated human settlements’. The basic premise is that settlements that integrate housing, economic activity, transport, nature, recreation and social amenities are the key to a viable and sustainable city. The argument makes the following important proposals to support and guide this approach: Urban growth should be contained and directed away from valuable natural and cultural resources. The implication is that urban development should not expand eastward and should be selective in growing northwards; Infrastructure planning and budgeting must be co-ordinated and aligned with the IDP’s spatial growth strategy in order to ensure the effective and efficient use of existing and new infrastructure and service capacities. Opportunities and mechanisms to improve the sustainability of existing and new living environments (environmentally, economically and socially) must be proactively explored and promoted Existing mono-functional and isolated settlement areas such as the townships and public housing estates need to be transformed into well functioning suburbs with a mix of income groups and land uses. Key sites such as Wingfield and Culemborg must be identified for development, planned and released at appropriate times with appropriate supporting infrastructure; Create more great people places A key concept in the argument for the long term planning of Cape Town is the protection and creation of the built environment assets that form the foundation for not only its identity, its international City of Cape Town Page 59 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 marketability, its economy but also its unique sense of place. Key interventions in this regard should include: Protecting and enhancing existing special places such as the Sea Point Promenade, Grand Parade, V & A Waterfront, and Jubilee Square in Simonstown and developing new such urban special places; Protecting and enhancing cultural landscapes and urban heritage areas such as Bo-Kaap, Company Gardens and Kalk Bay; Realizing the development potential of the coastline e.g. the West Coast and False Bay in an environmentally sensitive manner and making it more accessible; Establishing new public places and facilities that can enhance the dignity and ultimately community and investor confidence in depressed locations. City of Cape Town Page 60 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 Annexure D: Partnership Strategy The City will to oversee, manage and monitor its shareholdings and identified contractual relationships with external bodies and municipal entities to ensure alignment with the City’s strategic objectives, compliance with pertinent legislation and good governance practices. The City seeks to regulate and manage the shareholder interests of the City through monitoring the corporate governance, financial and legislative compliance of the entities and any strategic external body with a view to optimising the financial and non financial interests of the City as client and/or shareholder. The municipal entities and strategic partners of the City are an important part of the functioning of the City in respect of the City’s service delivery obligations and legal imperatives. The community holds the city accountable for the performance of municipal services, irrespective of the form of service delivery mechanism. It is therefore important that the City ensures that the City partners are aligned to the City’s vision and strategic objectives and that each partner is performing within its legislative mandate. As at 1 July 2006 the City had three municipal entities: o The Cape Town International Convention Centre (Pty) Ltd (Convenco) operates a convention centre. o Red One (Pty) Ltd is the entity established in terms of the national electricity restructuring initiative. o The Kayelitsha Community Trust is responsible for developing the Central Business District of Kayelitsha. Other strategic partners include Cape Town Routes Unlimited, Wesgro, Cape Town Community Housing Company and Cape Town Central City Partnership, Table Mountain National Park and ICLEI Local Governments for Sustainability. The City deals with various forms of entities and partnerships, each with their own specific goals and objectives and limited resources. Consistent monitoring covers aspects such as business planning processes and corporate governance initiatives as well as financial monitoring, the City will continuously assess the performance of its partners. The City will also assess new opportunities and possibilities to establish either new entities or partnerships within the framework of existing legislation as the need arises. The City’s objective is to oversee, manage and monitor the City’s shareholder and contractual relationship to ensure alignment with its strategic objectives and compliance with legislation and good City of Cape Town Page 61 5 Year Plan (IDP) for Cape Town Provisional Draft to Mayco 15 March 2007 governance practices as well as to provide assurance to the community that financial and service delivery performance is monitored to achieve the most economic, efficient and effective results with public funding. The City will therefore encourage and, where possible, enforce legislative compliance of municipal entities and partners regarding the reporting procedures related to municipal entities. Best practice policies in line with corporate governance legislation formulated, implemented and regularly reviewed. Business planning processes will be designed and implemented and the City will provide input into Service Delivery Agreements and regularly review these Agreements to ensure alignment to City strategic goals and objectives. Liaison with and assistance to line function departments monitoring the service delivery aspects of the entities and partnerships will be provided and reporting formats in line with legislative and best practice guides will be developed where not already legislated, and implemented. City of Cape Town Page 62 Annexure E: Draft Corporate Scorecard for 2007 – 2012 Core Objective Baseline Target 30.6.2007 30.6.2008 Strategic focus area 1: Shared Economic Growth and Development Target 30.6.2009 Target 30.6.2010 Target 30.6.2011 Target 30.6.2012 Evidence 1A Create an enabling environment for the economy to grow (objective 1.1 – 1.10) 1A.1 Number of direct job opportunities created (NKPI) > 7000 7700 8600 9700 11000 13000 Annual report 1A.2 Rand Value of direct > or = R 2 billion R2,2 bn R2,5bn R2,6bn R3,1bn R3,6 bn Annual report investment 1B Preparations for hosting the FIFA 2010 World Cup in accordance with FIFA’s requirements and the City’s developmental objectives (Objective 1.11) 1B.1 Conformity with agreed programme to the City’s Business Plan 1.B.2 Long term operator to manage stadium appointed New 100% 100% 100% Annual report New Operator appointed Finalise base design for long term requirements and sustainability 100% Compliance with lease agreement 100% Compliance with lease agreement 100% Compliance with lease agreement Annual report Strategic focus area 2: Sustainable Urban Infrastructure and Services 2A Universal access to basic service (objectives 2.1) 2A.1 Percentage of households with access to basic levels of sanitation (NKPI) 2A.2 Percentage of households with access to basic level of water (NKPI) 2A.3 Percentage of households with access to basic levels of Electricity (NKPI) 2A .4 Percentage of households with access to basic levels of solid 96,9% 97,5% 98,1% 98,8% 99,4% 100% 100% 100% 100% 100% 100% 100% Quarterly reports 5-year plan to eradicate Quarterly reports 90% 91,8% 92,8% 93,8% 94,8% 95,8% Quarterly reports 99% 99% 99% 99% 99% 99% Quarterly reports City of Cape Town 63 Page Core Objective Baseline 30.6.2007 Target 30.6.2008 Target 30.6.2009 Target 30.6.2010 Target 30.6.2011 Target 30.6.2012 Evidence waste removal (NKPI) 2B Conservation of natural resources (Objectives 2.2 – 2.5) 2B.1 Percentage reduction in unconstrained water demand 2B.2 Percentage compliance with 4 critical DWAF effluent standards (E-coli count, Ammonia content, Oxygen demanding substances, Total suspended solids) 2B.3 Ensure recreational waters (bathing beaches, vleis, lagoons, etc) comply with applicable water quality standards to safeguard public health 2B.4 % Cleanliness of the City (Metropolitan Cleanliness/ Photographic index Shared indicator - Contributing departments: SWM, City Parks, Roads & Stormwater 29% 30% 33% 36% 38% 40% Annual report 76% 79% 85% 90% 95% 98% Annual report 75% of points sampled comply 76% 78% 80% 82% 85% Annual report 61% 67% 70% 73% 76% 80% Quarterly report 2B.5 Percentage of airspace 14% 14.5% 15% saved in relation to the volume of waste disposed 2C Effective management of City’s Infrastructure and Resources (Objectives 2.6 – 2.7) 15.5% 16% 16.5% Quarterly reports 2.C.1 Development and Implementation of a planned infrastructure maintenance programme iro Electricity, Sewerage, Water and Roads & Stormwater, Solid Waste disposal 100% compliance with plan specifications for Year 1 100% compliance with plan specifications for Year 2 100% compliance with plan specifications for Year 3 100% compliance with plan specifications for Year 4 Quarterly reports 38 min 37 min 36 min 35 min Annual report New Integrated Infrastructure Plan developed and approved Strategic focus area 3: Public Transport Systems 3A Improve public transport system and services (Objectives3.1 – 3.6) 3A.1 Reduction of average 45 min City of Cape Town 40 min 64 Page Core Objective Baseline 30.6.2007 commuter travel time (home to work – peak periodpublic transport) 3A.2 Cumulative kilometres of critical and feeder commuter routes as per Annual Transport Plan with dedicated bus lanes 3A.3 Progressive evolution towards a single point of authority for transport 45km Target 30.6.2008 5 km on baseline Approved Creation of a transport single transport agreement all authority spheres of government Strategic focus area 4: Integrated Human Settlements Target 30.6.2009 12 km baseline on Target 30.6.2010 15 km baseline on Target 30.6.2011 20 km baseline Target 30.6.2012 on 35 km baseline on Transport authority fully operational Evidence Annual report Annual report 4A Improve and develop Integrated Human Settlements (Objectives 4.1 – 4.3) 4A.1 Development and adherence to Integrated Human Development plan (HIS) plan New HIS developed approved plan and 4A.2 Maintain Community 50% 70% Facilities according to defined minimum maintenance standards 4B Delivery of housing opportunities (Objectives 4.4 – 4.8) 4B.1 Number of new housing opportunities provided per year 4B.2 Development and implementation of an Informal Settlement Upgrade plan 100% compliance with plan specifications 80% 100% compliance with plan specifications 85% 100% compliance with plan specifications 90% 100% compliance with plan specifications 95% Annual report Annual report 8 335 10 200 11 000 12 000 12 000 12 000 Quarterly reports New Informal settlement Upgrade developed approved 100% compliance with plan specifications 100% compliance with plan specifications 100% compliance with plan specifications 100% compliance with plan specifications Annual Report 100% 100% 100% 100% Annual Report Plan and Strategic focus area 5: Safety and Security 5A Foster a safe and secure environment (Objectives 5.1 – 5.6) 5.A.1 Percentage Adherence to Metropolitan Police Plan Plan completed and approved City of Cape Town 100% compliance with plan 65 Page Core Objective Baseline 30.6.2007 5A.2 Percentage implementation of Disaster Plans according to legislative requirements Disaster Management Plan as per statutory requirements completed and approved Target 30.6.2008 specifications Disaster Management Plan developed and approved Target 30.6.2009 Target 30.6.2010 Target 30.6.2011 Target 30.6.2012 100% compliance with plan specifications 100% compliance with plan specifications 100% compliance with plan specifications 100% compliance with plan specifications Evidence Annual Report Strategic focus area 6: Social and Human Capital Development 6A Facilitating the development of a healthy and socially inclusive society (Objectives 6.1 – 6.5) 6A.1 Number of new Child Care facilities provided in partnership with governmental and nongovernmental organisations 6A.2 Number of partnerships implemented focussing on HIV/AIDS orphans 6A.3 Number of partnerships implemented with Early Childhood Development sector 6A.4 Number of local drug action committees established 6A.5 Increase number of strategic sporting partnerships and events implemented new 2 3 4 4 4 9 11 13 14 16 17 2 4 5 5 6 6 2 8 16 24 32 40 10 12 13 15 17 18 6A.6 Number of street people accommodated 6A.7 Number of days when air pollution exceeds WHO guidelines 280 300 330 413 516 645 148 144 140 137 135 133 6A.8 Reduction of the infant mortality rate (Number infant deaths per 1000 live births) 6A.9 Slow the rate of increase of TB per 100 000 of Cape Town 21,38 20,6 20 19,5 19,2 19 878 980 1040 1090 1120 1140 City of Cape Town 66 Page 6 Monthly report Core Objective Baseline 30.6.2007 Population 6A.10 Slow the rate of increase of the City’s ante-natal HIV prevalence 16% Target 30.6.2008 18,5% Target 30.6.2009 19 Target 30.6.2010 19,3 Target 30.6.2011 Target 30.6.2012 19,6 Evidence 19,8 Strategic focus area 7: Good governance and regulatory form 7A Ensuring enhanced service delivery with efficient institutional arrangements (Objectives 7.1 – 7.2; 7.4 & 7.6) 7A.1 Development and adherence to a comprehensive HR development strategy 7a2 Development and implementation of Quality Management Programme 7A.3 Improved turnaround time of tender procurement processes in accordance with procurement plan 7A.4 Development of and percentage adherence to Project Plan for integration of GIS, LIS and SAP Comprehensive HR development strategy Plan as per statutory requirements completed and approved Quality Management Programme developed and approved 8 weeks Integration Project developed approved 100% compliance with plan specifications of Year 1 100% compliance with plan specifications of year 2 100% compliance with plan specifications of year 3 100% compliance with plan specifications of year 4 100% compliance with plan specifications of year 5 10% of identified services/ functions ISO certified 20% of identified services/ functions ISO certified 8 weeks 50% of identified services/ functions ISO certified 7 weeks 70% of identified services/ functions ISO certified 7 weeks 100% of identified services/ functions ISO certified 6 weeks 8 weeks 100% 100% 100% 100% 100% compliance with compliance compliance compliance compliance strategy with strategy with strategy with strategy with strategy specifications for specifications specifications specifications specifications Year 1 for Year 2 for Year 3 for Year 4 for Year 5 7A.5 Gearing the City for improved Council approved 100% 100% 100% 100% 100% Service delivery Operating Model compliance with compliance compliance compliance compliance implemented by strategy with strategy with strategy with strategy with strategy Council specifications for specifications specifications specifications specifications Year 1 for Year 2 for Year 3 for Year 4 for Year 5 7B Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. (Objective 7.5 – 7.6) Plan and City of Cape Town 67 Page Core Objective Baseline 30.6.2007 21.07% Target 30.6.2008 20% Target 30.6.2009 20% Target 30.6.2010 19,75% Target 30.6.2011 19,75% Target 30.6.2012 19,70% 4.31:1 4.31:1 4.31:1 4.30:1 4.30:1 4.30:1 95% 95% 96% 97% 98% 98% 95% 95% 96% 97% 98% 98% 2.60:1 2.60:1 2.50:1 2.45:1 2.45:1 2.46:1 94% 95,5% 96% 97% 98% 98% 7B.7 Percentage reduction in the number of recurring findings emanating from Internal Audit 7B.8 Unqualified Audit from Auditor General New 50% 60% 70% 80% 90% Unqualified audit received from AG Unqualified audit received from AG Unqualified audit received from AG Unqualified audit received from AG Unqualified audit received from AG Unqualified audit received from AG 7B.9 Maintain City’s credit rating A1+ (short term) AA- (long term) A1+ (short term) AA- (long term) A1+(short term) AA(long term) A1+ term) AAterm) A1+ term) AAterm) A1+ term) AAterm) 7B.1 Net Debtors to Annual Income [Ratio of outstanding service debtors to revenue actually received for services (NKPI)] 7B.2 Debt coverage by own billed revenue (NKPI) 7B.3 Percentage of City’s Capital budget spent (NKPI) 7B.4 Percentage of City’s operating budget spent 7B.5 Ratio of cost coverage maintained 7B.6 Revenue collected as a percentage of billed amount (short (long (short (long (short Evidence Annual Financial Statement Annual Financial Statement Audited financial statements Audited financial statements Annual Financial Statement Finance Management Report Quarterly Audit Committee Report Receipt of clean audit report for financial year 2006/2007 Credit Rating report (long 7C Establish effective community engagement channels (Objective 7.7 – 7.8) 7C.1 Number of functioning ward participatory structures 7C.2 Community satisfaction score measured in terms of the Likert scale (1-5) 105 105 105 105 105 105 3 4 4 4 4 5 City of Cape Town 68 Page 6 Monthly Customer Perception Survey report Annexure F: Programmes towards the implementation of Objectives Strategic Focus Area 1:- Shared Economic Growth and Development Core Objective 1A Create an enabling environment for the economy to grow (objectives 1.1 – 1.10) Corporate Objective 1.1 :- Develop new and strengthen existing partnerships to meet the City’s strategic objectives focussing in particular on new direct investment and tourism. 1.1.1 Partnership Programme: Stimulate new Partnerships and package development opportunities to maximise the use of the City’s underutilised resources. Extend the mandate of successful partnerships and terminate unproductive partnerships. Engage the Tourism industry by providing packaged opportunities for unlocking the tourism value chain to broader based participants. Positioning the City Of Cape Town and its agencies as a leading participant in the tourism industry and other priority sectors. Engage with all spheres of government to solicit more investment in the City Of Cape Town and to synergise on joint projects. 1.1.2 Accelerated Investment Programme: Strengthen the City’s support for its investment promotion agencies and other partnerships Establish a City Development Facilitation Unit (DFU) to lead investment Eliminate constraints and barriers to investments Develop a proactive incentivation policy for new investment targeted LED areas. Identify and release land for commercial and industrial development. 1.1.3 Sector Support Programme:- Facilitate economic growth and investment and strengthen linkages to the second economy-: Strengthen sector support agencies (includes tourism, BPO/ Call Centres, ICT, alternative energy, creative industries, boat building, clothing & textile, agricultureand aquaculture business, Actively initiate events with sector bodies in partnership with external credible service providers Corporate Objective 1.2:- Develop and implement low complexity and high impact Local Area Development (LED) initiatives 1.2.1 Area Targeting and Management Programme: Introduce new opportunities and develop existing opportunities in prioritised areas: Actively engage and solicit large scale investments by packaging achievable and realistic economic opportunities Proactively plan and implement local economic development programmes in areas where development is currently taking place Build on existing community based economic forums and extend broad participation thereof Build and further strengthen the Central Improvement Partnerships in existing and emerging areas that will lead to self regulation and management 1.2.2 Informal Trade Support Programme: Review of regulations and by-laws to create a more enabling business environment. Encourage and promote transparent self regulation in the informal trading environment. Proactively facilitate business support programmes to informal traders to allow for natural progression into the formal business environment. Proactively encourage co-existence between the formal business environment and informal traders. Proactively promote markets with local products. .Implement Business Facilities Management Framework. Corporate Objective1.3:- Strengthen the City’s tourism capability and events management calendar 365 days a year. 1.3.1 Tourism Development Programme: Develop entrepreneurship and employment opportunities that will enable broader participation in the tourism value chain. Develop 2010 world cup tourism support programmes that will balance demand with supply of capacity and services. City of Cape Town Page 69 Initiate a skills development programme that will result in broader participation in the Tourism economic and job opportunities Strengthen and further capacitate the visitor centres to provide BBBEE opportunities. Initiate and influence strategic interventions with key stakeholders including ACSA, airlines and tour operators.. Develop BBBEE Entrepreneur development programmes. Enhance Visitor Information Centres Engage with SAPS and City police to enhance City Visitor Safety Programmes 1.3.2 Destination Development Management and Marketing Programme: Review and improve the mandate of our existing agencies in consultation with all stakeholders to improve Cape Town and the Western Cape as world class destination. Review and develop the City Of Cape Town tourism brand to take adavantage of all economic opportunities relating to 2010 and beyond Engage the private sector to actively participate with the City’s agencies to promote Cape Town and the Western Cape as world class destination. Actively promote Cape Town and the Western Cape as an environmentally friendly and creative industries city . Actively promote Cape Town as a Busines Tourism destination. 1.3.3 City Events Strategy and Programme: Develop and establishment a City wide events office as a single point of contact Market Cape Town as an Events Destination that is well capacitated to meet the expected increase in demand leading up to 2010 and beyond. Develop a strategy and implementation plan to spread the events capacity of the City evenly throughout the year.. Develop and market an all year City Events calender. Corporate Objective 1.4:- Develop and grow SMME opportunities through 2010, Supply Chain Management processes and events to encourage SMME development. 1.4.1 SMME and cooperative business support Programme: Bridge the gap and strengthen linkages between developed and emerging economies including: Review, develop and enhance partnerships to ensure Business Development support services. Develop a 2010 Small Business Programme that creates opportunities leading up to 2010 and beyond. In conjuction with external service providers, enhance the trade fairs capability that will have a more direct impact on . Business and Economic Opportunities Promotion: Small Business Week. Youth Entrepreneurship programmes including Schools Entrepreneurship Programme 1.4.2 Small Business Promotion Programme: Increase participation in Economic Networking Forums Increase participation in small business week and provide tangible opportunities for participants Review existing and establish further digital business centres Expand the presence of library business corners 1.4.3 City Procurement Programme: Establish and Integrated Supplier Development Programme including Voucher Programme Actively market the City’s tender processes in areas where it is most needed Interact with all spheres of government to establish targeted SMME procurement policies Promote Green Procurement and Fair Trade Review existing legislation governing supply chain and propose recommendations for improvement Entrench and publicise BBBEE policies Promote recycling business opportunities. Corporate Objective 1.5 :- Direct investment in strategic infrastructure where economic benefits are demonstrated.. 1.5.1 Transport and Telecommunications Infrastructure Programme:- to support the city’s economy, attract investment and support future growth: Leverage 2010 initiatives to help accelerate economic growth up to 2010 and beyond. Establish a Development Facilitation Unit (DFU) to indentify LED prioritised areas and package development opportunities Engage with all spheres of government including State-Owned Enterprises. Enhance the ICT infrastructure of the City by establishing a City wide wireless internet capability. Corporate Objective 1.6:- Proactively support the formal business environment. City of Cape Town Page 70 1.6.1 Enabling Business Environment Programme: Promote efficient and effective practices within the City Administration. Review existing legislation to promote economic development. Perform an investment climate survey Proactively engage with business, state-owned enterprises and national government. Support the City Improvement District parterships in existing and emerging areas. Provide affordable, sustainable and non-interrupted services 1.6.2 Business and Consumer Security Programme: Promote mixed land use and design treatments in new housing and business developments. Proactive enforcement of By-laws that affect the business environment. Improved Metro Police capacity and training. Increase Safety awareness Community policing fora. Tourist safety and security policy. Corporate Objective 1.7:- Develop skills to support the growing sectoral economy and access to opportunities. Prioritise skills development based on the needs of the local economy to support continued economic growth and access to opportunities. 1.7.1 Skills Development and Training Programme:- to unlock economic growth and ensure sustainability of growth sectors: Identify short, medium and long-term skills shortages. Develop a strategy to meet the demand on skills Enage with Industry and with the education industry to fast track development of skills in key economic sectors (including IT, Construction). Schools Entrepreneurship Computer Skills Training Support Artisan Training linked to growth industries ABET Promotion of learnerships Crisis Communication in Tourism Tourism Awareness Training 1.7.2 Low Skilled Job Creation Programme: EPWP prioritised in all infrastructure projects Early Childhood development programme. Establish further job centres. Corporate Objective 1.8:- Develop policy to encourage economic growth, job creation and broader participation. 1.8.1 Legislation review programme: Review existing national and provincial legislation and make recommendations for change. Participate in further development of policy and implementation processes impacting on economic development. 1.8.2 Implementation of the Economic Development Strategy Programme:- to ensure alignment with and inputs to: National and Provincial Government of the Western Cape strategies and Policies Regional Development Strategy The City’s Spatial Development Framework and District Spatial Development Plans City Infrastructure Investment Strategy. Integrated Human Settlement Plan. Resource management plans including environmental, water, energy , solid waste. 1.8.3 Economic research and information programme: Secure provision of official City level economic statistics. Local Area economic research Business survey (to replace RSC Levy database) Informal sector survey. Poverty study Key City indicators Tourism Infrastructure survey City of Cape Town Page 71 Tourism Satellite Account for Cape Town Tourist Tracking Survey. Corporate Objective 1.9:- Support the expansion and development of established Businesses to strengthen the city’s economic base and competitiveness. Corporate Objective 1.10:- Support an enabling environment for the development of opportunities. Core Objective 1B Preparations for hosting the FIFA 2010 World Cup in accordance with FIFA’s requirements and the City’s developmental objectives (Objective 1.11) Corporate Objective 1.11:- Hosting of the FIFA 2010 World Cup™ in the City of Cape town in accordance with FIFA’s requirements and the City’s developmental objectives 1.11.1 Implementation of 2010 World Cup™ programme (1B.1Conformity with agreed programme to the City’s Business Plan) to achieve the following: Timeous finalisation securing of the statutory planning processes related to the environment impact assessment, zoning, public participation process and building plans for the Green Point site, Stadium, Stadium Precinct and Urban Park land required for stadium and related facilities Timeous delivery on the City’s obligations in respect of bulk and link infrastructure services in support of the Green Point Stadium, Stadium Precinct and Urban Park Delivering on all pre-event requirements Completion of the new Green Point Stadium, Stadium Precinct and Green Point Common Urban Park according to FIFA programme Delivering on all services required Integrated Operational Plan and Decentralised Viewing Programme during the 2010 FIFA World Cup™ hosting of the event Ensuring deriving of optimum benefit from the hosting of the event with specific reference to improved infrastructure, economic development and soccer development Ensuring post –event sustainable use of, and operation of the Stadium and the Green Point Urban Park optimum return on infrastructure investment ? Check…”ensure” 1.11.2 – (1.B.2) Long term operator to manage stadium appointed City of Cape Town Page 72 Strategic Focus Area 2:- Sustainable Urban Infrastructure Core Objective 2A Universal access to basic service (objectives 2.1 – 2.3) Corporate Objective 2.1:- Reduce service backlogs for infrastructure-related services in accordance with national objectives for basic services. 2.1.1 Basic Sanitation Services Programme:- Local programmes, determined by policy, need (i.e. basic service backlog: where there is no access to service), standards and appropriate technology To ensure access to basic sanitation services by all by 2010. 2.1.2 Basic Water Services Programme:- Local programmes, determined by policy, need (i.e. basic service backlog: where there is no access to service), standards and appropriate technology To make potable water services available to all by 2008. 2.1.3 Basic Services Programme:- Local programmes, determined by policy, need (i.e. basic service backlog: where there is no access to service), standards and appropriate technology To eradicate the bucket system sanitation services in all settlements by 2007 (Informal settlements cannot be met within current financial constraints). 2.1.4 Basic Electrical Services Programme:- Local programmes, determined by policy, need (i.e. basic service backlog: where there is no access to service), standards and appropriate technology To complete electrification of all residences by 2012. 2.1.5 Basic Waste Collection Services Programme:- Local programmes, determined by policy, need (i.e. basic service backlog: where there is no access to service), standards and appropriate technology To standardise waste collection service for all. Core Objective 2B - Conservation of natural resources (Objectives 2.4 – 2.5) Corporate Objective 2.2:- Develop demand management programmes for water, electricity, waste and transport and reduce attendant pollutants. 2.2.1 Incentive Programme:- Introduce financial incentives (e.g. rebates for introducing sustainable technologies for households and business) and disincentives (e.g. step tariffs for electricity, bylaws for sustainable practise, etc) to support more sustainable consumptive patterns. Introduce incentives for brownfield/greyfield redevelopment, enforcement of urban edge, disincentives for greenfield development. To reduce consumption patterns (water, waste, energy, land, etc). 2.2.2 Sustainable Technology Programme:- Energy and Climate Change Strategy. Green Buildings Guideline. Solar Water Heating By-law. Developing industry for sustainable technology (e.g. solar water heater factory, biodiesel refinery, etc). To facilitate the introduction of sustainable technologies (e.g. solar water heaters, low flow showers, waterless toilets, indigenous gardens, biodiesel, biodigestors, re-use of treated sewerage, waste recycling, waste minimisation, etc,). Lead the way by installing said products in government buildings and low cost housing 2.2.4 Demand Management Programme:- To focus more strongly on water and electricity demand management and waste minimisation in order to reduce pollution levels and reduce capital investment requirements. Energy and Climate Change Strategy; Waste Minimization Strategy; Water Demand Management Strategy; Integrated Waste Management By-law. 2.2.5 Environmental Education and Training Programme:- Improve environmental awareness (thus promoting biodiversity conservation) by the co-ordination and facilitation of environmental education programmes for the public, both at a schools level, and an adult education level. Build skills and develop capacity of underprivileged communities through Environmental training and education, thus providing marketable workplace skills Community Cleaning and Greening Initiatives 2.2.6 (2B.2) % drinking water quality compliance with SANS 241 - microbiological requirement, chemical requirement Class 1 2.2.7 (2B.3) Percentage compliance with 4 critical DWAF effluent standards (E-coli count, Ammonia content, Oxygen demanding substances, Total suspended solids) 2.2.8 (2B.4) Ensure recreational waters (bathing beaches, vleis, lagoons, etc) comply with applicable water quality standards to safeguard public health 2.2.9 (2B.5) % Cleanliness of the City (Metropolitan Cleanliness/ Photographic index see Note: 3 below)Shared indicator City of Cape Town Page 73 Contributing departments: SWM, City Parks, Roads & Stormwater Corporate Objective 2.3:- Reduce impact of flooding on community livelihoods and regional economies 2.3.1 Development Planning to Minimise Flood Risk: Includes mapping of flood risk areas, preparation of Stormwater Master Plans, and ensuring development is appropriate for the anticipated flood risk, 2.3.2 Effective and Efficient Infrastructure Provision and Maintenance: Improving service levels by provision of new infrastructure, reduction of backlogs, and ensuring proper functioning of stormwater management infrasturucture in accordance with sound asset management principles. 2.3.3 Appropriate Disaster Risk Planning: Limit the impacts of extreme flood events and assist in recovery. 2.3.4 Communication and Advice to Affected Communities: Capacitate communities to manage flood risk in partnership with city and to understand that flooding cannot be entirely prevented Corporate Objective 2.4:- Conserving Biodiversity and improving quality living environments through greening, education and access. 2.4.1 Coastal Zone Managment Programme:- To enhance the quality of life for residents and tourism potential (ultimately jobs) through conserving and managing beaches, rivers, open spaces and nature reserves. 2.4.2 Nature Reserve Management Programme:- Support key community projects like Cape Flats Nature, Blaauwberg Cconservation Area, False Bay Ecology Park and Two Rivers Urban Park. To ensure nature reserves are managed in a peoplecentred way 2.4.3 New Nature Reserve Programme:- Create at least 3 multi-use nature conservation parks. 2.4.4 Nature Reserves:- The provision of safe recreational space in City nature reserves without compromising ecological integrity. Protection of resource base for present and future residents and tourists (beaches, nature reserves, cultural and heritage resources, etc). Support green economy through responsible tourism; Energy and Climate Change Strategy; Coastal Zone Management Strategy; Biodiversity Strategy; Tourism Development Framework. 2.4.5 Biodiversity Programme:- To undertake 30 000 person days of environmental education on nature reserves per year. To achieve Bidoiversity Network targets and secure sites for present and future generations (Conserve at least 10% of each original extent of vegetation type) 2.4.6 Biodiversity Strategy and Biodiversity Network. To ensure benefits (including jobs) are delivered from conservation of biodiversity. 2.4.7 Natural Areas Protection Programme:- To protect valuable agricultural land and natural areas for indigenous plant use. Remove identified alien invasive species, and follow up to ensure long term removal. 2.4.8 Safe natural areas Programme:- Biodiversity Strategy. Coastal Zone Management Strategy. To enhance the safety of natural areas for all citizens to use for recreation 2.4.9 Urban Edge and Metropolitan Open Space System. Corporate Objective 2.5:- Safeguard human health, protect natural aquatic environments, and improve and maintain recreational water quality. 2.5.1 Minimum Impact Development Planning: Employing Catchment Management Principles, through the preparation of Catchment and River Management Plans and Stormwater Master Plans, to guide and limit the impact of urban development on receiving waters. 2.5.2 Integrated Urban Water Management: Management of the collective impact of the various water processes (water supply, wastewater and stormwater), as well as solid waste disposal, on water resource sustainability, community health and the natural environment. 2.5.3 Communication and Advice to Communities: Awareness programmes focussing on understanding functioning and impacts of drainage systems as well as aquatic processes. Corporate Objective 2C Effective management of City’s Infrastructure and Resources (Objectives 2.6 – 2.9) Corporate Objective 2.6:- Large or bulk infrastructure programmes that are essential must receive priority. 2.6.1 Leakage control Programme:- Key parts of the water reticulation system (e.g. Voëlvlei bulk supply line) need urgent City of Cape Town Page 74 maintenance/ replacement to minimise losses and ensure uninterrupted potable water supply; To rehabilitate/ replace failing water bulk infrastructure (minimum measured leakage). 2.6.2 Reticulation Infrastructure Programme:- Water and sanitation reticulation need several new or enhanced systems to install and commission new water systems. Northern Bulk Water System:- Other bulk water system investment will be required soon for inter alia, treatment and storage especially to supply the northern growth area. Desalinisation:- Desalinisation pilot project at the V&A: Water Services. Bulk Water System:- Bulk water infrastructural investment on the Berg River Dam and System. 2.6.3 Maintenance Programme:- Most of the waste water treatment works need extensive maintenance/ upgrading in order to improve discharge effluent quality standards and reduce consequential environmental and ecological health impacts. To rehabilitate failing waste water treatment bulk infrastructure 2.6.4 Treatment Works Programme:- To rehabilitate/ replace failing bulk infrastructure (or establishment and commisioning of new). Wesfleur Treatment Works Upgrade:- To accommodate growth pressures in different parts of the city, Potsdam, Melkbosstrand, Wildevoëlvlei, Wesfleur & Mitchell’s Plain waste water treatment works need to be upgraded. New Fisantekraal Treatment Works:-New treatment facility (Fisantekraal) needs to be constructed. 2.6.5 Landfill Programme:- To establish and commission new landfill and rehabilitate full landfills Northern landfill:- Establish a new multipurpose landfill site in the far northern region of the city, approximately 45 km from the City centre (to replace four landfills within next five years). Integrated Waste Management (IWM) and waste minimization: Pilots have to be developed in partnership with business and industry, supported by various national departments (notably National Treasury, DTI, DME and DEAT) that will ensure markets are created to ensure successful recycling and reuse of materials that will reduce waste to landfills and impacts on natural resources (Solid Waste Management, Environmental Resource Management). Rehabilitation of old landfill sites To establish and commission new landfill transfer stations. New transfer stations:- Establish three additional transfer stations to compensate for landfill closures, which could also serve as Processing/ Treatment and/or Material Recovery Facilities to support the Council’s (and national) waste diversion and minimisation imperative. Fleet upgrade:- Optimise and upgrade waste collection and cleaning fleet. 2.6.6 Electricity Programme:- To ensure effective electricity provision. Network Infrastructure Refurbishment Plan:- Refurbish or replace ageing Medium Voltage infrastructure, depending on the status of infrastructure Network Infrastructure Growth & Reinforcement Plan:- Extension of the electrical distribution and reticulation network to take care of growth and development: South Peninsula area’s High Voltage supply:- Almost at capacity. Will necessitate an expansion of the network capacity. Helderberg area:- High growth will require the extension of network capacity to sustain electricity supply. Network Infrastructure Reinforcement for 2010:- The accelerated infrastructure reinforcement program for the CBD and 2010 is currently not funded.. Electricity Distribution Industry Restructuring (EDIR): Participate in the EDIR once key direction from the national process has been obtained. Roll-out of RED1:- Finalisation of all regulatory, asset, staffing and administrative aspects to ensure seamless transition of service provision that will not have an impact on the Council’s financial position. ESKOM Supply areas:- Covered by the Eskom Infrastructure development program 2.6.7 Road infrastructure Programme: Annual metropolitan and local road reconstruction and rehabilitation programme. The road network requires continuos reconstruction and rehabilitation as the key infrastructure supporting Public Transport and promoting access and mobility. Road maintenance programme - A well managed and maintained road network. To ensure driver, passenger and pedestrian safety, roads and footways are maintained. Standardisation of Policies, Specifications and Procedures for Roads for the City. Standards, guidelines, policies and specifications applicable to the development and management of all roads and related infrastructure. E.g. Road closures, design specifications,… 2.6.8 Transport, Roads and Stormwater Asset Management Programme:- Development of asset management systems for transport as well as for roads infrastructure to assist with the sustaianble provisioning and management of infrastructure. Well managed transport, roads and stormwater infrastructure and assests through proactive planning and needs based resourcing 2.6.9 Transport, Roads and Stormwater Infrastructure Investment Programme:- Construction of new transport and roads City of Cape Town Page 75 infrastructure through an inhouse infrastructure development unit and via facilitation of appropriate development. Develop and extend road and related infrastructure network in Cape Town in order to underpin a growing economy. Corporate Objective 2.7:- Develop an integrated programme approach to infrastructure and service planning and budgeting. 2.7.1 Public Infrastructure Investment Programme to be developed and implemented in conjunction with key departments (Finance, etc). To improve leveraging of available funds without compromising the Council’s ability to sustain service delivery (trade-off between the cost of investment and income generated or savings induced by alternate measures). Solid waste: phased development of regional landfill sites and associated transfer stations and treatment infrastructure New Water infrastructure – km’s of water piping New sewerage infrastructure – km’s of sewerage piping % Construction / completion of Sewerage Plant upgrades Potsdam, Fisantekraal, Scottsdene, Bellville, Melkbosstrand/Potsdam, Athlone 2.7.2 Staff optimization Programme:-Deliberations in the Metro Bargaining Council to move staff according to service delivery needs, as well as the use of shifts to improve the utilisation and accessibility of infrastructure. Focused employment plan:- supported by formal career development and succession planning tto ensure a sufficiently skilled pool of professionals is developed to manage infrastructure investment projects, programmes, and assets at the correct quality of service. Skills development plan:- (Corporate Services) 2.7.3 MSA S.78(1) investigations Programme:- (Ongoing) to indicate viability of Council or alternate service provision mechanisms. To develop alternative service delivery and infrastructure funding or investment mechanisms. These options could include: Partnerships; Concessions (BOTT); Equity Investments; Realistic tariffs and levies. 2.7.4 Cross-cutting Infrastructure Programme:- Develop an integrated, multi-disciplinary development plan , based on a balanced spatial-growth-and-densification approach, which will indicate priority areas and programmes. (2010 World Cup projects) To establish a more cost-efficient integrated top-down system of programme budgeting, instead of silo-based functional project budgets that cost more when added together. 2.7.5 Integrated, multi-disciplinary development programme:- Integrated development plans, budgets and programme/ project teams that deliver projects within budget and timelines. Sustainable infrastructure asset management plan. To effect repairs or replacement of infrastructure and related equipment per a schedule determined by an asset management programme that is supported by sufficient funds Asset Management Programme:- Develop and implement a sustainable infrastructure asset management programme. 2.7.6 Priority development programmes:- Budget collectively for priority development programmes (where Council must fund this). To establish integrated infrastructure development plans, budgets and programme/ project teams that deliver projects within budget and timelines. Execute the establishment of infrastructure on an integrated programme approach, after which it is handed to line management to maintain and operate. 2.7.7 SAP Asset Management Programme:- Effective deployment and use of SAP asset management module, linked to formal, continuously updated long-range infrastructure planning. 2.7.8 Social infrastructure Programmes to ensure participation by all communities in the City:- Develop social infrastructure to give access to all communities in the City. 2.7.9 Maintenance Programme:- Development and Implementation of a planned infrastructure maintenance programme iro Electricity, Sewerage, Water and Roads & Stormwater. 2.7.10 Asset Care Centre Programme:- Implementation of Asset care centre that is ISO 9001 compliant at various Electricity sites. Electricity Services: Development and implementation of an Asset Care programme City of Cape Town Page 76 2.7.11 Solid Waste Management:No. of depots ISO 9001 accredited, Replacement of existing Council owned refuse compactors with FML vehicles (No)Replacement of Specialised vehicles (No) 2.7.12 Water Services: Reduction in proactive maintenance backlog 2.7.13 Maintenance of existing infrastructure - Roads 2.7.14 % Reduction in backlogs in new Roads infrastructure. Note: % backlogs calculated relative to the total length of the existing road network with single storey dwelling units having 6m of road frontage. City of Cape Town Page 77 Strategic Focus Area 3:- Public Transport Systems Core Objective 3A Improve public transport system and services (Objectives3.1 – 3.6) Corporate Objective 3.1:- Improve public transport services and secure new investment in infrastructure 3.1.1 Public Transport Service Improvement Programme:- Managing public transport system for growth. Effective monitoring the Scheduled Public Transport Services. (Securing greater investment in rail and bringing existing system to good state of repair, Implementation of Taxi Recaptialistation Process, Converting interim bus contract in subsidised service contract (negotiated contracts). Ensure environmentally friendly technologies used in purchases of new public transport vehicles – incentives. Reduce commuter travel time. Corporate Objective 3.2:-Promote use of public transport. Create a unified road-based public transport system utilising the optimum mode for a particular route/corridor. Promote use of public transport to access all facilities and services and reduce the need to use private cars. 3.2.1 Interchange Programme:- Design and Construction of Improved and New Public Transport Interchanges. Creation of a unified road-based public transport system utilising the optimum mode for a particular route/corridor 3.2.2 Prioritiy lane programme:- Public Transport Priority Lanes. Enforcement of existing priority lanes.Construction of new priority lanes. Promote use of public transport to access all facilities and services and reduce the need to use private car. 3.2.3 Transport access programme:- Accessibility to Public Transport Facilities for passengers with special needs. Provision of the Dial-a-Ride Service. Model Contracts for Learner Service. Provision of Long Distance Facilities 3.2.4 Fare and Ticketing Programme:- Development and Implemenation of Integrated Fare Management and AVL System. Supporting Systems (Integrated ticketing, safety and security, information). Improved regulation and access control at facilities. Develop Fare Policy and Subsidy Policy Corporate Objective 3.3:- Reduce the demand for travel and create conditions for all day public transport services. 3.3.1 Travel Demand Management Programme:- Ensuring a sustainable level of travel demand where growth in traffic is less than the growth in population.Better distribution of trips throughout peak period. (1) Encouraging travel behaviour changes. (2)Car parking management system. (3)Restraint measures. (4)Incentives. (5)Land use changes. To reduce demand for travel and to create conditions for all day public transport services 3.3.2 Road Network Programme:- Establish a Safe and Efficient Road Network to ensure a balanced plan with major increases in NMT and public transport travel. People and goods can move safely on the road network by the most efficient modes and routes and minimising the impact of traffic on the environment: Reinforce road hierarchy Remote traffic monitoring systems Freeways – serve inter and intra – regional Expansion of CCTV on major roads connections for high volumes of people and goods Improved law enforcement Priority given to efficient passenger transport. Safe & quieter local streets. Target key bottlenecks Road investment strategy. Connecting new growth areas Ensure provision of safe pedestrian crossings, bridges Efficient use of existing road network. etc, especially in busy urban environments (i.e. Cape Town CBD) Corporate Objective 3.4:- Integrate Land Use and Transport 3.4.1 Business Decentralisation Promotion Programme:- Transport investment to support City Plan. Land use planning to reinforce investment in transport infrastructure and services through good urban design and zoning.Decentralise job opportunities/develop closer to residential areas. Possible relocation of big companies Transport planning to support urban renewal programmes. Corporate Objective 3.5 Ensure that freight moves efficiently and safely within the City 3.5.1 Freight Movement Programme: Keeping road freight moving Principal routes City of Cape Town Page 78 Primary routes Secondary routes Tertiary routes. Managing freight movement in local areas Minimise freight movement updates on surrounding communities. Intermodal facilities. 3.5.2 Non-motorised Transport Programme:- Encourage more people to walk and cycle through education programmes. Ensure that NMT1 is safe and attractive and provides an alternative mode of travel not only as a feeder mode but as a main mode of travel on short origin/destination routes. Ensure that pedestrian and cyclist planning is integrated with all transport initiatives (integrated planning approach). Ensure greater connectivity between NMT and other transport modes. To ensure investment in infrastructure for NMT and to create appropriate environment for this mode of travel by concentrating job opportunities close to residential areas. Supporting other transport modes.– walking, cycling, public spaces Development of City-Wide NMT Network. Development of NMT on the Klipfontein Corridor Corporate Objective 3.6:- Develop and implement a transport asset management plan for the City 3.6.1 Transport Asset Management Programme:- To develop and implement an asset management strategy for the Transport department *Asset Management Policy *Fixed asset information management system *Movable asset management Register *Asset Maintenance management plan *Staff resource plan 1 Non-motorised transport City of Cape Town Page 79 Strategic Focus Area 4:- Integrated Human Settlements Core Objective 4A - Improve and develop Integrated Human Settlements (Objectives 4.1 – 4.3) Corporate Objective 4.1: Transform dormitory suburbs into areas which support a greater mix of land uses, offer a range of amenities and are socially mixed facilities 4.1.1 Integrated Human Settlement Programme:- To transform dormitory suburbs into areas which support a greater mix of land uses, offer a range of amenities and are socially mixed facilities. Area based, cross-sectoral urban renewal programmes. Local area economic development (also mentioned in the economic section. Public spaces programme. Dignified places programme (burial and initiation). Memory programme. Meeting the coast 1 IHSS Projects in Urban Renewal Areas. Corporate Objective 4.2: Put in place policy and spatial planning frameworks that will facilitate the development of integrated human settlements. City Development Strategy City-wide spatial development framework District Plans Framework for the development of quality open spaces Environmental Management Frameworks Corporate Objective 4.3:- Develop and maintain zoned public open spaces, cemetries, beaches and resorts. 4.3.1 Zoned Public Open Spaces Equity Programme: Development and implementation of plans to ensure the equitable delivery of services. Development and implementation of park maintenance and development standards. Zoned Public Open Spaces Accessibility Plan.Ensuring influence on planning phases 4.3.2 Monitoring sustainability Programme:Sustainability Report:- Monitor and report annually on progress towards sustainability in Cape Town, thus improving transparency and accountability and highlighting key development and conservation issues. Portfolio of Sustainability Best Practice:- Monitor and report annually on sustainability of City led projects, thus improving transparency and holding decision makers accountable, while showcasing those projects that achieve a high sustainability rating 4.3.3 Beach and Resort Management Programme: Implementation and maintenance of the Beach Management Plan and the sustainable redevelopment and maintenance of Resorts 4.3.4 Environmental Auditing Programme:- Improve the environmental performance and efficiency of key service functions in the City (e.g. solid waste management, wastewater) through the development and implementation of an Environmental Auditing programme. 4.3.5 Cemeteries Management Plan:- Development and implementation of cemetery management plans. Cemeteries Service Plan:- Alignment of current cemetery plan with City’s spatial development service delivery plan. Post Capacity Plan:- Development of plans for post capacity use of cemeteries. Cemetery Service Delivery Mechanisms Plan:- Identification of alternative burial options for implementation. Core Objective 4B - Delivery of housing opportunities (Objectives 4.4 – 4.7) Corporate Objective 4.4: Development and Implementation of a incremental housing programme. 4.4.1 Incremental Housing Programme:- To commence the new programme of Incremental Housing. To provide serviced sites that may be occupied immediately and the top structures built later. Site and Services provision. Corporate Objective 4.5: Development of new housing opportunities. 4.5.1 Rapid Land Release Programme:- To conduct Land Identification and Packaging. To release and bank land for housing at an accelerated rate. Ensure it is done in an environmentally sustainable and socially just manner. Corporate Objective 4.6: Increase rental stock through social housing partnerships 4.6.1 Social Housing Programme:- Effective provision of Council Rental Stock. Provide a significant number of new rental housing City of Cape Town Page 80 opportunities Corporate Objective 4.7: Redress land ownership inequities by providing Housing based on Restitution claim settlements. 4.7.1 Restitution-Based Housing Development Programme:- To ensure settlement of restitution claims through housing provision where applicable. To have completed to process all claims and work towards completion of implementation. Corporate Objective 4.8: Facilitate gap housing programmes through partnerships with Banks and private sector developers. 4.8.1 Gap Housing Programme:- Ensure the creation of housing opportunities for the Gap market To create a platform for banks, developers and low-income earners to interact. To have vibrant housing programme driven by the forces of supply and demand. Ensure land release to Banks 4.8.2 Informal Settlement Upgared programme: Planning and provision of services and communal amenities. To ensure provision of services and emeities enjoyed by all citizens City of Cape Town Page 81 Strategic Focus Area 5:- Safety and Security Core objective 5A - Foster a safe and secure environment (Objectives 5.1 – 5.6) Corporate Objective 5.1 Community and youth programmes directed at reducing crime and lawlessness. 5.1.1 Crime prevention programme focusing on: Increased levels of proactive visible policing Improved participation on community Police Forums within the Cape Town Metropolitan Area. Enhance effective crime prevention in respect of identified crime categories 5.1.2 Crime and disorder reduction partnership programme focusing on: Promote partnership policing with public institutions, business, private security industry and the public in cooperation with SAPS addressing crime and anti-social activity within the City. 5.1.3 Educational and empowerment social crime prevention program focusing on: Addressing the causes anti-social behaviour. Educational and life skills empowerment of youth and identified communities Support families` dealing with difficulties in their life in respect of drug-based crime (rehabilitation) Engender a sense of community (shared responsibility) through participation and involvement at the community level. Support the Provincial Safer Schools Program. Support improving people’s quality of life through addressing the root causes of crime and anti- social behaviour. Corporate Objective 5.2:- The improvement of urban design to reduce crime and emergencies. 5.2.1 Crime prevention through environmental design (CPTED) programme focusing on: Develop and adopt a policy for safer design guidelines. Incorporate in the briefs for new and upgraded facilities the need to design in accordance CPTED. To reduce crime and anti-social behaviour through the utilization of urban and building design principles. Corporate Objective 5.3 The on- ongoing expansion of the CCTV network covering key economic and transport locations as well as crime hot spot areas. 5.3.1 Further out roll of CCTV Network programme:- Expansion of the City’s Closed Circuit Television in identified areas Corporate Objective 5.4 Improve law enforcement (traffic policing, licencing services and general law enforcement) through more visible actions. 5.4.1 Departmental service delivery improvement programme focusing on: Productivity, effectiveness and efficiency of department Enhance/improve public image of metro police Enhance service delivery and operational effectiveness Build an enabling institutional framework to sustain an ethical policing environment 5.4.2 Traffic and pedestrian safety programme focusing on: Increased visible policing and public transport enforcement initiatives. Adopting a zero tolerance approach towards traffic offences. Increase road and pedestrian – safety 5.4.3 Traffic and licensing service improvement programme focusing on: Reduced waiting periods in respect of appointments for learner/driving test Improve traffic and licensing service delivery 5.4.4 City’s by-law enforcement programme:- Effective by-law enforcement. Corporate Objective 5.5 Develop of disaster risk assessment and pro-active disaster prevention and response plans. City of Cape Town Page 82 5.5.1 Disaster risk management centre programme focussing on: Effective functioning of disaster risk management centre Integrated stakeholder participation and cooperation Ensure the optimal functioning of the Disaster Risk Management Centre 5.5.2 Disaster Risk Assessment Programme focusing on: City-wide participation in disaster risk assessment Establish a uniform approach to assessing and monitoring disaster risk Generating a disaster risk profile for the City of Cape Town 5.5.3 Disaster Risk Reduction Programme focusing on: Developing and implementing integrated disaster risk management and risk reduction plans. Continuous monitoring of effectiveness of risk reduction programmes. Protecting the assets of the City, government, business and communities. Ensure Integrated disaster risk reduction planning and implementation 5.5.4 Educational and empowerment programme (Disaster Risk Assessment) focussing on: Communities at risk Schools and higher education Commerce and Industry 5.5.5 Integrated disaster response and recovery programme to ensure efficient: Multi-disciplinary response Co-ordinated relief, rehabilitation and reconstruction efforts Ensure effective and appropriate disaster response and recovery within the municipal area Corporate Objective 5.6 Fast, efficient and equitable emergency response to safeguard life, property, the environment and livelihoods. 5.6.1 Fire safety programme focusing on: Development, implementation, policing and enforcement of Community Fire Safety and other relevant by-laws. Develop and implement industry best practice standards ( fire investigation methods) A higher standard of fire inspection practices and processes. Complying with SANS 10090 (Community protection) response and attendance time Decrease in the loss of life and property as a result of fires. 5.6.2 Preventative Community Fire Safety programme focusing on: Schools education Work with those most at risk from fire Forming multi-agency partnerships to reduce fire risk Publicity and campaign efforts A fire aware and better-educated community 5.6.3 Service improvement program focusing on: Improve the productivity, effectiveness and efficiency of operations Workforce development Resource management 5.6.4 Volunteer programme focusing on: Volunteer recruitment and retention Better trained volunteer firefighting resources Improved level of equipment for volunteer fire fighting units A fire service that cares for and support its volunteers. Building and sustain capacity to respond and recover. 5.6.5 107 programme to ensure: Equitable access to emergency service providers. Ensuring technological enhancement (107) Improving access to emergency service providers in life and/or property threatening situations (107) Improves the community’s ability to respond to emergencies and security threats DEPARTMENTAL OBJECTIVES City of Cape Town Page 83 5A.1 % Reduction in the number of council properties being used for illegal drug dealing and illegal liquor trading 5A.2 Reduction in the number occurrence of by-law infringements 5A.3 Reduce the number of council land illegally occupied 5A.4 % reduction in the number of incidence of corruption within the organisation 5A.5 % decrease in the number of road accidents 5A.6 Reduce turnaround time between application and appointment to learner / driving licenses. 5A.7 % Reduction in the incidence of crime where the CCTV network cameras are installed 5A.8 Percentage implementation of Disaster Plans according to legislative requirements 5A.9 % compliance of fire stations to risk standards 5A.10 Percentage calls (Fire and Disaster Management) responded to within 14 minutes from receipt of emergency call up to arrival at scene City of Cape Town Page 84 Strategic Focus Area 6:- Health, Social and Human Capital Development Core Objective 6A - Facilitating the development of a healthy and socially inclusive society (Objectives 6.1 – 6.5) Corporate Objective 6.1 :- Faciitate the provision of childcare facilities and services to promote holistic childhood development 6.1.1 Facilitate the Provision of Child Care facilities through partnerships with governmental and non-governmental entities 6.1.2 Facilitate Capacity Building programmes: Training of crèche management structures and pre-school educators in the home-based care sector; facilitate the formalisation of home based ECD crèches (linkages to environmental health and planning sectors). 6A.3 Number of capacity building programmes with the pre-school sector implemented 6.1.3 HIV/AIDS orphans: 6A.1 Number of new Child Care facilities provided in partnership with governmental and nongovernmental entities. 6A.2 Number of partnerships initiated to positively impact on the lives of HIV/AIDS orphans Corporate Objective 6.2 :- Use of Community Amenities and Facilities to implement programmes that impact on antisocial behaviour (eg Drugs and Crime) 6.2.1 Life skills Development Programme: Implementation of life skills development programmes amongst youth, women and children to address issues of drug and substance abuse, HIV/AIDS and crime. 6A.4 Number of life skills development programmes focussed on substance abuse; HIV/AIDS and crime implemented with youth, women and children 6.2.2 Sport and Recreation Development Programme:- Implementation of sustainable volunteer, recreational and sport outreach programmes; Development of strategic partnerships with sports federations; Strategic sports events and partnership plan with the soccer fraternity in the lead up to 2010. 6A.5 Increase number of strategic sporting partnerships, programmes and events implemented 6.2.3 Library educational, recreational and cultural programme: implementation of programmes that will focus on the reading, educational and recreational needs of communities. Corporate Objective 6.3: Implementation of programmes to address the plight of Street People 6.3.1 Rehabilitation Programme: Facilitation of partnerships to create jobs and address the substance abuse and other psychosocial needs of street people 6.3.2 Reintegration Programme: Facilitation of partnerships aimed at uniting street people with their families and communities of origin. 6.3.3 Local Networks of Care Programme: Strengthening of families and communities to prevent the increase of people moving to the streets. Corporate Objective 6.4 :- Provision of effective environmental health services including Air Quality Management and Pollution Control programmes (Including noise pollution). 6.4.1 Environmental Health Programme: Potable water sampling Food control Informal settlement monitoring Noise control Vector control Community outreach Monitoring of food premises 6.4.2 Implementation of the Air Quality Management Plan -To improve air quality and reduce adverse health effects 6A.7 Number of days when air pollution exceeds WHO guidelines 6A.8 Percentage of airspace saved in relation to the volume of waste disposed of City of Cape Town Page 85 6.4.3 Integrated Pollution control - To develop and implement an integrated pollution control strategy for the City. Corporate Objective 6.5:- Provision of effective primary health care services in close collaboration with Provincial Health Services with a special emphasis on maternal and child health care and HIV/AIDS/STI and TB control. 6.5.1 Implementation of an Effective Child Health Programme: Reduce Infant Mortality Rate (IMR) Reduce deaths from GE Reduce < 5 mortality Improving immunisation coverage Access to curative services 6.5.2 Maternal Health Programme:- Provide an effective women’s health service across the City by inter alia: Increasing cervical smear coverage Improving access to ante natal care Family Planning service Reduction in teenage births < 18 yrs 6.5.3 HIV/AIDS/TB Programme:- Integrated HIV/AIDS /STI & TB programme in partnership with PGWC by inter alia: Increasing VCT Access to ART ABC campaign Improving smear positive TB cure rate Partnerships with NGO’s, CBO’s etc (MSATS) HIV/AIDS strategy developed & mainstreamed Improved access to STI services 6.5.4 District Health Programme: Joint District Health Plan (DHP) Development of a DHP in collaboration with the PGWC Health Department 6.5.5 Primary Health Care Facilities facility building programme (applicable to all PHC objectives). Access to Community Facilities Linkages with Integrated Human settlements City of Cape Town Page 86 Strategic Focus Area 7:- Good governance and Regulatory reform Core objective 7A - Ensuring enhanced service delivery with efficient institutional arrangements (Objectives 7.1 – 7.2; 7.4 & 7.6) Corporate Objective 7.1:- Optimising the development of our Organisation staff structure, strategies, policies and promote skills development. 7.1.1 A comprehensive human capital programme focusing on: Remuneration and human resources strategic planning, human capital development, resourcing and capacity planning, talent management and retention. Labour flexibility and mobility- Getting the right people with the right skills in the right place at the right time Review and redesign HR policies and procedures which have a direct impact on the strategic imperatives of the organization –improve HR regulatory environment Maximizing return on human capital investment-- linking HR Management performance objective and indicators to the overall Business Strategy Develop, align and manage human capital. 7A.4 Implementation of Staffing Strategy 7A.3 Completion of the stabilisation intervention 7A.2 Reduction in absenteeism leading to improved staff productivity 7A.4 Staff Development maximised through Corporate Human Capital Management Strategy and WPSDP 7.1.2 Employment equity Programme:- ( including gender and disability). Diversity and equality enhancement 7.1.3 External bursary scheme and learnership programme: To support strengthening the city’s skills base, competetitiveness and access to opportunities. Support external skills development Corporate Objective 7.2:- Enhance service delivery through exploring alternative service delivery mechanisms. 7.2.1 Process Improvement Programme focusing on: Identify and reengineer key/core service realization process such as: Procurement Housing Provision Building/development plans Strategy development and implementation Support services Develop and sustain customer driven service delivery processes and structures. (Citizen and business centred services) Streamline key business processes and support processes to achieve efficiencies and deliver an efficient, cost-effective service to the public. 7.2.2 Organization-wide focused efficiency programme: Improving operational efficiency- (free more resources for critical front-line services. Identify and remove administrative bottlenecks Develop and implement value-add scorecards for support services Increase in productivity and optimization of available resources- improve cost effectiveness of doing business. 7.2.3 New Ways of Working Programme:- Feasibility investigations driven by the imperative to create and sustain a proper staffed and responsive administration delivering on its constitutional mandate and strategic imperatives. The key areas are: Governance strategy and functioning (Operations Integration Strategy) Service delivery strategy (Operations Integration Strategy) Support services strategy ( Operations Integration Strategy) Area service integration and co-ordination ( Operations Integration Model) Institutional transformation strategy ( As informed by inter alia the Operations Integration Strategy) Enhance service delivery performance through the implementation of sustainable and viable service delivery models and maximum resources allocated to mandatory functions. 7A.5 Development and implementation of Quality Management Programme 7.2.4 Operations Integration Programme:- 7A.5 Implementation of an Operations Integration Model to optimise service efficiency Corporate Objective 7.3:- Strategically utilise information technology, validated data bases and systems to support the City of Cape Town Page 87 transformation of public services to provide better and more efficient government and reporting structures. The two primary programmes are: 7.3.1 A user- friendly integrated management information programme 7.3.2 e- HR programme Strategically use information and knowledge management to drive change and improve decision-making. 7.3.3 Information technology programme focusing on: Provide on line e-government services Develop measurements to assess ROI of information technology investments Enhance staff skills and competency in technology utilization. Providing the platform through which the quality and efficiency of services can be improved. 7A.5 Number of line departments databases cleaned Corporate Objective 7.4: Improve the service culture and workplace ethics by accomplishing sound financial governance, improved accountability and transparency. 7.4.1 Service and workplace ethics programme focusing on: A policy framework for service delivery underpinned by core values and principles that guide development and citizenship Develop a citizen focussed service quality culture Promote the provision of quality services to the public through improving the service culture and workplace ethics 7.4.2 Anti-corruption programme:- Develop and maintain clean and transparent governance. Corporate Objective 7.5:- Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management 7.5.1 Financial sustainability programme focusing on: Identify alternative income sources Reengineer all key financial processes such as debts collection process. Improve cash-flow management Alternative funding mechanisms Indigent support The City will have growing and sustainable income streams 7A.6 Maintain City’s credit rating 7A.1 Improved turnaround time of tender procurement processes 7.5.2 Asset Management Programme: Focussing on reducing service delivery risks and financial risks Manage assets in a sustainable manner 7.5.3 Risk Management Programme focusing on: Service delivery risks Legal risks Financial risks Risk Management -Monitor, review and report on the Council’s key risks Corporate Objective 7.6:- Improve the regulatory environment (Bureaucratic red tape). 7.6.1 Land Reform Programme (currently be driven by the PGWC):- Review, alignment and streamlining of planning, heritage and environmental legislation and respective powers and functions of the different spheres of government perceived to cause bottlenecks within a sustainable development approach 7.6.2 Integrated Zoning Scheme, Spatial Planning and Land Use Planning Policy Programme:- Review and align current Council policies and regulations and build a legible and equitable policy and regulatory environment for decision-making on the built environment 7.6.3 Turnaround Time on Plan Approval: 7A.3 Percentage improvement on turn around time on applications for building plan approval completed within the statutory time frame of <500m sq it is 30 days and > than 500m sq it is 60 days. - number of plans finalised as a percentage of plans submitted 7A.4 Percentage improvement on turn around time on applications for land use approval completed within statutory timeframes City of Cape Town Page 88 of between 4 and 7 months Corporate Objective 7.7:- Establishment of representative Ward Participatory Mechanisms. Corporate Objective 7.8:- Improvement of Community satisfaciton. City of Cape Town Page 89 Annexure G: Scorecard Indicator Definitions FOR 2007 - 2008 IDP 07/08 Objectives 1 Shared Economic Growth and Development. 1.1 Create an enabling environment for the economy to grow City Indicators 2 Sustainable Urban Infrastructure and Services. KPI – Standard / Norm / Benchmark Direct jobs are defined as those directly created through the implementation of the Department of Economic and Human Development (EHD) and tourism services and local economic development initiatives and programmes, including capital projects. No formula- absolute number collected by project managers and agencies reported quarterly. Currently, the job creation figures in the tourism sector are based on either the World Tourism Organisation standard of 12 international tourists create 1 job or the City of Cape Town standard of 19 international tourists create 1 job. 1.1.1 Number of direct job opportunities created 1.1.2 Rand Value of direct investment 1.2 Preparations for hosting the FIFA 2010 World Cup in accordance with FIFA’s requirements and the City’s developmental objectives 7.9 Universal access to basic service KPI – Definition (How is it to be measured) A monetary measure (Rand Value) of new investment in Cape Town secured by Wesgro and the Sector Organizations in one year. Direct investment in a City is an important component of a growing economy and a catalyst for development in disadvantaged areas. Wesgro is the City’s vehicle for direct investment promotion. The Sector Organisations the City supports also secure direct investment in the City. Wesgro programmes and sub programmes investment promotion (investor targeting, joint marketing, missions, leveraging); investment facilitation, retention and expansion of new and existing investors, advocacy and strategic partnership management. Various by the Sector Organisations as part of their strategic plans and programmes. No formulaAbsolute Rand Value per quarter recorded and reported. 1.2.1 Conformity with FIFA’s Local Organising Committee agreed programme 2.1.1 Percentage of households with access to basic levels of sanitation (NKPI) This indicator refers to household access. The %'s are based on an estimated City-wide household count of 847 000 (732 000 formal and 115 000 informal). Basic Service delivery refers to informal household access to water (informal - 1 tap : 25 household), sanitation facilities (informal - 1 toilet : 5 households), solid waste removal (integrated area cleaning and refuse removal per household) and electricity connections (including subsidised connections) 2.1.2 Percentage of households with access to basic level of water (NKPI) This indicator refers to household access. The %'s are based on an estimated City-wide household count of 847 000 (732 000 formal and 115 000 informal). Basic Service delivery refers to informal household access to water (informal - 1 tap: 25 household), sanitation facilities (informal - 1 toilet: 5 households), solid waste removal (integrated area cleaning and refuse removal per household) and electricity connections (including subsidised connections. Backyard dwellers are not added in the denominator, as it is taken that a backyard dweller is serviced by way of sharing the formal connection with the owner or tenant. (Total informal households serviced + Total formal households serviced) / All households in City. Total informal households serviced currently calculated on average as total no of taps x 25 hh/tap. City of Cape Town 90 Page In future this needs to be improved to numerically tie individual taps to individual shacks to ensure condition of 200m distance away is achieved and that all settlements are serviced. 2.2 Conservation of natural resources 2.1.3 Percentage of households with access to basic levels of Electricity (NKPI) This indicator refers to household access. The %'s are based on an estimated City-wide household count of 847 000 (732 000 formal and 115 000 informal). Basic Service delivery refers to informal household access to electricity connections (including subsidised connections). Based on the average number of customers in a given period assuming that they all purchase monthly in the case of Prepaid customers. 2.1.4 Percentage of households with access to basic levels of solid waste removal (NKPI) The indicator reflects the % of formal properties ( households) with access to the basic collection service, which is a once weekly door- to door containerized refuse collection service (240 L containerised service) Physical monitoring on a daily basis with SAP records reflecting actual billing 2.2.1 Percentage reduction in unconstrained water demand Indicator refers to actual potable water usage below the predicted unconstrained demand curve, which is a theoretical curve starting in 200/2001 predicting what consumption would be if usage patterns of that time were to continue growing unabated. The aim is to see how far Water Demand Measures can reduce the actual usage below this curve. The actual usage comes from the Bulk Water's total monthly water treated, which is compared on a 12-month rolling basis (to flatten seasonal variations) with the theoretical curve ****** ex SAP, total water bought by the City ex treatment works - is it in SAP or is only water sold in SAP ??? (The 12-month rolling demand curve values - The 12-month rolling value of monthly bulk water treated) / the 12-month rolling demand curve values = to get % 2.2.2 Percentage compliance with 4 critical DWAF effluent standards (Ecoli count, Ammonia content, Oxygen demanding substances, Total suspended solids) 2.2.3 Ensure recreational waters (bathing beaches, vleis, lagoons, etc) comply with applicable water quality standards to safeguard public health The overall average of % samples passing tests for 4 parameters at each works: TSS 25mg/l, COD 75mg/l, NH3 10mg/l, E Coli 1000/100ml. A flow-weighted version is also possible, where the total flow at each work is used to give proportional weight to the result for that works, but is not used in this indicator. Spreadsheet calculates average compliance for 4 parameters at each works and gets the overall average monthly. This indicator applies to bathing beaches, vleis and lagoons officially designated for recreational purposes only and not the urban rivers. Coastal waters are sampled fortnightly and inland waters are sampled monthly. The following standards based on Water Affairs and Forestry National Water Quality Standards for full and intermediate contact recreation apply: (1) Full contact recreation (i.e. Swimming, surfing, etc): a. 80th percentile of sample results over 12 months < 100 Escherichia coli counts / 100ml water b. 95th percentile of sample results over 12 months < 2000 Escherichia coli count / 100ml water. (2) For intermediate contact recreation (i.e. Fishing, canoeing, etc): Median of sample results over 12 months < 1000 faecal coliform counts / 100 ml water. 2.3 Effective management of 2.3.1 Development and Implementation of a planned City of Cape Town 91 Page Every formal property is serviced once a week. No residential property is excluded. New properties are provided with a container once occupied. Monitoring is done by the refuse collection teams. A 1% deviance to the 100% target is made to provide for continuous growth in developments City’s Infrastructure Resources 3 Public Transport Systems. 4 Integrated Human Settlements. and 7.10 Improve public transport system and services 4.1 Improve and Integrated Settlements develop Human infrastructure maintenance programme iro Electricity, Sewerage, Water and Roads & Stormwater 3.1.1 Reduction of average commuter travel time(home to work – peak period) 3.1.2 Number of dedicated bus lanes introduced 3.1.3 Progressive evolution towards a single point of authority for transport 4.1.1 Provision of safe and clean community facilities 4.1.2 Maintain Community Facilities 4.2 Delivery opportunities 5 Safety Security. and of housing 7.11 Foster a safe and secure environment 7.12 Facilitating the development of a healthy and socially inclusive The introduction of dedicated public transport lanes. The indicator will be measured from the capital projects implemented within the Transport Corridors. The indicator will be measured by the milestones reached in achieving a single point of authority for transport i.e. protocols agreed to, draft founding document , legislation compiled, legislation promulgated etc. Percentage spend on the capital budget allocated to the development of new community facilities and the upgrade of existing community facilities (Sport and recreation facilities, resorts, cemeteries, zoned public open spaces, libraries, clinics). Development of minimum maintenance standards for the different categories of community facilities (Sport and recreation facilities, resorts, cemeteries, zoned public open spaces, libraries, clinics, beaches) and the percentage adherence to these established standards. 4.2.1 Number of housing opportunities created Quantity, number of houses (top structures) built that is ready for beneficiaries to occupy. Monthly evaluation, counting of houses via Project Managers and verified by signed beneficiary form. Not captured on SAP. Budget is captured on SAP and each project is allocated a budget and a project is created on SAP. 5.1.1 Adherence to the approved Metropolitan Police Plan The SAPS Act required Department to draft an Annual Police Plan which sets out its objectives for next financial year. It will be measured according to the extend to which the Dept meet the identified objectives in the Plan. Still in development phase of 2007/08 plan. 5.1.2 Number of working cameras installed to increase the City’s CCTV network Expansion of the City’s CCTV network to Woodstock, Observatory, Liesbeeck Park Way and Salt River in order to increase its crime/traffic offence prevention and detection capabilities. Actual camera systems will only be in place towards end of financial year however, the project has been broken down in 10 measurable milestones. The milestones for mid-year have all been achieved. 5.1.3 Percentage implementation of Disaster Plans according to legislative requirements 5.1.4 Percentage calls (Fire and Disaster Management) responded to within 14 minutes from receipt of emergency call up to arrival at scene 6 Social and Human Capital Development. The average travel time for commuters from home to work. The indicator will be measured using EMME2 Transport model with 2004 household survey as a base. 6.1.1 % Increase access to Community facilities City of Cape Town 100% adherence objectives. 100% adherence It indicates a percentage of the total number of incidents received by the Fire & Rescue Service, to which have been responded to and arrived at the required incident within 14 minutes of receipt of call. Tracked by a call taking and dispatch system Development of standards for the utilisation of the different categories of community facilities and the tracking and monitoring against these standards for increased usage/access through the development of in-house programmes, public/private 92 Page 14 minutes to society partnership arrangements and/or service level agreements . 6.1.2 Increase number of strategic sporting partnerships, programmes and events initiated Number of Partnerships and Service Level Agreements secured with sporting federations, the soccer fraternity and major sporting events. These are strategic initiatives aimed at elevating the profile of the city pre and post 2010. 6.1.3 Number of days when air pollution exceeds WHO guidelines 6.1.4 Percentage reduction of airspace used in relation to volume of waste disposal Any day when any one of the criteria pollutants at any one of the 10 air quality monitoring stations in the City exceeds WHO guideines. 6.1.5 Reduce infant mortality rate (per 1000 live births) Number of deaths < 1 year per 1,000 live births for that year Data collected by Health Information births and deaths 6.1.6 Slow the rate of increase of TB per 100 000 of Cape Town Population Total Number of TB cases per 100 000 population. Baseline of 177 days. Dependent on weather conditions and pollutants This indicator reflects the % of airspace saved by diverting recyclables from the waste stream in relation to the volume of waste disposed of. Implementation of waste of waste reduction strategy (greens chipping, rubble crushing, composing, streaming and MRF, industrial waste. % reduction in airspace = total waste stream diverted (cub.m – m3) / total waste disposed (cub.m – m3) Electronic TB Register (ETR.Net) and DHIS Population. Total Number of TB cases/Total Populationx100 000 6.1.7 Slow the rate of increase of the City’s antenatal HIV prevalence Prevalence of HIV in tested Antenatal Women. VCT Registers and Data Management System (In-House City Health). Number of Antenatal Women tested HIV +ve/Total Number of Women testedx100. 7 Good governance and regulatory form. 5.3 Ensuring enhanced service delivery with efficient institutional arrangements 7.1.1 Improved turnaround time of tender procurement processes 7.1.2 % reduction in absenteeism leading to improved staff productivity 7.1.3 Percentage improvement on turn around time on applications for building plan approval 7.1.4 Percentage improvement on turn around City of Cape Town There are 2 measures that we are taking into account ; A) Tenders are believed to be completed in 6 weeks from the closing to award, this is the norm. Therefore we have improved from 15.5 down to 8 weeks representing the improvement. B) Orders are based on a norm of not having any unprocessed requisitions calculated on a 22 day working month. The result in the first quarter shows that we are behind the norm. The net result of a and b is that we have improved the SCM processing by the % indicated. Tenders are believed to be completed in 6 weeks from the closing to award Benchmark - 4.9%. It is the number of building plans finalised from the time submitted with Council as a clean plan until completely finalised and returned to the applicant It is the number of land use applications finalised from the time submitted with Council until application is completely finalised and returned to the applicant 93 Page time on applications for land use approval 7.1.5 Implementation of an Operations Integration Model to optimise service efficiency 7.1.6 Maintain City’s credit rating 7.2 Management of key financial areas such as income control, cash flow, indigent support, alternative income opportunities, asset management and risk management. Rating determined by external company 7.2.1 Net Debtors to Annual Income [Ratio of outstanding service debtors to revenue actually received for services (NKPI)] Net Current debtors: Is the balance of debtors that are classified as current for financial statement purposes, but excluding the short-term portion of long-term debtors. The provision for bad debts is deducted from the current debtors’ balances. Provision for bad debts: Is the amount set aside as a provision in the accounting records to take into account the possible non-payment by debtors. Total Annual Operating Income: Income from all sources that will be credited to the income statement for financial statement purposes in accordance with prescribed financial statement formats but excluding conditional grants for capital expenditure, housing receipts attributable to the Housing Development Fund, new housing subsidy scheme receipts, public contributions and gains on the disposal of property, plant and equipment. The mid-year calculations for operating income are based [on the actuals up to the current period plus the budget for the remaining period. 7.2.2 Debt coverage by own billed revenue (NKPI) Own billed revenue to loans outstanding. Total own billed income: Income from all sources that will be credited to the income statement for financial statement purposes in accordance with prescribed financial statement formats. Total debt: Aggregate of longterm liabilities, short-term liabilities including bank overdrafts, hire purchase liabilities and finance lease liabilities but excluding trade creditors, consumer deposits, payments in advance from consumers and provisions, debt related to sinking fund investments is reduced by the investment. The mid-year calculations for own billed revenue are based on the actuals up to the current period plus the budget for the remaining period. 7.2.3 Percentage of City’s Capital budget spent (NKPI) % reflecting Actual spend / Planned Spend – SAP Report Nationally and Provincially there’s no benchmark although National has indicated that as far as the Capital Budget is concerned they are flexible as it varies from each municipality. Therefore in the nutshell 100% must be spent. % reflecting Actual spend / Planned Spend – SAP Report Nationally and Provincially there’s no benchmark although National has indicated that when reviewing Midyear Assessment on Operating Budget their expectation is between 48% and 55%. Therefore in the nutshell 7.2.4 Percentage of City’s operating budget spent City of Cape Town 94 Page 100% must be spent. 7.3 Establish effective community engagement channels 7.2.5 Ratio of cost coverage maintained Total cash and investments (short term) to monthly operating expenditure. Cash and cash equivalents refer to the short term investments and cash available as at the period ending. Operating expenditure: Includes all expenditure that will be debited to the income statement for financial statement purposes in accordance with prescribed financial statement formats, it exclude [operating expenditure related to the N2 Gateway development project. It excludes capital expenditure The mid-year calculations for expenditure are based on the actuals up to the current period plus the budget for the remaining period. 7.2.6 Revenue collected as a percentage of billed amount The calculation of a percentage of payments received on amounts billed. Section 97 Of the MFMA address the revenue management and a circular from National Treasury spells out the detail and the formula we need to use Audit report received from Auditor general containing no qualifications 7.2.7 Unqualified Audit from Auditor General 7.2.8 Number of functioning ward participatory structures 7.2.9 Community satisfaction measured in terms of the Likert scale City of Cape Town 95 Page See MFMA Section 97 Statutory Plans The following statutory plans are required to be attached as Annexures to the final compliance document or alternatively be completed by the end of June 2007 for implementation from 1 July 2007 as required in terms of the Corporate Scorecard: STATUTORY PLANS Disaster Management Plan 26 (g) – 5A2 (Dick Tshangela/Greg Pillay) Municipal Police Plan (5A1) (Dick Tshangela) Integrated Transport Plan. 3A3 Single Transport Authority Plan (Eddie Chinnapen/Maddie Mazasa) Water Services Development Plan (BV Msengana/Sipho Mosai) Environment/Sustainable development Plan (Cheryl Walters/Ossie Asmal) Municipal Entity Plans (Louise Muller) Process Plan (Martin van der Merwe) Annual Report (Themba Jack) HIV/AIDS/TB Plan for the City (Ivan Toms) District Health Plan (Ivan Toms) Environmental health plan (Air quality) (Ivan Toms) State of the City Report (Keith Smith) Land Reform Plan (Cheryl Walters) S6.1 Institutional delivery capacity (David Beretti/ Justine Quince) o Governance Framework and functioning (Council, Mayco, Sub-Councils, Portfolio Committees, Ward Participative Structures) o Institutional framework and organogram (Reg 2(1)(a) o Staffing analysis S 2.7 Anti-corruption strategy (Internal Audit) S2.4 MTIEF (Covering Sec 16-26 of MFMA, DORA, Sec 26(h) MSA, Reg 6 (i)). (Mike Richardson) o Inclusive of a 3 year budget projection (26 (h), o Must be based on development priorities and objectives (Reg 6) o Indicate financial resources for capital development projects and operational expenditure (Reg 2(3)b S 2.5 Revenue Management strategy Reg 2(3)(c) (Mike Richardson) o Debt collection strategy o Ways and means of increasing revenues o External funding initiatives S3.1 The City’s plausible long term sustainable development strategy (Mansoor Mohamed) o Development priorities and objectives City of Cape Town Requested from ED. Two page summary received. Full plan not received as yet (Also in Scorecard) New from Scorecard Requested from ED. New from Scorecard Requested from ED. Collection of information has been completed and provisional draft is being developed. Final draft will be available by the end of March and final plan by the end of April 07 Requested from ED. Process Plan approved by Council on 20 Aug 06 Annual report approved by Council on 31 Jan 07 Received Received Received This was completed and submitted to Portfolio Committees, subject to review. Requested from ED. Subject to a national govt linked process The governance structures of Council, Portfolio Committees and Sub-Councils have been finalised. Sub-Councils are being reviewed to incorporate an additional number of SubCouncils. Ward Participative Structures are still being finalised. The institutional top structure has been finalised and the process of re-alignment is currently being rolled out. Strategies to set this out has been developed. Requested from Acting CIA. The 1st draft of the MTIEF has already been compiled but is influenced by 2010 financial requirements and policy directives in terms of rate and tariff increase targets. Requested from ED. Requested from ED. Page 65 for the elected term 26 (c) Local economic development aims 26 (c) o Internal transformation needs 26 (c) o Long-term development drivers S3.2 Development strategies which are aligned with national or provincial sectoral plans 26 (d) o Local economic development strategy (Mansoor Mohamed) S2.3 Business Investment strategy of Council (Reg 2(1)(b) (Mansoor Mohamed) 7A.1 Comprehensive HR development strategy (David Beretti) S8.1 Institutional development, transformation and re-alignment plan for the City Of Cape Town (David Beretti/Justine Quince) S 8.2 Staff skills development plan (WPSP) (David Beretti/Justine Quince) S3.4 Skills development Plan for the City (Working with educational institutions aligned with Provincial Growth and Development Plan). (Mansoor Mohamed) 7A2 Quality Management Programme/ Plan (David Beretti) o 7A.4 Project Plan for Integrated Spatial Information System to link GIS, LIS and SAP (Mike Marsden & Osman Asmal) STAKEHOLDER INVOLVEMENT o Public participation process (Public involvement) 29 (b)(ii) o Public participation Framework (Brent Gerber/Anwar Isaacs) o Sub-councils (Brent Gerber/Sass) o Ward Structures(Brent Gerber/Ernest Sass) o Role of CDW’s(Brent Gerber/Anwar Isaacs) o Public needs analysis 29 (b)(i) o Organs of state and other role-players that was consulted 29 (b)(iii) o Communication strategy (Brent Gerber/Geoff Howard) 7C.2 Community satisfaction Survey (Osman Asmal) (Score measured in terms of the Likert scale) STRATEGIC PLANS S6.5 Risk Management Plan FIFA 2010 City’s Business Plan. 1B Preparations for hosting the FIFA 2010 World Cup in accordance with FIFA’s requirements and the City’s developmental objectives (Objective 1.11) (Mike Marsden/Dave Hugo) Stadium Operator Management Plan(Mike Marsden/Dave Hugo). 1.B.2 Lease agreement for long term operator to manage stadium Integrated Infrastructure Plan. 2C (BV Msengana) Effective management of City’s City of Cape Town Requested from ED. Requested from ED. New from Scorecard Requested from ED. Requested from ED. Requested from ED. New from Scorecard New from Scorecard Most of the information was received. New from Scorecard Requested from ED. New from Scorecard The business plan was approved by all stakeholders and funding resources committed to fund the implementation of the business plan New from Scorecard New from Scorecard Page 66 Infrastructure and Resources (Objectives 2.6 – 2.7) 2.C.1 Planned infrastructure maintenance plan (BV Msengana) iro Electricity, Sewerage, Water and Roads & Stormwater, Solid Waste disposal Integrated Human Settlement Development Plan 4A1 Improve and develop Integrated Human Settlements (Objectives 4.1 – 4.3) (Hans Smit) 4B.2 Informal Settlement Upgrade plan (Hans Smit) 7A5 Operations Integration Plan (Mike Marsden) S 6.6 Administrative Support Model (Strategy/Plan) (David Beretti/Justine Quince) Development of natural resources Water Savings Plan – (Sipho Mosai) Solid Waste Reduction Plan – (Barry Coetzee) Energy Savings Plan – (Les Rencontre) Regulatory Reform – Red Tape Review (S6.4 Improving the Regulatory Environment) (Brent Gerber – By-Laws) (Cheryl Walters – Approval of plans) S 8.3 Disabled and gender strategies (David Beretti/Joseph Williams) Sub-Council Plans (Brent Gerber/Ernest Sass) City of Cape Town New from Scorecard New from Scorecard New from Scorecard New from Scorecard New from Scorecard Requested from ED. Requested from ED. Requested from ED. Requested from ED. Requested from ED. Page 67